Bathtub cleaning device

The bathtub cleaning device automatically determines drainage completion using flow rate detection, eliminating the need for user intervention and ensuring timely cleaning operations.

JP7588040B2Active Publication Date: 2024-11-21RINNAI CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021115343
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-07-12
Publication Date
2024-11-21
Estimated Expiration
2041-07-12

AI Technical Summary

Technical Problem

Conventional bathtub cleaning devices require users to manually set and judge the drain waiting time based on the amount of water, which is time-consuming and burdensome.

Method used

A bathtub cleaning device that includes a flow rate detection unit to determine drainage completion by measuring the flow rate of hot water sprayed from a cleaning nozzle, automatically starting the cleaning operation when the bathtub is empty.

Benefits of technology

Eliminates the need for user intervention in setting drain times, ensuring the cleaning operation starts after the appropriate drainage time has elapsed, reducing user burden and ensuring efficient operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007588040000001
    Figure 0007588040000001
  • Figure 0007588040000002
    Figure 0007588040000002
  • Figure 0007588040000003
    Figure 0007588040000003
Patent Text Reader

Abstract

To provide a bathtub washing device that causes no excessive burden on a user and that, with a lapse of an appropriate drain time, enables bathtub washing operation to start.SOLUTION: A bathtub washing device 1 is equipped with a control device 3 for carrying out bathtub washing operation which washes by jetting hot water or wash water to a drain-completed bathtub 5 from a washing nozzle 6 provided in a bathtub bottom. The bathtub washing device 1 is also equipped with a flow rate detection part 26 that detects flow rate of the hot water jetted from the washing nozzle 6, and with a drain completion determination part 31 that determines drain completion in which drainage of the bathtub water in the bathtub 5 is completed. The drain completion determination part 31 determines drain completion on the basis of detection flow rate B of hot water detected by the flow rate detection part 26 by jetting hot water from the washing nozzle 6.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a bathtub cleaning device that sprays hot and cold water to clean a bathtub. [Background technology]

[0002] In the past, in a bathtub cleaning device, when starting the bathtub cleaning operation, an automatic drain valve is opened and a predetermined drainage wait time has elapsed before the bathtub cleaning operation begins in which hot and cold water is sprayed from the cleaning nozzle, and it has been proposed that the drainage wait time can be set by the user as desired (Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2003-250712 A Summary of the Invention [Problem to be solved by the invention]

[0004] In conventional bathtub cleaning devices, the drainage wait time is set by the user at their own discretion, but in order to set the optimal drainage wait time each time depending on the amount of bathtub water remaining in the bathtub, i.e., the drainage time required to complete drainage, the user must visually check the amount of bathtub water in the bathtub and determine and set the drainage time each time the bathtub cleaning operation is performed, which is a time-consuming task and a heavy burden for the user.

[0005] The present invention has been made in consideration of the above-mentioned circumstances, and aims to provide a bathtub cleaning device that does not impose an excessive burden on the user and that enables the bathtub cleaning operation to be started after an appropriate drainage time has elapsed. [Means for solving the problem]

[0006] The bathtub cleaning device according to the present invention is A bathtub cleaning device equipped with a control device that executes a bathtub cleaning operation in which hot water or cleaning water is sprayed from a cleaning nozzle provided on the bottom of the bathtub to clean the bathtub after drainage is completed, A flow rate detection unit that detects the flow rate of hot water sprayed from the cleaning nozzle; a drainage completion determination unit that determines when drainage of bath water stored in the bathtub is completed, The drainage completion determination section determines the completion of drainage based on the detected flow rate of hot and cold water detected by the flow rate detection section when hot and cold water is sprayed from the cleaning nozzle before the bathtub cleaning operation starts.

[0007] If there is bath water in the bathtub, when hot and cold water is sprayed from the cleaning nozzle installed on the bottom of the bathtub, the bath water in the bathtub acts as resistance to the hot and cold water sprayed from the cleaning nozzle, so the flow rate of hot and cold water sprayed from the cleaning nozzle differs depending on whether there is bath water in the bathtub or whether it has been drained and there is no bath water left. In other words, the flow rate of hot and cold water sprayed from the cleaning nozzle is smaller when there is bath water in the bathtub and larger when there is no bath water in the bathtub.

[0008] According to the above configuration, if the detected flow rate of hot and cold water sprayed from the cleaning nozzle is equal to or greater than a predetermined threshold before the bathtub cleaning operation starts, the drainage completion determination unit can assume that there is no bathtub water in the bathtub and can determine that the bathtub water has been drained. Therefore, when the drainage completion determination unit determines that the bathtub water has been drained, the bathtub cleaning operation can be started automatically, so that the user does not need to determine the drainage time required for draining. This does not impose a burden on the user, and the bathtub cleaning operation can be started after an appropriate drainage time has elapsed.

[0009] The bathtub cleaning device may be configured as follows: A storage unit is provided for storing the flow rate of hot and cold water detected by the flow rate detection unit, The drainage completion determination unit can be configured to first spray hot water from the cleaning nozzle for a first spray time before the bathtub cleaning operation begins, and store the flow rate of hot water detected by the flow detection unit in the memory unit as an initial flow rate, and thereafter, after each predetermined spray waiting time has elapsed, spray hot water from the cleaning nozzle for a second spray time, and determine the completion of drainage based on the detected flow rate of hot water detected by the flow detection unit and the initial flow rate stored in the memory unit.

[0010] According to the above configuration, the initial flow rate stored in the memory unit is the flow rate of hot and cold water when hot and cold water is sprayed from the cleaning nozzle when there is bath water in the bathtub. Therefore, after the initial flow rate is stored, hot and cold water is sprayed from the cleaning nozzle every time a predetermined spray standby time has elapsed, and the detected flow rate at that time is compared with the initial flow rate, making it possible to distinguish between a state in which there is bath water in the bathtub and a state in which the bath water has been drained and no longer exists, and to determine whether draining is complete. For example, when the difference between the detected flow rate and the initial flow rate exceeds a predetermined threshold value, or when the detected flow rate exceeds a flow rate increased by a predetermined percentage from the initial flow rate, it is determined that there is no bath water in the bathtub and draining is complete. Therefore, the bathtub cleaning operation can be started after an appropriate draining time has elapsed, without imposing a burden on the user.

[0011] In the bathtub cleaning device of the above embodiment, The drainage completion determination unit may determine that drainage is completed when the detected flow rate is equal to or greater than a predetermined determination flow rate calculated based on the initial flow rate. Here, the determination flow rate includes, for example, a flow rate value obtained by adding a constant flow rate to the initial flow rate, or a flow rate value obtained by increasing the initial flow rate by a predetermined percentage.

[0012] With the above configuration, when the detected flow rate is equal to or greater than the judgment flow rate, it can be assumed that all of the bath water in the bathtub has been drained, eliminating resistance when sprayed from the cleaning nozzle, and as a result, the detected flow rate has become equal to or greater than the judgment flow rate, making it possible to properly determine whether drainage is complete.

[0013] In each of the above-mentioned bathtub cleaning devices, If the bathtub is equipped with an automatic drain valve that opens and closes the drain automatically, The drainage completion determination unit can be configured to perform the operation of detecting the initial flow rate when the automatic drain plug is in a closed state, and thereafter perform the operation of detecting the detected flow rate with the automatic drain plug in an open state.

[0014] According to the above configuration, since the initial flow rate detection operation is performed when the automatic drain valve is in the closed state, the initial flow rate can be detected when there is a high possibility that bath water will remain in the bathtub. Therefore, by comparing this initial flow rate with the flow rate detected when the automatic drain valve is in the open state, it is possible to more accurately determine whether draining is complete.

[0015] In each of the bathtub cleaning devices, The drainage completion determination unit may determine that drainage is completed when a predetermined maximum drainage time has elapsed without determining drainage completion based on a change in the detected flow rate.

[0016] For example, if the drain completion determination operation is started when there is no bath water remaining in the bathtub, the detected flow rate of hot and cold water sprayed from the cleaning nozzle does not change no matter how much time passes, so if the drain completion determination is made based on changes in the detected flow rate, no drain completion determination will be made. In other words, when there is no bath water in the bathtub, for example, if the bathtub is configured without an automatic drain plug, the detected flow rate does not change no matter how much time passes from when the drain completion determination operation begins, and if the bathtub is configured with an automatic drain plug, the detected flow rate does not change no matter how much time passes from when the automatic drain plug is opened, so that no drain completion determination will be made based on changes in the detected flow rate.

[0017] According to the above configuration, when the maximum drain time has elapsed without any drain completion determination based on a change in the detected flow rate, the drain completion is determined to be complete, so that the drain completion can be determined without imposing a burden on the user. Therefore, the bathtub cleaning operation can be started without imposing a burden on the user. The maximum drain time can be, for example, the drain time required for the bathtub to go from full or nearly full to empty after the drain plug is opened. [Brief description of the drawings]

[0018] [Figure 1] 1 is a schematic diagram showing an overall configuration of a bathtub cleaning device according to embodiment 1. FIG. [Diagram 2] 11 is a flowchart for explaining the steps of a bathtub cleaning operation. [Diagram 3] 4 is a flowchart showing a control operation of a drainage completion determination process in the bathtub cleaning device according to the first embodiment. [Figure 4] 10 is a flowchart showing a control operation of a drainage completion determination process in the bathtub cleaning device according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. (Embodiment 1) As shown in Fig. 1, the bathtub cleaning device 1 of the first embodiment mainly comprises a cleaning unit 2 and a control device 3. A cleaning remote control 4 that remotely controls the bathtub cleaning device 1 is connected to the bathtub cleaning device 1. A heat source such as a water heater or a storage type water heater (not shown) is connected to the bathtub cleaning device 1 as a hot water supply source, but it may also be configured to be directly connected to a water supply source such as a water mains.

[0020] The open top portion of bathtub 5 is closed by the user placing bathtub lid 51 on bathtub 5 during bathtub cleaning operation. The bottom wall of bathtub 5 is provided with cleaning nozzle 6 that sprays hot water or cleaning water, and automatic drain plug 7 that opens and closes automatically to store or drain the bath water in bathtub 5. An opening and closing drive unit 71 for automatic drain plug 7 and detergent tank 8 are installed on the upper flange wall of bathtub 5. Note that bathtub 5 may be provided with a manually openable drain plug instead of the automatic drain plug 7.

[0021] The cleaning unit 2 is attached inside the apron on the side of the bathtub 5, and a hot water supply pipe 21 and a detergent pipe 22 are arranged inside the main body case.

[0022] Hot water supply pipe 21 has a water inlet at the upstream end connected to hot water supply inlet pipe 9 drawn from the heat source device, and a cleaning pipe 23 communicating with cleaning nozzle 6 connected to a water outlet at the downstream end. Hot water supply pipe 21 is provided with a cleaning valve 27, and when cleaning valve 27 is opened, hot water introduced from hot water supply inlet pipe 9 is sprayed from cleaning nozzle 6 into bathtub 5. Hot water supply pipe 21 is also provided with a flow rate detector 26 between the water inlet connecting hot water supply inlet pipe 9 and cleaning valve 27, and this flow rate detector 26 detects the flow rate of hot water flowing through hot water supply pipe 21 and sprayed from cleaning nozzle 6 when cleaning valve 27 is opened. As flow rate detector 26, a flow rate sensor or the like having a built-in impeller and detecting the flow rate in real time based on the flow velocity of the fluid flowing through the pipe can be used.

[0023] The detergent pipe 22 has an upstream end connected to a detergent pipe 24 drawn from the detergent tank 8, and a downstream end connected to the hot water supply pipe 21. A venturi 25 is provided at the junction of the detergent pipe 22 and the hot water supply pipe 21. The detergent pipe 22 is provided with a detergent valve 28, and by opening the detergent valve 28, the undiluted detergent solution in the detergent tank 8 is mixed with the hot water in the hot water supply pipe 21 to become cleaning water, which is sprayed from the cleaning nozzle 6 into the bathtub 5. Note that the cleaning unit 2 in the first embodiment is of a direct pressure type configuration in which the pressure of the hot water supplied from the hot water supply source is used to spray the hot water or cleaning water from the cleaning nozzle 6 into the bathtub 5, but it may also be of a pump type configuration in which the hot water supplied from the hot water supply source is stored in a storage tank such as a cistern, and the hot water in the storage tank is pumped out by a pump to spray the hot water or cleaning water from the cleaning nozzle 6 into the bathtub 5.

[0024] The control device 3 is composed of a control circuit for controlling the operation of the bathtub cleaning device 1, and is connected to each part, such as the cleaning unit 2, the opening / closing drive part 71 of the automatic drain plug 7, and the cleaning remote control 4, so that they can communicate with each other via a communication line or wirelessly. In this embodiment 1, the main parts of the control device 3 include a drainage completion determination part 31 and a memory part 32. The drainage completion determination part 31 is a component that determines the completion of drainage, that is, when the drainage of the bath water stored in the bathtub 5 before the bathtub cleaning operation is started is completed. The memory part 32 is a component that stores the flow rate of hot and cold water detected by the flow rate detection part 26 when determining the completion of drainage, and also stores various set values ​​such as threshold values ​​used for the drainage completion determination, set time, etc. The control device 3 also has a timer part that measures time, a calculation part that calculates various values, etc.

[0025] Next, the steps of the bathtub cleaning operation by the bathtub cleaning device 1 will be described. As shown in FIG. 2, the bathtub cleaning operation involves the pre-cleaning process, the cleaning process, and the rinsing process, in that order, but before the bathtub cleaning operation begins, a drainage process is performed.

[0026] When the user turns on the cleaning switch of the cleaning remote control 4, the draining process is first executed (step SI), and the automatic drain plug 7 of the bathtub 5 is opened to drain the bathtub water stored in the bathtub 5. When draining is completed, the bathtub cleaning operation is automatically started. In the bathtub cleaning device 1 of this embodiment 1, a process is performed in the draining process to automatically determine when draining of the bathtub water is completed, and the control operation for this draining completion determination will be described later.

[0027] After the drainage step is completed, a preliminary cleaning step (step S-II) is performed in which cleaning valve 27 is opened to introduce hot water from the hot water supply source and spray the hot water from cleaning nozzle 6 onto the inner wall of bathtub 5 through hot water supply pipe 21 and cleaning pipe 23. After spraying the hot water from cleaning nozzle 6 for a predetermined preliminary cleaning time, cleaning valve 27 is closed to stop spraying the hot water from cleaning nozzle 6 and complete the preliminary cleaning step.

[0028] After the preliminary washing step is completed, washing valve 27 and detergent valve 28 are opened to perform a washing step (step S-III) in which washing water, which is obtained by mixing hot water in hot water supply pipe 21 with undiluted detergent in detergent tank 8, is sprayed from washing nozzle 6 through washing pipe 23 onto the inner wall of bathtub 5. After washing water is sprayed from washing nozzle 6 for a predetermined washing time, washing valve 27 and detergent valve 28 are closed to stop spraying of washing water and complete the washing step. Note that the washing step may be performed multiple times, with one cycle consisting of a spraying operation of spraying washing water and a standby operation of waiting for a predetermined time to elapse after spraying has stopped.

[0029] After the cleaning process is completed, a rinsing process (step S-IV) is performed in which cleaning valve 27 is opened to introduce hot water from the hot water supply source and spray the hot water from cleaning nozzle 6 onto the inner wall of bathtub 5 through hot water supply pipe 21 and cleaning pipe 23. After spraying the hot water from cleaning nozzle 6 for a predetermined rinsing time, cleaning valve 27 is closed to stop spraying the hot water from cleaning nozzle 6 and complete the rinsing process. Completion of the rinsing process ends the bathtub cleaning operation.

[0030] Next, a control operation for determining whether or not the drainage process is completed will be described. The process for determining whether or not the drainage process is completed is executed by the control device 3. As shown in Figure 3, when the drainage process begins, in step S1, the control device 3 controls the automatic drain plug 7 to close so that the automatic drain plug 7 is in a closed state, and then in step S2, controls the flush valve 27 to open so that hot and cold water is sprayed from the flush nozzle 6, and in step S3, the flow rate of the hot and cold water when the hot and cold water is sprayed from the flush nozzle 6 for a first spray time Ta (e.g., 2 seconds) is detected by the flow detection unit 26, and the flow rate of the hot and cold water detected by the flow detection unit 26 at this time is stored in the memory unit 32 as an initial flow rate A.

[0031] The reason why the automatic drain plug 7 is closed in step S1 is that even if the user opens the automatic drain plug 7 when operating the flush switch on the flush remote control 4, there will still be bath water remaining in the bathtub 5 just before the start of the drainage process, so by closing the automatic drain plug 7 at the start of the drainage process, in step S2, it is possible to more reliably spray hot and cold water from the washing nozzle 6 with bath water still present in the bathtub 5. Therefore, in step S3, it is possible to reliably detect the initial flow rate A, which is the flow rate of hot and cold water when hot and cold water is sprayed from the washing nozzle 6 with bath water still present in the bathtub 5.

[0032] When the first spray time Ta has elapsed, in step S4, the control device 3 controls the flushing valve 27 to close to stop the spray of hot and cold water from the flushing nozzle 6, and in step S5, controls the automatic drain plug 7 to open to open the automatic drain plug 7 and begin draining the bath water accumulated in the bathtub 5.

[0033] Next, in step S6, when a predetermined spray waiting time Tw (e.g., 10 seconds) has elapsed since the automatic drain plug 7 was opened, the control device 3 controls the flush valve 27 to open in step S7 to spray hot water from the flush nozzle 6, and in step S8, the flow rate of hot water when the hot water is sprayed from the flush nozzle 6 for a second spray time Tb (e.g., 2 seconds) is detected by the flow detection unit 26, and the flow rate of hot water detected by the flow detection unit 26 at this time is designated as the detected flow rate B.

[0034] When the second injection time Tb has elapsed, in step 9, drainage completion determination unit 31 determines whether drainage of the bath water stored in bathtub 5 has been completed. This drainage completion determination is made based on the detected flow rate B of hot and cold water detected in step S8 and the initial flow rate A stored in memory unit 32 in step S3. In this embodiment 1, the method for determining whether drainage has been completed is to determine that drainage is complete when the difference between the detected flow rate B and the initial flow rate A exceeds a set threshold (detected flow rate B - initial flow rate A > set threshold).

[0035] The completion of draining is determined based on the detected flow rate B and the initial flow rate A for the following reasons. When there is bath water in the bathtub 5, the bath water in the bathtub 5 acts as a resistance to the water sprayed from the cleaning nozzle 6 provided on the bottom of the bathtub 5. This causes a difference in the flow rate of the water sprayed from the cleaning nozzle 6 between when there is bath water in the bathtub 5 and when there is no bath water after the bathtub 5 has been drained. That is, the flow rate of the water sprayed from the cleaning nozzle 6 is smaller when there is bath water in the bathtub 5, and is larger when there is no bath water in the bathtub 5. The initial flow rate A stored in step S3 is the flow rate of the water sprayed from the cleaning nozzle 6 when there is bath water in the bathtub 5. The detected flow rate B detected in step S8 is the flow rate of the water sprayed from the cleaning nozzle 6 when the bath water in the bathtub 5 is being drained by the automatic drain plug 7 being opened, or when there is no bath water in the bathtub 5 after the bathtub water has been drained. Therefore, by comparing the detected flow rate B with the initial flow rate A, it is possible to determine whether there is bath water in the bathtub 5 or whether the bath water has been drained and there is no bath water in the bathtub 5, making it possible to determine whether draining is complete.

[0036] The method of judging the completion of drainage is not limited to the above judgment method, and various judgment methods can be adopted in which the completion of drainage is recognized when the detected flow rate B is greater than the initial flow rate A by a predetermined flow rate or more. For example, the completion of drainage may be judged when the detected flow rate B is equal to or greater than a predetermined judgment flow rate calculated based on the initial flow rate A (detected flow rate B≧judgment flow rate). In this case, the judgment flow rate may be a flow rate value greater than the initial flow rate A, such as a flow rate value obtained by adding a predetermined threshold to the initial flow rate A (judgment flow rate=initial flow rate A+threshold), or a flow rate value obtained by increasing the initial flow rate A by a predetermined ratio (for example, 1.1 to 1.2 times) (judgment flow rate=initial flow rate A×predetermined ratio). According to this, when the detected flow rate B is equal to or greater than the judgment flow rate, it can be assumed that all the bath water in the bathtub 5 has been drained, so that there is no resistance when hot and cold water is sprayed from the cleaning nozzle 6, and as a result, the detected flow rate B is equal to or greater than the judgment flow rate, making it possible to appropriately judge the completion of drainage.

[0037] In addition, by detecting the initial flow rate A when the drainage process begins (step S3), even if the water supply flow rate of hot water supplied from the hot water supply source to the bathtub cleaning device 1 varies depending on the installation site environment (area, floor of apartment building, hot water usage, etc.) where the bathtub cleaning device 1 is installed, an appropriate standard initial flow rate A can be obtained according to the site environment.

[0038] In step S9, if the difference between the detected flow rate B and the initial flow rate A does not exceed the set threshold, the drain completion determination unit 31 determines that there is bath water in the bathtub 5 (still draining), and moves the process to step S10. In step S10, the control device 3 controls the flush valve 27 to close, stops the spraying of hot and cold water from the cleaning nozzle 6, and returns the process to step S6. In this case, in step S6, the spray waiting time Tw (e.g., 10 seconds) after the flush valve 27 is closed in step S10 is timed, and the drain confirmation process (steps S6 to S10) is repeated until the completion of draining is determined in step S9. That is, after the automatic drain plug 7 is opened in step S5, the flush valve 27 is opened and hot and cold water is sprayed from the cleaning nozzle 6 for the second spray time Tb every time the spray waiting time Tw has elapsed, the detected flow rate B is obtained, and the drain completion determination is performed. The second injection time Tb (step S8) for detecting the detection flow rate B and the first injection time Ta (step S3) for detecting the initial flow rate A may be set to the same time or different times. For example, the second injection time Tb may be set to a shorter time in order to perform step S9 for determining the completion of drainage as soon as possible.

[0039] On the other hand, in step S9, if the difference between the detected flow rate B and the initial flow rate A exceeds the set threshold, the drainage completion determination unit 31 determines that drainage is complete. In this case, in step S11, the control device 3 controls the flush valve 27 to close, stopping the spray of hot and cold water from the flush nozzle 6, and completing the drainage process. Upon completion of the drainage process, the control device 3 starts a bathtub cleaning operation, and the preliminary cleaning process, cleaning process, and rinsing process are executed in sequence.

[0040] As described above, according to the bathtub cleaning device 1 of the first embodiment, the drainage completion determination unit 31 can automatically determine the completion of drainage of bathtub water, and when it is determined that drainage is complete, the bathtub cleaning operation can be started automatically, so the user does not need to determine the drainage time required to drain the bathtub water when starting the bathtub cleaning operation. This does not impose a burden on the user, and the bathtub cleaning operation can be started after an appropriate drainage time has elapsed.

[0041] In addition, in embodiment 1, if the configuration does not have an automatic drain plug 7, in the control operation for determining completion of drainage shown in Figure 3, the drainage process is started by the user opening the drain plug, and the processing of steps S1 and S5 is not performed.

[0042] (Embodiment 2) Bathtub cleaning device 1 of embodiment 2 has a control configuration in which control device 3 determines that drainage is complete when a predetermined maximum drainage time Tx has elapsed without a drainage completion determination based on a change in detected flow rate B as the drainage completion determination based on detected flow rate B. In other words, drainage is determined to be complete when the elapsed time from starting the drainage process and opening automatic drain plug 7 has elapsed the predetermined maximum drainage time Tx. Maximum drainage time Tx can be, for example, the drainage time required for bathtub 5 to go from a full or nearly full state to an empty state by opening automatic drain plug 7.

[0043] Next, the control operation for determining completion of drainage in the draining process in the bathtub cleaning device 1 of the second embodiment will be described in comparison with the first embodiment. As shown in Fig. 4, when the drainage process starts, similarly to the first embodiment (steps S1 to S5 in Fig. 3), the automatic drain plug 7 is closed and hot and cold water is sprayed from the washing nozzle 6 for the first spray time Ta, the flow rate of hot and cold water detected at this time is stored in the memory unit 32 as the initial flow rate A, and then the automatic drain plug 7 is opened (steps S21 to S25). At this time, in the second embodiment, when the automatic drain plug 7 is controlled to the open state, a timer starts counting the elapsed time in step S-1.

[0044] Next, as in the case of embodiment 1 (steps S6 to S9 in Figure 3), hot water is sprayed from the cleaning nozzle 6 for a second spray time Tb every time a predetermined spray wait time Tw has elapsed, and the flow rate of the hot water detected at this time is set as the detected flow rate B. The completion of drainage is determined based on this detected flow rate B and the initial flow rate A stored in the memory unit 32 (steps S26 to S29).

[0045] If the drainage completion judgment in step S29 judges that drainage is complete, the flush valve 27 is closed (step S31) to complete the drainage process, but if the drainage completion judgment in step S29 judges that drainage is not yet complete, in embodiment 2, in step S-2, it is judged whether the elapsed time measured by the timer has passed a predetermined maximum drainage time Tx. If it is judged in this step S-2 that the elapsed time of the timer has not passed the maximum drainage time Tx, similarly to the case of embodiment 1 (step S10 in FIG. 3), the process proceeds to step S30, the flush valve 27 is closed, and the spraying of hot and cold water from the flush nozzle 6 is stopped, and the drainage confirmation process (steps S26 to S29 → step S-2 → step S30) is repeated until the drainage completion is judged.

[0046] On the other hand, if it is determined in step S-2 that the elapsed time of the timer has exceeded the maximum drain time Tx, drain completion determination unit 31 determines that drainage is complete. In this case, control device 3 closes flush valve 27 (step S31) to complete the drainage process and start the bathtub cleaning operation.

[0047] For example, if the drain completion determination operation is started when there is no bath water remaining in the bathtub 5, the flow rate of hot and cold water sprayed from the cleaning nozzle 6 does not change no matter how much time passes from the beginning, so there is no drain completion determination based on the change in the detected flow rate B compared to the initial flow rate A. In this regard, according to the bathtub cleaning device 1 of embodiment 2, as the drain completion determination based on the detected flow rate B, if the maximum drain time Tx has elapsed without the drain completion determination based on the change in the detected flow rate B, it is determined that drainage is complete, so that the drain completion can be determined without imposing a burden on the user. Therefore, the bathtub cleaning operation can be started without imposing a burden on the user.

[0048] In the second embodiment, in the case of a configuration that does not have the automatic drain plug 7, in the control operation for determining completion of drainage shown in Fig. 4, the drainage process is started by the user opening the drain plug, and the processing of steps S21 and S25 is not performed. Also, in the case of a configuration that does not have the automatic drain plug 7, the timer starts counting the elapsed time (step S-1) at the start of the operation for determining completion of drainage (for example, the point at which the command to open the flush valve 27 is issued in step S22) or the start of the drainage process. Other than what has been described above, the configuration and effects of the second embodiment are the same as those of the first embodiment.

[0049] (Other embodiments) In the first and second embodiments, when determining whether drainage is complete, an initial flow rate A is detected and the completion of drainage is determined based on this initial flow rate A and the detected flow rate B after the drain plug (automatic drain plug 7 or manual drain plug) is opened. However, in other embodiments, the completion of drainage is determined based on the detected flow rate B without detecting the initial flow rate A.

[0050] In this other embodiment, when the drain plug opens due to the start of the drain process, the drain completion determination unit 31 periodically (for example, at fixed intervals of 10 to 30 seconds) sprays hot water from the washing nozzle 6 for a predetermined spray time (for example, 2 seconds), and if the detected flow rate B of hot water detected by the flow rate detection unit 26 at this time is equal to or greater than a predetermined threshold, it determines that the bath water has been drained and drainage is complete. The threshold is set in advance to a flow rate value equal to or greater than the flow rate of hot water when hot water is sprayed from the washing nozzle 6 when there is bath water in the bathtub 5, and may be set to the flow rate of hot water when hot water is sprayed from the washing nozzle 6 when the bathtub 5 is almost full. As a result, if the detected flow rate B is equal to or greater than the threshold, it can be assumed that there is no bath water in the bathtub 5, and it can be determined that all the bath water in the bathtub 5 has been drained and drainage is complete. Furthermore, by setting the threshold in advance, it can be immediately determined that drainage is complete even if there is no bath water in the bathtub 5 when the drainage process starts.

[0051] In addition, in the case of other embodiments, when determining the threshold value, it is necessary to consider whether the cleaning unit 2 is of the direct pressure type or the pump pressure type. That is, since the water pressure differs depending on the site environment (such as the area or the floor of the apartment building) where the bathtub cleaning device 1 is installed, when the cleaning unit 2 is of the direct pressure type, the flow rate of hot water sprayed from the cleaning nozzle 6 varies depending on the supply pressure at the hot water supply source. Therefore, when the cleaning unit 2 is of the direct pressure type, the predetermined threshold value may be set based on the actual measurement value of the flow rate of hot water when hot water is sprayed from the cleaning nozzle 6 with bath water stored in the bathtub 5 (for example, full water state) during a trial run such as when the bathtub cleaning device 1 is installed on site. When the cleaning unit 2 is of the pump pressure type, the pump pressure for pumping the hot water is constant, so the flow rate of hot water sprayed from the cleaning nozzle 6 is constant. Therefore, the predetermined threshold value can be determined by calculating or measuring the flow rate of hot water when hot water is sprayed from the cleaning nozzle 6 with bath water in the bathtub 5 (for example, full water state) based on the pump pressure set in the cleaning unit 2, and can be set in advance at the time of shipping the bathtub cleaning device 1 from the factory.

[0052] The present invention is not limited to the above-described embodiment, and various modifications can be made within the scope of the claims. [Explanation of symbols]

[0053] 1 Bathtub cleaning device 2 Cleaning unit 3. Control device 4 Cleaning remote control 5. Bathtub 6 Cleaning nozzle 7 Automatic drain valve 8 Detergent tank 9 Hot water supply pipe 21 Hot water piping 22 Detergent piping 23 Cleaning pipe 24 Detergent Tube 25 Venturi 26 Flow rate detector 27 Cleaning valve 28 Detergent valve 31 Drainage completion determination section 32 Storage section 51 Bathtub cover 71 Opening and closing drive unit A Initial flow rate B Detected flow rate Ta First injection time Tb Second injection time Tw Injection standby time Tx maximum drain time

Claims

1. A bathtub cleaning device equipped with a control device that executes a bathtub cleaning operation in which hot water or cleaning water is sprayed from a cleaning nozzle provided on the bottom of the bathtub to clean the bathtub after drainage is completed, A flow rate detection unit that detects the flow rate of hot water sprayed from the cleaning nozzle; a drainage completion determination unit that determines when drainage of bath water stored in the bathtub is completed, The drainage completion determination unit is a bathtub cleaning device that determines the completion of drainage based on the detected flow rate of hot and cold water detected by the flow rate detection unit when hot and cold water is sprayed from the cleaning nozzle before the bathtub cleaning operation begins.

2. The bathtub cleaning device according to claim 1, A storage unit is provided for storing the flow rate of hot and cold water detected by the flow rate detection unit, The drainage completion determination unit of this bathtub cleaning device first sprays hot water from the cleaning nozzle for a first spray time before the start of the bathtub cleaning operation, and stores the flow rate of the hot water detected by the flow rate detection unit in the memory unit as an initial flow rate, and then sprays hot water from the cleaning nozzle for a second spray time each time a predetermined spray waiting time has elapsed, and determines the completion of drainage based on the detected flow rate of the hot water detected by the flow rate detection unit and the initial flow rate stored in the memory unit.

3. The bathtub cleaning device according to claim 2, The drainage completion determination unit determines that drainage is complete when the detected flow rate is equal to or greater than a predetermined determination flow rate calculated based on the initial flow rate.

4. The bathtub cleaning device according to claim 2 or 3, Equipped with an automatic drain plug that automatically opens and closes the bathtub drain plug, The bathtub cleaning device is configured so that the drain completion determination unit performs the operation of detecting the initial flow rate when the automatic drain plug is in a closed state, and thereafter performs the operation of detecting the detected flow rate by opening the automatic drain plug.

5. The bathtub cleaning device according to any one of claims 1 to 4, The drainage completion determination unit determines that drainage is complete when a predetermined maximum drainage time has elapsed without determining that drainage is complete based on a change in the detected flow rate.

Citation Information

Patent Citations

  • Whirlpool unit

    JP1995100174A

  • Bathtub cleaning device

    JP1999206603A

  • Bathtub-washing apparatus

    JP2003250712A

  • Bathtub automatic cleaning device

    JP2009162460A

  • Hot water supply device

    JP2014152980A