Water exchange storage facility construction method and storage facility
The method constructs a water-stop enclosure and terraces within a pit to maximize storage space, addressing space and cost inefficiencies in conventional methods, achieving efficient and cost-effective storage expansion.
Patent Information
- Application Number
- JP2024529496
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-10-21
- Filing Date
- 2023-09-01
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2043-09-01
AI Technical Summary
Conventional storage facility construction methods result in reduced enclosure space due to submerged fill materials, consuming the designed shell structure and converting water environments into anhydrous ground environments, leading to inefficiencies and increased costs.
A method involving constructing a water-stop enclosure, forming a drainage channel, and creating terraces within a pit to build a stacking yard, using cylindrical steel plates and riprap mounds for reinforcement, and arranging warehouses on terraces to maximize storage space without land-filling.
Expands storage capacity, reduces construction time and costs by utilizing a water-stop enclosure to convert water space into usable storage space, enhancing stability and efficiency.
Smart Images

Figure 0007588276000001_ABST
Abstract
Description
[Technical field]
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS This application claims priority to Chinese Application No. 202211293054.2, filed on October 21, 2022, and entitled "Water replacement type storage field construction method and application thereof," the entire contents of which are incorporated herein by reference.
[0002] The present application is in the field of water transportation technology, and in particular relates to a method for constructing a water replacement type storage field and the storage field obtained by said construction method. [Background technology]
[0003] Storage yards are one of the main infrastructures for bulk cargo storage in water transport technology. Since storage yards need to be located close to wharves, the traditional construction method is often to first build an enclosure around a part of the water body, then turn the enclosed water body into land by hydraulic fill or land reclamation, and then build the storage yards on top of it.
[0004] Conventional methods of constructing storage sites have the following problems: In enclosed areas, the underwater fill material (e.g., sand and gravel) occupies much of the enclosure space, consuming the bulk of the designed hull, which is reduced by the fill hull. During the fill process, the fill material functions primarily to transform the water environment into a dry ground environment, facilitating the storage of materials. Summary of the Invention [Problem to be solved by the invention]
[0005] To solve some of the problems in the prior art, the present application provides a method for constructing a water exchange reservoir, and the reservoir. [Means for solving the problem]
[0006] A first aspect of the present application provides a method for constructing a water exchange storage facility, the method comprising the steps of: constructing a water-stop enclosure, the enclosure being capable of stopping water; A step of constructing a drainage channel after enclosing the watertight enclosure, in which after enclosing the watertight enclosure, the water within the enclosed area of the watertight enclosure is drained to expose the pit and form a dry construction state; constructing a stacking yard in the pit under dry construction conditions, including constructing a lower low terrace and an upper high terrace, the low terrace being lower than the average water level outside the watertight enclosure, the high terrace being usable for moving a stacking-reclaiming device, the stacking-reclaiming device being capable of transporting material to and from the warehouse; and constructing a warehouse on the low rise terrace.
[0007] In some embodiments of the present application, the step of constructing the watertight enclosure further includes the steps of first inserting a plurality of cylindrical steel plates into the soft ground foundation using a vibrating hammer set, then inserting two auxiliary steel plates into the soft ground foundation between every two adjacent cylindrical steel plates along the mortise grooves on the outer walls of the cylindrical steel plates using the vibrating hammer set to seal the gaps between adjacent cylindrical steel plates, and backfilling the internal cavity formed between the inside of the cylindrical steel plates and the two auxiliary steel plates to form the watertight enclosure.
[0008] In some embodiments of the present application, the step of constructing a drainage channel after fencing further includes the steps of leveling the pit after forming a dry construction state, usually without filling the pit to create height, and further constructing a stacking yard in the leveled pit.
[0009] In some embodiments of the present application, the method of constructing a water exchange storage field further includes constructing riprap mounds on the inside and outside of the cutoff wall, respectively, so that the riprap mounds form a generally right-angled trapezoid shape with the cutoff wall on the inside and outside, and further, the upper surface of the riprap mounds is generally flush with the upper surface of the cutoff wall. An upwardly extending wave wall can be constructed on top of the cutoff wall or on top of the outer riprap mound.
[0010] In some embodiments of the present application, in the step of constructing the stacking yard, the low-rise terrace is 3 m to 20 m lower than the average water level outside the watertight enclosure.
[0011] In some embodiments of the present application, in the step of constructing a stacking yard, the average depth from the pit to the top of the watertight enclosure is L1, the depth from the surface of the low-rise terrace to the top of the watertight enclosure is L2, and further, L2 / L1 ≧ 50%.
[0012] In some embodiments of the present application, in the step of constructing the stacking yard, a permeable cushion, a water-impermeable cushion, a waterproof layer, and a base plate layer are formed in the drained pit in order from the bottom to form a low-rise terrace. More specifically, the permeable cushion is formed by laying a permeable material in the pit, the water-impermeable cushion is formed by pouring cement or concrete on the permeable cushion, the waterproof layer is formed by coating a waterproof material on the water-impermeable cushion or laying a physical waterproof layer, and the base plate layer is formed by pouring cement or concrete.
[0013] In some embodiments of the present application, the base plate layer further comprises spaced apart ground beams, the ground beams being plate structures and extending below the pits.
[0014] In some embodiments of the present application, in the step of constructing a warehouse, a storage warehouse and a ballast warehouse are arranged on a low-rise terrace, the ballast warehouse is distributed around the storage warehouse, the storage warehouse can be used for storing materials, and the ballast warehouse can be used for filling ballast.
[0015] In some embodiments of the present application, the storage sheds and ballast sheds are elongated and spaced apart, adjacent storage sheds and ballast sheds share the same long side wall, the short side walls of multiple parallel storage sheds and multiple ballast sheds form a common side wall, and the width of the storage sheds is wider than the width of the ballast shed.
[0016] In some embodiments of the present application, in the step of constructing the stacking yard, a high-rise terrace is constructed above the warehouse. More specifically, a main road of the high-rise terrace is constructed in a direction substantially perpendicular to the length direction of the elongated warehouse, and a branch road of the high-rise terrace is formed above the ballast warehouse connecting with the main road, and the main road and the branch road allow the stacking / removal device to move thereon.
[0017] In some embodiments of the present application, a support plate used to support the main road is arranged in the warehouse corresponding to the main road, and a steel plate or a reinforced concrete plate is arranged vertically on the support plate, and the long side wall of the ballast warehouse is manufactured with a reinforced concrete or steel structure and has a height substantially equal to the height of the main road of the high-rise terrace to form a branch road on the ballast warehouse, and the long side wall of the ballast warehouse is used as a moving track for the stacking / removal device.
[0018] In some embodiments of the present application, the upper portions of two long side walls of the same ballast storehouse are provided with connecting beams for connecting the two long side walls.
[0019] A second aspect of the present application provides an application of a water exchange storage construction method in constructing a storage field in a port, which may adopt the construction method described in any one of the above embodiments.
[0020] A third aspect of the present application provides a water exchange storage facility, which can be constructed by the construction method described in any one of the above embodiments.
[0021] The water exchange storage area includes a water enclosure and a stacking yard, the stacking yard is constructed within the interior space surrounded by the water enclosure and is located on a drained pit formed inside the water enclosure. The stacking yard includes a lower low terrace and an upper high terrace, the low terrace is lower than the average water level outside the water enclosure, a warehouse is constructed on the low terrace, and the high terrace can be used for moving stacking / removal devices.
[0022] In some embodiments of the present application, the pit is leveled, typically without any fill to create height, and the stacking yard is then placed in the leveled pit.
[0023] In some embodiments of the present application, the watertight enclosure includes a plurality of cylindrical steel plates and auxiliary steel plates located between adjacent cylindrical steel plates, the cylindrical steel plates are distributed at intervals along the length of the watertight enclosure, the auxiliary steel plates are arc-shaped and are closely connected to the cylindrical steel plates through tenon grooves on the cylindrical steel plates, two auxiliary steel plates are disposed opposite each other between adjacent cylindrical steel plates, the arc-shaped convex surface of each auxiliary steel plate faces outward to form an internal cavity, and soil is backfilled into the cylindrical steel plates and the internal cavity of the auxiliary steel plates.
[0024] In some embodiments of the present application, riprap mounds are disposed on the inside and outside of a cut-off enclosure, respectively, and an upwardly extending wave break wall is disposed on top of the cut-off enclosure.
[0025] In some embodiments of the present application, the low-rise terrace is 3m to 20m lower than the average water level outside the watertight enclosure.
[0026] In some embodiments of the present application, the average depth from the pit to the top of the watertight enclosure is L1, the depth from the surface of the low-rise terrace to the top of the watertight enclosure is L2, and further, 100%≧L2 / L1≧50%.
[0027] In some embodiments of the present application, the low-rise terrace includes, in order from the bottom, a water-permeable cushion, a water-shielding cushion, a waterproof layer, and a base plate layer. The water-permeable cushion is formed by laying a water-permeable material in a pit, the water-shielding cushion is formed by pouring cement or concrete on the water-permeable cushion, the waterproof layer is formed by coating a waterproof material on the water-shielding cushion or laying a physical waterproof layer, and the base plate layer is formed by pouring cement or concrete.
[0028] In some embodiments of the present application, the base plate layer further comprises spaced apart ground beams, the ground beams being plate structures and extending below the pits.
[0029] In some embodiments of the present application, a storage warehouse and a ballast warehouse are arranged on a low terrace, the ballast warehouses are distributed around the storage warehouse, the storage warehouses can be used for storing materials, and the ballast warehouses can be used for filling ballast.
[0030] In some embodiments of the present application, the storage warehouse and the ballast warehouse are rectangular and spaced apart, adjacent storage warehouses and ballast warehouses share the same long side wall, the short side walls of multiple storage warehouses and multiple ballast warehouses arranged in parallel form a common side wall, and the width of the storage warehouse is wider than the width of the ballast warehouse.
[0031] In some embodiments of the present application, the high-rise terrace is located above the warehouse and includes a main road and a branch road communicating with the main road, the stacking / removal device is movable thereon, the main road is arranged in a direction substantially perpendicular to the rectangular warehouse, and the branch road is located above the ballast warehouse.
[0032] In some embodiments of the present application, a support plate used to support the main road is arranged in the warehouse corresponding to the main road, and a steel plate or a reinforced concrete plate is arranged vertically on the support plate, and the long side wall of the ballast warehouse is manufactured of reinforced concrete or steel structure and has a height substantially equal to the height of the main road of the high-rise terrace to form a branch road on the ballast warehouse, and the long side wall of the ballast warehouse is used as the base of the moving truck of the stacking / removal device.
[0033] In some embodiments of the present application, the upper portions of two long side walls of the same ballast storehouse are provided with a number of connecting beams for connecting the two long side walls.
[0034] A fourth aspect of the present application provides an application of a water exchange storage facility in a port storage facility, which may employ the water exchange storage facility described in any one of the above embodiments. Compared with the prior art, the beneficial effects of the present application are as follows:
[0035] The water exchange storage facility provided by at least one embodiment of the present application adopts a water-stopping enclosure to stop water instead of filling the soil, transforming the water environment into an anhydrous environment, and replacing the space occupied by the water body in the water-stopping enclosure with storage space, thereby expanding the capacity of the stacking yard, saving landfill costs, and greatly improving the cost-effectiveness of the project.
[0036] The water exchange storage field provided by at least one embodiment of the present application uses an inserted cylindrical structure to reinforce the foundation of the enclosure and function as a water stop and enclosure structure, which not only can quickly construct a water vehicle driving passage, but also can form a water stop enclosure, while the enclosure can be built in a short time, forming a dry construction state of the stacking yard in the water stop enclosure, and creating parallel construction conditions for the stacking yard and the water stop enclosure, thereby greatly shortening the construction period. [Brief description of the drawings]
[0037] [Figure 1] FIG. 2 is a schematic diagram showing the structure of a water-stopping enclosure. [Diagram 2] FIG. 2 is a partially enlarged view of FIG. [Diagram 3] FIG. 1 is a schematic diagram showing the structure of a warehouse. [Figure 4] FIG. 4 is a partially enlarged view of FIG. [Diagram 5] FIG. 1 is a schematic diagram of the warehouse after stacking. [Figure 6] FIG. 6 is a partially enlarged view of FIG. [Figure 7] FIG. 1 is a front view of a warehouse yard in one embodiment. [Figure 8] A side view of a warehouse yard in one embodiment. In the figure, 1 is a watertight enclosure, 101 is a cylindrical structure, 1011 is a cylindrical steel plate, 1012 is an auxiliary steel plate, 1013 is an internal cavity, 2 is a pit, 3 is a stacking yard, 4 is a riprap mound, 5 is a wave break wall, 6 is a low-rise terrace, 601 is a water-permeable cushion, 602 is a water-shielding cushion, 603 is a waterproof layer, 604 is a base plate layer, 604 is a ground beam, 7 is a high-rise terrace, 701 is a main road, 702 is a branch road, 8 is a warehouse, 801 is a storage warehouse, 802 is a ballast warehouse, 803 is a long side wall, 804 is a common side wall, 805 is a support plate, and 806 is a connection beam. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0038] The technical solutions of the present application will now be described in detail in combination with specific embodiments, but it should be understood that elements, components, structures and features in one embodiment can also be advantageously incorporated into other embodiments, although not described further.
[0039] It should be noted that in the present description, terms such as "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or suggesting a relative importance or implying a number of the indicated technical features. Thus, features defined as "first" and "second" may explicitly or implicitly include one or more of these features.
[0040] It should be understood that in the description of this application, the terms "up," "down," "bottom," "inner," and the like indicate an orientation or positional relationship based on the orientation or positional relationship shown in FIG. 7 and are for the purposes of this application and simplified description only, but do not indicate or imply that the device or element referenced must be in a particular orientation, configured, or operated in a particular orientation, and therefore should not be construed as limiting this application.
[0041] It should be noted that in the description of this application, the terms "connect", "connecting" and "connected" should be understood in a broad sense unless otherwise specified or limited. For example, they may be fixed connections, removable connections, or integral connections, and may be direct connections or indirect connections through intermediate media, and may also be internal connections between two elements. For those skilled in the art, the specific meanings of the above terms in this application may be understood under certain circumstances.
[0042] As shown in FIG. 1 to FIG. 5, the first embodiment of the present application provides a water exchange storage construction method, which includes the following steps: (1) Includes the step of constructing a watertight enclosure. In one implementation, as seen in FIG. 2, multiple cylindrical structures 101 can be inserted into water to reinforce the foundation of the enclosure and further function as a watertight enclosure structure to form a watertight enclosure.
[0043] Specifically, as seen in FIGS. 1 and 2, each cylindrical structure 101 includes a cylindrical steel plate 1011 and an auxiliary steel plate 1012 .
[0044] First, each cylindrical steel plate 1011 is inserted into the soft ground foundation to improve the shear strength of the ground foundation. The construction of inserting the cylindrical steel plate 1011 into the soft ground foundation can be completed by using a crane ship to hoist, vibrate and sink a vibration hammer set.
[0045] Next, two auxiliary steel plates 1012 are inserted into the soft ground foundation between every two adjacent cylindrical steel plates 1011 along the mortise and tenon grooves (not shown, could be tenons in the prior art) on the outer walls of the adjacent cylindrical steel plates 1011 to seal the gaps between the adjacent cylindrical steel plates 1011. A sealant is applied to the joints between the auxiliary steel plates 1012 and the mortise and tenon grooves to achieve watertightness.
[0046] Similarly, the auxiliary steel plate 1012 can be inserted into the soft foundation by a process of lifting, vibrating and sinking a vibration hammer set using a crane ship. The sealant can be a mixture of sawdust, asphalt or other materials, which is pre-placed in the tenon groove to keep it watertight during the process of inserting the auxiliary steel plate 1012 into the tenon groove. Alternatively, the sealant can be a cement paste, which is injected into the tenon groove through a pre-installed pipe after the auxiliary steel plate 1012 is inserted into the tenon groove to achieve watertightness.
[0047] Next, the inside of each cylindrical steel plate 1011 and the internal cavities 1013 formed between every two opposing auxiliary steel plates 1012 are backfilled to form the watertight enclosure 1.
[0048] Sand and gravel can be used for backfilling, and may be transported on water using a belt ship or on land, thereby preventing the shape of each cylindrical steel plate from shrinking due to the silo pressure of the sand and gravel. The cylindrical steel plates are protected from buckling and breaking by the strength of the sand and gravel and the cylindrical structure 101, and the gravity of the sand and gravel, the gravity of the cylindrical structure 101, and the frictional resistance of the buried part prevent the water stoppage 1 from tipping over and slipping, maintaining the overall stability. The top of the water stoppage 1 can also be leveled and compacted to form a construction road for construction and for construction machinery and vehicles to pass through. (2) Construct a drainage channel after fencing
[0049] After the water stop enclosure 1 is enclosed, the water within the enclosed area is drained, exposing the pit 2 to form a dry construction state. In order to further construct the stacking yard 3 within the water stop enclosure 1, the pit 2 may be leveled according to the actual situation. Leveling means to completely or partially level the pit, except for filling in the traditional sense. The main purpose of filling is to create height, and the material consumption for this is much higher than for leveling. (3) Construct riprap mound 4
[0050] As can be seen in Figure 4, riprap mounds 4 may be constructed on the inside and outside of the waterstop 1. The riprap mounds 4 form approximately right-angled trapezoidal shapes that fit with the waterstop 1 on the inside and outside, respectively, and the upper surface of the riprap mounds 4 is approximately flush with the upper surface of the waterstop 1.
[0051] The portion of the riprap mound 4 below the water line may be dump-filled on the water using a riprap vessel, or a portion may be dump-filled using a land-based device and the left side may be dump-filled on the water using the riprap vessel, and the portion of the riprap mound 4 above the water line may be dump-filled using a land-based device. The riprap mound 102 inside the waterstop may be completely filled using a land-based device.
[0052] As can be seen in Figures 6-8, an upwardly extending wave break wall 5 can be constructed on top of the cutoff wall 1, or on top of the outer riprap mound 4, to reduce the amount of wave penetration into the cutoff wall 1. The wave break wall 5 can be formed by pouring reinforced concrete. (4) Build Stacking Yard 3
[0053] After the dry construction state is formed, the construction of the stacking yard 3 is carried out, including the construction of the low-rise terrace 6 and the high-rise terrace 7, and the low-rise terrace 6 is lower than the average water level outside the waterstop 1, and can be 3m to 20mm lower than the average water level according to the actual water depth and construction environment to form a material stacking state. Alternatively, as seen in FIG. 7, if the average depth from the pit 2 to the top of the waterstop 1 is L1, and the depth from the surface of the low-rise terrace 6 to the top of the waterstop 1 is L2, 100%≧L2 / L1≧50%, for example, L2 / L1≧60%, L2 / L1≧65%, L2 / L1≧70%, L2 / L1≧75%, L2 / L1≧80%, etc. Since the surface of the low-rise terrace 6 is below the water level, a large available space is formed above it. The high-rise terrace 7 can be built based on the low-rise terrace 6, and the height is higher to form the condition to install and run the stacking / removal device.
[0054] More specifically, as seen in FIG. 7 and FIG. 8, the water-permeable cushion 601, the water-shielding cushion 602, the waterproof layer 603, and the base plate layer 604 are formed in the pit 2 after drainage in order from the bottom to form the low-level terrace 6. The water-permeable cushion 601 can be formed by laying water-permeable gravel in the pit 2. Water seepage may occur in the pit 2, which may cause buoyancy in the low-level terrace 6 and may cause the low-level terrace 6 to burst. By providing the water-permeable cushion 601, the pressure caused by the water can be reduced or eliminated to protect other layers above the water-permeable cushion from damage. Thus, the water-permeable cushion 601 has the functions of filtering, reducing pressure, and draining. The water-shielding cushion 602 can be formed by pouring cement or concrete on the water-permeable cushion 601. The water-shielding cushion 602 can block water to a certain extent, which facilitates the subsequent construction of the waterproof layer 603, and serves as a joining layer between the water-permeable cushion 601 and the waterproof layer 603. The waterproof layer 603 can be formed by coating a waterproof material on the water-proof cushion 602 or laying a physical waterproof layer (e.g., a multi-layered, partially laminated waterproof geotextile), and performs the main waterproof function of preventing water from seeping into the surface of the low-rise terrace 6. Conventionally, the base plate layer 604 located on the waterproof layer 603 is formed by pouring cement or concrete. As can be seen in FIG. 8, the base plate layer 604 further includes ground beams 6041 arranged at intervals and extending downward. The ground beams 6041 are of plate structure and extend into the pit 2, thereby increasing the bearing capacity of the low-rise terrace 6. (5) Build Warehouse 8
[0055] As seen in FIG. 4, the warehouses 8 including the storage warehouse 801 and the ballast warehouse 802 are arranged on the low-rise terrace 6, and the ballast warehouse 802 is evenly distributed near the storage warehouse 801. The storage warehouse 801 is mainly used to store materials (e.g., ore, coal, food, etc.), and the ballast warehouse 802 is mainly used to fill ballast (e.g., sand, stone, etc.) when the storage warehouse 801 is light. Considering that flooding may occur at the bottom of the low-rise terrace 6 (or the waterproof cushion 602), back pressure of flooding is generated to overcome the buoyancy of flooding when there is an appropriate weight of materials in the storage warehouse 801. However, when there is little material in the storage warehouse 801 or no material in the storage warehouse, the ballast warehouse 802 can be filled with ballast to increase the back pressure of the low-rise terrace 6 against flooding, so as to prevent the low-rise terrace 6 from being damaged by the buoyancy generated by flooding. It should be understood that the storage warehouse 801 and the ballast warehouse 802 can be mixed. For example, when there is a lot of material, the material can be stored in both the storage warehouse and the ballast warehouse 802, so that the ballast warehouse 802 functions as the storage warehouse 801, and when there is a small amount of material, the storage warehouse 801 can be filled with ballast, so that the storage warehouse 801 can function as the ballast warehouse 802.
[0056] The storage warehouse 801 and the ballast warehouse 802 can be arranged as regions, sections and layers, so that the space above the low-rise terrace 6 is utilized rationally. Because the low-rise terrace 6 is located below the mean water level, the space provided above the low-rise terrace is much larger than the space formed by the stacking yard obtained by the traditional filling method, so that the height and volume of the storage warehouse 801 are greatly increased and more materials can be stored.
[0057] In one implementation, each storage shed 801 and each ballast shed 802 is elongated and spaced apart. As seen in Figures 3-6, each storage shed 801 and each ballast shed 802 is rectangular, adjacent storage sheds 801 and ballast sheds 802 share the same long side wall 803, and further, the short side walls of multiple storage sheds 801 and multiple ballast sheds 802 arranged in parallel form one common side wall 804. In order to store more materials, the width of the storage shed 801 is wider than the width of the ballast shed 802.
[0058] To facilitate long-term storage of materials, a waterproof layer may be formed on the four sides and bottom of each storage warehouse 801 to enhance the waterproof effect (i.e., a second waterproof layer may be constructed on the base plate layer 604). (6) Construct high-rise terraces
[0059] Conventionally, stacking / removal devices used in the storage field are mainly stackers and reclaimers, which are very heavy. In normal use, to support the movement of the stacking / removal devices, it is often necessary to drive piles into the foundation, then lay a truck beam on the ground, and lay a truck so that the stacking / removal devices can move on the truck beam.
[0060] In the stacking yard 3 of the present application, the stacking / removing device also requires a special moving truck. As mentioned in step (4), a moving state of the stacking / removing device can be formed by constructing a higher-rise terrace 7 based on the low-rise terrace 6. However, if the passages of the multiple high-rise terraces 7 are blindly constructed on the low-rise terrace 6, the space occupied by the high-rise terraces 7 will become large, and the space for the warehouse 8 will be compressed.
[0061] In one implementation, to solve the above problem, a high-rise terrace 7 can be constructed on the warehouse 8. More specifically, as seen in FIG. 3 to FIG. 6, the main road 701 of the high-rise terrace 7 is constructed in a direction approximately perpendicular to the length direction of the elongated or rectangular warehouse 8, and a support plate 805 is provided in the corresponding warehouse 8 below the main road 701, which can be a steel plate or a reinforced concrete plate, forming a state to support the stacking / removal device to move on the main road 701. As seen in FIG. 5 and FIG. 6, the branch road 702 of the high-rise terrace 7 is formed above the ballast warehouse 802 and communicates with the main road 701, and the stacking / removal device can also move on it. Specifically, the long side wall 803 of the ballast warehouse 802 can be made of reinforced concrete, steel structure, or other materials with high strength, and has a height approximately the same as that of the high-rise terrace 7 (or the main road 701), so that walking tracks for stackers and reclaimers can be laid on the long side wall 803 of the ballast warehouse 802.
[0062] By providing the main road 701 and the branch roads 702 of the high-rise terrace 7, a stacking / removal device from the main road 701 can reach each branch road 702 to stack or remove materials along the length of the storage warehouse 801. As seen in Figure 6, the stacker can move along the branch road 702 over the second row of ballast warehouses 802 to stack materials in the second row of storage warehouses 801. Figures 5 and 6 are schematic views after materials are stacked.
[0063] As seen in Fig. 4, a connecting beam 806 is provided on the long sidewall 803 of each ballast storehouse 802 and is located on the top of the long sidewall 803 of the ballast storehouse 802 to connect two adjacent long sidewalls 803 in the ballast storehouse 802. For example, multiple connecting beams 803 can be arranged between the two long sidewalls by welding. With this configuration, the tops of the long sidewalls 803 can be connected together to overcome the outward lateral pressure applied to the long sidewalls 803 by the load (e.g., stacker / reclaimer), thereby improving the stability of the bearing.
[0064] It should be noted that the order of steps in this implementation is merely a description order, and can be adjusted according to actual needs, and therefore the description order does not constitute an absolute limitation on the present application.
[0065] In this implementation, the low-rise terrace 6 is constructed directly within the pit 2, and the low-rise terrace 6 is lowered below the average water level of the outer width, thereby expanding the space of the stacking yard / warehouse. Furthermore, in one implementation, most of the area of the pit 2 is directly used as the stacking yard / warehouse, so that the traditional technology for filling the pit 2 can be eliminated, saving the filling material and labor as well as the large consumption of machinery, and greatly improving the cost-effectiveness ratio of the technology.
[0066] A second aspect of the present application provides a water exchange storage field, which can be constructed by the construction method described in any one of the above implementations.
[0067] The water exchange storage facility includes a water-stopping enclosure 1 and a stacking yard 3, the outside of which is in contact with the water body, and the stacking yard 3 is formed within the internal space surrounded by the water-stopping enclosure 1 and is located on a pit 2 formed after the water in the water-stopping enclosure 1 is drained.
[0068] The water stop enclosure 1 has a water stop function and prevents the water body from entering the water stop enclosure 1. The water stop enclosure 1 can be constructed by the construction method of the enclosure 1 in the prior art. In one implementation, the water stop enclosure 1 includes a plurality of cylindrical steel plates 1011 and auxiliary steel plates 1012 located between the adjacent cylindrical steel plates 1011. The cylindrical steel plates 1011 are cylindrical and are distributed at intervals in the longitudinal direction of the water stop enclosure 1. The auxiliary steel plates 1012 are arc-shaped and are closely connected to the cylindrical steel plates 1011 through the tenon grooves on the cylindrical steel plates 1011 to stop water. In one implementation, two auxiliary steel plates 1012 arranged opposite to each other are provided between the adjacent cylindrical steel plates, and the arc-shaped convex surface of each auxiliary steel plate 1012 faces outward, forming an internal cavity 1013. In order to increase the stability of the watertight enclosure 1, the inside of the cylindrical steel plate 1011 and the internal cavity 1012 are backfilled with backfill soil.
[0069] If necessary, riprap mounds 4 are arranged on the inside and outside of the cut-off wall 1. This reduces the lateral pressure on the cut-off wall 1 caused by the laminated material on the inside and generates back pressure on the foundation, reducing the force acting on the cut-off wall 1 from waves or water currents and generating back pressure on the foundation, improving the stability of the cut-off wall 1. A wave break wall 5 can be provided on the top of the cut-off wall 1 to reduce wave overtopping.
[0070] The stacking yard 3 includes a lower low-rise terrace 6 and an upper high-rise terrace 7. The low-rise terrace 6 includes a water-permeable cushion 601, a water-shielding cushion 602, a waterproof layer 603, and a base plate layer 604, which are distributed in order from the bottom. The water-permeable cushion 601 has a water-permeable function and can be formed by laying a water-permeable material (e.g., gravel, sand) in the pit 2, and has a thickness of 200 mm to 3000 mm. The water-shielding cushion 602 is a cement layer or a concrete layer, has a certain water-shielding effect, and has a thickness of 100 mm to 300 mm. The waterproof layer 603 is formed by coating a waterproof material on the water-shielding cushion 602 or laying a physical waterproof layer, and has a thickness of 0.1 mm to 10 mm. The base plate layer 604 is a cement layer or a concrete layer, which corresponds to the working surface layer, and has a thickness of 300 mm to 2500 mm. The base plate layer 604 further comprises spaced apart ground beams 6041, which are parallel plate structures formed by extending the base plate layer 604 downwardly.
[0071] The surface of the low-rise terrace 6 is at least 1 m (e.g., 1 m to 20 m, e.g., 2 m, 3 m, 5 m, 8 m, 10 m, 12 m, 15 m, or 18 m) lower than the average water level outside the watertight enclosure 1. The space originally occupied by the water body is utilized, greatly expanding the storage space for materials.
[0072] Warehouses 8, including a storage warehouse 801 and a ballast warehouse 802, are arranged on the low terrace 6. The storage warehouse 801 and the ballast warehouse 802 are arranged adjacent to each other. The storage warehouse 801 is used to store materials, and the ballast warehouse 802 is used to fill ballast to supplement the weight of the storage warehouse 801 so as to increase the downward loading capacity of the low terrace 6 when the weight of the storage warehouse 801 is insufficient.
[0073] 4, in one implementation, the storage shed 801 and the ballast shed 802 are rectangular and spaced apart, with the width of the storage shed 801 being greater than the width of the ballast shed 802. Adjacent storage sheds 801 and ballast sheds 802 share the same long side wall 803, and further, the short side walls of the multiple storage sheds 801 and multiple ballast sheds 802 arranged in parallel form one common side wall 804.
[0074] The high-rise terrace 7 may be constructed on the low-rise terrace 6 and used to allow the stacking / removal device to move thereon. In one implementation, the high-rise terrace 7 includes a main road 701 and a number of branch roads 702 that communicate with the main road 701. As seen in Figures 3 to 6, the main road 701 is arranged perpendicular to the length direction of the storage warehouse 801 and the ballast warehouse 802 and is located above the storage warehouse 801 and the ballast warehouse 802, and the branch roads 702 are formed above the ballast warehouse 802.
[0075] Furthermore, the support plate 805 is a reinforced concrete plate or a steel plate that is vertically arranged in the warehouse 8 (storage warehouse 801 and ballast warehouse 802) located below the main road 701 and is used to support the main road 701. As seen in FIG. 7, the long side wall 803 of the ballast warehouse is a reinforced concrete and steel structure and has a height equal to that of the main road 701, so that the upper part of the ballast warehouse 802 serves as a branch road 702 for laying the truck of the stacking / removal device. Furthermore, a number of connecting beams 806 can be arranged in each ballast warehouse 802, located between the upper parts of the two opposing long side walls 803 of the ballast warehouse, and connecting the two side walls to improve the pressure resistance. In this implementation, the long side walls of the ballast warehouse can also be used as the foundation of the moving truck of the stacking / removal device without occupying additional space for installing the truck foundation, so that the storage space of the warehouse 8 is increased.
[0076] The above embodiments are merely described as preferred embodiments of the present application, and are not intended to limit the scope of the present application. Various modifications and improvements made to the technical solutions of the present application by those skilled in the art without departing from the design spirit of the present application shall be included in the scope of protection confirmed by the claims of the present application.
Claims
1. 1. A method for constructing a water exchange storage facility, comprising the steps of: constructing a watertight enclosure, the enclosure being capable of stopping water; A step of constructing a drainage channel after enclosing the watertight enclosure, in which after enclosing the watertight enclosure, the water within the enclosed area of the watertight enclosure is drained to expose the pit and form a dry construction state; constructing a stacking yard in the pit under the dry construction conditions, including constructing a lower low terrace and an upper high terrace, the low terrace being lower than the average water level outside the watertight enclosure, the high terrace being usable for moving a stacking / removal device, the stacking / removal device being capable of transporting material to and from a warehouse; A step of constructing the warehouse includes a step of constructing the warehouse on the low-rise terrace, A water exchange storage facility construction method, wherein in the step of constructing the warehouse, a storage warehouse and a ballast warehouse are arranged on the low-rise terrace, the ballast warehouse is distributed around the storage warehouse, the storage warehouse can be used for storing materials, and the ballast warehouse can be used for filling ballast.
2. The water exchange storage facility construction method according to claim 1, wherein in the step of constructing the stacking yard, the low-rise terrace is 3m to 20m lower than the average water level outside the water-stopping enclosure.
3. A water exchange storage facility construction method as described in claim 1, wherein, in the step of constructing the stacking yard, the average depth from the pit to the top of the water stop enclosure is L1, the depth from the surface of the low-rise terrace to the top of the water stop enclosure is L2, and further, L2 / L1 is greater than or equal to 50%.
4. The method for constructing a water exchange storage facility according to any one of claims 1 to 3, wherein the step of constructing a drainage channel after fencing further includes the steps of leveling the pit after forming the dry construction state, without filling the pit to increase the height, and further constructing the stacking yard in the leveled pit.
5. A water exchange storage field construction method as described in any one of claims 1 to 3, wherein the storage warehouse and the ballast warehouse are elongated and spaced apart, adjacent storage warehouses and ballast warehouses share the same long side wall, the short side walls of multiple storage warehouses and multiple ballast warehouses arranged in parallel form a common side wall, and the width of the storage warehouse is wider than the width of the ballast warehouse.
6. 6. The water exchange storage facility construction method according to claim 5, wherein in the step of constructing the stacking yard, the high-rise terrace is constructed on top of the warehouse, more specifically, a main road of the high-rise terrace is constructed in a direction substantially perpendicular to the longitudinal direction of the elongated warehouse, and a branch road of the high-rise terrace is formed above the ballast warehouse connecting with the main road, and the main road and the branch road allow the stacking / removal device to move thereon.
7. The water exchange storage field construction method according to claim 6, wherein the warehouse corresponding to the main road has a support plate arranged thereon, which is used to support the main road, and a steel plate or a reinforced concrete plate is arranged vertically on the support plate; the long side wall of the ballast warehouse is manufactured with reinforced concrete or steel structure and has a height substantially equal to the height of the main road of the high-rise terrace to form the branch road on the ballast warehouse; the long side wall of the ballast warehouse is used as a moving track for the stacking / removal device; and further, the upper part of the two long side walls of the same ballast warehouse is provided with a plurality of connecting beams to connect the two long side walls.
8. The step of constructing the watertight enclosure further includes the steps of first inserting a plurality of cylindrical steel plates into the soft ground foundation by a vibrating hammer set, then inserting two auxiliary steel plates into the soft ground foundation between every two adjacent cylindrical steel plates along the tenon grooves on the outer walls of the cylindrical steel plates by the vibrating hammer set to close the gaps between the adjacent cylindrical steel plates, and backfilling the inside of the cylindrical steel plates and the internal cavities formed between the two auxiliary steel plates to form the watertight enclosure, The water exchange storage construction method of any one of claims 1 to 3 further includes a step of constructing a riprap mound on the inside and outside of the water stoppage, so that the riprap mound forms an approximately right-angled trapezoid shape, with the water stoppage provided on the inside and outside, the upper surface of the riprap mound being approximately flush with the upper surface of the water stoppage, and an upwardly extending wave break wall being constructed on the top of the water stoppage or on the top of the riprap mound on the outside.
9. The method for constructing a water exchange storage facility according to any one of claims 1 to 3, wherein in the step of constructing the stacking yard, a permeable cushion, a waterproof cushion, a waterproof layer, and a base plate layer are formed in the drained pit in order from the bottom to form the low-rise terrace, the permeable cushion is formed by laying a permeable material in the pit, the waterproof cushion is formed by pouring cement or concrete on the permeable cushion, the waterproof layer is formed by coating a waterproof material on the waterproof cushion or laying a physical waterproof layer, and further, the base plate layer is formed by pouring cement or concrete.
10. A water exchange storage facility constructed by the construction method according to any one of claims 1 to 3.
Citation Information
Patent Citations
Construction method of underground structures of seacoasts and artificial islands
CN102345300A
Construction method for coastal reclamation based on basement utilization
CN110080169A
Automatic container port and construction and installation method
CN110921342A
The base structure and the method of forming a road
JP1990504050A
Construction method of reclaiming land from the sea based on basement utilization
US20200318306A1