CHARGE MANAGEMENT DEVICE, CHARGE MANAGEMENT METHOD, AND CHARGE MANAGEMENT PROGRAM

The charging management device predicts future charge needs based on travel reservations and station capacity, ensuring efficient and reliable charge management for electric vehicles.

JP7589960B2Active Publication Date: 2024-11-26REXEV CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2020081595
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-05-01
Publication Date
2024-11-26
Estimated Expiration
2040-05-01

AI Technical Summary

Technical Problem

Existing vehicle charging management systems do not consider future usage conditions, leading to inefficiencies in managing the remaining charge amount for electric vehicles.

Method used

A charging management device that predicts the remaining charge amount based on future travel reservations, schedule information, and charging station capacity, allowing for efficient management of charging and discharging to ensure sufficient charge for upcoming trips.

Benefits of technology

Enables secure and efficient management of vehicle charge levels, optimizing charging times and reducing the risk of insufficient charge during scheduled trips by utilizing renewable energy sources and peak demand management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007589960000001
    Figure 0007589960000001
  • Figure 0007589960000002
    Figure 0007589960000002
  • Figure 0007589960000003
    Figure 0007589960000003
Patent Text Reader

Abstract

To provide a charge management device, a charge management method and a charge management program, capable of predicting a future residual amount of charge of each vehicle, according to various embodiments of the present disclosure.SOLUTION: A charge management device manages a situation of a vehicle capable of charging electric power to a battery by electric connection in a charging station and travelling by using the charged electric power. The charge management device includes a processor configured to calculate a target residual amount of charge, which is a residual amount of charge to be a target before travelling in one or a plurality of travelling reservations, on the basis of power cost information indicating a distance in which the vehicle can travel per predetermined unit electrical power, information indicating charging capacity and schedule information, which are identified by information specifying the vehicle stored in a memory.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a charge management device, a charge management method, and a charge management program that manage the status of a vehicle that is electrically connected to a charging station and charges a battery with power. [Background technology]

[0002] Conventionally, in car sharing of so-called electric vehicles, operation systems that manage the charging status of each vehicle have been known. For example, Patent Document 1 describes a system that includes an electric power acquisition unit that acquires a station electric power amount, which is the sum of the amount of electric power stored in the station's power storage equipment and the amount of electric power stored in all electric vehicles parked at the station, and manages operations such as fees based on the station electric power amount. However, such a system does not take into account future usage conditions, etc. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-162370 A Summary of the Invention [Problem to be solved by the invention]

[0004] In light of the above-described techniques, the present disclosure provides, in various embodiments, a charging management device, a charging management method, and a charging management program capable of predicting the remaining charge amount of each vehicle in the future. [Means for solving the problem]

[0005] According to one aspect of the present disclosure, a vehicle is capable of being electrically connected to a charging station to charge a battery and run using the power charged in the battery. One or more A charging management device that manages the status of a vehicle. , place A certain instruction command is stored, Vehicle identification information for identifying the vehicle; and storing schedule information including one or more trip reservations for a predetermined future period. Possible and executing instructions stored in said memory, Calculating power consumption or charging power estimated information based on the schedule information for the vehicle identified by the vehicle identification information, and The one or more travel reservations of Calculate the target remaining charge before driving The target remaining charge amount for one of the plurality of travel reservations is calculated based on the target remaining charge amount for a travel reservation that is later than the one travel reservation. and a processor configured to perform the charging management device.

[0006] According to one aspect of the present disclosure, a vehicle is capable of being electrically connected to a charging station to charge a battery and run using the power charged in the battery. One or more To manage the vehicle situation , place A certain instruction command is stored, Vehicle identification information for identifying the vehicle; and storing schedule information including one or more trip reservations for a predetermined future period. Possible and a memory configured as above. A charge management method performed by a processor executing the instruction command in a charge management device including the charge management device, Calculating estimated power information of power consumption or charging power until the start of the one or more travel reservations in the vehicle identified by the vehicle identification information, and based on the estimated power information, A step of calculating a target remaining charge amount, which is a target remaining charge amount before traveling in the one or more traveling reservations; and wherein the target remaining charge amount for one of the plurality of travel reservations is calculated based on the target remaining charge amount for a travel reservation that is later than the one travel reservation. A charging management method is provided.

[0007] According to one aspect of the present disclosure, a vehicle is capable of being electrically connected to a charging station to charge a battery and run using the power charged in the battery. One or more To manage the vehicle status, Vehicle identification information for identifying the vehicle; and storing schedule information including one or more trip reservations for a predetermined future period. Possible and a memory configured as Calculating estimated power information of power consumption or charging power until the start of the one or more travel reservations in the vehicle identified by the vehicle identification information, and based on the estimated power information, Calculate a target remaining charge amount, which is a target remaining charge amount before the travel in the one or more travel reservations. death, The target remaining charge amount for one of the plurality of travel reservations is calculated based on the target remaining charge amount for a travel reservation that is later than the one travel reservation. The present invention provides a processor configured to perform a charging management program. Effect of the Invention

[0008] According to various embodiments of the present disclosure, it is possible to predict the remaining charge of each vehicle in the future. and capable of ensuring a sufficient remaining charge for each of a plurality of travel reservations for one vehicle. It is possible to provide a charge management device, a charge management method, and a charge management program.

[0009] It should be noted that the above effects are merely illustrative for the convenience of explanation and are not limiting. In addition to or in place of the above effects, any effect described in this disclosure or any effect obvious to a person skilled in the art may be achieved. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a diagram showing an overview of remaining charge prediction according to various embodiments of the present disclosure. [Diagram 2] FIG. 2 is a conceptual diagram illustrating a schematic configuration of the system 1 according to the first embodiment of the present disclosure. [Diagram 3] FIG. 3 is a block diagram showing an example of the configuration of the charge management device 100 according to the first embodiment of the present disclosure. [Figure 4A] FIG. 4A is a diagram conceptually showing a vehicle information table stored in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 4B] FIG. 4B is a diagram conceptually showing a station information table stored in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 4C] FIG. 4C is a diagram conceptually showing a predicted remaining charge amount information table stored in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 4D] FIG. 4D is a reservation information table stored in the charging management device 100 according to the first embodiment of the present disclosure. [Diagram 5] FIG. 5 is a functional block diagram showing functions of the charge management device 100 according to the first embodiment of the present disclosure. [Figure 6]FIG. 6 is a diagram showing a process flow executed in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 7] FIG. 7 is a diagram showing an overview of prediction of the remaining charge amount according to the first embodiment of the present disclosure. [Figure 8] FIG. 8 is a diagram showing a process flow executed in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 9] FIG. 9 is a diagram showing a process flow executed in the charge management device 100 according to the first embodiment of the present disclosure. [Figure 10] FIG. 10 is a diagram showing a process flow executed in the charge management device 100 according to the first embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Various embodiments of the present disclosure will now be described with reference to the accompanying drawings, in which common elements are designated by the same reference numerals.

[0012] <Overview of the system according to the present disclosure> In the system according to various embodiments of the present disclosure, the vehicle status is managed in a charging state in which the vehicle is electrically connected to a charging station and charges a battery with power, and in a running state in which the vehicle runs using the power stored in the battery. In particular, the system calculates a target remaining charge amount, which is a remaining charge amount required before a future planned run, based on information on the charging capacity of the charging station and information on the power consumption indicating a distance that can be run per unit amount of power, etc.

[0013] The target remaining charge calculated in this manner can be used, for example, to shift the charging period to a period when there is an abundant supply of electricity from renewable energy sources such as solar power supplied to the charging station and there is a surplus of electricity, to discharge electricity from a vehicle connected to the charging station and use it as a power source for an office or home, to determine whether or not to reserve a vehicle, or to treat the vehicle as a virtual power plant and buy and sell the electricity stored in the vehicle.

[0014] FIG. 1 is a diagram showing an overview of remaining charge prediction according to various embodiments of the present disclosure. FIG. 1 shows a curve showing the result of prediction of a target remaining charge for a vehicle over a certain future period (for example, two weeks) taking into account a reservation schedule at the current time. As described above, in the present disclosure, the target remaining charge is predicted based on information on the charging capacity of the charging station and on the electric power cost information showing the distance that can be traveled per unit of electric power, in addition to the reservation schedule. For example, referring to reservation 2, a charging amount W3 is required at the start of use. Therefore, the target remaining charge at the start of use of reservation 1 is set to the electric power amount W2 based on the charging capacity from time t2 to t3, the electric power cost from time t1 to t2, and the remaining charge at the prediction time (t0). In addition, for example, when there is a large supply from a renewable energy source and there is a surplus in the amount of power supply, it is also possible to shift the charging time to outside the time when there is a surplus based on the prediction of the target remaining charge. In addition, when the peak power consumption exceeds a predetermined amount of power in a home where a charging station is installed, for example, based on the prediction of the target remaining charge amount, it is possible to cover the excess by discharging power from the battery of the vehicle based on the prediction of the target remaining charge amount. Furthermore, based on the prediction of the target remaining charge amount, it is also possible to sell or buy power by charging or discharging the vehicle to a power supplier that supplies power to the charging station.

[0015] In this way, by calculating the target remaining charge amount, which is the remaining charge amount required before a planned future journey, and managing the charging state and traveling state based on that, it becomes possible to operate the vehicle and manage the charging station more efficiently.

[0016] In the present disclosure, the vehicle may be any vehicle that is electrically connected to a charging station and has a charging state in which the battery is charged with power, and a running state in which the battery is used to run. In the following embodiment, an example of a so-called electric vehicle will be described as a vehicle, but the vehicle is not limited to this. For example, the system according to the present disclosure can be suitably applied to any vehicle that can run using electric power, such as a two-wheeled vehicle such as a bicycle or a motorcycle, a train, a bus, a truck, a ship, or an airplane.

[0017] First Embodiment 1. Configuration of system 1 according to the first embodiment of the present disclosure Fig. 2 is a conceptual diagram illustrating a schematic configuration of a system 1 according to a first embodiment of the present disclosure. Referring to Fig. 2, the system 1 includes at least a charging management device 100, a reservation management device 200, a vehicle 300, and a terminal device 400, which are directly or indirectly connected to each other via a network 500 so as to be able to communicate with each other.

[0018] The network 500 may be configured by wireless communication, may be configured by wired communication, or may be configured by a combination of them. In the example of FIG. 2, only one each of the charging management device 100, the reservation management device 200, and the terminal device 400 is shown, but it is possible to configure them by two or more devices. For example, the charging management device 100 can distribute its components and processes to a plurality of management devices. In addition, the system 1 can be connected to various databases as necessary and execute each process together with them.

[0019] The charging management device 100 is a device that manages the status of the vehicle 300, which is electrically connected to the charging station and has a charging state in which power is charged to the battery and a running state in which the vehicle runs using the power charged to the battery. The reservation management device 200 is a device that receives target remaining charge amount information and the like between the charging management device 100 and the vehicle 300, and manages reservations for the vehicle 300. The vehicle 300 transmits vehicle information and the like to the charging management device 100 via the reservation management device 200 by a communication interface mounted on the vehicle-mounted device. The terminal device 400 is a device that performs vehicle travel reservations and the like and evaluates the vehicle 300, and transmits information about the inputted travel reservation and the like to the reservation management device 200. Note that, in FIG. 2, the vehicle 300 and the terminal device 400 are illustrated as one each for convenience of explanation, but the charging management device 100 and the reservation management device 200 can naturally be connected to multiple vehicles and terminal devices. In addition, although vehicle information, etc. is configured to be transmitted from vehicle 300 to charging management device 100 via reservation management device 200, it may also be transmitted directly from vehicle 300 to charging management device 100 without going through reservation management device 200.

[0020] 2. Configuration of the charging management device 100 Fig. 3 is a block diagram showing an example of the configuration of the charging management device 100 according to the first embodiment of the present disclosure. The charging management device 100 does not need to include all of the components shown in Fig. 3, and may have a configuration in which some components are omitted, or may include other components.

[0021] 3, the charging management device 100 includes a memory 111 including a RAM, a ROM, a non-volatile memory, an HDD, etc., a processor 112 including a CPU, etc., an output interface 113, and a communication interface 114. These components are electrically connected to each other via a control line and a data line.

[0022] The memory 111 includes a RAM, a ROM, a non-volatile memory, and a HDD, and functions as a storage unit. The memory 111 stores, as a program, instruction commands for each process according to the present embodiment and instruction commands for executing an OS. Such programs are loaded and executed by the processor 112. The memory 111 also stores various information such as a vehicle information table shown in FIG. 4A, a station information table shown in FIG. 4B, a predicted remaining charge information table shown in FIG. 4C, and a reservation information table. In the present embodiment, the memory 111 also stores programs for executing a process of calculating a target remaining charge amount, which is a target remaining charge amount before traveling in one or more travel reservations, based on electricity cost information indicating a distance that can be traveled per a predetermined unit of electricity, information indicating a charging capacity, and schedule information, a process of instructing to set a time frame for charging during a time period when there is a surplus of supplied electricity, a process of updating a charging schedule at the charging station, a process of instructing to discharge from a vehicle electrically connected to the charging station, a process of instructing a vehicle to discharge to a supply source that supplies electricity to the charging station and to charge from the supply source, and the like.

[0023] The processor 112 is composed of a CPU (microcomputer) and functions as a control unit for controlling other components connected thereto based on various programs stored in the memory 111. In this embodiment, the processor 112 particularly executes a process of calculating a target remaining charge amount, which is a target remaining charge amount before traveling in one or more travel reservations, based on electricity cost information indicating a distance that can be traveled per a predetermined unit amount of electricity, information indicating a charging capacity, and schedule information, a process of instructing to set a time frame for charging in a time period when there is a surplus of supplied electricity, a process of updating a charging schedule at the charging station, a process of instructing to discharge from a vehicle electrically connected to the charging station, a process of instructing the vehicle to discharge to a supply source that supplies electricity to the charging station and to charge from the supply source, and the like. The processor 112 may be composed of a single CPU or may be composed of multiple CPUs.

[0024] As an example, the communication interface 114 performs processes such as modulation and demodulation in order to transmit and receive the program according to this embodiment, various information, and the like, to and from the reservation management device 200, the vehicle 300, and / or the terminal device 400 via the network 500. The communication interface 114 communicates with each of the above-mentioned devices according to a known wireless communication method or a known wired communication method. In this embodiment, the communication interface 114 particularly receives vehicle information from the vehicle 300 and schedule information indicating the vehicle's travel reservation status from the reservation management device 200, and transmits information related to the target remaining charge amount and updated schedule information to each device.

[0025] Although not specifically shown, the output interface 213 functions as an information input / output unit for inputting and outputting information to and from various external devices such as a printer, a display, etc. The output interface 213 can adopt a known connection format such as a serial port, a parallel port, a USB, etc. as desired.

[0026] 3. Information stored in each memory 4A is a diagram conceptually illustrating a vehicle information table stored in the charging management device 100 according to the first embodiment of the present disclosure. Information stored in the vehicle information table is received from the vehicle 300 as the processing progresses, updated, and stored in the memory 111.

[0027] According to FIG. 4A, the vehicle information table stores station ID information, current remaining charge information, and electricity cost information in association with vehicle ID information. "Vehicle ID information" is information that identifies each vehicle using unique information assigned to each vehicle. "Station ID information" is information that is transmitted from a charging station when a vehicle is connected to a charging station, and is information that identifies the charging station to which the vehicle is connected. It is transmitted when the vehicle is currently connected to a charging station. "Current remaining charge information" is information that indicates the current remaining charge of each vehicle. "Electricity cost information" is information that indicates the distance that can be traveled per a specified unit of electricity (e.g., 1 kWh).

[0028] 4B is a diagram conceptually illustrating a station information table stored in the charge management device 100 according to the first embodiment of the present disclosure. Information stored in the station information table is stored in the memory 111 in advance.

[0029] According to FIG. 4B, the station information table stores charging amount information in association with station ID information. "Station ID information" is information that identifies each charging station using unique information assigned to each charging station. "Charging amount information" is information related to the charging capacity of each charging station. As an example, the charging amount per unit time (e.g., 40 kWh) is used. The charging amount information is mainly used to calculate a target remaining charging amount.

[0030] 4C is a diagram conceptually illustrating a predicted remaining charge information table stored in the charge management device 100 according to the first embodiment of the present disclosure. The information stored in the predicted remaining charge information table is updated and stored every time each value is calculated by the charge management device 100.

[0031] According to FIG. 4C, one predicted remaining charge information table is generated for each vehicle, i.e., for each vehicle ID. Then, target remaining charge information is stored for each predetermined time. "Target remaining charge information" is information indicating the minimum remaining charge required at the start of a trip scheduled in the future. Note that, as an example, the target remaining charge information is calculated for each period divided by dividing two weeks at a predetermined interval.

[0032] 4D is a diagram conceptually illustrating a reservation information table stored in the charging management device 100 according to the first embodiment of the present disclosure. Information stored in the reservation information table is received from the reservation management device 200, updated by the charging management device 100, and then transmitted to the reservation management device 200 again for management.

[0033] 4D, the reservation information table is information indicating a reservation schedule for each vehicle, and is a table in which the driving state, i.e., the presence or absence of a driving reservation, is stored for each time period in association with each vehicle ID information. The reservation information table is managed by the reservation management device 200, after a driving reservation is input based on an input from a vehicle user received by the terminal device 400. The reservation information table is then transmitted to the charging management device 100, and the period to be secured for charging is updated and stored in the reservation information table based on a prediction of the future remaining charge amount, and is then transmitted again to the reservation management device 200. The time period in which the period to be secured for charging is stored is a time period during which the user cannot reserve the vehicle.

[0034] 4. Functions of the charging management device 100 Fig. 5 is a functional block diagram showing functions of the charging management device 100 according to the first embodiment of the present disclosure. Specifically, Fig. 5 is a diagram showing each function performed by the charging management device 100 having the configuration shown in Fig. 3 in cooperation with the reservation management device 200 and the like.

[0035] According to FIG. 5, the charging management device 100 has functional blocks of a storage unit 111, a communication unit 114, an output unit 113, and a control unit 112. Among these, the storage unit 111, the communication unit 114, and the output unit 113 execute the functions of each component corresponding to the memory 111, the communication interface 114, and the output interface 113 shown in FIG. 3. For example, the communication unit 114 receives vehicle status information, vehicle information including information for identifying the vehicle (vehicle ID information), reservation schedule information, reservation processing information, and the like from the reservation management device 200. Here, the vehicle status information is information on the current status of the vehicle together with the vehicle ID information from each vehicle 300 received by the reservation management device 200, and is information indicating whether the vehicle is currently in a traveling state or a charging state. In addition, the reservation schedule information is information stored in a reservation information table in the reservation management device 200 in which a usage reservation time frame for each vehicle is secured based on an input from a user of each terminal device 400. The reservation processing information is information related to a reservation for use of a vehicle accepted via a reservation application or the like in each terminal device 400. The storage unit 111 stores vehicle status information, vehicle information, reservation schedule information, reservation processing information, and the like received by the communication unit 114.

[0036] Next, according to Fig. 5, the control unit 112 has the functional blocks of a remaining charge prediction unit 112a, a reservation schedule update unit 112b, a charging time shift unit 112c, a peak cut unit 112d, and an electricity buying and selling unit 112e. Among these, the remaining charge prediction unit 112a judges that it is necessary to recalculate the target remaining charge amount based on the above information received from the reservation management device 200 at the timing when a new reservation for use of the vehicle is made (for example, the timing when the user receives selection information in which the terminal device 400 selects a specific vehicle), the timing when a new reservation for use is made, and the timing when it is judged that the deviation between the actual measurement value of the remaining charge amount and the target remaining charge amount is large. Then, the remaining charge prediction unit 112a performs a prediction process of the target remaining charge amount based on the vehicle information and reservation schedule information received from the reservation management device 200 by the communication unit 114. Here, the vehicle information includes at least vehicle ID information, current remaining charge amount, and station ID information for each connected vehicle 300, and is received by the reservation management device at a predetermined timing from each vehicle.

[0037] Based on the predicted target remaining charge amount, the reservation schedule update unit 112b updates and stores the time to be secured as charging time in the reservation schedule information stored in the storage unit 111. The charging time shift unit 112c performs processing to shift the scheduled charging time for the vehicle 300 to a time period when there is a surplus in the amount of supplied power (a surplus power generation period) due to, for example, a larger supply from a renewable energy source, based on the target remaining charge amount calculated by the reservation schedule update unit 112b.

[0038] The peak shaving unit 112d performs peak shaving processing to discharge, based on the predicted target remaining charge amount, from the vehicle connected to the charging station to, for example, an office power source or a home power source during the time period when power consumption is at its peak. In addition, the power buying and selling unit 112e performs processing to sell power to a power company or a power transmission and distribution company by discharging through a power transmission network to which the charging station of each vehicle 300 is connected, or to buy power from a power company or a power transmission and distribution company and charge each vehicle 300.

[0039] 5. Processing flow performed by the charge management device 100 (target remaining charge amount prediction processing) Fig. 6 is a diagram showing a processing flow executed in the charge management device 100 according to the first embodiment of the present disclosure. Specifically, the diagram shows functions mainly performed by the remaining charge amount prediction unit 112a and the reservation schedule unit 112b in Fig. 5. The processing flow is mainly performed by the processor 112 reading and executing a program stored in the memory 111 at a predetermined cycle (for example, every 15 minutes).

[0040] In the following, a case where a reservation schedule stored for the vehicle ID information "V1" in the reservation information table shown in Fig. 4D is received will be described. Here, Fig. 7 is a diagram showing an overview of a prediction of a remaining charge amount according to the first embodiment of the present disclosure, and reflects the reservation schedule for the vehicle ID information "V1" shown in Fig. 4D. Therefore, the description will be given with reference to Fig. 7 as appropriate in addition to Fig. 4D.

[0041] 6, the processor 112 performs a process of reading information received from the reservation management device 200 and stored in the memory 111. Specifically, the processor 112 refers to the reservation information table of FIG. 4D to read reservation schedule information for the vehicle V1 (S101). Next, the processor 112 refers to the vehicle information table of FIG. 4A to read electricity cost information associated with the vehicle V1 (S102). Furthermore, the processor 112 refers to the vehicle information table of FIG. 4A and the station information table of FIG. 4B to read charging amount information associated with the station ID to which the vehicle V1 is connected (S103).

[0042] When the information required for calculating the target remaining charge amount is read out in S101 to S103, the processor 112 calculates the target remaining charge amount required at the end of each reservation registered in the reservation schedule information (S104). For example, reservation 3, which is the last reservation in the reservation schedule information, is scheduled from time t7 to t8. At this time, the processor 112 calculates the target remaining charge amount required at the end of the reservation as "0". Next, the processor 112 calculates the target remaining charge amount required at the start of each reservation (S105). For example, reservation 3, which is the last reservation in the reservation schedule information, is scheduled from time t7 to t8. At this time, the processor 112 calculates the amount of power consumed in reservation 3 based on the reservation time and power cost information, and calculates the target remaining charge amount required at the start of the travel reservation by adding the calculated power consumption amount to the target remaining charge amount at the end calculated in S104.

[0043] When the processor 112 calculates each target remaining charge amount for the last reservation (i.e., reservation 3), it calculates the target remaining charge amount at the end of the travel reservation and the target remaining charge amount at the start of the travel reservation for the reservation immediately before (e.g., reservation 2). First, the processor 112 calculates the amount of power that can be charged during the free time based on the free time between this reservation (i.e., reservation 2) and the reservation immediately after (i.e., reservation 3) and the charge amount (charging capacity) of the charging station, and calculates the target remaining charge amount at the end of the travel reservation by subtracting the calculated chargeable amount of power from the target remaining charge amount at the start of the travel of the reservation immediately after (i.e., reservation 3). Next, the processor 112 calculates the amount of power consumed in this reservation 2 based on the reserved time and power cost information, and calculates the target remaining charge amount required at the start of the travel reservation of reservation 2 by adding the calculated amount of power consumption to the calculated target remaining charge amount at the end of reservation 2.

[0044] The processor 112 calculates the target remaining charge amount at the end and the target remaining charge amount at the start for all travel reservations in a similar manner. Then, the processor 112 stores the calculated target remaining charge amounts at the start and end of each travel reservation in a predicted remaining charge amount information table in the memory 111. In this manner, for example, focusing on reservation 1, which is the first reservation, the target remaining charge amount at the start of reservation 1 is calculated based on all of the amount of power consumed during the reservation time of reservation 3, the amount of power consumed during the reservation time of reservation 2, and the amount of power consumed during the reservation time of reservation 1.

[0045] When the processor 112 has finished calculating the target remaining charge amount at the start and end of each travel reservation in S104 and S105, it calculates the charging time required to secure the target remaining charge amount at the start of each travel reservation (S106). Specifically, the processor 112 calculates the amount of power to be charged by the start of a travel reservation based on the target remaining charge amount at the end of the previous travel reservation (e.g., reservation 2) from the target remaining charge amount at the start of a certain travel reservation (e.g., reservation 3), and calculates the charging time by dividing the amount of power by the charging capacity. The processor 112 then sets the calculated charging time from the free time between both travel reservations (e.g., reservation 3 and reservation 2) as a charging slot, and stores the calculated charging slot in the schedule information table (S107). In addition, the processor 112 stores the target remaining charge amount at the end of the previous driving reservation as the target remaining charge amount at the start of charging, and the target remaining charge amount at the start of the next driving reservation as the target remaining charge amount at the end of charging, in the predicted remaining charge amount information table in the memory 111, for the set charging time frame.

[0046] The above process calculates the target remaining charge amount, which is the target remaining charge amount before the planned future travel. Note that in S105, the target remaining charge amount at the start of the reservation is calculated using the electricity cost information, but in addition to or instead of this information, information such as the average speed of the vehicle can also be used.

[0047] 6. Processing flow performed by the charging management device 100 (reservation schedule update processing) FIG. 7 shows target remaining charge amounts at the start and end of reservation 1, reservation 2, and reservation 3 scheduled for future times t0 to t9 for vehicle ID information "V1" according to the processing flow of FIG.

[0048] Focusing on the target remaining charge curve K1 in FIG. 7, for example, the target remaining charge will be zero at the end of appointment 2. Therefore, the processor 112 updates the appointment schedule information to input "charging" so that the next period, time t6 to t7, will always be in a charging state. Also, the target remaining charge at the start (t3) of appointment 2 is approximately the full amount of the battery. On the other hand, the target remaining charge at the end (t2) of the immediately preceding appointment 1 is approximately half the amount. Therefore, since the amount of charge required for the next appointment 2 cannot be secured at the end of the immediately preceding appointment 1, the processor 112 updates the appointment schedule information to input "charging" so that the time t2 to t3 after the end of appointment 1 will be a charging time.

[0049] For example, if the target remaining charge amount after the end of reservation 1 exceeds the target remaining charge amount at the start of the next reservation 2, the time t2 to t3 between them does not need to be reserved as charging time. Therefore, in such a case, the processor 112 reserves the time equivalent to the surplus as a time during which a trip reservation can be made subsequently, rather than as charging time. In this way, the charging state of the reservation schedule information and whether or not a trip reservation can be made are determined based on the calculated target remaining charge amount.

[0050] 7. Processing flow performed by the charge management device 100 (charging time shift processing) FIG. 8 is a diagram showing a process flow executed in the charging management device 100 according to the first embodiment of the present disclosure. Here, due to the recent increase in environmental awareness, renewable energy sources such as solar power supplied to charging stations have been attracting much more attention than energy sources such as nuclear energy sources and carbon energy sources such as coal and oil. Many homes and office buildings are now equipped with renewable energy power generation facilities, and technologies and services for storing the electricity generated therein in batteries installed there have been developed. As a result, charging stations are usually supplied with energy from power plants that generate electricity using coal, oil, nuclear power, etc., but they can also be supplied with electricity from batteries that store electricity generated by renewable energy sources installed in homes, office buildings, etc. In this regard, in FIG. 8, it is possible to instruct the charging time for the vehicle 300, which was initially scheduled, to be shifted to a time period in which there is a surplus in the amount of electricity supplied (a period in which surplus electricity is generated) based on the calculated target remaining charge amount, for example, because the supply from the renewable energy source is greater. That is, the charging time shifting process is a process of shifting the charging time to a time period when there is a surplus of supplied power (a surplus power generation period), for example, when there is a supply of power from a renewable energy source.

[0051] Fig. 8 is a processing flow performed by the charging management device 100 in the charging source switching processing shown in Fig. 5. This processing flow is performed mainly by the processor 112 reading and executing a program stored in the memory 111 at a predetermined cycle (for example, every 15 minutes).

[0052] First, the processor 112 receives from the outside and stores an surplus power information table that stores predictions of surplus power of batteries installed in structures (e.g., houses, office buildings, etc.) electrically connected to a charging station. Then, the processor 112 determines whether or not there is a period of surplus power in the battery associated with the station ID information of the charging station to which the vehicle 300 to be charged is connected (S201).

[0053] Next, when there is a period of surplus power generation, the processor 112 determines the priority order among the vehicles consuming the surplus power (S202). Specifically, based on the charge amount (the amount of power that can be charged per unit time: usually stored in the vehicle information table of FIG. 4A or the like) registered in advance for each vehicle and the length of the chargeable time of each vehicle during the period of surplus power generation (i.e., the period during which each vehicle is in a non-driving state in the reservation schedule information of each vehicle updated based on the target remaining charge amount), the priority order for each vehicle is determined so that the renewable energy source is preferentially allocated to the vehicle with the largest amount of chargeable time during the period of surplus power generation.

[0054] Next, the processor 112 allocates a schedule to supply power during the surplus power generation period according to the determined priority (S203). Then, the processor 112 again calculates the target remaining charge amount on the premise that a renewable energy source is used during the allocated period, again in the process flow shown in FIG. 6 (S204). As a result, if it is determined that the target remaining charge amount at the start of the next reservation can be secured even if charging from a renewable energy source is not performed during the entire allocated surplus power generation period, the processor 112 corrects the reservation schedule to allocate the remaining charge amount to a vehicle with the next priority (S205). The processor 112 determines a charging schedule for the vehicle to be shifted to the surplus power generation period and charged, and instructs the charging station to charge according to the determined charging schedule (S206).

[0055] In this way, when there is a period of surplus power generation at a charging station, it is possible to shift the charging time so that charging that would normally be performed outside the surplus power supply period is performed within the surplus power supply period based on the target remaining charge amount. Note that, in the above, an example has been given of a case in which the charging time is shifted to the surplus power supply period in which the proportion of so-called renewable energy sources is high, taking the environment into consideration, but the charging time may also be shifted from the viewpoint of, for example, cost or charging efficiency.

[0056] 8. Processing flow performed by the charge management device 100 (peak shaving processing) FIG. 9 is a diagram showing a processing flow executed in the charge management device 100 according to the first embodiment of the present disclosure. In recent years, vehicles having a battery capable of storing a large amount of power are not only discharged during driving, but are also attracting attention as a source of household power supply. That is, when the battery is charged with more power than is required during driving, the surplus can be supplied to a structure such as an office building or a house during a time period when power consumption is at its peak, thereby enabling more efficient operation. That is, the peak cut processing in FIG. 5 is a process for discharging the power stored in the battery for purposes other than driving, such as a power supply in an office building or a household power supply.

[0057] Fig. 9 shows a processing flow performed by the charge management device 100 in the peak shaving processing shown in Fig. 5. This processing flow is performed mainly by the processor 112 reading and executing a program stored in the memory 111 at a predetermined cycle (for example, every 15 minutes).

[0058] First, the processor 112 receives information indicating a predicted amount of power consumption of a structure (e.g., a house, an office building, etc.) electrically connected to the charging station, and determines whether the received amount of power consumption exceeds a predetermined threshold (S301).

[0059] Next, when there is an excess power occurrence period in which the predicted value of the power consumption exceeds a predetermined threshold, the processor 112 determines the priority order between the vehicles (S302). Specifically, based on the discharge amount (the amount of power that can be discharged per unit time: usually stored in the vehicle information table of FIG. 4A or the like) registered in advance for each vehicle and the length of the non-driving period of each vehicle during the excess power occurrence period (i.e., the period during which each vehicle is in a non-driving state in the reservation schedule information of each vehicle updated based on the target remaining charge amount), the priority order for each vehicle is determined so that vehicles that can discharge a large amount during the excess power occurrence period are given priority for discharging.

[0060] Next, the processor 112 assigns a schedule for discharging during the excess power occurrence period according to the determined priority (S303). The processor 112 then calculates the target remaining charge amount again, assuming that discharging will occur during the assigned period, again using the processing flow shown in FIG. 6 (S304). If it is determined that discharging during the entire assigned excess power occurrence period will not ensure the target remaining charge amount at the start of the next reservation, the processor 112 corrects the reservation schedule to assign the amount exceeding the target remaining charge amount to a vehicle with the next priority (S305). The processor 112 determines the allocation of the discharge schedule for the excess power occurrence period, and instructs the vehicle 300 to discharge during that period for peak shaving (S306).

[0061] In this way, for a structure such as a home or office building, if the predicted power consumption exceeds a predetermined threshold, the power stored in the battery for purposes other than driving will be discharged, enabling more efficient power management.

[0062] 9. Processing flow performed by the charging management device 100 (power buying and selling processing) FIG. 10 is a diagram showing a processing flow executed in the charging management device 100 according to the first embodiment of the present disclosure. The power buying and selling processing enables, for example, a plurality of vehicles 300 to be linked together and the charging and discharging of each vehicle 300 to be managed, so to speak, to be treated as a virtual power plant. Specifically, the processing is for discharging the power through a power transmission network to which the charging station of each vehicle 300 is connected and selling the power to a power company or a power transmission and distribution company, or purchasing the power from the power company or the power transmission and distribution company to charge each vehicle 300. That is, the power buying and selling processing in FIG. 5 is a processing for discharging the power stored in a battery stored in a power supplier (e.g., a power company or a power transmission and distribution company) to the charging station, or purchasing the power from the power supplier.

[0063] Fig. 10 shows a processing flow performed by the charging management device 100 in the power selling process shown in Fig. 5. This processing flow is performed mainly by the processor 112 reading and executing a program stored in the memory 111 at a predetermined cycle (for example, every 15 minutes).

[0064] First, the processor 112 determines whether or not a power supply request has been received from a power supplier (e.g., a power company or a power transmission and distribution company) (S401). As an example, when a request such as the time and amount of power required for power supply is received from the power supplier, the amount of power that can be supplied to the power supplier is calculated based on the request. Then, the processor 112 determines the priority order of vehicles to be used in the power buying and selling process (S402). Specifically, the processor 112 refers to the reservation information table and the predicted remaining charge information table of each vehicle, and obtains the non-driving period for each vehicle connected to the charging station during the period when surplus power is generated at the charging station. Then, the processor 112 determines the priority order of each vehicle so that vehicles with the longest non-driving period are given priority for charging and discharging.

[0065] Next, the processor 112 assigns a schedule for charging and discharging the power supply source to the charging station in the surplus power generation period according to the determined priority (S403). Note that at this time, if the power demand is high in the power company or the power transmission and distribution company that is the power supply source, discharging is performed, and if the power supply is sufficiently met, charging is performed. Then, the processor 112 calculates the target remaining charge amount again based on the processing flow shown in FIG. 6, assuming that charging and discharging will be performed during the assigned period (S404). As a result, if it is determined that the target remaining charge amount at the start of the next reservation cannot be secured with the charge and discharge schedule for the assigned surplus power generation period, the processor 112 corrects the reservation schedule so that the amount exceeding the target remaining charge amount is assigned to the vehicle with the next priority (S405). The processor 112 determines the assignment of the charge and discharge schedule for the surplus power generation period, and instructs the vehicle 300 to charge and discharge between the supply source that supplies power to the charging station and the battery for the power buying and selling process during that period (S406).

[0066] In this way, by managing the charging and discharging of electricity in the battery during periods when surplus electricity is generated and buying and selling electricity with electric power companies and electricity transmission and distribution companies, more efficient electricity management is possible.

[0067] As described above, in this embodiment, it is possible to predict the target remaining charge amount required in a predetermined period of time in the future and control charging and discharging accordingly, thereby enabling more efficient operation of the vehicle.

[0068] <Second embodiment> In the first embodiment, a reservation schedule is created based on user input received by the terminal device 400, and a target remaining charge amount is calculated according to the reservation schedule. In the second embodiment, in addition to this, a reservation schedule is created by referring to the past usage history of each vehicle and taking into account a usage forecast for a predetermined future period from the usage history, and a target remaining charge amount is calculated in the same manner as in the first embodiment. Note that this embodiment has the same configuration, processing, and procedure as the first embodiment, except for the points that will be specifically described below. Therefore, detailed descriptions of these matters will be omitted.

[0069] First, the charging management device 100 refers to the reservation schedule information of the vehicle for a certain period in the past (for example, the same period in the past 10 years) for each vehicle, in addition to the reservation schedule information for a predetermined future period received from the reservation management device 200. Then, for a usage record that has been input with a certain probability or higher during the same period in the past 10 years, even if it is not registered in the reservation schedule information received from the reservation management device 200, it registers it as a "reservation" in the reservation schedule information. According to the reservation schedule information updated in this way, the target remaining charge amount is calculated.

[0070] The above is just an example of how to use the past usage history. For example, reservation schedule information may be updated using a learning device that has been trained on learning data such as the past usage history, the day of the week when the vehicle was used, and the weather. It is also possible to use usage history of different vehicles.

[0071] As described above, in this embodiment, as in the first embodiment, it is possible to predict the target remaining charge amount required in a predetermined future period and control charging and discharging accordingly, thereby enabling more efficient operation of the vehicle.

[0072] <Third embodiment> In the first and second embodiments, the case where the target remaining charge amount is calculated based on predetermined electricity cost information has been described. In the third embodiment, in addition to this, the past driving history of each vehicle is referenced, and the amount of power that is expected to decrease during the travel reservation is calculated from the driving history. Note that this embodiment has the same configuration, processing, and procedure as the first embodiment, except for the points that will be specifically described below. Therefore, detailed explanations of these matters will be omitted.

[0073] First, the charge management device 100 stores driving history information of the vehicle used for a certain period of time in the past (for example, the past 10 years) for each user. Examples of the driving history information include information such as the average speed at the time of use, weather, outside temperature, driving time, and degree of acceleration / deceleration. Then, based on this information, the electric power consumption information is weighted, and a target remaining charge amount is calculated based on the weighted electric power consumption information.

[0074] The above is just an example of how to use the past driving history. For example, a learning device that has undergone machine learning of the driving history information as learning data may be used to calculate the target remaining charge amount.

[0075] As described above, in this embodiment, as in the first and second embodiments, it is possible to predict the target remaining charge amount required in a predetermined future period and control charging and discharging accordingly, thereby enabling more efficient operation of the vehicle.

[0076] It is also possible to configure a system by appropriately combining or replacing the elements described in each embodiment.

[0077] The processes and procedures described in this specification can be realized not only by those explicitly described in the embodiments, but also by software, hardware, or a combination of these. Specifically, the processes and procedures described in this specification can be realized by implementing logic corresponding to the processes in a medium such as an integrated circuit, a volatile memory, a non-volatile memory, a magnetic disk, or an optical storage. In addition, the processes and procedures described in this specification can be implemented as computer programs and executed by various computers including terminal devices and server devices.

[0078] Although the processes and procedures described herein are described as being executed by a single device, software, component, or module, such processes or procedures may be executed by multiple devices, multiple software, multiple components, and / or multiple modules. Furthermore, although the various information described herein is described as being stored in a single memory or storage unit, such information may be stored in multiple memories provided in a single device or multiple memories distributed across multiple devices. Furthermore, the software and hardware elements described herein may be realized by integrating them into fewer components or breaking them down into more components.

[0079] In addition, the following supplementary notes are provided in relation to the above description. (Appendix 1) A charging management device that manages a state of a vehicle that is electrically connected to a charging station to charge a battery and is capable of running using the power charged in the battery, a communication interface configured to receive vehicle information from the vehicles connected via a network, the vehicle information including information identifying the vehicle; a memory configured to store a predetermined instruction command and to store the vehicle information received by the communication interface, station information including information indicating a charging capacity of the charging station, and schedule information including one or more travel reservations for a predetermined future period; By executing the instruction command stored in the memory, a target remaining charge amount that is a target remaining charge amount before traveling for the one or more traveling reservations is calculated based on electricity cost information that indicates a distance that can be traveled per a predetermined unit amount of electricity, which is specified by the information that specifies the vehicle stored in the memory, the information that indicates the charging capacity, and the schedule information. a processor configured to A charging management device comprising: (Appendix 2) 2. The charging management device according to claim 1, wherein the schedule information is generated based on a history of past travel reservations of the vehicle and vehicle use reservations made by vehicle users. (Appendix 3) 3. The charge management device according to claim 1, further comprising: updating the schedule information based on the calculated target remaining charge amount. (Appendix 4) The charge management device according to any one of appendices 1 to 3, instructing to set a time frame for charging during a time period when there is a surplus in the amount of power supplied, based on the calculated target remaining charge amount. (Appendix 5) The charging management device according to any one of appendices 1 to 4, wherein when a prediction of power consumption in a structure connected to the charging station exceeds a predetermined threshold, the charging management device instructs discharging from the vehicle electrically connected to the charging station based on the calculated target remaining charge amount. (Appendix 6) The charging management device according to any one of appendices 1 to 5, which instructs the vehicle to discharge to a power source that supplies power to the charging station and to charge from the power source based on the calculated target remaining charge amount. (Appendix 7) A charging management method in which a processor executes the instruction commands in a charging management device including a communication interface configured to receive vehicle information including information identifying a vehicle from a vehicle connected via a network to a charging station in order to manage a status of the vehicle that is electrically connected to the charging station to charge a battery and run using the power charged in the battery, and a memory in which a predetermined instruction command is stored and configured to store the vehicle information received by the communication interface, station information including information indicating a charging capacity of the charging station, and schedule information including one or more travel reservations for a predetermined future period, the charging management method being performed by the processor executing the instruction commands, calculating a target remaining charge amount, which is a target remaining charge amount before traveling in the one or more travel reservations, based on electricity cost information indicating a distance that can be traveled per a predetermined unit amount of electricity, which is specified by the information specifying the vehicle stored in the memory, the information indicating the charging capacity, and the schedule information; A charge management method comprising: (Appendix 8) A charging management device including: a communication interface configured to receive vehicle information including information for identifying a vehicle from a vehicle connected via a network, the vehicle being electrically connected to a charging station to charge a battery with power and to manage a status of the vehicle that is capable of running using the power charged in the battery; and a memory configured to store the vehicle information received by the communication interface, station information including information indicating a charging capacity of the charging station, and schedule information including one or more running reservations for a predetermined future period; a processor configured to calculate a target remaining charge amount, which is a target remaining charge amount before traveling in the one or more traveling reservations, based on the information indicating the remaining charge amount stored in the memory, electricity cost information indicating a distance that can be traveled per a predetermined unit amount of electricity, the information indicating the charging capacity, and the schedule information; A charging management program that acts as a [Explanation of symbols]

[0080] 100 Charging management device 200 Reservation Management Device 300 vehicles 400 Terminal Equipment 500 Network

Claims

1. A charging management device that manages the status of one or more vehicles that are electrically connected to a charging station to charge a battery and run using the power charged in the battery, a memory configured to store a predetermined instruction command, and to be capable of storing vehicle identification information for identifying the vehicle and schedule information including one or more travel reservations for a predetermined future period; Executing the instruction command stored in the memory to calculate estimated power information of power consumption or charging power based on the schedule information for the vehicle identified by the vehicle identification information, and calculating a target remaining charge amount that is a target remaining charge amount before traveling for the one or more travel reservations based on the estimated power information, The target remaining charge amount for one of the plurality of travel reservations is calculated based on the target remaining charge amount for a travel reservation that is later than the one travel reservation. a processor configured to A charging management device comprising:

2. The charging management device of claim 1, wherein the processor calculates the target remaining charge amount for one of the multiple driving reservations based on the target remaining charge amount for the previous driving reservation, the free time between the one driving reservation and the driving reservation immediately before the one driving reservation, and the charging capacity of the charging station.

3. The charging management device according to claim 1 or 2, wherein the schedule information includes a travel reservation generated based on a history of past travel reservations for the vehicle, and a travel reservation generated based on a vehicle use reservation made by a vehicle user.

4. creating a charge / discharge plan for the vehicle based on the calculated target remaining charge amount; The charge management device according to any one of claims 1 to 3.

5. The charge / discharge plan is updated when a difference between the target remaining charge amount and a current remaining charge amount in the vehicle is equal to or greater than a predetermined value. The charge management device according to claim 4 .

6. the processor creates the charge / discharge plan between the one travel reservation and the next subsequent travel reservation based on a remaining charge amount at the end of one of the plurality of travel reservations and the target remaining charge amount of the travel reservation that is one subsequent to the one travel reservation. The charge management device according to claim 4 or 5.

7. The charge / discharge plan is set as charging for a time period in which power generation by a power generation facility connected to the charging station is predicted to be greater than power consumption in a structure connected to the charging station, resulting in a power surplus. The charge management device according to any one of claims 4 to 6.

8. The charge / discharge plan is set as charging for a time period when there is a surplus of power in a power supply source to the charging station. The charge management device according to any one of claims 4 to 7.

9. updating a charge / discharge plan for the vehicle to a degree that satisfies the target remaining charge amount based on the received request information for power; The charge management device according to any one of claims 4 to 8.

10. Based on receiving request information regarding power, modifying the charge / discharge plan for the time period specified in the request information; recalculating the target remaining charge amount based on the change in the charge / discharge plan; The charge management device according to any one of claims 4 to 8.

11. The charging management device according to any one of claims 1 to 7, wherein the processor manages charging and discharging of the vehicle electrically connected to the charging station when a prediction of power consumption in a structure connected to the charging station exceeds a predetermined threshold.

12. The charge management device according to claim 11 , wherein the processor calculates the target remaining charge amount of the vehicle on the assumption that charging and discharging of the vehicle is managed during a period in which the power consumption exceeds the threshold value.

13. The charging management device according to any one of claims 1 to 12, further comprising a communication interface configured to receive vehicle information including the vehicle identification information from the vehicle connected via a network.

14. 2. The charging management device according to claim 1, wherein the power estimation information is calculated based on power consumption information indicating a distance that can be traveled per a predetermined unit amount of power identified by the vehicle identification information, information indicating a charging capacity of the charging station, and the schedule information.

15. A charge management method for managing a status of one or more vehicles that are electrically connected to a charging station to charge a battery and run using the power charged in the battery, the charge management device including a memory configured to store predetermined instructions and to store vehicle identification information for identifying the vehicle and schedule information including one or more travel reservations for a predetermined future period, the charge management method being performed by a processor executing the instructions, the charge management method comprising: calculating estimated power information of power consumption or charging power until the start of the one or more travel reservations in the vehicle identified by the vehicle identification information, and calculating a target remaining charge amount that is a target remaining charge amount before travel in the one or more travel reservations based on the estimated power information; Including, The charging management method includes calculating the target remaining charge amount for one of the plurality of travel reservations based on the target remaining charge amount for a travel reservation that is later than the one travel reservation.

16. A charging management device including a memory configured to store vehicle identification information for identifying one or more vehicles that are electrically connected to a charging station, charge a battery, and are capable of running using the power charged in the battery, and the charging management device includes a charging station and a memory configured to store schedule information including one or more running reservations for a predetermined future period, Calculating estimated power information of power consumption or charging power up to the start time of the one or more travel reservations in the vehicle identified by the vehicle identification information, and calculating a target remaining charge amount that is a target remaining charge amount before travel in the one or more travel reservations based on the estimated power information; a processor configured to calculate the target remaining charge amount for one of the plurality of travel reservations based on the target remaining charge amount for a travel reservation that is later than the one travel reservation; A charging management program that acts as a

Citation Information

Patent Citations

  • Vehicle allocation device and method for allotting vehicle

    JP2013069226A

  • Device, method, and program for charge / discharge schedule management

    JP2014054091A

  • Power management system

    JP2015104157A

  • Vehicle management system

    JP2016009357A

  • Vehicle management system and vehicle management method

    JP2016206699A