How to discharge remaining concrete from a concrete pump truck

The method automates the discharge of residual concrete from a concrete pump truck by using an on-off valve and lid body with protrusions to capture sponge balls, reducing labor and improving efficiency by directly discharging into a mixer truck.

JP7590712B1Active Publication Date: 2024-11-27ECO STICK CO LTD +1

Patent Information

Application Number
JP2024058593
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-27
Estimated Expiration
2044-04-01

AI Technical Summary

Technical Problem

Discharging residual concrete from a concrete pump truck requires significant labor effort, including setting and transporting containers, managing overflow, and disposing of wash water, which is cumbersome and inefficient.

Method used

A method involving a concrete pump truck with a concrete pressure-feeding pipe equipped with an on-off valve and a lid body with protrusions, allowing for automatic discharge of residual concrete into a mixer truck by reversing the concrete flow through the pipe, capturing sponge balls with protrusions, and using the discharge pipe for efficient removal.

Benefits of technology

Reduces labor effort by automating the discharge process, eliminating the need for manual handling of containers and wash water disposal, and minimizing residual concrete in the pressure pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590712000001_ABST
    Figure 0007590712000001_ABST
Patent Text Reader

Abstract

To provide a method for discharging residual concrete from a concrete pump truck, which reduces the labor required for the work. [Solution] The subject of the present invention is a concrete pump vehicle (1) equipped with a piston-type concrete pump, a discharge pipe discharged from the concrete pump, and a concrete pressure pipe (6) connected to the discharge pipe. An on-off valve (8) for opening and closing the inside of the concrete pressure pipe (6) is provided in the concrete pressure pipe (6), and an opening (13) is formed in the concrete pressure pipe (6) between the discharge pipe and the on-off valve (8) and a lid (16) for closing the opening is provided. When the remaining concrete in the hopper (3) is to be discharged to the outside, the on-off valve (8) is closed, the lid (16) is removed, a discharge pipe (33) is connected to the opening (13), and the concrete pump is driven to discharge the remaining concrete from the discharge pipe (33).
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for discharging residual concrete in a concrete pump truck. [Background technology]

[0002] As described in Patent Document 1, for example, a concrete pump vehicle includes a self-propelled vehicle and various devices provided on the vehicle, such as a hopper into which concrete is poured, a concrete pump, a multi-stage boom, and a concrete pressure pipe. When the concrete pump is of the piston type, for example, two pumps are provided with their tips inserted in the hopper. An S-shaped pipe is rotatably provided in the hopper and is alternately connected to the tips of the two concrete pumps. The S-shaped pipe is connected to a discharge pipe, and the concrete pressure pipe is connected to the discharge pipe.

[0003] When a concrete pump that is not connected to the S-shaped pipe is driven, the concrete in the hopper is sucked in, or the concrete in the concrete pump is discharged into the hopper. On the other hand, when a concrete pump that is connected to the S-shaped pipe is driven, the concrete in the concrete pump is pumped through the S-shaped pipe to the concrete pressure pipe, or the concrete in the concrete pressure pipe is returned to the concrete pump. Therefore, by driving two concrete pumps alternately and appropriately controlling the rotational position of the S-shaped pipe and connecting them alternately to the concrete pumps, the concrete in the hopper is sucked in and pumped into the concrete pressure pipe continuously, so that the concrete can be pumped.

[0004] The concrete pumping pipe is made up of multiple unit pipes, and the section that is fixed to the vehicle has multiple unit pipes fixedly connected to it, while the section that is supported by the multi-stage boom has them rotatably connected as needed. Therefore, the concrete pumping pipe is bent in accordance with the bending of the multi-stage boom, and concrete can be poured in the desired position.

[0005] After concrete has been poured by a concrete pump truck, the concrete remaining in the concrete pressure pipe and hopper, that is, the residual concrete, must be discharged. To discharge the residual concrete, first, a sponge ball is inserted into the end of the concrete pressure pipe. By alternately driving the two concrete pumps while appropriately controlling the rotational position of the S-shaped pipe, the concrete in the concrete pressure pipe will flow backwards and be returned to the hopper. As the sponge ball moves through the concrete pressure pipe together with the concrete, it cleans the inside of the concrete pressure pipe. When the sponge ball reaches the vicinity of the hopper, the lid on the concrete pressure pipe is removed and the sponge ball is removed. The residual concrete returned to the hopper is discharged to the outside by opening the valve located below the hopper. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent No. 7045026 Summary of the Invention [Problem to be solved by the invention]

[0007] As explained above, the discharge of residual concrete from a concrete pump vehicle is done by opening the valve below the hopper, but this requires a great deal of work. First, before opening the valve, a container called a funnel must be set below the hopper. When the valve is opened, the residual concrete is discharged into the funnel, but the valve must be closed again before it overflows from the funnel. The residual concrete discharged into the funnel is transported to another location or returned to the mixer vehicle, but the funnel is heavy and the work is complicated. If there is residual concrete left in the hopper, an empty funnel must be set below the hopper again and the same work must be repeated. Furthermore, even after all the residual concrete has been discharged, the washing water generated when washing the hopper and concrete pump must also be treated in the same way, which requires a lot of work.

[0008] An object of the present invention is to provide a method for discharging remaining concrete from a concrete pump truck that reduces the labor required for such work. [Means for solving the problem]

[0009] The present invention provides a method for discharging residual concrete in a concrete pump vehicle equipped with a hopper, a piston-type concrete pump that sucks and discharges concrete from the hopper, a discharge pipe from the concrete pump, and a concrete pressure pipe connected to the discharge pipe. An opening valve for opening and closing the inside of the pipe is provided at a predetermined position of the concrete pressure pipe, and a cover is provided between the discharge pipe and the on-off valve to form an opening in the concrete pressure pipe and close the opening. The lid has a protrusion on its surface. Keep it. When returning the concrete in the concrete pumping pipe to the hopper prior to discharging the remaining concrete, the following procedure is followed: the cover is removed from the opening in advance and reattached to the opening with the front side facing the inside of the pipe, so that the projection is positioned inside the concrete pumping pipe. A sponge ball is pushed into the tip of the concrete pumping pipe while the concrete pump is driven to reverse the flow of the concrete in the concrete pumping pipe and return it to the hopper. At this time, the sponge balls that flow back together with the concrete are captured by the projection, and the cover is removed from the opening, through which the sponge balls can be taken out. When the remaining concrete in the hopper is to be discharged to the outside, the on-off valve is closed, a discharge pipe is connected to the opening, and the concrete pump is driven to discharge the remaining concrete from the discharge pipe.

[0010] The invention described in claim 2 is configured as follows. That is, the concrete pumping pipe is composed of a plurality of unit pipes having different shapes, and the unit pipe connected to the discharge pipe is composed of a discharge elbow pipe. The on-off valve is provided between the discharge elbow pipe and another unit pipe connected to the discharge elbow pipe, and the opening is formed in the discharge elbow pipe. Effect of the Invention

[0011] According to the present invention, when the remaining concrete in the hopper is discharged to the outside, the on-off valve is closed, the lid is removed, a discharge pipe is connected to the opening, and the concrete pump is driven to discharge the remaining concrete from the discharge pipe. Then, if the discharge pipe is connected to a mixer truck, the remaining concrete will be automatically put into the mixer truck by driving the concrete pump. In other words, there is no need to set up or transport a boat. Furthermore, after the remaining concrete in the hopper is discharged, the inside of the hopper and the concrete pump are washed, and the washing water can also be discharged into the mixer truck, reducing the labor required.

[0012] In the invention described in claim 2, the on-off valve is provided between the discharge elbow pipe connected to the discharge pipe and the other unit pipe connected to the discharge elbow pipe, and the opening is formed in the discharge elbow pipe, so that the discharge pipe is connected near the hopper. Although a small amount of residual concrete remains in the concrete pumping pipe after discharge, because the discharge pipe is connected near the hopper, the amount of residual concrete remaining in the concrete pumping pipe can be kept small. [Brief description of the drawings]

[0013] [Figure 1] 1 is a perspective view of a concrete pump vehicle equipped with a concrete pressure pipe according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a perspective view of a discharge elbow pipe and an on-off valve according to the present embodiment, which are unit pipes constituting the concrete pressure pipe according to the present embodiment. [Figure 3A] FIG. 2 is a front view of the valve body of the on-off valve according to the present embodiment. [Figure 3B] 1 is a side cross-sectional view of an on-off valve according to an embodiment of the present invention; [Figure 4A] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. [Figure 4B] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. [Figure 4C] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. [Figure 4D] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. [Figure 4E] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. [Figure 4F] FIG. 2 is a front cross-sectional view showing a portion of the concrete pumping pipe according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] <Concrete pump truck> The present embodiment will be described below. A concrete pump vehicle 1 according to the present embodiment is shown in FIG. 1. The concrete pump vehicle 1 is generally composed of a self-propelled vehicle 2, a hopper 3 provided on the vehicle 2, a multi-stage boom 4, and a concrete pressure pipe 6 according to the present embodiment provided on the vehicle 2 and the multi-stage boom 4. Although not shown in the figure, the vehicle 2 is provided with two piston-type concrete pumps, the ends of which are located in the hopper 3. The hopper 3 is provided with an S-shaped pipe that is rotatably provided, not shown, and a discharge pipe connected to the S-shaped pipe. The S-shaped pipe is connected to one of the two concrete pumps depending on the rotation position. The concrete pressure pipe 6 according to the present embodiment, which will be described next, is connected to a discharge pipe that is not shown.

[0015] <Concrete pressure pipe> The concrete pressure pipe 6 according to the present embodiment is composed of a plurality of unit pipes 6a, 6b, ... connected to each other. The unit pipe 6a connected to the discharge pipe in the hopper 3 is a discharge elbow pipe 6a according to the present embodiment, which will be described in detail below, and the unit pipe 6b composed of a tapered pipe 6b is connected to this discharge elbow pipe 6a via an opening / closing valve 8 according to the present embodiment, which will be described later. The unit pipe 6c composed of a bent pipe 6c is connected to the tapered pipe 6b, and similarly, a plurality of unit pipes 6d, 6e ... are connected thereto. The concrete pressure pipe 6 has a section provided on the vehicle 2 side as described above and a section supported by the multi-stage boom 4. The section supported by the multi-stage boom 4 is bent as the multi-stage boom 4 bends.

[0016] <Discharge elbow pipe> FIG. 2 shows a discharge elbow 6a according to this embodiment and an on-off valve 8 according to this embodiment. The discharge elbow 6a according to this embodiment is gently curved in the perpendicular direction and has a tapered inner diameter. A flange 9 is formed at the large diameter end, which is connected to a discharge pipe (not shown). Meanwhile, a flange 10 is formed at the small diameter end, which is connected to an on-off valve 8, which will be described later, by a coupling fitting 12.

[0017] An opening 13 is formed midway through the discharge elbow pipe 6a. A flange portion 14 is formed at the opening 13. This opening 13 is closed by a lid 16 according to this embodiment, and the lid 16 is fixed to the opening 13 by a coupling fitting (not shown). The back side of the lid 16 is flat, but a projection 17 of a predetermined shape is formed on the front side. As will be described later, when the lid 16 is turned over and the back side is attached to the opening 13, the projection 17 is positioned inside the discharge elbow pipe 6a.

[0018] <Shut-off valve> The on-off valve 8 according to the present embodiment is composed of a main body 19 and a valve body 20 inserted into the main body 19. As shown in FIG. 3A, the valve body 20 is formed from a metal plate into a substantially rectangular shape. The valve body 20 has horizontally elongated cutouts 21, 21 near both short sides of the rectangle. The cutouts 21, 21 are holes into which fingers can be inserted when gripping and operating the valve body 20. The valve body 20 has no hole in the upper half area in FIG. 3A, but has a circular hole 23 in the lower half area. As will be described next, the upper half is an area for closing the on-off valve 8, and the lower half is an area for opening the on-off valve 8. Stoppers 24, 24, ... are formed near both short sides of the valve body 20 to prevent the valve body 20 from coming off the main body 19, which will be described next.

[0019] The main body 19 is formed in a short tube shape, the cross section of which is shown in FIG. 3B. The center of the main body 19 is a valve body housing 26 that houses the valve body 20 slidably. When the circular hole 23 of the valve body 20 is aligned with the inner peripheral surface of the valve body housing 26, that is, when the state shown in FIG. 3B is reached, the on-off valve 8 is opened and concrete flows through the pipe. On the other hand, when the valve body 20 is driven to slide the upper half of the valve body 20 into the valve body housing 26, the on-off valve 8 is closed. Flanges 27, 27 are formed at both ends of the main body 19, and are adapted to connect the unit pipe 6a (see FIG. 1), i.e., the discharge elbow pipe 6a, and the unit pipe 6b, i.e., the tapered pipe 6b.

[0020] <How to remove remaining concrete> A method of discharging remaining concrete in a concrete pump vehicle 1 (see FIG. 1) according to this embodiment will be described. First, a state in which concrete is being pumped will be described. FIG. 4A shows a part of a concrete pumping pipe 6. Specifically, a discharge elbow pipe 6a, an on-off valve 8, and a tapered pipe 6b are shown. When pumping concrete, an opening 13 of the discharge elbow pipe 6a is closed by a cover 16, and the on-off valve 8 is in an open state. In the concrete pump vehicle 1, when the concrete pump is driven and the S-shaped pipe is appropriately controlled, the concrete in the hopper 3 is pumped, and the concrete 30 flows in the concrete pumping pipe 6 as shown in FIG. 4A. The concrete is poured.

[0021] When the concrete has been poured, the concrete 30 in the concrete pumping pipe 6 is returned to the hopper 3. As shown in FIG. 1, a sponge ball (not shown) is pushed into the tip 29 of the concrete pumping pipe 6. Next, as shown in FIG. 4B, the cover 16 is removed from the discharge elbow pipe 6a, turned over, and reattached to the opening 13. Then, the protrusion 17 on the cover 16 is placed inside the pipe. In the concrete pump truck 1 (see FIG. 1), the concrete pump is driven and the S-shaped pipe is appropriately controlled. Then, as shown in FIG. 4B, the concrete 30 flows backward in the concrete pumping pipe 6. As a result of this backward flow, the sponge ball 31 moves inside the concrete pumping pipe 6, cleaning the inside of the concrete pumping pipe 6.

[0022] Eventually, as shown in Figure 4C, the sponge ball 31 gets caught on the protrusion 17. That is, the sponge ball 31 stops in the discharge elbow pipe 6a. The concrete pump of the concrete pump truck 1 is stopped. As shown in Figure 4D, the cover 16 is removed and the opening 13 is opened. The sponge ball 31 is taken out from the opening.

[0023] Next, as shown in FIG. 4E, the discharge pipe 33 is connected to the opening 13 of the discharge elbow pipe 6a. Although not shown in the figure, the other end of the discharge pipe 33 is connected to the hopper of the mixer truck. The valve body 20 of the on-off valve 8 is operated to close the on-off valve 8. The concrete pump is driven in the concrete pump truck 1, and the S-shaped pipe is appropriately controlled. Then, the concrete 30 is pumped as shown in FIG. 4F. Since the concrete pumping pipe 6 is closed by the on-off valve 8, the concrete 30 flows through the discharge pipe 33. The concrete is discharged from the discharge pipe 33 to the mixer truck not shown in the figure. When the concrete in the hopper 3 (see FIG. 1) becomes equal to or less than a predetermined amount, cleaning water is supplied to wash the concrete pump and the inside of the hopper 3. If the concrete pump is subsequently driven, the cleaning water is sent to the mixer truck via the discharge pipe 33. Discharge of the remaining concrete is completed.

[0024] <Modification> This embodiment can be modified in various ways. For example, the on-off valve 8 is described as being provided between the discharge elbow pipe 6a and the tapered pipe 6b, but is not limited to this location. That is, the on-off valve 8 may be provided between other unit pipes 6c, 6d, ..., for example, between the tapered pipe 6b and the bent pipe 6c. Furthermore, the on-off valve 8 may not be provided between two adjacent unit pipes 6a, 6b, ..., but may be provided within one unit pipe 6a, 6b, .... The position where the opening 13 is formed can also be modified. The opening 13 formed in the concrete pressure pipe 6 can be formed at any position between the discharge pipe and the on-off valve 8. Note that, if the on-off valve 8 is provided adjacent to the discharge elbow pipe 6a and the opening 13 is formed in the discharge elbow pipe 6a as in this embodiment, the amount of remaining concrete remaining in the concrete pressure pipe 6 can be reduced when the discharge of the remaining concrete is completed. [Explanation of symbols]

[0025] 1 Concrete pump truck 2 Vehicles 3 Hopper 4 Multi-stage boom 6. Concrete pumping pipe 6a Discharge elbow pipe (unit pipe) 6b Tapered pipe (unit pipe) 8 Opening and closing valve 9 Flange section 10 Flange portion 12 Coupling metal fitting 13 Opening 14 Flange 16 Lid 17 Protrusion 19 Main body 20 Valve body 21 Hole 23 Circular hole 24 Stopper 26 Valve body storage section 29 Tip 30 Concrete 31 Sponge ball 33 Discharge pipe

Claims

1. A concrete pump vehicle includes a hopper, a piston-type concrete pump that sucks and discharges concrete from the hopper, a discharge pipe that discharges concrete from the concrete pump, and a concrete pressure pipe that is connected to the discharge pipe. An opening / closing valve for opening and closing the inside of the concrete pumping pipe is provided at a predetermined position of the concrete pumping pipe, an opening is formed in the concrete pumping pipe between the discharge pipe and the opening / closing valve, and a lid for closing the opening is provided, and a protrusion is provided on the surface of the lid, When returning the concrete in the concrete pumping pipe to the hopper prior to discharging the remaining concrete, the cover is removed from the opening in advance and reattached to the opening with the front surface facing the inside of the pipe, thereby positioning the projection inside the concrete pumping pipe; a sponge ball is pushed in from the tip of the concrete pumping pipe while the concrete pump is driven to reverse the flow of concrete in the concrete pumping pipe and return it to the hopper; the sponge ball that reverses with the reverse flow of concrete is captured by the projection; the cover is removed from the opening and the sponge ball is taken out from the opening; A method for discharging remaining concrete, when discharging remaining concrete in the hopper to the outside, comprises closing the on-off valve, connecting a discharge pipe to the opening, and driving the concrete pump to discharge the remaining concrete from the discharge pipe.

2. 2. The method for discharging residual concrete as described in claim 1, wherein the concrete pressure pipe is composed of a plurality of unit pipes of different shapes, the unit pipe connected to the discharge pipe is composed of a discharge elbow pipe, the on-off valve is provided between the discharge elbow pipe and the other unit pipe connected to the discharge elbow pipe, and the opening is formed in the discharge elbow pipe.

Citation Information

Patent Citations

  • JP1972004593U

  • Wet concrete spraying equipment

    JP1991105543U

  • Viscous fluid pump