Unauthorized registration prevention device, method, and program for preventing unauthorized registration
The unauthorized registration prevention device and method address the oversight of supervising engineer assignment by ensuring proper engineer allocation and error checking, enhancing compliance and reducing manual burdens in construction budget registration.
Patent Information
- Application Number
- JP2022043162
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-03-17
- Publication Date
- 2024-11-27
- Estimated Expiration
- 2042-03-17
AI Technical Summary
Existing systems fail to ensure that a supervising engineer is assigned during budget registration for construction work when the contract amount exceeds a certain level, leading to potential errors and incorrect oversight.
An unauthorized registration prevention device and method that includes a storage section and control section to check if a supervising engineer is required based on budget amounts, using a budget detail acquisition means, prime contractor determination, totaling, and installation determination to display errors if engineers are not appropriately assigned.
Ensures appropriate allocation of supervising engineers, reduces manual checking burdens, prevents incorrect construction progress, and checks for qualified personnel and duplicate assignments, thereby enhancing compliance with regulations.
Smart Images

Figure 0007591000000001 
Figure 0007591000000002 
Figure 0007591000000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an apparatus, a method, and a program for preventing fraudulent registration. [Background technology]
[0002] Patent Document 1 discloses a configuration in which personnel required to be assigned to a construction project acquire planning information for assigning engineers having predetermined attributes for a predetermined period of time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2022-32175 Summary of the Invention [Problem to be solved by the invention]
[0004] However, the invention described in the above Patent Document 1 had a problem in that it was not possible to check whether or not a supervising engineer was required when registering the budget input for a construction work.
[0005] The present invention has been made in consideration of the above problems, and aims to provide a fraudulent registration prevention device, a fraudulent registration prevention method, and a fraudulent registration prevention program that can determine, in accordance with the Construction Business Act, at the time of registering the budget input for a construction work, whether or not a supervising engineer is required for a work project with a prime contractor budget amount of a certain amount or more. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, the fraudulent registration prevention device of the present invention is a fraudulent registration prevention device equipped with a memory unit and a control unit, the memory unit is equipped with a construction basic storage means for storing construction basic information in which a construction project and a prime contractor / subcontractor classification are set, a construction engineer storage means for storing construction engineer information in which the project, the engineer classification, and the engineer for the construction project are linked and set, and a cost item master in which cost items and whether or not the subcontract amount is subject to linking are set, and the control unit is equipped with a budget detail acquisition means for acquiring budget detail information in which the project, the cost item, and the budget amount are linked, a prime contractor determination means for determining whether or not the project set in the budget detail information is a prime contractor based on the construction basic information, and a prime contractor determination means for determining whether or not the project set in the budget detail information is a prime contractor based on the cost item master. The system is characterized in that it comprises: an aggregation means for acquiring, for each project determined by the contract determination means to be the prime contractor, an aggregate amount obtained by aggregating the budget amounts set in the budget detail information in which the cost item that is the subject of the subcontract amount is set, and acquiring aggregate information linked to the project and the aggregate amount; a set amount determination means for determining whether the aggregate amount is equal to or greater than a set amount, based on the construction technical person information, a setting determination means for determining whether a supervising engineer has been appointed as the person in charge of the project set in the aggregate information in which the aggregate amount determined by the set amount determination means to be equal to or greater than the set amount has been set; and an error display means for displaying an error display for the project determined by the setting determination means to have no supervising engineer.
[0007] In addition, in the fraudulent registration prevention device according to the present invention, the cost item that is the object of the subcontract amount is an outsourcing cost.
[0008] In the fraudulent registration prevention device according to the present invention, the set amount is 40 million yen.
[0009] In addition, in the fraudulent registration prevention device of the present invention, the budget detail acquisition means displays a budget input screen when a request to display a budget input screen is input when inputting a budget, and acquires the budget detail information when the project, the cost item, and the budget amount are set on the budget input screen.
[0010] In addition, in the fraudulent registration prevention device of the present invention, the control unit is further characterized by having a construction registration means which, when a request to display a construction input screen is input, displays a construction basic information input screen, and, when the project and the prime contractor / subcontractor classification of the construction work are set on the construction basic information input screen, registers the construction basic information in the construction basic storage means.
[0011] In addition, in the fraudulent registration prevention device of the present invention, the budget detail acquisition means is further characterized in that, when the budget amount is changed due to a fluctuation in the contract amount and / or subcontract amount after the start of the construction work, the budget detail acquisition means acquires changed budget detail information that is linked to the project, the cost item, and the changed budget amount.
[0012] The fraudulent registration prevention method according to the present invention is a fraudulent registration prevention method to be executed by a fraudulent registration prevention device having a memory unit and a control unit, the memory unit being equipped with a construction basic storage means for storing construction basic information in which a construction project and a prime contractor / subcontractor classification are set, a construction engineer storage means for storing construction engineer information in which the construction project, the engineer classification, and the engineer are linked and set, and a cost item master in which cost items and subcontract amount target / non-target are linked, and the control unit is caused to execute a budget detail acquisition step of acquiring budget detail information in which the project, the cost items, and the budget amount are linked, a prime contractor judgment step of judging whether the project set in the budget detail information is a prime contractor based on the construction basic information, and a prime contractor judgment step of acquiring the prime contractor based on the cost item master. The method includes a calculation step of acquiring an aggregate amount by aggregating the budget amounts set in the budget detail information in which the cost item that is the target of the subcontract amount is set, for each project determined to be the prime contractor in the determination step, and acquiring aggregate information linked to the project and the aggregate amount; a set amount determination step of determining whether the aggregate amount is equal to or greater than a set amount, based on the construction engineer information, a setting determination step of determining whether a supervising engineer has been assigned as the person in charge of the project set in the aggregate information in which the aggregate amount determined to be equal to or greater than the set amount in the set amount determination step is set; and an error display step of displaying an error message for the project determined to not have a supervising engineer in the setting determination step.
[0013] Further, the fraudulent registration prevention program according to the present invention is a fraudulent registration prevention program to be executed by a fraudulent registration prevention device having a memory unit and a control unit, the memory unit having a construction basic storage means for storing construction basic information in which a construction project and a prime contractor / subcontractor classification are set, a construction engineer storage means for storing construction engineer information in which the construction project, the engineer classification, and the engineer are linked and set, and a cost item master in which a cost item and a subcontract amount target are linked and set, and the control unit has a budget item acquisition step for acquiring budget item information in which the project, the cost item, and the budget amount are linked, a prime contractor judgment step for judging whether the project set in the budget item information is a prime contractor based on the construction basic information, and a prime contractor judgment step for judging whether the project set in the budget item information is a prime contractor based on the cost item master. The method is characterized in that, for each project determined to be the prime contractor in the determination step, the method executes the following steps: an aggregation step of acquiring an aggregate amount by aggregating the budget amounts set in the budget detail information in which the cost item that is the subject of the subcontract amount is set, and acquiring aggregate information linked to the project and the aggregate amount; a set amount determination step of determining whether the aggregate amount is equal to or greater than a set amount, based on the construction engineer information, a setting determination step of determining whether or not a supervising engineer has been assigned as the person in charge of the project set in the aggregate information in which the aggregate amount determined to be equal to or greater than the set amount in the set amount determination step is set; and an error display step of displaying an error message for the project determined to not have a supervising engineer in the setting determination step. Effect of the Invention
[0014] According to the present invention, it is possible to check whether a supervising engineer and a chief engineer are appropriately assigned by the system. Also, according to the present invention, it is possible to reduce the burden of checking the assignment status of workers on-site. Also, according to the present invention, it is possible to prevent construction work from proceeding in an incorrect state. Also, according to the present invention, when the subcontract amount including tax of the prime contractor work is 40 million yen or more at the time of registering the budget input, it is necessary to assign a supervising engineer, so it is possible to check whether a supervising engineer has been assigned. Also, according to the present invention, it is possible to check whether a person who has appropriate qualifications has been registered as a worker at the time of registering the basic construction information input. Also, according to the present invention, it is possible to check whether a worker to be registered is not also engaged in other construction work during the same period ... supervising engineer or a chief engineer has been assigned, so it is possible to check whether a supervising engineer or a chief engineer has been assigned, at the time of registering the contract information input, when the subcontract amount including tax of the prime contractor work is 35 million yen or more at the time of registering the contract information input. The present invention also has the effect of making it possible to visualize the allocation of engineers. The present invention also has the effect of registering information on the person in charge, including technical responsibility classification, in a project (PJ), and checking the person in charge of the project when registering a contract. The present invention also has the effect of enabling checks at the time of budget registration, qualification checks at the time of PJ registration, and duplicate assignment checks at the time of PJ registration. The present invention also has the effect of providing a mechanism for performing error checks according to the contract amount in the system. The present invention also has the effect of enabling changes in the amount after the start of construction to be accommodated by performing error checks each time the contract amount is revised and registered, in particular. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a diagram showing an example of an information registration process for a construction project in this embodiment. [Diagram 2]FIG. 2 is a block diagram showing an example of the configuration of the fraudulent registration prevention device in this embodiment. [Diagram 3] FIG. 3 is a flowchart showing an example of the process of the fraudulent registration prevention device in this embodiment. [Figure 4] FIG. 4 is a flowchart showing an example of the process of the fraudulent registration prevention device in this embodiment. [Diagram 5] FIG. 5 is a flowchart showing an example of the process of the fraudulent registration prevention device in this embodiment. [Figure 6] FIG. 6 is a diagram showing an example of the fraudulent registration prevention process in this embodiment. [Figure 7] FIG. 7 is a diagram showing an example of the fraudulent registration prevention process in this embodiment. [Figure 8] FIG. 8 is a diagram showing an example of the fraudulent registration prevention process in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to the embodiment.
[0017] [1. Overview] First, an overview of the present invention will be described with reference to Fig. 1. Fig. 1 is a diagram showing an example of an information registration process for construction work in this embodiment.
[0018] The Construction Business Act stipulates that for construction projects with a contract amount above a certain level, engineers (supervising engineers and chief engineers) must be assigned to each project (Construction Business Act, Article 26), and the Act stipulates that "When carrying out contracted construction work, construction contractors must appoint a chief engineer at the construction site, regardless of the contract amount," and "When a construction contractor contracts for construction work directly from a client and subcontracts work worth 40 million yen or more, they must appoint a supervising engineer at the site instead of a chief engineer."
[0019] Therefore, it has been necessary to comply with this regulation from the past, but in reality, the contract amount may change after the start of construction due to additional work, and the subcontract amount changes daily depending on the progress of the work, so in order to properly assign engineers with the appropriate qualifications (supervising engineers, chief engineers) when the threshold amount is reached, a burden of checking is placed on the on-site work. Also, in the past, when checking the threshold amount by human eyes, there was a risk of burdensome checking and a risk of fraud occurring due to oversight.
[0020] Therefore, as shown in Figure 1, in the information registration process for construction work in this embodiment, a mechanism is provided that allows engineers to be registered appropriately by performing error checks according to the allocation status of supervising engineers and chief engineers when entering basic information about the construction work, contract information, and budget information.
[0021] [2. Configuration] An example of the configuration of the fraudulent registration prevention device 100 according to this embodiment will be described with reference to Fig. 2. Fig. 2 is a block diagram showing an example of the configuration of the fraudulent registration prevention device 100 according to this embodiment.
[0022] 2, the fraudulent registration prevention device 100 is a commercially available desktop personal computer. The fraudulent registration prevention device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.
[0023] The fraudulent registration prevention device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the fraudulent registration prevention device 100 is connected to each other so as to be able to communicate with each other via an arbitrary communication path.
[0024] The communication interface unit 104 communicably connects the fraudulent registration prevention device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the fraudulent registration prevention device 100 and the server 200 to be able to communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).
[0025] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a touch panel), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114 or the printer 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.
[0026] The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 includes an employee-specific qualification master 106a, a qualification-specific engineering division master 106b, a cost item master 106c, and a construction work database 106d.
[0027] The employee-specific qualification master 106a is a master that associates the person in charge with the qualification.
[0028] The qualification-based engineering responsibility division master 106b is a master that associates the qualification with the engineering responsibility division. Here, the engineering responsibility division may be set to a supervising engineer or a chief engineer.
[0029] The cost item master 106c is a master that associates the cost item with the subcontract amount and whether or not it is a subcontract item.
[0030] The construction work database 106d stores construction work information. Here, the construction work database 106d may store (as construction information) construction work projects and basic construction information in which a prime contractor / subcontractor division is set. The construction work database 106d may also store (as construction information) construction work projects, technical divisions, and construction technical staff information in which staff members are linked together. The construction information may also include order information (e.g., order header information or order detail information, etc.) and / or budget information (e.g., budget detail information, etc.).
[0031] The control unit 102 is a CPU or the like that comprehensively controls the fraudulent registration prevention device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various information processing based on these stored programs. The control unit 102 conceptually includes a construction registration unit 102a, a contract registration unit 102b, a budget detail acquisition unit 102c, a prime contractor determination unit 102d, a compilation unit 102e, a set amount determination unit 102f, an installation determination unit 102g, and an error display unit 102h.
[0032] The construction registration unit 102a registers construction information for a construction work. Here, when a construction input screen display request is input, the construction registration unit 102a displays a construction basic information input screen, and when a construction project and a prime contractor / subcontractor classification are set on the construction basic information input screen, the construction basic information may be registered in the construction work database 106d. In addition, when a construction project, technical division, and technician are set on the construction basic information input screen, the construction registration unit 102a may register construction technician information in the construction work database 106d.
[0033] The contract registration unit 102b registers the contract information of the construction work. Here, the contract registration unit 102b may register the order information of the construction work. In addition, when a request to display a contract information input screen is input, the contract registration unit 102b may display the contract information input screen and register the contract information of the construction work.
[0034] The budget detail acquisition unit 102c acquires budget information. Here, the budget detail acquisition unit 102c may acquire budget detail information in which a project, a cost item, and a budget amount are linked together. In addition, when a budget input screen display request is input during budget input, the budget detail acquisition unit 102c may display a budget input screen, and when a project, a cost item, and a budget amount are set on the budget input screen, the budget detail acquisition unit 102c may acquire budget detail information after the project, the cost item, and the changed budget amount are linked together when the budget amount is changed due to a change in the contract amount and / or the subcontract amount after the start of construction work. In addition, the budget detail acquisition unit 102c may register the budget information.
[0035] The prime contractor determination unit 102d determines whether or not the project set in the budget detail information is a prime contractor. Here, the prime contractor determination unit 102d may determine whether or not the project set in the budget detail information is a prime contractor based on the basic construction information.
[0036] The tallying unit 102e acquires an aggregated amount by tallying up the budget amounts set in the budget detail information in which the cost item that is the subcontract amount target is set, for each project. Here, the tallying unit 102e may acquire an aggregated amount by tallying up the budget amounts set in the budget detail information in which the cost item that is the subcontract amount target is set, for each project that is determined to be a prime contractor by the prime contractor determination unit 102d, based on the cost item master 106c, and acquire aggregated information set by linking the project and the aggregated amount. Here, the cost item that is the subcontract amount target may be an outsourcing cost.
[0037] The set amount determination unit 102f determines whether the total amount is equal to or greater than a set amount. Here, the set amount may be 40 million yen.
[0038] The installation determination unit 102g determines whether or not a supervising engineer is installed as the person in charge of the project set in the tally information in which the tally amount determined by the set amount determination unit 102f to be equal to or greater than the set amount is set.
[0039] The error display unit 102h displays an error message for the project. Here, the error display unit 102h may display an error message for the project for which the installation determination unit 102g has determined that a supervising engineer is not installed.
[0040] [3. Specific Examples] A specific example of this embodiment will be described with reference to FIGS.
[0041] [Fraudulent registration prevention process] An example of the fraudulent registration prevention process in this embodiment will now be described with reference to Fig. 3 to Fig. 5. Fig. 3 to Fig. 5 are flow charts showing an example of the process of the fraudulent registration prevention device 100 in this embodiment.
[0042] [Error check when registering budget] As shown in FIG. 3, when a request to display the budget input screen is input by the user via the input device 112 during budget input, the budget detail acquisition unit 102c displays the budget input screen on the output device 114, and when the user sets the project, cost item, and budget amount including tax on the budget input screen via the input device 112 and presses the register button, acquires budget detail information (step SA-1).
[0043] Then, the prime contractor determination unit 102d determines whether or not the project set in the budget detail information is a prime contractor, based on the basic construction information stored in the construction work database 106d (step SA-2).
[0044] If the prime contractor determination unit 102d determines that the project set in the budget detail information is not a prime contractor (is a subcontractor) (step SA-2: No), it shifts the process to step SA-6.
[0045] On the other hand, if the prime contractor determination unit 102d determines that the project set in the budget detail information is a prime contractor (step SA-2: Yes), it shifts the process to step SA-3.
[0046] Then, the aggregation unit 102e obtains an aggregated amount by aggregating the tax-inclusive budget amounts set in the budget detail information in which the outsourcing costs are set, which is the subcontractor target budget amount, for each project determined to be a prime contractor by the prime contractor determination unit 102d based on the cost item master 106c, and obtains aggregation information set in association with the project and the aggregated amount. The set amount determination unit 102f determines whether the aggregated amount is 40 million yen or more (step SA-3).
[0047] If the set amount determination unit 102f determines that the total amount is not 40 million yen or more (is less than 40 million yen) (step SA-3: No), it shifts the process to step SA-6.
[0048] On the other hand, if the set amount determination unit 102f determines that the total amount is 40 million yen or more (step SA-3: Yes), it shifts the process to step SA-4.
[0049] Then, based on the basic construction information and construction engineer information stored in the construction work database 106d, the installation determination unit 102g determines whether a supervising engineer has been installed (registered) as the person in charge of the project set in the aggregate information for which the aggregate amount determined by the set amount determination unit 102f to be 40 million yen or more has been set (step SA-4).
[0050] If the installation determining unit 102g determines that the supervising engineer is not registered as the person in charge of the project set in the tallying information (step SA-4: No), the installation determining unit 102g shifts the process to step SA-5.
[0051] Then, the error display unit 102h causes the output device 114 to display an error message for the project for which it has been determined by the installation determination unit 102g that no supervising engineer has been installed (step SA-5), and the process ends.
[0052] On the other hand, if the installation determining unit 102g determines that the supervising engineer is registered as the person in charge of the project set in the tallying information (step SA-4: Yes), it shifts the process to step SA-6.
[0053] Then, the budget detail acquisition unit 102c completes the registration of the budget detail information in the construction work database 106d (step SA-6), and ends the process.
[0054] [Error check when registering basic construction information] As shown in FIG. 4, when a user inputs a request to display a construction basic information input screen via the input device 112, the construction registration unit 102a displays the construction basic information input screen on the output device 114, and when the user sets the construction project, prime contractor / subcontractor classification, technical responsibility classification, and person in charge on the construction basic information input screen via the input device 112 and presses the registration button, the construction basic information and construction technical person information are acquired (step SB-1).
[0055] Then, the construction registration unit 102a judges whether or not a supervising engineer or a chief engineer is registered in the construction engineer information (step SB-2).
[0056] Then, when the construction registration unit 102a determines that a supervising engineer or a chief engineer is not registered in the construction engineer information (step SB-2: No), it shifts the process to step SB-6.
[0057] On the other hand, if the construction registration unit 102a determines that a supervising engineer or a chief engineer is registered in the construction engineer information (step SB-2: Yes), it shifts the process to step SB-3.
[0058] Then, the construction registration unit 102a judges whether or not the person in charge set in the construction engineer information has the necessary qualifications for the project based on the employee-specific qualification master 106a and the qualification-specific engineer division master 106b (step SB-3).
[0059] Then, if the construction registration unit 102a determines that the person in charge set in the construction engineer information does not have the necessary qualifications for the project (does not hold necessary qualifications) (step SB-3: No), it transitions the processing to step SB-5.
[0060] On the other hand, if the construction registration unit 102a determines that the person in charge set in the construction engineer information has the necessary qualifications for the project (required qualifications held) (step SB-3: Yes), it transitions the process to step SB-4.
[0061] Then, the construction registration unit 102a checks the person in charge's engagement in other projects based on the employee-specific acquired qualification master 106a and the qualification-specific technical responsibility category master 106b, and determines whether the person in charge's engagement period in the project set in the construction technical responsibility information overlaps with the engagement period in the other projects (step SB-4).
[0062] Then, if the construction registration unit 102a determines that the project working period set in the construction engineer information by the engineer overlaps with the working period of the other project (step SB-4: Yes), it transitions the processing to step SB-5.
[0063] Then, the error display unit 102h displays an error message on the output device 114 (step SB-5), and ends the process.
[0064] On the other hand, if the construction registration unit 102a determines that the project working period set in the construction engineer information by the engineer does not overlap with the working period of the other project (step SB-4: No), it transitions the processing to step SB-6.
[0065] Then, the construction registration unit 102a completes the registration of the construction basic information and construction engineer information in the construction work database 106d (step SB-6), and ends the process.
[0066] [Error check when registering contract information] As shown in FIG. 5, when a request to display a contract information input screen is input by the user via the input device 112, the contract registration unit 102b displays the contract information input screen on the output device 114, and when the user sets the project, department in charge, contract subject, contract location, product, and contract amount including tax on the contract information input screen via the input device 112 and presses the register button, the contract registration unit 102b obtains the order information (step SC-1).
[0067] Then, the contract registration unit 102b judges whether or not the project set in the order information is a prime contractor based on the basic construction information stored in the construction work database 106d (step SC-2).
[0068] If the contract registration unit 102b determines that the project set in the order information is not a prime contract (is a subcontract) (step SC-2: No), it shifts the process to step SC-6.
[0069] On the other hand, if the contract registration unit 102b determines that the project set in the order information is a prime contractor (step SC-2: Yes), it shifts the process to step SC-3.
[0070] Then, the contract registration unit 102b obtains, for each project determined to be a prime contractor, a contract summary amount calculated by aggregating the tax-inclusive contract amount set in the order information in which the outsourcing cost is set, which is the subcontractor target tax-inclusive budget amount, obtains contract summary information set in association with the project and the contract summary amount, and determines whether the contract summary amount is 35 million yen or more (step SC-3).
[0071] If the contract registration unit 102b determines that the contract total amount is not equal to or greater than 35 million yen (is less than 35 million yen) (step SC-3: No), it shifts the process to step SC-6.
[0072] On the other hand, if the contract registration unit 102b determines that the contract total amount is 35 million yen or more (step SC-3: Yes), it shifts the process to step SC-4.
[0073] Then, based on the basic construction information and construction technical person information stored in the construction work database 106d, the contract registration unit 102b determines whether either a supervising engineer or a chief engineer has been appointed (registered) as the person in charge of the project set in the contract summary information for which the contract summary amount determined to be 35 million yen or more has been set (step SC-4).
[0074] If the contract registration unit 102b determines that either the supervising engineer or the chief engineer is not registered as the person in charge of the project set in the contract summary information (step SC-4: No), it transitions the processing to step SC-5.
[0075] Then, the error display unit 102h displays an error message on the output device 114 for the project for which the contract registration unit 102b has determined that no supervising engineer has been assigned (step SC-5), and ends the process.
[0076] On the other hand, if the contract registration unit 102b determines that either a supervising engineer or a chief engineer is registered as the person in charge of the project set in the contract summary information (step SC-4: Yes), it transitions to step SC-6.
[0077] Then, the contract registration unit 102b completes the registration of the order information in the construction work database 106d (step SC-6), and ends the process.
[0078] Here, an example of the fraudulent registration prevention (error check) process in this embodiment will be described with reference to Fig. 6 to Fig. 8. Fig. 6 to Fig. 8 are diagrams showing an example of the fraudulent registration prevention process in this embodiment.
[0079] As shown in FIG. 6, in the input of basic construction information in this embodiment, construction information is registered on a client contract basis, a number is automatically assigned in the details, other items are manually entered on the screen (multiple lines can also be entered), and the basic construction information and construction engineer information are updated. Then, as shown in FIG. 6, in this embodiment, an error check is performed to see whether the person registered as the construction engineer at the time of registering the basic construction information input has the appropriate engineer qualification. That is, as shown in FIG. 6, in this embodiment, since Obic Taro has the necessary qualifications as a chief engineer but does not have the necessary qualifications as a supervising engineer, an error is generated when the operator registers Obic Taro as a supervising engineer. Also, as shown in FIG. 6, if the person registered as a supervising engineer or chief engineer at the time of registering the basic construction information input is registered as a supervising engineer or chief engineer of another construction during the same period (there is one or more days that overlap between the start date and the end date of the work), an error is generated. That is, as shown in FIG. 6, in this embodiment, Obic Taro is engaged in multiple construction projects on 2021 / 7 / 1, so an error is generated. Here, as shown in FIG. 6, in this embodiment, the construction period and engagement period are the same, but if the worker is replaced during the construction period, multiple workers can be registered. Note that, as shown in FIG. 6, the basic construction information and construction engineer information for PJ number: PJ002 in this embodiment are information on other construction projects that were registered in advance.
[0080] Also, as shown in FIG. 7, in the contract information input in this embodiment, the information of the construction contract is registered by construction branch office, and the order header information and order detail information are updated. Then, as shown in FIG. 7, in this embodiment, when the contract information input is registered, the tax-inclusive contract amount held in the order detail by PJ is totaled, and if the tax-inclusive contract amount is 35 million yen or more, an error check is performed because either a supervising engineer or a chief engineer is required to be installed. That is, as shown in FIG. 7, in this embodiment, since the total tax-inclusive contract amount of PJ001 is 49.5 million yen, which is 35 million yen or more, the registration of a supervising engineer or a chief engineer is required, but since neither a supervising engineer nor a chief engineer is registered in PJ001, an error is generated. Here, in this embodiment, when the prime contractor / subcontractor classification of the construction basic information is subcontracting, the installation of an engineer is not required, so an error check is not performed. Here, as shown in Fig. 7, in this embodiment, when the sales month is divided into multiple sales months for construction work by the same department, income and expenditures are managed for each planned sales date, so the order detail information is managed in two parts with the same order number. Also, as shown in Fig. 7, in this embodiment, when one customer contract is divided into multiple departments, the order number is managed in two parts with the same project number, so that income and expenditures are managed for each location. Note that, as shown in Fig. 7, the order header information and order detail information for order number: JU002 in this embodiment are other contract information that was registered in advance.
[0081] Also, as shown in FIG. 8, in the budget input in this embodiment, the budget information for each order detail information is registered, and the budget amount is registered for each cost item for each order detail information. Then, as shown in FIG. 8, in this embodiment, the cost item master 106c is referenced, and only the detailed information of the outsourcing cost, which is the cost item for the subcontract amount, is tallied among the tax-inclusive budget amounts held in the budget detail information for each PJ at the time of budget input registration, and as a result of the tallying, if the tax-inclusive budget amount is 40 million yen or more, an error check is performed because a supervising engineer is required to be appointed. That is, as shown in FIG. 8, in this embodiment, since the total tax-inclusive contract amount of PJ001 is 40.7 million yen, which is 40 million yen or more and the appointment of a supervising engineer is required, an error is generated. Here, in this embodiment, when the prime contractor / subcontractor classification in the basic construction information is subcontracting, the appointment of a supervising engineer / chief engineer is not required, so an error check is not performed.
[0082] In this way, in this embodiment, it is possible to check for errors when inputting basic construction information, contract information, and budget information at the time of new registration. If the contract amount or subcontract amount fluctuates as the construction progresses and the details of the engineers required change, error checking is performed in each program, making it possible to take appropriate measures to prevent employee information from becoming fraudulent.
[0083] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.
[0084] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.
[0085] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.
[0086] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.
[0087] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.
[0088] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.
[0089] Moreover, with regard to the fraudulent registration prevention device 100, each of the components shown in the figures is merely a functional concept, and the device does not necessarily have to be physically configured as shown in the figures.
[0090] For example, the processing functions of the fraudulent registration prevention device 100, particularly the processing functions performed by the control unit 102, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium including programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the fraudulent registration prevention device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.
[0091] In addition, this computer program may be stored in an application program server connected to the fraudulent registration prevention device 100 via any network, and it is also possible to download all or a part of it as necessary.
[0092] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.
[0093] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a configuration that is distributed as a plurality of modules or libraries, and a program that achieves its function by cooperating with a separate program, such as an OS. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in this embodiment, as well as the installation procedure after reading, may use well-known configurations and procedures.
[0094] The various databases etc. stored in the memory unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.
[0095] The fraudulent registration prevention device 100 may be configured as an information processing device such as a known personal computer or a workstation, or may be configured as the information processing device to which any peripheral device is connected. The fraudulent registration prevention device 100 may be realized by installing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.
[0096] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]
[0097] The present invention is useful in industries such as the construction industry. [Explanation of symbols]
[0098] 100 Fraudulent registration prevention device 102 Control section 102a Construction Registration Department 102b Contract Registration Department 102c Budget Detail Acquisition Department 102d Prime Contractor Determination Department 102e Counting section 102f Set amount determination section 102g Installation judgment part 102h Error display 104 Communication interface section 106 Storage section 106a Employee-specific qualification master 106b Master of technical duties by qualification 106c Cost item master 106d Construction Work Database 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network
Claims
1. An unauthorized registration prevention device including a storage unit and a control unit, The storage unit is A construction project basic storage means for storing construction project basic information including a prime contractor / subcontractor classification; A construction engineer storage means for storing construction engineer information that is set by linking the project, the engineering division, and the engineer of the construction work; Cost item master set by linking cost items and subcontract amount target, A construction storage means for storing order detail information that is set by linking the project, order number, and order line number, and budget detail information for each order detail information that is set by linking the cost item and budget amount; Equipped with The control unit is a budget detail acquisition means for acquiring, when the budget amount is changed due to a change in the contract amount and / or subcontract amount after the start of the construction work, the budget detail information after the change is set in association with the cost item and the changed budget amount for each of the order detail information; A prime contractor determination means for determining whether or not the project set in the budget detail information is a prime contractor based on the basic construction information; aggregating means for acquiring, for each project determined to be a prime contractor by the prime contractor determination means based on the cost item master, a total amount obtained by aggregating the budget amounts set in the budget detail information in which the cost items that are the subcontractor amount targets are set, and acquiring aggregate information set by linking the project and the total amount; a set amount determination means for determining whether the total amount is equal to or greater than a set amount; an installation determination means for determining whether or not a supervising engineer is installed as the person in charge of the project set in the tabulated information in which the tabulated amount determined to be equal to or greater than the set amount by the set amount determination means is set based on the construction engineer information; an error display means for displaying an error display for the project for which it has been determined by the installation determination means that the supervising engineer is not installed; An unauthorized registration prevention device comprising:
2. The cost items that are the subject of the subcontract amount are:
2. The fraudulent registration prevention device according to claim 1, characterized in that the fee is an outsourcing fee.
3. The set amount is:
3. The fraudulent registration prevention device according to claim 1, wherein the amount is 40 million yen.
4. The budget detail acquisition means includes: The fraudulent registration prevention device as described in any one of claims 1 to 3 further comprises, when a request to display a budget input screen is input during budget input, a budget input screen is displayed, and when the cost item and the budget amount are set on the budget input screen, the budget detail information for each order detail information is registered.
5. The control unit is a construction registration means for displaying a construction basic information input screen when a construction input screen display request is input, and registering the construction basic information in the construction basic storage means when the project and the prime contractor / subcontractor classification of the construction work are set on the construction basic information input screen; 5. The fraudulent registration prevention device according to claim 1, further comprising:
6. A fraudulent registration prevention method to be executed by a fraudulent registration prevention device having a storage unit and a control unit, The storage unit is A construction project basic storage means for storing construction project basic information including a prime contractor / subcontractor classification; A construction engineer storage means for storing construction engineer information that is set by linking the project, the engineering division, and the engineer of the construction work; Cost item master set by linking cost items and subcontract amount target, A construction storage means for storing order detail information that is set by linking the project, order number, and order line number, and budget detail information for each order detail information that is set by linking the cost item and budget amount; Equipped with Executed in the control unit, a budget detail acquisition step of acquiring, when the budget amount is changed due to a change in the contract amount and / or subcontract amount after the start of the construction work, the budget detail information after the change is acquired for each of the order detail information, the budget detail information being linked to the cost item and the changed budget amount; A prime contractor determination step for determining whether or not the project set in the budget detail information is a prime contractor based on the basic construction information; a counting step of acquiring a total amount by tallying up the budget amounts set in the budget detail information in which the cost items that are the subcontract amount targets are set, for each project that has been determined to be the prime contractor in the prime contractor determination step based on the cost item master, and acquiring the total information set by linking the project and the total amount; a set amount determination step of determining whether the total amount is equal to or greater than a set amount; an installation determination step for determining whether or not a supervising engineer is installed as the person in charge of the project set in the aggregate information in which the aggregate amount determined to be equal to or greater than the set amount in the set amount determination step is set based on the construction engineer information; an error display step of displaying an error display for the project for which it has been determined in the installation determination step that the supervising engineer is not installed; A method for preventing fraudulent registration, comprising:
7. A fraudulent registration prevention program to be executed by a fraudulent registration prevention device having a storage unit and a control unit, The storage unit is A construction project basic storage means for storing construction project basic information including a prime contractor / subcontractor classification; A construction engineer storage means for storing construction engineer information that is set by linking the project, the engineering division, and the engineer of the construction work; Cost item master set by linking cost items and subcontract amount target, A construction storage means for storing order detail information that is set by linking the project, order number, and order line number, and budget detail information for each order detail information that is set by linking the cost item and budget amount; Equipped with In the control unit, a budget detail acquisition step of acquiring, when the budget amount is changed due to a change in the contract amount and / or subcontract amount after the start of the construction work, the budget detail information after the change is acquired for each of the order detail information, the budget detail information being linked to the cost item and the changed budget amount; A prime contractor determination step for determining whether or not the project set in the budget detail information is a prime contractor based on the basic construction information; a counting step of acquiring a total amount by tallying up the budget amounts set in the budget detail information in which the cost items that are the subcontract amount targets are set, for each project that has been determined to be the prime contractor in the prime contractor determination step based on the cost item master, and acquiring the total information set by linking the project and the total amount; a set amount determination step of determining whether the total amount is equal to or greater than a set amount; an installation determination step for determining whether or not a supervising engineer is installed as the person in charge of the project set in the aggregate information in which the aggregate amount determined to be equal to or greater than the set amount in the set amount determination step is set based on the construction engineer information; an error display step of displaying an error display for the project for which it has been determined in the installation determination step that the supervising engineer is not installed; A fraudulent registration prevention program to execute the above.
Citation Information
Patent Citations
Management method and apparatus for license information
JP2003162612A
Method of construction cost payment agency business for letting cost payment agency keep construction cost of contract construction from business owner and for letting cost payment agency pay kept construction cost to construction-related company in place of main contractor
JP2005141712A
Process management support system, process management support method, and process management support program
JP2006119917A
Personnel distribution system
JP2011165036A
Construction engineer management device, construction engineer management method, and construction engineer management program
JP2022032175A