Workload estimation system, workload management system, workload estimation method, and program
The workload estimation system uses terminal operation, biometric, and personnel data to estimate workload changes for each employee, enhancing workload management and engagement without surveys.
Patent Information
- Application Number
- JP2023564843
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-11-30
- Filing Date
- 2022-11-10
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2042-11-10
AI Technical Summary
Existing technologies cannot estimate the workload status of each individual without requiring surveys, limiting the ability to understand and manage workload distribution effectively.
A workload estimation system that utilizes business data such as terminal operation information, biometric data, location data, and voice data, combined with personnel data like job history, training, and attendance information, to estimate workload without surveys, using a workload estimation unit to calculate indices and compare them against reference values to determine workload changes.
Enables real-time estimation of workload for each employee, identifying changes and trends in workload without the need for surveys, thereby improving workload management and employee engagement.
Smart Images

Figure 0007591723000001 
Figure 0007591723000002 
Figure 0007591723000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a workload estimation system, a workload management system, a workload estimation method, and a program. [Background technology]
[0002] Patent Document 1 discloses an engagement estimation device that makes it possible to estimate engagement without requiring a questionnaire.
[0003] The engagement estimation device is connected to a database via a communication network and acquires various information from the database. The database stores group information for each group. The group information includes attribute information, network information, and engagement information for each group.
[0004] Then, the engagement estimation device estimates the engagement of the target group as follows.
[0005] The engagement estimation device selects a group showing network information having a feature quantity similar to the feature quantity of the network information of the target group based on the group information of each group acquired from the database, and extracts the engagement information of the selected group as first engagement information.
[0006] Furthermore, the engagement estimation device selects a group showing attribute information similar to the attribute information of the target group based on the group information of each group acquired from the database, and extracts the engagement information of the selected group as second engagement information.
[0007] Then, the engagement calculation unit calculates an average of the engagement values based on the first engagement information and the second engagement information, and estimates the average value as the engagement value of the target group.
[0008] The technology of the above-mentioned Patent Document 1 can estimate the engagement of a target group without requiring a questionnaire (survey), but cannot estimate the workload state of each individual. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] JP 2020-135543 A Summary of the Invention
[0010] An object of the present disclosure is to provide a workload estimation system, a workload management system, a workload estimation method, and a program that can estimate the workload state for each individual without requiring a survey.
[0011] A workload estimation system according to one aspect of the present disclosure estimates a workload state, which is the degree of burden placed on a person by work. The workload estimation system includes a workload estimation unit and a data output unit. The workload estimation unit estimates the workload state based on at least one of work data related to a history of work performed by the person and personnel data related to the person's personnel. The data output unit outputs estimation data including an estimation result of the workload state. The workload estimation unit calculates an index represented by a numerical value based on at least one of the work data and the personnel data, and estimates the workload state based on an inflection point occurring in time-series data of the index.
[0012] A workload management system according to one aspect of the present disclosure includes the workload estimation system described above and a display device that displays the estimated data.
[0013] A workload estimation method according to one aspect of the present disclosure is executed by a workload estimation system to estimate a workload state, which is the degree of burden placed on a person by work. The workload estimation method includes a workload estimation step and a data output step. The workload estimation step estimates the workload state based on at least one of work data related to a history of work performed by the person and personnel data related to the person's personnel. The data output step outputs estimation data including an estimation result of the workload state. In the workload estimation step, a numerical index is calculated based on at least one of the work data and the personnel data, and a workload state is estimated based on an inflection point occurring in time-series data of the index.
[0014] A program according to an aspect of the present disclosure causes a computer system to execute the above-described workload estimation method. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a block diagram showing a workload management system including a workload estimation system according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing an overview of a company to which employees who are targets of estimation by the above-mentioned workload estimation system belong. [Diagram 3] FIG. 3 is a perspective view showing employees to be estimated by the workload estimation system according to the embodiment. [Figure 4] FIG. 4 is a graph showing time series data of indices in the above-mentioned workload estimation system. [Diagram 5] FIG. 5 is a graph showing time series data of the total time of use of the information terminal in the above-mentioned workload estimation system. [Figure 6] FIG. 6 is a diagram for explaining the estimation process in the above-mentioned workload estimation system. [Figure 7] FIG. 7 is a diagram for explaining the estimation process in the first modified example of the embodiment. [Figure 8] FIG. 8 is a diagram for explaining the estimation process in the second modified example of the embodiment. [Figure 9] FIG. 9 is a diagram for explaining the estimation process in the third modified example of the embodiment. [Figure 10]FIG. 10 is a block diagram showing a workload management system including a workload estimation system according to the fourth modified example of the above embodiment. [Figure 11] FIG. 11 is a graph showing time-series data of the index in the fifth modified example of the above embodiment. [Figure 12] FIG. 12 is a flowchart showing a work load estimation method in the ninth modified example of the above embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] The following embodiments generally relate to a workload estimation system, a workload management system, a workload estimation method, and a program. More specifically, the following embodiments relate to a workload estimation system, a workload management system, a workload estimation method, and a program that estimate a workload state of a person. Note that the embodiments described below are merely examples of embodiments of the present disclosure. The present disclosure is not limited to the following embodiments, and various modifications are possible depending on the design, etc., as long as the effects of the present disclosure can be achieved.
[0017] (1) Overview of the Workload Management System The workload management system 1 shown in FIG.
[0018] The workload estimation system 2 estimates a workload state, which is the degree of burden placed on a person by work. The workload estimation system 2 includes a workload estimation unit 22 and a data output unit 23. The workload estimation unit 22 estimates the workload state based on at least one of work data related to the history of work performed by a person and personnel data related to the person's personnel affairs. The data output unit 23 outputs estimation data including the estimation result of the workload state.
[0019] The display device 3 displays the estimated data.
[0020] The workload management system 1 and the workload estimation system 2 having the above-described configuration can estimate the workload state for each person without requiring a survey.
[0021] (2) Details of the Workload Management System 1 shows an example of a specific configuration of a workload management system 1, which includes a workload estimation system 2 and a display device 3. It is preferable that the workload management system 1 further includes a work data collection system 4. The workload estimation system 2, the display device 3, and the work data collection system 4 are connected to a network NT1 including the Internet or the like and configured to enable communication via the network NT1.
[0022] The workload management system 1 manages the workload status of people who belong to an organization. An organization is, for example, a company, a corporation, a business, or an organization, and multiple people belong to the organization. Each person who belongs to an organization performs work required or requested by the organization.
[0023] In recent years, there has been a demand for improving engagement in organizations where multiple people work. For example, the more people in an organization feel comfortable working, motivated, and empathetic, the higher their engagement will be. Therefore, the workload management system 1 manages the workload of people in an organization to improve engagement in the organization. In the following explanation, the organization will be referred to as a company, and the people in the organization as employees.
[0024] (2.1) Business data collection system The business data collection system 4 collects business data for each of multiple employees H0 belonging to company C1 shown in Fig. 2. When distinguishing between the multiple employees H0, they are referred to as employees H1, H2, H3, H4, .... The multiple departments that make up company C1 include a first department C11, a second department C12, and a third department C13. Employees H1 and H2 belong to the first department C11. Employee H3 belongs to the second department C12. Employee H4 belongs to the third department C13.
[0025] The business data preferably includes at least one of terminal operation information, biometric information, location information, and voice information. In this embodiment, the business data includes terminal operation information, biometric information, location information, and voice information.
[0026] The business data collection system 4 includes an information collection application 41 , a biometric sensor 42 , a position sensor 43 , and a microphone 44 .
[0027] The terminal operation information is information related to the operation of an information terminal operated by the employee H0. In the company C1, the employee H0 operates an information terminal 9 (see FIG. 3) such as a personal computer, a tablet terminal, or a smartphone during work hours to perform tasks such as document creation, data entry, data browsing, remote conferencing, and contact. First identification information, which is identification information for each information terminal 9, is assigned in advance to the information terminal 9. Furthermore, an information collection application 41 is installed in the information terminal 9. The information collection application 41 collects terminal operation information corresponding to operations performed on the information terminal 9, and intermittently (periodically) transmits the collected terminal operation information to the workload estimation system 2 together with the first identification information.
[0028] The terminal operation information is information on at least one of, for example, a keyboard operation of the information terminal 9, a mouse operation of the information terminal 9, voice input to a microphone of the information terminal 9, operation of a camera of the information terminal 9, launch of an application executed by the information terminal 9, operation of the application, type of application running in the active window, type of application currently running, number of applications currently running, and number of windows generated with execution of the application. In this embodiment, the terminal operation information includes keyboard operation, mouse operation, voice input to a microphone, operation of the camera, launch of an application, operation of the application, type of application running in the active window, type of application currently running, number of applications currently running, and number of windows generated with execution of the application.
[0029] The biological information includes at least one of the heart rate of employee H0, the body temperature of employee H0, and the acceleration of a part of the body accompanying the movement of employee H0. In this embodiment, the biological information includes the heart rate of employee H0, the body temperature of employee H0, and the acceleration of a part of the body accompanying the movement of employee H0. The acceleration of a part of the body accompanying the movement of employee H0 is, for example, the acceleration of the legs when walking or running, the acceleration of a swinging arm or wrist, or the acceleration accompanying the movement of the body. In addition to the above-mentioned items, it is preferable that the biological information further includes a respiration rate (respiratory cycle or number of breaths per unit time), a body fat percentage, a basal metabolic rate, an activity level, and blood oxygen.
[0030] The location information is information that indicates the location of the employee H0. The voice information is information about the voice uttered by the employee H0.
[0031] The biosensor 42, the position sensor 43, and the microphone 44 are provided in a wearable terminal 8 (see FIG. 3), such as a smartwatch worn by the employee H0, and the wearable terminal 8 is assigned in advance second identification information, which is identification information for each wearable terminal 8. The biosensor 42 measures the employee H0's heart rate, body temperature, acceleration of parts of the body accompanying movements, respiratory rate (respiratory cycle or respiratory rate per unit time), body fat percentage, basal metabolic rate, activity level, blood oxygen level, and the like, and transmits the measurement results as bioinformation together with the second identification information to the workload estimation system 2 intermittently (periodically). The position sensor 43 detects the position of the employee H0 using a positioning technology using radio wave information such as GPS (Global Positioning System) or beacon or Wi-Fi (registered trademark), and transmits the detection result as position information together with the second identification information to the workload estimation system 2 intermittently (periodically). The microphone 44 collects the voice uttered by the employee H0 and transmits the collected voice result as voice information to the workload estimation system 2 together with the second identification information.
[0032] The business data collection system 4 may include an imaging device installed in a building, such as a building, office, or tenant space, in which the company C1 is located. In this case, the business data collection system 4 can acquire the biometric information and location information of each of the multiple employees H0 from the captured image by performing image recognition processing on the captured image of the imaging device installed in the building.
[0033] The business data collection system 4 may also include a fixed microphone installed in a building, such as a building, office, or tenant space, in which the company C1 is located. In this case, the business data collection system 4 can acquire voice information of each of the multiple employees H0 by performing voice recognition processing on the output of the fixed microphone installed in the building.
[0034] (2.2) Workload Estimation System The workload estimation system 2 includes a workload estimation unit 22 and a data output unit 23. It is preferable that the workload estimation system 2 further includes a data management unit 21.
[0035] The workload estimation system 2 preferably includes a computer system. The computer system executes a program to realize some or all of the functions of the workload estimation system 2. The computer system includes a processor that operates according to a program as a main hardware configuration. The type of processor is not important as long as it can realize the functions by executing the program. The processor is composed of one or more electronic circuits including a semiconductor integrated circuit (Integrated Circuit) or an LSI (Large Scale Integration). Here, it is called an IC or an LSI, but the name changes depending on the degree of integration, and it may be called a system LSI, a VLSI (Very Large Scale Integration), or an ULSI (Ultra Large Scale Integration). A field-programmable gate array (FPGA), which is programmed after the manufacture of the LSI, or a reconfigurable logic device that can reconfigure the connection relationship inside the LSI or set up the circuit partition inside the LSI, can also be used for the same purpose. The electronic circuits may be integrated into one chip or provided on multiple chips. The multiple chips may be integrated into one device or provided on multiple devices. The program is recorded on a non-transitory recording medium such as a computer-readable ROM, an optical disk, a hard disk drive, etc. The program may be stored in the recording medium in advance, or may be supplied to the recording medium via a wide area communication network including the Internet.
[0036] The workload estimation system 2 may be realized by one computer device or by multiple computers linked to each other. The workload estimation system 2 may also be constructed as a cloud computing system.
[0037] For example, the workload estimation system 2 is preferably a server device SV1 equipped with a computer system. That is, the data management unit 21, the workload estimation unit 22, and the data output unit 23 are provided in the server device SV1. In this case, the workload estimation system 2 can easily secure resources for processing the workload state.
[0038] (2.2.1) Data Management Section The data management unit 21 stores the above-mentioned first identification information and second identification information in association with the identification information of the multiple employees H0. Based on the first identification information and second identification information added to the received business data and personnel data, the data management unit 21 can link the corresponding business data and personnel data to the identification information of each of the multiple employees H0.
[0039] That is, the data management unit 21 stores the business data and personnel data for each employee H0.
[0040] (Business Data) The business data stored in the data management unit 21 includes terminal operation information, biometric information, position information, and voice information received from the business data collection system 4.
[0041] (Personnel data) The personnel data stored in the data management unit 21 is data transmitted by the personnel department of company C1 to the workload estimation system 2. The personnel data includes at least one of job information, training information, performance evaluation information, attendance information, and department information. In this embodiment, the personnel data includes job information, training information, performance evaluation information, attendance information, and department information.
[0042] The job information is information related to the job history of the employee H0, for example, information related to the job experience of the employee H0, such as the history of the work that the employee H0 is responsible for.
[0043] The training information is information relating to the training history of the employee H0, for example, information relating to the skills possessed by the employee H0.
[0044] The performance appraisal information is information relating to the performance appraisal history of the employee H0, for example, information relating to the results of a supervisor's evaluation of the work of the employee H0.
[0045] The attendance information is information relating to the attendance history of employee H0, such as information relating to employee H0's paid annual leave and time off such as absences, and working hours such as arrival time and departure time.
[0046] The department information is information about the department of the company C1 to which the employee H0 currently belongs, for example, information about the personnel of the department to which the employee H0 belongs. The department information is, for example, information about superior-subordinate relationships and colleagues shown in an organizational chart.
[0047] (2.2.2) Workload Estimation Section The workload estimation unit 22 estimates the workload state of the employee H0 based on at least one of the work data and the personnel data. The employee H0 to be estimated is assumed to be an employee H1.
[0048] Specifically, the workload estimation unit 22 intermittently (periodically) calculates an index Y0 (see FIG. 4) expressed as a numerical value based on at least one of the work data and personnel data of employee H1, and creates time series data of the index Y0. Then, as shown in FIG. 4, the workload estimation unit 22 calculates an evaluation value Ya based on the index Y0 in an evaluation period T1. The workload estimation unit 22 calculates a reference value Yb based on the index Y0 in a reference period T2 that includes a period before the evaluation period T1. The workload estimation unit 22 estimates the workload state of employee H1 by comparing the evaluation value Ya with the reference value Yb.
[0049] In this way, the workload estimation unit 22 can estimate the workload state for each employee H0 using at least one of the business data and the personnel data, without requiring a survey.
[0050] (Indicators based on business data) The following describes the process in which the workload estimation unit 22 calculates the index Y0 based on the task data. The workload estimation unit 22 calculates the index Y0 (see FIG. 4) expressed as a numerical value based on the task data. The task data includes terminal operation information, biometric information, position information, and voice information.
[0051] (Indicators based on device operation information) The workload estimation unit 22 can use the terminal operation information of the information terminal 9 used by the employee H1 as the business data. The terminal operation information is information on at least one of the following: operation of the keyboard of the information terminal 9, operation of the mouse of the information terminal 9, voice input to the microphone of the information terminal 9, operation of the camera of the information terminal 9, start of an application executed by the information terminal 9, operation of the application, type of application executed in the active window, type of application currently running, number of applications currently running, and number of windows generated with execution of the application. The workload estimation unit 22 can obtain the total usage time, which is the total time each day that the information terminal 9 is used by the employee H1, based on the terminal operation information. That is, the workload estimation unit 22 can obtain time series data of the total usage time and use the numerical value of the total usage time as the index Y0.
[0052] Fig. 5 shows time series data of the total usage time Y1 of the information terminal 9 used by employee H1 as an example of the index Y0. The horizontal axis of Fig. 5 represents days, E1 represents the period of weekdays, and E2 represents the period of holidays (Saturdays, Sundays, and public holidays). The vertical axis of Fig. 5 represents the total usage time Y1.
[0053] (Indicators based on biological information) The workload estimation unit 22 can use the biometric information of the employee H1 as the work data. The biometric information includes the heart rate of the employee H1, the body temperature of the employee H1, and the acceleration of the body parts associated with the movements of the employee H1. Therefore, the workload estimation unit 22 can obtain time-series data of the heart rate, body temperature, acceleration, etc. of the employee H1 based on the biometric information, and use the numerical values of the heart rate, body temperature, acceleration, etc. as the index Y0.
[0054] The workload estimation unit 22 can also determine whether the employee H1 is in a resting state where he / she is not moving, based on at least one of the heart rate and the acceleration. The workload estimation unit 22 may use the heart rate when the employee H1 is in a resting state as the index Y0. Furthermore, the workload estimation unit 22 may exclude the heart rate data immediately after the employee H1 transitions from the moving state to the resting state from the index Y0.
[0055] (Location-based metrics) The workload estimation unit 22 can use the location information of the employee H1 as the task data. The location information is information that indicates the location of the employee H1. Therefore, the workload estimation unit 22 can acquire time-series data such as the moving distance and moving speed of the employee H1 based on the location information, and use the numerical values of the moving distance and moving speed as the index Y0.
[0056] The workload estimation unit 22 can also determine whether the employee H1 is in a resting state where he / she is not moving, based on the position information. The workload estimation unit 22 may use the heart rate when the employee H1 is in a resting state as the index Y0. Furthermore, the workload estimation unit 22 may exclude the heart rate data immediately after the employee H1 transitions from the moving state to the resting state from the index Y0.
[0057] (Indicators based on audio information) Furthermore, the workload estimation unit 22 can use voice information of the person H1 as the task data. The voice information is information on the voice uttered by the employee H1. Therefore, the workload estimation unit 22 can acquire time-series data such as the amount of speech and the number of speeches of the employee H1 based on the voice information, and use the numerical values of the amount of speech and the number of speeches as the index Y0.
[0058] (Estimation based on device operation information, biometric information, location information, and voice information) Furthermore, the workload estimation unit 22 may obtain the index Y0 by using at least two of the terminal operation information, biometric information, position information, and voice information of the person H1 in combination as the task data.
[0059] (Based on personnel data) The following describes the process in which the workload estimation unit 22 calculates the index Y0 based on the personnel data. The workload estimation unit 22 calculates the index Y0 (see FIG. 4) expressed as a numerical value based on the personnel data. The personnel data includes job information, training information, performance evaluation information, attendance information, and department information.
[0060] (Job-based indicators) The workload estimation unit 22 can use the job information of the employee H1 as the personnel data. The job information is information related to the job history of the employee H1. The workload estimation unit 22 can obtain the job suitability of the employee H1 for the current job by comparing the current job of the employee H1 with the job history based on the job information. In other words, the workload estimation unit 22 can use the numerical value of the job suitability as the index Y0.
[0061] (Training-based indicators) The workload estimation unit 22 can use the training information of employee H1 as the personnel data. The training information is information related to the training attendance history of employee H1. The workload estimation unit 22 can obtain the work suitability of employee H1 for the current work by comparing the current work of employee H1 with the training attendance history based on the training information. In other words, the workload estimation unit 22 can use the numerical value of the work suitability as the index Y0.
[0062] (Indicators based on performance evaluation information) The workload estimation unit 22 can use performance appraisal information of employee H1 as personnel data. The performance appraisal information is information related to the performance appraisal history of employee H1. The workload estimation unit 22 can obtain the work suitability of employee H1 for the current work by comparing the current work of employee H1 with the performance appraisal history based on the performance appraisal information. In other words, the workload estimation unit 22 can use the numerical value of the work suitability as the index Y0.
[0063] (Indicators based on attendance information) The work load estimation unit 22 can use attendance information of the employee H1 as the personnel data. The attendance information is information related to the attendance history of the employee H1.
[0064] The workload estimation unit 22 can obtain the workload of the employee H1 from the working hours of the employee H1 based on the attendance information. That is, the workload estimation unit 22 can use the numerical value of the workload as the index Y0.
[0065] In addition, the workload estimation unit 22 can obtain the degree of support of other employees (H2-H4) for the work of employee H1 from the working hours of employee H1 based on the attendance information. That is, the workload estimation unit 22 can use the numerical value of the degree of support of other employees as the index Y0.
[0066] Furthermore, the workload estimation unit 22 can ascertain the interval between the time when employee H1 leaves work and the time when he or she next arrives at work based on the attendance information.Then, the workload estimation unit 22 can obtain the workload of employee H1 or the degree of support from other employees from the interval between the time when employee H1 leaves work and the time when he or she next arrives at work.That is, the workload estimation unit 22 can use the numerical value of the workload or the degree of support from other employees as the index Y0.
[0067] Furthermore, the workload estimation unit 22 can ascertain the annual paid leave acquisition rate of employee H1 based on the attendance information. The workload estimation unit 22 can then determine the workload of employee H1 or the degree of support from other employees from the annual paid leave acquisition rate. In other words, the workload estimation unit 22 can use the numerical value of the workload or the degree of support from other employees as the index Y0.
[0068] (Indicators based on department information) The workload estimation unit 22 can use department information of employee H1 as personnel data. The department information is information related to the first department C11, which is a department of company C1 to which employee H0 belongs. The workload estimation unit 22 can ascertain the number of members of the first department C11 to which employee H1 belongs, based on the department information. In other words, the workload estimation unit 22 can use the numerical value of the number of members of the first department C11 as an index Y0.
[0069] (Indicators based on job information, training information, performance evaluation information, attendance information, and department information) Furthermore, the workload estimation unit 22 may obtain the index Y0 by using at least two of the job information, training information, performance evaluation information, attendance information, and department information of the person H1 as personnel data.
[0070] (Indicators based on business and personnel data) The work load estimation unit 22 may obtain the index Y0 based on a combination of the work data and the personnel data.
[0071] For example, the workload estimation unit 22 uses the position information and voice information of each of the employees H1-H4 as the work data, and the department information of each of the employees H1-H4 as the personnel data. In this case, the workload estimation unit 22 can determine the length of time that the employees H1-H4 approach each other (approach time) and the number of times that the employees H1-H4 approach each other (number of approaches) based on the position information of each of the employees H1-H4. Furthermore, the workload estimation unit 22 can determine the presence or absence of mutual communication when the employees H1-H4 approach each other based on the voice information of each of the employees H1-H4. Furthermore, the workload estimation unit 22 can determine the mutual relationships of the employees H1-H4 (presence or absence of a relationship between a superior and a subordinate, whether or not they are in charge of the same work, etc.) based on the job information and department information of each of the employees H1-H4. Then, the workload estimation unit 22 can obtain the number or amount of mutual communication (degree of work cooperation) of the employees H1-H4 as an index Y0 based on each of the above-mentioned judgment results.
[0072] (Estimation of workload status) The workload estimation unit 22 estimates the workload state of the employee H1 using the index Y0.
[0073] 4, the workload estimation unit 22 calculates an evaluation value Ya based on an index Y0 in an evaluation period T1. The workload estimation unit 22 calculates a reference value Yb based on an index Y0 in a reference period T2 that includes a period before the evaluation period T1. The workload estimation unit 22 compares the evaluation value Ya with the reference value Yb to estimate the workload state of employee H1.
[0074] Here, the work load estimation unit 22 divides the work into unit periods D1 (1 day) from 0:00 to 24:00. In Fig. 4, the unit period D1 is exemplified by the day before yesterday D11, the day before yesterday D12, and today D13, and the time series data of the index Y0 for the three days of the day before yesterday D11, the day before yesterday D12, and today D13 is shown.
[0075] The workload estimation unit 22 then sets today D13 among the day before yesterday D11, the day before yesterday D12, and today D13 as the evaluation period T1. This evaluation period T1 includes today D13, which is the latest unit period D1, among the multiple unit periods D1, the day before yesterday D11, the day before yesterday D12, and today D13. In FIG. 4, the evaluation period T1 is set to today D13. That is, the workload estimation unit 22 performs real-time estimation to estimate the current or today's workload of employee H1 by setting the evaluation period T1 to today D13, which is the latest unit period D1.
[0076] Next, the workload estimation unit 22 obtains an evaluation value Ya based on the index Y0 in the evaluation period T1 (today D13). The evaluation value Ya is preferably the maximum value, minimum value, median value, variation, average value, or moving average value of the index Y0 in the evaluation period T1. For example, when the maximum value of the index Y0 in the evaluation period T1 is the evaluation value Ya, the evaluation value Ya becomes Ya1 (see FIG. 4). When the minimum value of the index Y0 in the evaluation period T1 is the evaluation value Ya, the evaluation value Ya becomes Ya2 (see FIG. 4). Therefore, the workload estimation unit 22 can easily obtain the evaluation value Ya from the index Y0.
[0077] Furthermore, the workload estimation unit 22 sets the day before yesterday D11 and the day before yesterday D12 among the day before yesterday D11, the day before yesterday D12, and today D13 as the reference period T2. This reference period T2 includes a period before the evaluation period T1. Then, the workload estimation unit 22 obtains the reference value Yb based on the index Y0 in the reference period T2 (the day before yesterday D11 and the day before yesterday D12). It is preferable that the reference value Yb is the maximum value, minimum value, median value, variation, average value, or moving average value of the index Y0 in the reference period T2. For example, when the maximum value of the index Y0 in the reference period T2 is set as the reference value Yb, the reference value Yb is Yb1 (see FIG. 4). When the minimum value of the index Y0 in the reference period T2 is set as the reference value Yb, the reference value Yb is Yb2 (see FIG. 4). Therefore, the workload estimation unit 22 can easily obtain the reference value Yb from the index Y0.
[0078] Then, the workload estimating unit 22 compares the evaluation value Ya with the reference value Yb to estimate the workload state.
[0079] Specifically, as shown in Fig. 6, if the evaluation value Ya falls within the reference range W1, the workload estimation unit 22 estimates that the workload has not changed. Also, if the evaluation value Ya does not fall within the reference range W1, the workload estimation unit 22 estimates that the workload has changed. The reference range W1 is a range that includes the reference value Yb. For example, the reference range W1 is a range of ±W11 with the reference value Yb at the center. Note that the reference range W1 may be any range that includes the reference value Yb, and may be, for example, a predetermined range equal to or greater than the reference value Yb, or a predetermined range equal to or less than the reference value Yb.
[0080] Then, if the evaluation value Ya is an evaluation value Ya11 that is greater than the upper limit value V1 of the reference range W1, the workload estimation unit 22 estimates that the workload of employee H1 has changed to the higher workload side (the workload has increased). If the evaluation value Ya is an evaluation value Ya13 that is smaller than the lower limit value V2 of the reference range W1, the workload estimation unit 22 estimates that the workload of employee H1 has changed to the lower workload side (the workload has decreased). If the evaluation value Ya is an evaluation value Ya12 that falls within the reference range W1, the workload estimation unit 22 estimates that the workload of employee H1 has not changed.
[0081] As described above, the workload estimation unit 22 can easily determine whether or not there has been a change in the workload of the employee H1 by comparing the evaluation value Ya with the reference value Yb.
[0082] (2.2.3) Data output section The data output unit 23 outputs the estimated data including the estimation result of the workload state by the workload estimation unit 22 to the display device 3. The data output unit 23 generates the estimated data as image data. The data output unit 23 may further include voice data in the estimated data.
[0083] (2.3)Display device The display device 3 is a tablet terminal, a smartphone, a liquid crystal display device, an organic EL display device, or the like used by the employee H0, and has a screen for displaying images. The display device 3 displays the inferred data received from the data output unit 23 on the screen. Furthermore, if the inferred data includes audio data, the display device 3 outputs audio from a speaker device.
[0084] (3) First Modification In this modification, the workload estimation unit 22 performs a comparison process between the evaluation value Ya of the new unit period D1 and the reference range W1 every time a new unit period D1 (the latest unit period D1) is added. Then, the workload estimation unit 22 stores the comparison result for each unit period D1 as shown in FIG. 7. In FIG. 7, if the evaluation value Ya of the unit period D1 falls within the reference range W1, the comparison result is expressed as "no change". Also, if the evaluation value Ya is greater than the upper limit of the reference range W1, the comparison result is expressed as "changed (high load)". Also, if the evaluation value Ya is less than the upper limit of the reference range W1, the comparison result is expressed as "changed (low load)". Note that the reference range W1 used in the comparison process for each of the multiple unit periods D1 is a range obtained from the reference period T2 corresponding to each unit period D1, and is not common to all unit periods D1.
[0085] It is preferable that the workload estimation unit 22 estimates the workload state based on at least one of the occurrence frequency of the comparison result "no change", the occurrence frequency of the comparison results "changed (high load)" and "changed (low load)." In other words, it is preferable that the workload estimation unit 22 estimates the workload state based on at least one of the occurrence frequency of the state where the evaluation value Ya falls within the reference range W1 and the occurrence frequency of the state where the evaluation value Ya does not fall within the reference range W1.
[0086] In this modified example, the workload estimation unit 22 estimates the workload state based on the frequency of occurrence of the comparison result “no change”, the frequency of occurrence of the comparison result “changed (high load)”, and the frequency of occurrence of the comparison result “changed (low load)”.
[0087] Specifically, the workload estimation unit 22 updates the estimation result when the number of consecutive occurrences of the same comparison result becomes equal to or exceeds the frequency threshold "2 times." In Fig. 7, the comparison result "changed (high load)" occurs twice consecutively in unit periods D21 and D22. That is, in unit periods D21 and D22, the number of consecutive occurrences of a state in which the evaluation value Ya is greater than the upper limit value V1 of the reference range W1 becomes equal to or exceeds the frequency threshold "2 times." Therefore, the workload estimation unit 22 estimates that the workload is in a high load state at timing t1 immediately after unit period D22.
[0088] 7, the comparison result "no change" occurs twice in succession in unit periods D31 and D32. That is, in unit periods D31 and D32, the number of consecutive occurrences of the state in which the evaluation value Ya falls within the reference range W1 is equal to or greater than the frequency threshold "twice." Therefore, the workload estimation unit 22 estimates that the workload is in a steady state at timing t2 immediately after unit period D32.
[0089] The workload estimation unit 22 of this modified example can easily estimate the workload state of the employee H0.
[0090] (4) Second Modification In this modification, the workload estimation unit 22 performs a comparison process between the evaluation value Ya of the new unit period D1 and the reference range W1 every time a new unit period D1 (latest unit period D1) is added. Then, the workload estimation unit 22 stores the comparison result for each unit period D1 as shown in FIG. 8. In FIG. 8, if the evaluation value Ya of the unit period D1 falls within the reference range W1, the comparison result is expressed as "no change". Also, if the evaluation value Ya is greater than the upper limit of the reference range W1, the comparison result is expressed as "changed (high load)". Also, if the evaluation value Ya is less than the upper limit of the reference range W1, the comparison result is expressed as "changed (low load)". Note that the reference range W1 used in the comparison process for each of the multiple unit periods D1 is a range obtained from the reference period T2 corresponding to each unit period D1, and is not common to all unit periods D1.
[0091] It is preferable that the workload estimation unit 22 estimates the workload state based on at least one of the occurrence frequency of the comparison result "no change", the occurrence frequency of the comparison results "changed (high load)" and "changed (low load)." In other words, it is preferable that the workload estimation unit 22 estimates the workload state based on at least one of the occurrence frequency of the state where the evaluation value Ya falls within the reference range W1 and the occurrence frequency of the state where the evaluation value Ya does not fall within the reference range W1.
[0092] In this modified example, the workload estimation unit 22 estimates the workload state based on the frequency of occurrence of the comparison result “no change”, the frequency of occurrence of the comparison result “changed (high load)”, and the frequency of occurrence of the comparison result “changed (low load)”.
[0093] Specifically, the work load estimation unit 22 creates groups each consisting of three consecutive unit periods D1, and performs statistical processing on the comparison results of the three unit periods D1 for each group. In Fig. 8, statistical processing is performed on each of groups G1 and G2 each consisting of three consecutive unit periods D1.
[0094] For group G1, the comparison results for the three unit periods D1 are "changed (low load)", "changed (high load)", and "changed (high load)", with the occurrence probability of "changed (high load)" being the highest. Therefore, the workload estimation unit 22 estimates that the workload is in a high load state at timing t11 immediately after group G1.
[0095] For group G2, the comparison results for the three unit periods D1 are "no change", "changed (low load)", and "no change", with "no change" occurring most frequently. Therefore, the workload estimation unit 22 estimates that the workload is in a steady state at timing t12 immediately after group G2.
[0096] The workload estimation unit 22 of this modified example can easily estimate the workload state of the employee H0.
[0097] (5) Third Modification In this modification, the workload estimation unit 22 estimates the state of the workload based on an inflection point that occurs in the time-series data of the index Y0.
[0098] Specifically, the workload estimation unit 22 extracts an inflection point P1 from the time-series data of the index Y0 of employee H1, as shown in Fig. 9. Then, if the index Y0 continues to decrease from the timing t21 at which the inflection point P1 occurs over the time threshold L1, as shown in Fig. 9, the workload estimation unit 22 estimates that the workload of employee H1 has changed to the lower workload side (the workload has decreased). Also, if the index Y0 continues to increase from the timing t21 at which the inflection point P1 occurs over the time threshold L1, the workload estimation unit 22 estimates that the workload of employee H1 has changed to the higher workload side (the workload has increased).
[0099] The workload estimation unit 22 of this modified example can easily estimate the workload state of the employee H0.
[0100] (6) Fourth Modification The workload estimation system 2 shown in Fig. 10 further includes an estimation result storage unit 24. The estimation result storage unit 24 stores the estimation results of the workload states of each of the multiple employees H0. The data output unit 23 predetermines at least one estimation result that can be included in the estimation data among the estimation results of the workload states of each of the multiple employees H0, for each output destination of the estimation data.
[0101] Specifically, the workload estimation unit 22 estimates the workload state for each of the multiple employees H0 in the same manner as for the above-mentioned employee H1. The workload estimation unit 22 stores the estimation results for each of the multiple employees H0 in the estimation result storage unit 24.
[0102] For example, employee H2 is a manager (or section manager) of the first department C11, and multiple employees H0, including employee H1, belong to the first department C11 as subordinates of employee H2. In this case, if the display device 3 to which the estimated data is output is used by employee H2, the data output unit 23 can include in the estimated data not only the estimated result for employee H2, but also the estimated results for each of the multiple employees H0 belonging to the first department C11. Furthermore, if the display device 3 to which the estimated data is output is used by employee H1, the data output unit 23 can include in the estimated data the estimated result of the workload for employee H1, but cannot include in the estimated data the estimated result of the workload for employees H0 other than employee H1.
[0103] Furthermore, the average of the estimated results of the workloads of all employees H0 (including employees H1 and H2) belonging to the first department C11 is set as the estimated result of the workload state of the first department C11. In this case, if the display device 3 to which the estimated data is output is used by the employee H0 belonging to the first department C11, the data output unit 23 can include the estimated result for the first department C11 in the estimated data.
[0104] The workload estimation system 2 of this modified example can protect the personal information of the employee H0 by determining in advance which estimation results can be output for each output destination of the estimation data.
[0105] (7) Fifth Modification By treating the above-mentioned evaluation period T1 as a past period, the workload estimation unit 22 can perform past estimation to estimate the workload state of employee H1 in the past or the day before, rather than real-time estimation to estimate the workload state of employee H1 at present or today.
[0106] Specifically, as shown in Fig. 11, the workload estimation unit 22 defines a period from 0:00 to 24:00 as a unit period D1 (one day). In Fig. 11, the day before yesterday D10, the day before yesterday D11, the day before yesterday D12, and today D13 are exemplified as the unit period D1, and the time series data of the index Y0 for four days, the day before yesterday D10, the day before yesterday D11, the day before yesterday D12, and today D13, is shown.
[0107] The workload estimation unit 22 then sets the previous day D12 among the day before previous D10, the day before previous D11, the day before previous D12, and today D13 as the evaluation period T1. This evaluation period T1 does not include today D13, which is the latest unit period D1, among the multiple unit periods D1, which are the day before previous D10, the day before previous D11, the day before previous D12, and today D13. In other words, the workload estimation unit 22 performs past estimation to estimate the workload of employee H1 in the past or before the day before by not including today D13, which is the latest unit period D1, in the evaluation period T1.
[0108] Then, the work load estimation unit 22 calculates an evaluation value Ya based on the index Y0 in the evaluation period T1 (the previous day D12). The evaluation value Ya is preferably the maximum value, minimum value, median value, variation, average value, or moving average value of the index Y0 in the evaluation period T1.
[0109] Furthermore, the workload estimation unit 22 sets the day before yesterday D10 and the day before yesterday D11 as the reference period T2 out of the day before yesterday D10, the day before yesterday D11, the day before yesterday D12, and today D13. This reference period T2 includes the period before the evaluation period T1. Then, the workload estimation unit 22 calculates a reference value Yb based on the index Y0 in the reference period T2 (the day before yesterday D10 and the day before yesterday D11). It is preferable that the reference value Yb is the maximum value, minimum value, median value, variation, average value, or moving average value of the index Y0 in the reference period T2.
[0110] Then, the workload estimating unit 22 compares the evaluation value Ya with the reference value Yb to estimate the workload state.
[0111] (8) Sixth Modification It is preferable that the unit period D1 is set for the weekdays of employee H0, and is not set for the holidays of employee H0.
[0112] Specifically, when the workload estimation unit 22 uses the total usage time Y1 shown in FIG. 5 as the index Y0, it extracts the total usage time Y1 for the weekday period E1, but does not extract the total usage time Y1 for holidays (Saturdays, Sundays, public holidays, and annual paid leave (including half-day leave and hourly leave)) E2. Then, the workload estimation unit 22 estimates the workload state based on the total usage time Y1 for the weekday period E1. For example, the workload estimation unit 22 sets the above-mentioned evaluation period T1 and reference period T2 for the time series data of the total usage time Y1 for the weekday period E1, and finds the evaluation value Ya and reference value Yb. The workload estimation unit 22 may also extract an inflection point from the time series data of the total usage time Y1 for the weekday period E1.
[0113] The workload estimating unit 22 of this modified example can estimate the workload state on weekdays.
[0114] (9) Seventh Modification It is preferable that the workload estimation system 2 estimates the workload state by using response data in addition to the above-mentioned task data and personnel data.
[0115] The response data is data from a survey (including questionnaires, etc.) conducted on employee H0 to understand employee H0's thoughts about his / her working conditions. In other words, the response data is data on employee H0's responses to the survey questions.
[0116] The data management unit 21 further stores the response data in addition to the work data and the personnel data. The workload estimation unit 22 estimates the workload state based on at least one of the work data and the personnel data and the response data.
[0117] For example, when the workload is increasing in the estimation result based on at least one of the business data and the personnel data, the work situation is confirmed by a survey of the employee H0 himself, and the response data is stored in the data management unit 21. Then, the workload estimation unit 22 judges the optimism and resilience of the employee H0 himself based on the response data, and re-estimates the workload state after taking the optimism and resilience into consideration.
[0118] The workload estimation unit 22 of this modified example can estimate the workload state of the employee H0 with higher accuracy by using the response data in addition to the business data and personnel data.
[0119] (10) Eighth Modification It is preferable that the workload estimation unit 22 inputs at least one of the work data and the personnel data into a learning model constructed by machine learning, and obtains an estimation result of the workload state from the learning model.
[0120] Specifically, employee H0 creates his / her own evaluation of the workload for the evaluation period T1 as self-evaluation data. Then, the estimation data including the estimation result of the workload estimation unit 22 for the workload for the evaluation period T1 and employee H0's self-evaluation data are input as teacher data to the learning model generation system. The learning model generation system stores the learning model used by the workload estimation unit 22, and performs a learning process to construct or reconstruct the algorithm of the learning model by learning using the teacher data. In other words, the learning model generation system generates a learning model by machine learning and improves the learning model. The learning model generated and improved by the learning model generation system is implemented in the workload estimation unit 22 as appropriate.
[0121] The learning model is preferably constructed by machine learning such as deep learning using a neural network, but is not limited to a specific model.
[0122] The workload estimation unit 22 can improve the estimation accuracy of the workload state by using a learning model.
[0123] (11) Ninth Variation The workload estimation method executed by the workload estimation system 2 described above can be summarized as shown in the flowchart of FIG.
[0124] The workload estimation method includes a data acquisition step S1, a workload estimation step S2, and a data output step S3.
[0125] In the data acquisition step S1, the data management unit 21 acquires at least one of business data and personnel data (and response data, if necessary).
[0126] In the workload estimation step S2, the workload estimation unit 22 estimates the state of the workload based on at least one of the work data and the personnel data (and also uses the response data if necessary).
[0127] In the data output step S3, the data output unit 23 outputs to the display device 3 the estimated data including the estimation result of the workload state.
[0128] The above-described workload estimation method can estimate the workload state for each employee H0 using at least one of the business data and the personnel data, without requiring a survey.
[0129] (12) 10th Variation The workload estimation system 2 does not need to use both the work data and the personnel data, and it is sufficient to estimate the workload state using at least one of the work data and the personnel data.
[0130] The business data may include information other than the terminal operation information, the biometric information, the location information, and the voice information. The biometric information may include information other than the employee H0's heart rate, body temperature, and the acceleration of parts of the body associated with the movement.
[0131] The personnel data may include information other than job information, training information, performance evaluation information, attendance information, and department information.
[0132] The evaluation period T1 may include multiple unit periods D1.
[0133] The reference period T2 may include today D13, which is the latest unit period D1.
[0134] The data management unit 21 may be provided in a system or device separate from the workload estimation system 2.
[0135] (13) Summary The workload estimation system (2) of the first aspect according to the above-mentioned embodiment estimates a workload state, which is the degree of burden on a person (H0) due to work. The workload estimation system (2) includes a workload estimation unit (22) and a data output unit (23). The workload estimation unit (22) estimates the workload state based on at least one of task data related to the history of work performed by the person (H0) and personnel data related to the personnel of the person (H0). The data output unit (23) outputs estimation data including an estimation result of the workload state.
[0136] The above-mentioned workload estimation system (2) can estimate the workload state for each person (H0) without requiring a survey.
[0137] In the second aspect of the workload estimation system (2) according to the above-described embodiment, in the first aspect, the task data preferably includes at least one of terminal operation information related to the operation of an information terminal (9) operated by the person (H0), biometric information of the person (H0), location information of the person (H0), and audio information related to audio uttered by the person (H0).
[0138] The above-mentioned workload estimation system (2) can use task data that allows the workload state to be estimated.
[0139] In the workload estimation system (2) of the third aspect according to the embodiment described above, in the second aspect, the terminal operation information is preferably information on at least one of the following: operation of a keyboard of the information terminal (9), operation of a mouse of the information terminal (9), voice input to a microphone of the information terminal (9), operation of a camera of the information terminal (9), launch of an application executed by the information terminal (9), operation of the application, type of application executed in an active window, type of application currently running, number of applications currently running, and number of windows generated in association with execution of an application.
[0140] The above-mentioned workload estimation system (2) can use terminal operation information that enables estimation of the workload state.
[0141] In the fourth aspect of the workload estimation system (2) according to the above-described embodiment, in the second or third aspect, it is preferable that the biological information is information relating to at least one of the heart rate of the person (H0), the body temperature of the person (H0), and the acceleration of a part of the body accompanying the movement of the person (H0).
[0142] The above-mentioned workload estimation system (2) can use bio-information that enables estimation of the workload state.
[0143] In the workload estimation system (2) of the fifth aspect according to the above-mentioned embodiment, in any one of the first to fourth aspects, the personnel data preferably includes at least one of job information related to the job history of the person (H0), training information related to the training attendance history of the person (H0), performance evaluation information related to the performance evaluation history of the person (H0), attendance information related to the attendance of the person (H0), and department information related to the department to which the person (H0) belongs.
[0144] The workload estimation system (2) described above can use personnel data that allows to estimate the workload state.
[0145] In the workload estimation system (2) of the sixth aspect according to the above embodiment, in any one of the first to fifth aspects, it is preferable that the workload estimation unit (22) obtains an index (Y0) expressed by a numerical value based on at least one of the work data and the personnel data. The workload estimation unit (22) obtains an evaluation value (Ya) based on the index (Y0) in the evaluation period (T1), and obtains a reference value (Yb) based on the index (Y0) in the reference period (T2) including the period before the evaluation period (T1). The workload estimation unit (22) estimates the workload state by comparing the evaluation value (Ya) with the reference value (Yb).
[0146] The above-mentioned workload estimation system (2) can estimate the workload state for each employee (H0) using at least one of the work data and the personnel data, without requiring a survey.
[0147] In the seventh aspect of the workload estimation system (2) according to the above embodiment, in the sixth aspect, the evaluation value (Ya) is preferably the maximum value (Ya1), minimum value (Ya2), median value, variation, average value, or moving average value of the index (Y0) in the evaluation period (T1). The reference value (Yb) is preferably the maximum value (Yb1), minimum value (Yb2), median value, variation, average value, or moving average value of the index (Y0) in the reference period (T2).
[0148] The above-mentioned workload estimation system (2) can easily obtain the evaluation value (Ya) from the index (Y0).
[0149] In the eighth aspect of the workload estimation system (2) according to the above-mentioned embodiment, in the sixth or seventh aspect, it is preferable that the work is divided into unit periods (D1), and the evaluation period (T1) includes the latest unit period (D13) among the multiple unit periods (D1).
[0150] The workload estimation system (2) described above is capable of performing real-time estimation of the workload of a person (H0) at the present or today.
[0151] In the ninth aspect of the workload estimation system (2) according to the above-mentioned embodiment, in the sixth or seventh aspect, it is preferable that the work is divided into unit periods (D1), and the evaluation period (T1) does not include the latest unit period (D13) among the multiple unit periods (D1).
[0152] The above-mentioned workload estimation system (2) can perform past estimation to estimate the workload of a person (H0) in the past or the day before.
[0153] In the workload estimation system (2) of the 10th aspect according to the above-mentioned embodiment, in the 8th or 9th aspect, it is preferable that the unit period (D1) is set for a weekday (E1) of a person (H0) and is not set for a holiday (E2) of a person (H0).
[0154] The above-mentioned workload estimation system (2) can estimate the workload state on weekdays.
[0155] In the workload estimation system (2) of the eleventh aspect according to the above-mentioned embodiment, in any one of the sixth to tenth aspects, the workload estimation unit (22) preferably estimates that the workload has not changed if the evaluation value (Ya) is within a reference range (W1) including the reference value (Yb). The workload estimation unit (22) preferably estimates that the workload has changed if the evaluation value (Ya) is not within the reference range (W1).
[0156] The above-described workload estimation system (2) can easily determine whether or not there is a change in the workload of the person (H0).
[0157] In the workload estimation system (2) of the twelfth aspect according to the above-mentioned embodiment, in any one of the sixth to tenth aspects, it is preferable that the workload estimation unit (22) estimates the workload state based on at least one of the occurrence frequency of a state in which the evaluation value (Ya) falls within a reference range (W1) including the reference value (Yb) and the occurrence frequency of a state in which the evaluation value (Ya) does not fall within the reference range (W1).
[0158] The above-described workload estimation system (2) can easily estimate the workload state of a person (H0).
[0159] In the workload estimation system (2) of the thirteenth aspect according to the above-mentioned embodiment, in any one of the first to fifth aspects, it is preferable that the workload estimation unit (22) obtains an index (Y0) expressed by a numerical value based on at least one of the work data and the personnel data. The workload estimation unit (22) estimates the state of the workload based on an inflection point (P1) occurring in the time-series data of the index (Y0).
[0160] The above-described workload estimation system (2) can easily estimate the workload state of a person (H0).
[0161] In the workload estimation system (2) of the fourteenth aspect according to the above-described embodiment, in the thirteenth aspect, it is preferable that the workload estimation unit (22) estimates that the workload has changed if the time during which the index (Y0) continues to increase or decrease after the inflection point (P1) occurs is equal to or longer than the time threshold value (L1).
[0162] The above-described workload estimation system (2) can easily estimate the workload state of a person (H0).
[0163] It is preferable that the workload estimation system (2) of the fifteenth aspect according to the above-mentioned embodiment further includes an estimation result storage unit (24) that stores the estimation results of each of the plurality of people (H0) in any one of the first to fourteenth aspects. The data output unit (23) predetermines at least one estimation result that can be included in the estimation data from among the plurality of estimation results, for each output destination of the estimation data.
[0164] The above-described workload estimation system (2) can protect personal information of a person (H0).
[0165] In the workload estimation system (2) of the 16th aspect according to the above-mentioned embodiment, in the 15th aspect, the workload estimation unit (22) and the data output unit (23) are preferably provided in a server device (SV1).
[0166] The workload estimation system (2) described above can easily secure resources to handle the workload situation.
[0167] In the workload estimation system (2) of the 17th aspect according to the above-mentioned embodiment, in any one of the 1st to 16th aspects, the workload estimation unit (22) estimates the workload state based on at least one of the business data and the personnel data, and response data regarding the response of the person (H0) to a question.
[0168] The above-mentioned workload estimation system (2) can estimate the workload state with higher accuracy by using the response data in addition to the work data and personnel data.
[0169] In the workload estimation system (2) of the 18th aspect according to the above-mentioned embodiment, in any one of the 1st to 17th aspects, it is preferable that the workload estimation unit (22) inputs at least one of the business data and the personnel data to a learning model constructed by machine learning and obtains an estimation result from the learning model.
[0170] The above-mentioned workload estimation system (2) can improve the estimation accuracy of the workload state by using a learning model.
[0171] It is preferable that the workload estimation system (2) of the 19th aspect according to the above-mentioned embodiment, in any one of the 1st to 18th aspects, further includes a data management unit (21) that stores at least one of business data and personnel data.
[0172] The above-mentioned workload estimation system (2) can manage at least one of work data and personnel data.
[0173] A workload management system (1) of the 20th aspect relating to the above-mentioned embodiment includes a workload estimation system (2) of any one of the 1st to 19th aspects and a display device (3) that displays the estimated data.
[0174] The above-mentioned workload management system (1) can estimate the workload state for each person (H0) without requiring a survey.
[0175] The workload estimation method of the 21st aspect according to the above embodiment is executed by the workload estimation system (2) to estimate a workload state, which is the degree of burden on a person (H0) due to work. The workload estimation method includes a workload estimation step (S2) and a data output step (S3). The workload estimation step (S2) estimates the workload state based on at least one of task data related to the history of work performed by the person (H0) and personnel data related to the personnel of the person (H0). The data output step (S3) outputs estimation data including an estimation result of the workload state.
[0176] The above-described workload estimation method can estimate the workload state for each person (H0) without requiring a survey.
[0177] A program according to a twenty-second aspect of the embodiment described above causes a computer system to execute the workload estimation method according to the twenty-first aspect.
[0178] The above-mentioned program is capable of estimating the workload status for each person (H0) without requiring a survey. [Explanation of symbols]
[0179] 1 Workload Management System 2 Workload Estimation System 21 Data Management Department 22 Workload Estimation Department 23 Data output section 24 Estimation result storage unit 3 Display device 9. Information terminal H0 (H1, H2, …) Employees (people) SV1 Server Equipment Y0 indicator Ya rating value Ya1 Maximum index Minimum value of Ya2 index Yb Reference Value Maximum Yb1 index Minimum Yb2 index value T1 Evaluation Period T2 Reference Period D1 Unit Period D13 Today (latest unit period) E1 Weekday period E2 Holiday Period W1 Reference Range P1 inflection point L1 Time Threshold S2 Workload estimation step S3 Data Output Step
Claims
1. A workload estimation system that estimates a workload state, which is a degree of burden on a person due to work, comprising: a workload estimation unit that estimates the workload state based on at least one of work data related to a history of work performed by the person and personnel data related to the person's personnel; A data output unit that outputs estimated data including the estimated result of the workload state, The workload estimation unit is determining an index expressed by a numerical value based on at least one of the business data and the personnel data; The state of the workload is estimated based on an inflection point occurring in the time series data of the index. Workload estimation system.
2. The business data includes at least one of terminal operation information related to the operation of an information terminal operated by the person, biometric information of the person, location information of the person, and voice information related to a voice uttered by the person. The workload estimation system according to claim 1.
3. The terminal operation information is information on at least one of the following: operation of a keyboard of the information terminal, operation of a mouse of the information terminal, voice input to a microphone of the information terminal, operation of a camera of the information terminal, launch of an application executed by the information terminal, operation of the application, type of the application executed in an active window, type of the application being launched, number of the applications being launched, and number of windows generated with execution of the application. The workload estimation system according to claim 2.
4. The biological information is information related to at least one of the heart rate of the person, the body temperature of the person, and the acceleration of a part of the body associated with the movement of the person. The workload estimation system according to claim 2.
5. The personnel data includes at least one of job information related to the person's job history, training information related to the person's training attendance history, performance evaluation information related to the person's performance evaluation history, attendance information related to the person's attendance, and department information related to the department to which the person belongs. The workload estimation system according to claim 1.
6. The workload estimation unit is determining an index expressed by a numerical value based on at least one of the business data and the personnel data; Calculating an evaluation value based on the index during an evaluation period; determining a reference value based on the index in a reference period including a period before the evaluation period; The workload state is estimated by comparing the evaluation value with the reference value. The workload estimation system according to claim 1.
7. The evaluation value is a maximum value, a minimum value, a median value, a variation, an average value, or a moving average value of the index during the evaluation period, The reference value is a maximum value, a minimum value, a median value, a variation, an average value, or a moving average value of the index during the reference period. The workload estimation system according to claim 6.
8. The work is divided into unit periods, The evaluation period includes the latest unit period among the plurality of unit periods. The workload estimation system according to claim 6.
9. The work is divided into unit periods, The evaluation period does not include the latest unit period among the plurality of unit periods. The workload estimation system according to claim 6.
10. The unit period is set for the person's weekdays and is not set for the person's holidays. The workload estimation system according to claim 8.
11. The workload estimation unit is If the evaluation value is within a reference range including the reference value, it is assumed that the workload has not changed; If the evaluation value is not within the reference range, it is assumed that the workload has changed. The workload estimation system according to claim 6.
12. The workload estimation unit estimates the workload state based on at least one of an occurrence frequency of a state in which the evaluation value falls within a reference range including the reference value and an occurrence frequency of a state in which the evaluation value does not fall within the reference range. The workload estimation system according to claim 6.
13. The workload estimation unit estimates that the workload has changed if the time during which the index continues to increase or decrease after the inflection point occurs is equal to or longer than a time threshold. The workload estimation system according to claim 1.
14. Further comprising an estimation result storage unit that stores the estimation results of each of the plurality of people, The data output unit predetermines at least one of the plurality of estimation results that can be included in the estimation data for each output destination of the estimation data. The workload estimation system according to claim 1.
15. The work load estimation unit and the data output unit are provided in a server device. The workload estimation system according to claim 14.
16. The workload estimation unit estimates the workload state based on at least one of the business data and the personnel data, and answer data regarding the person's answer to a question. The workload estimation system according to claim 1.
17. The workload estimation unit inputs at least one of the business data and the personnel data into a learning model constructed by machine learning, and obtains the estimation result from the learning model. The workload estimation system according to claim 1.
18. Further comprising a data management unit for storing at least one of the business data and the personnel data. The workload estimation system according to claim 1.
19. The workload estimation system of claim 1, and a display device for displaying the estimated data. Workload management system.
20. A workload estimation method executed by a workload estimation system for estimating a workload state, which is a degree of burden on a person due to work, comprising: a workload estimation step of estimating a workload state based on at least one of work data related to a history of work performed by the person and personnel data related to the person's personnel; A data output step of outputting estimated data including the estimated result of the workload state, In the work load estimation step, determining an index expressed by a numerical value based on at least one of the business data and the personnel data; The state of the workload is estimated based on an inflection point occurring in the time series data of the index. Workload estimation methods.
21. A computer system that executes the work load estimation method according to claim 20. program.
Citation Information
Patent Citations
Stress alarm system and program
JP2019144718A
Signal processor, program and signal processing system
JP2019195417A
Information processor, method for processing information, and program
JP2020038542A
Estimation device, estimation method, program, and recording medium for engagement
JP2020135543A
Information processing system and program
JP2020190939A
