Operational status management device, operational status management method, and operational status management program

The operating status management device optimizes machine relocation and layout planning by tracking movement and performance data, enhancing efficiency and reducing idle assets through informed decision-making.

JP7593860B2Active Publication Date: 2024-12-03OBIC CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2021058518
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-30
Publication Date
2024-12-03
Estimated Expiration
2041-03-30

AI Technical Summary

Technical Problem

Existing systems fail to efficiently manage machine movement and operating rates, making it difficult to determine the next site for machine relocation and grasp the operating efficiency of each machine.

Method used

An operating status management device and method that includes a storage unit and control unit to track machine movement, inventory, and operating performance, enabling efficient layout planning by identifying the next warehouse location based on machine function, distance, and operating rates.

Benefits of technology

Enhances machine management efficiency by improving the accuracy and effectiveness of machine allocation, reducing idle assets, and supporting informed decision-making through real-time data on machine usage and layout optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007593860000001
    Figure 0007593860000001
  • Figure 0007593860000002
    Figure 0007593860000002
  • Figure 0007593860000003
    Figure 0007593860000003
Patent Text Reader

Abstract

To provide an operation state management apparatus configured to confirm whether machines are effectively utilized or not by calculating operating rates by registering introduction information and operation results of the machines, an operation status management method, and an operation status management program.SOLUTION: An operation status management apparatus acquires move data with a machine, a warehousing work site, and a scheduled return date set thereto, acquires machine arrangement request data with a machine request work site, a machine required by the request work site, and a scheduled use start date set thereto, acquires a next warehousing work site candidate to which the machine is to be moved after an operation in the current warehousing work site ends, acquires operation result data with the number of days for machine detention in a predetermined period in the warehousing work site, and calculates an operating rate of the machine based on the operation result data.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation status management device, an operation status management method, and an operation status management program. [Background technology]

[0002] Patent Document 1 discloses a configuration for calculating the operating rate of each machine by accepting input of the movement status and operating hours of machines used at a forestry business work site (business location), aggregating the operation and movement status of the machines, and calculating the cumulative operating hours. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 6319704 Summary of the Invention [Problem to be solved by the invention]

[0004] However, the invention described in the above Patent Document 1 has a problem in that it is not possible to efficiently manage which site a machine should be moved to next, and it is not possible to grasp the operating rate of each machine.

[0005] The present invention has been made in consideration of the above problems, and has an object to provide an operation status management device, an operation status management method, and an operation status management program which support the consideration of efficient deployment plans by calculating the operating rate through registering machine input (movement) information and operation results, thereby making it possible to confirm whether the machines are being used effectively, accepting applications in advance for the period when the machines are needed for each site, and making it possible to know the current locations of the machines and the site where they should be next deployed. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the operation status management device of the present invention is an operation status management device having a memory unit and a control unit, and the control unit is characterized in that it is equipped with: a movement acquisition means for acquiring movement data set by linking a machine, a warehouse workshop for the machine, and a planned return date of the machine; a machine arrangement request acquisition means for acquiring machine arrangement request data set by linking an arrangement workshop that requests the arrangement of the machine, the machine required at the arrangement workshop, and a planned start date of use of the machine; a candidate acquisition means for acquiring a candidate next warehouse workshop to which the machine will be moved after operation at the warehouse workshop is completed based on the movement data and the machine arrangement request data; an operation performance acquisition means for acquiring operation record data that sets the number of days that the machine will be held for a specified period at the warehouse workshop; and an operation rate calculation means for calculating the operation rate of the machine based on the operation performance data.

[0007] In addition, in the operation status management device of the present invention, the memory unit is equipped with a machine memory means for storing a machine master set by linking the machine and an equivalent function identifier that enables the machine with equivalent function to be identified, and the candidate acquisition means acquires candidates for the next receiving workshop to which the machine will be moved after operation at the receiving workshop is completed based on the movement data, the machine arrangement request data, and the machine master.

[0008] In addition, in the operation status management device of the present invention, the candidate acquisition means is characterized in that, based on the movement data, the machine arrangement request data, and the machine master, when the distance between the receiving workshop of the machine and the arrangement workshop is greater than the distance between the previous receiving workshop of the machine with the equivalent function and the arrangement workshop, and the planned return date of the machine with the equivalent function is before the planned start date of use, the candidate acquisition means acquires the arrangement workshop as a candidate for the next receiving workshop to which the machine with the equivalent function will be moved after operation at the receiving workshop is completed.

[0009] In addition, in the operation status management device of the present invention, the control unit is characterized in that it further includes an inventory acquisition means for acquiring inventory data set by linking the machine, the location which is the receiving work site, and the current inventory quantity of the machine at the location based on the movement data, and registering the inventory data in the memory unit.

[0010] In addition, in the operation status management device of the present invention, the inventory acquisition means is further characterized in that it acquires monthly inventory data based on the inventory data, linking the machine, the location, the inventory quantity at the end of the previous month, the quantity received in this month, the quantity shipped out this month, and the inventory quantity at the end of the current month.

[0011] In addition, in the operation status management device of the present invention, the inventory acquisition means further acquires work site-specific machine layout table data and / or machine-specific work site layout table data based on the movement data and the inventory data, and the control unit further includes a machine display means for displaying the work site-specific machine layout table data and / or the machine-specific work site layout table data.

[0012] In addition, in the operation status management device according to the present invention, the operation rate calculation means further acquires machine operation rate list data based on the operation result data and the operation rate, and the control unit further includes machine display means for displaying the machine operation rate list data.

[0013] In addition, in the operation status management device of the present invention, the movement acquisition means is further characterized in that it registers in the memory unit basic project data that sets a project corresponding to the receiving work site based on the movement data, and sets in the memory unit a warehouse master that sets the receiving work site as an inventory management location.

[0014] Further, the operation status management method according to the present invention is an operation status management method to be executed by an operation status management device having a control unit, and is characterized by including a movement acquisition step executed by the control unit, which acquires movement data set by linking a machine, a warehouse workshop for the machine, and a planned return date of the machine; a machine arrangement request acquisition step, which acquires machine arrangement request data set by linking an arrangement workshop that requests the arrangement of the machine, the machine required at the arrangement workshop, and a planned start date of use of the machine; a candidate acquisition step, which acquires a candidate for a next warehouse workshop to which the machine will be moved after operation at the warehouse workshop is completed based on the movement data and the machine arrangement request data; an operation performance acquisition step, which acquires operation performance data that sets the number of days that the machine will be on hold for a specified period at the warehouse workshop; and an operation rate calculation step, which calculates the operation rate of the machine based on the operation performance data.

[0015] Further, the operation status management program according to the present invention is an operation status management program to be executed by an operation status management device having a control unit, and is characterized in that the control unit executes the following steps: a movement acquisition step of acquiring movement data set by linking a machine, a warehouse workshop for the machine, and a planned return date of the machine; a machine arrangement request acquisition step of acquiring machine arrangement request data set by linking an arrangement workshop that requests the arrangement of the machine, the machine required at the arrangement workshop, and a planned start date of use of the machine; a candidate acquisition step of acquiring a next warehouse workshop candidate to which the machine will be moved after operation at the warehouse workshop is completed based on the movement data and the machine arrangement request data; an operation performance acquisition step of acquiring operation performance data that sets the number of days that the machine will be on hold for a specified period at the warehouse workshop; and an operation rate calculation step of calculating the operation rate of the machine based on the operation performance data. Effect of the Invention

[0016] According to the present invention, it is possible to realize the effect of managing the operation status of machines and an efficient operation support function. In addition, according to the present invention, in a company that holds heavy machinery and equipment as its own assets and charges the depreciation cost on the construction cost, or in a company in which the depreciation cost accounts for a large proportion of the cost, it is possible to improve the operation rate by registering the layout plan in advance, and it is possible to improve the management effect. In addition, according to the present invention, it is possible to grasp the layout status of the machines, so that it is possible to improve the accuracy and efficiency of the layout plan. In addition, according to the present invention, it is possible to grasp the operation rate of the equipment and to support the planning of the layout of the equipment from the operating results and the construction schedule, so that it is possible to improve the management effect by efficient machine layout and reduction of idle assets. In addition, according to the present invention, it is possible to manage which machines are present at each work site by registering the movement data of the machines at any time. In addition, according to the present invention, by outputting a machine allocation table by work site, it is possible to confirm unused machines for each work site (site), and by outputting a work site allocation table by machine, it is possible to confirm unused machines for each machine. In addition, according to the present invention, by registering the number of operating days for each work site at the end of the month, etc., it is possible to confirm the operating rate and provide material for considering how to handle (discard, sell, etc.) machines with low operating rates. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of an operational status management device according to this embodiment. [Diagram 2] FIG. 2 is a flowchart showing an example of the process of the operational status management device in this embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of the operational status management process in this embodiment. [Figure 4] FIG. 4 is a diagram illustrating an example of the operational status management process in this embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of the operational status management process in this embodiment. [Figure 6] FIG. 6 is a diagram illustrating an example of the operational status management process in this embodiment. [Figure 7] FIG. 7 is a diagram illustrating an example of the operational status management process in this embodiment. [Figure 8] FIG. 8 is a diagram illustrating an example of the operational status management process in this embodiment. [Figure 9] FIG. 9 is a diagram illustrating an example of the operational status management process in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to the embodiment.

[0019] [1. Overview] First, an overview of the present invention will be described.

[0020] Although the company had been checking machine utilization rates, the standards for utilization rates differed depending on the machine, making it impossible to judge objectively and dependent on the individual. Decisions about the use of machines were also based on individual judgments.

[0021] Therefore, in this embodiment, a mechanism is provided that allows a workshop to register an arrangement request indicating which machine is needed from when and for how long, and proposes a movement plan taking into account the planned return date and required date in the machine movement input. Also, in this embodiment, a machine operation rate list based on the operation record can be viewed on a screen, and movement history can also be viewed on a screen. Also, in this embodiment, a warehouse master is automatically created when a work site (project) is registered, eliminating input errors and realizing inventory (location) management of machines by workshop.

[0022] [2. Configuration] An example of the configuration of an operational status management device 100 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the operational status management device 100 according to this embodiment.

[0023] 1, the operating status management device 100 is a commercially available desktop personal computer. Note that the operating status management device 100 is not limited to a stationary information processing device such as a desktop personal computer, and may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

[0024] The operational status management device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units included in the operational status management device 100 are connected to each other so as to be able to communicate with each other via any communication path.

[0025] The communication interface unit 104 communicatively connects the operation status management device 100 to a network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the operation status management device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

[0026] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a touch panel), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114 or the printer 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

[0027] The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 includes a project database 106a, a warehouse master 106b, and a machine master 106c.

[0028] The project database 106a stores project data. Here, the project data may include project basic data, movement data, machine arrangement request data, operation performance data, inventory data, monthly inventory data, worksite-specific machine allocation table data, machine-specific worksite allocation table data, and / or machine operation rate list data. Here, the project basic data may be set to a project corresponding to a warehouse worksite.

[0029] The warehouse master 106b is a master in which the receiving workshop is set as the inventory management location (of machines).

[0030] The machine master 106c is a master set by linking machines with equivalent function identifiers that enable identification of machines with equivalent functions.

[0031] The control unit 102 is a CPU or the like that performs overall control of the operation status management device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various information processing based on these stored programs. In terms of functional concept, the control unit 102 includes a movement acquisition unit 102a, an inventory acquisition unit 102b, a machine arrangement request acquisition unit 102c, a candidate acquisition unit 102d, an operation record acquisition unit 102e, an operation rate calculation unit 102f, and a machine display unit 102g.

[0032] The movement acquisition unit 102a acquires movement data in which a scheduled return date of the machine is set. Here, the movement acquisition unit 102a may acquire movement data in which a machine, a warehouse work site for the machine, and a scheduled return date of the machine are linked together. In addition, the movement acquisition unit 102a may register project basic data in which a project corresponding to the warehouse work site is set based on the movement data in the project database 106a, and set a warehouse master 106b in which the warehouse work site is set as an inventory management location in the storage unit 106.

[0033] The inventory acquisition unit 102b acquires inventory data that sets the current inventory quantity of the machine at the location. Here, the inventory acquisition unit 102b may acquire inventory data that is set by linking the machine, the location that is the receiving work site, and the current inventory quantity of the machine at the location based on the movement data, and register the inventory data in the project database 106a. Furthermore, the inventory acquisition unit 102b may acquire monthly inventory data that is set by linking the machine, the location, the inventory quantity at the end of the previous month, the inventory quantity in this month, the inventory quantity out this month, and the inventory quantity at the end of the current month based on the inventory data. Furthermore, the inventory acquisition unit 102b may acquire work site-specific machine allocation table data and / or work site-specific machine allocation table data based on the movement data and the inventory data.

[0034] The machine arrangement request acquisition unit 102c acquires machine arrangement request data for requesting the arrangement of a machine. Here, the machine arrangement request acquisition unit 102c may acquire machine arrangement request data that is set by linking the arrangement work site that requests the arrangement of a machine, the machine required at the arrangement work site, and the scheduled start date of use of the machine. In addition, the machine arrangement request acquisition unit 102c may register the machine arrangement request data in the project database 106a.

[0035] The candidate acquisition unit 102d acquires a next candidate for a warehouse work site to which the machine is moved after the operation at the warehouse work site is completed. Here, the candidate acquisition unit 102d may acquire a next candidate for a warehouse work site to which the machine is moved after the operation at the warehouse work site is completed based on the movement data and the machine arrangement request data. In addition, the candidate acquisition unit 102d may acquire a next candidate for a warehouse work site to which the machine is moved after the operation at the warehouse work site is completed based on the movement data, the machine arrangement request data, and the machine master 106c. In addition, the candidate acquisition unit 102d may acquire the arrangement work site as a next candidate for a warehouse work site to which the machine with the equivalent function is moved after the operation at the warehouse work site is completed based on the movement data, the machine arrangement request data, and the machine master 106c, when the distance between the warehouse work site of the machine and the arrangement work site is longer than the distance between the warehouse work site of the machine with the equivalent function and the arrangement work site, and the scheduled return date of the machine with the equivalent function is before the scheduled start date of use. Furthermore, the candidate acquisition unit 102d may output a machine movement schedule inquiry screen that enables the user to confirm the next warehousing work site candidates.

[0036] The operation record acquiring unit 102e acquires operation record data of the machine. Here, the operation record acquiring unit 102e may acquire operation record data that sets the number of days that the machine is in operation during a predetermined period at the receiving work site. In addition, the operation record acquiring unit 102e may register the operation record data in the project database 106a.

[0037] The operation rate calculation unit 102f calculates the operation rate of the machine. Here, the operation rate calculation unit 102f may calculate the operation rate of the machine based on operation result data. Furthermore, the operation rate calculation unit 102f may acquire machine operation rate list data based on the operation result data and the operation rate. Furthermore, the operation rate calculation unit 102f may register the machine operation rate list data in the project database 106a.

[0038] The machine display unit 102g displays work site-specific machine allocation table data, machine-specific work site allocation table data, and / or machine operation rate list data.

[0039] [3. Specific Examples] A specific example of this embodiment will be described with reference to FIGS.

[0040] [Operation status management process] An example of the operational status management process in this embodiment will now be described with reference to Fig. 2. Fig. 2 is a flowchart showing an example of the process of the operational status management device 100 in this embodiment.

[0041] As shown in FIG. 2, when a user sets a machine, a workshop where the machine is to be stored, and a planned return date of the machine via the input device 112, the movement acquisition unit 102a acquires movement data that is set by linking the machine, the workshop where the machine is to be stored, and the planned return date of the machine (step SA-1).

[0042] Then, the movement acquisition unit 102a registers project basic data that sets the project corresponding to the receiving work site based on the movement data in the project database 106a, and also sets a record that sets the receiving work site as an inventory management location (warehouse) in the warehouse master 106b (step SA-2).

[0043] Then, the inventory acquisition unit 102b acquires inventory data based on the movement data, linking the machine, the location (warehouse) which is the receiving work site, and the current inventory quantity of the machine at that location, and registers the inventory data in the project database 106a, and acquires monthly inventory data based on the inventory data, linking the machine, the location, the inventory quantity at the end of the previous month, the inventory quantity in this month, the inventory quantity out this month, and the inventory quantity at the end of the current month, and registers the monthly inventory data in the project database 106a (step SA-3).

[0044] Then, the inventory acquisition unit 102b acquires work site-specific machine layout table data and / or machine-specific work site layout table data based on the movement data and the inventory data, and the machine display unit 102g displays the work site-specific machine layout table data and / or machine-specific work site layout table data on the output device 114 (step SA-4).

[0045] Then, when the user sets the arrangement workshop requesting the machine arrangement, the machine required at the arrangement workshop, and the planned start date for use of the machine via the input device 112, the machine arrangement request acquisition unit 102c acquires machine arrangement request data that is set in association with the arrangement workshop requesting the machine arrangement, the machine required at the arrangement workshop, and the planned start date for use of the machine (step SA-5).

[0046] Then, based on the movement data, the machine arrangement request data, and the machine master 106c, the candidate acquisition unit 102d acquires candidates for the next entry work site to which the machine will be moved after operations at the entry work site are completed, and displays a machine movement schedule inquiry screen on the output device 114 where the candidates for the next entry work site can be confirmed (step SA-6).

[0047] Then, when the user sets the receiving workshop, the operation period, the machine in operation, and the number of working days via the input device 112, the operation history acquisition unit 102e acquires operation history data that sets the number of working days for the machine during the operation period at the receiving workshop (step SA-7).

[0048] Then, the operation rate calculation unit 102f calculates the operation rate of the machine based on the operation result data, and acquires machine operation rate list data based on the operation result data and the operation rate (step SA-8).

[0049] Then, the machine display unit 102g displays the machine availability rate list data on the output device 114 (step SA-9), and the process ends.

[0050] An example of the operational status management process in this embodiment will now be described with reference to Fig. 3 to Fig. 9. Fig. 3 to Fig. 9 are diagrams showing an example of the operational status management process in this embodiment.

[0051] As shown in Fig. 3, in this embodiment, when inputting the movement of a machine in a project, the planned return date is registered in advance, so that movement data with the planned return date set is created, and linking with the warehouse is also performed by project input. That is, in this embodiment, at the same time as registering the PJ (project) basic data, one warehouse code is set for one PJ code without duplicate input of warehouse data, and the warehouse master is also updated.

[0052] Then, as shown in FIG. 4, in this embodiment, inventory data indicating where inventory is located is updated based on the movement data, and monthly inventory data indicating where inventory has increased or decreased over the course of a month is updated.

[0053] 5, in this embodiment, work site-specific machine allocation table data and machine-specific work site allocation table data are output based on the movement data and the inventory data. Here, in this embodiment, when the allocation table is output, if the condition "unused only" is specified, only unused machines may be extracted and output.

[0054] As shown in FIG. 6, in this embodiment, data on machines required for each workshop is registered in advance by the user, and when the start date of use is specified, machine arrangement request data is acquired.

[0055] 7, in this embodiment, the next warehouse work site candidate is acquired based on the movement data, the machine arrangement request data, and the machine master 106c, and the machine movement schedule inquiry screen is displayed, so that the machine management department can confirm where the necessary machine is located based on the request data and consider where to move it efficiently. Also, in this embodiment, the machine management department can confirm candidates for machines with equivalent functions and consider whether a different machine would be acceptable.

[0056] As shown in FIG. 8, in this embodiment, an operation record input screen is displayed in which target machine data is set based on the movement data and monthly inventory data at the end of the current month, and when the user registers the machine's operation record for the current month, the operation status is reflected and the operation rate is calculated using the formula "number of working days ÷ number of calendar days × 100".

[0057] Then, as shown in FIG. 9, in this embodiment, machine operation rate list data in which the number of on-duty days is tallied from the operation performance data is output.

[0058] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0059] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.

[0060] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0061] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0062] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0063] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0064] Moreover, with regard to the operational status management device 100, the components shown in the figures are merely conceptual functional elements, and the devices do not necessarily have to be physically configured as shown in the figures.

[0065] For example, the processing functions of the operating status management device 100, particularly the processing functions performed by the control unit 102, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium that includes programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the operating status management device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.

[0066] In addition, this computer program may be stored in an application program server connected to the operational status management device 100 via any network, and it is also possible to download all or part of it as necessary.

[0067] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0068] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a configuration that is distributed as a plurality of modules or libraries, and a program that achieves its function by cooperating with a separate program, such as an OS. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in this embodiment, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0069] The various databases etc. stored in the memory unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0070] The operating status management device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The operating status management device 100 may be realized by installing software (including programs or data) that causes the device to realize the processing described in this embodiment.

[0071] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0072] The present invention is useful in the construction industry, including the civil engineering industry that handles machinery and materials, and the building industry. [Explanation of symbols]

[0073] 100 Operation status management device 102 Control section 102a Movement acquisition unit 102b Inventory Acquisition Department 102c Machinery Arrangement Request Acquisition Department 102d Candidate Acquisition Department 102e Operational Performance Acquisition Department 102f Operating rate calculation section 102g Machine display section 104 Communication interface section 106 Storage section 106a Project Database 106b Warehouse Master 106c Machine Master 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network

Claims

1. An operating status management device including a storage unit and a control unit, The storage unit is A machine storage means for storing a machine master set by linking the machine and an equivalent function identifier that enables machines with equivalent functions to be identified; Equipped with The control unit is A movement acquisition means for acquiring movement data set by linking the machine, the warehouse of the machine, and the scheduled return date of the machine; A machine arrangement request acquisition means for acquiring machine arrangement request data that is set by linking a preparation workshop that requests the preparation of the machine, the machine required at the preparation workshop, and a planned start date of use of the machine; a candidate acquisition means for acquiring the arranging workshop as a candidate for a next receiving workshop to which the machine with the equivalent function is to be moved after the operation at the receiving workshop is completed, when the distance between the receiving workshop of the machine and the arranging workshop is longer than the distance between the previous receiving workshop of the machine with the equivalent function and the arranging workshop, and the planned return date of the machine with the equivalent function is before the planned start date of use, based on the movement data, the machine arrangement request data, and the machine master; an operation record acquiring means for acquiring operation record data that sets the number of days the machine is in operation during a predetermined period at the receiving work site; an operation rate calculation means for calculating an operation rate of the machine based on the operation result data; An operation status management device comprising:

2. The control unit is an inventory acquisition means for acquiring inventory data that is set by linking the machine, the location which is the warehousing work site, and the current inventory quantity of the machine at the location based on the movement data, and registering the inventory data in the storage unit; 2. The operating status management device according to claim 1, further comprising:

3. The inventory acquisition means includes: The operation status management device as described in claim 2, further characterized in that monthly inventory data is acquired by linking the machine, the location, the inventory quantity at the end of the previous month, the quantity received in the current month, the quantity shipped out in the current month, and the inventory quantity at the end of the current month based on the inventory data.

4. The inventory acquisition means includes: Further, based on the movement data and the inventory data, obtain work site machine allocation table data and / or work site machine allocation table data; The control unit is A machine display means for displaying the work site machine allocation table data and / or the work site machine allocation table data; 4. The operating status management device according to claim 2, further comprising:

5. The operation rate calculation means Further, acquiring machine operation rate list data based on the operation result data and the operation rate; The control unit is A machine display means for displaying the machine operation rate list data; 4. The operating status management device according to claim 1, further comprising:

6. The movement acquisition means includes: An operation status management device as described in any one of claims 1 to 5, further characterized in that project basic data setting a project corresponding to the receiving work site based on the movement data is registered in the memory unit, and a warehouse master setting the receiving work site as an inventory management location is set in the memory unit.

7. An operation status management method to be executed by an operation status management device having a memory unit and a control unit, The storage unit is A machine storage means for storing a machine master set by linking the machine and an equivalent function identifier that enables machines with equivalent functions to be identified; Equipped with The control unit executes A movement acquisition step of acquiring movement data set by linking the machine, the warehouse where the machine is stored, and the scheduled return date of the machine; A machine arrangement request acquisition step for acquiring machine arrangement request data that is set by linking together an arrangement workshop that requests the arrangement of the machine, the machine required at the arrangement workshop, and a planned start date of use of the machine; a candidate acquisition step of acquiring the arranging workshop as a next candidate for the receiving workshop to which the machine with the equivalent function is to be moved after the operation at the receiving workshop is terminated, when the distance between the receiving workshop of the machine and the arranging workshop is longer than the distance between the previous receiving workshop of the machine with the equivalent function and the arranging workshop, and the planned return date of the machine with the equivalent function is before the planned start date of use, based on the movement data, the machine arrangement request data, and the machine master; an operation performance acquisition step of acquiring operation performance data in which the number of days the machine is in operation during a predetermined period at the receiving work site is set; an operation rate calculation step of calculating an operation rate of the machine based on the operation result data; An operation status management method comprising:

8. An operation status management program to be executed by an operation status management device having a memory unit and a control unit, The storage unit is A machine storage means for storing a machine master set by linking the machine and an equivalent function identifier that enables machines with equivalent functions to be identified; Equipped with In the control unit, A movement acquisition step of acquiring movement data set by linking the machine, the warehouse where the machine is stored, and the scheduled return date of the machine; A machine arrangement request acquisition step for acquiring machine arrangement request data that is set by linking together an arrangement workshop that requests the arrangement of the machine, the machine required at the arrangement workshop, and a planned start date of use of the machine; a candidate acquisition step of acquiring the arranging workshop as a next candidate for the receiving workshop to which the machine with the equivalent function is to be moved after the operation at the receiving workshop is terminated, when the distance between the receiving workshop of the machine and the arranging workshop is longer than the distance between the previous receiving workshop of the machine with the equivalent function and the arranging workshop, and the planned return date of the machine with the equivalent function is before the planned start date of use, based on the movement data, the machine arrangement request data, and the machine master; an operation performance acquisition step of acquiring operation performance data in which the number of days the machine is in operation during a predetermined period at the receiving work site is set; an operation rate calculation step of calculating an operation rate of the machine based on the operation result data; An operation status management program for executing the above.

Citation Information

Patent Citations

  • Bulb type fluorescent lamp

    JP1988019704A

  • Rental equipment and material management device, rental equipment and material management method, and program

    JP2019128684A

  • Rental equipment management system and rental equipment management method

    JP2021026695A