DC / DC Converter
The DC/DC converter addresses efficiency and noise issues by using a control circuit to adjust and update switching times based on real-time measurements, ensuring precise alignment with resonance current crossover points, thereby maintaining efficiency and reducing noise despite variations in resonance components.
Patent Information
- Application Number
- JP2021144544
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-06
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2041-09-06
AI Technical Summary
Existing DC/DC converters experience a decrease in power conversion efficiency and an increase in switching noise due to variations in resonance time caused by deviations in the inductance of the resonant reactor, leakage inductance of the transformer, and capacitance of the resonant capacitor from their designed values.
The DC/DC converter incorporates a control circuit with a control unit that adjusts and updates the operation timing of the main and resonance switches based on real-time measurements of reactor and resonant currents and voltages, using timing tables to minimize the deviation between the actual and desired switching times, thereby correcting for variations in resonance time.
This approach effectively suppresses the decrease in power conversion efficiency and reduces switching noise by accurately aligning switching operations with the resonance current crossover points, even in the presence of variations in resonance time components.
Smart Images

Figure 0007594988000001 
Figure 0007594988000002 
Figure 0007594988000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a DC / DC converter equipped with an ARCP (Auxiliary Resonant Commutated Pole) circuit. [Background technology]
[0002] A known example of a DC / DC converter equipped with an ARCP circuit is the bidirectional DC / DC converter described in Patent Document 1. The bidirectional DC / DC converter described in Patent Document 1 has the same circuit configuration as the bidirectional DC / DC converter 1C shown in FIG.
[0003] The bidirectional DC / DC converter 1C includes a DC / DC converter circuit, an ARCP circuit 2, a control circuit 10C that controls the DC / DC converter circuit and the ARCP circuit 2, and input / output terminals T1 to T4.
[0004] A bidirectional inverter is connected to the input / output terminals T1 and T2, and a storage battery (for example, a battery of an electric vehicle) is connected to the input / output terminals T3 and T4.
[0005] The DC / DC converter circuit includes main switches S1 and S2, a DC reactor L1, and capacitors C1 and C2. The main switch S1 includes a switching element Q1 made of a MOSFET and a diode D1 connected in parallel between the drain and source of the switching element Q1. Similarly, the main switch S2 includes a switching element Q2 made of a MOSFET and a diode D2 connected in parallel between the drain and source of the switching element Q2.
[0006] The ARCP circuit 2 includes resonant switches S3 and S4, a regenerative transformer TR1 including a main winding N1 and an auxiliary winding N2, a resonant reactor L2, resonant capacitors C3 and C4, and regenerative diodes D5 and D6. The resonant switch S3 includes a switching element Q3 made of a MOSFET and a diode D3 connected in parallel between the drain and source of the switching element Q3. Similarly, the resonant switch S4 includes a switching element Q4 made of a MOSFET and a diode D4 connected in parallel between the drain and source of the switching element Q4.
[0007] The bidirectional DC / DC converter 1C performs power conversion operation (step-up operation) from the capacitor C2 side to the capacitor C1 side, and power conversion operation (step-down operation) from the capacitor C1 side to the capacitor C2 side.
[0008] Figure 5 shows various waveforms when switching element Q2 is turned off in boost operation. Figure 5(A) shows the waveform of the gate voltage Vgs of switching elements Q2 and Q4, Figure 5(B) shows the waveform of the reactor current flowing through DC reactor L1 and the resonant current flowing through resonant reactor L2, and Figure 5(C) shows the waveform of the drain current Id and drain-source voltage Vds of switching element Q2.
[0009] time t 11 When the control circuit 10C turns off the switching element Q2, the current flowing through the switching element Q2 is commutated to the resonant capacitor C4, and the resonant capacitor C4 is charged. The drain current Id of the switching element Q2 decreases relatively quickly, while the drain-source voltage Vds of the switching element Q2 increases slowly, so that the overlapping region between the falling edge of the drain current Id and the rising edge of the drain-source voltage Vds decreases. As a result, at time t 11 ~t 12 In this case, zero voltage switching is realized, and the switching loss when the switching element Q2 is turned off is reduced.
[0010] Figure 6 shows various waveforms when switching element Q2 is turned on in boost operation. Figure 6(A) shows the waveform of the gate voltage Vgs of switching elements Q2 and Q4, Figure 6(B) shows the waveform of the reactor current and the resonant current, and Figure 6(C) shows the waveform of the drain current Id and the drain-source voltage Vds of switching element Q2.
[0011] time t 21 In the above, when the control circuit 10C turns on the switching element Q4, the current flowing through the diode D1 is commutated to the resonant reactor L2, which then acts to draw charge from the resonant capacitor C4, causing the resonant reactor L2, the leakage inductance of the transformer TR1, and the resonant capacitor C4 to resonate. As a result, a resonant current flows through the resonant reactor L2, and the drain-to-source voltage Vds of the switching element Q2 decreases.
[0012] time t 22 When the control circuit 10C turns on the switching element Q2 at the timing when the current waveform at the falling edge of the resonant current intersects with the current waveform of the reactor current, the drain-source voltage Vds of the switching element Q2 becomes approximately 0 [V] because the switching element Q4 is on, and the drain current Id of the switching element Q2 rises from 0 [A]. As a result, zero voltage switching and zero current switching are realized, and the switching loss when the switching element Q2 is turned on is reduced.
[0013] When the charge extracted from the resonant capacitor C4 flows as a resonant current to the main winding N1 of the transformer TR1, a voltage is induced in the auxiliary winding N2 of the transformer TR1. The voltage induced in the auxiliary winding N2 is regenerated in the capacitor C1 via the diode D5. When the resonant current stops flowing and the voltage polarity of the main winding N1 is reversed, the polarity of the voltage induced in the auxiliary winding N2 is also reversed. This reversed voltage with reversed polarity is regenerated in the capacitor C1 via the diode D6.
[0014] The control circuit 10C stores in advance the operation timing for turning on the switching element Q2. The operation timing is calculated by an experiment in which the input voltage and load conditions are varied using the design values (average values) of the inductance of the resonant reactor L2, the leakage inductance of the transformer TR1, and the capacitance of the resonant capacitor C4 so that the switching element Q2 is turned on at the crossing timing where the falling edge of the resonant current crosses the reactor current.
[0015] However, the inductance of the resonant reactor L2, the leakage inductance of the transformer TR1, and the capacitance of the resonant capacitor C4 vary from their designed values. When variations occur from the designed values, the time during which the resonant current flows (resonant time) also varies, causing a discrepancy between the crossover timing and the operation timing.
[0016] Figure 7 shows various waveforms when inductance varies. Figure 7(A) is the same as Figure 6(A). Figure 7(B) is Figure 6(B) with the addition of the resonant current waveforms when the inductance is smaller and larger than the design value. Figure 7(C) is Figure 6(C) with the addition of the drain-source voltage Vds waveform of the switching element Q2 when the inductance is smaller and larger than the design value.
[0017] As shown in FIG. 7, when the inductance is smaller than the design value, the operation timing at which the switching element Q2 is turned on (time t 22 ) is the crossing timing (time t 221 As a result, the drain current Id of the switching element Q2 rises from 0 [A] a certain time after the drain-source voltage Vds of the switching element Q2 becomes approximately 0 [V].
[0018] On the other hand, when the inductance is larger than the design value, the timing at which the switching element Q2 turns on (time t 22) is the crossing timing (time t 222 As a result, the drain current Id of the switching element Q2 rises from 0 [A] before the drain-source voltage Vds of the switching element Q2 reaches approximately 0 [V].
[0019] In this way, when a mismatch occurs between the crossover timing and the operation timing due to the variation in the resonance time, a mismatch also occurs in the timing of the fall of the drain-source voltage Vds of the switching element Q2. As a result, the switching of the switching element Q2 deviates from zero voltage switching and zero current switching, resulting in a decrease in power conversion efficiency and an increase in switching noise. In addition, in the bidirectional DC / DC converter 1C, the same problem occurs during the step-down operation because the step-up operation and the step-down operation are based on the same operating principle.
[0020] In order to suppress the variation in the resonance time, it is possible to manufacture or select components that suppress the variation in the inductance of the resonant reactor L2, the leakage inductance of the transformer TR1, and the capacitance of the resonant capacitors C3 and C4. However, this would result in other problems such as increased costs and reduced yields. [Prior art documents] [Patent documents]
[0021] [Patent Document 1] Patent Publication No. 2021-19396 Summary of the Invention [Problem to be solved by the invention]
[0022] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to provide a DC / DC converter that can suppress a decrease in power conversion efficiency and an increase in switching noise caused by variations in resonance time. [Means for solving the problem]
[0023] In order to solve the above problems, the DC / DC converter according to the present invention comprises: a DC / DC converter circuit including a main switch and a DC reactor; an ARCP circuit including a resonant switch, a resonant reactor, and a resonant capacitor connected in parallel to a current path of the main switch; a control circuit for controlling switching of the main switch and the resonance switch; A DC / DC converter comprising: The control circuit includes: a control unit that turns on the resonance switch and turns on the main switch during an on-period of the resonance switch; a memory unit storing a timing table relating to an operation timing for turning on the main switch; Equipped with The control unit is a switching process for turning on the main switch based on the operation timing of the timing table; an update process for updating the timing table by correcting the operation timing so that a deviation between a crossing timing at which a current waveform at the time of a fall of the resonant current flowing through the resonant reactor and a current waveform of a reactor current flowing through the DC reactor cross each other and the operation timing is reduced; The present invention is characterized by carrying out the following.
[0024] According to this configuration, even if a deviation occurs between the crossover timing and the operation timing due to the variation in the resonance time, the amount of deviation between the crossover timing and the operation timing can be reduced by correcting the operation timing by executing the update process. Therefore, according to this configuration, it is possible to suppress the decrease in power conversion efficiency and the increase in switching noise caused by the variation in the resonance time.
[0025] The DC / DC converter comprises: A first current measuring means for measuring the reactor current; A second current measuring means for measuring the resonant current; Equipped with The control unit is The crossing timing may be detected based on the measurement results of the first current measuring means and the second current measuring means.
[0026] The DC / DC converter comprises: a voltage measuring means for measuring a voltage across the current path of the main switch; The control unit is The crossing timing can be detected by detecting that the voltage across the resonant switch reaches a minimum value during the on-period of the resonant switch based on the measurement result of the voltage measurement means.
[0027] In the DC / DC converter, The crossing timing and the operation timing are The time may be determined from the time when the resonance switch is turned on.
[0028] In the DC / DC converter, The storage unit includes: a condition table relating to an operating condition consisting of at least one of an input voltage value, an output voltage value, and an output current value of the DC / DC converter circuit, the condition table storing a plurality of condition tables each having different values of the operating condition; The plurality of condition tables are associated with the timing table for each of the condition tables, The control unit is The switching process and the updating process may be performed by selecting one condition table from the plurality of condition tables and using the timing table associated with the one condition table.
[0029] The DC / DC converter comprises: measuring means for measuring said operating conditions; The control unit is determining whether or not to stop the operation of the ARCP circuit based on the measurement result of the measurement means; When it is determined that the operation of the ARCP circuit is to be stopped, the resonance switch can be kept in a continuous off state, and the main switch can be turned on / off by PWM control. Effect of the Invention
[0030] According to the present invention, it is possible to provide a DC / DC converter capable of suppressing a decrease in power conversion efficiency and an increase in switching noise caused by variations in resonance time. [Brief description of the drawings]
[0031] [Figure 1] 1 is a circuit diagram of a DC / DC converter according to a first embodiment. [Diagram 2] FIG. 11 is a waveform diagram of various waveforms during boost operation of the DC / DC converter according to the first embodiment, in which (A) is a waveform diagram of the gate voltage Vgs of switching elements Q2 and Q4, (B) is a waveform diagram of a reactor current and a resonant current, and (C) is a waveform diagram of the drain current Id and drain-source voltage Vds of the switching element Q2. [Diagram 3] FIG. 11 is a circuit diagram of a DC / DC converter according to a second embodiment. [Figure 4] FIG. 1 is a circuit diagram of a conventional DC / DC converter. [Diagram 5] 11A to 11C are diagrams showing various waveforms when the switching element Q2 is turned off during boost operation in a conventional DC / DC converter. [Figure 6] 11A to 11C are diagrams showing various waveforms when a switching element Q2 is turned on during a boost operation in a conventional DC / DC converter. [Figure 7] 1A to 1C are various waveform diagrams for explaining a problem caused by a variation in resonance time in a conventional DC / DC converter. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0032] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, with reference to the accompanying drawings, an embodiment of a DC / DC converter according to the present invention will be described by taking a bidirectional DC / DC converter as an example.
[0033] [First embodiment] 1 shows a bidirectional DC / DC converter 1A according to the first embodiment. The bidirectional DC / DC converter 1A includes a DC / DC converter circuit, an ARCP circuit 2, a first voltage measuring means 3, a second voltage measuring means 4, a first current measuring means 5, a second current measuring means 6, a control circuit 10A that controls the DC / DC converter circuit and the ARCP circuit 2, and input / output terminals T1 to T4.
[0034] The bidirectional DC / DC converter 1A performs power conversion operation (step-up operation) from the input / output terminals T3, T4 side to the input / output terminals T1, T2 side, and power conversion operation (step-down operation) from the input / output terminals T1, T2 side to the input / output terminals T3, T4 side. For example, a bidirectional inverter is connected to the input / output terminals T1, T2, and for example, a battery of an electric vehicle is connected to the input / output terminals T3, T4.
[0035] The DC / DC converter circuit includes main switches S1, S2, a DC reactor L1, and capacitors C1, C2.
[0036] The main switches S1 and S2 are connected in series with each other, with one end of the series-connected current path connected to the input / output terminal T1 and the other end connected to the input / output terminals T2 and T4. A connection point X1 between the main switches S1 and S2 is connected to the input / output terminal T3 via a DC reactor L1. The capacitor C1 is connected between the input / output terminals T1 and T2 on the input / output terminals T1 and T2 side of the main switches S1 and S2. The capacitor C2 is connected between the input / output terminals T3 and T4 on the input / output terminals T3 and T4 side of the DC reactor L1.
[0037] The main switch S1 includes a switching element Q1 made of a MOSFET and a diode D1 connected in parallel between the drain and source of the switching element Q1. Similarly, the main switch S2 includes a switching element Q2 made of a MOSFET and a diode D2 connected in parallel between the drain and source of the switching element Q2. The diode D1 may be a parasitic diode of the switching element Q1 or may be an individual diode independent of the switching element Q1. The same applies to the diode D2.
[0038] The ARCP circuit 2 includes resonant switches S3 and S4, a regenerative transformer TR1 including a main winding N1 and an auxiliary winding N2, a resonant reactor L2, resonant capacitors C3 and C4, and regenerative diodes D5 and D6.
[0039] The resonant switches S3 and S4 are provided between the main switches S1 and S2 and the capacitor C1, and are connected in series with each other and in parallel with the main switches S1 and S2. A connection point X2 between the resonant switches S3 and S4 is connected to the connection point X1 via a main winding N1 of the transformer TR1 and a resonant reactor L2. The resonant capacitor C3 is connected in parallel between the drain and source of the switching element Q1, and the resonant capacitor C4 is connected in parallel between the drain and source of the switching element Q2. One end and the other end of the auxiliary winding N2 of the transformer TR1 are connected to the input / output terminal T1 via diodes D5 and D6, respectively. The auxiliary winding N2 also has a center tap, which is connected to the input / output terminal T2.
[0040] The resonant switch S3 includes a switching element Q3 made of a MOSFET and a diode D3 connected in parallel between the drain and source of the switching element Q3. Similarly, the resonant switch S4 includes a switching element Q4 made of a MOSFET and a diode D4 connected in parallel between the drain and source of the switching element Q4. The diode D3 may be a parasitic diode of the switching element Q3 or may be an individual diode independent of the switching element Q3. The same applies to the diode D4.
[0041] The first voltage measuring means 3 measures the voltage across the capacitor C1. The second voltage measuring means 4 measures the voltage across the capacitor C2. The first current measuring means 5 is provided between the DC reactor L1 and the input / output terminal T3, and measures the reactor current flowing through the DC reactor L1. The second current measuring means 6 is provided between the resonant reactor L2 and the connection point X1, and measures the resonant current flowing through the resonant reactor L2. The first voltage measuring means 3, the second voltage measuring means 4, the first current measuring means 5, and the second current measuring means 6 output the measurement results (sensor signals corresponding to the measured voltage value or current value) to the control circuit 10A.
[0042] The control circuit 10A includes a control unit 11A and a storage unit 12A. The control circuit 10A is configured by, for example, a microcomputer.
[0043] The control unit 11A controls the switching elements Q1 and Q2 of the main switches S1 and S2 and the switching elements Q3 and Q4 of the resonant switches S3 and S4. For example, during the boost operation, the control unit 11A controls the switching elements Q1 and Q2 of the main switches S1 and S2 and the switching elements Q3 and Q4 of the resonant switches S3 and S4. 3 ~t 6 ), PWM control of the switching element Q2 is performed during a period in which a resonant current flows (for example, a period in which PWM control is not possible in FIG. 2: time t 1 ~t 3) turns on switching element Q2 at the operation timing stored in storage unit 12A. Similarly, during step-down operation, control unit 11A performs PWM control of switching element Q1 during a PWM controllable period, and turns on switching element Q1 at the operation timing stored in storage unit 12A during a PWM controllable period.
[0044] The memory unit 12A stores a plurality of first condition tables related to the operating conditions during boost operation, a plurality of first timing tables associated one-to-one with each of the plurality of first condition tables, a plurality of second condition tables related to the operating conditions during step-down operation, a plurality of second timing tables associated one-to-one with each of the plurality of second condition tables, and a plurality of third condition tables related to the operating conditions under which the operation of the ARCP circuit 2 is stopped.
[0045] The operating conditions in the first condition table include the input voltage value (the voltage value of the capacitor C2), the output voltage value (the voltage value of the capacitor C1), and the output current value (the current value of the reactor current flowing through the DC reactor L1) of the DC / DC converter circuit during boost operation. The multiple first condition tables each have different values of the operating conditions.
[0046] The first timing table relates to the operation timing for turning on the switching element Q2 of the main switch S2. The operation timing is the time from the turning on of the switching element Q4 of the resonant switch S4 as a starting point, that is, the time from when the control circuit 10A switches the gate signal (gate voltage Vgs) of the switching element Q4 to a high level to when the control circuit 10A switches the gate signal (gate voltage Vgs) of the switching element Q2 to a high level.
[0047] The operating timing of the first timing table is calculated by conducting experiments under each operating condition of the first condition table using, for example, design values (average values) of the inductance of the resonant reactor L2, the leakage inductance of the transformer TR1, and the capacitance of the resonant capacitor C4 so that the switching element Q2 is turned on at the intersection timing where the falling edge of the resonant current and the reactor current intersect.
[0048] The operating conditions in the second condition table include the input voltage value (voltage value of capacitor C1), the output voltage value (voltage value of capacitor C2), and the output current value (current value of the reactor current flowing through DC reactor L1) of the DC / DC converter circuit during step-down operation. The multiple second condition tables each have different values of the operating conditions.
[0049] The second timing table relates to the operation timing for turning on the switching element Q1 of the main switch S1. The operation timing is the time from the turning on of the switching element Q3 of the resonant switch S3 as a starting point, that is, the time from when the control circuit 10A switches the gate signal (gate voltage Vgs) of the switching element Q3 to a high level to when the control circuit 10A switches the gate signal (gate voltage Vgs) of the switching element Q1 to a high level.
[0050] The operating timing of the second timing table is calculated by conducting experiments under each operating condition of the second condition table using, for example, design values (average values) of the inductance of the resonant reactor L2, the leakage inductance of the transformer TR1, and the capacitance of the resonant capacitor C3 so that the switching element Q1 is turned on at the intersection timing where the falling edge of the resonant current and the reactor current intersect.
[0051] The operating conditions in the third condition table include operating conditions consisting of an input voltage value, an output voltage value, and an output current value of the DC / DC converter circuit when the operation of the ARCP circuit 2 is stopped during boost operation, and operating conditions consisting of an input voltage value, an output voltage value, and an output current value of the DC / DC converter circuit when the operation of the ARCP circuit 2 is stopped during step-down operation.
[0052] For example, during boost operation, the control unit 11A performs PWM control by varying the duty of the switching element Q2 within the PWM controllable period, but as the load becomes lighter, it becomes necessary to increase the off period of the switching element Q2. If the load becomes even lighter, it becomes necessary to perform PWM control (turn off the switching element Q2) even during the PWM control uncontrollable period in which the resonant current flows. In that case, the control unit 11A stops the operation of the ARCP circuit 2 to prevent the resonant current from flowing, and makes the PWM control uncontrollable period a PWM controllable period.
[0053] Next, the control of the control section 11A during the voltage boosting operation will be described.
[0054] The control unit 11A first performs a stop determination process. During the stop determination process, the control unit 11A compares the acquired operating conditions with the operating conditions in the third condition table stored in the storage unit 12A to perform a stop determination as to whether or not to stop the operation of the ARCP circuit 2. The operating conditions include the input voltage value (voltage value of the capacitor C2) acquired by the second voltage measurement means 4, the output voltage value (voltage value of the capacitor C1) acquired by the first voltage measurement means 3, and the output current value (current value of the reactor current) acquired by the first current measurement means 5.
[0055] When it is determined in the stop determination that the operation of the ARCP circuit 2 is to be stopped, the control unit 11A stops the operation of the ARCP circuit 2 (puts the switching element Q4 of the resonance switch S4 in a continuous off state) to prevent the resonance current from flowing, and 1 ~t 3 The period (the above period) is set as a PWM controllable period. The control unit 11A performs the stop determination again after a predetermined time has elapsed.
[0056] When it is determined in the stop determination that the operation of the ARCP circuit 2 is not to be stopped, the control unit 11A selects a first condition table that is closest to the acquired operating conditions from among the multiple first condition tables stored in the storage unit 12A.
[0057] The control unit 11A that has selected the first condition table performs a switching process. During the switching process, the control unit 11A turns on the switching element Q4 of the resonance switch S4 at a predetermined timing (time t 1 ), and the switching element Q2 of the main switch S2 is turned on at the operation timing of the first timing table associated with the selected first condition table (time t 2 When the control unit 11A turns on the switching element Q2 (at time t 2 The operating conditions (input voltage value, output voltage value, output current value) of the inverter 10 and the current value of the resonant current are stored.
[0058] The control unit 11A detects a time t 3 After the resonant current becomes zero at time t 4 ), the switching element Q2 of the main switch S2 is turned off in accordance with the duty of the PWM control (at time t 5 ).
[0059] The control unit 11A performs an update process in parallel with the switching process. During the update process, the control unit 11A calculates the crossing timing at which the current waveform of the falling edge of the resonant current flowing through the resonant reactor L2 crosses the current waveform of the reactor current flowing through the DC reactor L1, and the operation timing (time t 2 The stored operation timing is corrected to update the first timing table so that the deviation from the first timing is reduced.
[0060] Specifically, the control unit 11A controls the switching element Q2 to be turned on (at time t 2) and the current value of the resonant current, the output current value (the current value of the reactor current) is compared with the current value of the resonant current. If the comparison shows that the two are the same, the control unit 11A ends the update process without updating the first timing table.
[0061] If the two do not match, the control unit 11A selects a first condition table corresponding to the time t 2 The control unit 11A selects the first condition table that is closest to the operating conditions in and corrects the operating timing of the selected first condition table, and ends the update process.
[0062] Regarding the correction of the operation timing, when the control unit 11A measures the time from when the gate signal of the switching element Q4 is switched to a high level until the current value of the reactor current acquired by the first current measuring means 5 matches the current value of the resonant current acquired by the second current measuring means 6, the control unit 11A may correct the operation timing of the first condition table to the acquired time (timing).
[0063] Alternatively, the control unit 11A may 2 In the first condition table, the difference between the current value of the reactor current and the current value of the resonant current may be calculated, and the operation timing for making the difference approach zero may be calculated by a predetermined calculation, and the operation timing in the first condition table may be corrected to the calculated operation timing.
[0064] After completing the update process, the control unit 11A performs the stop determination again after a predetermined time has elapsed. In this manner, the control unit 11A during the voltage step-up operation repeatedly performs a series of controls including the stop determination process, the switching process, and the update process. Note that the control unit 11A during the voltage step-down operation also performs the same control.
[0065] The bidirectional DC / DC converter 1A according to the first embodiment employs a method of turning on the switching element Q2 (the switching element Q1 in the step-down operation) of the main switch S2 at an operation timing stored in the storage unit 12A, without employing a real-time control method of turning on the switching element Q2 (the switching element Q1 in the step-down operation) of the main switch S2 at a timing when the current value of the reactor current acquired by the first current measuring means 5 matches the current value of the resonant current acquired by the second current measuring means 6. Therefore, the bidirectional DC / DC converter 1A can avoid control delays caused by the real-time control method.
[0066] Furthermore, in the bidirectional DC / DC converter 1A, even if a deviation occurs between the crossover timing and the operation timing stored in the storage unit 12A due to a variation in the resonance time, the control unit 11A executes an update process to correct the operation timing, thereby reducing the deviation between the crossover timing and the operation timing. Therefore, the bidirectional DC / DC converter 1A can suppress a decrease in power conversion efficiency and an increase in switching noise caused by a variation in the resonance time.
[0067] [Second embodiment] A bidirectional DC / DC converter 1B according to the second embodiment is shown in Fig. 3. The bidirectional DC / DC converter 1B differs from the first embodiment in that it includes a third voltage measuring means 7 and a fourth voltage measuring means 8 instead of the second current measuring means 6, and a control circuit 10B instead of the control circuit 10A, but is otherwise the same as the first embodiment.
[0068] The third voltage measurement means 7 measures the voltage across the resonant capacitor C3, in other words, the drain-source voltage of the switching element Q1. The fourth voltage measurement means 8 measures the voltage across the resonant capacitor C4, in other words, the drain-source voltage of the switching element Q2. The third voltage measurement means 7 and the fourth voltage measurement means 8 output the measurement results (sensor signals according to the measured voltage values) to the control circuit 10B.
[0069] The control circuit 10B includes a control unit 11B and a storage unit 12B. The control circuit 10B is configured, for example, by a microcomputer. The storage unit 12B has the same configuration as the storage unit 12A of the first embodiment.
[0070] The control unit 11B has the same configuration as the control unit 11A of the first embodiment, except that the measurement results of the third voltage measurement means 7 and the fourth voltage measurement means 8 are used instead of the measurement result of the second current measurement means 6.
[0071] The control unit 11B determines the crossing timing at which the current waveform of the resonant current flowing through the resonant reactor L2 at the falling edge intersects with the current waveform of the reactor current flowing through the DC reactor L1 by detecting that the voltage value measured by the fourth voltage measuring means 8 has reached a minimum value (e.g., 0 [V] or a value close to 0 [V]) during boost operation, and by detecting that the voltage value measured by the third voltage measuring means 7 has reached a minimum value (e.g., 0 [V] or a value close to 0 [V]) during step-down operation.
[0072] In the update process, the control unit 11B compares the voltage value measured by the fourth voltage measurement means 8 (the third voltage measurement means 7 during step-down operation) when the switching element Q2 (the switching element Q1 during step-down operation) is turned on with the minimum value. If the comparison result shows that the voltage value is the minimum value, the control unit 11B ends the update process without correcting the operation timing stored in the memory unit 12B.
[0073] If the voltage value is different from the minimum value, the control unit 11B selects, from among a plurality of first condition tables (second condition tables during step-down operation) stored in the memory unit 12B, a condition table that is closest to the operating conditions stored when the switching element Q2 (switching element Q1 during step-down operation) is turned on, and the control unit 11B corrects the operating timing of the selected condition table and terminates the update process.
[0074] Regarding the correction of the operation timing, when the control unit 11B measures the time from when the gate signal of the switching element Q4 (switching element Q3 in step-down operation) is switched to a high level until the voltage value reaches the minimum value, the control unit 11B may correct the operation timing stored in the memory unit 12B to the acquired time (timing).
[0075] Alternatively, the control unit 11B may calculate the difference between the above-mentioned voltage value when the switching element Q2 (switching element Q1 during step-down operation) is turned on and the above-mentioned minimum value, calculate the operation timing that makes the difference approach zero, and correct the operation timing stored in the memory unit 12B to the calculated operation timing.
[0076] According to the bidirectional DC / DC converter 1B according to the second embodiment, it is possible to obtain the same effects as those of the first embodiment.
[0077] [Variations] Although the embodiments of the DC / DC converter according to the present invention have been described above, the present invention is not limited to the above embodiments.
[0078] The configuration of the DC / DC converter according to the present invention can be modified as appropriate as long as it includes a DC / DC converter circuit including a main switch and a DC reactor, an ARCP circuit including a resonant switch, a resonant reactor, and a resonant capacitor connected in parallel to the current path of the main switch, and a control circuit that controls the switching of the main switch and the resonant switch.
[0079] The control circuit of the present invention includes a control unit that turns on the resonant switch and turns on the main switch during the on period of the resonant switch, and a memory unit in which a timing table related to the operation timing for turning on the main switch is stored, and the control unit can be configured as appropriate so long as it performs a switching process that turns on the main switch based on the operation timing of the timing table, and an update process that corrects the operation timing and updates the timing table so as to reduce the deviation between the operation timing and the intersection timing at which the current waveform of the resonant current flowing through the resonant reactor at the falling edge and the current waveform of the reactor current flowing through the DC reactor intersect.
[0080] In the above embodiment, the bidirectional DC / DC converters 1A, 1B that perform bidirectional power conversion operations (step-up operation and step-down operation) have been described, but the present invention is also applicable to DC / DC converters that perform unidirectional power conversion.
[0081] The operating conditions in the first to third condition tables may include at least one of the input voltage value, the output voltage value, and the output current value of the DC / DC converter circuit. Since the output power value of the DC / DC converter circuit includes information on the output current value, the output power value may be used instead of the output current value.
[0082] As the switching element of the main switch and / or the resonant switch, a switching element other than a MOSFET (eg, an IGBT) can be used. [Explanation of symbols]
[0083] 1A,1B bidirectional DC / DC converter 2 ARCP circuit 3. First voltage measuring means 4. Second voltage measuring means 5 First current measuring means 6 Second current measuring means 7. Third voltage measuring means 8. Fourth voltage measuring means 10A, 10B Control circuit 11A, 11B Control section 12A,12B Storage section
Claims
1. a DC / DC converter circuit including a main switch and a DC reactor; an ARCP circuit including a resonant switch, a resonant reactor, and a resonant capacitor connected in parallel to a current path of the main switch; a control circuit for controlling switching of the main switch and the resonance switch; A DC / DC converter comprising: The control circuit includes: a control unit that turns on the resonance switch and turns on the main switch during an on-period of the resonance switch; a memory unit storing a timing table relating to an operation timing for turning on the main switch; Equipped with The control unit is a switching process for turning on the main switch based on the operation timing of the timing table; an update process for updating the timing table by correcting the operation timing so that a deviation between a crossing timing at which a current waveform at the time of a fall of the resonant current flowing through the resonant reactor and a current waveform of a reactor current flowing through the DC reactor cross each other and the operation timing is reduced; A DC / DC converter comprising:
2. a first current measuring means for measuring the reactor current; A second current measuring means for measuring the resonant current; Equipped with The control unit is 2. The DC / DC converter according to claim 1, wherein the crossing timing is detected based on the measurement results of the first current measuring means and the second current measuring means.
3. a voltage measuring means for measuring a voltage across the current path of the main switch; The control unit is 2. The DC / DC converter according to claim 1, wherein the crossing timing is detected by detecting that the voltage across the resonant switch reaches a minimum value during the on-period of the resonant switch based on a measurement result of the voltage measurement means.
4. The crossing timing and the operation timing are 4. The DC / DC converter according to claim 1, wherein the time is determined from a time when the resonance switch is turned on.
5. The storage unit includes: a condition table relating to an operating condition consisting of at least one of an input voltage value, an output voltage value, and an output current value of the DC / DC converter circuit, the condition table storing a plurality of condition tables each having different values of the operating condition; The plurality of condition tables are associated with the timing table for each of the condition tables, The control unit is 5. The DC / DC converter according to claim 1, further comprising: a first condition table selected from the plurality of condition tables; and a timing table associated with the first condition table, the timing table being used to execute the switching process and the update process.
6. measuring means for measuring said operating conditions; The control unit is determining whether or not to stop the operation of the ARCP circuit based on the measurement result of the measurement means; 6. The DC / DC converter according to claim 5, wherein when it is determined that the operation of the ARCP circuit is to be stopped, the resonant switch is kept in a continuous off state and the main switch is turned on / off by PWM control.
Citation Information
Patent Citations
DC-DC converter
JP2011114931A
Bidirectional DC / DC converter
JP2021019396A
Power-supply device, inspection device, and optimization method for power-supply device
WO2015079573A1