Control device, program, and power management system

The control device and program within the power management system address the challenge of distributing power to multiple destinations by calculating and enforcing usage limits, ensuring fair and efficient power distribution during disasters.

JP7615941B2Active Publication Date: 2025-01-17TOYOTA JIDOSHA KK
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021121053
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-07-21
Publication Date
2025-01-17
Estimated Expiration
2041-07-21

AI Technical Summary

Technical Problem

Existing systems fail to determine the appropriate amount of power that can be distributed to multiple power supply destinations during a disaster, leading to inefficiencies and potential overuse.

Method used

A control device and program that calculate an upper limit value of power distribution to each destination and enforce usage limits to prevent exceeding these values, using a power management system with processors to manage and distribute power effectively.

Benefits of technology

Ensures fair distribution of power by determining and enforcing usage limits, preventing overconsumption and promoting efficient power allocation among multiple supply destinations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007615941000001
    Figure 0007615941000001
  • Figure 0007615941000002
    Figure 0007615941000002
  • Figure 0007615941000003
    Figure 0007615941000003
Patent Text Reader

Abstract

To provide a control device, a program, and a power management system capable of determining an amount of power usable for each of a plurality of power supplying destinations.SOLUTION: In the power management system, when a residential control device acquires information on an occurrence of a disaster, the residential control device calculates an upper limit value for power to be distributed from a power supplying source to each of a plurality of power supplying destinations and controls to prevent an amount of power used by each of the plurality of supplying destinations from exceeding the upper limit value. The residential control device displays on a display device provided at each of the plurality of power supplying destinations (residences) at least one of a remaining amount of power usable at each of the plurality of power supplying destinations and an amount of power used at each of the plurality of supplying destinations.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device, a program, and a power management system. [Background technology]

[0002] Patent document 1 discloses that in the event that the supply of external power is cut off, power is supplied from the storage battery to the air conditioning unit while maintaining a preset minimum remaining power storage amount so that at least a predetermined minimum stored power can be supplied. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2008-128605 A Summary of the Invention [Problem to be solved by the invention]

[0004] When power is to be distributed and supplied from a power supply source to a plurality of power supply destinations in the event of a disaster, it is desirable to determine the amount of power available to each of the plurality of power supply destinations.

[0005] The present disclosure has been made in consideration of the above-mentioned problems, and its purpose is to provide a control device, a program, and a power management system that can determine the amount of power available for each of multiple power supply destinations. [Means for solving the problem]

[0006] The control device according to the present disclosure includes a processor configured to calculate an upper limit of power to be distributed from a power supply source to each of multiple power supply destinations when information regarding the occurrence of a disaster is acquired, and to perform control to prevent the power usage of each of the multiple power supply destinations from exceeding the upper limit.

[0007] The program disclosed herein, when information regarding the occurrence of a disaster is obtained, calculates an upper limit value of the electricity to be distributed from a power supply source to each of multiple power supply destinations, and causes a processor to execute control to prevent the electricity usage of each of the multiple power supply destinations from exceeding the upper limit value.

[0008] The power management system of the present disclosure comprises a first control device having a first processor provided at a power supply destination to which power is supplied from a power supply source, and a second control device having a second processor configured to cause the first processor to execute control to calculate an upper limit of power to be distributed from the power supply source to the power supply destination when information regarding the occurrence of a disaster is acquired, and to prevent the amount of power usage at the power supply destination from exceeding the upper limit. Effect of the Invention

[0009] The present disclosure provides an advantage in that it is possible to determine the amount of power available to each of a plurality of power supply destinations. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a power management system according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a schematic configuration of the management server. [Diagram 3] FIG. 3 is a schematic diagram of an apartment building and a power generation facility. [Figure 4] Figure 4 is a schematic diagram of a collective evacuation shelter. [Diagram 5] FIG. 5 is a schematic configuration diagram of the disaster information management device. [Figure 6] FIG. 6 is a block diagram of a process for maintaining a balance between the demand and supply of power by the management server. [Figure 7] FIG. 7 is a diagram showing a power management control routine that is executed when the server control device acquires information regarding the occurrence of a disaster in the power management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, embodiments of a control device, a program, and a power management system according to the present disclosure will be described. Note that the present disclosure is not limited to the embodiments.

[0012] 1 is a diagram showing a schematic configuration of a power management system 1 according to an embodiment. The power management system 1 is configured with a management server 10, an apartment building 20 consisting of multiple dwelling units 200A, 200B, 200C, and 200D, a power generation facility 30, a collective evacuation shelter 40, a disaster information management device 50, and a network NW, all of which are installed within a management area 100, and a power system 60 installed outside the management area 100.

[0013] In the following description, when there is no need to distinguish between the multiple dwelling units 200A, 200B, 200C, and 200D, they will be simply referred to as dwelling unit 200. Furthermore, the power system 60 is, for example, a power network configured from power plants and power transmission and distribution facilities provided by an electric utility company or the like.

[0014] The management server 10 is configured to be able to communicate with the apartment building 20 (plurality of dwelling units 200A, 200B, 200C, 200D), the power generation facility 30, the collective evacuation shelter 40, and the disaster information management device 50 via the network NW. In the power management system 1, for example, the distribution of power supplied from the power generation facility 30 to the apartment building 20 (plurality of dwelling units 200A, 200B, 200C, 200D) and the collective evacuation shelter 40 is managed by the management server 10 based on a supply and demand operation plan for maintaining a balance between the supply and demand of power in the managed area 100 and disaster information from the disaster information management device 50. In the power management system 1 of the embodiment, the facilities for which the management server 10 manages the distribution of power are not limited to the multiple units 200A, 200B, 200C, and 200D of the apartment building 20 and the collective evacuation shelter 40. For example, the management server 10 may also manage the distribution of power to detached houses, commercial facilities, and other public facilities such as hospitals.

[0015] 2 is a diagram showing a schematic configuration of the management server 10. The management server 10 includes a server control device 11, a storage device 12, and a communication device 13.

[0016] The server control device 11 includes a processor including a CPU (Central Processing Unit), a DSP (Digital Signal Processor), an FPGA (Field-Programmable Gate Array), etc., and a memory including a RAM (Random Access Memory), a ROM (Read Only Memory), etc. The server control device 11 loads a program stored in the storage device 12 into a working area of ​​the memory, executes it, and realizes a function that meets a predetermined purpose by controlling each component through the execution of the program.

[0017] The storage device 12 is composed of recording media such as an EPROM (Erasable Programmable ROM), a hard disk drive (HDD), and a removable medium. Examples of removable media include optical disks (CD (Compact Disc)-R or CD-ROM, DVD (Digital Versatile Disc)-R or DVD-ROM, BD (Blu-ray (registered trademark) Disc), etc.), flash memory (USB (Universal Serial Bus) memory, memory card, etc.), etc. The storage device 12 can store an operating system (OS), various programs, various tables, various databases, etc., and stores, for example, a supply and demand operation plan for maintaining a balance between the demand and supply of electricity in the management area 100.

[0018] The communication device 13 is composed of, for example, a LAN (Local Area Network) interface board, a wireless communication circuit for wireless communication, etc. The communication device 13 is connected to a network NW such as the Internet, which is a public communication network. The communication device 13 connects to the network NW to realize two-way communication between the server control device 11 and the network NW.

[0019] Fig. 3 is a schematic diagram of an apartment building 20 and a power generation facility 30. In Fig. 3, the arrows shown with solid lines indicate the direction of communication, and the arrows shown with dashed lines indicate the direction of power transmission. The apartment building 20 is provided with a home control device 21, a storage device 22, a communication device 23, a power facility 24, a power storage device 25, a home distribution board 26, and a power conversion device 27. The physical configurations of the home control device 21, the storage device 22, and the communication device 23 are similar to those of the server control device 11, the storage device 12, and the communication device 13 provided in the management server 10, for example.

[0020] The power equipment 24 is common equipment installed in the apartment building 20, such as lighting and elevators.

[0021] The power storage device 25 includes, for example, a secondary battery such as a lithium ion battery or a nickel-metal hydride battery. A capacitor such as an electric double layer capacitor can also be used as the power storage device 25. The power storage device 25 temporarily stores the power supplied from the power generation facility 30 and appropriately discharges the stored power as needed for use in the apartment building 20.

[0022] The residential distribution board 26 branches the electric power from the power generation facility 30 and the electric power system 60 to the electric power facility 24, the power conversion device 27, and the plurality of dwelling units 200A, 200B, 200C, and 200D. In addition, the electric power branched to the plurality of dwelling units 200A, 200B, 200C, and 200D is supplied to smart meters 201A, 201B, 201C, and 201D.

[0023] In accordance with instructions from the home control device 21, the power conversion device 27 converts the power supplied from the power system 60 to the power storage device 25 via the home distribution board 26 from AC to DC, converts the power supplied from the generator 34 of the power generation equipment 30 via the home distribution board 26 from AC to DC, and converts the power supplied from the power storage device 25 to the home distribution board 26 from DC to AC.

[0024] The dwelling unit 200A is provided with a smart meter 201A, a distribution board 202A, electrical appliances 203A and 204A, a HEMS (Home Energy Management System) 205A, and a display device 206A. The dwelling unit 200B is provided with a smart meter 201B, a distribution board 202B, electrical appliances 203B and 204B, a HEMS 205B, and a display device 206B. The dwelling unit 200C is provided with a smart meter 201C, a distribution board 202C, electrical appliances 203C and 204C, a HEMS 205C, and a display device 206C. The dwelling unit 200D is provided with a smart meter 201D, a distribution board 202D, electrical appliances 203D and 204D, a HEMS 205D, and a display device 206D.

[0025] In the following description, the smart meters 201A, 201B, 201C, and 201D have the same configuration, and therefore are simply referred to as smart meters 201 when there is no need to distinguish between them. The distribution boards 202A, 202B, 202C, and 202D have the same configuration, and therefore are simply referred to as distribution boards 202 when there is no need to distinguish between them. The electric devices 203A, 203B, 203C, and 203D have the same configuration, and therefore are simply referred to as electric devices 203 when there is no need to distinguish between them. The electric devices 204A, 204B, 204C, and 204D have the same configuration, and therefore are simply referred to as electric devices 204 when there is no need to distinguish between them. The HEMSs 205A, 205B, 205C, and 205D have the same configuration, and therefore are simply referred to as HEMSs 205 when there is no need to distinguish between them. Moreover, since the display devices 206A, 206B, 206C, and 206D have the same configuration, they will be simply referred to as the display device 206 when no distinction is required.

[0026] The smart meter 201 transmits data on the amount of electricity used in the dwelling unit 200 after being supplied from the power generation facility 30 to the HEMS 205, the home control device 21, the management server 10, and the like, via a communication device. The distribution board 202 distributes the electricity supplied from the power generation facility 30 to the electrical appliances 203, 204, and the like. The electrical appliances 203, 204 are, for example, air conditioners, lighting fixtures, refrigerators, and televisions. The HEMS 205 uses a communication device to display information such as the power usage status of the electrical appliances 203, 204 on a display device 206 or a mobile information terminal of the resident to "visualize" the information, and controls the electrical appliances 203, 204 to automatically control the power. The display device 206 is composed of a touch panel display such as a liquid crystal or organic electroluminescence display, and an amplifier and speaker for audio guidance, and displays information such as the power usage status of the electrical appliances 203, 204 from the HEMS 205 on the display or notifies the user by voice from the speaker.

[0027] The power generation facility 30 is a power supply source that generates electricity to be used in a power supply destination such as an apartment building 20. The power generation facility 30 is provided with a power generation control device 31, a storage device 32, a communication device 33, a generator 34, and the like. The physical configurations of the power generation control device 31, the storage device 32, and the communication device 33 are similar to those of the server control device 11, the storage device 12, and the communication device 13 provided in the management server 10, for example.

[0028] The generator 34 is configured, for example, by a fuel cell that generates electricity using hydrogen supplied from a hydrogen supply source. The generator 34 may also be configured to generate electricity using a rotating electric machine by operating an internal combustion engine using a liquid fuel such as petroleum fuel or alcohol. The electricity generated by the generator 34 is supplied to the housing distribution board 26 of the apartment building 20 via a power cable or the like.

[0029] 4 is a schematic diagram of the collective evacuation shelter 40. The collective evacuation shelter 40 is a facility that can be used as an evacuation site in the event of a disaster by residents and others in a managed area 100 including the apartment complex 20.

[0030] The collective evacuation shelter 40 is provided with a shelter control device 41, a storage device 42, a communication device 43, and electrical equipment 44. The physical configurations of the shelter control device 41, the storage device 42, and the communication device 43 are similar to those of the server control device 11, the storage device 12, and the communication device 13 provided in the management server 10, for example. The electrical equipment 44 is, for example, air conditioning equipment, lighting fixtures, etc.

[0031] 5 is a schematic configuration diagram of the disaster information management device 50. The disaster information management device 50 is, for example, a device that outputs disaster information related to a management area 100 to the management server 10 via the network NW.

[0032] The disaster information management device 50 includes an information control device 51, a storage device 52, and a communication device 53. The physical configurations of the information control device 51, the storage device 52, and the communication device 53 are similar to those of the server control device 11, the storage device 12, and the communication device 13 included in the management server 10, for example.

[0033] The disaster information management device 50 acquires information on disasters such as heavy rain, floods, typhoons, and earthquakes (hereinafter also referred to as disaster information) from, for example, public or private organizations issuing weather forecasts, or national or local disaster prevention centers, and stores the information in the storage device 52. Then, the disaster information management device 50 outputs the disaster information stored in the storage device 52 to the management server 10 via the communication device 53. The disaster information also includes the predicted time of occurrence of future disasters.

[0034] FIG. 6 is a block diagram relating to the process for maintaining a balance between the demand and supply of power by the management server 10. In FIG.

[0035] In the power management system 1, in order to maintain a balance between the demand and supply of power in the management area 100 during a disaster, external data 601, generator information 602, disaster power demand data 603, at-home evacuation personal data 604, collective evacuation shelter data 605, town management data 606, and supply target setting data 607 are input to the management server 10 via a network NW or the like. The external data 601 includes, for example, an external support plan, power outage restoration information, and weather information. The generator information 602 includes, for example, information on the amount of power generated by the generator 34 and the amount that can be supplied. The disaster power demand data 603 includes, for example, data on the amount of power required by each facility, such as the apartment building 20 and the collective evacuation shelter 40, in the management area 100 during a disaster. The at-home evacuation personal data 604 includes, for example, data on the resident (disaster victim) who has evacuated to the dwelling unit 200. The collective evacuation shelter data 605 includes data on the electric appliances 44 to be used preferentially in the collective evacuation shelter 40 in the event of a disaster, data on the number of disaster victims evacuated to the collective evacuation shelter 40, and the like. The town management data 606 includes data on the number of people in the collective evacuation shelter 20, for example, when the management area 100 is regarded as one town and the entrance and exit of residents to the collective evacuation shelter 20 is managed by a surveillance camera or the like in the event of a disaster. The supply target setting data 607 includes data on the service level that ranks the priority of the power supply destination according to the importance in the event of a disaster, the power supply time to the power supply destination set according to the service level, and the standby time from the occurrence of a power outage to the start of power supply to the power supply destination set according to the service level. Note that the data on the service level, the power supply time, the standby time, and the like included in the supply target setting data 607 are not limited to those that are set in advance, and may be set as needed according to the type and scale of the disaster that has occurred.

[0036] The server control device 11 of the management server 10 has a power restoration prediction unit 111, a power generation prediction unit 112, a power demand prediction unit 113, a victim data list generation unit 114, an evacuation pattern generation unit 115, a load distribution plan calculation unit 116, an individual usage limit amount calculation unit 117, a supply and demand balance control command generation unit 118, etc. Also, the storage device 12 of the management server 10 stores a priority supply database 121 that collects information on targets to which power should be supplied preferentially in the event of a disaster.

[0037] The power restoration prediction unit 111 predicts the restoration time of power supply from the power system 60 when a power outage occurs in the power system 60 during a disaster. The power generation prediction unit 112 predicts the amount of power required by power generation by the power generation facility 30. The power demand prediction unit 113 predicts the demand for power during a disaster. The victim data list generation unit 114 generates a data list that collects information on victims.

[0038] The evacuation pattern generating unit 115 generates an evacuation pattern for each disaster victim, such as who will evacuate, where, and for how long, based on various information from the priority supply database 121, the power restoration predicting unit 111, the power generation predicting unit 112, the power demand predicting unit 113, and the disaster victim data list generating unit 114. The evacuation pattern generating unit 115 receives a command signal for controlling the balance of power supply and demand in the event of a disaster, generated by the supply and demand balance control command generating unit 118, and feeds back the command signal to the generation of the evacuation pattern. The load distribution plan calculating unit 116 calculates a plan for load distribution (power distribution) to the collective evacuation shelter 40 and the dwelling unit 200, etc., based on the power consumption and number of evacuees in the collective evacuation shelter 40 and the dwelling unit 200, etc., and loads (electrical equipment 203, 204, 44 and power equipment 24) to which power supply such as medical equipment should be prioritized in the event of a disaster. The individual usage limit amount calculation unit 117 calculates the limit amount of electricity available for each of the collective evacuation shelter 40 and the dwelling unit 200, etc., based on the load distribution plan calculated by the load distribution plan calculation unit 116. The supply and demand balance control command generation unit 118 generates a command for controlling the balance of supply and demand of electricity in the event of a disaster, based on the calculation results of the load distribution plan calculation unit 116 and the calculation results of the individual usage limit amount calculation unit 117.

[0039] The supply and demand balance control command generating unit 118 outputs the generated command signal for controlling the balance between supply and demand of electricity in the event of a disaster to, for example, the apartment house 20, the power generation facility 30, or the collective evacuation shelter 40. In the apartment house 20, the home control device 21 performs, for example, remote shutoff control of the smart meter 201, control of the electric appliances 203 and 204 by the HEMS 205, and control for displaying information such as the upper limit of the available power amount and the remaining available power amount on the display device 206. In the power generation facility 30, the power generation control device 31 performs, for example, power generation control of the generator 34 to generate the required amount of power. In the collective evacuation shelter 40, the evacuation shelter control device 41 performs, for example, control of the electric appliances 44.

[0040] In the power management system 1 of the embodiment, for example, in the event of a disaster, the remaining amount of power in the power storage device 25 installed in the apartment building 20 and the amount of available power in each of the dwelling units 200A, 200B, 200C, and 200D are made visible, and the supply of power to each of the dwelling units 200A, 200B, 200C, and 200D is controlled.

[0041] In the power management system 1 according to the embodiment, when the power grid 60 is powered off during a disaster and the power generating facility 30 supplies power to each of the multiple dwelling units 200A, 200B, 200C, and 200D of the apartment building 20, the smart meters 201A, 201B, 201C, and 201D and the HEMS 205A, 205B, 205C, and 205D are controlled to adjust the amount of available power for each of the multiple dwelling units 200A, 200B, 200C, and 200D. Information such as the upper limit of the amount of available power during a disaster and the remaining amount of available power for each of the multiple dwelling units 200A, 200B, 200C, and 200D is displayed on the display devices 206A, 206B, 206C, and 206D and the mobile information terminals of the residents by the HEMS 205A, 205B, 205C, and 205D.

[0042] The amount of electricity required in the event of a disaster for each of the multiple dwelling units 200A, 200B, 200C, and 200D is predicted based on the scale of the disaster, the electricity demand during peacetime, the importance of the power equipment 24, the weather, the number of residents, and the personal data of the residents, and a fair electricity distribution is planned based on specified conditions.

[0043] For example, in the event of a large-scale earthquake occurring as a disaster, power is supplied to the lighting and elevators, which are power facilities 24 in apartment building 20, which are of high importance during evacuation, and power supply to elevators, which are prohibited from use during evacuation and are of low importance, is stopped. Then, the amount of power that is no longer required to be supplied to the elevators is distributed to multiple dwelling units 200A, 200B, 200C, and 200D.

[0044] Also, the amount of electricity to be distributed may be increased for dwelling units 200 with a larger number of residents according to the number of residents in each of the multiple dwelling units 200A, 200B, 200C, and 200D. Also, the amount of electricity to be distributed may be calculated according to the age distribution of the residents of the dwelling units 200. For example, the amount of electricity to be distributed may be increased according to the number of elderly people (for example, residents aged 65 or older) in the dwelling units 200, assuming that medical equipment and the like are likely to be used in the dwelling units 200 that include elderly people. Also, for example, depending on the scale of the disaster, it is considered that some of the residents of the apartment building 20 evacuate to the collective evacuation shelter 40 or stay at their homes (dwelling units 200). Also, in each of the multiple dwelling units 200A, 200B, 200C, and 200D, it is considered that all the household members evacuate to the collective evacuation shelter 40, or some of the residents of the household evacuate to the collective evacuation shelter 40 and the remaining residents stay at their homes. Therefore, in the event of a disaster, residents passing through the entrances and exits of the apartment building 20 can be detected using a camera or the like, and it can be determined which dwelling unit 200 the detected resident belongs to. The number of residents predicted to remain in each of the multiple dwelling units 200A, 200B, 200C, and 200D can then be calculated, and a greater amount of electricity can be distributed to dwelling units 200 with a greater number of residents remaining there.

[0045] Furthermore, in the power management system according to the embodiment, power may be exchanged between the multiple dwelling units 200A, 200B, 200C, and 200D. This allows, for example, a dwelling unit 200 with a relatively large remaining amount of available power displayed on the display device 206 to supply power to a dwelling unit 200 with a relatively small remaining amount of available power displayed on the display device 206, allowing power to be shared between the dwelling units 200 in the event of a disaster.

[0046] In the power management system 1 according to the embodiment, power distribution predictions and actual results of power usage are shared and visualized among the dwelling units 200, making it possible to reduce wasteful power consumption and promote the exchange of power among the dwelling units 200. Furthermore, for dwelling units 200 that exceed the upper limit of the amount of power that can be used in the event of a disaster, a notification is sent to the display device 206 or the resident's mobile information terminal, and power control can be performed, such as automatically cutting off the power supply by operating a circuit breaker that is provided in the distribution board 202 of the dwelling unit 200 and can be operated from the HEMS 205.

[0047] Fig. 7 is a diagram showing a power management control routine that is executed when the server control device 11 acquires information regarding the occurrence of a disaster in the power management system 1. The power management control routine shown in Fig. 7 is performed by the server control device 11 in cooperation with the home control device 21, and is composed of a control routine executed by the server control device 11 and a control routine executed by the home control device 21. The power management control routine shown in Fig. 7 also shows power management for multiple dwelling units 200A, 200B, 200C, and 200D of the apartment building 20 when a disaster occurs.

[0048] First, the server control device 11 acquires information on the occurrence of a disaster from the disaster information management device 50 via the network NW or the like (step S1). Next, the server control device 11 calculates the upper limit value of the amount of power to be distributed to the multiple dwelling units 200A, 200B, 200C, and 200D of the apartment building 20 (step S2). Next, the server control device 11 outputs a signal related to the upper limit value of the amount of power to be distributed to the multiple dwelling units 200A, 200B, 200C, and 200D to the home control device 21 via the network NW or the like (step S3). Then, the server control device 11 ends this control routine. The signal related to the upper limit value of the amount of power also includes a command signal to cut off the power supply when the amount of power used exceeds the upper limit value.

[0049] Next, the home control device 21 receives a signal related to the upper limit of the amount of power to be distributed to the multiple dwelling units 200A, 200B, 200C, and 200D (step S4). Next, the home control device 21 causes the HEMS 205 installed in the dwelling unit 200 to display the amount of power available and the amount of power used in the dwelling unit 200 on the display device 206 based on the upper limit of the amount of power (step S5). Next, the home control device 21 causes the HEMS 205 installed in the dwelling unit 200 to determine whether the amount of power used in the dwelling unit 200 has exceeded the upper limit (step S6). If the HEMS 205 determines that the amount of power used in the dwelling unit 200 has not exceeded the upper limit (No in step S6), the home control device 21 returns to step S5. On the other hand, if the HEMS 205 determines that the amount of power used in the dwelling unit 200 has exceeded the upper limit (Yes in step S6), the home control device 21 causes the HEMS 205 to notify the display device 206 that the amount of power used has exceeded the upper limit (step S7). Next, the home control device 21 causes the HEMS 205 to operate a circuit breaker provided in the distribution board 202 of the dwelling unit 200, and cuts off the power supply to the dwelling unit 200 (step S8). Then, the home control device 21 ends this control routine.

[0050] In the power management system 1 according to the embodiment, the amount of power available and the amount of power used during a disaster are displayed on the display device 206 and made visible, so that the resident can be encouraged to use power within the range of the amount of power to be distributed according to the upper limit set in the dwelling unit 200. Furthermore, in the power management system 1 according to the embodiment, by notifying the dwelling unit 200 of the fact that the power supply to the dwelling unit 200 is to be cut off before the power supply to the dwelling unit 200 is cut off, it becomes possible to obtain power from other dwelling units 200 before the power supply to the dwelling unit 200 is cut off. Furthermore, in the power management system 1 according to the embodiment, by cutting off the power supply to the dwelling unit 200 that has exceeded the upper limit of the amount of power to be distributed during a disaster, it is possible to prevent a specific dwelling unit 200 from using too much power alone, and to distribute power fairly to the multiple dwelling units 200A, 200B, 200C, and 200D. [Explanation of symbols]

[0051] 1. Power Management System 10 Management Server 11 Server control device 12,22,32,42,52 Storage device 13,23,33,43,53 Communication equipment 20 Apartment complex 21 Residential control device 24 Power equipment 25 Energy storage device 26 Residential distribution board 27 Power conversion device 30 Power generation facilities 31 Power generation control device 34 Generator 40 Collective evacuation center 41 Evacuation shelter control device 44 Electrical Equipment 50 Disaster information management device 51 Information and Control Equipment 60 Power system 111 Power Restoration Prediction Department 112 Power Generation Forecasting Department 113 Electricity Demand Forecasting Department 114 Victim Data List Generation Department 115 Evacuation pattern generation unit 116 Load distribution plan calculation unit 117 Individual use limit calculation unit 118 Supply and demand balance control command generation unit 200, 200A, 200B, 200C, 200D dwelling units 201, 201A, 201B, 201C, 201D Smart Meter 202, 202A, 202B, 202C, 202D Distribution board 203, 203A, 203B, 203C, 203D Electrical Equipment 204, 204A, 204B, 204C, 204D Electrical equipment 205, 205A, 205B, 205C, 205D HEMS 206,206A,206B,206C,206D Display device

Claims

1. a processor configured to calculate an upper limit of power to be distributed from a power supply source to each of a plurality of power supply destinations when information regarding the occurrence of a disaster is acquired, and to perform control to suppress the amount of power usage of each of the plurality of power supply destinations from exceeding the upper limit; A control device comprising: the plurality of power supply destinations are a plurality of dwelling units of an apartment building, The processor, A control device that calculates the amount of electricity to be distributed to each of the plurality of dwelling units according to the number of people evacuated to each of the plurality of dwelling units in the event of a disaster.

2. The processor, Displaying at least one of the remaining amount of electricity available for use in each of the plurality of dwelling units and the amount of electricity used in each of the plurality of dwelling units on a display device provided in each of the plurality of dwelling units; The control device according to claim 1 .

3. The processor, a cut-off device provided in each of the plurality of dwelling units for cutting off the power supply to the dwelling unit cuts off the power supply when the power usage of the dwelling unit exceeds the upper limit during a disaster; The control device according to claim 1 or 2.

4. The processor, calculating the number of people evacuated from each of the plurality of dwelling units based on information regarding the entry and exit of people from a management device that manages the entry and exit of people into the apartment building; The control device according to any one of claims 1 to 3.

5. when acquiring information regarding the occurrence of a disaster, calculating an upper limit value of power to be distributed from a power supply source to each of a plurality of power supply destinations, and causing a processor to execute control to suppress the amount of power usage of each of the plurality of power supply destinations from exceeding the upper limit value; A program, the plurality of power supply destinations are a plurality of dwelling units of an apartment building, The processor, A program that executes the calculation of the amount of electricity to be distributed to each of the plurality of dwelling units according to the number of people evacuated to each of the plurality of dwelling units in the event of a disaster.

6. The processor, causing a display device provided in each of the plurality of dwelling units to display at least one of the remaining amount of power available in each of the plurality of dwelling units and the amount of power used in each of the plurality of dwelling units; The program according to claim 5.

7. The processor, a cut-off device provided in each of the plurality of dwelling units for cutting off the power supply to the dwelling unit is caused to cut off the power supply when the power usage of the dwelling unit exceeds the upper limit during a disaster; The program according to claim 5 or 6.

8. The processor, Calculating the number of people evacuated to each of the plurality of dwelling units based on information regarding entry and exit from a management device that manages entry and exit of people into the apartment building. The program according to any one of claims 5 to 7.

9. A first control device having a first processor provided at a power supply destination to which power is supplied from a power supply source; a second control device having a second processor configured to, when acquiring information regarding the occurrence of a disaster, calculate an upper limit of power to be distributed from the power supply source to the power supply destination, and cause the first processor to execute control to prevent the amount of power usage at the power supply destination from exceeding the upper limit; A power management system comprising: The power supply destination is a dwelling unit of an apartment building consisting of a plurality of dwelling units, The second processor comprises: An electricity management system that calculates the amount of electricity to be distributed based on the number of people taking refuge in the residence in the event of a disaster.

10. The second processor comprises: causing the first processor to control a display device provided in the dwelling unit to display at least one of the remaining amount of electricity available in the dwelling unit and the amount of electricity used in the dwelling unit; The power management system of claim 9.

11. The second processor comprises: causing the first processor to control a cutoff device provided in the dwelling unit to cut off the power supply to the dwelling unit when the amount of power used by the dwelling unit exceeds the upper limit during a disaster; The power management system according to claim 9 or 10.

12. Electricity can be exchanged between the plurality of dwelling units. The power management system according to any one of claims 9 to 11.

Citation Information

Patent Citations

  • Storage type air conditioning device

    JP2008128605A

  • Power control part and power control system

    JP2013172589A

  • Power management device, power management system, and power management method

    JP2018137880A

  • Management system for apartment houses and apartment house

    JP2019012355A

  • Family size assuming device, and device and method for assuming number of non-evacuating persons at disaster generation

    JP2019036262A