Method for manufacturing an electricity storage device

JP7636382B2Active Publication Date: 2025-02-26PRIME PLANET ENERGY & SOLUTIONS INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022172566
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-10-27
Publication Date
2025-02-26
Estimated Expiration
2042-10-27

Smart Images

  • Figure 0007636382000001
    Figure 0007636382000001
  • Figure 0007636382000002
    Figure 0007636382000002
  • Figure 0007636382000003
    Figure 0007636382000003
Patent Text Reader

Abstract

To provide a method for manufacturing a power storage device that can reduce weld defects caused by fumes at a first long side part and a second long side part.SOLUTION: A welding process includes: a first long side part welding process for welding a first long side part 31 by scanning a laser beam LB from a second short side part 34 side of the first long side part 31 to a first short side part 33 side; and a second long side part welding process for welding a second long side part 32 by scanning the laser beam LB from the first short side part 33 side of the second long side part 32 to the second short side part 34 side. The first long side part welding process is performed while forming a first air current A1 flowing above the first long side part 31 from the first short side part 33 side to the second short side part 34 side, and the second long side part welding process is performed while forming a second air current A3 flowing above the second long side part 32 from the second short side part 34 side to the first short side part 33 side.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for manufacturing an electricity storage device. [Background technology]

[0002] Patent Document 1 discloses an electricity storage device having a case with a rectangular opening and a rectangular sealing plate that closes the opening. In this electricity storage device, an opening wall that surrounds the opening of the case and an outer peripheral edge of the sealing plate are welded to each other along the entire periphery. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-107515 A

[0004] The above-mentioned electricity storage device is manufactured as follows. First, in a closing step, a sealing plate is inserted into the opening of the case, and the opening of the case is closed by the sealing plate. Next, in a welding step, a laser beam is irradiated from above the sealing plate to a contact portion (referred to as a welded portion) between the outer peripheral edge portion of the sealing plate and the opening wall portion of the case, with the case opening closed by the sealing plate with its outer surface facing upward, to laser weld the welded portion in the circumferential direction over the entire circumference. The welded portion has a rectangular ring shape in a plan view, and has first and second long sides that are parallel to each other, and first and second short sides that are parallel to each other. Summary of the Invention [Problem to be solved by the invention]

[0005] In the above-mentioned welding process, fumes are generated from the welded parts irradiated with the laser beam. Here, fumes refer to dust particles that are generated when metal vapor from the welded parts, generated by the welding heat, cools and turns into fine metal particles (metal dust) and floats in the air. If these fumes are present in the optical path of the laser beam, the laser beam may collide with the fumes and cause them to diffuse, lowering the energy density of the laser beam irradiated to the welded parts. This may result in poor welding.

[0006] In contrast, in the welding process of Patent Document 1, exhaust is performed from the suction port of an exhaust nozzle arranged around the entire circumference along the outside of the welded part, from the center side of the sealing plate to the outside of the sealing plate when viewed from a direction perpendicular to the plane of the sealing plate. Furthermore, inert gas is supplied from the air supply port of an air supply nozzle arranged around the entire circumference along the outside of the welded part below the exhaust nozzle, to supply inert gas from the outside of the sealing plate to the center of the sealing plate when viewed from a direction perpendicular to the plane of the sealing plate. In this way, the generated fumes are directed from the center of the sealing plate to the outside.

[0007] However, in the method of Patent Document 1, it is difficult to remove the generated fumes from the optical path of the laser beam. Therefore, it is difficult to reduce poor welding caused by the collision of the laser beam with the fumes. For this reason, there has been a demand for a method that can effectively reduce poor welding between the case and the sealing plate by reducing poor welding caused by fumes. In particular, there has been a demand for a method that can reduce poor welding caused by fumes in the first long side portion and the second long side portion, which have a relatively long welding distance among the welded parts.

[0008] The present invention has been made in consideration of the current situation, and aims to provide a manufacturing method for an electricity storage device that can reduce welding defects caused by fumes in the first long side portion and the second long side portion. [Means for solving the problem]

[0009] (1) One aspect of the present invention relates to a method for manufacturing an electricity storage device having a case having a rectangular opening and a rectangular sealing plate closing the opening, wherein an opening wall surrounding the opening of the case is welded to an outer periphery of the sealing plate, the method including the steps of: inserting the sealing plate into the opening of the case and closing the opening with the sealing plate; and, with the opening of the case closed by the sealing plate with its outer surface facing upward, irradiating a laser beam from above the sealing plate to a welded portion between the outer periphery of the sealing plate and the opening wall of the case to weld the opening. and a welding step of laser-welding the weld portion in a circumferential direction over an entire circumference, the weld portion having a rectangular ring shape in a plan view and a first long side portion and a second long side portion parallel to each other and a first short side portion and a second short side portion parallel to each other, the welding step includes a first long side portion welding step of scanning the laser beam from the second short side portion side of the first long side portion to the first short side portion side to weld the first long side portion, and a second long side portion welding step of scanning the laser beam from the first short side portion side of the second long side portion to the second short side portion side to weld the second long side portion, the first long side portion welding step includes welding the weld portion in a circumferential direction over an entire circumference of the weld portion, the first long side portion welding step includes welding the weld portion in a circumferential direction over an entire circumference of the weld portion, the second short ... and the first short side portion welding step includes welding the weld portion in a circumferential direction over an entire circumference of the weld portion. from the end portion on the first short side side to the end portion on the second short side side While forming the first air flow, Thus, first fumes generated from the first long side portion are moved by the first airflow to a side above the first long side portion where laser welding has been completed, The second long side portion welding step includes: from the end portion on the second short side side to the end portion on the first short side side While forming a second air flow Thus, the second fumes generated from the second long side portion are moved by the second air flow to the side above the second long side portion where the laser welding has been completed. A method for manufacturing an electricity storage device.

[0010] In the above-mentioned manufacturing method, the first long side welding step is performed while forming a first air flow that flows above the first long side from the first short side to the second short side (for example, in the opposite direction to the scanning direction of the laser beam). This allows the first air flow to move fumes generated by the irradiation of the laser beam to the side of the first long side where the laser welding has been completed (i.e., the side where the laser beam has been irradiated). This allows the fumes present in the space above the part of the first long side that will be irradiated with the laser beam to be reduced. Therefore, it is possible to reduce the diffusion of the laser beam that travels in the space above the first long side toward the first long side (specifically, the part where the laser beam will be irradiated with the laser beam) due to the fumes. This allows the energy density of the laser beam in the first long side to be reduced. Specifically, it is possible to appropriately converge the laser beam and irradiate it to the first long side. This allows the welding defects in the first long side to be reduced.

[0011] Furthermore, in the above-mentioned manufacturing method, the second long side welding step is performed while forming a second air flow that flows above the second long side from the second short side to the first short side (for example, in the opposite direction to the scanning direction of the laser beam). This allows the second air flow to move fumes generated by the irradiation of the laser beam to the side of the second long side where the laser welding has been completed (i.e., the side where the laser beam has been irradiated). This allows the fumes present in the space above the part of the second long side that will be irradiated with the laser beam to be reduced in the second long side welding step. Therefore, it is possible to reduce the diffusion of the laser beam that travels in the space above the second long side toward the second long side (specifically, the part where the laser beam will be irradiated with the laser beam) due to the fumes. This allows the energy density of the laser beam in the second long side to be reduced. Specifically, it is possible to appropriately converge the laser beam and irradiate it to the second long side. This allows the welding defects in the second long side to be reduced.

[0012] As described above, in the above-mentioned manufacturing method, it is possible to reduce welding defects caused by fumes in the first long side portion and the second long side portion, which have a relatively long welding distance, among the welded portions between the sealing plate and the case. Therefore, it is possible to effectively reduce welding defects between the case and the sealing plate. The welded portion is a portion where the outer peripheral edge portion of the sealing plate and the opening wall portion of the case are welded, and is a rectangular ring-shaped portion in a plan view, having first and second long side portions parallel to each other and first and second short side portions parallel to each other. In addition, the fumes are dust particles that are generated from the welded portion by the welding heat, are cooled, and become fine metal particles and float in the air.

[0013] (2) Furthermore, in the manufacturing method of the electricity storage device of (1), the first long side welding process may be configured to suck in and remove first fumes generated from the first long side portion, which have been carried by the first air flow and passed above the first long side portion, using a first suction device, and the second long side welding process may be configured to suck in and remove second fumes generated from the second long side portion, which have been carried by the second air flow and passed above the second long side portion, using a second suction device.

[0014] In the above-mentioned manufacturing method, in the first long side welding step, first fumes generated from the first long side (specifically, the portion irradiated with the laser beam) and carried by the first air current and passing above the first long side are sucked in and removed by a first suction device. This makes it possible to further reduce welding defects caused by the first fumes in the first long side. Furthermore, in the second long side welding step, second fumes generated from the second long side (specifically, the portion irradiated with the laser beam) and carried by the second air current and passing above the second long side are sucked in and removed by a second suction device. This makes it possible to further reduce welding defects caused by the second fumes in the second long side.

[0015] (3) Furthermore, in the manufacturing method of the electricity storage device according to (1) or (2), the welding step includes a first short side portion welding step of welding the first short side portion by scanning the laser beam from the first long side portion side to the second long side portion side of the first short side portion, and a second short side portion welding step of welding the second short side portion by scanning the laser beam from the second long side portion side to the first long side portion side of the second short side portion, flows from the end portion on the second long side side toward the end portion on the first long side side. While forming a third air current and moving third fumes generated from the first short side portion by the third air flow to a side above the first short side portion where laser welding has been completed, The second short side portion welding step includes: flows from the end portion on the first long side side toward the end portion on the second long side side. While forming the fourth air current Thus, the fourth fumes generated from the second short side portion are moved by the fourth air flow to a side above the second short side portion where the laser welding has been completed. The method may be used as a method for manufacturing an electricity storage device.

[0016] In the above-mentioned manufacturing method, the first short side welding step is performed while forming a third air flow that flows above the first short side from the second long side to the first long side. This allows the third air flow to move fumes generated by the irradiation of the laser beam to the side of the first short side where the laser welding has been completed (i.e., the side where the laser beam has been irradiated). This allows the fumes present in the space above the part of the first short side that will be irradiated with the laser beam to be reduced. Therefore, it is possible to reduce the diffusion of the laser beam that travels in the space above the first short side toward the first short side (specifically, the part where the laser beam will be irradiated with the laser beam) due to the fumes. This allows the energy density of the laser beam in the first short side to be reduced. Specifically, it is possible to appropriately converge the laser beam and irradiate it to the first short side. This allows the welding defects in the first short side to be reduced.

[0017] Furthermore, in the above-mentioned manufacturing method, the second short side welding step is performed while forming a fourth air flow that flows above the second short side from the first long side to the second long side. This allows the fourth air flow to move fumes generated by the irradiation of the laser beam to the side of the second short side where the laser welding has been completed (i.e., the side where the laser beam has been irradiated). This allows the second short side welding step to reduce fumes present in the space above the part of the second short side that will be irradiated with the laser beam. Therefore, it is possible to reduce the diffusion of the laser beam that travels in the space above the second short side toward the second short side (specifically, the part where the laser beam will be irradiated) due to the fumes. This allows the energy density of the laser beam in the second short side to be suppressed from decreasing. Specifically, it is possible to appropriately converge the laser beam and irradiate it on the second short side. This allows the welding defects in the second short side to be reduced.

[0018] As described above, the above-mentioned manufacturing method can reduce welding defects caused by fumes not only in the first long side portion and the second long side portion but also in the first short side portion and the second short side portion, thereby further reducing welding defects between the case and the sealing plate.

[0019] (4) Furthermore, in the method for manufacturing an electricity storage device of (3), the first short side welding process may be configured to suck in and remove third fumes generated from the first short side portion, which have been carried by the third air stream and passed above the first short side portion, using a third suction device, and the second short side welding process may be configured to suck in and remove fourth fumes generated from the second short side portion, which have been carried by the fourth air stream and passed above the second short side portion, using a fourth suction device.

[0020] In the above-mentioned manufacturing method, in the first short side welding process, the third fumes generated from the first short side (specifically, the portion irradiated with the laser beam) and carried by the third air current to pass above the first short side are sucked in and removed by the third suction device. This makes it possible to further reduce welding defects caused by the third fumes in the first short side. Furthermore, in the second short side welding process, the fourth fumes generated from the second short side (specifically, the portion irradiated with the laser beam) and carried by the fourth air current to pass above the second short side are sucked in and removed by the fourth suction device. This makes it possible to further reduce welding defects caused by the fourth fumes in the second short side. [Brief description of the drawings]

[0021] [Figure 1] 1 is a plan view (top view) of an electricity storage device according to an embodiment. [Diagram 2] FIG. 2 is a cross-sectional view of FIG. [Diagram 3] FIG. 2 is a plan view of a sealing plate according to the embodiment. [Figure 4] FIG. 2 is a plan view of a case according to the embodiment. [Diagram 5] FIG. [Figure 6] 11A to 11C are diagrams illustrating a closing step according to the embodiment. [Figure 7] FIG. 11 is another view illustrating the closing step. [Figure 8] 8 is a cross-sectional view taken along CC in FIG. 7 . [Figure 9] FIG. 2 is a diagram illustrating a welding process according to the embodiment. [Figure 10] FIG. [Figure 11] 13A to 13C are diagrams illustrating a welding process according to a modified embodiment. [Figure 12] FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] <Embodiment> Next, an embodiment of the present invention will be described. The electricity storage device 1 of this embodiment is a lithium ion secondary battery. This electricity storage device 1 includes an electrode body 50, a case 20 that houses the electrode body 50, and a sealing plate 10 that closes an opening 20b of the case 20 (see FIGS. 1 and 2). The case 20 is a metal hard case in the shape of a rectangular parallelepiped box, and has a rectangular opening 20b (see FIGS. 4 and 5). The sealing plate 10 is made of metal in the shape of a rectangular plate, and is inserted into the opening 20b of the case 20 to close the opening 20b (see FIGS. 1 and 2).

[0023] The opening wall 21 of the case 20 and the outer peripheral edge 11 of the sealing plate 10 are welded around the entire circumference to form an annular weld W (see FIGS. 1 and 2). Here, the opening wall 21 of the case 20 is a portion that surrounds the opening 20b of the case 20, and has a rectangular ring shape in plan view (see FIG. 4). The outer peripheral edge 11 of the sealing plate 10 is a portion that includes the outer peripheral surface 13 of the sealing plate 10, and has a rectangular ring shape in plan view (see FIG. 3).

[0024] The electrode body 50 has a positive electrode plate 51, a negative electrode plate 52, and a separator 53 interposed between the positive electrode plate 51 and the negative electrode plate 52 (see FIG. 2). More specifically, the electrode body 50 is a flat wound type electrode body including a strip-shaped positive electrode plate 51, a strip-shaped negative electrode plate 52, and a strip-shaped separator 53, in which the positive electrode plate 51 and the negative electrode plate 52 are wound with the separator 53 sandwiched therebetween. An electrolyte (not shown) is contained inside the electrode body 50. An electrolyte (not shown) is also contained on the bottom side inside the case 20.

[0025] The electricity storage device 1 further has a positive electrode current collecting member 61 connected to the positive electrode plate 51 of the electrode body 50, and a negative electrode current collecting member 62 connected to the negative electrode plate 52 of the electrode body 50 (see FIG. 2). The electricity storage device 1 further has a positive electrode terminal member (not shown) connected to the positive electrode current collecting member 61 and exposed to the outside of the electricity storage device 1 through a first through hole (not shown) formed in the sealing plate 10. The electricity storage device 1 further has a negative electrode terminal member (not shown) connected to the negative electrode current collecting member 62 and exposed to the outside of the electricity storage device 1 through a second through hole (not shown) formed in the sealing plate 10.

[0026] Next, a method for manufacturing the electricity storage device 1 of this embodiment will be described. First, the lid structure 100 is formed (see FIG. 6). Specifically, a positive electrode current collecting member 61, a negative electrode current collecting member 62, a positive electrode terminal member (not shown), and a negative electrode terminal member (not shown) are assembled to the sealing plate 10 to form the lid structure 100 in which these are integrated. Next, the electrode body 50 is prepared, and the positive electrode current collecting member 61 of the lid structure 100 is connected to the positive electrode plate 51 of this electrode body 50, and the negative electrode current collecting member 62 of the lid structure 100 is connected to the negative electrode plate 52 of the electrode body 50, thereby integrating the lid structure 100 and the electrode body 50 (see FIG. 6).

[0027] Next, in a closing step, the electrode body 50 integrated with the lid structure 100 is housed inside the case 20 through the opening 20b, and the sealing plate 10 is inserted into the opening 20b of the case 20 to close the opening 20b of the case 20 with the sealing plate 10 (see Figs. 6 to 8). Fig. 7 is a plan view (top view) of the case 20 with the opening 20b closed by the sealing plate 10. Fig. 8 is a cross-sectional view taken along CC in Fig. 7.

[0028] The sealing plate 10 is inserted into the opening 20b of the case 20 from the rear surface 10c side. The opening wall 21 of the case 20 subjected to the closing step has a rectangular ring shape, and has a first opening long side portion 21b and a second opening long side portion 21c that are parallel to each other, a first opening short side portion 21d and a second opening short side portion 21e that are parallel to each other, and four arc-shaped opening corners 21f to 21i that connect them (see FIG. 4). The opening corner 21f is a portion that connects the first opening long side portion 21b and the first opening short side portion 21d. The opening corner 21g is a portion that connects the second opening long side portion 21c and the first opening short side portion 21d. The opening corner 21h is a portion that connects the second opening long side portion 21c and the second opening short side portion 21e. Moreover, the opening corner portion 21i is a portion that connects the first opening long side portion 21b and the second opening short side portion 21e.

[0029] The sealing plate 10 used in the sealing step has the following configuration. Specifically, the outer peripheral edge 11 of the sealing plate 10 has a rectangular ring shape, and has a first sealing long side 11b and a second sealing long side 11c that are parallel to each other, a first sealing short side 11d and a second sealing short side 11e that are parallel to each other, and four arc-shaped sealing corners 11f to 11i that connect them (see FIG. 3). The sealing corner 11f is a portion that connects the first sealing long side 11b and the first sealing short side 11d. The sealing corner 11g is a portion that connects the second sealing long side 11c and the first sealing short side 11d. The sealing corner 11h is a portion that connects the second sealing long side 11c and the second sealing short side 11e. Further, the sealing corner portion 11i is a portion that connects the first sealing long side portion 11b and the second sealing short side portion 11e.

[0030] Next, in a welding step, with the opening 20b of the case 20 closed by the sealing plate 10, the welded portion 30 between the outer peripheral edge portion 11 of the sealing plate 10 and the opening wall portion 21 of the case 20 is laser welded over the entire circumference (see FIGS. 9 and 10). Note that, in the welding step, with the outer surface 10b of the sealing plate 10 facing upward, a laser beam LB is irradiated onto the welded portion 30 from above the sealing plate 10, thereby laser welding the welded portion 30.

[0031] As shown in FIG. 7, the welded portion 30 has a rectangular ring shape in a plan view, and has a first long side portion 31 and a second long side portion 32 that are parallel to each other, a first short side portion 33 and a second short side portion 34 that are parallel to each other, and four arc-shaped corners 35, 36, 37, 38 that connect them. The first long side portion 31 is composed of the first opening long side portion 21b and the first sealing long side portion 11b. The second long side portion 32 is composed of the second opening long side portion 21c and the second sealing long side portion 11c. The first short side portion 33 is composed of the first opening short side portion 21d and the first sealing short side portion 11d. The second short side portion 34 is composed of the second opening short side portion 21e and the second sealing short side portion 11e. The corners 35-38 are constituted by the opening corners 21f-21i and the sealing corners 11f-11i. In this embodiment, the laser beam LB is scanned in the circumferential direction of the welded portion 30 to laser-weld the welded portion 30 over the entire circumference (see Figs. 9 and 10).

[0032] In this embodiment, the welding process is performed using a welding device 70 (see Figs. 9 and 10). Fig. 9 is a schematic front view of the welding device 70, showing the state where the first long side portion 31 is being laser-welded. Fig. 10 is a schematic plan view of the welding device 70. The welding device 70 includes a laser irradiation device 40, a gas delivery unit 80, a suction unit 90, and a controller 75. The laser irradiation device 40 includes a welding head 41 and a laser oscillator (not shown). The welding head 41 is connected to the laser oscillator (not shown) via an optical fiber, and emits a laser beam LB input from the laser oscillator toward the welded portion 30. In detail, the welding head 41 scans the laser beam LB in the circumferential direction of the welded portion 30, and irradiates the laser beam LB over the entire circumference of the welded portion 30.

[0033] The gas delivery unit 80 includes a gas delivery main body 85, a first delivery device 81, a second delivery device 82, a third delivery device 83, and a fourth delivery device 84. The gas delivery main body 85 is, for example, a known air compressor. The first delivery device 81 includes a first delivery section 81d having a gas delivery port 81f and a first delivery pipe 81c having a first delivery valve 81b. The first delivery section 81d is connected to the gas delivery main body 85 through the first delivery pipe 81c. The second delivery device 82 includes a second delivery section 82d having a gas delivery port 82f and a second delivery pipe 82c having a second delivery valve 82b. The second delivery section 82d is connected to the gas delivery main body 85 through the second delivery pipe 82c.

[0034] The third delivery device 83 has a third delivery section 83d having a gas delivery port 83f and a third delivery pipe 83c having a third delivery valve 83b. The third delivery section 83d is connected to the gas delivery main body 85 through the third delivery pipe 83c. The fourth delivery device 84 has a fourth delivery section 84d having a gas delivery port 84f and a fourth delivery pipe 84c having a fourth delivery valve 84b. The fourth delivery section 84d is connected to the gas delivery main body 85 through the fourth delivery pipe 84c. Note that in FIG. 9, the gas delivery unit 80 and the suction unit 90 are partially omitted. Also, in FIG. 10, the welding head 41 is omitted.

[0035] The gas delivery port 81f of the first delivery section 81d is disposed on the side (right side in FIG. 10) of the space above the first long side section 31, and delivers (spouts) the gas (air in this embodiment) supplied from the gas delivery main body section 85 to the first delivery section 81d through the first delivery pipe 81c toward the space above the first long side section 31. This forms a first airflow A1 that flows above the first long side section 31 from the first short side section 33 side to the second short side section 34 side (from right to left in FIGS. 9 and 10).

[0036] The gas delivery port 82f of the second delivery section 82d is disposed on the side (left side in FIG. 10) of the space above the second long side section 32, and delivers (spouts) the gas (air in this embodiment) supplied from the gas delivery main body 85 to the second delivery section 82d through the second delivery pipe 82c toward the space above the second long side section 32. This forms a second airflow A2 that flows above the second long side section 32 from the second short side section 34 side to the first short side section 33 side (from left to right in FIG. 10).

[0037] A gas delivery port 83f of the third delivery section 83d is disposed on the side (lower side in FIG. 10) of the space above the first short side section 33, and delivers (spouts) gas (air in this embodiment) supplied from the gas delivery main body section 85 to the third delivery section 83d through the third delivery pipe 83c from the gas delivery port 83f toward the space above the first short side section 33. This forms a third airflow A3 that flows above the first short side section 33 from the second long side section 32 side to the first long side section 31 side (from bottom to top in FIG. 10).

[0038] The gas delivery port 84f of the fourth delivery section 84d is disposed on the side (upper side in FIG. 10) of the space above the second short side section 34, and delivers (spouts) the gas (air in this embodiment) supplied from the gas delivery main body section 85 to the fourth delivery section 84d through the fourth delivery pipe 84c from the gas delivery port 84f toward the space above the second short side section 34. This forms a fourth airflow A4 that flows above the second short side section 34 from the first long side section 31 side to the second long side section 32 side (from top to bottom in FIG. 10).

[0039] The suction unit 90 also includes a suction main body 95, a first suction device 91, a second suction device 92, a third suction device 93, and a fourth suction device 94. The suction main body 95 is, for example, a known dust collector. The first suction device 91 includes a first suction section 91d having a suction port 91f and a first suction pipe 91c having a first suction valve 91b. The first suction section 91d is connected to the suction main body 95 through the first suction pipe 91c. The second suction device 92 includes a second suction section 92d having a suction port 92f and a second suction pipe 92c having a second suction valve 92b. The second suction section 92d is connected to the suction main body 95 through the second suction pipe 92c.

[0040] The third suction device 93 has a third suction section 93d having a suction port 93f and a third suction pipe 93c having a third suction valve 93b. The third suction section 93d is connected to the suction main body 95 through the third suction pipe 93c. The fourth suction device 94 has a fourth suction section 94d having a suction port 94f and a fourth suction pipe 94c having a fourth suction valve 94b. The fourth suction section 94d is connected to the suction main body 95 through the fourth suction pipe 94c.

[0041] The suction port 91f of the first suction section 91d is disposed on the side (left side in FIG. 10) of the space above the first long side 31. Therefore, the gas delivery port 81f of the first delivery section 81d and the suction port 91f of the first suction section 91d are disposed facing each other in the direction in which the first long side 31 extends (left-right direction in FIG. 10) so as to sandwich the space above the first long side 31. The first suction section 91d sucks in the first fumes F1 that have passed above the first long side 31 on the first airflow A1 together with the air contained in the first airflow A1 through the suction port 91f. The first fumes F1 sucked in by the first suction section 91d are collected in the suction main body 95 through the first suction pipe 91c. The fumes are dust particles that are generated from the welded part 30 by the welding heat, cooled, and become fine metal particles that float in the space. The first fumes F1 are fumes generated from the first long side portion 31 by irradiation with the laser beam LB, and float in the space above the first long side portion 31.

[0042] The intake port 92f of the second intake section 92d is disposed on the side (right side in FIG. 10) of the space above the second long side section 32. Therefore, the gas delivery port 82f of the second delivery section 82d and the intake port 92f of the second intake section 92d are disposed facing each other in the direction in which the second long side section 32 extends (left and right direction in FIG. 10) so as to sandwich the space above the second long side section 32. The second intake section 92d intakes the second fumes F2 that have passed above the second long side section 32 on the second airflow A2 together with the air contained in the second airflow A2 through the intake port 92f. The second fumes F2 that have been drawn in by the second intake section 92d are collected in the intake main body section 95 through the second intake pipe 92c. The second fumes F2 are fumes that are generated from the second long side section 32 by the irradiation of the laser beam LB, and float in the space above the second long side section 32.

[0043] The intake port 93f of the third intake section 93d is disposed on the side (upper side in FIG. 10) of the space above the first short side section 33. Therefore, the gas delivery port 83f of the third delivery section 83d and the intake port 93f of the third intake section 93d are disposed facing each other in the direction in which the first short side section 33 extends (up and down direction in FIG. 10) so as to sandwich the space above the first short side section 33. The third intake section 93d draws in the third fumes F3 that have passed above the first short side section 33 on the third airflow A3 together with the air contained in the third airflow A3 through the intake port 93f. The third fumes F3 drawn in by the third intake section 93d are collected in the intake main body section 95 through the third intake pipe 93c. The third fumes F3 are fumes generated from the first short side portion 33 by irradiation with the laser beam LB, and float in the space above the first short side portion 33.

[0044] The intake port 94f of the fourth intake section 94d is disposed on the side (lower side in FIG. 10) of the space above the second short side section 34. Therefore, the gas delivery port 84f of the fourth delivery section 84d and the intake port 94f of the fourth intake section 94d are disposed facing each other in the direction in which the second short side section 34 extends (up and down direction in FIG. 10) so as to sandwich the space above the second short side section 34. The fourth intake section 94d draws in the fourth fumes F4 that have passed above the second short side section 34 on the fourth airflow A4 together with the air contained in the fourth airflow A4 from the intake port 94f. The fourth fumes F4 drawn in by the fourth intake section 94d are collected in the intake main body section 95 through the fourth intake pipe 94c. The fourth fume F4 is a fume generated from the second short side portion by irradiation with the laser beam LB, and floats in the space above the second short side portion .

[0045] The controller 75 controls the opening and closing of the first delivery valve 81b, the second delivery valve 82b, the third delivery valve 83b, and the fourth delivery valve 84b according to the irradiation position of the laser beam LB, and also controls the opening and closing of the first suction valve 91b, the second suction valve 92b, the third suction valve 93b, and the fourth suction valve 94b. Specifically, when the first long side portion 31 is irradiated with the laser beam LB, the controller 75 opens the first delivery valve 81b and the first suction valve 91b and closes the other valves. When the second long side portion 32 is irradiated with the laser beam LB, the controller 75 opens the second delivery valve 82b and the second suction valve 92b and closes the other valves. When the first short side portion 33 is irradiated with the laser beam LB, the controller 75 opens the third delivery valve 83b and the third suction valve 93b and closes the other valves. Furthermore, when the second short side portion 34 is irradiated with the laser beam LB, the controller 75 opens the fourth delivery valve 84b and the fourth suction valve 94b and closes the other valves.

[0046] The gas delivery port 81f of the first delivery section 81d, the gas delivery port 82f of the second delivery section 82d, the gas delivery port 83f of the third delivery section 83d, the gas delivery port 84f of the fourth delivery section 84d, the intake port 91f of the first intake section 91d, the intake port 92f of the second intake section 92d, the intake port 93f of the third intake section 93d, and the intake port 94f of the fourth intake section 94d are positioned at the same vertical position (see FIG. 9). As a result, the first airflow A1, the second airflow A2, the third airflow A3, and the fourth airflow A4 become airflows that flow straight along the first long side portion 31, the second long side portion 32, the first short side portion 33, and the second short side portion 34, respectively.

[0047] The welding process of this embodiment will be described in detail below. In this embodiment, the laser beam LB is scanned over the welded portion 30 (see FIG. 7) in the order of the first long side portion 31, the corner portion 35, the first short side portion 33, the corner portion 36, the second long side portion 32, the corner portion 37, the second short side portion 34, and the corner portion 38, to laser-weld the entire circumference of the welded portion 30. First, in the first long side portion welding process, the laser beam LB is irradiated onto the first long side portion 31 using a laser irradiation device 40 while scanning the laser beam LB from the second short side portion 34 side of the first long side portion 31 to the first short side portion 33 side (from left to right in FIG. 10), to weld the first long side portion 31.

[0048] However, this first long side welding process is performed while the first airflow A1 that flows above the first long side 31 from the first short side 33 side to the second short side 34 side (from right to left in Figs. 9 and 10) is formed by the first delivery device 81. Specifically, with the gas delivery main body 85 driven, the first delivery valve 81b is opened under the control of the controller 75, thereby forming the first airflow A1 by the first delivery device 81. At this time, the second delivery valve 82b, the third delivery valve 83b, and the fourth delivery valve 84b are closed, so that the second airflow A2, the third airflow A3, and the fourth airflow A4 are not formed.

[0049] Therefore, the first long side welding process is performed while forming a first air flow A1 that flows in the opposite direction to the scanning direction of the laser beam LB. This allows the first fumes F1 generated by the irradiation of the laser beam LB to be moved by the first air flow A1 to the side of the first long side 31 where the laser welding has been completed (i.e., the side where the irradiation of the laser beam LB has been completed). This allows the first fumes F1 present in the space above the part of the first long side 31 that will be irradiated with the laser beam LB from now on to be reduced. This allows the laser beam LB emitted from the welding head 41 and traveling toward the first long side 31 to be reduced from colliding with the first fumes F1 and diffusing. This allows the energy density of the laser beam LB to be suppressed from decreasing in the first long side 31. Specifically, it is possible to appropriately converge the laser beam LB and irradiate it to the first long side 31. This allows the welding defects in the first long side 31 to be reduced.

[0050] Furthermore, in the first long side welding process, during the period in which the first long side 31 is welded, the first fumes F1 generated from the first long side 31 and passing above the first long side 31 on the first airflow A1 are sucked in and removed by the first suction device 91. Specifically, the first suction valve 91b is opened under the control of the controller 75 while the suction main body 95 is driven, so that the first fumes F1 can be sucked in by the first suction device 91. At this time, the second suction valve 92b, the third suction valve 93b, and the fourth suction valve 94b are closed. In this way, by sucking in and removing the first fumes F1 by the first suction device 91, welding defects caused by the first fumes F1 in the first long side 31 can be further reduced.

[0051] Next, using the laser irradiation device 40, the corner portion 35 is laser welded, and then the first short side welding process is started, in which the laser beam LB is irradiated onto the first short side portion 33 while scanning the laser beam LB from the first long side portion 31 side to the second long side portion 32 side of the first short side portion 33 (from top to bottom in Figure 10), thereby welding the first short side portion 33.

[0052] However, this first short side welding process is performed while the third airflow A3, which flows above the first short side 33 from the second long side 32 side to the first long side 31 side (from bottom to top in FIG. 10), is formed by the third delivery device 83. Specifically, with the gas delivery main body 85 driven, the third delivery valve 83b is opened under the control of the controller 75, thereby forming the third airflow A3 by the third delivery device 83. At this time, the first delivery valve 81b, the second delivery valve 82b, and the fourth delivery valve 84b are closed, so that the first airflow A1, the second airflow A2, and the fourth airflow A4 are not formed.

[0053] Therefore, the first short side welding process is performed while forming the third air flow A3 that flows in the opposite direction to the scanning direction of the laser beam LB. This allows the third fumes F3 generated by the irradiation of the laser beam LB to be moved by the third air flow A3 to the side of the first short side 33 where the laser welding has been completed (i.e., the side where the irradiation of the laser beam LB has been completed). This allows the third fumes F3 present in the space above the part of the first short side 33 that will be irradiated with the laser beam LB from now on to be reduced. This allows the laser beam LB emitted from the welding head 41 and traveling toward the first short side 33 to be reduced from colliding with the third fumes F3 and diffusing. This allows the energy density of the laser beam LB to be suppressed from decreasing in the first short side 33. Specifically, it is possible to appropriately converge the laser beam LB and irradiate it to the first short side 33. This allows the welding defects in the first short side 33 to be reduced.

[0054] Furthermore, in the first short side welding process, during the period in which the first short side portion 33 is welded, the third fumes F3 generated from the first short side portion 33 and passing above the first short side portion 33 on the third air flow A3 are sucked in and removed by the third suction device 93. Specifically, the third suction valve 93b is opened under the control of the controller 75 while the suction main body portion 95 is driven, so that the third fumes F3 can be sucked in by the third suction device 93. At this time, the first suction valve 91b, the second suction valve 92b, and the fourth suction valve 94b are closed. In this way, by sucking in and removing the third fumes F3 by the third suction device 93, welding defects caused by the third fumes F3 in the first short side portion 33 can be further reduced.

[0055] Next, using a laser irradiation device 40, the corner portion 36 is laser welded, and then the second long side welding process is started, in which the laser beam LB is irradiated onto the second long side portion 32 while scanning the laser beam LB from the first short side portion 33 side to the second short side portion 34 side of the second long side portion 32 (from right to left in Figure 10), thereby welding the second long side portion 32.

[0056] However, this second long side welding process is performed while forming a second airflow A2 flowing above the second long side 32 from the second short side 34 side to the first short side 33 side (from left to right in FIG. 10) by the second delivery device 82. Specifically, with the gas delivery main body 85 driven, the second delivery valve 82b is opened under the control of the controller 75, thereby forming the second airflow A2 by the second delivery device 82. At this time, the first delivery valve 81b, the third delivery valve 83b, and the fourth delivery valve 84b are closed, so that the first airflow A1, the third airflow A3, and the fourth airflow A4 are not formed.

[0057] Therefore, the second long side welding process is performed while forming the second air flow A2 that flows in the opposite direction to the scanning direction of the laser beam LB. This allows the second fumes F2 generated by the irradiation of the laser beam LB to be moved by the second air flow A2 to the side of the second long side 32 where the laser welding has been completed (i.e., the side where the irradiation of the laser beam LB has been completed). This allows the second fumes F2 present in the space above the part of the second long side 32 that will be irradiated with the laser beam LB from now on to be reduced. This allows the laser beam LB emitted from the welding head 41 and traveling toward the second long side 32 to be reduced from colliding with the second fumes F2 and diffusing. This allows the energy density of the laser beam LB to be suppressed from decreasing in the second long side 32. Specifically, it is possible to appropriately converge the laser beam LB and irradiate it to the second long side 32. This allows the welding defects in the second long side 32 to be reduced.

[0058] Furthermore, in the second long side welding process, during the period in which the second long side portion 32 is welded, the second fumes F2 generated from the second long side portion 32 and passing above the second long side portion 32 on the second air flow A2 are sucked in and removed by the second suction device 92. Specifically, the second fumes F2 can be sucked in by the second suction device 92 by opening the second suction valve 92b under the control of the controller 75 while the suction main body portion 95 is driven. At this time, the first suction valve 91b, the third suction valve 93b, and the fourth suction valve 94b are closed. In this way, by sucking in and removing the second fumes F2 by the second suction device 92, welding defects caused by the second fumes F2 in the second long side portion 32 can be further reduced.

[0059] Next, using the laser irradiation device 40, the corner portion 37 is laser welded, and then the second short side welding process is started, in which the laser beam LB is irradiated onto the second short side portion 34 while scanning the laser beam LB from the second long side portion 32 side of the second short side portion 34 to the first long side portion 31 side (from bottom to top in Figure 10) to weld the second short side portion 34.

[0060] However, this second short side welding process is performed while a fourth airflow A4 that flows above the second short side 34 from the first long side 31 side to the second long side 32 side (from top to bottom in FIG. 10) is formed by the fourth delivery device 84. Specifically, with the gas delivery main body 85 driven, the fourth delivery valve 84b is opened under the control of the controller 75, thereby forming the fourth airflow A4 by the fourth delivery device 84. At this time, the first delivery valve 81b, the second delivery valve 82b, and the third delivery valve 83b are closed, so that the first airflow A1, the second airflow A2, and the third airflow A3 are not formed.

[0061] Therefore, the second short side welding process is performed while forming a fourth air flow A4 that flows in the opposite direction to the scanning direction of the laser beam LB. This allows the fourth fumes F4 generated by the irradiation of the laser beam LB to be moved by the fourth air flow A4 to the side of the second short side 34 where the laser welding has been completed (i.e., the side where the irradiation of the laser beam LB has been completed). This allows the fourth fumes F4 present in the space above the part of the second short side 34 that will be irradiated with the laser beam LB from now on to be reduced. This allows the laser beam LB emitted from the welding head 41 and traveling toward the second short side 34 to be reduced from colliding with the fourth fumes F4 and diffusing. This allows the energy density of the laser beam LB to be suppressed from decreasing in the second short side 34. Specifically, it is possible to appropriately converge the laser beam LB and irradiate it to the second short side 34. This allows the welding defects in the second short side 34 to be reduced.

[0062] Furthermore, in the second short side welding process, during the period in which the second short side portion 34 is welded, the fourth fumes F4 generated from the second short side portion 34 and passing above the second short side portion 34 on the fourth air flow A4 are sucked in and removed by the fourth suction device 94. Specifically, the fourth suction valve 94b is opened under the control of the controller 75 while the suction main body portion 95 is driven, so that the fourth fumes F4 can be sucked in by the fourth suction device 94. At this time, the first suction valve 91b, the second suction valve 92b, and the third suction valve 93b are closed. In this way, by sucking in and removing the fourth fumes F4 by the fourth suction device 94, welding defects caused by the fourth fumes F4 in the second short side portion 34 can be further reduced.

[0063] Subsequently, the corners 38 are welded, thereby laser welding the entire circumference of the welded portion 30. This completes the welding process, and the case 20 and the sealing plate 10 are joined together to become one body. Thereafter, an electrolyte (not shown) is injected into the case 20 through an injection hole (not shown) formed in the sealing plate 10. Thereafter, the injection hole is sealed, and the electricity storage device 1 is completed.

[0064] <Transformation> Next, a modified embodiment of the present invention will be described. This modified embodiment is for a case where the thickness of case 120 is thin and the distance between first long side 131 and second long side 132 of welded part 130 (the distance in the thickness direction of case 20) is small, making it difficult to arrange first delivery section 81d and second suction section 92d, and second delivery section 82d and first suction section 91d of welding device 70 side by side in the thickness direction of case 120 (the up-down direction in FIG. 12).

[0065] In such a case, as shown in Fig. 11, it is preferable to arrange the first delivery section 81d and the second suction section 92d so as to overlap each other in the vertical direction. This allows the first delivery section 81d to be arranged on the first side (the right side in Fig. 12) of the space above the first long side section 131, and the second suction section 92d to be arranged on the first side (the right side in Fig. 12) of the space above the second long side section 132. Furthermore, it is preferable to arrange the second delivery section 82d and the first suction section 91d so as to overlap each other in the vertical direction. This allows the second delivery section 82d to be arranged on the second side (the left side in Fig. 12) of the space above the second long side section 132, and the first suction section 91d to be arranged on the second side (the left side in Fig. 12) of the space above the first long side section 131.

[0066] As a result, in the welding process, the first delivery section 81d can appropriately form the first airflow A1 that flows above the first long side section 131 from the first short side section 133 side to the second short side section 134 side, and the second suction section 92d can appropriately suck in the second fumes F2 that have passed above the second long side section 132 on the second airflow A2. Furthermore, the second delivery section 82d can appropriately form the second airflow A2 that flows above the second long side section 132 from the second short side section 134 side to the first short side section 133 side, and the first suction section 91d can appropriately suck in the first fumes F1 that have passed above the first long side section 131 on the first airflow A1.

[0067] 11, it is preferable to equalize the vertical positions of the gas delivery port 81f of the first delivery section 81d and the gas delivery port 82f of the second delivery section 82d, and to equalize the vertical positions of the suction port 91f of the first suction section 91d and the suction port 92f of the second suction section 92d. This makes it possible to equalize the vertical positions of the first airflow A1 relative to the first long side section 131 and the vertical positions of the second airflow A2 relative to the second long side section 132. This makes it possible to equalize the degree to which the first fumes F1 are sucked and removed together with the first airflow A1 by the first suction section 91d and the degree to which the second fumes F2 are sucked and removed together with the second airflow A2 by the second suction section 92d in the welding process.

[0068] While the present invention has been described above with reference to embodiments and modified forms, it goes without saying that the present invention is not limited to the above-described embodiments, and can be modified as appropriate without departing from the spirit of the present invention. [Explanation of symbols]

[0069] 1. Energy storage devices 10 Sealing plate 11 Outer periphery 20 cases 20b opening 21 Opening wall 30 Welding section 31 First long side 32 Second long side 33 First short side 34 Second short side 40 Laser irradiation device 50 Electrode body 70 Welding Equipment 80 Gas Delivery Unit 90 Inhalation Unit 91 1st inhalation device 92 Second inhalation device 93 Third inhalation device 94 4th inhalation device A1 First airflow A2 Second Airflow A3 3rd Air Stream A4 4th Air Stream LB Laser Beam W Welding

Claims

1. A method for manufacturing an electricity storage device comprising: a case having a rectangular opening; and a rectangular sealing plate closing the opening, wherein an opening wall portion surrounding the opening of the case and an outer peripheral edge portion of the sealing plate are welded together along an entire periphery, a closing step of inserting the sealing plate into the opening of the case to close the opening with the sealing plate; a welding process in which, in a state in which the opening of the case is closed by the sealing plate with its outer surface facing upward, a laser beam is irradiated from above the sealing plate onto a welded portion between the outer peripheral edge portion of the sealing plate and the opening wall portion of the case, thereby laser welding the welded portion in a circumferential direction over an entire circumference, The welded portion has a rectangular ring shape in a plan view, and has a first long side portion and a second long side portion parallel to each other, and a first short side portion and a second short side portion parallel to each other, The welding step includes: a first long side portion welding process of welding the first long side portion by scanning the laser beam from the second short side portion side to the first short side portion side of the first long side portion; a second long side welding process of welding the second long side portion by scanning the laser beam from the first short side portion side to the second short side portion side of the second long side portion, The first long side portion welding process is performed while forming a first air flow flowing from an end portion on the first short side portion side of the upper portion of the first long side portion toward an end portion on the second short side portion side, and moving first fumes generated from the first long side portion to a side above the first long side portion where laser welding has been completed by the first air flow. The second long side welding step is performed while forming a second air flow that flows from an end portion on the second short side side of the second long side toward an end portion on the first short side side of the second long side, and moves second fumes generated from the second long side to a side above the second long side where laser welding has been completed by the second air flow. A method for manufacturing an electricity storage device.

2. A method for producing the electricity storage device according to claim 1, comprising the steps of: The first long side portion welding process includes: sucking and removing first fumes generated from the first long side portion and carried by the first air flow and passing above the first long side portion by a first suction device; The second long side welding process includes removing second fumes generated from the second long side and carried by the second air flow above the second long side by sucking them in with a second suction device. A method for manufacturing an electricity storage device.

3. The method for producing an electricity storage device according to claim 1 or 2, The welding step includes: a first short side welding process of welding the first short side portion by scanning the laser beam from the first long side portion side to the second long side portion side of the first short side portion; a second short side welding step of scanning the laser beam from the second long side side of the second short side portion to the first long side side of the second short side portion to weld the second short side portion, The first short side welding process is performed while forming a third air flow flowing from an end portion on the second long side side of the upper portion of the first short side portion toward an end portion on the first long side side, and moving third fumes generated from the first short side portion to a side above the first short side portion where laser welding has been completed by the third air flow. The second short side welding step is performed while forming a fourth air flow that flows from an end portion on the first long side side of the upper part of the second short side to an end portion on the second long side side, and moves fourth fumes generated from the second short side to a side above the second short side where laser welding has been completed by the fourth air flow. A method for manufacturing an electricity storage device.

4. A method for producing the electricity storage device according to claim 3, comprising the steps of: The first short side portion welding process includes removing third fumes generated from the first short side portion and carried by the third air flow above the first short side portion by sucking the third fumes with a third suction device, The second short side portion welding step includes removing fourth fumes generated from the second short side portion and carried by the fourth air flow above the second short side portion by sucking the fourth fumes with a fourth suction device. A method for manufacturing an electricity storage device.

Citation Information

Patent Citations

  • Assisting gas injection controller for laser beam welding equipment

    JP1993208290A

  • Laser beam welding apparatus

    JP2010172941A

  • Welding equipment for secondary battery and method of manufacturing secondary battery

    JP2013197034A

  • Laser welding method and laser welding device

    JP2015107515A

  • Laser welding device

    JP2019130556A