Maintenance plan creation support system, maintenance plan creation support method, and maintenance plan creation support program

The maintenance plan preparation support system addresses the challenge of creating preventive maintenance plans by integrating information acquisition, display, and update processing units to align maintenance plans with the product life cycle, thereby enhancing maintenance efficiency.

JP7650715B2Active Publication Date: 2025-03-25MITSUBISHI ELECTRIC CORP
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2021075247
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-27
Publication Date
2025-03-25
Estimated Expiration
2041-04-27

AI Technical Summary

Technical Problem

Existing maintenance plan creation technologies do not adequately consider the product life cycle, making it difficult to create effective preventive maintenance plans.

Method used

A maintenance plan preparation support system that includes an information acquisition unit, a display processing unit, and an update processing unit, which acquires and displays maintenance information, management information, and inventory information to support the creation of preventive maintenance plans aligned with the product life cycle.

Benefits of technology

Enables the creation of comprehensive preventive maintenance plans that take into account the product life cycle, ensuring timely and effective maintenance operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007650715000001
    Figure 0007650715000001
  • Figure 0007650715000002
    Figure 0007650715000002
  • Figure 0007650715000003
    Figure 0007650715000003
Patent Text Reader

Abstract

To provide a conservation plan creation supporting system capable of supporting creation of a preventive maintenance type conservation plan based on a product life cycle of a conservation target.SOLUTION: A conservation plan creation supporting system 1 comprises an information acquisition unit 22, a display processing unit 24, and an update processing unit 25. The information acquisition unit 22 acquires conservation information 11 including history information 14 including information showing a conservation target inspection history and a replacement history and schedule information 15 including information showing a scheduled inspection time and a schedule replacement time, and management information 12 including information showing a conservation target production cancellation time. The display processing unit 24 displays a conservation plan table showing inspection history information, replacement history information, scheduled inspection time information, scheduled replacement time information, and production cancellation time information in a display unit 43 on the basis of the conservation information 11 and the management information 12. When the conservation plan table is updated, the update processing unit 25 updates the conservation information 11 on the basis of the update of the conservation plan table.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a maintenance plan creation support system, a maintenance plan creation support method, and a maintenance plan creation support program that support the creation of a maintenance plan for a facility or equipment. [Background technology]

[0002] A facility or equipment is provided with various types of equipment, and in order to maintain the equipment in good condition, maintenance work such as inspection, maintenance, and part replacement is performed on the equipment. Such maintenance work is performed according to a maintenance plan that is created in advance.

[0003] Since creating a maintenance plan takes time, a technology to support the creation of the maintenance plan has been proposed. For example, Patent Document 1 proposes a technology that predicts the periodic update cycle and future aging status of parts based on equipment part information, part inspection or replacement history, and part update standard information, and creates a maintenance plan for the parts based on the predicted results. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2002-259594 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology described in Patent Document 1 does not take into consideration the life cycle of the product to be maintained, and it may be difficult to appropriately create a preventive maintenance plan.

[0006] The present disclosure has been made in consideration of the above, and aims to provide a maintenance plan creation support system that can support the creation of a preventive maintenance plan that takes into account the product life cycle of the product to be maintained. [Means for solving the problem]

[0007] In order to solve the above-mentioned problems and achieve the object, the maintenance plan creation support system of the present disclosure includes an information acquisition unit, a display processing unit, and an update processing unit. The information acquisition unit acquires maintenance information including history information including information indicating the inspection history and replacement history of the maintenance object, schedule information including information indicating the scheduled inspection time and scheduled replacement time, and management information including information indicating the production discontinuation time of the maintenance object. The display processing unit displays a maintenance plan table indicating information on the inspection history, information on the replacement history, information on the scheduled inspection time, information on the scheduled replacement time, and information on the production discontinuation time on the display unit based on the maintenance information and the management information. The update processing unit updates the maintenance information based on the update of the maintenance plan table when the maintenance plan table is updated. The display processing unit highlights each unit period after the production stop time in the maintenance planning table. Effect of the Invention

[0008] According to the present disclosure, it is possible to provide an advantage in that it is possible to assist in creating a preventive maintenance plan that takes into account the life cycle of the product to be maintained. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a maintenance plan creation support system according to a first embodiment. [Diagram 2] FIG. 1 is a diagram showing an example of maintenance information according to the first embodiment; [Diagram 3] FIG. 1 is a diagram showing an example of device information included in management information according to the first embodiment; [Figure 4] FIG. 1 is a diagram showing an example of part information included in management information according to the first embodiment; [Diagram 5] FIG. 1 is a diagram showing an example of inventory information according to the first embodiment. [Figure 6] FIG. 13 is a diagram showing an example of information regarding a production stop timing notified by a notification processing unit according to the first embodiment; [Figure 7] FIG. 13 is a diagram showing an example of a maintenance plan screen including a maintenance plan table displayed on a display unit according to the first embodiment; [Figure 8] FIG. 13 is a diagram showing another example of a maintenance plan screen including a maintenance plan table displayed on the display unit according to the first embodiment; [Figure 9] 1 is a flowchart showing an example of processing by a processing unit of the maintenance plan creation support system according to the first embodiment. [Figure 10] 1 is a flowchart showing an example of a process for an administrator performed by a processing unit of the maintenance plan creation support system according to the first embodiment. [Figure 11] A flowchart showing an example of a period-related process performed by a processing unit of the maintenance plan creation support system according to the first embodiment. [Figure 12] 1 is a flowchart showing an example of a process for a worker by a processing unit of the maintenance plan creation support system according to the first embodiment. [Figure 13] FIG. 1 is a diagram illustrating an example of a system configuration of a maintenance plan creation support system according to a first embodiment. [Figure 14] FIG. 1 is a diagram illustrating an example of a hardware configuration of a processing unit according to a first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] A maintenance plan creation support system, a maintenance plan creation support method, and a maintenance plan creation support program according to embodiments will be described in detail below with reference to the drawings.

[0011] Embodiment 1 Fig. 1 is a diagram illustrating an example of a configuration of a maintenance plan creation support system according to a first embodiment. The maintenance plan creation support system 1 illustrated in Fig. 1 supports the creation of a maintenance plan for a maintenance object. The maintenance object includes each device provided in a facility or equipment such as a building, a plant, or a factory, and parts constituting each device.

[0012] 1, the maintenance plan creation support system 1 according to the first embodiment includes a storage unit 10, a processing unit 20, input units 42 and 52, and display units 43 and 53. The input unit 42 and the display unit 43 are used by a manager U1 who creates a maintenance plan for a maintenance object, and the input unit 52 and the display unit 53 are used by a worker U2 who performs maintenance work on the maintenance object.

[0013] The input units 42 and 52 are input devices such as a mouse, a keyboard, a touch panel, etc. The display units 43 and 53 are display devices such as an LCD (Liquid Crystal Display) or an organic EL (ElectroLuminescence) display.

[0014] The storage unit 10 stores maintenance information 11, management information 12, and inventory information 13. The maintenance information 11 includes history information 14 including information indicating the results of maintenance work on the maintenance object, and schedule information 15 including information indicating the scheduled timing of the maintenance work on the maintenance object.

[0015] The information indicating the results of maintenance work includes information on the past inspection timing of the maintenance object and information on the past replacement timing of the maintenance object for each maintenance object. The information indicating the planned timing of maintenance work includes information on the planned inspection timing of the maintenance object and information on the planned replacement timing of the maintenance object for each maintenance object. As described above, the maintenance object is equipment installed in a facility or equipment and parts that constitute the equipment.

[0016] Fig. 2 is a diagram showing an example of maintenance information according to the first embodiment. As shown in Fig. 2, the maintenance information 11 includes an "equipment ID (IDentifier)", a "part ID", a "facility name", a "equipment name", a "part name", a "maintenance year", a "maintenance type", and a "maintenance status". The "equipment ID", "part ID", "facility name", "equipment name", "part name", "maintenance year", and "maintenance type" are examples of schedule information 15, and the "maintenance status" is an example of history information 14.

[0017] "Equipment ID" is identification information unique to the equipment. "Part ID" is identification information unique to the part that makes up the equipment. "Facility name" is information indicating the name of the facility in which the equipment corresponding to the equipment ID is installed. "Equipment name" is information indicating the name of the equipment. "Part name" is information indicating the name of the part corresponding to the part ID.

[0018] "Maintenance year" is information indicating the maintenance year of a device corresponding to a device name, or information indicating the maintenance year of a part corresponding to a part name. Maintenance year is information indicating the year in which maintenance work is scheduled to be performed, or information indicating the year in which maintenance work was performed. Maintenance work is inspection or replacement, but may also include repair. The maintenance year is, for example, a fiscal year, but may also be a year indicated in the Gregorian calendar.

[0019] "Maintenance type" is information indicating the type of maintenance work, which is inspection or replacement, but may also include repair. "Maintenance status" is information indicating the implementation status of maintenance work or information indicating the planned status.

[0020] In the maintenance information 11 shown in Fig. 2, the name of the facility in which the device with the device ID "E001" is installed is "Facility AA", the name is "Generator", the maintenance year is "2018", the maintenance type is "Inspection", and the maintenance status is "Completed". In other words, the maintenance information 11 shown in Fig. 2 indicates that the device with the device ID "E001" was inspected in 2018.

[0021] 2, the device with device ID "E001" has a maintenance year of "2027", a maintenance type of "replacement", and a maintenance status of "planned". In other words, the maintenance information 11 shown in FIG. 2 indicates that the device with device ID "E001" is scheduled to be replaced in 2027.

[0022] 2, the device with device ID "E001" has a maintenance year of "2041", a maintenance type of "replacement", and a maintenance status of "planned". In other words, the maintenance information 11 shown in FIG. 2 indicates that the device with device ID "E001" is scheduled to be replaced in 2041.

[0023] 2, the part with part ID "P001" constituting the equipment with equipment ID "E001" has the name of the facility where it is installed as "facility AA", the name of the equipment to be installed as "generator", the name of the part as "generator bearing", the maintenance year as "2019", the maintenance type as "replacement", and the maintenance status as "not yet". In other words, the maintenance information 11 shown in FIG. 2 indicates that the part with part ID "P001" was scheduled to be replaced in 2019 but has not yet been replaced.

[0024] Returning to Fig. 1, the description of the storage unit 10 will continue. The management information 12 of the storage unit 10 includes equipment information 16 including information indicating the warranty period of the equipment to be maintained and the time when production of the equipment will be discontinued, and part information 17 including information indicating the warranty period of the part to be maintained and the time when production of the part will be discontinued. The part to be maintained is a part that constitutes the equipment to be maintained.

[0025] The warranty period of an appliance is, for example, the period obtained by adding the date of manufacture of the appliance to the useful life of the appliance, but may also be the period obtained by adding the date of manufacture of the appliance to the useful life of the appliance predicted from the operating time of the appliance, etc. Similarly, the warranty period of a part is, for example, the period obtained by adding the date of manufacture of the part to the useful life of the part, but may also be the period obtained by adding the date of manufacture of the part to the useful life of the part predicted from the operating time of the part, etc.

[0026] Fig. 3 is a diagram showing an example of device information included in the management information according to the embodiment 1. As shown in Fig. 3, device information 16 included in the management information 12 includes "device ID", "device name", "facility name", "manufacturing company", "date of manufacture", "date of installation", "useful life", "warranty period", and "time of discontinuation of production".

[0027] "Device ID" is identification information unique to each device. "Device Name" is information indicating the name of the device. "Facility Name" is information indicating the name of the facility where the device is installed. "Manufacturer" is information indicating the name of the manufacturer that manufactured the device. "Manufacturing Date" is information indicating the date and year the device was manufactured.

[0028] "Installation date" is information indicating the date and time when the equipment was installed in a facility. "Useful life" is information indicating the useful life of the equipment or the useful life of the equipment. "Warranty period" is information indicating the end of the warranty period of the equipment, for example, the period obtained by adding the equipment's manufacturing date and the useful life of the equipment. "Discontinuation of production" is information indicating the time when production of the equipment will be discontinued.

[0029] In the device information 16 shown in FIG. 3, the device with device ID "E001" has a name "Generator", a name of the facility in which it will be installed is "Facility AA", a manufacturer is "Company A", a manufacturing date is "December 1998", an installation date is "January 1999", a useful life is "30 years", a warranty period is until "December 2028", and a discontinuation date is "2028".

[0030] In addition, in device information 16 shown in FIG. 3, the device with device ID "E002" has a name of "air conditioner," a name of the facility in which it will be installed is "facility AA," a manufacturer is "Company B," a manufacturing date is "January 2011," an installation date is "February 2011," a useful life is "30 years," a warranty period is until "January 2041," and a discontinuation date is undecided.

[0031] Fig. 4 is a diagram showing an example of part information included in the management information according to the embodiment 1. As shown in Fig. 4, part information 17 included in the management information 12 includes "part ID", "part name", "equipment ID", "manufacturing company", "manufacturing date", "useful life", "warranty period", and "discontinuation of production".

[0032] "Part ID" is identification information unique to each part. "Part name" is information indicating the name of the part. "Equipment ID" is identification information unique to each piece of equipment. "Manufacturer" is information indicating the name of the manufacturer that manufactured the part. "Manufacturing date" is information indicating the date and year the part was manufactured.

[0033] "Useful life" is information indicating the useful life of a part or information that indicates the useful life of a part. "Warranty period" is information indicating the final year and month of the warranty period of a part, for example, the period obtained by adding the useful life of the part to the manufacturing year and month of the part. "End of production date" is information indicating the end of production date of a part.

[0034] In part information 17 shown in FIG. 4, a part with part ID "P001" has a name "generator bearing", is installed in equipment with equipment ID "E001", the name of the equipment to be installed is "generator", the manufacturer is "Company C", the manufacturing date is "April 2018", the useful life is "10 years", the warranty period is until "April 2028", and the production discontinuation date is "2030".

[0035] In part information 17 shown in FIG. 4, a part with part ID "P002" has a name "shaft", is installed in equipment with equipment ID "E001", the name of the equipment to be installed is "generator", the manufacturer is "Company D", the manufacturing date is "June 2015", the useful life is "10 years", the warranty period is until "June 2025", and the discontinuation date is undecided.

[0036] Fig. 5 is a diagram showing an example of inventory information according to the embodiment 1. As shown in Fig. 5, the inventory information 13 includes a "device ID", a "device name", a "part ID", a "part name", a "model", a "stock quantity", and a "stock threshold".

[0037] "Device ID" is identification information unique to each device. "Device name" is information indicating the name of the device. "Part ID" is identification information unique to each part. "Part name" is information indicating the name of the part. "Model" is information indicating the model of the device or information indicating the model of the part.

[0038] "Stock quantity" is information indicating the stock quantity of equipment or the stock quantity of parts. "Stock threshold" is information indicating a threshold for notifying information related to stock, and may be referred to as stock threshold Na below.

[0039] Inventory information 13 shown in FIG. 5 indicates that a part with part ID "P001" that constitutes an equipment with equipment ID "E001" and equipment name "generator" has a name "generator bearing", a model number "AAAA-AA", an inventory quantity "11", and an inventory threshold value Na of "10".

[0040] Furthermore, the inventory information 13 shown in FIG. 5 indicates that the part with part ID "P002" that constitutes the equipment with equipment ID "E001" and equipment name "generator" has a name "shaft", a model number "BBBB-BB", an inventory quantity of "20", and an inventory threshold value Na of "10".

[0041] 1, the description will continue of the maintenance plan creation support system 1. The processing unit 20 of the maintenance plan creation support system 1 includes an input processing unit 21, an information acquisition unit 22, a notification processing unit 23, a display processing unit 24, and an update processing unit 25.

[0042] The input processing unit 21 performs processing in response to an operation on the input unit 42 by the manager U1 and processing in response to an operation on the input unit 52 by the worker U2. When the manager U1 and the worker U2 are not individually distinguished from each other, they may be referred to as users U.

[0043] For example, when an operation by the user U on the input units 42, 52 is a login request, if the ID and password input by the operation on the input units 42, 52 match a preset ID and password, the input processing unit 21 permits the login request of the user U. In the following, the user U whose login request is permitted may be referred to as a login user.

[0044] When a login request is accepted by the input processing unit 21, the information acquiring unit 22 acquires the maintenance information 11, the management information 12, and the inventory information 13 from the storage unit 10.

[0045] The notification processing unit 23 judges, based on the management information 12 acquired by the information acquisition unit 22, whether the period until the production discontinuation time is within a preset period, whether the production discontinuation time has passed, and the like.

[0046] If the period until the production stop time is within a preset period or if the production stop time has passed, the notification processing unit 23 notifies the logged-in user of information related to the production stop time. The information related to the production stop time is, for example, information indicating that the production stop time is approaching or information indicating that the production stop time has passed.

[0047] In the following, the production stop time of the maintenance target may be the production stop time Ts, the current year and month Tn, and a preset period of time may be the threshold period Tths. The notification processing unit 23 determines whether the period difference ΔTs between the production stop time Ts and the current year and month Tn is equal to or less than the threshold period Tths. If the period difference ΔTs is equal to or less than the threshold period Tths, the notification processing unit 23 notifies the logged-in user of information related to the production stop time Ts.

[0048] Fig. 6 is a diagram showing an example of information related to the production stop time notified by the notification processing unit according to the embodiment 1. As shown in Fig. 6, notification information 80, which is information related to the production stop time Ts, includes "notification title", "category", "importance", "text", "sender", "expiration date", and "sent date and time".

[0049] "Notification title" is information indicating an overview of the notification content, "category" is information indicating the category of the notification content, "importance" is information indicating the importance of the notification, and "text" is information indicating the details of the notification content. "Sender" is information indicating the notifier, "expiration date" is information indicating the expiration date of the notification content, and "sent date and time" is information indicating the date and time the notification was made.

[0050] The notification information 80 shown in Figure 6 indicates that the system administrator of the maintenance plan creation support system 1 notified at 14:35 on February 1, 2020 that the production discontinuation date Ts of the generator with equipment ID "E003" at facility AA is approaching.

[0051] Returning to Fig. 1, the processing unit 20 will be described further. The notification processing unit 23 of the processing unit 20 determines whether the period until the end of the warranty period is within a preset period and whether the warranty period has been exceeded, based on the management information 12 acquired by the information acquisition unit 22. If the period until the end of the warranty period is within the preset period or if the warranty period has been exceeded, the notification processing unit 23 notifies the logged-in user of information related to the warranty period.

[0052] In the following, the end date of the warranty period is the warranty deadline Tw, the current date is the current date Tn, and the preset period is the threshold period Tthw. The notification processing unit 23 determines whether the period difference ΔTw between the warranty deadline Tw and the current date Tn is equal to or less than the threshold period Tthw. If the period difference ΔTw is equal to or less than the threshold period Tthw, the notification processing unit 23 notifies the logged-in user of information related to the warranty period. The information related to the warranty period is, for example, information indicating that the warranty period is approaching or information indicating that the warranty period has expired.

[0053] The notification processing unit 23 also determines the number of items to be replaced that are to be maintained based on the maintenance information 11 and the inventory information 13 acquired by the information acquisition unit 22, and notifies the logged-in user of information regarding the inventory of the items to be maintained if the value Ni obtained by subtracting the determined number of items to be replaced from the inventory quantity is equal to or less than the inventory threshold Na. The information regarding the inventory includes, for example, information regarding the inventory quantity and the number of items to be replaced.

[0054] For example, assume that the inventory information 13 is in the state shown in Fig. 5 and the planned replacement quantity of the part "generator bearing" is "2". In this case, the value Ni obtained by subtracting the planned replacement quantity from the inventory quantity is "9", which is below the inventory threshold value Na of "10", so the notification processing unit 23 notifies the logged-in user of information regarding the inventory of the part "generator bearing".

[0055] The information is notified to the logged-in user by displaying the information on the display unit of the logged-in user. For example, the display unit of the logged-in user is the display unit 43 when the logged-in user is the administrator U1, and is the display unit 53 when the logged-in user is the worker U2.

[0056] When the logged-in user is the administrator U1, the display processing unit 24 displays a maintenance plan screen on the display unit 43, and when the logged-in user is the worker U2, the display processing unit 24 displays a maintenance work screen on the display unit 53. First, the maintenance plan screen displayed on the display unit 43 of the administrator U1 will be described.

[0057] The display processing unit 24 displays a maintenance plan table on the display unit 43 of the logged-in administrator U1 based on the maintenance information 11 and management information 12 acquired by the information acquisition unit 22. Fig. 7 is a diagram showing an example of a maintenance plan screen including a maintenance plan table displayed on the display unit according to the first embodiment.

[0058] A maintenance plan screen 60 shown in Fig. 7 includes a maintenance plan table 61, an individual setting button 62, a repeat setting button 63, an inspection result automatic setting button 64, a production discontinuation information registration button 65, a registration button 66, and a discontinued equipment display box 67. On the maintenance plan screen 60 shown in Fig. 7, differences in color are indicated by differences in hatching.

[0059] The maintenance plan table 61 includes information on each maintenance object, such as the name of the maintenance object, the warranty period, the type of maintenance, the production stop time Ts, the maintenance implementation time, and the planned maintenance time. The maintenance object is a device or a part. The name of the maintenance object is the name of the device or the name of the part, and in the maintenance plan table 61 shown in FIG. 7, it is "generator", "generator bearing", "shaft", or "air conditioner", etc.

[0060] The warranty period is indicated in the maintenance planning table 61 shown in FIG. 7 as the end year and month of the warranty period, for example, "December 2018" for generators, "April 2028" for generator bearings, "June 2025" for shafts, and "December 2022" for air conditioners.

[0061] In the maintenance planning table 61 shown in FIG. 7, the production stoppage time Ts is indicated as the year or month when production stoppage will start. For example, for generators, it is "2028," for generator bearings, it is "2030," and for shafts and air conditioners, it is undecided.

[0062] The maintenance implementation timing is the time when maintenance work on the maintenance target was implemented, and the planned maintenance timing is the time when maintenance work on the maintenance target is planned to be implemented. The maintenance plan table 61 shown in FIG. 7 shows the maintenance implementation timing and planned maintenance timing for each maintenance type from 2016 to 2030. In the maintenance plan table 61 shown in FIG. 7, the period from 2016 to 2030 is divided into unit periods in yearly units, and the maintenance implementation timing and planned maintenance timing for each year are shown.

[0063] For example, in the example shown in Fig. 7, the timing of inspections that have been performed is indicated by a white star mark, and the timing of replacements that have been performed is indicated by a white diamond mark. This allows the manager U1 to easily understand the timing of maintenance work that has been performed. In addition, in the example shown in Fig. 7, inspections that have been performed and replacements that have been performed are represented as inspected and replaced.

[0064] In addition, in the example shown in Fig. 7, inspections that have not been performed by the scheduled time are indicated with a black star mark, and replacements that have not been performed by the scheduled time are indicated with a black diamond mark. This allows the manager U1 to easily grasp maintenance work that has not been performed even after the scheduled time has passed. In addition, inspections that have not been performed by the scheduled time and replacements that have not been performed by the scheduled time are represented as uninspected and unreplaced in the example shown in Fig. 7.

[0065] In addition, in the example shown in Fig. 7, the scheduled inspection times are indicated by colored star marks, and the scheduled replacement times are indicated by colored diamond marks. This allows the manager U1 to easily grasp the future scheduled times for maintenance work. In addition, the scheduled inspection times and the scheduled replacement times are represented as an inspection plan and a replacement plan in the example shown in Fig. 7.

[0066] 7, a first color is applied to the frame of each unit period indicating the current year in the maintenance schedule table 61. In this manner, since the frame of each unit period indicating the current year is highlighted in the maintenance schedule table 61, the manager U1 can easily grasp the position of the frame indicating the current year in the maintenance schedule table 61.

[0067] Also, in the example shown in FIG. 7, in each row for the replacement of each maintenance object in the maintenance plan table 61, the box for each unit period after the production discontinuation time is colored a second color, and the box for each unit period outside the warranty period is colored a third color.

[0068] In this way, since the maintenance planning table 61 highlights the period after the production discontinuation date and the period outside the warranty period for each maintenance object, the manager U1 can easily understand the period after the production discontinuation date and the period outside the warranty period in the maintenance planning table 61.

[0069] In addition, since the maintenance planning table 61 displays the period after production is stopped and the period outside the warranty period on a timeline, the manager U1 can easily understand the period after production is stopped and the period outside the warranty period in the maintenance planning table 61.

[0070] The display processing unit 24 can also highlight the frame of each unit period indicating the current year, the frame of each unit period after the production discontinuation date, and the frame of each unit period outside the warranty period in a display manner other than color. For example, the display processing unit 24 can highlight the frame of each unit period by a pattern or a symbol instead of a color.

[0071] The individual setting button 62 is a button for editing the scheduled timing of maintenance work in the maintenance plan table 61. When the individual setting button 62 is pressed, the input processing unit 21 individually accepts edits such as addition, deletion, or change of the scheduled timing of maintenance work in the maintenance plan table 61. The display processing unit 24 causes the display unit 43 to display the maintenance plan table 61 updated based on the edits accepted by the input processing unit 21.

[0072] The administrator U1 can operate the input unit 42 to press the individual setting button 62, and then operate the input unit 42 to add, delete, or change colored star marks or colored diamond marks in the maintenance plan table 61.

[0073] The repeat setting button 63 is a button for setting a period to be repeated periodically as a scheduled period for maintenance work. When the manager U1 operates the input unit 42 to press the repeat setting button 63 and select a row in the maintenance plan table 61, the input processing unit 21 accepts input of the start date and cycle of the maintenance work. The display processing unit 24 causes the display unit 43 to display the updated maintenance plan table 61 in which the timing of the maintenance work is repeatedly set based on the start date and cycle of the maintenance work accepted by the input processing unit 21.

[0074] The automatic inspection record setting button 64 is a button for automatically adding the maintenance record of the equipment of the selected row, which is the selected row, to the maintenance plan table 61. When the input processing unit 21 accepts the pressing of the automatic inspection record setting button 64 and the selection of a row in the maintenance plan table 61, the information acquisition unit 22 acquires the maintenance work record for the equipment of the selected row from the history information 14.

[0075] The display processing unit 24 causes the display unit 43 to display the maintenance plan table 61 to which the maintenance results acquired by the information acquisition unit 22 have been added. For example, when the inspection results automatic setting button 64 is pressed and the rows of “generator” and “replacement” are selected in the maintenance plan table 61, the display processing unit 24 causes the display unit 43 to display the maintenance plan table 61 to which the replacement results of the generator have been added.

[0076] The production stop information registration button 65 is information for adding information on the production stop time Ts to the maintenance plan table 61. When the input processing unit 21 accepts the pressing of the production stop information registration button 65 and the input of the information on the production stop time Ts, the update processing unit 25 adds the input information on the production stop time Ts to the management information 12 and updates the management information 12.

[0077] The information acquiring unit 22 acquires the information on the production stop time Ts added to the management information 12 by the update processing unit 25. The display processing unit 24 causes the display unit 43 to display the maintenance plan table 61 to which the information on the production stop time Ts acquired by the information acquiring unit 22 has been added.

[0078] The registration button 66 is a button for reflecting the updated maintenance plan table 61 in the maintenance information 11. When the input processing unit 21 accepts the pressing of the registration button 66, the update processing unit 25 updates the maintenance information 11 and the management information 12 based on the information of the updated portion of the maintenance plan table 61. This allows the display processing unit 24 to display the updated maintenance plan table 61 on the display unit 43 for the administrator U1 who logs in next.

[0079] The discontinued equipment display box 67 is a selection box for hiding information about equipment other than equipment whose production has been discontinued. When the input processing unit 21 accepts the administrator U1's operation on the input unit 42 to press the discontinued equipment display box 67, the display processing unit 24 hides information about equipment other than equipment whose production has been discontinued.

[0080] When notifying the manager U1 of information regarding the inventory of the maintenance object, the notification processing unit 23 can add the information regarding the inventory of the maintenance object to the maintenance plan table 61. Fig. 8 is a diagram showing another example of the maintenance plan screen including the maintenance plan table displayed on the display unit according to the first embodiment.

[0081] In the maintenance plan screen 60 shown in Fig. 8, a warning mark 68 is displayed as information regarding the inventory of the maintenance target. The warning mark 68 shown in Fig. 8 indicates that the value Ni obtained by subtracting the planned replacement quantity of the part "generator bearing" from the inventory quantity is equal to or less than the inventory threshold Na. This allows the manager U1 to easily understand that the part "generator bearing" needs to be replenished.

[0082] Next, the maintenance work screen displayed on the display unit 53 of the worker U2 will be described. The information acquisition unit 22 acquires, as maintenance item information, information on the maintenance targets and maintenance types for which maintenance work is scheduled for the current year from the schedule information 15 stored in the storage unit 10. The display processing unit 24 displays the maintenance work screen on the display unit 53 of the worker U2 based on the maintenance item information acquired by the information acquisition unit 22.

[0083] The maintenance work screen displayed on the display unit 53 includes information on the maintenance targets and maintenance types for which maintenance work is scheduled for the current year, and an input frame for inputting the results of the maintenance work. By operating the input unit 52, the worker U2 can input the results of the maintenance work into the input frame on the maintenance work screen.

[0084] The input processing unit 21 receives the results of the maintenance work input in the input box. The update processing unit 25 updates the history information 14 based on the results of the maintenance work received by the input processing unit 21.

[0085] Next, a description will be given of a process performed by the processor 20 of the maintenance plan creation support system 1 with reference to a flowchart. Fig. 9 is a flowchart showing an example of a process performed by the processor of the maintenance plan creation support system according to the first embodiment.

[0086] As shown in Fig. 9, the processing unit 20 of the maintenance plan creation support system 1 determines whether or not there is a login request from the administrator U1 (step S10). If the processing unit 20 determines that there is a login request from the administrator U1 (step S10: Yes), it starts the administrator process (step S11). The administrator process is the process of steps S20 to S29 shown in Fig. 10, and will be described in detail later.

[0087] When the processing of step S11 is completed, or when it is determined that there is no login request from the manager U1 (step S10: No), the processing unit 20 determines whether there is a login request from the worker U2 (step S12). When it is determined that there is a login request from the worker U2 (step S12: Yes), the processing unit 20 starts the processing for the worker (step S13). The processing for the worker is the processing of steps S40 to S48 shown in FIG. 12, and will be described in detail later.

[0088] When the processing of step S13 is completed or when it is determined that there is no login request from the worker U2 (step S12: No), the processing unit 20 determines whether or not it is time to end the operation (step S14). For example, when it is determined that the power supply (not shown) is turned off, the processing unit 20 determines that it is time to end the operation.

[0089] If the processing unit 20 determines that it is not time to end the operation (step S14: No), it transitions to step S10, and if it determines that it is time to end the operation (step S14: Yes), it terminates the processing shown in Figure 9.

[0090] Fig. 10 is a flowchart showing an example of a process for an administrator by a processing unit of the maintenance plan creation support system according to the first embodiment. As shown in Fig. 10, the processing unit 20 judges whether or not authentication of a login request from the administrator U1 has been successful (step S20). For example, the processing unit 20 judges that authentication of a login request from the administrator U1 has been successful when an ID and a password included in the login request from the administrator U1 match a preset ID and password.

[0091] When the processing unit 20 determines that the authentication for the login request of the administrator U1 is successful (step S20: Yes), it executes a period-related process (step S21). The period-related process is the process of steps S30 to S35 shown in FIG. 11, and will be described in detail later.

[0092] Next, the processing unit 20 acquires the maintenance information 11 and management information 12 from the memory unit 10 (step S22), and displays the maintenance plan screen 60 on the display unit 43 based on the acquired maintenance information 11 and management information 12 (step S23).

[0093] Next, the processing unit 20 judges whether or not the maintenance plan table 61 has been updated (step S24). When the processing unit 20 judges that the maintenance plan table 61 has been updated (step S24: Yes), it updates the maintenance information 11 (step S25). Note that when information on the production stop time Ts is added to the maintenance plan table 61, the processing unit 20 also updates the management information 12 in the processing of step S25.

[0094] When the processing of step S25 is completed, or when it is determined that the maintenance plan table 61 has not been updated (step S24: No), the processing unit 20 calculates the value Ni obtained by subtracting the number of items scheduled for replacement from the number of items in stock for each maintenance object (step S26).

[0095] Next, the processing unit 20 judges whether there is a maintenance object for which the value Ni obtained by subtracting the planned replacement quantity from the inventory quantity is equal to or less than the inventory threshold value Na (step S27). When the processing unit 20 judges that there is a maintenance object for which the value Ni obtained by subtracting the planned replacement quantity from the inventory quantity is equal to or less than the inventory threshold value Na (step S27: Yes), the processing unit 20 causes the display unit 43 to display information regarding the inventory (step S28).

[0096] When the processing of step S28 is completed, or when it is determined that there is no conservation target whose value Ni obtained by subtracting the planned replacement quantity from the inventory quantity is equal to or less than the inventory threshold Na (step S27: No), the processing unit 20 determines whether or not there is a logout request from the administrator U1 (step S29). When it is determined that there is no logout request from the administrator U1 (step S29: No), the processing unit 20 shifts the processing to step S21, and when it is determined that there is a logout request from the administrator U1 (step S29: Yes) or when the authentication has failed (step S20: No), the processing unit 20 ends the processing shown in FIG.

[0097] Fig. 11 is a flowchart showing an example of a period-related process performed by the processing unit of the maintenance plan creation support system according to the embodiment 1. As shown in Fig. 11, the processing unit 20 acquires information on a production stop time Ts (step S30).

[0098] Next, the processing unit 20 determines whether the time difference ΔTs between the production stop time Ts and the current year and month Tn is equal to or less than the threshold time Tths (step S31). If the processing unit 20 determines that the time difference ΔTs is equal to or less than the threshold time Tths (step S31: Yes), it notifies the logged-in user of information related to the production stop time Ts (step S32).

[0099] When the processing of step S32 is completed, or when it is determined that the period difference ΔTs is not equal to or less than the threshold period Tths (step S31: No), the processing unit 20 acquires information on the warranty period Tw (step S33). Then, the processing unit 20 determines whether the period difference ΔTw between the warranty period Tw and the current year and month Tn is equal to or less than the threshold period Tthw (step S34).

[0100] When the processing unit 20 determines that the period difference ΔTw is equal to or less than the threshold period Tthw (step S34: Yes), it notifies the logged-in user of information regarding the warranty period Tw (step S35). When the processing unit 20 finishes the process of step S35 or determines that the period difference ΔTw is not equal to or less than the threshold period Tthw (step S34: No), it ends the process shown in FIG.

[0101] Fig. 12 is a flowchart showing an example of a process for a worker by the processing unit of the maintenance plan creation support system according to the first embodiment. As shown in Fig. 12, the processing unit 20 judges whether or not authentication of the login request of the worker U2 has been successful (step S40). For example, the processing unit 20 judges that authentication of the login request of the worker U2 has been successful when an ID and a password included in the login request of the worker U2 match a preset ID and a password.

[0102] Next, the processing unit 20 executes the above-mentioned period-related processing (step S41), and then the processing unit 20 acquires maintenance item information for the maintenance target from the memory unit 10 (step S42), and displays a maintenance work screen on the display unit 53 based on the acquired maintenance item information (step S43).

[0103] Next, the processing unit 20 determines whether or not a maintenance result has been input by the operator U2 operating the input unit 52 (step S44). When the processing unit 20 determines that a maintenance result has been input (step S44: Yes), the processing unit 20 updates the history information 14 based on the input maintenance result (step S45).

[0104] Next, the processing unit 20 judges whether or not there is a replacement of the maintenance object based on the input maintenance result (step S46). If the processing unit 20 judges that there is a replacement of the maintenance object (step S46: Yes), it updates the inventory information 13 (step S47). As a result, the inventory information 13 is updated to a number that is the number of the replaced maintenance object in stock.

[0105] When the processing of step S47 is completed, when it is determined that the maintenance result has not been input (step S44: No), or when it is determined that the maintenance target has not been replaced (step S46: No), the processing unit 20 determines whether or not there is a logout request from the worker U2 (step S48). When it is determined that there is no logout request from the worker U2 (step S48: No), the processing unit 20 shifts the processing to step S41, and when it is determined that there is a logout request from the worker U2 (step S48: Yes) or when the authentication has failed (step S40: No), the processing unit 20 ends the processing shown in FIG.

[0106] Fig. 13 is a diagram illustrating an example of a system configuration of the maintenance plan creation support system according to the first embodiment. As illustrated in Fig. 13, the maintenance plan creation support system 1 includes a server 3 and terminal devices 4 and 5. The server 3 and the terminal devices 4 and 5 are capable of communicating with each other via a network 2. The network 2 includes, for example, a wide area network (WAN) such as the Internet, a mobile communication network, and the like.

[0107] The server 3 is a server built in a cloud environment 6. The cloud environment 6 includes computer resources provided in a cloud service platform. The cloud service platform is provided by a cloud service provider and includes, for example, PaaS (Platform as a Service). Since the server 3 is built in the cloud environment 6, it may also be called a cloud server.

[0108] The terminal device 4 is a terminal device used by the manager U1, and the terminal device 5 is a terminal device used by the worker U2. The terminal devices 4 and 5 are, for example, tablet PCs (Personal Computers), notebook PCs, or smartphones.

[0109] The server 3 includes a communication unit 30, a processing unit 31, and a storage unit 10. The terminal device 4 includes a communication unit 40, a processing unit 41, an input unit 42, and a display unit 43. The terminal device 5 includes a communication unit 50, a processing unit 51, an input unit 52, and a display unit 53.

[0110] The communication units 30, 40, and 50 are connected to the network 2. The processing unit 20 includes processing units 31, 41, and 51, but may be configured by the processing unit 31. Note that the system configuration of the maintenance plan creation support system 1 is not limited to the example shown in FIG.

[0111] In the above example, the maintenance plan creation support system 1 supports the creation of a maintenance plan on a year-month basis, but it can also support the creation of a maintenance plan on a year-month-day basis.

[0112] Furthermore, the information acquisition unit 22 can acquire the manufacturer's web page or a production discontinuation notification email from the manufacturer, and extract information on the production discontinuation time Ts from the acquired information. In this case, the information acquisition unit 22 can update the management information 12 based on the extracted information on the production discontinuation time Ts. This allows the management information 12 to be updated without the need for the administrator U1 to operate the input unit 42.

[0113] In addition, the notification processing unit 23 can increase the inventory threshold Na when the price of the maintenance object rises or the delivery date is delayed, and can increase the inventory threshold Na as the production stop time Ts approaches. This allows the manager U1 to stably replenish the maintenance object.

[0114] The maintenance plan creation support system 1 can also store information on the free repair period by the manufacturer of the maintenance target in the storage unit 10. In this case, the display processing unit 24 can highlight the free repair period in the maintenance plan table 61, and the notification processing unit 23 can notify the logged-in user of information on the free repair period when the period difference between the free repair period and the current year / month Tn is equal to or less than a threshold period.

[0115] In the above-described example, the notification processing unit 23 notifies the logged-in user of information, but it is also possible to display an email or a message on the display unit 43, 53 by push notification when the user U is not logged in.

[0116] Fig. 14 is a diagram illustrating an example of a hardware configuration of a processing unit according to the first embodiment. As illustrated in Fig. 11, the processing units 20, 31, 41, and 51 each include a computer including a processor 101, a memory 102, and a bus 103. The processor 101 and the memory 102 can transmit and receive information to and from each other via the bus 103.

[0117] The storage unit 10 is realized by a memory 102. The processor 101 executes the functions of the processing units 20, 31, 41, and 51 by reading and executing a program stored in the memory 102. The processor 101 is, for example, an example of a processing circuit, and includes one or more of a CPU (Central Processing Unit), a DSP (Digital Signal Processor), and a system LSI (Large Scale Integration).

[0118] The memory 102 includes one or more of a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable Read Only Memory), and an EEPROM (Electrically Erasable Programmable Read Only Memory). The memory 102 also includes a recording medium on which a computer-readable program is recorded. Such a recording medium includes one or more of a non-volatile or volatile semiconductor memory, a magnetic disk, a flexible memory, an optical disk, a compact disk, and a DVD (Digital Versatile Disc). The processing units 20, 31, 41, and 51 may include integrated circuits such as an ASIC (Application Specific Integrated Circuit) and an FPGA (Field Programmable Gate Array).

[0119] As described above, the maintenance plan creation support system 1 according to the first embodiment includes the information acquisition unit 22, the display processing unit 24, and the update processing unit 25. The information acquisition unit 22 acquires the maintenance information 11 including the history information 14 including information indicating the inspection history and replacement history of the maintenance object, the schedule information 15 including information indicating the scheduled inspection time and the scheduled replacement time, and the management information 12 including information indicating the production stop time Ts of the maintenance object. The display processing unit 24 displays the maintenance plan table 61 indicating the information of the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time Ts on the display unit 43 based on the maintenance information 11 and the management information 12. When the maintenance plan table 61 is updated, the update processing unit 25 updates the maintenance information 11 based on the update of the maintenance plan table 61. This allows the maintenance plan creation support system 1 to support the creation of a preventive maintenance-type maintenance plan based on the product life cycle of the maintenance object.

[0120] Furthermore, the display processing unit 24 highlights each unit period after the production stop time Ts in the maintenance plan table 61. This allows the manager U1 in the maintenance plan creation support system 1 to easily grasp the period after the production stop time in the maintenance plan table 61.

[0121] Furthermore, the management information 12 includes information indicating the warranty period of the maintenance object, and the maintenance plan table 61 includes information on the warranty period of the maintenance object. This enables the maintenance plan creation support system 1 to better support the creation of a preventive maintenance-type maintenance plan that takes into account the product life cycle of the maintenance object.

[0122] Furthermore, the display processing unit 24 highlights each unit period after the warranty period in the maintenance plan table 61. This allows the manager U1 in the maintenance plan creation support system 1 to easily grasp periods outside the warranty period in the maintenance plan table 61.

[0123] Furthermore, the notification processing unit 23 notifies information on the production stop time Ts when the period until the production stop time Ts is within a preset period or when the production stop time Ts has passed. This allows the manager U1 in the maintenance plan creation support system 1 to easily grasp the period after the production stop time in the maintenance plan table 61.

[0124] In addition, the notification processing unit 23 notifies information about the warranty period when the remaining period of the warranty period is within a preset period or exceeds the warranty period. This allows the manager U1 in the maintenance plan creation support system 1 to easily understand the period outside the warranty period in the maintenance plan table 61.

[0125] Furthermore, the information acquisition unit 22 acquires inventory information 13 including the inventory quantity of the maintenance object and the inventory threshold Na. If the value Ni obtained by subtracting the scheduled replacement quantity of the maintenance object from the inventory quantity is equal to or less than the inventory threshold Na, the notification processing unit 23 notifies information regarding the inventory of the maintenance object. This allows the manager U1 in the maintenance plan creation support system 1 to easily grasp that a maintenance object needs to be replenished.

[0126] The configurations shown in the above embodiments are merely examples, and may be combined with other known technologies. Parts of the configurations may be omitted or modified without departing from the spirit of the invention. [Explanation of symbols]

[0127] 1 Maintenance plan creation support system, 2 Network, 3 Server, 4, 5 Terminal device, 6 Cloud environment, 10 Memory unit, 11 Maintenance information, 12 Management information, 13 Stock information, 14 History information, 15 Schedule information, 16 Equipment information, 17 Parts information, 20, 31, 41, 51 Processing unit, 21 Input processing unit, 22 Information acquisition unit, 23 Notification processing unit, 24 Display processing unit, 25 Update processing unit, 30, 40, 50 Communication unit, 42, 52 Input unit, 43, 53 Display unit, 60 Maintenance plan screen, 61 Maintenance plan table, 62 Individual setting button, 63 Repeat setting button, 64 Inspection results automatic setting button, 65 Discontinued production information registration button, 66 Registration button, 67 Discontinued production equipment display box, 68 Warning mark, 80 Notification information, 101 Processor, 102 Memory, 103 Bus.

Claims

1. an information acquiring unit that acquires maintenance information including history information including information indicating an inspection history and a replacement history of a maintenance object, schedule information including information indicating a scheduled time for the inspection and a scheduled time for the replacement, and management information including information indicating a time when production of the maintenance object will be discontinued; a display processing unit that displays on a display unit a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; an update processing unit that updates the maintenance information based on an update of the maintenance plan table when the maintenance plan table is updated, The display processing unit is Highlight each unit period after the production stop time in the maintenance planning table A maintenance plan creation support system comprising:

2. an information acquisition unit that acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled inspection time and the scheduled replacement time, and management information including information indicating the discontinuation time of the maintenance object and information indicating the warranty period of the maintenance object; a display processing unit that displays on a display unit a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the discontinuation time, and the warranty period based on the maintenance information and the management information; an update processing unit that updates the maintenance information based on an update of the maintenance plan table when the maintenance plan table is updated, The display processing unit is Highlighting each unit period after the warranty period in the maintenance planning table A maintenance plan creation support system comprising:

3. an information acquiring unit that acquires maintenance information including history information including information indicating an inspection history and a replacement history of a maintenance object, schedule information including information indicating a scheduled time for the inspection and a scheduled time for the replacement, and management information including information indicating a time when production of the maintenance object will be discontinued; a display processing unit that displays on a display unit a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; an update processing unit that updates the maintenance information based on an update of the maintenance planning table when the maintenance planning table is updated; a notification processing unit that notifies information regarding the production discontinuation time when the period until the production discontinuation time is within a preset period or when the production discontinuation time has passed; Equipped with The information acquisition unit Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; The notification processing unit: When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support system comprising:

4. an information acquisition unit that acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled inspection time and the scheduled replacement time, and management information including information indicating the discontinuation time of the maintenance object and information indicating the warranty period of the maintenance object; a display processing unit that displays on a display unit a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the discontinuation time, and the warranty period based on the maintenance information and the management information; an update processing unit that updates the maintenance information based on an update of the maintenance planning table when the maintenance planning table is updated; a notification processing unit that notifies information regarding the warranty period when the remaining period of the warranty period is within a preset period or when the remaining period of the warranty period has exceeded the warranty period; Equipped with The information acquisition unit Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; The notification processing unit: When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support system comprising:

5. The display processing unit is Highlighting each unit period after the production stop time in the maintenance planning table 5. The maintenance plan creation support system according to claim 2, wherein the maintenance plan creation support system comprises:

6. The management information includes: information indicating a warranty period for the protected item is included; The maintenance planning table includes: Information on the warranty period for the above-mentioned protected items is included 2. The maintenance plan creation support system according to claim 1 .

7. The display processing unit is Highlighting each unit period after the warranty period in the maintenance planning table 7. The maintenance plan creation support system according to claim 6.

8. A step in which a computer acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled timing of the inspection and the scheduled timing of the replacement, and management information including information indicating the timing of discontinuing production of the maintenance object; a step of displaying a maintenance schedule table on a display unit, the maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; When the maintenance planning table is updated, the computer updates the maintenance information based on the update of the maintenance planning table, In the step of displaying the maintenance plan table on a display unit, Highlighting each unit period after the production stop time in the maintenance planning table A maintenance plan creation support method comprising:

9. A step in which a computer acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled timing of the inspection and the scheduled timing of the replacement, and management information including information indicating the discontinuation time of the maintenance object and information indicating the warranty period of the maintenance object; a step of displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the production discontinuation time, and the warranty period based on the maintenance information and the management information by the computer; When the maintenance planning table is updated, the computer updates the maintenance information based on the update of the maintenance planning table, In the step of displaying the maintenance plan table on a display unit, Highlighting each unit period after the warranty period in the maintenance planning table A maintenance plan creation support method comprising:

10. A step in which a computer acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled timing of said inspection and the scheduled timing of said replacement, and management information including information indicating the timing of discontinuing production of said maintenance object; a step of displaying a maintenance schedule table on a display unit, the maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; a step of updating the maintenance information based on an update of the maintenance planning table when the maintenance planning table is updated by the computer; and when the period until the production discontinuation time is within a preset period or the production discontinuation time has passed, the computer notifies the user of information regarding the production discontinuation time, In the step of acquiring, Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; In the step of notifying, When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support method comprising:

11. A step in which a computer acquires maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled timing of said inspection and said scheduled timing of said replacement, and management information including information indicating the discontinuation time of said maintenance object and information indicating the warranty period of said maintenance object; a step of displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the production discontinuation time, and the warranty period based on the maintenance information and the management information by the computer; a step of updating the maintenance information based on an update of the maintenance planning table when the maintenance planning table is updated by the computer; and when the remaining period of the warranty period is within a preset period or exceeds the warranty period, the computer notifies the user of information regarding the warranty period. In the step of acquiring, Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; In the step of notifying, When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support method comprising:

12. acquiring maintenance information including history information including information indicating an inspection history and a replacement history of a maintenance object, and schedule information including information indicating a scheduled time for the inspection and a scheduled time for the replacement, and management information including information indicating a time when production of the maintenance object will be stopped; displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; when the maintenance planning table is updated, updating the maintenance information based on the update of the maintenance planning table; In the step of displaying the maintenance plan table on a display unit, Highlight each unit period after the production stop time in the maintenance planning table A maintenance plan creation support program comprising:

13. acquiring maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled inspection time and the scheduled replacement time, and management information including information indicating the discontinuation time of the maintenance object and information indicating the warranty period of the maintenance object; displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the discontinuation time, and the warranty period based on the maintenance information and the management information; when the maintenance planning table is updated, updating the maintenance information based on the update of the maintenance planning table; In the step of displaying the maintenance plan table on a display unit, Highlighting each unit period after the warranty period in the maintenance planning table A maintenance plan creation support program comprising:

14. acquiring maintenance information including history information including information indicating an inspection history and a replacement history of a maintenance object, and schedule information including information indicating a scheduled time for the inspection and a scheduled time for the replacement, and management information including information indicating a time when production of the maintenance object will be stopped; displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, and the production stop time based on the maintenance information and the management information; When the maintenance planning table is updated, updating the maintenance information based on the update of the maintenance planning table; if the period until the production discontinuation time is within a preset period or if the production discontinuation time has passed, notifying information regarding the production discontinuation time; In the step of acquiring, Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; In the step of notifying, When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support program comprising:

15. acquiring maintenance information including history information including information indicating the inspection history and replacement history of a maintenance object, and schedule information including information indicating the scheduled inspection time and the scheduled replacement time, and management information including information indicating the discontinuation time of the maintenance object and information indicating the warranty period of the maintenance object; displaying, on a display unit, a maintenance schedule table showing information on the inspection history, the replacement history, the scheduled inspection time, the scheduled replacement time, the discontinuation time, and the warranty period based on the maintenance information and the management information; When the maintenance planning table is updated, updating the maintenance information based on the update of the maintenance planning table; and if the remaining period of the warranty period is within a preset period or has exceeded the warranty period, notifying the user of information regarding the warranty period; In the step of acquiring, Acquire inventory information including an inventory quantity of the maintenance object and an inventory threshold value; In the step of notifying, When the value obtained by subtracting the scheduled replacement number of the maintenance object from the inventory number is equal to or less than the inventory threshold, notifying information regarding the inventory of the maintenance object A maintenance plan creation support program comprising:

Citation Information

Patent Citations

  • Part data managing system and maintenance support system for electric load facility

    JP2002259594A

  • Facility maintenance management device, facility maintenance management method and its program

    JP2005284712A

  • Inventory management apparatus and inventory management method

    JP2012104058A

  • Maintenance management system and maintenance management method

    JP2013122715A

  • Ordering support device, ordering support method, manufacturing management system