Apparatus for manufacturing cement clinker, apparatus for recovering clinker dust, method for manufacturing cement clinker, and method for recovering clinker dust.
The apparatus and method reintroduce clinker dust into the cooler using high-pressure air, addressing thermal efficiency losses and equipment issues in cement manufacturing by minimizing temperature drops and wear.
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-07-06
- Publication Date
- 2026-04-07
AI Technical Summary
Existing cement clinker manufacturing processes experience a decrease in thermal efficiency due to the recovery of clinker dust, which leads to equipment damage and ventilation obstruction.
A cement clinker manufacturing apparatus and method that includes a collection device for gathering clinker dust from the gap between the rotary kiln and clinker cooler, an introduction device with an air supply system to reintroduce the dust into the cooler using compressed high-pressure air, and control mechanisms to manage the dust reintroduction process, minimizing temperature drops and equipment wear.
The solution effectively suppresses the decrease in thermal efficiency and reduces equipment damage by intermittently reintroducing clinker dust into the cooler, maintaining operational efficiency and simplifying operator checks.
Smart Images

Figure 0007841970000001 
Figure 0007841970000002 
Figure 0007841970000003
Abstract
Description
Technical Field
[0001] The present disclosure relates to a cement clinker manufacturing apparatus, a clinker dust recovery apparatus, a cement clinker manufacturing method, and a clinker dust recovery method.
Background Art
[0002] Patent Document 1 discloses a dust recovery apparatus for a cooler exhaust extraction system of a firing facility such as cement or alumina. Patent Document 2 discloses a cement manufacturing apparatus including a blower that supplies a gas for transporting bone meal supplied to a pipe connected to a cement kiln toward the cement kiln side.
Prior Art Documents
Patent Documents
[0003]
Patent Document 1
Patent Document 2
Summary of the Invention
Problems to be Solved by the Invention
[0004] The present disclosure provides a cement clinker manufacturing apparatus, a clinker dust recovery apparatus, a cement clinker manufacturing method, and a clinker dust recovery method that are useful for suppressing a decrease in thermal efficiency associated with the recovery of clinker dust.
Means for Solving the Problems
[0005] [1] A cement clinker manufacturing apparatus according to one aspect of the present disclosure comprises a rotary kiln for firing cement raw materials, a clinker cooler for cooling the cement clinker produced by firing in the rotary kiln, a collection device for collecting clinker dust discharged from the gap between the rotary kiln and the clinker cooler, and an introduction device having an inlet formed in a blowing pipe that opens into the clinker cooler, for introducing the clinker dust collected by the collection device into the clinker cooler via the blowing pipe. The introduction device further comprises an air supply device that intermittently supplies compressed high-pressure air into the blowing pipe from the end opposite the inlet of the blowing pipe so as to blow the clinker dust collected by the collection device into the clinker cooler.
[0006] In the manufacturing apparatus described in [1] above, clinker dust discharged from the gap between the rotary kiln and the clinker cooler is returned to the clinker cooler by a collection device and an introduction device. Compressed high-pressure air is supplied intermittently when the clinker dust is returned to the clinker cooler, so that the time that air is blown into the clinker cooler is shortened. As a result, the temperature drop of the hot gas moving from the clinker cooler to the rotary kiln is suppressed. Therefore, it is useful in suppressing the decrease in thermal efficiency associated with the recovery of clinker dust.
[0007] [2] In the manufacturing apparatus described in [1] above, the introduction device may further include an extraction pipe connecting the intermediate portion of the injection pipe to the collection device, and a first opening / closing device capable of switching the open / closed state of the extraction pipe. The first opening / closing device may include a shaft member provided in the extraction pipe and extending in a direction intersecting the extraction pipe, and a valve member provided on the shaft member, and the open / closed state of the extraction pipe may be switched by rotating the valve member around the shaft member. In this case, even if the valve member is moved with clinker dust accumulated in the valve member, the valve member can be opened and closed smoothly, and wear of the valve member can be suppressed. Therefore, this is useful for improving the durability of the opening / closing device.
[0008] [3] In the manufacturing apparatus described in [1] or [2] above, the introduction device may further include a second switchable device capable of switching the open / closed state between the connection portion from which clinker dust is supplied from the collection device in the injection piping and the injection port. The second switchable device may include a gate valve provided so as to intersect the injection piping, and the open / closed state between the connection portion and the injection port may be switched by moving the gate valve along the direction intersecting the injection piping. In this case, since it is not necessary to provide a mechanism for moving the gate valve in the piping, damage to the switchable device due to collision with clinker dust flowing with high-pressure air can be prevented. Therefore, this is useful for improving the durability of the switchable device.
[0009] [4] In the manufacturing apparatus described in any of [1] to [3] above, the collection device may include an air seal device that forms a space connected to the gap between the rotary kiln and the clinker cooler and guides the clinker dust discharged into the space to a storage device, and a cold air supply device that supplies cooling air at a temperature lower than the temperature inside the rotary kiln from the gap between the air seal device and the rotary kiln to the space formed by the air seal device. In this case, it is easy to retain the clinker dust that leaks from the gap between the rotary kiln and the clinker cooler in the above space, and the clinker dust can be cooled by the cooling air. Therefore, it is useful in suppressing the impact of clinker dust on the manufacturing apparatus.
[0010] [5] The manufacturing apparatus described in any of [1] to [4] above may further include a control device that controls the introduction device so that when the supply of high-pressure air has been stopped for a predetermined time, high-pressure air is supplied from the air supply device to the injection piping, thereby introducing clinker dust into the clinker cooler. In this case, since clinker dust is introduced into the clinker cooler after the predetermined time has elapsed, the operator does not need to frequently check the discharge status of the clinker dust. Therefore, this is useful in simplifying the work of checking the operating status of the manufacturing apparatus by the operator.
[0011] [6] The manufacturing apparatus described in any of [1] to [4] above may further include a detection device for detecting the amount of clinker dust stored in the storage device of the collection device before it is supplied to the injection piping, and a control device for controlling the introduction device so that when the value detected by the detection device reaches a predetermined amount, high-pressure air is supplied from the air supply device to the injection piping and the clinker dust is introduced into the clinker cooler. In this case, since the clinker dust is introduced into the clinker cooler when the amount of clinker dust reaches a predetermined amount, the operator does not have to frequently check the discharge status of the clinker dust. Therefore, it is useful in simplifying the work of checking the operating status of the manufacturing apparatus by the operator.
[0012] [7] A clinker dust recovery apparatus according to one aspect of the present disclosure comprises a collection device for collecting clinker dust discharged from the gap between a rotary kiln for firing cement raw materials and a clinker cooler for cooling cement clinker produced by firing in the rotary kiln, and an introduction device for introducing the clinker dust collected by the collection device into the clinker cooler via an injection pipe having an inlet that opens into the clinker cooler. The introduction device has an air supply device that intermittently supplies compressed high-pressure air into the injection pipe from the end of the injection pipe opposite to the inlet so as to blow the clinker dust collected by the collection device into the clinker cooler. In this recovery apparatus, as with the manufacturing apparatus described above, the temperature drop of the hot gas moving from the clinker cooler to the rotary kiln is suppressed. Therefore, it is useful in suppressing the decrease in thermal efficiency associated with the recovery of clinker dust.
[0013] [8] A method for producing cement clinker according to one aspect of the present disclosure includes the steps of: firing cement raw materials in a rotary kiln; cooling the cement clinker produced by firing in the rotary kiln in a clinker cooler; collecting clinker dust discharged from the gap between the rotary kiln and the clinker cooler; and introducing the collected clinker dust into the clinker cooler via an injection pipe having an inlet opening into the clinker cooler. The step of introducing clinker dust into the clinker cooler includes intermittently supplying compressed high-pressure air into the injection pipe from the end of the injection pipe opposite to the inlet opening so as to blow the collected clinker dust into the clinker cooler. In this method, similar to the production apparatus described above, the temperature drop of the hot gas moving from the clinker cooler to the rotary kiln is suppressed. Therefore, it is useful for suppressing the decrease in thermal efficiency associated with the recovery of clinker dust.
[0014] [9] A method for recovering clinker dust according to one aspect of the present disclosure includes the steps of: collecting clinker dust discharged from the gap between a rotary kiln for firing cement raw materials and a clinker cooler for cooling cement clinker produced by firing in the rotary kiln; and introducing the collected clinker dust into the clinker cooler via an injection pipe having an inlet opening into the clinker cooler. The step of introducing the clinker dust into the clinker cooler includes intermittently supplying compressed high-pressure air into the injection pipe from the end of the injection pipe opposite to the inlet opening so as to blow the collected clinker dust into the clinker cooler. In this recovery method, similar to the manufacturing apparatus described above, the temperature drop of the hot gas moving from the clinker cooler to the rotary kiln is suppressed. Therefore, it is useful in suppressing the decrease in thermal efficiency associated with the recovery of clinker dust. [Effects of the Invention]
[0015] This disclosure provides a cement clinker manufacturing apparatus, a clinker dust recovery apparatus, a cement clinker manufacturing method, and a clinker dust recovery method that are useful for suppressing the decrease in thermal efficiency associated with the recovery of clinker dust.
Brief Description of the Drawings
[0016] [Figure 1] FIG. 1 is a schematic diagram showing an example of an apparatus for manufacturing cement clinker. [Figure 2] FIG. 2 is a schematic diagram showing an example of a cross-section at the connection portion between a rotary kiln and a clinker cooler. [Figure 3] FIG. 3 is a schematic diagram showing an example of an opening / closing device in an injection pipe. [Figure 4] FIG. 4 is a schematic diagram showing an example of an opening / closing device in an extraction pipe. [Figure 5] FIG. 5 is a block diagram showing an example of the hardware configuration of a control device. [Figure 6] FIG. 6 is a flowchart showing an example of a series of processes executed by a control device. [Figure 7] FIG. 7 is a flowchart showing an example of a series of processes executed by a control device.
Embodiments for Carrying Out the Invention
[0017] Hereinafter, an embodiment will be described with reference to the drawings. In the description, the same reference numerals are given to the same elements or elements having the same function, and redundant descriptions are omitted.
[0018] First, an apparatus for manufacturing cement clinker according to an embodiment will be described. The manufacturing apparatus 1 shown in FIG. 1 is an apparatus for manufacturing cement clinker by firing cement raw materials. The manufacturing apparatus 1 includes a preheating and calcining apparatus 2, a rotary kiln 4, a clinker cooler 6, a recovery apparatus 10, and a control apparatus 80.
[0019] The preheating and calcining device 2 is a device that preheats and calcines the cement raw material (raw material for cement clinker) supplied from the device that performs the raw material process. The preheating and calcining device 2 is, for example, a new suspension preheater (NSP). In this case, the preheating and calcining device 2 has a plurality of cyclones constituting a multi-stage cyclone and a calcining furnace. The preheating and calcining device 2 drops the cement raw material supplied from the supply port provided in the duct leading to the uppermost cyclone sequentially to the lower cyclones, and heats the cement raw material so that it gradually becomes high temperature. Further, the preheating and calcining device 2 heats (calcines) the cement raw material by a combustion device such as a burner in the calcining furnace. The preheating and calcining device 2 supplies the preheated and calcined cement raw material to the rotary kiln 4.
[0020] The rotary kiln 4 is a device for firing the cement raw material. Specifically, the rotary kiln 4 fires the cement raw material by heating the cement raw material supplied from the preheating and calcining device 2. By firing the cement raw material in the rotary kiln 4, cement clinker is produced. Hereinafter, the cement clinker is referred to as "clinker 92". The rotary kiln 4 is a rotary kiln configured to rotate around an axis along its long axis direction. The rotary kiln 4 extends along a horizontal one direction (for example, the direction D1 shown in FIG. 1). The rotary kiln 4 has, for example, a drum body (shell) slightly inclined with respect to the horizontal direction so that the cement raw material is sent to the downstream side, and a burner (not shown) for firing the cement raw material charged into the drum body. At least a part of the downstream end 4a of the rotary kiln 4 overlaps with the clinker cooler 6 in the direction D1 and is located inside the clinker cooler 6.
[0021] The clinker cooler 6 is a device for cooling the clinker 92 produced by firing in the rotary kiln 4. The clinker cooler 6 may cool the high-temperature clinker 92 discharged from the end 4a of the rotary kiln 4 using cooling air. The clinker cooler 6, for example, has a grate device 8 inside. The grate device 8 transports the clinker 92 to be cooled by using multiple grate plates with slits for passing cooling air through them. Multiple air chambers are provided at the bottom of the grate device 8, and each of the multiple air chambers sends cooling air into the space above the grate device 8. The clinker cooler 6 discharges the cooled clinker 92 from the downstream end to a conveying device or the like.
[0022] As shown in Figure 1 or Figure 2, the side wall 6a of the clinker cooler 6, near the rotary kiln 4, is provided with an insertion hole 6b into which the end 4a of the rotary kiln 4 is inserted. The side wall 6a extends along a direction intersecting the direction in which the rotary kiln 4 extends (for example, a direction perpendicular to direction D1). The insertion hole 6b is located above the grating device 8, thereby supplying the clinker 92 discharged from the end 4a of the rotary kiln 4 onto the grating plate of the grating device 8, forming a mass of clinker 92 on the grating device 8. The diameter (e.g., diameter) of the insertion hole 6b is larger than the outer diameter of the end 4a of the rotary kiln 4.
[0023] In the above configuration, a gap g is formed between the rotary kiln 4 and the clinker cooler 6. As shown in Figure 2, the gap g is the space between the inner surface of the insertion hole 6b formed in the side wall 6a and the outer surface of the shell 4b (end of the shell 4b) of the rotary kiln 4. The gap g extends along the circumference around the axis of rotation of the rotary kiln 4 (hereinafter referred to as the "axis of the rotary kiln 4") and is formed in an annular shape. The formation of this gap g allows the rotary kiln 4 to rotate around the axis along its direction of extension. The outer diameter of the end of the shell 4b may be larger than the outer diameter of other areas of the shell 4b.
[0024] In one example, the clinker 92 (clinker mineral) immediately after being produced in the rotary kiln 4 has a temperature of approximately 1300°C to 1600°C, and the clinker cooler 6 rapidly cools this clinker 92 with air. In the clinker cooler 6, the air used for cooling absorbs a large amount of heat from the clinker 92. To efficiently utilize the hot gas that has absorbed heat from the clinker 92, this hot gas is used for combustion in cement equipment such as the rotary kiln 4 and the calcination furnace of the preheating calcination device 2, or for drying cement raw materials. Thus, as shown in Figure 1, a portion of the air used for cooling in the clinker cooler 6 is introduced as hot gas into the rotary kiln 4 from end 4a.
[0025] The hot gas used for cooling in the clinker cooler 6 contains clinker dust 94, which is fine particulate matter of clinker 92. This clinker dust 94 can cause equipment damage or ventilation obstruction due to accumulation. Figure 1 illustrates the clinker dust 94 contained in the hot gas inside the clinker cooler 6. The rotary kiln 4 and the clinker cooler 6 are not in contact with each other, and as described above, a gap g is formed between the rotary kiln 4 and the clinker cooler 6. When the hot gas containing clinker dust 94 is introduced into the rotary kiln 4, a portion of the hot gas may be discharged outside the apparatus through the gap g, so a recovery device 10 is provided.
[0026] (Recovery device) The recovery device 10 is a device for recovering clinker dust 94 discharged from the gap g between the rotary kiln 4 and the clinker cooler 6. The recovery device 10 collects the clinker dust 94 discharged from the gap g outside the rotary kiln 4 and the clinker cooler 6, and introduces the collected clinker dust 94 into the clinker cooler 6. After collecting the clinker dust 94 discharged from the gap g, the recovery device 10 temporarily stores it and then introduces the stored clinker dust 94 into the clinker cooler 6 using compressed high-pressure air (hereinafter referred to as "high-pressure air"). High-pressure air is air whose volume has been reduced by pressurization (compressed air). The recovery device 10 has a collection device 20 and an introduction device 30.
[0027] <Collection device> The collection device 20 is a device that collects clinker dust 94 discharged from the gap g between the rotary kiln 4 and the clinker cooler 6. The collection device 20 forms a space connected to the gap g and then collects the clinker dust 94 discharged into that space. The collection device 20 has a function to temporarily store the collected clinker dust 94. The collection device 20 includes, for example, an air seal device 22, a storage device 24, and a cold air supply device 28.
[0028] The air seal device 22 forms a space S connected to the gap g and guides the clinker dust 94 discharged into the space S to the storage device 24. The air seal device 22 forms an annular space S connected to the annular gap g. Figure 2 shows a longitudinal section along a plane containing the axis of the rotary kiln 4, in which the area of space S is larger than the area of gap g. The air seal device 22 is installed so as to cover the gap g when viewed from the rotary kiln 4 towards the clinker cooler 6 (side wall 6a). The air seal device 22 has, for example, a peripheral wall 22a, a side wall 22b, and a partition wall 22c.
[0029] The peripheral wall 22a is connected to the side wall 6a at one end, outside the insertion hole 6b, and extends along direction D1. The peripheral wall 22a is formed in an annular shape around the axis of the rotary kiln 4 and covers a portion of the shell 4b (the portion of the shell 4b's end that is located outside the insertion hole 6b).
[0030] The side wall 22b is connected to the other end of the peripheral wall 22a and extends from that other end toward the axis of the rotary kiln 4. The side wall 22b is formed in an annular shape around the axis of the rotary kiln 4 and covers a portion of the side wall 6a around the insertion hole 6b. The inner end of the side wall 22b (the end opposite to the connection portion with the peripheral wall 22a) does not contact the outer surface of the shell 4b. A gap g1 is formed between the inner end of the side wall 22b and the outer surface of the shell 4b. The space S formed by the air seal device 22 is partitioned by the peripheral wall 22a and the side wall 22b, a portion of the side wall 6a around the insertion hole 6b, and the end of the shell 4b.
[0031] The partition wall 22c blocks the flow of hot gas and clinker dust 94 along direction D1, forming a flow perpendicular to direction D1. One end of the partition wall 22c is connected to the shell 4b and extends outward from the shell 4b from the axis of the rotary kiln 4. The partition wall 22c is formed in an annular shape around the axis of the rotary kiln 4. In direction D1, the partition wall 22c is located between the side wall 6a and the side wall 22b. The air seal device 22 may have a plurality of partition walls 22c, and the plurality of partition walls 22c may be arranged along direction D1.
[0032] The storage device 24 is a device for storing clinker dust 94 discharged into the space S formed by the air seal device 22. The space for storing clinker dust 94 formed by the storage device 24 is connected to space S. The storage device 24 is connected to the lower part of the annularly formed space S (air seal device 22). For example, at the location where the storage device 24 is installed on the peripheral wall 22a of the air seal device 22, a connection hole is formed that penetrates the peripheral wall 22a. Clinker dust 94 that flows into space S inside the air seal device 22 falls into the space inside the storage device 24, either on the shell 4b or along the peripheral wall 22a (inner wall) of the air seal device 22.
[0033] The cold air supply device 28 is a device that supplies air at a temperature lower than the temperature inside the rotary kiln 4 (hereinafter referred to as "cooling air") into the space S formed by the air seal device 22. The cold air supply device 28 supplies, for example, room temperature air as cooling air from the gap g1 into the space S. By supplying cooling air into the space S from the gap g1, leakage of clinker dust 94 from the gap g1 to the outside of the space S is suppressed. Multiple cold air supply devices 28 may be arranged around the shell 4b of the rotary kiln 4 to prevent leakage of clinker dust 94 from the annular gap g1. The cold air supply device 28 may continue to supply cooling air from the gap g1 while the manufacturing apparatus 1 is in operation, or it may switch the supply state of cooling air from the gap g1 depending on the conditions (e.g., pressure) around the connection part between the rotary kiln 4 and the clinker cooler 6.
[0034] At the connection point between the rotary kiln 4 and the clinker cooler 6, under normal conditions, negative pressure is maintained so that gas is drawn towards the rotary kiln 4. When negative pressure is present, hot gas containing clinker dust 94 is less likely to leak into the space S formed by the air seal device 22. However, when the pressure at the connection point becomes positive due to pressure fluctuations during the operation of the manufacturing apparatus 1, the hot gas containing clinker dust 94 is discharged into space S. Since the pressure fluctuation is quickly resolved, the hot gas discharged into space S is drawn into the interior of the rotary kiln 4. Meanwhile, the clinker dust 94 discharged into space S remains in space S and is guided into the storage device 24.
[0035] <Installed Equipment> Returning to Figure 1, the introduction device 30 is a device that introduces the clinker dust 94 collected by the collection device 20 into the clinker cooler 6. The introduction device 30 has piping with an inlet (blowing port) that opens into the clinker cooler 6, and introduces the clinker dust 94 into the clinker cooler 6 through this piping. The introduction device 30 has a blowing pipe 32, an air supply device 34, an extraction pipe 36, an opening / closing device 42 (second opening / closing device), and an opening / closing device 52 (first opening / closing device).
[0036] The blowing pipe 32 is a pipe for blowing the collected clinker dust 94 into the clinker cooler 6 with high-pressure air. The blowing pipe 32 is a pipe that forms a line (supply path) through which the clinker dust 94 and high-pressure air pass. The blowing pipe 32 may be a metal pipe with a circular cross-section. An inlet 32a that opens into the clinker cooler 6 is formed at one end of the blowing pipe 32. That is, the space inside the blowing pipe 32 is connected to the space inside the clinker cooler 6 via the inlet 32a. The inlet 32a may be located inside the side wall 6a, or it may be provided on the side wall 6a.
[0037] The inlet 32a of the injection piping 32 may be positioned so as not to interfere with the clinker 92 (clinker 92 falling from the end 4a of the rotary kiln 4) being discharged into the clinker cooler 6 from the end 4a of the rotary kiln 4. A portion of the injection piping 32, including the inlet 32a, may be formed to extend along direction D1. A supply port 32b for supplying high-pressure air into the injection piping 32 is formed at the end of the injection piping 32 opposite to the inlet 32a. In this case, the injection piping 32 forms a line (supply path) extending from the supply port 32b to the inlet 32a. An air supply device 34 is provided at the supply port 32b.
[0038] The air supply device 34 is a device that intermittently supplies compressed high-pressure air from the end of the blowing pipe 32 opposite to the blowing port 32a. In this disclosure, intermittently supplying high-pressure air means alternating between a state in which high-pressure air is being supplied and a state in which the supply of high-pressure air is stopped. The air supply device 34 supplies high-pressure air into the blowing pipe 32 from the supply port 32b, thereby blowing high-pressure air into the clinker cooler 6 from the blowing port 32a. At this time, if clinker dust 94 is present in the blowing pipe 32, the high-pressure air supplied by the air supply device 34 blows (introduces) the clinker dust 94 into the clinker cooler 6 from the blowing port 32a. The air supply device 34 may be a device that generates and sprays high-pressure air by any method, and a specific example thereof is a blaster.
[0039] The extraction pipe 36 is a pipe for supplying the clinker dust 94 collected by the collection device 20 to the injection pipe 32. The extraction pipe 36 is a pipe that connects the middle section of the extraction pipe 36 to the collection device 20 and forms a line (extraction path) through which the clinker dust 94 passes. The extraction pipe 36 may be a metal pipe with a circular cross-section.
[0040] The extraction pipe 36 may be arranged to extend vertically (direction D2 in the illustration). In one example, the upper end of the extraction pipe 36 is connected to the lower end of the storage device 24 of the collection device 20, and the lower end of the extraction pipe 36 is connected to any point in the portion of the injection pipe 32 that extends along direction D1. Hereinafter, the connection point between the lower end of the extraction pipe 36 and the injection pipe 32 will be referred to as the "connection portion 32c". Clinker dust 94 stored in the storage device 24 is supplied into the injection pipe 32 from the connection portion 32c via the extraction pipe 36.
[0041] The switching device 42 is a device that can switch the open / closed state between the connection portion 32c, through which clinker dust 94 is supplied from the collection device 20 in the blowing pipe 32, and the blowing port 32a. The switching device 42 can switch between a state in which the supply port 32b, where the air supply device 34 is installed, and the blowing port 32a, which opens into the clinker cooler 6, are connected, and a state in which the connection between the supply port 32b and the blowing port 32a is blocked. With the connection between the supply port 32b and the blowing port 32a made by the switching device 42, the air supply device 34 supplies high-pressure air into the blowing pipe 32, thereby introducing the clinker dust 94 in the blowing pipe 32 into the clinker cooler 6 by the high-pressure air.
[0042] The opening / closing device 42 can be configured in any way as long as it can switch the open / closed state of the injection pipe 32, but one example is a plug-in type opening / closing device such as a slide gate. The opening / closing device 42 may also be an opening / closing device that includes a gate valve installed so as to intersect the injection pipe 32, and switches the open / closed state of the injection pipe 32 by moving the gate valve along the direction intersecting the injection pipe 32.
[0043] As shown in Figure 3, the opening / closing device 42 includes, for example, a gate valve 44 and a drive unit 46. The gate valve 44 is a valve configured to shut off the flow of air or the like in the blowing pipe 32 and extends along a direction intersecting (for example, perpendicular to) direction D1. The gate valve 44 may be provided to be movable between a closed position where the opening degree in the blowing pipe 32 is approximately 0% and an open position where the opening degree in the blowing pipe 32 is approximately 100%. The drive unit 46 includes a power source such as a motor and moves the gate valve 44 between the closed position and the open position based on the operation instructions of the control device 80.
[0044] Returning to Figure 1, the switch 52 is a device that can switch the open / closed state of the extraction pipe 36. The switch 52 can switch between a state in which the storage device 24 of the collection device 20 and the connection portion 32c of the injection pipe 32 are connected, and a state in which the connection between the storage device 24 and the connection portion 32c is blocked. By switching the switch 52, the storage device 24 and the connection portion 32c are connected, and the clinker dust 94 stored in the storage device 24 and the upstream side of the switch 52 of the injection pipe 32 is supplied into the injection pipe 32.
[0045] The opening / closing device 52 can be configured in any way as long as it can switch the open / closed state within the extraction pipe 36, but in one example it is a rotary opening / closing device including a ball valve or a butterfly valve. The opening / closing device 52 may also be a butterfly damper. The opening / closing device 52 includes, for example, a shaft member 54, a valve member 56, and a drive unit 58, as shown in Figure 4. The shaft member 54 is provided within the extraction pipe 36 and extends along a direction intersecting the injection pipe 32. In the example shown in Figure 4, the shaft member 54 extends along a direction perpendicular to both direction D1 and direction D2. The shaft member 54 is provided in the extraction pipe 36 so as to be rotatable about an axis along its extending direction.
[0046] The valve member 56 is provided on the shaft member 54 and is a valve configured to block the flow (fall) of clinker dust 94 in the extraction pipe 36. The area of the surface of the valve member 56 opposite to the connection portion with the shaft member 54 is approximately equal to the opening area in the extraction pipe 36, so that the opening degree in the extraction pipe 36 can be set to approximately 0%. When the opening degree in the extraction pipe 36 is approximately 0%, the valve member 56 is positioned perpendicular to direction D2. The valve member 56 is rotatable around the shaft member 54.
[0047] The valve member 56 is rotatable, for example, between a closed position where the opening degree in the extraction pipe 36 is approximately 0%, and an open position positioned along direction D2. The drive unit 58 includes a power source such as a motor and rotates the shaft member 54 so that the valve member 56 moves between the closed and open positions based on the operation instructions of the control device 80. As described above, the opening / closing device 52 switches the open / closed state in the extraction pipe 36 by rotating the valve member 56 around the shaft member 54.
[0048] (Control device) The control device 80 shown in Figure 1 is a computer that controls the recovery device 10. The control device 80 is configured to control the recovery device 10 so that high-pressure air is intermittently supplied by the air supply device 34 from the supply port 32b on the opposite side of the inlet port 32a of the injection pipe 32, thereby introducing clinker dust 94 into the clinker cooler 6 from the inlet port 32a.
[0049] The control device 80 has a circuit 81, as shown in Figure 5. The circuit 81 includes at least one processor 82, a memory 84, a storage 86, an input / output port 88, and a timer 89. The storage 86 stores a program for controlling the recovery device 10. The storage 86 is a computer-readable recording medium such as a hard disk, non-volatile semiconductor memory, a magnetic disk, or an optical disk.
[0050] Memory 84 temporarily stores programs loaded from storage 86, calculation results from processor 82, etc. Processor 82 works in cooperation with memory 84 to execute programs and thereby control the recovery device 10. Input / output ports 88 input and output electrical signals between the air supply device 34, switchgear 42, and switchgear 52, etc., in response to commands from processor 82. Timer 89 counts clock pulses of a predetermined period in response to commands from processor 82 to measure elapsed time.
[0051] [Method for producing cement clinker] Clinker 92 can be manufactured using the manufacturing apparatus 1 described above. The method for manufacturing clinker 92 includes, for example, a preheating and calcination step, a firing step, a cooling step, and a recovery step. In the preheating and calcination step, the cement raw material is preheated and calcined by the preheating and calcination apparatus 2. In the firing step, the preheated and calcined cement raw material is supplied from the preheating and calcination apparatus 2 to the kiln end of the rotary kiln 4, and clinker 92 is produced by firing in the rotary kiln 4. In the cooling step, the clinker 92 produced in the firing step is cooled by the clinker cooler 6.
[0052] These preheating, calcination, and cooling processes are carried out continuously while the supply of cement raw materials from the previous process continues. The recovery process is carried out in parallel with the calcination and cooling processes. The recovery process (method for recovering clinker dust) includes the steps of collecting clinker dust 94 discharged from the gap g between the rotary kiln 4 and the clinker cooler 6, and introducing the collected clinker dust 94 into the clinker cooler 6 via an injection pipe 32 having an inlet 32a that opens into the clinker cooler 6. The step of introducing the clinker dust 94 into the clinker cooler 6 includes intermittently supplying compressed high-pressure air into the injection pipe 32 from the end of the injection pipe 32 opposite to the inlet 32a so as to blow the collected clinker dust 94 into the clinker cooler 6.
[0053] The control device 80 controls the recovery device 10 to perform the recovery process described above. Figure 6 is a flowchart showing an example of a series of processes performed by the control device 80 in the recovery process. In this series of processes, the operation of the manufacturing device 1 is started with the switchgear 42 and switchgear 52 maintained in the closed state, and while the firing process and cooling process are continuing, the control device 80 performs step S11.
[0054] In step S11, for example, the control device 80 switches the extraction pipe 36 from a closed state to an open state using the opening / closing device 52. In one example, the control device 80 controls the drive unit 58 so that the valve member 56, which is in the closed position, rotates around the shaft member 54 to an open position along direction D2. As a result, the connection portion 32c of the storage device 24 and the injection pipe 32 are connected to each other, and the clinker dust 94 whose flow was stopped by the valve member 56 and the clinker dust 94 stored in the storage device 24 begin to be supplied into the injection pipe 32.
[0055] Next, the control device 80 executes steps S12 and S13. In step S12, for example, the control device 80 waits until a predetermined extraction time has elapsed since the execution of step S11. The extraction time is preset so that, for example, an amount of clinker dust 94 that can be introduced (blown) into the clinker cooler 6 in one go is supplied to the blowing pipe 32. In step S13, for example, the control device 80 switches the extraction pipe 36 from the open state to the closed state using the opening / closing device 52. In one example, the control device 80 controls the drive unit 58 so that the valve member 56, which is in the open position, rotates around the shaft member 54 to the closed position that blocks the flow inside the extraction pipe 36.
[0056] Next, the control device 80 executes steps S14 and S15. In step S14, for example, the control device 80 switches the blowing pipe 32 from a closed state to an open state using the switching device 42. In one example, the control device 80 controls the drive unit 46 so that the gate valve 44, which is in the closed position, moves to the open position along direction D1. In step S15, for example, the control device 80 causes the air supply device 34 to start supplying high-pressure air from the supply port 32b of the blowing pipe 32. This starts the introduction (blowing) of clinker dust 94 into the clinker cooler 6.
[0057] Next, the control device 80 executes steps S16 and S17. In step S16, for example, the control device 80 waits until a predetermined injection time has elapsed since the execution of step S15. The injection time is preset, for example, based on the amount of time that the air supply device 34 can continue to supply high-pressure air. In step S17, for example, the control device 80 instructs the air supply device 34 to stop supplying high-pressure air from the supply port 32b of the injection pipe 32. This stops the introduction of clinker dust 94 into the clinker cooler 6.
[0058] Next, the control device 80 executes step S18. In step S18, for example, the control device 80 switches the injection pipe 32 from the open state to the closed state using the opening / closing device 42. In one example, the control device 80 controls the drive unit 46 so that the gate valve 44, which is in the open position, moves along direction D1 to the closed position to shut off the injection pipe 32. As a result, the state of the injection device 30 returns to the same state as the initial state before step S11 was executed.
[0059] Next, the control device 80 executes step S19. In step S19, for example, the control device 80 waits until a predetermined downtime has elapsed since the execution of step S18. The downtime is the time during which clinker dust 94 is not introduced into the clinker cooler 6. This downtime is preset based on, for example, the waiting time until the air supply device 34 is ready to supply high-pressure air, or on the historical amount of clinker dust 94 stored in the storage device 24 per unit time.
[0060] When a predetermined stop time has elapsed since the execution of step S18, the control device 80 returns to step S11. Thereafter, the control device 80 repeatedly executes the series of processes from steps S11 to S19. This alternates between a state in which high-pressure air is supplied from the air supply device 34 into the injection pipe 32 and clinker dust 94 is introduced into the clinker cooler 6 (steps S15 to S17) and a state in which clinker dust 94 is not introduced into the clinker cooler 6 (steps S18, S19, S11 to S14). When these states alternate, the control device 80 controls the introduction device 30 so that if the state in which the supply of high-pressure air has been stopped has elapsed for a predetermined stop time, high-pressure air is supplied from the air supply device 34 to the injection pipe 32 and clinker dust 94 is introduced into the clinker cooler 6. While the series of processes in steps S11 to S19 are being repeated, the control device 80 may control the cold air supply device 28 to continue supplying cooling air to the space S formed by the air seal device 22.
[0061] The series of processes described above is just one example and can be modified as appropriate. In the above series of processes, the control device 80 may execute one step and the next step in parallel, or it may execute each step in a different order than the example described above. The control device 80 may omit any of the steps, or it may execute a different process in any of the steps than the example described above. For example, the control device 80 may execute step S13 and step S14 in parallel.
[0062] In the example described above, the control device 80 controls the introduction device 30 to introduce clinker dust 94 into the clinker cooler 6 by supplying high-pressure air from the air supply device 34 at predetermined stop times. The method of intermittently supplying high-pressure air (intermittently introducing clinker dust 94) is not limited to this example. The control device 80 may also control the introduction device 30 to introduce clinker dust 94 into the clinker cooler 6 by supplying high-pressure air from the air supply device 34 each time a predetermined amount of clinker dust 94 is stored in the storage device 24.
[0063] The recovery device 10 may further include, for example, a detection device 70 in addition to the recovery device 10 and the collection device 20. As shown in Figure 2, the detection device 70 is provided in the storage device 24 and is a device that detects the amount of clinker dust 94 stored in the storage device 24 before it is supplied to the blowing pipe 32. The detection device 70 may detect the amount of clinker dust 94 in the storage device 24 in any way that is capable of detecting it. The detection device 70 may be, for example, a sensor that detects the weight of the clinker dust 94 in the storage device 24, or a sensor that detects the height of the clumps of clinker dust 94 stored in the storage device 24. The detection device 70 outputs the detected amount of clinker dust 94 to the control device 80.
[0064] Figure 7 is a flowchart showing another example of a series of processes performed by the control device 80 in the recovery process. In this example, the control device 80 performs step S29 instead of step S19 in the series of processes illustrated in Figure 6. In step S29, for example, the control device 80 waits until the detected value (amount of clinker dust 94 detected) by the detection device 70 reaches a predetermined amount. The predetermined amount is set in advance based on, for example, the amount of clinker dust 94 that can be introduced (blown) into the clinker cooler 6 in one go. In this case, the extraction time during which the user waits in step S12 may be set so that the predetermined amount of clinker dust 94 is supplied to the blowing pipe 32.
[0065] In the series of processes illustrated in Figure 7, the control device 80 controls the introduction device 30 so that when the value detected by the detection device 70 reaches a predetermined amount, high-pressure air is supplied from the air supply device 34 to the injection pipe 32, and clinker dust 94 is introduced into the clinker cooler 6. The control device 80 repeats the series of processes in steps S11 to S18 and S29, so that each time the value detected by the detection device 70 reaches a predetermined amount, the introduction device 30 is controlled to introduce clinker dust 94 into the clinker cooler 6 by supplying high-pressure air from the air supply device 34.
[0066] The control device 80 may control the introduction device 30 by combining the processes of step S19 and step S29. For example, the control device 80 may, based on the supply of high-pressure air at predetermined intervals, control the introduction device 30 to introduce clinker dust 94 into the clinker cooler 6 by supplying high-pressure air from the air supply device 34 if the detected value by the detection device 70 reaches a predetermined amount before the predetermined time has elapsed. For example, the control device 80 may, based on the supply of high-pressure air each time the detected value by the detection device 70 reaches a predetermined amount, control the introduction device 30 to introduce clinker dust 94 into the clinker cooler 6 by supplying high-pressure air from the air supply device 34 if the stopped time has elapsed before the detected value by the detection device 70 reaches a predetermined amount.
[0067] Instead of automatic control by the control device 80, the air supply device 34, the switchgear 42, and the switchgear 52 may be operated by an operator, thereby intermittently supplying high-pressure air from the air supply device 34 to the blowing pipe 32 and intermittently introducing clinker dust 94 into the clinker cooler 6. In this case, the switchgear 42 and the switchgear 52 do not necessarily have drive units.
[0068] The configuration of the collection device 20 is not limited to the example described above. In the example described above, the air seal device 22 and the storage device 24 are directly connected, but a device for transporting clinker dust 94 may be provided between the air seal device 22 and the storage device 24. At least some of the matters described in one of the multiple examples described in this disclosure may be applied to other examples.
[0069] [Effects of the Embodiment] When the hot gas containing clinker dust 94 enters the rotary kiln 4 from the clinker cooler 6, clinker dust 94 may leak out of the processing space (outside the system) of the manufacturing apparatus 1 through the gap g between the rotary kiln 4 and the clinker cooler 6. However, in the manufacturing apparatus 1 according to the above embodiment, a recovery device 10 is provided, so the clinker dust 94 discharged from the gap g between the rotary kiln 4 and the clinker cooler 6 is returned to the clinker cooler 6 by the collection device 20 and the introduction device 30. As a method of returning the clinker dust 94 to the clinker cooler 6, it is also conceivable to introduce the clinker dust 94 into the clinker cooler 6 by continuously supplying air at atmospheric pressure through an inlet 32a that opens into the clinker cooler 6. However, in this case, a large amount of air is blown into the clinker cooler 6 along with the introduction of clinker dust 94, and there is a risk that the temperature of the hot gas heading from the clinker cooler 6 to the rotary kiln 4 will drop significantly.
[0070] In contrast, in the manufacturing apparatus 1 according to the above embodiment, compressed high-pressure air is supplied intermittently when the clinker dust 94 is returned to the clinker cooler 6, thus shortening the time that air is blown into the clinker cooler 6. As a result, the temperature drop of the hot gas moving from the clinker cooler 6 to the rotary kiln 4 is suppressed. Therefore, this is useful in suppressing the decrease in thermal efficiency associated with the recovery of clinker dust.
[0071] By introducing clinker dust 94 using high-pressure air, the clinker dust 94 accumulated at the inlet 32a can be introduced into the clinker cooler 6 along with the recovered clinker dust 94. Furthermore, since the recovered clinker dust 94 can be scattered over a wide area on the clinker 92 mass in the clinker cooler 6, uneven distribution of the recovered clinker dust 94 can be suppressed. Moreover, in the manufacturing apparatus 1 according to the above embodiment, there is no need to provide a device to transport the clinker dust 94 to the cooling completion position in the clinker cooler 6, which is useful for simplifying the apparatus for manufacturing cement clinker.
[0072] The introduction device 30 may further include an extraction pipe 36 connecting the intermediate portion (connection portion 32c) of the injection pipe 32 to the collection device 20, and an opening / closing device 52 capable of switching the open / closed state of the extraction pipe 36. The opening / closing device 52 includes a shaft member 54 provided inside the extraction pipe 36 and extending along a direction intersecting the extraction pipe 36, and a valve member 56 provided on the shaft member 54, and the open / closed state of the extraction pipe 36 may be switched by rotating the valve member 56 around the shaft member 54. In this case, compared to the case in which a plug-in type opening / closing device is provided on the extraction pipe 36, even if the valve member 56 is moved with clinker dust 94 accumulated on the valve member 56, the valve member 56 can be opened and closed smoothly, and wear of the valve member 56 due to clinker dust 94 can be suppressed. Therefore, this is useful for improving the durability of the opening / closing device.
[0073] The introduction device 30 may further include an opening / closing device 42 capable of switching the open / closed state between the connection portion 32c, to which clinker dust 94 is supplied from the collection device 20 in the injection pipe 32, and the injection port 32a. The opening / closing device 42 may include a gate valve 44 provided so as to intersect the injection pipe 32, and the open / closed state between the connection portion 32c and the injection port 32a may be switched by moving the gate valve 44 along the direction intersecting the injection pipe 32. In this case, compared to the case in which a rotary opening / closing device is provided in the injection pipe 32, it is not necessary to provide a mechanism for moving the gate valve 44 inside the pipe, so damage to the opening / closing device due to collision with clinker dust 94 flowing with high-pressure air can be prevented. Therefore, this is useful for improving the durability of the opening / closing device.
[0074] The collection device 20 may include an air seal device 22 that forms a space S connected to the gap g and guides the clinker dust 94 discharged into the space S to the storage device 24, and a cold air supply device 28 that supplies cooling air at a temperature lower than the temperature inside the rotary kiln 4 from the gap g1 between the air seal device 22 and the rotary kiln 4 to the space S formed by the air seal device 22. In this case, it is easy to retain the clinker dust 94 that leaks from the gap g between the rotary kiln 4 and the clinker cooler 6 in the space S, and the clinker dust 94 can be cooled by the cooling air. Therefore, it is useful in suppressing the impact of clinker dust 94 on the manufacturing device 1.
[0075] The manufacturing apparatus 1 may further include a control device 80 that controls the introduction device 30 so that, if the supply of high-pressure air has been stopped for a predetermined period of time, high-pressure air is supplied from the air supply device 34 to the injection pipe 32, thereby introducing clinker dust 94 into the clinker cooler 6. In this case, since the clinker dust 94 is introduced into the clinker cooler 6 after the predetermined period of time has elapsed, the operator does not need to frequently check the discharge status of the clinker dust 94. Therefore, this is useful in simplifying the operation status checks performed by the operator of the manufacturing apparatus 1.
[0076] The manufacturing apparatus 1 may further include a detection device 70 for detecting the amount of clinker dust 94 stored in the storage device 24 of the collection device 20 before it is supplied to the injection pipe 32, and a control device 80 for controlling the introduction device 30 so that when the detected value by the detection device 70 reaches a predetermined amount, high-pressure air is supplied from the air supply device 34 to the injection pipe 32, and the clinker dust 94 is introduced into the clinker cooler 6. In this case, since the clinker dust 94 is introduced into the clinker cooler 6 when the amount of clinker dust 94 reaches a predetermined amount, the operator does not need to frequently check the discharge status of the clinker dust. Therefore, this is useful for simplifying the operation status checks performed by the operator of the manufacturing apparatus 1. [Explanation of Symbols]
[0077] 1...Cement clinker manufacturing equipment, 4...Rotary kiln, 6...Clinker cooler, 10...Recovery equipment, 20...Collection equipment, 22...Air seal equipment, 24...Storage equipment, 28...Cold air supply equipment, 30...Inlet equipment, 32...Injection piping, 34...Air supply equipment, 36...Extraction piping, 42...Opening / closing device, 44...Gate valve, 52...Opening / closing device, 54...Shaft member, 56...Valve member, 70...Detection device, 80...Control device, 94...Clinker dust.
Claims
1. A rotary kiln used for firing cement raw materials, A clinker cooler for cooling the cement clinker produced by firing in the rotary kiln, A collection device for collecting clinker dust discharged from the gap between the rotary kiln and the clinker cooler, The system includes an injection pipe having an inlet formed in which an inlet is formed to open into the clinker cooler, and an introduction device for introducing clinker dust collected by the collection device into the clinker cooler via the injection pipe, A cement clinker manufacturing apparatus, wherein the introduction device further comprises an air supply device that intermittently supplies compressed high-pressure air into the blowing pipe from the end of the blowing pipe opposite to the blowing port, so as to blow the clinker dust collected by the collection device into the clinker cooler.
2. The introduction device further includes an extraction pipe connecting the intermediate portion of the injection pipe and the collection device, and a first opening / closing device capable of switching the open / closed state of the extraction pipe. The manufacturing apparatus according to claim 1, wherein the first opening / closing device is provided in the extraction pipe and includes a shaft member extending in a direction intersecting the extraction pipe, and a valve member provided on the shaft member, and the opening / closing state of the extraction pipe is switched by rotating the valve member around the shaft member.
3. The introduction device further includes a second opening / closing device that can switch the open / closed state between the connection portion of the blowing pipe through which clinker dust is supplied from the collection device and the blowing port, The manufacturing apparatus according to claim 1 or 2, wherein the second opening / closing device includes a gate valve provided so as to intersect the injection pipe, and the opening / closing state between the connection portion and the injection port is switched by moving the gate valve along a direction intersecting the injection pipe.
4. The aforementioned collection device, An air seal device that forms a space connected to the gap between the rotary kiln and the clinker cooler, and guides the clinker dust discharged into that space to a storage device, The manufacturing apparatus according to claim 1 or 2, further comprising a cold air supply device that supplies cooling air at a temperature lower than the temperature inside the rotary kiln into the space formed by the air seal device through the gap between the air seal device and the rotary kiln.
5. The manufacturing apparatus according to claim 1 or 2, further comprising a control device that controls the introduction device so that, when the supply of the high-pressure air has been stopped for a predetermined period of time, the high-pressure air is supplied from the air supply device to the injection pipe, thereby introducing clinker dust into the clinker cooler.
6. A detection device for detecting the amount of clinker dust stored in the storage device of the collection device before it is supplied to the injection pipe, The manufacturing apparatus according to claim 1 or 2, further comprising a control device that controls the introduction device so that when the detected value by the detection device reaches a predetermined amount, the high-pressure air is supplied from the air supply device to the injection pipe, thereby introducing clinker dust into the clinker cooler.
7. A collection device for collecting clinker dust discharged from the gap between a rotary kiln for firing cement raw materials and a clinker cooler for cooling the cement clinker produced by firing in the rotary kiln, The system includes an introduction device for introducing clinker dust collected by the collection device into the clinker cooler via an injection pipe having an inlet that opens into the clinker cooler. The introduction device is a clinker dust recovery device having an air supply device that intermittently supplies compressed high-pressure air into the blowing pipe from the end of the blowing pipe opposite to the blowing port, so as to blow the clinker dust collected by the collection device into the clinker cooler.
8. The process of firing cement raw materials in a rotary kiln, The process involves cooling the cement clinker produced by firing in the rotary kiln in a clinker cooler, A step of collecting clinker dust discharged from the gap between the rotary kiln and the clinker cooler, The process includes the step of introducing the collected clinker dust into the clinker cooler via an injection pipe having an inlet that opens into the clinker cooler, A method for producing cement clinker, comprising the step of introducing clinker dust into the clinker cooler, which includes intermittently supplying compressed high-pressure air into the blowing pipe from the end of the blowing pipe opposite to the blowing port so as to blow the collected clinker dust into the clinker cooler.
9. A step of collecting clinker dust discharged from the gap between a rotary kiln used for firing cement raw materials and a clinker cooler used to cool the cement clinker produced by firing in the rotary kiln, The process includes the step of introducing the collected clinker dust into the clinker cooler through an injection pipe having an inlet that opens into the clinker cooler, A method for recovering clinker dust, comprising the step of introducing clinker dust into the clinker cooler, which includes intermittently supplying compressed high-pressure air into the blowing pipe from the end of the blowing pipe opposite to the blowing port so as to blow the collected clinker dust into the clinker cooler.
Citation Information
Patent Citations
JP1975056417A
JP1977100861U
The exhaust extraction system of the dust collecting device - neural firing facility controller
JP1983092342U
Rotary kiln for baking cement raw material
JP1985086374A
Facilities for cooling cement clinker
JP1987226844A