Cooling system for data centers with buffer tank units for cold water supply and efficient cooling during power outages
The cooling system with a buffer tank and control unit addresses the challenge of maintaining stable cold water supply in data centers, enhancing cooling efficiency and preventing server failures.
Patent Information
- Application Number
- KR1020250127867
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2025-09-09
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2045-09-09
AI Technical Summary
Existing data center cooling systems face challenges in reliably supplying cold water at low temperatures during emergencies and high ambient temperatures, leading to potential server failures and performance degradation.
A cooling system with a buffer tank and control unit that regulates cold water temperature by using temperature sensors and valves to maintain stable cold water supply to servers, even in emergency situations or high ambient temperatures.
Ensures stable server operation by supplying cold water at a lower temperature than conventional coolers, mitigating temperature variability, and preventing equipment failures.
Smart Images

Figure 112025103303405-PAT00001_ABST
Abstract
Description
Technology Field
[0001] The present invention relates to a cooling system for a data center, and more specifically, to a cooling system for a data center capable of performing efficient server cooling by installing a buffer tank to supply cold water in the event of an emergency, such as a power outage, in immersion cooling and direct cooling for cooling data center servers. Background Technology
[0002] Modern data centers perform massive computations and data processing through the integrated operation of large-scale servers and network equipment. During this process, server equipment continuously generates heat; failure to effectively control this heat can lead to performance degradation, failures, and even service interruptions. Therefore, high-efficiency cooling technology is essential for the stable operation of data centers.
[0003] While air cooling was the mainstream method in conventional data centers, its limitations in cooling efficiency became apparent as server density increased and power consumption rose. Consequently, immersion cooling and direct cooling methods have recently gained prominence. Immersion cooling involves immersing the entire server in an insulating cooling fluid to directly absorb heat, offering high heat transfer efficiency and reduced noise. Direct cooling removes heat by directly supplying cooling water to key heat-generating components of the server, making it effective for high-heat-generating equipment. Both methods offer higher energy efficiency compared to air cooling and have the advantage of supporting the high performance and high integration of data centers.
[0004] The devices commonly used in this cooling method are dry coolers or wet coolers. These devices have a structure that supplies chilled water through heat exchange with the outside air, and since they do not use a separate chiller, they have the advantage of reducing initial investment and operating costs. However, because they depend directly on outside conditions, a problem arises where the chilled water temperature fluctuates significantly depending on the outside temperature.
[0005] In particular, in situations where ambient temperatures are high, such as during the summer, coolers are unable to supply chilled water at a sufficiently low temperature. In this case, the temperature of the chilled water supplied to the servers rises, reducing cooling efficiency. Furthermore, cooling performance drops significantly during peak daytime ambient temperatures, leading to a decline in data center operational stability. Additionally, while the quality of chilled water improves at night due to relatively lower ambient temperatures, there is a limitation in securing cooling performance because high cooling demand is mostly concentrated during the day.
[0006] Furthermore, emergencies such as power outages or unstable power supply may occur during data center operations. In such situations, the operation of cooling units is halted, and the availability of chilled water for emergencies is also dependent on the ambient temperature. In other words, the temperature of the chilled water secured during an emergency remains relatively high when the ambient temperature is high; consequently, this leads to a problem where the cooling effect of the water supplied to servers is significantly reduced. This results in a rapid rise in server equipment temperatures, posing a serious risk factor that can cause failures or service interruptions.
[0007] Therefore, the following technical challenges are emerging in the field of data center cooling.
[0008] First, it must be possible to reliably secure and supply cold water at a low temperature to the servers even in emergency situations. This allows the servers to be operated stably for a certain period of time or shutdown procedures to be performed even in the event of a power outage or interruption.
[0009] Second, it must be possible to maintain cooling efficiency even under high ambient temperature conditions during the day. In other words, it is necessary to effectively control the heat generated by the server by supplying it with cold water at a lower temperature than that supplied by dry coolers or wet coolers.
[0010] Third, to achieve this objective, a buffer capable of maintaining and regulating the temperature of the chilled water is required. In other words, a system is needed that provides a stable chilled water temperature to the server, even in the event of instantaneous performance degradation of the cooler or rapid changes in external conditions. The problem to be solved
[0011] The present invention provides a cooling system for a data center that can reliably secure low-temperature cold water and supply it to data center servers even in emergency situations such as power outages or power instability.
[0012] In addition, a cooling system for a data center is provided that can improve cooling efficiency by supplying cold water at a lower temperature than the cold water supplied by the cooler to the server, even in situations where the cooling efficiency of a dry cooler or wet cooler decreases due to rising ambient temperatures, such as during the day.
[0013] In addition, it provides a cooling system for data centers that can act as a buffer to mitigate variability in cold water temperature and stabilize it at the target design temperature level. means of solving the problem
[0014] A cooling system for a data center according to the present invention may include: a heat exchanger in which heat exchange occurs between heat generated in the data center and cold water; a cooler for cooling hot water whose temperature has risen due to the heat exchange; a cold water supply line for supplying cold water cooled in the cooler to the heat exchanger; a buffer tank unit installed on the cold water supply line and storing cold water supplied through the cold water supply line; and a control unit for controlling the supply of cold water to the buffer tank unit and the heat exchanger by comparing the target design temperature of the cold water stored in the buffer tank unit, the measured temperature of the stored cold water, the measured temperature of the cold water supplied from the cooler, and the measured temperature of the cold water supplied to the heat exchanger.
[0015] Additionally, the buffer tank unit comprises: a buffer tank for storing the cold water; a first bypass line connected to a first point of the cold water supply line and supplying cold water flowing along the cold water supply line to the buffer tank; a second bypass line connected to a second point of the cold water supply line and supplying cold water stored in the buffer tank to the cold water supply line; a first temperature sensor installed in the cold water supply line in the section between the cooler and the first point and measuring the temperature of the cold water flowing along the cold water supply line; a second temperature sensor installed in the cold water supply line in the section between the second point and the heat exchanger and measuring the temperature of the cold water flowing along the cold water supply line; a third temperature sensor measuring the temperature of the cold water stored in the buffer tank; and a first valve installed in the cold water supply line between the first point and the second point. and includes a second valve installed in the first bypass line, and the control unit can control the first valve and the second valve by comparing the target design temperature with the measured temperature of the cold water measured by the first temperature sensor to the third temperature sensor.
[0016] Additionally, the control unit may partially open the first valve and the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and lower than the temperature measured by the third temperature sensor.
[0017] In addition, the control unit may partially open the first valve and the second valve when the target design temperature is lower than the temperature measured by the first temperature sensor and the third temperature sensor.
[0018] In addition, the control unit may fully open the first valve and fully close the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and the third temperature sensor, and the temperature measured by the first temperature sensor is higher than the temperature measured by the third temperature sensor.
[0019] In addition, the control unit may completely shut off the first valve and completely open the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and the third temperature sensor, and the temperature measured by the first temperature sensor is lower than the temperature measured by the third temperature sensor. Effects of the invention
[0020] The cooling system for a data center according to the present invention utilizes cold water stored in advance in a buffer tank unit, thereby supplying cold water at a low temperature to the server for a certain period of time even if the operation of the cooler is stopped, and thus prevents a rapid rise in the server's temperature and enables emergency response and safe shutdown procedures.
[0021] In addition, the cooling system for a data center according to the present invention can supply cold water to the server at a temperature lower than that supplied by the cooler, even when the efficiency of the cooler decreases due to high daytime ambient temperatures. This improves cooling efficiency and ensures the stable operation of the data center. In particular, since the effect of suppressing server heat generation in high-temperature environments is enhanced, it can prevent equipment performance degradation and failures.
[0022] In addition, the cooling system for a data center according to the present invention can mitigate the variability of the cold water temperature and stabilize it to the target design temperature level, so that cold water at a stable temperature can be supplied to the server even in the event of rapid changes in external conditions through the control of cold water storage, mixing, and supply via a buffer tank unit. Brief explanation of the drawing
[0023] FIG. 1 is a drawing showing a cooling system for a data center according to an embodiment of the present invention. Figure 2 is a drawing showing the buffer tank unit of Figure 1. FIG. 3 is a diagram showing an initial thermal storage operation mode according to an embodiment of the present invention. FIG. 4 is a diagram showing an emergency operation mode according to an embodiment of the present invention. FIG. 5 is a diagram showing a re-cooling operation mode according to an embodiment of the present invention. FIGS. 6 to 9 are drawings illustrating normal operation modes according to embodiments of the present invention. Specific details for implementing the invention
[0024] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings. However, the technical concept of the present invention is not limited to the embodiments described herein and may be embodied in other forms. Rather, the embodiments introduced herein are provided to ensure that the disclosed content is thorough and complete and to ensure that the concept of the present invention is sufficiently conveyed to those skilled in the art.
[0025] In this specification, when a component is described as being on another component, it means that it may be formed directly on the other component or that a third component may be interposed between them. Additionally, in the drawings, the thicknesses of the films and regions are exaggerated for the effective description of the technical content.
[0026] Additionally, although terms such as first, second, third, etc., have been used to describe various components in the various embodiments of this specification, these components should not be limited by such terms. These terms are used merely to distinguish one component from another. Accordingly, what is referred to as the first component in one embodiment may be referred to as the second component in another embodiment. Each embodiment described and illustrated herein also includes its complementary embodiment. Furthermore, in this specification, "and / or" is used to mean including at least one of the components listed before and after it.
[0027] In the specification, singular expressions include plural expressions unless the context clearly indicates otherwise. Furthermore, terms such as "include" or "have" are intended to specify the existence of the features, numbers, steps, components, or combinations thereof described in the specification, and should not be understood as excluding the existence or addition of one or more other features, numbers, steps, components, or combinations thereof. Additionally, in this specification, "connection" is used to include both indirectly connecting multiple components and directly connecting them.
[0028] In addition, in describing the present invention below, if it is determined that a detailed description of related known functions or configurations could unnecessarily obscure the essence of the invention, such detailed description will be omitted.
[0030] FIG. 1 is a drawing showing a cooling system for a data center according to an embodiment of the present invention, and FIG. 2 is a drawing showing a buffer tank unit of FIG. 1.
[0031] Referring to FIGS. 1 and 2, a cooling system (100) for a data center performs immersion cooling and / or direct cooling for cooling a data center server (10). The cooling system (100) for a data center includes a heat exchanger (110), a cooler (120), a hot water supply line (130), a cold water supply line (140), a butter tank unit (200), and a control unit (not shown).
[0032] The heat exchanger (110) cools the data center server (10) by exchanging heat generated in the data center (10) with cold water. The heat exchanger (110) can cool the data center server (10) by an immersion cooling method or a direct cooling method.
[0033] The cooler (120) cools the hot water whose temperature has risen during the cooling process of the data center server (10). The cooler (120) is operated by power supplied from an external power supply. The cooler (120) may be a dry cooler or a wet cooler.
[0034] The hot water cooling line (130) connects the heat exchanger (110) and the cooler (120) and supplies hot water, whose temperature has risen during the cooling process of the data center server (10), to the cooler (120). A pump (135) may be installed in the hot water cooling line (130).
[0035] The cold water supply line (140) connects the cooler (120) and the heat exchanger (110) and supplies hot water cooled in the cooler (120) to the heat exchanger (110).
[0036] The butter tank unit (200) is installed in the cold water supply line (140), stores cold water transported through the cold water supply line (140), and supplies the stored cold water to the heat exchanger (110) in the event of an emergency operation such as a power outage. The butter tank unit (200) regulates the supply of cold water so that the cold water supplied to the heat exchanger (110) is maintained at a level lower than or similar to the target design temperature.
[0037] According to an embodiment, the butter tank unit (200) includes a buffer tank (210), an upper diffuser (220), a lower diffuser (230), a first bypass line (240), a second bypass line (250), first to third temperature sensors (260, 270, 280), a first valve, and a second valve (290, 310).
[0038] The buffer tank (210) stores cold water. Under normal operating conditions, the cold water stored in the buffer tank (210) is maintained at a level lower than or similar to the target design temperature. The buffer tank (210) is provided as a pressure vessel. Specifically, the buffer tank (210) comprises a body, an upper dome, and a lower dome. The body is provided in a cylindrical shape having a predetermined height, with the upper and lower surfaces open. The upper dome is in an upwardly convex dome shape and covers the open upper surface of the body. The lower dome is in a downwardly convex dome shape and covers the open lower surface of the body. The lower dome has a shape corresponding to that of the upper dome.
[0039] The upper diffuser (220) is located in the upper space of the buffer tank (210) and supplies cold water supplied through the first bypass line (240) into the buffer tank (210).
[0040] The lower diffuser (230) is located in the lower space of the buffer tank (210) and supplies cold water stored in the buffer tank (210) to the second bypass line (250).
[0041] The first bypass line (240) connects the cold water supply line (140) and the upper diffuser (220), and supplies cold water, which is cooled in the cooler (120) and transported through the cold water supply line (140), into the buffer tank (210). The first bypass line (240) is connected to the cold water supply line (140) at the first point (P1) of the cold water supply line (140).
[0042] The second bypass line (250) connects the cold water supply line (140) and the lower diffuser (230), and supplies cold water stored in the buffer tank (210) to the cold water supply line (140). The second bypass line (250) is connected to the cold water supply line (140) at a second point (P2) of the cold water supply line (140). The second point (P2) is located in the section between the first point (P1) and the heat exchanger (10).
[0043] The first temperature sensor (260) is installed in the cold water supply line (140) in the section between the cooler (120) and the first point (P1), and measures the temperature of the cold water that is cooled in the cooler (120) and transported through the cold water supply line (140).
[0044] A second temperature sensor (270) is installed in the cold water supply line (140) in the section between the second point (P2) and the heat exchanger (110), and measures the temperature of the cold water supplied to the heat exchanger (110).
[0045] A third temperature sensor (280) is installed in the buffer tank (210) and measures the temperature of the cold water stored in the buffer tank (210).
[0046] The first valve (290) is installed in the section between the first point (P1) and the second point (P2) of the cold water supply line (140) and controls the flow rate of cold water supplied through the cold water supply line (140).
[0047] The second valve (290) is installed in the first bypass line (240) and controls the flow rate of cold water supplied through the first bypass line (240).
[0048] The control unit controls the valves (290, 310) according to the operating mode of the cooling system (100) for the data center. The control unit can control the valves (290, 310) so that the cold water in the heat exchanger (110) is maintained at a level lower than or similar to the target design temperature. According to an embodiment, the target design temperature may be around 5°C.
[0049] Specifically, the control unit can control the valves (290, 310) according to the initial cold storage operation mode, emergency operation mode, re-cold storage operation mode, and normal operation mode. The control unit can control the valves (290, 310) by comparing the target design temperature of the cold water stored in the buffer tank (210), the measured temperature of the cold water stored in the buffer tank (210), the measured temperature of the cold water supplied from the cooler (120), and the measured temperature of the cold water supplied to the heat exchanger (110).
[0051] FIG. 3 is a diagram showing an initial thermal storage operation mode according to an embodiment of the present invention.
[0052] Referring to FIG. 3, in the initial cold storage operation mode, cold water is filled into the buffer tank (210). In the initial cold storage mode, the first valve (290) is completely closed and the second valve (310) is completely opened under the control of the control unit. As a result, cold water cooled in the cooler (120) is supplied into the buffer tank (210) through the cold water supply line (140) and the first bypass line (240). Then, the cold water inside the buffer tank (210) circulates through the second bypass line (250), the cold water supply line (140), and the hot water supply line (130), is cooled by the cooler (120), and is supplied back into the buffer tank (210). Through this circulation of cold water, the cold water stored inside the buffer tank (210) is maintained at a temperature lower than or similar to the target design temperature.
[0054] FIG. 4 is a diagram showing an emergency operation mode according to an embodiment of the present invention.
[0055] Referring to FIG. 4, the emergency operation mode is activated when power supply from an external power source is cut off or when power supply is not smooth. When power supply is cut off, the operation of the data center (10) and the cooler (120) is stopped. When the operation of the cooler (120) is stopped, heat exchange does not occur in the heat exchanger (110), so the internal temperature of the data center server (10) may increase.
[0056] In emergency operation mode, power stored in the auxiliary power supply is supplied to the pump (135), the first valve (290), and the second valve (310) under the control of the control unit. Since the auxiliary power supply has a limited amount of power that can be stored, power cannot be supplied to the cooler (120) which requires high power consumption, and power is supplied only to the pump (135), the first valve (290), and the second valve (310).
[0057] In emergency operation mode, the first valve (290) is completely shut off and the second valve (310) is completely opened under the control of the control unit. As a result, cold water stored in the buffer tank (210) is sucked in through the lower diffuser (230) and supplied to the heat exchanger (110) through the second bypass line (250). The cold water undergoes heat exchange with the heat generated in the data center (10) through the heat exchanger (110), causing its temperature to rise and convert it into hot water. The hot water is supplied to the cooler (120) through the hot water supply line (130), but since the cooler (120) is not operating, it is supplied into the buffer tank (210) in a hot water state by sequentially passing through the cold water supply line (140) and the first bypass line (240).
[0058] The temperature rise of the data center (10) can be suppressed for a certain period of time through this circulation of cold water. The aforementioned circulation of cold water continues until the supply of external power is restored.
[0060] FIG. 5 is a diagram showing a re-cooling operation mode according to an embodiment of the present invention.
[0061] Referring to FIG. 5, when the external power supply is restored, the recharge cooling operation is activated, in which the buffer tank (210) is refilled with cold water. In the recharge cooling operation mode, both the first valve (290) and the second valve (310) are opened. The cooler (120) is operated by the external power supply, and the hot water is converted into cold water as it passes through the cooler (120). The cold water flows along the cold water supply line (140), some of which is supplied into the buffer tank (210) through the first bypass line (240), and the remainder is supplied to the heat exchanger (110) side through the cold water supply line (140). As cold water is supplied into the buffer tank (210), the hot water that was filling the buffer tank (210) is discharged through the second bypass line (250), meets the cold water flowing along the cold water supply line (140), and is supplied to the heat exchanger (110). Cold water is converted into hot water by heat exchange with heat generated in the data center (10) in the heat exchanger (110), and then supplied to the cooler (120) through the hot water supply line (130) and converted back into cold water.
[0062] This flow of cold water continues until the temperature of the cold water measured by the third temperature sensor (280) is lower than or similar to the target design temperature.
[0064] FIGS. 6 to 9 are drawings illustrating normal operation modes according to embodiments of the present invention.
[0065] In normal operation mode, external power is supplied stably and the pump (135) and cooler (120) operate normally. In normal operation mode, the control unit can control the valve (290, 310) differently depending on the target design temperature of the cold water and the measured temperature of the cold water measured by the first to third temperature sensors (260, 270, 280).
[0066] First, referring to FIG. 6, when the target design temperature is between the temperature measured at the first temperature sensor (2600) and the temperature measured at the third temperature sensor (280), the control unit partially opens the first valve (290) and the second valve (310). In this case, cold water flows along the cold water supply line (140), some of which is supplied into the buffer tank (210) through the first bypass line (240), and the remainder is supplied to the heat exchanger (110) side through the cold water supply line (140). As cold water is supplied into the buffer tank (210), the cold water filling the buffer tank (210) is mixed with the cold water flowing along the cold water supply line (140) through the second bypass line (250). At this time, since the cold water supplied through the second bypass line (250) has a lower temperature than the cold water supplied through the cold water supply line (140), cold water with a temperature closer to the target design temperature can be supplied to the heat exchanger (110).
[0068] Referring to FIG. 7, when the target design temperature is lower than the temperature measured by the first temperature sensor (260) and the third temperature sensor (280), the control unit partially opens the first valve (290) and the second valve (310). In this case, the cold water cooled in the cooler (120) flows along the cold water supply line (140), some of which is supplied into the buffer tank (210) through the first bypass line (240), and the remainder is supplied to the heat exchanger (110) side through the cold water supply line (140). As cold water is supplied into the buffer tank (210), the cold water filling the buffer tank (210) is mixed with the cold water flowing along the cold water supply line (140) through the second bypass line (250). The mixed cold water passes through the heat exchanger (110) and the cooler (120) and is cooled to a temperature close to the target design temperature. Cold water cooled to a temperature close to the target design temperature is partially supplied into the buffer tank (210), and the remainder is supplied to the heat exchanger (110). As this circulation of cold water proceeds, cold water at a temperature close to the target design temperature can be stored in the buffer tank (210).
[0070] Referring to FIG. 8, when the target design temperature is higher than the temperature measured by the first temperature sensor (260) and the third temperature sensor (280), and the temperature measured by the first temperature sensor (260) is higher than the temperature measured by the third temperature sensor (280), the control unit fully opens the first valve (290) and completely closes the second valve (310). The cold water cooled in the cooler (120) is supplied to the heat exchanger (110) along the cold water supply line (140) and then supplied back to the cooler (120) through the hot water supply line (130). The cold water re-cooled in the cooler (120) circulates along the cold water supply line (140) and is not supplied into the buffer tank (210), so the cold water stored in the buffer tank (210) can be stably maintained at a temperature lower than the target design temperature.
[0072] Referring to FIG. 9, when the target design temperature is higher than the temperature measured by the first temperature sensor (260) and the third temperature sensor (280), and the temperature measured by the first temperature sensor (260) is lower than the temperature measured by the third temperature sensor (280), the control unit completely shuts off the first valve (290) and completely opens the second valve (310). The cold water cooled in the cooler (120) is supplied to the buffer tank (210) along the first bypass line (240), and the cold water filling the buffer tank (210) is supplied to the heat exchanger (110) side through the second bypass line (250). Then, after passing through the cooler (120), it is cooled again to a temperature lower than the target design temperature and supplied to the buffer tank (210). As this circulation of cold water proceeds, cold water with a lower temperature than the previously stored cold water can be stored in the buffer tank (210).
[0074] Although the present invention has been described in detail using preferred embodiments, the scope of the invention is not limited to specific embodiments and should be interpreted by the appended claims. Furthermore, those skilled in the art will understand that many modifications and variations are possible without departing from the scope of the invention. Explanation of the symbols
[0075] 100: Cooling systems for data centers 10: Data center server 110: Heat exchanger 120: Cooler 130: Hot water supply line 140: Cold water supply line 200: Butter Tank Unit 210: Buffer Tank 220: Upper diffuser 230: Lower diffuser 240: First Bypass Line 250: Second Bypass Line 260, 270, 280: 1st to 3rd temperature sensors 290: First valve 310: Second valve
Claims
Claim 1 A heat exchanger in which heat exchange occurs between heat generated in a data center and cold water; a cooler for cooling hot water whose temperature has risen due to the heat exchange; a cold water supply line for supplying cold water cooled in the cooler to the heat exchanger; and a buffer tank unit installed on the cold water supply line and storing the cold water supplied through the cold water supply line. A cooling system for a data center comprising a control unit that controls the supply of cold water to the buffer tank unit and the heat exchanger by comparing the target design temperature of the cold water stored in the buffer tank unit, the measured temperature of the stored cold water, the measured temperature of the cold water supplied from the cooler, and the measured temperature of the cold water supplied to the heat exchanger, wherein the buffer tank unit comprises: a buffer tank for storing the cold water; a first bypass line connected to a first point of the cold water supply line and supplying cold water flowing along the cold water supply line to the buffer tank; a second bypass line connected to a second point of the cold water supply line and supplying cold water stored in the buffer tank to the cold water supply line; a first valve installed in the cold water supply line between the first point and the second point; and a second valve installed in the first bypass line. Claim 2 A cooling system for a data center according to claim 1, wherein the buffer tank unit further comprises: a first temperature sensor installed in the cold water supply line in the section between the cooler and the first point and measuring the temperature of the cold water flowing along the cold water supply line; a second temperature sensor installed in the cold water supply line in the section between the second point and the heat exchanger and measuring the temperature of the cold water flowing along the cold water supply line; and a third temperature sensor measuring the temperature of the cold water stored in the buffer tank, wherein the control unit controls the first valve and the second valve by comparing the target design temperature with the measured temperature of the cold water measured by the first temperature sensor to the third temperature sensor. Claim 3 A cooling system for a data center according to claim 2, wherein the control unit partially opens the first valve and the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and lower than the temperature measured by the third temperature sensor. Claim 4 In claim 2, the control unit partially opens the first valve and the second valve when the target design temperature is lower than the temperature measured by the first temperature sensor and the third temperature sensor, in a cooling system for a data center. Claim 5 A cooling system for a data center according to claim 2, wherein the control unit fully opens the first valve and completely closes the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and the third temperature sensor, and the temperature measured by the first temperature sensor is higher than the temperature measured by the third temperature sensor. Claim 6 A cooling system for a data center according to claim 2, wherein the control unit completely shuts off the first valve and completely opens the second valve when the target design temperature is higher than the temperature measured by the first temperature sensor and the third temperature sensor, and the temperature measured by the first temperature sensor is lower than the temperature measured by the third temperature sensor.
Citation Information
Patent Citations
Method for operating brine cooling system
JP2001021247A
Chiller system with dual cooling media for semiconductor process
KR102804303B1