Monitoring device, monitoring method, and program

The monitoring device and method address the challenge of managing PUE in data centers by evaluating air conditioner performance through temperature and flow velocity measurements, enabling efficient energy use and reducing power consumption by detecting and addressing abnormal usage.

WO2024202106A1PCT designated stage expired Publication Date: 2024-10-03MITSUBISHI HEAVY IND LTD

Patent Information

Application Number
PCT/JP2023/032200
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-27
Filing Date
2023-09-04
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

There is a need for effective monitoring and management of Power Usage Effectiveness (PUE) in data centers to reduce power consumption, as existing methods do not adequately address the energy efficiency of air conditioning systems within these facilities.

Method used

A monitoring device and method that evaluates air conditioner power usage efficiency by measuring outside and intake air temperatures, heat removal amounts, and air flow velocities, allowing for the calculation of PUE and detection of abnormal power consumption, with a program configured to store and analyze these metrics for efficient data center operation.

Benefits of technology

The solution enables accurate monitoring and evaluation of air conditioner power usage efficiency, detecting abnormal power consumption and prompting corrective actions, thereby reducing energy waste and improving cooling efficiency in data centers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023032200_03102024_PF_FP_ABST
    Figure JP2023032200_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This monitoring device is provided with: an air conditioner evaluating unit which evaluates an air conditioner power of an air conditioner comprising an outdoor unit installed outside a data center and an indoor unit installed inside the data center, on the basis of an outside air temperature measured outside the data center and an intake air temperature of the indoor unit; a heat removal amount evaluating unit which evaluates a heat removal amount of a rack for storing at least one electronic appliance in the data center, on the basis of an intake air temperature obtained by measuring the temperature of air taken into the rack, an exhaust temperature obtained by measuring the temperature of air exhausted from the rack, and a flow rate of the air; and an efficiency evaluating unit which evaluates a power usage efficiency of the air conditioner of the data center on the basis of the air conditioner power and the heat removal amount.
Need to check novelty before this filing date? Find Prior Art

Description

Monitoring device, monitoring method, and program

[0001] This application claims priority to Japanese Patent Application No. 2023-049799, filed on March 27, 2023, the contents of which are incorporated herein by reference.

[0002] Toward the realization of a carbon-free society, efforts are being made to reduce power consumption in data centers as well (see, for example, Patent Documents 1 and 2).

[0003] Special Table of Contents No. 2011-505784 Japanese Patent No. 5649646

[0004] One indicator of a data center's energy efficiency is PUE (Power Usage Effectiveness). PUE is an indicator obtained by dividing the power consumption of the entire data center by the power consumption of electronic devices such as servers. In recent years, there has been a demand for monitoring and managing PUE in order to curb increases in power consumption in data centers.

[0005] An object of the present disclosure is to provide a monitoring device, a monitoring method, and a program that can monitor the power usage effectiveness (PUE) of air conditioners in a data center.

[0006] According to one aspect of the present disclosure, a monitoring device includes an air conditioner evaluation unit that evaluates the air conditioning power of an air conditioner consisting of an outdoor unit installed outside a data center and an indoor unit installed inside the data center based on the outdoor air temperature measured outside the data center and the intake temperature of the indoor unit; a heat removal amount evaluation unit that evaluates the heat removal amount of a rack that stores at least one electronic device in the data center based on an intake temperature measured by measuring the temperature of the air drawn into the rack, an exhaust temperature measured by measuring the temperature of the air exhausted from the rack, and the air flow velocity; and an efficiency evaluation unit that evaluates the power usage efficiency of the air conditioner in the data center based on the air conditioning power and the heat removal amount.

[0007] According to one aspect of the present disclosure, a monitoring method includes the steps of: evaluating the air conditioning power of an air conditioner consisting of an outdoor unit installed outside a data center and an indoor unit installed inside the data center based on the outdoor air temperature measured outside the data center and the intake temperature of the indoor unit; evaluating the heat removal amount of a rack storing at least one electronic device in the data center based on the intake temperature measured by the temperature of the air drawn into the rack, the exhaust temperature measured by the temperature of the air exhausted from the rack, and the air flow velocity; and evaluating the power usage efficiency of the air conditioner in the data center based on the air conditioning power and the heat removal amount.

[0008] According to one aspect of the present disclosure, the program causes a monitoring device to perform the following steps: evaluate the air conditioning power of an air conditioner consisting of an outdoor unit installed outside the data center and an indoor unit installed inside the data center based on the outdoor air temperature measured outside the data center and the intake temperature of the indoor unit; evaluate the heat removal amount of a rack storing at least one electronic device in the data center based on the intake temperature measured by the temperature of the air drawn into the rack, the exhaust temperature measured by the temperature of the air exhausted from the rack, and the air flow velocity; and evaluate the power usage efficiency of the air conditioner in the data center based on the air conditioning power and the heat removal amount.

[0009] According to the above aspect, it is possible to monitor the power usage effectiveness (PUE) of the air conditioners in the data center.

[0010] FIG. 1 is a diagram illustrating an overall configuration of a monitoring system according to a first embodiment. FIG. 2 is a diagram illustrating an example of an entrance measurement point and an exit measurement point according to the first embodiment. FIG. 3 is a block diagram illustrating a functional configuration of a monitoring device according to the first embodiment. FIG. 4 is a flowchart illustrating an example of processing of the monitoring device according to the first embodiment. FIG. 5 is a diagram illustrating an example of entrance measurement point and an exit measurement point according to a second embodiment. FIG. 6 is a diagram illustrating the configuration of air conditioners and racks according to a third embodiment. FIG. 7 is a flowchart illustrating an example of processing of the monitoring device according to the third embodiment. FIG. 8 is a diagram for explaining the functions of the monitoring device according to the third embodiment.

[0011] First Embodiment A first embodiment will be described below with reference to FIGS.

[0012] (Overall Configuration of Monitoring System) Fig. 1 is a diagram showing the overall configuration of a monitoring system according to Embodiment 1. As shown in Fig. 1, the monitoring system 1 includes a monitoring device 2, a plurality of racks 3, and a plurality of air conditioners 4.

[0013] The monitoring device 2 is a system for monitoring the air conditioning and PUE of the data center DC. The detailed functional configuration of the monitoring device 2 will be described later.

[0014] The rack 3 (server rack) is installed in the data center DC and stores at least one electronic device inside. The electronic device is, for example, information equipment such as a server or a router. It is assumed that each rack 3 has the same configuration.

[0015] The up-down direction of the paper surface is the front-rear direction of the rack 3, and the left-right direction of the paper surface is the left-right direction of the rack 3. In the example of Fig. 1 , a plurality of racks 3 are lined up in the left-right direction to form a rack row 30. Furthermore, a plurality of rack rows 30 may be arranged at intervals in the front-rear and left-right directions. In the example of Fig. 1 , rack rows 30a, 30b, and 30c are arranged at intervals in the front-rear direction in the left-hand region, and rack rows 30d and 30e are arranged at intervals in the front-rear direction in the right-hand region.

[0016] The rack 3 has an air inlet on its front surface 31 that takes in cooling air F (intake air F1), and an air outlet on its rear surface 32 that exhausts air F (exhaust air F2) that has cooled electronic devices and increased in temperature. The aisles between the rack rows 30 arranged in the front-to-rear direction are arranged so that the front surfaces 31 (air inlets) or rear surfaces 32 (air outlets) of the racks 3 face each other. In the example of FIG. 1 , the rear surfaces 32 of the rack rows 30a and 30b face each other. The front surfaces 31 of the rack rows 30b and 30c face each other. The aisle toward which the front surfaces 31 of the rack rows 30 face is the cold aisle CI, and the aisle toward which the rear surfaces 32 face is the hot aisle HI.

[0017] An intake air temperature sensor 35 and a flow meter 36 are provided on the front side of the rack 3, and an exhaust air temperature sensor 37 is provided on the rear side. The intake air temperature sensor 35 measures the temperature of the intake air F1 (intake air temperature). The flow meter 36 measures the speed of the air F. The exhaust air temperature sensor 37 measures the temperature of the exhaust air F2 (exhaust air temperature). In this embodiment, the flow meter 36 is provided on the front side of the rack 3 and measures the speed of the intake air F1. Note that in other embodiments, the flow meter 36 may be provided on the rear side of the rack 3 and measure the speed of the exhaust air F2.

[0018] FIG. 2 is a diagram illustrating an example of inlet measurement points and outlet measurement points according to the first embodiment. As shown in FIG. 2 , an inlet measurement point Pi, which is a representative point for measuring the temperature and flow velocity of intake air F1, is set at an arbitrary location on the front surface 31 of the rack 3. Furthermore, an outlet measurement point Po, which is a representative point for measuring the temperature of exhaust air F2, is set at an arbitrary location on the rear surface 32 of the rack 3. In the example of FIG. 2 , the inlet measurement point Pi and the outlet measurement point Po are set near the center of the front surface 31 and the rear surface 32 of the rack 3, respectively, but this is not limiting. In other embodiments, the positions of the inlet measurement point Pi and the outlet measurement point Po may be changed to match the positions of the air inlet and air outlet. The intake air temperature sensor 35 and the flow velocity meter 36 are provided near the inlet measurement point Pi. The exhaust air temperature sensor 37 is provided near the outlet measurement point Po.

[0019] The air conditioners 4 cool the air F within the data center DC. In the example of FIG. 1 , one air conditioner 4 (4a to 4g) is provided for each aisle (cold aisle CI, hot aisle HI) that exists in the front-to-rear direction of the rack 3. It is assumed that each air conditioner 4 has the same configuration. The air conditioner 4 has an indoor unit 41 and an outdoor unit 42. The indoor unit 41 is installed inside the data center DC, and the outdoor unit 42 is installed outside the data center DC. The indoor unit 41 and the outdoor unit 42 are connected by a pipe 43 through which a refrigerant flows.

[0020] The indoor unit 41 is also provided with an intake temperature sensor 45. The intake temperature sensor 45 measures the intake temperature, which is the temperature of the air F taken in by the indoor unit 41. The outdoor unit 42 is provided with an outside air temperature sensor 46. The outside air temperature sensor 46 measures the outside air temperature, which is the temperature outside the data center DC. Note that the outside air temperature sensor 46 may be installed near the outdoor unit 42 instead of being attached to the outdoor unit 42.

[0021] (Functional Configuration of Monitoring Device) Fig. 3 is a block diagram showing the functional configuration of the monitoring device according to Embodiment 1. As shown in Fig. 3, the monitoring device 2 includes a processor 20, a memory 21, a storage 22, a communication interface 23, and an input / output interface 24.

[0022] The processor 20 operates in accordance with a predetermined program to cause the monitoring device 2 to perform various functions. The functions of the processor 20 will be described later.

[0023] The memory 21 has a memory area necessary for the operation of the processor 20 .

[0024] The storage 22 is a so-called auxiliary storage device, such as a hard disk drive (HDD), a solid state drive (SSD), etc. The storage 22 stores data that each part of the processor 20 acquires, generates, and references during processing.

[0025] The communication interface 23 is an interface for transmitting and receiving various data, control signals, and the like to and from sensors provided in each rack 3 and the air conditioners 4 .

[0026] The input / output interface 24 is a connection interface for communicating with devices such as the display device 2A and the input device 2B. The display device 2A is a monitor such as a liquid crystal display. The input device 2B is a device such as a mouse or keyboard for accepting input operations by the monitor. The display device 2A and the input device 2B may be integrated into one device, for example, a touch panel.

[0027] Next, a description will be given of the functions of the processor 20. The processor 20 operates in accordance with a pre-prepared program to fulfill the functions of a measurement value acquisition unit 201, an air conditioner evaluation unit 202, a heat removal amount evaluation unit 203, an efficiency evaluation unit 204, and an abnormality determination unit 205.

[0028] The measurement value acquisition unit 201 acquires the measurement values ​​of the intake temperature sensor 35, the flow meter 36, and the exhaust temperature sensor 37 of each rack 3. The measurement value acquisition unit 201 also acquires the measurement values ​​of the intake temperature sensor 45 and the outside air temperature sensor 46 of each air conditioner 4.

[0029] The air conditioner evaluation unit 202 evaluates the air conditioning power of the air conditioner 4 based on the outside air temperature outside the data center DC and the suction temperature of the indoor unit 41 of the air conditioner 4. In this embodiment, the air conditioner evaluation unit 202 evaluates the total power of the multiple air conditioners 4.

[0030] The heat removal amount evaluation unit 203 evaluates the heat removal amount of the rack 3 based on the intake air temperature, which is the temperature of the air F (intake air F1) measured at the inlet measurement point Pi on the front surface 31 of the rack 3, the exhaust air temperature, which is the temperature of the air F (exhaust air F2) measured at the outlet measurement point Po on the rear surface 32 of the rack 3, and the flow rate of the air F (intake air F1 or exhaust air F2). In this embodiment, the heat removal amount evaluation unit 203 evaluates the total heat removal amount of all the racks 3 in the data center DC.

[0031] The efficiency evaluation unit 204 evaluates the power usage effectiveness (PUE) of the air conditioners 4 in the data center DC based on the air conditioner operating power and the amount of heat removed by the racks 3 .

[0032] The abnormality determination unit 205 determines whether or not there is an abnormality in the power consumption of the air conditioner 4. Specifically, the abnormality determination unit 205 determines that the power consumption of the air conditioner 4 is abnormal when the PUE exceeds a predetermined determination threshold.

[0033] (Processing Flow of Monitoring Device) Fig. 4 is a flowchart showing an example of processing of the monitoring device according to the first embodiment. Here, the flow of processing of the monitoring device 2 will be described with reference to Fig. 4 .

[0034] First, the process by which the monitoring device 2 evaluates the air conditioning power will be described.

[0035] The measurement value acquisition unit 201 acquires the measurement values ​​of the intake temperature and the outside air temperature from the intake temperature sensor 45 and the outside air temperature sensor 46 of each air conditioner 4 (step S101).

[0036] The air conditioner evaluation unit 202 evaluates the air conditioner power of the entire data center DC based on the intake temperature of the air conditioner 4 and the outside air temperature (step S102).

[0037] For example, the air conditioner evaluation unit 202 calculates the power (power consumption [kW]) of each air conditioner 4 based on the intake temperature and outdoor air temperature of each air conditioner 4, the length (piping distance) of the piping 43 connecting the indoor unit 41 and the outdoor unit 42, and the cooling capacity determined in the specifications of the air conditioner 4. Since the method of calculating the power of each air conditioner 4 is known, explanation will be omitted. The air conditioner evaluation unit 202 also adds up the power of each air conditioner 4 to determine the total air conditioner power value Qp [kW] of the entire data center DC. In the example of FIG. 1, the air conditioner evaluation unit 202 calculates the total air conditioner power value Qp by adding up the power of the eight air conditioners 4a to 4g.

[0038] Next, a description will be given of the process of evaluating the amount of heat removal from the data center DC by the monitoring device 2. This process is performed in parallel with the evaluation of the air conditioning power.

[0039] The measurement value acquisition unit 201 acquires measurement values ​​of the temperature of intake air F1 (intake air temperature), the flow rate of intake air F1, and the temperature of exhaust air F2 (exhaust air temperature) from the intake air temperature sensor 35, flow rate meter 36, and exhaust air temperature sensor 37 of each rack 3 (step S103).

[0040] Furthermore, the heat removal amount evaluation unit 203 evaluates the amount of heat removal Qc of the rack 3 by the air conditioner 4 from each measurement value.

[0041] Specifically, first, the heat removal amount evaluation unit 203 derives the air volume (mass flow rate m [kg / s]) of the air F for each rack 3 using the following equations (1) and (2) (step S104).

[0042] V=A×v...(1)

[0043] m=V×ρ...(2)

[0044] V in equation (1) is the volumetric flow rate [m 3 / s], A is the cross-sectional area of ​​the air inlet of the rack 3, and v is the flow velocity of the intake air F1 measured by the flow meter 36. Furthermore, ρ in equation (2) is the density of the intake air F1. The density ρ can be calculated from the temperature (intake air temperature) and pressure (atmospheric pressure) of the intake air F1.

[0045] Next, the heat removal amount evaluation unit 203 derives the amount of heat exchanged Q [kW] of each rack 3 using the following formula (3) (step S105).

[0046] Q=m×cp×ΔT...(3)

[0047] In equation (3), m is the mass flow rate calculated in equation (2), cp is the specific heat, and ΔT is the temperature difference between the intake air temperature and the exhaust air temperature. The specific heat cp is calculated from the temperature (intake air temperature) and pressure (atmospheric pressure) of the intake air F1.

[0048] Next, the heat removal amount evaluation unit 203 sums up the heat exchange amount Q of each of the plurality of racks 3 to evaluate the total heat removal amount Qc [kW] of all the racks 3 in the data center DC (step S106).

[0049] When the evaluation of the air conditioner operating power and the amount of heat removal is completed, the efficiency evaluation unit 204 evaluates the PUE of the air conditioner 4 in the data center DC using the following formula (4) (step S107).

[0050] PUE=(Qp+Qc) / Qc...(4)

[0051] Next, the abnormality determination unit 205 determines whether or not the power consumption of the air conditioner 4 is abnormal based on the PUE calculated by equation (4) (step S108). Specifically, if the PUE is less than a predetermined determination threshold (step S108; NO), the abnormality determination unit 205 determines that there is no abnormality (step S109) and ends the process. The determination threshold is, for example, "1.5", and may be changed arbitrarily based on the required specifications for energy efficiency of the data center DC, the size of the data center DC, etc.

[0052] On the other hand, if the PUE is equal to or greater than the determination threshold (step S108; YES), the abnormality determination unit 205 determines that the power consumption of the air conditioner 4 is abnormal and outputs a warning to the monitor (step S110). The abnormality determination unit 205 outputs the warning in the form of a warning message on the display device 2A, for example. The abnormality determination unit 205 may also read out the warning message or output a warning sound from a speaker (not shown), or may send a warning message (email, etc.) to a terminal (personal computer, smartphone, tablet, etc.) carried by the monitor.

[0053] The monitoring device 2 periodically executes the series of processes shown in FIG. 3 to monitor the PUE of the air conditioners 4 in the data center DC.

[0054] (Actions and Effects) As described above, the monitoring device 2 according to this embodiment includes an air conditioner evaluation unit 202 that evaluates the air conditioner power Qp based on the outdoor air temperature measured outside the data center DC and the intake temperature of the indoor unit 41 of the air conditioner 4; a heat removal amount evaluation unit 203 that evaluates the heat removal amount Qc of the rack 3 based on the intake temperature of the cooling air F taken into the rack 3, the exhaust temperature of the air F exhausted from the rack 3, and the flow rate of the air F; and an efficiency evaluation unit 204 that evaluates the PUE of the air conditioner 4 of the data center DC based on the air conditioner power Qp and the heat removal amount Qc.

[0055] In this way, the monitoring device 2 can evaluate and monitor the efficiency (PUE) of the power consumed by the air conditioner 4 to cool the rack 3 simply by providing a simple configuration in the data center DC to measure temperature and flow rate.

[0056] The monitoring device 2 further includes an abnormality determination unit 205 that determines that the power consumption of the air conditioner 4 is abnormal when the PUE exceeds a predetermined determination threshold.

[0057] In this way, the monitoring device 2 can detect that the air conditioners 4 in the data center DC are consuming an abnormal amount of power that does not contribute to cooling the racks 3 .

[0058] Furthermore, the abnormality determination unit 205 may output a warning to an observer when it determines that the power consumption of the air conditioner 4 is abnormal.

[0059] By outputting a warning, the monitoring device 2 can prompt the monitor to quickly take measures such as changing the settings of the air conditioner.

[0060] Second Embodiment Next, a second embodiment will be described with reference to Fig. 5. Components common to the above-described embodiment will be assigned the same reference numerals, and detailed description thereof will be omitted.

[0061] 5 is a diagram illustrating an example of inlet measurement points and outlet measurement points according to the second embodiment. As shown in Fig. 5, the inlet measurement points Pi for measuring the intake temperature and flow velocity of the rack 3 and the outlet measurement points Po for measuring the exhaust temperature may each be set at a plurality of locations.

[0062] 5, the front surface 31 of the rack 3 is divided into nine regions, and one entrance measurement point Pi1 to Pi9 (for example, near the center of each region) is set in each region. The rear surface 32 of the rack 3 is also divided into nine regions corresponding to the front surface 31. In each region of the rear surface 32, exit measurement points Po1 to Po9 are set at positions corresponding to the entrance measurement points Pi1 to Pi9, respectively.

[0063] One intake air temperature sensor 35 and one flow meter 36 are provided at each of the inlet measurement points Pi1 to Pi9, and one exhaust air temperature sensor 37 is provided at each of the outlet measurement points Po1 to Po9.

[0064] In this embodiment, the heat removal amount evaluation unit 203 of the monitoring device 2 calculates the air volume (mass flow rate m) for each area of ​​the rack 3 using the measurement values ​​at each measurement point in step S104 of FIG.

[0065] Specifically, the heat removal amount evaluation unit 203 first calculates the volumetric flow rate Vi (V1 to V9) for each region of the rack 3 using the following equation (5) based on the flow velocity vi (v1 to v9) measured at each inlet measurement point Pi1 to Pi9 and the cross-sectional area Ai (A1 to A9) of the air inlet in the region corresponding to each inlet measurement point Pi1 to Pi9.

[0066] Vi=Ai×vi...(5)

[0067] In addition, the heat removal amount evaluation unit 203 calculates the mass flow rate mi (m1 to m9) of each region of the rack 3 based on the volume flow rate Vi (V1 to V9) of each region and the density ρi (ρ1 to ρ9) using the following equation (6).

[0068] mi=Vi×ρi...(6)

[0069] 4, the heat removal amount evaluation unit 203 calculates the heat exchange amount Q of the rack 3 using the measurement values ​​of each measurement point. Specifically, the heat removal amount evaluation unit 203 calculates the heat exchange amount Q, which is the total of the heat exchange amounts for each region of the rack 3, using the following formula (7) based on the mass flow rates mi (m1 to m9) of each measurement point, the specific heats cpi (cp1 to cp9), and the temperature differences ΔTi (ΔT1 to ΔT9) between the intake air temperature and the exhaust air temperature.

[0070] Q=Σ(mi×cpi×ΔTi)...(7)

[0071] In addition, in step S106 of FIG. 4, the heat removal amount evaluation unit 203 sums up the heat exchange amounts Q of the respective racks 3 to evaluate the total heat removal amount Qc [kW] of all racks 3 in the data center DC.

[0072] As described above, in the monitoring device 2 according to this embodiment, the heat removal amount evaluation unit 203 calculates the heat exchange amount Q, which is the sum of the heat exchange amounts for the regions corresponding to the entrance measurement points Pi and exit measurement points Po of the rack 3, based on the measurement values ​​measured at each of the entrance measurement points Pi and exit measurement points Po of the rack 3, and evaluates the heat exchange amount Q for each of the multiple racks 3. The heat removal amount evaluation unit 203 also sums the heat exchange amounts Q for each of the multiple racks 3 to evaluate the heat removal amount Qc for all of the multiple racks 3.

[0073] In this way, the monitoring device 2 can more accurately evaluate the amount of heat removal Qc of the rack 3 and the efficiency (PUE) of the power consumed by the air conditioner 4 to cool the rack 3 .

[0074] Third Embodiment Next, a third embodiment will be described with reference to Figures 6 to 8. Components common to the above-described embodiments are denoted by the same reference numerals, and detailed description thereof will be omitted.

[0075] (Functional Configuration of Monitoring Device) Fig. 6 is a diagram showing the configuration of an air conditioner and a rack according to the third embodiment. As shown in Fig. 6, in the monitoring device 2 according to this embodiment, the processor 20 further functions as a detection unit 206 and a control unit 207.

[0076] When the abnormality determination unit 205 determines that the power consumption of the air conditioner 4 is abnormal, the detection unit 206 detects, among the multiple racks 3, a rack 3 that has a hot spot where the intake air temperature or exhaust air temperature is equal to or higher than a predetermined upper limit temperature. A hot spot is a location within the data center DC where the temperature is locally high. A hot spot may occur in a rack 3 that stores more servers than the other racks 3, a rack 3 that stores servers with a concentrated calculation load, or a rack 3 that is installed far from the air conditioner 4.

[0077] When the detection unit 206 detects a rack having a hot spot, the control unit 207 lowers the set temperature of the air conditioner 4 among the multiple air conditioners 4 that contributes most to cooling the rack 3 having the hot spot, and raises the set temperature of at least one of the other air conditioners 4.

[0078] (Processing flow of the monitoring device) Fig. 7 is a flowchart showing an example of processing of the monitoring device according to the third embodiment. The processing of steps S201 to S210 in Fig. 7 is the same as the processing of steps S101 to S110 in Fig. 4, and therefore a description thereof will be omitted. Here, processing unique to this embodiment, i.e., the processing of steps S211 to S212 in Fig. 7, will be described.

[0079] If the abnormality determination unit 205 determines that the power consumption of the air conditioner 4 is abnormal (S208; YES, and S210 is executed), the detection unit 206 determines whether or not there is a hot spot (step S211).

[0080] If the intake and exhaust temperatures of all racks 3 are below the predetermined upper limit temperature, the detection unit 206 determines that no hot spots exist in the data center DC (step S211; NO). This determination result may be displayed on the display device 2A so that the monitor can confirm it.

[0081] On the other hand, if the intake temperature or exhaust temperature in any of the racks 3 is equal to or higher than the upper limit temperature, the detection unit 206 determines that a hot spot exists in the rack 3 where this temperature was measured (step S211; YES).

[0082] 8 is a diagram illustrating the functions of a monitoring device according to the third embodiment. For example, assume that, among the multiple rack rows 30a to 30e, the intake temperature of rack 3cn in rack row 30c and the exhaust temperature of rack 3d1 in rack row 30d are equal to or higher than the upper limit temperature. In this case, the detection unit 206 detects rack 3cn and rack 3d1 as racks having hot spots.

[0083] At this time, the detection unit 206 may notify the monitor by displaying information that can identify the location of the hotspot (such as the name or identification number of the rack 3cn, 3d1 where the hotspot is located) on the display device 2A. Also, a mark (hotspot mark HS in FIG. 8) indicating the location of the rack 3cn, 3d1 where the hotspot was detected may be superimposed on image data (map data) that shows the layout of each rack 3 in the data center DC and displayed on the display device 2A.

[0084] In addition, when multiple entrance measurement points Pi and exit measurement points Po are set on each rack 3 as in the second embodiment, the detection unit 206 may notify the monitor of the location of the measurement point where the hotspot exists via the display device 2A.

[0085] Next, the control unit 207 performs a setting change process to lower the set temperature of the air conditioner 4 (4a to 4e) that contributes most to cooling the rack 3 having the hot spot, and to raise the set temperature of at least one of the other air conditioners 4 (step S212).

[0086] In the example of Figure 8, rack 3cn has a hot spot on the front side 31 (air inlet). Therefore, the control unit 207 selects air conditioner 4c, which cools the aisle where this hot spot exists (cold aisle CI between rack rows 30b and 30c), as the air conditioner that will contribute most to cooling rack 3bn. Also, rack 3d1 has a hot spot on the rear side 32 (air outlet). Therefore, the control unit 207 selects air conditioner 4e, which cools the aisle where this hot spot exists (hot aisle HI between rack rows 30d and 30e), as the air conditioner that will contribute most to cooling rack 3d1.

[0087] The control unit 207 lowers the set temperatures of the selected air conditioners 4c and 4e by a fixed temperature (α°C). Furthermore, for the other air conditioners 4a, 4b, 4d, 4f, and 4g whose set temperatures may be increased, the control unit 207 raises the set temperatures by a fixed temperature (β°C). The values ​​of α°C and β°C may be the same or different.

[0088] For example, the control unit 207 sets a reference intake temperature and a reference exhaust temperature in advance. If the intake temperatures of all racks 3 with their front faces 31 facing a certain aisle are equal to or lower than the reference intake temperature, the control unit 207 determines that it is acceptable to raise the set temperature of the air conditioner 4 that cools this aisle. In FIG. 8 , assume that the intake temperatures of all racks 3a1 to 3an in rack row 30a are equal to or lower than the reference intake temperature. In this case, the control unit 207 determines that it is acceptable to raise the set temperature of the air conditioner 4a that cools the aisle on the intake side of this rack row 30a.

[0089] The control unit 207 may select multiple air conditioners 4 for which the set temperature may be increased. For example, if the exhaust temperatures of all racks 3a1 to 3an in rack row 30a and all racks 3b1 to 3bn in rack row 30b are equal to or lower than the exhaust reference temperature, the control unit 207 determines that the set temperature of air conditioner 4b, which cools the passage between these rack rows 30a and 30b, may also be increased. In this case, the control unit 207 controls both air conditioner 4a and air conditioner 4b to increase their set temperatures by β°C.

[0090] In this way, the monitoring device 2 can improve the cooling effect in areas where hot spots exist, while preventing the overall power consumption of the air conditioners 4 from increasing and the PUE from deteriorating.

[0091] The monitoring device 2 periodically executes the series of processes shown in FIG. 6 to monitor the PUE of the air conditioners 4 in the data center DC, as well as to detect and eliminate hot spots.

[0092] In another embodiment, the monitoring device 2 may perform the process of notifying the monitor of the presence of a hotspot and have the monitor manually change the temperature setting of the air conditioner 4. In this case, the monitoring device 2 may not have the control unit 207.

[0093] (Actions and Effects) As described above, the monitoring device 2 according to this embodiment further includes a detection unit 206 that, when it is determined that the power consumption of the air conditioner 4 is abnormal, detects among the multiple racks 3 a rack in which a hot spot exists where the intake temperature or exhaust temperature is above a predetermined upper limit temperature.

[0094] In this way, the monitoring device 2 can quickly detect the presence of a hotspot and identify the location of the hotspot. The monitoring device 2 may also display information that can identify the location of the hotspot on the display device 2A. This allows the monitor to confirm the location of the hotspot and change the set temperature of each air conditioner 4 as desired.

[0095] In addition, the monitoring device 2 further includes a control unit 207 that, when a hot spot is detected, lowers the set temperature of the air conditioner 4 among the multiple air conditioners 4 that contributes most to cooling the rack 3 where the hot spot is located, and raises the set temperatures of the other air conditioners 4.

[0096] In conventional technology, when a hot spot exists in a data center, the set temperature of all air conditioners is lowered to eliminate the hot spot. However, lowering the set temperature of all air conditioners in this way increases the PUE. However, the monitoring device 2 according to this embodiment controls only the set temperature of the air conditioners 4 that contribute to cooling the hot spot, and raises the set temperatures of the other air conditioners. In this way, the monitoring device 2 can improve the cooling effect in the area where the hot spot exists while preventing the overall power consumption of the air conditioners 4 from increasing and worsening the PUE.

[0097] Other Embodiments Although one embodiment has been described in detail above with reference to the drawings, the specific configuration is not limited to the above, and various design modifications are possible. That is, in other embodiments, the order of the above-described processes may be changed as appropriate. Furthermore, some processes may be executed in parallel.

[0098] In the above-described embodiment, an example has been described in which the data center DC is configured with only one floor, but in other embodiments, the data center DC may have multiple floors. In this case, the efficiency evaluation unit 204 of the monitoring device 2 may evaluate the power usage efficiency pPUE (partial PUE) of the air conditioners 4 for each floor. The efficiency evaluation unit 204 may also add up the pPUEs of the air conditioners 4 for each floor to further evaluate the PUE of the air conditioners 4 for the entire data center DC.

[0099] <Additional Notes> The monitoring device, the monitoring method, and the program described in the above-described embodiments can be understood, for example, as follows.

[0100] (1) According to the first aspect, the monitoring device 2 includes an air conditioner evaluation unit 202 that evaluates the air conditioner power Qp of an air conditioner 4 consisting of an outdoor unit 42 installed outside the data center DC and an indoor unit 41 installed inside the data center DC based on the outdoor air temperature measured outside the data center DC and the intake temperature of the indoor unit 41; a heat removal amount evaluation unit 203 that evaluates the heat removal amount Qc of a rack 3 that stores at least one electronic device in the data center DC based on the intake air temperature measured from the temperature of the air F drawn into the rack 3, the exhaust temperature measured from the temperature of the air F exhausted from the rack 3, and the flow velocity of the air F; and an efficiency evaluation unit 204 that evaluates the power usage efficiency (PUE) of the air conditioner 4 in the data center DC based on the air conditioner power Qp and the heat removal amount Qc.

[0101] In this way, the monitoring device 2 can evaluate and monitor the efficiency (PUE) of the power consumed by the air conditioner 4 to cool the rack 3 simply by providing a simple configuration in the data center DC to measure temperature and flow rate.

[0102] (2) According to the second aspect, in the monitoring device 2 relating to the first aspect, the intake temperature is measured at a plurality of entrance measurement points Pi set on the front surface 31 of the rack 3, the exhaust temperature is measured at a plurality of exit measurement points Po set on the rear surface 32 of the rack 3 corresponding to each of the plurality of entrance measurement points Pi, the flow rate is measured at the plurality of entrance measurement points Pi or the plurality of exit measurement points Po, and the heat removal amount evaluation unit 203 evaluates the heat removal amount Qc of the rack 3 based on the plurality of intake temperatures, the plurality of exhaust temperatures, and the plurality of flow rates.

[0103] In this way, the monitoring device 2 can more accurately evaluate the amount of heat removal Qc of the rack 3 and the efficiency (PUE) of the power consumed by the air conditioner 4 to cool the rack 3 .

[0104] (3) According to a third aspect, the monitoring device 2 according to the first or second aspect further includes an abnormality determination unit 205 that determines that the power consumption of the air conditioner 4 is abnormal when the power usage efficiency (PUE) exceeds a predetermined determination threshold.

[0105] In this way, the monitoring device 2 can detect that the air conditioners 4 in the data center DC are consuming an abnormal amount of power that does not contribute to cooling the racks 3 .

[0106] (4) According to the fourth aspect, the monitoring device 2 according to the third aspect further includes a detection unit 206 that, when it is determined that the power consumption of the air conditioner 4 is abnormal, detects, among the multiple racks 3, a rack 3 in which a hot spot exists where the intake temperature or exhaust temperature is equal to or higher than a predetermined upper limit temperature.

[0107] In this way, the monitoring device 2 can quickly detect the presence of a hotspot and identify the location of the hotspot. The monitoring device 2 may also display information that can identify the location of the hotspot on the display device 2A. This allows the monitor to confirm the location of the hotspot and change the set temperature of each air conditioner 4 as desired.

[0108] (5) According to the fifth aspect, the monitoring device 2 according to the fourth aspect further includes a control unit 207 that, when a hotspot is detected, lowers the set temperature of the air conditioner 4 among the multiple air conditioners 4 that contributes most to cooling the rack 3 in which the hotspot is located, and raises the set temperature of at least one of the other air conditioners 4.

[0109] In this way, the monitoring device 2 can improve the cooling effect in areas where hot spots exist, while preventing the overall power consumption of the air conditioners 4 from increasing and the PUE from deteriorating.

[0110] (6) According to a sixth aspect, the monitoring method includes the steps of: evaluating an air conditioner power Qp for an air conditioner 4 consisting of an outdoor unit 42 installed outside the data center DC and an indoor unit 41 installed inside the data center DC, based on the outdoor air temperature measured outside the data center DC and the intake temperature of the indoor unit 41; evaluating a rack 3 storing at least one electronic device in the data center DC, based on an intake air temperature measured by measuring the temperature of the air F drawn into the rack 3, an exhaust temperature measured by measuring the temperature of the air F exhausted from the rack 3, and the flow velocity of the air F; and evaluating a power usage efficiency (PUE) of the air conditioner 4 of the data center DC based on the air conditioner power Qp and the heat removal amount Qc.

[0111] (7) According to the seventh aspect, the program causes the monitoring device 2 to execute the following steps for an air conditioner 4 consisting of an outdoor unit 42 installed outside the data center DC and an indoor unit 41 installed inside the data center DC: a step of evaluating an air conditioner power Qp based on an outdoor air temperature measured outside the data center DC and an intake temperature of the indoor unit 41; a step of evaluating, for a rack 3 storing at least one electronic device in the data center DC, an intake air temperature measured by measuring the temperature of the air F drawn into the rack 3, an exhaust air temperature measured by measuring the temperature of the air F exhausted from the rack 3, and the flow velocity of the air F; and a step of evaluating a power usage efficiency (PUE) of the air conditioner 4 in the data center DC based on the air conditioner power Qp and the heat removal amount Qc.

[0112] According to the above aspect, it is possible to monitor the power usage effectiveness (PUE) of the air conditioners in the data center.

[0113] REFERENCE SIGNS LIST 1 Monitoring system 2 Monitoring device 20 Processor 201 Measurement value acquisition unit 202 Air conditioner evaluation unit 203 Heat removal amount evaluation unit 204 Efficiency evaluation unit 205 Abnormality determination unit 206 Detection unit 207 Control unit 21 Memory 22 Storage 23 Communication interface 24 Input / output interface 2A Display device 2B Input device 3 Rack 30 Row of racks 31 Front 32 Rear 35 Intake air temperature sensor 36 Flow meter 37 Exhaust air temperature sensor 4 Air conditioner 41 Indoor unit 42 Outdoor unit 43 Piping 45 Intake temperature sensor 46 Outdoor air temperature sensor

Claims

1. A monitoring device comprising: an air conditioner evaluation unit that evaluates the power of an air conditioner consisting of an outdoor unit installed outside a data center and an indoor unit installed inside the data center based on the outdoor air temperature measured outside the data center and the suction temperature of the indoor unit; a heat removal amount evaluation unit that evaluates the amount of heat removal of a rack storing at least one electronic device in the data center based on an intake temperature measured by measuring the temperature of the air drawn into the rack, an exhaust temperature measured by measuring the temperature of the air exhausted from the rack, and the air flow velocity; and an efficiency evaluation unit that evaluates the power usage efficiency of the air conditioner in the data center based on the air conditioner power and the heat removal amount.

2. The monitoring device of claim 1, wherein the intake temperature is measured at a plurality of inlet measurement points set on the front of the rack, the exhaust temperature is measured at a plurality of outlet measurement points set on the rear of the rack corresponding to each of the plurality of inlet measurement points, the flow rate is measured at a plurality of the inlet measurement points or a plurality of the outlet measurement points, and the heat removal amount evaluation unit evaluates the heat removal amount of the rack based on the plurality of intake temperatures, the plurality of exhaust temperatures, and the plurality of flow rates.

3. The monitoring device according to claim 1 or 2, further comprising an abnormality determination unit that determines that the power consumption of the air conditioner is abnormal when the power usage efficiency exceeds a predetermined determination threshold.

4. The monitoring device according to claim 3, further comprising a detection unit that detects, when it is determined that the power consumption of the air conditioner is abnormal, a rack among the plurality of racks in which a hot spot exists where the intake temperature or exhaust temperature is equal to or higher than a predetermined upper limit temperature.

5. The monitoring device according to claim 4, further comprising a control unit that, when the hot spot is detected, lowers the set temperature of one of the multiple air conditioners that contributes most to cooling the rack in which the hot spot is located, and raises the set temperature of at least one of the other air conditioners.

6. A monitoring method comprising the steps of: evaluating an air conditioning unit consisting of an outdoor unit installed outside a data center and an indoor unit installed inside the data center, based on the outdoor air temperature measured outside the data center and the suction temperature of the indoor unit; evaluating, for a rack storing at least one electronic device in the data center, the amount of heat removal from the rack, based on an intake temperature measured by measuring the temperature of the air drawn into the rack, an exhaust temperature measured by measuring the temperature of the air exhausted from the rack, and the air flow velocity; and evaluating the power usage efficiency of the air conditioner in the data center, based on the air conditioning unit power and the amount of heat removal.

7. A program that causes a monitoring device to execute the following steps: for an air conditioner consisting of an outdoor unit installed outside the data center and an indoor unit installed inside the data center, evaluating the air conditioner's power consumption based on the outdoor air temperature measured outside the data center and the suction temperature of the indoor unit; for a rack storing at least one electronic device in the data center, evaluating the amount of heat removal from the rack based on the intake temperature measured by measuring the temperature of the air drawn into the rack, the exhaust temperature measured by measuring the temperature of the air exhausted from the rack, and the air flow velocity; and evaluating the power usage efficiency of the air conditioner in the data center based on the air conditioner's power consumption and the amount of heat removal.

Citation Information

Patent Citations

  • System and method for controlling air conditioning

    JP2013204932A

  • Environment monitoring device, environment monitoring system, environment monitoring method, and environment monitoring program

    JP2019148407A

Cited By

  • Intelligent refrigeration control method and system of intelligent computer room moving ring system

    CN119155969A