Information processing method and information processing system
The information processing method and system address the challenge of managing interconnected construction project information by using a third server system to coordinate data exchange between first and second server systems, facilitating efficient access and management of linked project data.
Patent Information
- Application Number
- PCT/JP2024/008457
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-30
- Filing Date
- 2024-03-06
- Publication Date
- 2024-10-03
AI Technical Summary
Construction project information management systems face challenges in efficiently registering and linking related information across multiple systems, leading to difficulties in accessing and managing interconnected project data.
An information processing method and system that enables the registration of mutually related construction project information across multiple server systems by using a third server system to coordinate the exchange and registration of data between first and second server systems, allowing users to access and manage linked project information through a unified interface.
Facilitates quick access to related construction project information, reducing the complexity of information processing and enabling efficient management of interconnected project data across multiple systems.
Smart Images

Figure JP2024008457_03102024_PF_FP_ABST
Abstract
Description
Information processing method and information processing system
[0001] The present invention relates to an information processing method and an information processing system.
[0002] Construction management systems for managing information related to electrical work, architectural work, or other construction work are known. Patent Document 1 discloses a comprehensive construction management system for buildings that includes clients, supervisors, and construction companies.
[0003] JP 2009-134685 A
[0004] The present invention provides an information processing method and the like that can register mutually related construction project information in each of a plurality of systems.
[0005] An information processing method according to one aspect of the present invention is an information processing method executed by an information terminal, and includes a registration request step in which a third server system acquires first construction project information that a user belonging to a construction company has registered in a first server system by having a first information terminal execute a first application program, and then sends a registration request to the third server system to register at least a portion of the first construction project information in a second server system as second construction project information relating to the same construction project as the first construction project information, wherein the second server system is a server system in which the user can register the second construction project information by having the first information terminal execute a second application program, and the information terminal is an information terminal that is the same as or different from the first information terminal.
[0006] A program according to one aspect of the present invention is a program for causing the information terminal to execute the information processing method.
[0007] An information processing method according to one aspect of the present invention is an information processing method executed by a computer system that cooperates with a first server system and a second server system, and includes an acquisition step of acquiring first construction project information that a user belonging to a construction company has registered in the first server system by having a first information terminal execute a first application program, and a registration request step of sending to the second server system a registration request for at least a portion of the acquired first construction project information and second construction project information related to the same construction project as the first construction project information, wherein the second server system is a server system in which the user can register second construction project information by having the first information terminal execute a second application program.
[0008] A program according to one aspect of the present invention is a program for causing the computer system to execute the information processing method.
[0009] An information processing system according to one embodiment of the present invention is an information processing system that cooperates with a first server system and a second server system, and is equipped with an information processing unit, wherein the information processing unit acquires first construction project information that a user belonging to a construction company has registered in the first server system by having a first information terminal execute a first application program, and transmits at least a portion of the acquired first construction project information and a registration request for second construction project information relating to the same construction project as the first construction project information to the second server system, and the second server system is a server system in which the user can register second construction project information by having the first information terminal execute a second application program.
[0010] According to the present invention, construction project information related to each other can be registered in each of a plurality of systems.
[0011] FIG. 1 is a block diagram showing the functional configuration of a business support system according to an embodiment. FIG. 2 is a sequence diagram of example 1 of a registration operation of construction project information. FIG. 3 is a sequence diagram of a display operation of a project management screen. FIG. 4 is a diagram showing an example of a project list screen. FIG. 5 is a diagram showing an example of a project management screen. FIG. 6 is a sequence diagram of example 2 of a registration operation of construction project information. FIG. 7 is a diagram showing example 1 of a selection screen in example 2 of a registration operation of construction project information. FIG. 8 is a diagram showing example 2 of a selection screen in example 2 of a registration operation of construction project information. FIG. 9 is a diagram showing example 3 of a selection screen in example 2 of a registration operation of construction project information. FIG. 10 is a sequence diagram of example 3 of a registration operation of construction project information. FIG. 11 is a diagram showing example 1 of a selection screen in example 3 of a registration operation of construction project information. FIG. 12 is a diagram showing example 2 of a selection screen in example 3 of a registration operation of construction project information. FIG. 13 is a diagram showing example 3 of a selection screen in example 3 of a registration operation of construction project information.
[0012] Hereinafter, the embodiments will be described in detail with reference to the drawings. Note that the embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, component placement and connection forms, steps, and step order shown in the following embodiments are merely examples and are not intended to limit the present invention. Furthermore, among the components in the following embodiments, components not recited in independent claims will be described as optional components.
[0013] It should be noted that the drawings are schematic diagrams and are not necessarily strict illustrations. In addition, in the drawings, substantially the same components are denoted by the same reference numerals, and overlapping descriptions may be omitted or simplified.
[0014] (Embodiment) [Configuration] First, the configuration of a business support system according to an embodiment will be described. Fig. 1 is a block diagram showing the functional configuration of a business support system according to an embodiment.
[0015] 1 is a system for supporting the work of an electrical construction company that performs electrical construction on facilities such as homes. Specifically, the work support system 10 includes a first server system 20, a second server system 30, a third server system 40, and a plurality of information terminals 50.
[0016] The first server system 20 is a system used or operated by a first business operator that develops and sells a first application program (hereinafter also simply referred to as a first app) for supporting the operations of electrical construction companies. Employees of the electrical construction company can receive a first service provided by the first business operator by accessing the first server system 20 using an information terminal 50 running the first app. The first server system 20 is realized by one or more server devices (web servers). The first service realized by the first app is, for example, a business management service that manages the progress of the electrical construction company's operations. The first service is also a customer management service.
[0017] The second server system 30 is a system used or operated by a second business operator that develops and sells a second application program (hereinafter also simply referred to as a second app) for supporting the operations of electrical construction companies. Employees of the electrical construction company can receive a second service provided by the second business operator by accessing the second server system 30 using an information terminal 50 running the second app. The second server system 30 is realized by one or more server devices (web servers). The second service realized by the second app is, for example, a photo management service that manages photos of a construction site.
[0018] The third server system 40 is a system used or operated by a third operator different from both the first operator and the second operator. The third server system 40 is a computer system that cooperates with the first server system 20 and the second server system 30. The third server system 40 is realized by one or more server devices (web servers).
[0019] Specifically, the third server system 40 links the first construction project information managed by the first server system 20 and the second construction project information managed by the second server system 30 together, thereby linking the first construction project and the second construction project that are related to each other. The third server system 40 also provides the electrical construction company with a third service based on the linking. The third service is a service that supports quick access to the first construction project information and the second construction project information that are related to each other. The third business operator provides the electrical construction company with a third application program (hereinafter also simply referred to as a third app) to provide the third service. The third server system 40 includes a communication unit 41, an information processing unit 42, and a memory unit 43.
[0020] The communication unit 41 is a communication circuit (communication module) that enables the third server system 40 to communicate with the first server system 20, the second server system 30, and a plurality of information terminals 50 via a wide area communication network 60 such as the Internet. The communication unit 41 is, for example, a wired communication circuit that performs wired communication, but may also be a wireless communication circuit that performs wireless communication. There are no particular limitations on the communication standard of the communication performed by the communication unit 41.
[0021] The information processing unit 42 performs information processing for registering the first construction project information and the second construction project information in conjunction with each other. The information processing unit 42 is realized, for example, by a microcomputer, but may also be realized by a processor. The functions of the information processing unit 42 are realized, for example, by the microcomputer or processor constituting the information processing unit 42 executing a computer program stored in the storage unit 43.
[0022] The storage unit 43 is a storage device that stores information necessary for information processing for registering the first construction project information and the second construction project information in conjunction with each other, such as a computer program executed by the information processing unit 42. The storage unit 43 is realized by, for example, an HDD (Hard Disk Drive), but may also be realized by a semiconductor memory.
[0023] Each of the multiple information terminals 50 is an information terminal used by an employee of the electrical construction company (hereinafter also referred to as a user) to access the first server system 20, the second server system 30, or the third server system 40. The information terminal 50 is, for example, a stationary information terminal such as a personal computer, but may also be a portable information terminal such as a smartphone or a tablet terminal. The information terminal 50 includes an operation reception unit 51, a display unit 52, an information processing unit 53, a storage unit 54, and a communication unit 55.
[0024] The operation acceptance unit 51 accepts user operations. The operation acceptance unit 51 is, for example, an input device such as a mouse or a keyboard, and accepts user click operations, etc. Alternatively, the operation acceptance unit 51 may be another input device such as a touch panel, in which case it accepts user tap operations, etc.
[0025] The display unit 52 displays an image and is realized by a display panel such as a liquid crystal panel or an organic EL (Electro Luminescence) panel.
[0026] The information processing unit 53 performs processing such as displaying an image on the display unit 52 in response to an input received by the operation receiving unit 51. The information processing unit 53 is realized, for example, by a microcomputer, but may also be realized by a processor. The functions of the information processing unit 53 are realized, for example, by the microcomputer or processor constituting the information processing unit 53 executing a computer program stored in the storage unit 54.
[0027] The storage unit 54 is a storage device that stores computer programs and the like executed by the information processing unit 53. The computer programs stored in the storage unit 54 include a first application, a second application, and a third application. The storage unit 54 is realized by, for example, a semiconductor memory.
[0028] The communication unit 55 is a communication circuit (communication module) that enables the information terminal 50 to communicate with the first server system 20, the second server system 30, and the third server system 40 via the wide area communication network 60. The communication unit 55 is, for example, a wireless communication circuit that performs wireless communication, but may also be a wired communication circuit that performs wired communication. There are no particular limitations on the communication standard used for communication by the communication unit 55.
[0029] [Example 1 of construction project information registration operation] A user who belongs to an electrical construction company can use an information terminal 50 to register construction project information related to construction projects that the electrical construction company has been commissioned to carry out in the first server system 20 and the second server system 30.
[0030] When a new construction project occurs, typically, a user registers first construction project information related to the construction project in the first server system 20 by executing a first application (business management) on the information terminal 50, and registers second construction project information related to the construction project in the second server system 30 by executing a second application (photo management) on the information terminal 50.
[0031] In contrast, in the business support system 10, when first construction project information related to a new construction project is registered in the first server system 20, second construction project information related to the new construction project can be automatically registered (generated) in the second server system 30. In other words, the business support system 10 can register first construction project information and second construction project information that are related to each other in a linked manner. The operation of registering construction project information will be described below. Figure 2 is a sequence diagram of Example 1 of the operation of registering construction project information.
[0032] The user performs an instruction operation on information terminal 50 to instruct the information terminal 50 to execute the first app, and operation receiving unit 51 receives the instruction operation (S11). Information processing unit 53 executes the first app in response to the received instruction operation. As a result, a first display screen corresponding to the first app is displayed on display unit 52 (S12). As described above, the first service realized by the first app is, for example, a business management service that manages the progress of work at an electrical construction company, and therefore, in step S12, the business management screen is displayed.
[0033] When the first display screen is displayed, the information necessary for displaying the first display screen (display screen information) is provided from the first server system 20 to the information terminal 50, but this point is not shown in Figure 2.
[0034] While the first display screen is displayed, the user performs a registration operation to register first construction project information, and the operation reception unit 51 receives the registration operation (S13). The first construction project information includes information such as the project name (e.g., AAA Residence in XXX City), the type of work (e.g., wiring work), work content, start date, completion date, registration date, and registrant. In step S13, the user inputs this information into the information terminal 50.
[0035] When the registration operation is completed, the information processing unit 53 transmits a registration request to the first server system 20 (S14). The registration request is information for registering the first construction project information input in step S13 in the first server system 20. More specifically, the registration request is transmitted to the first server system 20 by the communication unit 55. The registration request includes the first construction project information input in step S13.
[0036] The first server system 20 receives the registration request, and based on the received registration request, adds the first ID to the first construction project information included in the registration request and registers (stores) the result in a storage unit provided in the first server system 20 (S15). The first ID is an ID (for example, a character string composed of numbers or letters) used by the first server system 20 to manage the first construction project information.
[0037] Furthermore, the first server system 20 transmits the registered first construction project information to the third server system 40 (S16). The first construction project information may be transmitted from the first server system 20 to the third server system 40 in a timely manner, or may be transmitted from the first server system 20 to the third server system 40 in response to a request from the third server system 40. The first construction project information is transmitted, for example, in a format defined in an API (Application Programming Interface) used between the first server system 20 (first business operator) and the third server system 40 (third business operator).
[0038] The communication unit 41 of the third server system 40 receives the first construction project information. The information processing unit 42 acquires the received first construction project information, adds a third ID to the acquired first construction project information, and registers (stores) the third ID in the storage unit 43 (S17). The third ID is an ID (for example, a character string composed of numbers or letters) used by the third server system 40 to manage the first construction project information and the second construction project information (described later).
[0039] Furthermore, the information processing unit 42 transmits ID notification information for notifying the first server system 20 of the third ID (S18). More specifically, the ID notification information is transmitted to the first server system 20 by the communication unit 41.
[0040] The first server system 20 receives the ID notification information and adds the third ID to the first construction project information registered in step S15 (S19). As a result, two IDs, the first ID and the third ID, are assigned to the first construction project information registered in step S15.
[0041] Furthermore, when the first construction project information is registered in step S17, the information processing unit 42 of the third server system 40 sends a registration request to the second server system 30 to request the registration of second construction project information related to the same construction project as the first construction project information (S20). The registration request includes, for example, at least a portion of the information of the first construction project information (for example, a project name such as Mr. / Ms. AAA's House in XXX City, and the third ID).
[0042] More specifically, the registration request is transmitted to the second server system 30 by the communication unit 41. The registration request is transmitted, for example, in a format defined in an API used between the second server system 30 (second business operator) and the third server system 40 (third business operator). Note that it is not essential that the registration request includes at least a portion of the first construction project information, and the registration request and at least a portion of the first construction project information may be transmitted separately.
[0043] The second server system 30 receives the registration request and, based on the received registration request, registers (stores) the second construction project information in a storage unit provided in the second server system 30 (S21). The second server system 30 adds the third ID and the second ID included in the registration request to the second construction project information. The second ID is an ID (for example, a character string composed of numbers or letters) used by the second server system 30 to manage the second construction project information.
[0044] This includes information such as the project name (such as Mr. AAA's house in XXX City), the actual data of the photo, additional information about the photo (such as comments and the location where the photo was taken), the start date of construction, the completion date, the registration date, and the registrant.
[0045] As described above, the second service realized by the second application is, for example, a photo management service that manages photos of a construction site. Therefore, although the second construction project information originally includes information such as actual photo data, the second construction project information immediately after being registered in step S21 only includes the project name included in the registration request (i.e., "House of Mr. AAA, XXX City," the same as the first construction project information), and the remaining information is unregistered (vacant). The remaining information can be added by the user executing the second application on the information terminal 50.
[0046] The second server system 30 also transmits ID notification information for notifying the first server system 20 of the second ID (S22). The ID notification information is transmitted in a format determined by an API used between the second server system 30 (second business operator) and the third server system 40 (third business operator), for example.
[0047] The communication unit 41 of the third server system 40 receives the second construction project information. The information processing unit 42 registers (stores) the received second construction project information in the storage unit 43 (S23).
[0048] Thereafter, the user executes the second application on the information terminal 50 to add the actual data of the photograph and the like to the second construction project information stored in the second server system 30. As a result, the actual data of the photograph and the like is similarly added to the second construction project information stored in the third server system 40. In other words, the information processing unit 42 can acquire second construction project information that is identical to the second construction project information stored in the second server system 30, and store the acquired second construction project information in the storage unit 43. The operation at this time is the same as steps S11 to S17, and therefore is not illustrated.
[0049] In this way, in the business support system 10, when a user newly registers first construction project information in the first server system 20, the same first construction project information is also registered in the third server system 40, and further, second construction project information relating to the same construction project is registered in the second server system 30.
[0050] 2, the same process is performed when a user newly registers second construction project information in the second server system 30. Specifically, when a user newly registers second construction project information in the second server system 30, the same second construction project information is also registered in the third server system 40, and further, first construction project information relating to the same construction project is registered in the first server system 20. Furthermore, the same third ID is assigned to the first construction project information and the second construction project information relating to the same construction project.
[0051] It is not essential that the same first construction project information be registered in each of the first server system 20 and the third server system 40. It is sufficient that at least a part of the first construction project information registered in the first server system 20 is registered in the third server system 40. It is sufficient that a part of the first construction project information (for example, the first ID, the third ID, and the project name) necessary for displaying a project management screen (described later) is registered in the third server system 40.
[0052] Furthermore, it is not essential that the same second construction project information be registered in each of the second server system 30 and the third server system 40. It is sufficient that at least a part of the second construction project information registered in the second server system 30 is registered in the third server system 40. It is sufficient that a part of the second construction project information (for example, the second ID, the third ID, and the project name) necessary for displaying a project management screen (described later) is registered in the third server system 40.
[0053] When the above-described operations are performed several times, a plurality of pieces of first construction project information managed by the electrical construction company are registered in the first server system 20, and a plurality of pieces of second construction project information managed by the electrical construction company are registered in the second server system 30. A plurality of pieces of first construction project information stored in the first server system 20 and construction project information identical to a plurality of pieces of second construction project information stored in the second server system 30 are registered in the third server system 40.
[0054] [Display Operation of Project Management Screen] As described above, the third server system 40 (third business operator) provides a third service that supports quick access to mutually related first construction project information and second construction project information. In order to provide such a third service, a project management screen ( FIG. 5 ) is displayed on the display unit 52 of the information terminal 50. The display operation of the project management screen will be described below. FIG. 3 is a sequence diagram of the display operation of the project management screen.
[0055] A user belonging to an electrical construction company performs an instruction operation on information terminal 50 to instruct the information terminal 50 to execute the third app, and operation receiving unit 51 receives the instruction operation (S31). Information processing unit 53 executes the third app in response to the received instruction operation and transmits a request for information (display screen information) required to display each screen of the third app to third server system 40 (S32). The information request is information for requesting third server system 40 to provide display screen information required to display the project list screen of FIG. 4 and the project management screen of FIG. 5, and includes identification information of the information terminal 50 executing the third app or its user. More specifically, the information request is transmitted to third server system 40 by communication unit 55.
[0056] The communication unit 41 of the third server system 40 receives the information request. The information processing unit 42 reads out display screen information corresponding to the identification information included in the received information request (S33). The information processing unit 42 then transmits the read out display screen information to the information terminal 50 (S34). The display screen information includes information related to the third ID of the construction project information. More specifically, the display screen information is transmitted to the information terminal 50 by the communication unit 41.
[0057] The communication unit 55 of the information terminal 50 receives the display screen information. The information processing unit 53 displays a case list screen corresponding to the third app on the display unit 52 based on the received display screen information (S35). Figure 4 is a diagram showing an example of the case list screen.
[0058] At the bottom of the project list screen in Fig. 4, a list of multiple construction project information items stored in the storage unit 43 by the operation described in Fig. 2 is displayed. Each row corresponding to one piece of construction project information displays the type, project name, start date, completion date, status, etc.
[0059] Of the multiple construction project information displayed in the list, construction project information whose type is the first application means first construction project information, and construction project information whose type is the second application means second construction project information.
[0060] At the top of the project list screen, there is a field for entering filter conditions to narrow down the construction project information displayed. Users can select between an input field that allows the entry of a relatively small number of filter conditions (corresponding to the "Simple Filter" tab) and an input field that allows the entry of a relatively large number of filter conditions (corresponding to the "Detailed Filter" tab).
[0061] When such a project list screen is displayed, the user performs a selection operation to select one piece of construction project information, and the operation reception unit 51 receives the selection operation (S36). The selection operation is, for example, an operation to select a project name on the project list screen.
[0062] The information processing unit 53 identifies the third ID of the selected construction project information (one of the first construction project information and the second construction project information) in response to the selection operation received in step S36. According to the operation of FIG. 2 , the first construction project information and the second construction project information related to the same construction project are assigned the same third ID. Therefore, the information processing unit 42 can identify another construction project information (the other of the first construction project information and the second construction project information) to which the identified third ID is assigned. In other words, the information processing unit 42 can identify a pair of first construction project information and second construction project information related to the same construction project. The information processing unit 53 then displays a project management screen on the display unit 52 based on the identified first construction project information and second construction project information (S37).
[0063] 5, the project management screen displays the construction project information selected in step S36 (one of the first construction project information and the second construction project information) and construction project information related to the selected construction project information (the other of the first construction project information and the second construction project information). In the example of FIG. 5, the first construction project information is displayed on the left, and the second construction project information is displayed on the right.
[0064] A first object 52d is provided below the display area of the first construction project information. The user performs a selection operation to select the first object 52d, and the operation acceptance unit 51 accepts the selection operation (S38).
[0065] Here, a link for executing the first application is embedded in the first object 52d selected in step S38. The information processing unit 53 executes the first application based on the selection operation accepted in step S38, and displays a first display screen (business management screen) corresponding to the first application (S39).
[0066] In this way, the first object 52d is an object for causing the information terminal 50 to execute the first app, and the information processing unit 53 can execute the first app in response to an operation of selecting the first object 52d, and display an individual screen of the first construction project information (the first display screen corresponding to the first app) on the display unit 52.
[0067] 5, a second object 52e is provided below the display area for the second construction project information. Although not shown, when a selection operation for selecting the second object 52e is performed, processing similar to steps S38 to S39 is performed, and an individual screen for the second construction project information indicated by the second ID is displayed on the display unit 52 from among the second display screens (photo management screens) corresponding to the second app. In other words, the second object 52e is an object for causing the information terminal 50 to execute the second app, and the information processing unit 53 can display the individual screen for the second construction project information (the second display screen corresponding to the second app) on the display unit 52 in response to the operation for selecting the second object 52e.
[0068] As described above, the user can easily access the individual screen for the construction project information on the first app and the individual screen for the construction project information on the second app from the project management screen in Fig. 5. For example, the user can access the individual screen for the construction project information on the first app and the individual screen for the construction project information on the second app with a one-touch operation on the first object 52d or the second object 52e.
[0069] When the project management screen is not used, the user must repeatedly operate the top screen (menu screen) that is first displayed when the first application is executed to display the first display screen corresponding to the desired first construction project information. Similarly, the user must repeatedly operate the top screen (menu screen) that is first displayed when the second application is executed to display the second display screen corresponding to the desired second construction project information. In such cases, the time required to access the desired construction project information becomes an issue.
[0070] In contrast, the project management screen allows users to quickly access first construction project information and second construction project information that are related to each other. In other words, the third server system 40 (third business operator) can provide a third service that allows users to quickly access first construction project information and second construction project information that are related to each other. Furthermore, the project management screen can reduce the amount of information processing (communication volume) required to display the desired display screen.
[0071] [Example 2 of the operation for registering construction project information] In Example 1 of the operation for registering construction project information, when a user belonging to an electrical construction company newly registers first construction project information in the first server system 20, second construction project information related to the same construction project is automatically registered in the second server system 30. However, the registration of second construction project information related to the same construction project in the second server system 30 may be performed upon a user operation (triggered by a user operation). Such Example 2 of the operation for registering construction project information will be described below. Figure 6 is a sequence diagram of Example 2 of the operation for registering construction project information.
[0072] A user belonging to an electrical construction company performs a process of newly registering first construction project information in the first server system 20 (S51). The process performed at this time is similar to steps S11 to S19 in FIG. 2, and therefore a detailed description thereof will be omitted.
[0073] Thereafter, the user performs an instruction operation on the information terminal 50 to instruct the information terminal 50 to execute the third application, and the operation accepting unit 51 accepts the instruction operation (S52). The information processing unit 53 executes the third application in response to the accepted instruction operation. At this time, if there is newly registered first construction project information, the third server system 40 provides the information terminal 50 with display screen information for displaying a selection screen for whether or not to register, rather than the project list screen ( FIG. 4 ). As a result, the information processing unit 53 displays the selection screen for whether or not to register on the display unit 52 based on the received display screen information (S53). FIG. 7 is a diagram showing an example of the selection screen for whether or not to register.
[0074] 7 is displayed, the user performs an operation indicating that the second construction project information needs to be registered, and the operation accepting unit 51 accepts such an operation (S54). The operation indicating that the registration is needed is an operation of selecting the OK icon 52f.
[0075] When the information processing unit 53 receives an operation indicating that registration is necessary, it adds an area to be operated for making detailed settings related to registration to the selection screen (S55). Fig. 8 is a diagram showing an example of the selection screen on which an area to be operated is provided.
[0076] On the selection screen shown in Figure 8, the user can select the items contained in the first construction project information (project name, construction type, construction content, start date, completion date, etc.) that they want to copy to the second construction project information to be registered.
[0077] When this selection screen is displayed, the user performs a selection operation to select an item to be copied and a registration instruction operation, and the operation reception unit 51 receives these operations (S56). The selection operation is an operation to check the check box 52g, and the registration instruction operation is an operation to select the registration instruction object 52h.
[0078] When the registration instruction operation is accepted, the information processing unit 53 transmits a registration request to the third server system 40 (S57). More specifically, the registration request is transmitted to the third server system 40 by the communication unit 55.
[0079] The communication unit 41 of the third server system 40 receives the registration request. Based on the received registration request, the information processing unit 42 performs a process of registering the second construction project information in the second server system 30 (S58). The process performed at this time is similar to steps S20 to S23 in Fig. 2, and therefore a detailed description will be omitted. However, it differs from steps S20 to S23 in Fig. 2 in that the items that the user wants to copy to the second construction project information are reflected.
[0080] As described above, after the first construction project information is registered, the third server system 40 displays a selection screen on the display unit 52 of the information terminal 50 running the third app. The third server system 40 registers the second construction project information including the information selected on the selection screen in the second server system 30, on the condition that the registration instruction object 52h has been selected (the user has the intention to register).
[0081] This allows the user, when first construction project information is registered, to select whether or not to register second construction project information related to the first construction project information, and the information to be registered as the second construction project information.
[0082] It is not essential that the user be able to select the information to be registered as the second construction project information on the selection screen; it is sufficient that the selection screen displays an object (such as an OK icon 52f or a registration instruction object 52h) to instruct the user to register the second construction project information.
[0083] There may also be three or more applications related to a construction project. Specifically, in addition to the first application (first server system 20) and the second application (second server system 30), there may also be a fourth application (fourth server system) and a fifth application (fifth server system).
[0084] In such a case, the selection screen may be provided with an area to be operated for selecting an application in which the construction project information is to be registered (selecting a server system to which a registration request is to be sent). Fig. 9 is a diagram showing an example of a selection screen provided with an area to be operated for selecting an application in which the construction project information is to be registered. The user can select an application in which the construction project information is to be registered by checking a check box 52i while the selection screen shown in Fig. 9 is displayed.
[0085] 6, the same process is performed when the user newly registers second construction project information in the second server system 30. Specifically, whether or not to register first construction project information related to the second construction project information in the first server system 20 is determined by the user's operation on the information terminal 50 running the third application.
[0086] [Example 3 of the operation of registering construction project information] In example 2 of the operation of registering construction project information, whether or not to register second construction project information related to the first construction project information in the second server system 30 was determined by a user's operation on the information terminal 50 running the third application. Whether or not to register second construction project information related to the first construction project information in the second server system 30 may also be determined by a user's operation on the information terminal 50 running the first application. Hereinafter, example 3 of the operation of registering construction project information will be described. FIG. 10 is a sequence diagram of example 3 of the operation of registering construction project information.
[0087] A user who belongs to an electrical construction company newly registers first construction project information in the first server system 20 and the third server system 40 (S61). The processing performed at this time is similar to S11 to S19 in Fig. 2, and therefore a detailed description thereof will be omitted.
[0088] After the registration of the first construction project information is completed, the information processing unit 53 of the information terminal 50 running the first application displays a registration completion screen on the display unit 52 following the reception of the registration operation in step S13 (S62). Fig. 11 is a diagram showing an example of the registration completion screen.
[0089] 11 is also a selection screen for selecting whether or not to register second construction project information related to the first construction project information. When the selection screen is displayed, the user performs an operation indicating that registration of the second construction project information is necessary, and the operation reception unit 51 accepts such an operation (S63). The operation indicating that registration is necessary is an operation of selecting the OK icon 52j.
[0090] When the information processing unit 53 receives an operation indicating that registration is necessary, it adds an area to be operated for making detailed settings related to registration to the selection screen (S64). Fig. 12 is a diagram showing an example of the selection screen on which an area to be operated is provided.
[0091] On the selection screen shown in Figure 12, the user can select the items contained in the first construction project information (project name, construction type, construction content, start date, completion date, etc.) that they want to copy to the second construction project information to be registered.
[0092] When this selection screen is displayed, the user performs a selection operation to select an item to be copied and a registration instruction operation, and the operation reception unit 51 receives these operations (S65). The selection operation is an operation to check the check box 52k, and the registration instruction operation is an operation to select the registration instruction object 52l.
[0093] When the registration instruction operation is accepted, the information processing unit 53 transmits a registration request to the third server system 40 (S66). More specifically, the registration request is transmitted to the first server system 20 by the communication unit 55.
[0094] The first server system 20 receives the registration request and transmits the received registration request to the third server system 40 (S67). Note that the registration request may be transmitted to the third server system 40 without going through the first server system 20.
[0095] The communication unit 41 of the third server system 40 receives the registration request. The information processing unit 42 performs a process of registering the second construction project information in the second server system 30 based on the received registration request (S68). The process performed at this time is similar to steps S20 to S23 in Fig. 2, and therefore a detailed description will be omitted. However, it differs from steps S20 to S23 in Fig. 2 in that the items that the user wants to copy to the second construction project information are reflected.
[0096] As described above, after the first construction project information is registered, the third server system 40 displays a selection screen on the display unit 52 of the information terminal 50 running the first application. The third server system 40 registers the second construction project information including the information selected on the selection screen in the second server system 30, on the condition that the registration instruction object 52l has been selected (the user has the intention to register).
[0097] This allows the user, when first construction project information is registered, to select whether or not to register second construction project information related to the first construction project information, and the information to be registered as the second construction project information.
[0098] It is not essential that the user be able to select the information to be registered as the second construction project information on the selection screen; it is sufficient that the selection screen displays an object (such as an OK icon 52j or a registration instruction object 52l) to instruct the user to register the second construction project information.
[0099] There may also be three or more applications related to a construction project. Specifically, in addition to the first application (first server system 20) and the second application (second server system 30), there may also be a fourth application (fourth server system) and a fifth application (fifth server system).
[0100] In such a case, the selection screen may be provided with an area to be operated for selecting the application in which the construction project information is to be registered (selecting the server system to which the registration request is to be sent). Fig. 13 is a diagram showing an example of a selection screen provided with an area to be operated for selecting the application in which the construction project information is to be registered. The user can select the application in which the construction project information is to be registered by checking a check box 52m when the selection screen shown in Fig. 13 is displayed.
[0101] 10, the same process is performed when the user newly registers second construction project information in the second server system 30. Specifically, whether or not to register first construction project information related to the second construction project information in the first server system 20 is determined by the user's operation on the information terminal 50 running the second application.
[0102] [Account Information] Although not explained in the above embodiment, a user who belongs to an electrical construction company needs to enter account information (such as a login ID and password) when using the first app (first service), second app (second service), and third app (third service).
[0103] Typically, an electrical construction company enters into a license agreement for a first app with a first business operator, a license agreement for a second app with a second business operator, and a license agreement for a third app with a third business operator. This enables the electrical construction company to obtain first account information for the first app, second account information for the second app, and third account information for the third app for as many people as necessary.
[0104] Here, the third business operator can conclude a comprehensive license agreement for the first app, the second app, and the third app with the electrical construction company by first concluding license agreements with the first business operator and the second business operator. In this case, the electrical construction company is provided with the necessary number of account information that can be used in common for the first app, the second app, and the third app, and users can use the same account information to use the first app (first service), the second app (second service), and the third app (third service). This also has the advantage that the third server system 40 can easily identify the same user (no need to link the first account information, second account information, and third account information of the same user, for example).
[0105] [Modification] In the above embodiment, when the project management screen is displayed, one of the first construction project information and the second construction project information is identified based on the third ID. However, the other of the first construction project information and the second construction project information may be identified based on the correspondence between the first ID of the first construction project information and the second ID of the second construction project information. In other words, it is not essential that the third ID be assigned to the first construction project information and the second construction project information.
[0106] In the above embodiment, the user who registers the first construction project information, the user who registers the second construction project information, and the user who displays the project management screen may be the same user or different users. Furthermore, the information terminal 50 used to register the first construction project information, the information terminal 50 used to register the second construction project information, and the information terminal 50 used to display the project management screen may be the same information terminal 50 or different information terminals 50.
[0107] In the above embodiment, the first service realized by the first app is a business management service (customer management service), and the second service realized by the second app is a photo management service. However, the first service realized by the first app and the second service realized by the second app are not particularly limited. Other examples of the first service and the second service include a service (tool) for an electrical construction company to communicate with a sales agent about estimates or orders, a partner company matching service, and an employee training service.
[0108] In the above embodiment, the first application, the second application, and the third application are each a dedicated application program for accessing the corresponding server system, but they may be browsers. In this case, the first application, the second application, and the third application may be the same browser or different browsers.
[0109] In the above embodiment, the business support system 10 has been described as a system primarily for electrical construction companies, but it may also be realized as a system for construction companies other than electrical construction companies. Examples of other construction companies include construction companies that perform housing construction (new construction and renovation), plumbing, air conditioning, gas construction, repair work, or installation of solar power generation systems.
[0110] In the above embodiment, the third server system 40 may be a system used or operated by either the first business operator or the second business operator. In the above embodiment, the first business operator, the second business operator, and the third business operator may all be the same business operator.
[0111] [Effects, etc.] Hereinafter, examples of inventions obtained from the disclosure of this specification will be described, and effects, etc. obtained from the exemplified inventions will be explained.
[0112] Invention 1 is an information processing method executed by an information terminal, the information processing method including a registration request step (S57) of transmitting to the third server system 40 a registration request for registering at least a portion of the first construction project information in the second server system 30 as second construction project information relating to the same construction project as the first construction project information, after the third server system 40 acquires first construction project information that a user belonging to a construction company has registered in the first server system by having the first information terminal execute a first application program, the information terminal being the same as or different from the first information terminal. Each of the information terminal and the first information terminal corresponds to one of the plurality of information terminals 50 in the above embodiment.
[0113] Such an information processing method can be triggered by the registration of first construction project information in the first server system 20, and can register at least a portion of the first construction project information as second construction project information in the second server system 30. In other words, the information processing method can register mutually related construction project information in each of a plurality of server systems.
[0114] Invention 2 is the information processing method of Invention 1, in which the second server system 30 is a server system in which a user can register second construction project information by having a first information terminal execute a second application program, and the third server system 40 is a server system that a user can access by having an information terminal execute a third application program, and the information processing method further includes a step (S55) of displaying a registration instruction object 52h to instruct the information terminal executing the first application program or the third application program to execute a registration request step, and the registration request step (S57) is executed on the condition that the registration instruction object 52h is selected.
[0115] Such an information processing method requires that the registration instruction object 52h is selected, and can register at least a portion of the first construction project information in the second server system 30. In such an information processing method, by implementing a display function for the registration instruction object 52h in the third application program, it is possible to suppress changes to the specifications of the first application program.
[0116] Invention 3 is the information processing method of Invention 2, further comprising a step (S55) of displaying a selection screen (FIG. 9) for selecting a server system on an information terminal running the first application program or the third application program, and the second server system 30 is the server system selected as the destination on the selection screen.
[0117] Such an information processing method can register second construction project information in the second server system 30 selected by the user.
[0118] Invention 4 is an information processing method of either Invention 2 or 3, further including a step (S55) of displaying a selection screen (Figure 8 or Figure 9) on an information terminal running the first application program or the third application program to select information to be sent to the second server system 30 from the first construction project information, and at least some of the information is information selected on the selection screen.
[0119] Such an information processing method can register, in the second server system 30, at least a portion of the first construction project information, which is selected by the user.
[0120] Invention 5 is an information processing method of any of Inventions 2 to 4, further comprising a step of displaying a project management screen on an information terminal running a third application program, the project management screen visualizing at least a portion of the first construction project information and at least a portion of the second construction project information, the project management screen including a first object 52d and a second object 52e, the first object 52d being an object for causing the information terminal to execute the first application program, and the second object 52e being an object for causing the information terminal to execute the second application program.
[0121] This information processing method can display multiple pieces of construction project information registered in different server systems on a single project management screen. Also, the information processing method can cause a third information terminal displaying the project management screen to execute the first application program or the second application program.
[0122] A sixth aspect of the present invention is a program for causing an information terminal to execute any one of the information processing methods of the first to fifth aspects.
[0123] According to such a program, the information terminal can, when triggered by the registration of first construction project information in the first server system 20, register at least a portion of the first construction project information as second construction project information in the second server system 30. In other words, the information processing method can register mutually related construction project information in each of a plurality of server systems.
[0124] Invention 7 is an information processing method executed by a computer system cooperating with a first server system 20 and a second server system 30, the information processing method including: an acquisition step (S17) of acquiring first construction project information registered with the first server system 20 by a user belonging to a construction company by having a first information terminal execute a first application program; and a registration request step (S20) of transmitting to the second server system 30 a registration request for at least a portion of the acquired first construction project information and second construction project information related to the same construction project as the first construction project information, the second server system 30 being a server system in which the user can register the second construction project information by having the first information terminal execute a second application program. The computer system corresponds to the third server system 40 in the above embodiment, and the first information terminal corresponds to one of the plurality of information terminals 50 in the above embodiment.
[0125] Such an information processing method can be triggered by the registration of first construction project information in the first server system 20, and can register at least a portion of the first construction project information as second construction project information in the second server system 30. In other words, the information processing method can register mutually related construction project information in each of a plurality of server systems.
[0126] An eighth aspect of the present invention is a program for causing a computer system to execute the information processing method of the seventh aspect.
[0127] According to such a program, the computer system can register mutually related construction project information in each of a plurality of server systems.
[0128] Invention 9 is an information processing system that cooperates with a first server system 20 and a second server system 30, and includes an information processing unit 42. The information processing unit 42 acquires first construction project information that a user belonging to a construction company has registered with the first server system 20 by having a first information terminal execute a first application program, and transmits at least a portion of the acquired first construction project information and a registration request for second construction project information related to the same construction project as the first construction project information to the second server system 30. The second server system 30 is a server system in which the user can register the second construction project information by having the first information terminal execute a second application program. The information processing system corresponds to the third server system 40 in the above embodiment, and the first information terminal, the second information terminal, and the third information terminal correspond to one or more information terminals 50 in the above embodiment.
[0129] Such an information processing system can register mutually related construction project information in each of a plurality of server systems.
[0130] (Other Embodiments) Although the embodiments have been described above, the present invention is not limited to the above-described embodiments.
[0131] For example, the display screens and operations on the display screens disclosed in the above embodiments are merely examples, and other display screens having similar functions and other operations performed for similar purposes may be adopted in the business support system. For example, the selection of an icon or object in the above embodiments may be performed based on a click operation or a tap operation.
[0132] In the above embodiment, the business support system, the first server system, the second server system, and the third server system are implemented by a plurality of devices, but they may be implemented as a single device. When a system is implemented by a plurality of devices, the components of the system may be distributed among the devices in any manner.
[0133] For example, the communication method between the devices in the above-described embodiment is not particularly limited. Furthermore, a relay device (for example, a wireless router, etc.) not shown may be involved in the communication between the devices.
[0134] In the above-described embodiment, the processing performed by a specific processing unit may be performed by another processing unit. The order of multiple processing operations may be changed, or multiple processing operations may be performed in parallel.
[0135] In the above-described embodiments, each component may be realized by executing a software program suitable for that component, or by a program execution unit such as a CPU or processor reading and executing a software program recorded on a recording medium such as a hard disk or semiconductor memory.
[0136] Furthermore, each component may be realized by hardware. For example, each component may be a circuit (or integrated circuit). These circuits may form a single circuit as a whole, or each may be a separate circuit. Furthermore, each of these circuits may be a general-purpose circuit or a dedicated circuit.
[0137] Furthermore, the general or specific aspects of the present invention may be realized as a system, an apparatus, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM, or as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.
[0138] For example, the present invention may be realized as an information terminal, a first server system, a second server system, a third server system (information processing system), or a business support system. The present invention may be realized as an information processing method executed by a computer such as the third server system. The present invention may be realized as a program for causing a computer to execute such an information processing method. The present invention may be realized as a dedicated application program installed on an information terminal. Furthermore, the present invention may be realized as a computer-readable non-transitory recording medium on which these programs are recorded.
[0139] In addition, the present invention also includes forms obtained by applying various modifications to each embodiment that a person skilled in the art would think of, or forms realized by arbitrarily combining the components and functions of each embodiment within the scope of the present invention.
[0140] REFERENCE SIGNS LIST 10 Business support system 20 First server system 30 Second server system 40 Third server system (computer system, information processing system) 41, 55 Communication unit 42, 53 Information processing unit 43, 54 Storage unit 50 Information terminal 51 Operation acceptance unit 52 Display unit 52d First object 52e Second object 52f, 52j OK icon 52g, 52k, 52i, 52m Check box 52h, 52l Registration instruction object 60 Wide area communication network
Claims
1. An information processing method executed by an information terminal, comprising: a third server system acquires first construction project information that a user belonging to a construction company has registered in a first server system by having a first information terminal execute a first application program; and then a registration request step of transmitting to the third server system a registration request to register at least a portion of the first construction project information in the second server system as second construction project information relating to the same construction project as the first construction project information; the second server system is a server system in which the user can register the second construction project information by having the first information terminal execute a second application program; and the information terminal is an information terminal that is the same as or different from the first information terminal.
2. The information processing method according to claim 1, wherein the third server system is a server system that the user can access by having the information terminal execute a third application program, and the information processing method further includes a step of displaying an object on the information terminal executing the first application program or the third application program to instruct the execution of the registration request step, and the registration request step is executed on the condition that the object is selected.
3. The information processing method according to claim 2, further comprising the step of displaying a selection screen for selecting a server system on the information terminal executing the first application program or the third application program, and the second server system is the server system selected on the selection screen.
4. The information processing method according to claim 2, further comprising the step of displaying a selection screen on the information terminal executing the first application program or the third application program for selecting information to be sent from the first construction project information to the second server system, wherein at least a portion of the information is information selected on the selection screen.
5. The information processing method according to claim 2, further comprising the step of displaying a project management screen on the information terminal executing the third application program, the project management screen visualizing at least a portion of the first construction project information and at least a portion of the second construction project information, the project management screen including a first object and a second object, the first object being an object for causing the information terminal to execute the first application program, and the second object being an object for causing the information terminal to execute the second application program.
6. A program for causing the information terminal to execute the information processing method according to any one of claims 1 to 5.
7. An information processing method executed by a computer system linked to a first server system and a second server system, comprising: an acquisition step of acquiring first construction project information registered in the first server system by a user belonging to a construction company by having a first information terminal execute a first application program; and a registration request step of transmitting to the second server system at least a portion of the acquired first construction project information and a registration request for second construction project information relating to the same construction project as the first construction project information, wherein the second server system is a server system in which the user can register second construction project information by having the first information terminal execute a second application program.
8. A program for causing the computer system to execute the information processing method according to claim 7.
9. An information processing system that cooperates with a first server system and a second server system, comprising an information processing unit, which acquires first construction project information registered in the first server system by a user belonging to a construction company having a first information terminal execute a first application program, and transmits to the second server system at least a portion of the acquired first construction project information and a registration request for second construction project information relating to the same construction project as the first construction project information, and the second server system is a server system in which the user can register second construction project information by having the first information terminal execute a second application program.
Citation Information
Patent Citations
Information processing integrated system for engineering audit and method thereof
CN114911798A
Construction site photographing system, pile work inspection system, work data acquisition device and work data acquisition method
JP2017089127A
Information processing device, information processing method and program
JP2018041177A
