Method for manufacturing and operating reuse battery system

By verifying and accurately storing SOC-OCV map data using error detection codes, the method addresses the issue of incorrect data storage in reusable battery systems, improving operational reliability and performance for secondary applications.

WO2024203372A1PCT designated stage expired Publication Date: 2024-10-03GS YUASA INT LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/009918
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-27
Filing Date
2024-03-14
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing methods for manufacturing reusable battery systems often result in incorrect storage of characteristic map data, leading to impaired operational reliability due to errors in writing SOC-OCV map data corresponding to the battery's state of health (SOH) at the start of reuse, which affects SOC estimation and overall system performance.

Method used

The method involves a used battery management unit receiving and verifying characteristic map data using error detection codes, ensuring accurate storage of SOC-OCV map data corresponding to the battery's state after reuse, thereby improving operational reliability by correctly storing data in the management unit.

Benefits of technology

This approach enhances the operational reliability of reusable battery systems by ensuring accurate SOC estimation and system performance, even when batteries are reused or repurposed for secondary applications like backup power or energy storage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024009918_03102024_PF_FP_ABST
    Figure JP2024009918_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A method for manufacturing a reuse battery system 1 comprises steps in which: a management unit 10 of a used battery receives characteristic map data 1P corresponding to the state of the used battery after a reuse start; the management unit 10 uses an error detection code added to the characteristic map data 1P to verify the received characteristic map data 1P; and the management unit 10 stores the characteristic map data 1P into a storage unit 101 when the received characteristic map data 1P is appropriate.
Need to check novelty before this filing date? Find Prior Art

Description

Manufacturing method and operation method of reused battery system

[0001] One aspect of the present invention relates to a manufacturing method (construction method) of a reuse battery system.

[0002] Patent Document 1 discloses a method for recycling secondary batteries that enables batteries that are not suitable for reuse to be detected (sorted) before being removed from a vehicle, before being transported to a factory, before being dismantled at the factory, or before being measured for capacity.

[0003] Japanese Patent Application Laid-Open No. 2020-53167

[0004] In recent years, attempts have been made to apply batteries (mainly lithium-ion batteries) used for primary purposes to secondary uses such as backup power systems and energy storage systems. Various technological developments have been made to improve the operational reliability of such secondary use battery systems (reused battery systems).

[0005] One aspect of the present invention provides a method for manufacturing a reuse battery system to improve the operational reliability of the system.

[0006] A manufacturing method for a reused battery system according to one embodiment of the present invention comprises a management unit for a used battery receiving characteristic map data corresponding to the state of the used battery after the start of reuse, the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data, and if the received characteristic map data is correct, the management unit storing the characteristic map data in a memory unit.

[0007] According to the above aspect, by correctly storing characteristic map data with a large amount of data in the storage unit of the management unit, it is possible to manufacture a reuse battery system with improved operational reliability.

[0008] 1 is a block diagram showing an example of a reuse battery system; 2 is a diagram showing an example of the arrangement of used batteries and a management unit in a power storage unit; 3 is a perspective view showing an example of a battery module; 4 is a graph showing an example of a characteristic map (SOC-OCV map); 5 is a conceptual diagram explaining an example of characteristic map data (SOC-OCV map data) received by the management unit; 6 is a flowchart showing the procedure by which the management unit stores the received characteristic map data in a storage unit; and 7 is a flowchart showing the procedure by which the management unit reads out characteristic map data from the storage unit.

[0009] An outline of an embodiment will be described below. (1) A manufacturing method of a reuse battery system includes a step in which a management unit for used batteries receives characteristic map data corresponding to a state of the used batteries after the start of reuse, the management unit verifies the received characteristic map data using an error detection code added to the characteristic map data, and if the received characteristic map data is correct, the management unit stores the characteristic map data in a storage unit.

[0010] A used battery may be a single battery cell, a battery module in which battery cells are connected in series and / or parallel, or a battery pack in which battery cells or battery modules are connected in series and / or parallel. From the viewpoint of reducing the labor required for dismantling, it is preferable that a used battery be applied to a reuse battery system without changing its configuration (e.g., battery pack, battery module) from its primary use (e.g., an on-board battery system) as much as possible. A used battery may be, but is not limited to, a lithium-ion secondary battery. It may also be a secondary battery such as a NaS (sodium-sulfur) battery, a redox flow battery, a lithium-ion capacitor, an electric double-layer capacitor, an air battery, an all-solid-state battery, a semi-solid-state battery, a nickel-metal hydride battery, an alkaline battery, a nickel-cadmium battery, a lithium polymer battery, or a lead-acid battery. The term "start of reuse" refers to the time of manufacturing (construction) of a reuse battery system or the time of performance measurement of a used battery. The term "start of reuse" may refer to the start of reuse for a secondary use, or the start of reuse for a tertiary or subsequent use.

[0011] According to the method (1) above, characteristic map data containing a large amount of data (for example, state of charge-open circuit voltage map data, hereinafter referred to as SOC-OCV map data) can be correctly stored in the management unit of the used battery, thereby enabling the manufacture of a reuse battery system with improved operational reliability.

[0012] When a reused battery system is manufactured without changing the configuration of the battery pack or battery module as much as possible, the initial characteristic map data is stored in the management unit used in the primary use. However, the map data stored there often does not correspond to the state of the used battery at the start of reuse, such as its state of health (SOH).

[0013] Figure 4 shows SOC-OCV maps of batteries with different SOHs. Each curve (profile) contains a large number of data points, for example, around 100 data points.

[0014] Battery control requires not only an SOC-OCV map (an example of a characteristic map) for estimating the SOC from the battery's measured voltage, but also an upper limit charge voltage and a lower limit discharge voltage. The upper limit voltage and the lower limit voltage are each single data point. Compared to these numerical values ​​(so-called set values), the data that makes up a characteristic map such as an SOC-OCV map is extremely large, making it prone to errors when writing data to a management unit during the manufacture of a reused battery system.

[0015] 4, the curve marked 100% is the initial SOC-OCV map (when the SOH is 100%) in the primary use of the battery, and the curve marked 70% is the SOC-OCV map to be referred to when the SOH drops to 70% after the battery has been used.

[0016] If only SOC-OCV map data corresponding to an SOH of 100% is stored in the management unit of a battery pack or battery module for primary use, that map data does not correspond to the state of the used battery at the start of reuse. Therefore, it is necessary to write SOC-OCV map data corresponding to the state of the used battery at the start of reuse (e.g., an SOH of 70%) into the management unit. This writing is also necessary when managing used batteries with a new management unit instead of the management unit used for primary use.

[0017] If an error occurs when writing map data for forming a curve corresponding to an SOH of 70% to the management unit, an outlier or a curve with a different shape than the intended curve may be stored. This can cause the management unit to be unable to correctly estimate the battery SOC after the reuse battery system begins operation, compromising the operational reliability of the system. The same thing can happen with other characteristic map data besides the SOC-OCV map data.

[0018] The state (e.g., SOH) of a used battery at the start of reuse can be determined by measurement (e.g., measuring the capacity by discharging the battery from full charge). Battery states other than SOH include degradation states corresponding to various battery degradation mechanisms (isolation of active material, reduction in charge carriers (e.g., lithium ions, Li+) involved in charging and discharging, increased electrical resistance, reduced conductivity in the electrolyte, etc.). The battery degradation states corresponding to these various degradation mechanisms can be determined or estimated by simulation based on operational history data (current history, voltage history, temperature history, etc.) from the primary use (or past uses up to the present).

[0019] According to the method (1) above, characteristic map data (such as SOC-OCV map data with a large amount of data) corresponding to the state of used batteries determined by measurement or estimation can be verified using an error detection code and then correctly stored in the storage unit of the management unit, thereby enabling the manufacture of a reuse battery system with improved operational reliability.

[0020] (2) In the method (1) above, the characteristic map data may be received by a communication unit of the reuse battery system from a higher-level device, and the characteristic map data may be received from the communication unit by a plurality of management units provided in each of a plurality of groups of used batteries.

[0021] According to the above method, the configuration of the reuse battery system can be simplified, while each of the multiple management units can receive characteristic map data appropriate for the battery group it manages. It is difficult to prepare a large number of used batteries with consistent remaining performance. Therefore, different characteristic map data may be provided to the management units of the multiple battery groups via the communication unit of the reuse battery system. In secondary applications such as backup power systems and energy storage systems, a large number of used batteries are often connected in parallel to ensure the required electrical capacity. It is possible to provide the management unit provided for each parallel-connected battery group with characteristic map data appropriate for that battery group.

[0022] (3) In the method (1) or (2) above, the higher-level device may prepare the characteristic map data based on measurement data of the used battery and / or simulation results based on historical data of past uses.

[0023] Battery measurement and simulation technologies are still in the development stage. Measurement and simulation accuracy is improving every year, and previously unknown battery degradation phenomena are being elucidated and modeled. By applying measurement data based on the latest technology and the latest simulation technology to host equipment, and having that host equipment estimate the condition of used batteries at the start of reuse and prepare characteristic map data, the operational reliability of the reuse battery systems we manufacture can be further improved.

[0024] (4) A method of operating a reuse battery system includes a host device monitoring the state of a used battery after reuse begins, a management unit for the used battery receiving characteristic map data corresponding to the state prepared by the host device, the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data, and if the received characteristic map data is correct, the management unit storing the characteristic map data in a memory unit.

[0025] According to the above-described operation method, the upper device monitors the state of the used battery after the start of reuse, prepares characteristic map data, and correctly stores the characteristic map data, which has a large amount of data, in the memory unit of the management unit, thereby improving operational reliability.

[0026] (5) In the method of (4) above, the higher-level device may prepare the characteristic map data based on measurement data after the start of reuse of the used battery and / or simulation results based on historical data after the start of reuse.

[0027] After the start of reuse, charging and discharging is often performed in a manner that differs from the operation pattern before (for example, during primary use). According to the operation method of (5) above, appropriate characteristic map data can be prepared based on measurement data after the start of reuse and / or operation history data after the start of reuse, for example, using the results of a simulation using the latest technology.

[0028] Hereinafter, embodiments will be described with reference to the drawings. The present invention is not limited to the embodiments described below. FIG. 1 shows the configuration of an energy storage system (ESS) 1 as a reuse battery system. The ESS 1 includes a battery management unit (BMU) 10, an energy storage unit 11, a power conditioner (PCS) 12 as an example of a charge / discharge unit, and a communication unit 13. The ESS 1 may be a so-called power conditioner with a storage battery. Instead of the ESS 1, the reuse battery system may be a backup power supply system or another system (for example, a battery system for driving a mobile object).

[0029] The BMU 10 includes a CPU (Central Processing Unit) 100 , a ROM (Read Only Memory) 101 , a RAM (Random Access Memory) 102 , and an I / O (Input / Output) 103 .

[0030] The CPU 100 is an execution unit that sequentially reads firmware stored in the ROM 101 and executes control processing according to a control procedure defined in the firmware. The ROM 101 is a non-transitory memory that is read-only from the CPU 100 in principle. The ROM 101 is, for example, an EEPROM (Electrically Erasable Programmable Read-Only Memory). The ROM 101 stores a default SOC-OCV map 2P and a reuse SOC-OCV map 1P. The default SOC-OCV map 2P may be continuously stored in the ROM built into the CPU 100.

[0031] The RAM 102 is a temporary memory used for calculations by the CPU 100. The CPU 100 writes the results of calculations to the RAM 102 and reads them out as it proceeds with processing. The data stored in the RAM 102 is volatilized when the BMU 10 is restarted.

[0032] The power storage unit 11 includes used batteries. The power storage unit 11 is connected to a system power supply E via the PCS 12. The power storage unit 11 may be connected to a power generation source (not shown) (for example, a solar panel or other renewable energy generator) via the PCS 12. The BMU 10 may receive power supply from the power storage unit 11.

[0033] The PCS 12 includes an inverter and / or a converter as a power conversion unit 12a (see FIG. 2 ). The PCS 12 is connected to an electric load and performs operations such as supplying electric power from the system power supply E to the electric load, charging the power storage unit 11 from the system power supply E, and supplying electric power from the power storage unit 11 to the electric load (including assisting discharging when supplying electric power from the system power supply E to the electric load). The PCS 12 may be connected to an alternating current power grid (AC grid) or a direct current power grid (DC grid).

[0034] The communication unit 13 is a communication device for communicating with the higher-level device 2. The higher-level device 2 may be an external storage medium (e.g., a USB memory). The communication unit 13 may be, for example, a network interface card or may be configured to be able to mount an external storage medium. The BMU 10 receives data (e.g., SOC-OCV map data for reuse) from the higher-level device 2 via the communication unit 13.

[0035] The higher-level device 2 may be a terminal device (e.g., a maintenance terminal device) that transmits update data of the SOC-OCV map via a local network to the ESS 1. Alternatively, the higher-level device 2 may be a server device (e.g., a remote monitoring server) that issues instructions to the ESS 1 and collects data from the ESS 1 via a communication network including the Internet.

[0036] FIG. 2 shows an example of the arrangement of used batteries and the BMU 10 in the power storage unit 11. The power storage unit 11 is configured by storing multiple groups U1, U2, ... of used batteries in a battery panel or container. The multiple battery groups U are connected in parallel to a common current path Lo extending from the power conversion unit 12a of the PCS 12. In this embodiment, five used battery groups U1 to U5 are connected in parallel, but the number of parallel connections is not limited to this. As shown in FIG. 2, the PCS may be arranged outside the container.

[0037] Each battery group U includes a plurality of battery modules M connected in series, a current sensor 41, and a current interruption device 45. Each battery module M may be configured by connecting battery cells (also referred to as cells) in series. A group of a plurality of battery modules M connected in series will be referred to as a bank hereinafter.

[0038] In the power storage unit 11 of this embodiment, a bank BMU 10B is provided for each bank U, and a domain BMU 10D is provided for each group (hereinafter referred to as a domain) in which multiple banks U are connected in parallel. The domain BMU 10D can communicate with the bank BMU 10B via a communication bus (e.g., a CAN bus).

[0039] In each bank U, a cell management unit (CMU) 33 provided in each battery module M communicates with the bank BMU 10B connected to the CMU 33 via a serial communication interface such as RS-232C. The CMU 33 may include a voltage sensor (not shown) that measures the voltage of each cell, and a temperature sensor 37 (see FIG. 3). The bank BMU 10B acquires current data measured for each bank, and voltage and temperature data measured by the CMU 33 of each battery module M.

[0040] The domain BMU 10D may aggregate the battery state data acquired by each bank BMU 10B and store it in the storage unit 25. The storage unit 25 may be located outside the domain BMU 10D.

[0041] 2 shows an example in which the domain BMU 10D is connected to the control unit 12b of the PCS 12, but the domain BMU 10D may also be connected to the communication unit 13 (see FIG. 1). Alternatively, the bank BMU 10B may be connected to the communication unit 13 via a CAN bus without going through the domain BMU 10D.

[0042] As shown in FIG. 3 , the battery module M in this embodiment includes a case 31 that houses a plurality of adjacent battery cells 60 and a plurality of temperature sensors 37A, 37B that measure the temperatures of the battery cells 60. The battery cells 60 are prismatic cells that house an electrode assembly and a nonaqueous electrolyte in a rectangular parallelepiped case. Alternatively, the battery cells may be pouch cells or cylindrical cells. The battery cells 60 in this embodiment are lithium-ion secondary battery cells. The battery module M in this embodiment is applied to a reused battery system in substantially the same form as in its previous use (e.g., primary use). That is, the battery module M is applied to a reused battery system without disassembling the CMU 33 and temperature sensors 37 used in the previous use.

[0043] In this embodiment, the higher-level device 2 (see FIG. 1) prepares characteristic map data corresponding to the state of the used battery after the start of reuse, and the bank BMU 10B provided in each bank U (see FIG. 2) receives the data. The higher-level device 2 may prepare multiple characteristic map data corresponding to the expected state of the used battery at multiple points in time (in the future) after the start of reuse.

[0044] When a battery for primary use (e.g., a drive battery system for an electric vehicle) is shipped, characteristic map data corresponding to various battery states is not sufficiently prepared. For example, preparing SOC-OCV map data corresponding to various SOHs (e.g., 80%, 75%, 70%, 65%, 60%, ...) requires a long time and a great deal of effort. Furthermore, when a battery for primary use is shipped, reuse is not even considered. Therefore, when a battery for primary use is shipped, only a limited number of characteristic data, including SOC-OCV map data corresponding to an SOH of 100%, is stored in the management unit for primary use. Even when a different BMU 10 is used as the BMU 10 from the one used for primary use (when the BMU is replaced), only a limited number of characteristic data is stored in the replaced BMU 10.

[0045] As the SOH of the battery decreases, it is necessary to switch the SOC-OCV map referenced for SOC estimation. In this embodiment, the higher-level device 2 (see FIG. 1) prepares characteristic map data corresponding to the state of the used battery after the start of reuse and transmits it to the domain BMU 10D or the bank BMU 10B.

[0046] 5 shows SOC-OCV map data as an example of characteristic map data prepared by the higher-level device 2. This map data includes a table management number, table data in which SOC and OCV are associated with each other and stored in a table, and an error detection code.

[0047] Examples of the error detection code include a checksum and a cyclic redundancy code (CRC). From the viewpoint of verification accuracy, CRC-16 can be adopted, but the code is not limited to this.

[0048] The table management number may be any number that can identify the table data. The table management number can be used to determine whether new map data is being used in the bank BMU 10B or whether the default map data is still being used in the bank BMU 10B.

[0049] 6 shows the procedure by which the bank BMU 10B stores the SOC-OCV map data received from the higher-level device 2 in the ROM 101. The bank BMU 10B calculates the collation data from the table management number to the table data using a calculation method corresponding to the error detection code (step S10).

[0050] The bank BMU 10B determines whether the calculated verification data matches the error detection code (step S20). If they match (S20: YES), the bank BMU 10B determines that the received SOC-OCV map data is correct and stores it in the ROM 101 (step S30).

[0051] If the bank BMU 10B determines that the calculated verification data does not match the error detection code (S20: NO), the bank BMU 10B discards the received SOC-OCV map data. In this case, the bank BMU 10B continues to use the default SOC-OCV map data.

[0052] 7 shows the procedure for reading the SOC-OCV table stored in the ROM 101. The bank BMU 10B calculates collation data from the table management number to the table data using a calculation method corresponding to the error detection code (step S60).

[0053] The bank BMU 10B determines whether the calculated verification data matches the error detection code (step S70). If they match (S70: YES), the newly read SOC-OCV map data is deemed to be correct and is used to estimate the SOC from the measured voltage of the used battery.

[0054] If the bank BMU 10B determines that the calculated verification data does not match the error detection code (S70: NO), the bank BMU 10B adopts the default SOC-OCV map data.

[0055] An embodiment of a method for manufacturing a reuse battery system has been described above. Next, an embodiment of a method for operating a reuse battery system will be described.

[0056] In the operation method of the reuse battery system (ESS1), the higher-level device 2 (for example, a remote monitoring server) monitors the state of the used battery (electricity storage unit 11) shown in FIG. 1 after the start of reuse.

[0057] The used battery management unit (bank BMU 10B) receives characteristic map data (see FIG. 5) prepared by the higher-level device 2 and corresponding to the state of the used battery after the start of reuse.

[0058] The management unit verifies the received characteristic map data using the error detection code added to the characteristic map data.

[0059] If the received characteristic map data is correct, the management unit stores the characteristic map data in the storage unit (ROM 101). The management unit uses the new characteristic map data to control the used battery.

[0060] In a reused battery system, batteries deteriorate compared to their previous use, so various technologies must be applied to improve operational reliability. In the above embodiment, remote monitoring is achieved using a communication unit 13 provided in the ESS 1 and a host device 2. Furthermore, in the above embodiment, the host device 2 prepares characteristic map data corresponding to the state of the used batteries after reuse begins, and the management unit receives this data, verifies it using an error detection code, and then stores it. By correctly storing characteristic map data with a large amount of data in the storage unit of the management unit, the operational reliability of the reused battery system can be improved.

[0061] Through remote monitoring, the host device can detect any deviations from the load pattern assumed at the time of manufacturing the reuse battery system, allowing appropriate measures to be taken promptly, such as reviewing the operation of the reuse battery system, adding more banks, or replacing deteriorated battery modules M or banks U.

[0062] 1 ESS (reused battery system) 10 BMU (management unit) 11 Power storage unit (used battery) 101 ROM (storage unit)

Claims

1. A manufacturing method for a reuse battery system, comprising: a management unit for used batteries receiving characteristic map data corresponding to the state of the used batteries after the start of reuse; the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data; and, if the received characteristic map data is correct, the management unit storing the characteristic map data in a memory unit.

2. A method for manufacturing a reuse battery system as described in claim 1, wherein a communication unit of the reuse battery system receives the characteristic map data from a higher-level device, and a plurality of management units provided in each of a plurality of groups of used batteries receive the characteristic map data from the communication unit.

3. A manufacturing method for a reuse battery system as described in claim 1 or claim 2, wherein a higher-level device prepares the characteristic map data based on measurement data of the used batteries and / or simulation results based on historical data of past uses.

4. A method for operating a reuse battery system, comprising: a host device monitoring the state of a used battery after reuse has begun; a management unit for the used battery receiving characteristic map data corresponding to the state prepared by the host device; the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data; and, if the received characteristic map data is correct, the management unit storing the characteristic map data in a memory unit.

5. A method for operating a reuse battery system as described in claim 4, wherein the higher-level device prepares the characteristic map data based on measurement data after reuse of the used batteries has begun and / or simulation results based on historical data after reuse has begun.

Citation Information

Patent Citations

  • Battery pack, and control method of battery pack

    JP2008098056A

  • Battery information update system

    JP2013024725A

  • Battery information management system, node, management method, recording method, and computer program

    WO2021010092A1