Information processing method, information processing device, and information processing program
The information processing method balances demand and supply across multiple taxi patrol areas by predicting demand and optimizing vehicle relocation, addressing the inefficiencies in conventional systems and improving customer acquisition opportunities and driver well-being.
Patent Information
- Application Number
- PCT/JP2024/010278
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-30
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-03
AI Technical Summary
Conventional taxi dispatch systems fail to evenly distribute customer acquisition opportunities among vehicles in multiple patrol areas, leading to inefficiencies and driver psychological fatigue due to concentration of vehicles in high-demand areas and lack of efficient vehicle relocation strategies.
An information processing method that balances demand and supply across multiple patrol areas by predicting transportation demand for each time period, rearranging vehicles to different areas, and optimizing vehicle relocation to minimize travel time and reduce driver fatigue, using a vehicle management system that calculates and updates itinerary plans based on supply and demand indices.
This approach ensures fair customer acquisition opportunities for all vehicles, reduces driver fatigue, and optimizes business operations by efficiently reallocating vehicles to match changing demand patterns, thereby improving overall business performance and reducing travel times.
Smart Images

Figure JP2024010278_03102024_PF_FP_ABST
Abstract
Description
Information processing method, information processing device, and information processing program
[0001] The present disclosure relates to a technology for creating a route plan that allocates a plurality of vehicles in a plurality of route areas for each of a plurality of time periods.
[0002] One business method for taxis is mobile driving. Mobile driving is a business method in which the driver continues to drive around town, etc., to find and pick up customers who want transportation. In mobile driving, driving on roads with high transportation demand leads to improved sales performance for the driver. Another business method for taxis is vehicle dispatching. Vehicle dispatching is a business method in which transportation orders sent by customers to a taxi operating company via telephone or smartphone are assigned to a vehicle that is close to the transportation request. In this case, too, being in an area with high transportation demand leads to an improved order rate for the driver. Generally, taxi drivers often drive around town in the hope of receiving transportation orders through vehicle dispatching.
[0003] Conventionally, drivers have decided their own travel areas, but this has led to the problem of vehicles concentrating in areas where they are likely to attract passengers. To address this problem, a system has been proposed in which taxi operating companies subdivide their travel areas (hereinafter, travel areas are also referred to as sub-areas) and specify the sub-areas that each vehicle should travel in (see, for example, Patent Documents 1 to 3).
[0004] However, with the above-mentioned conventional technology, it is difficult to ensure fairness in the opportunities to acquire customers among the multiple vehicles deployed in the multiple travel areas, and further improvement is needed.
[0005] JP 2019-91274 A JP 2019-57310 A JP 2014-6890 A
[0006] The present disclosure has been made to solve the above problem, and aims to provide a technology that can equalize the opportunity for multiple vehicles deployed in multiple patrol areas to acquire customers.
[0007] The information processing method disclosed herein is an information processing method in a computer that deploys multiple vehicles in multiple route areas for multiple time periods, obtains multiple vehicle identification information for identifying the multiple vehicles and demand forecast information that predicts transportation demand for each of the multiple route areas for each of the multiple time periods, deploys the multiple vehicles based on the multiple vehicle identification information and the demand forecast information so as to balance demand and supply in the multiple route areas for each of the multiple time periods, and creates a route plan that deploys at least one of the multiple vehicles in a route area different from the first time period in a second time period that is after a first time period among the multiple time periods, and outputs the route plan.
[0008] According to the present disclosure, it is possible to make the opportunity to acquire customers fair for multiple vehicles located in multiple travel areas.
[0009] 1 is a diagram illustrating an overall configuration of a vehicle dispatch management system according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating an example of subarea definition data according to the embodiment. FIG. 3 is a diagram illustrating an example of subarea adjacency matrix data according to the embodiment. FIG. 4 is a diagram illustrating an example of transportation demand expected value table data according to the embodiment. FIG. 5 is a diagram illustrating an example of vehicle definition data according to the embodiment. FIG. 6 is a flowchart illustrating the operation of a vehicle management server according to an embodiment of the present disclosure. FIG. 7 is a first flowchart illustrating the route planning process of the vehicle management server according to the embodiment. FIG. 8 is a second flowchart illustrating the route planning process of the vehicle management server according to the embodiment. FIG. 9 is a third flowchart illustrating the route planning process of the vehicle management server according to the embodiment. FIG. 10 is a diagram illustrating an example of an initial solution of a route plan according to the embodiment. FIG. 11 is a first flowchart illustrating the solution evaluation process of the vehicle management server according to the embodiment. FIG. 12 is a second flowchart illustrating the solution evaluation process of the vehicle management server according to the embodiment. FIG. 13 is a schematic diagram illustrating the process of calculating a first index value by a supply and demand balance evaluation unit according to the embodiment. FIG. 14 is a schematic diagram illustrating the process of calculating a second index value by a rearrangement evaluation unit according to the embodiment. Fig. 1 is a diagram showing an example of a tour plan presentation screen displayed on a driver's terminal in this embodiment. Fig. 2 is a diagram showing another example of a tour plan presentation screen displayed on a driver's terminal in this embodiment. Fig. 3 is a flowchart for explaining a solution evaluation process of a vehicle management server in a modified example of this embodiment. Fig. 4 is a schematic diagram for explaining a process of calculating a first index value by a supply and demand balance evaluation unit in a modified example of this embodiment.
[0010] (Knowledge that forms the basis of this disclosure) Conventional systems statistically predict the transportation demand volume (e.g., the number of transportation requests that occur per unit time) for each sub-area based on past sales performance logs, etc., and then dispatch an adjusted (e.g., proportional) number of vehicles to each sub-area based on that prediction, thereby leveling out the transportation supply and demand between sub-areas.
[0011] As a result, taxi operators can expect to improve their customer discovery rate in their mobile business and their order-taking rate in their dispatch business. Passengers can also benefit from the reduced time it takes to search for a vehicle.
[0012] However, the distribution of transportation demand changes depending on the time of day. If we are to pursue overall business optimization, we will need to dispatch vehicles to respond to these changes in the demand distribution. This will require the reallocation of vehicles that have already been dispatched according to the time of day.
[0013] It is necessary to efficiently reallocate vehicles according to the time of day. If vehicle reallocation is not performed efficiently, there is a risk that travel time unrelated to supply and demand equalization will increase. If the subareas assigned to each driver are changed periodically, it is necessary to shorten the travel time between subareas. However, conventional systems do not disclose how to efficiently reallocate vehicles.
[0014] For example, one method of allocating vehicles so that vehicles do not remain in the same subarea is to cyclically rotate the vehicles assigned to each of multiple subareas. Specifically, if 50 vehicles are assigned to a first subarea with a demand of 100 vehicles, a second subarea with a demand of 150 vehicles, a third subarea with a demand of 50 vehicles, and a fourth subarea with a demand of 200 vehicles so that the supply-demand ratio is balanced, then in a first time slot, 10 vehicles are assigned to the first subarea, 15 vehicles to the second subarea, 5 vehicles to the third subarea, and 20 vehicles to the fourth subarea. In this case, the supply-demand ratio (supply / demand) of each subarea is 1 / 10. If the vehicles in each sub-area are cyclically swapped in the second time slot following the first time slot, the 10 vehicles in the first sub-area will be assigned to the second sub-area, the 15 vehicles in the second sub-area will be assigned to the third sub-area, the 5 vehicles in the third sub-area will be assigned to the fourth sub-area, and the 20 vehicles in the fourth sub-area will be assigned to the first sub-area. At this time, the balance between supply and demand in each sub-area will be significantly disrupted.
[0015] From the driver's perspective, periodic relocation of vehicles is also necessary. If the sub-areas that each vehicle patrols are fixed or if there is a bias in the sub-areas that each vehicle patrols, two problems arise for the driver: inequality in customer acquisition opportunities and psychological fatigue.
[0016] Conventional systems equalize the supply and demand ratio for each sub-area. While the supply and demand ratio serves as a guide for the size of customer acquisition opportunities, there is a discrepancy between the supply and demand ratio and the actual customer acquisition opportunities. For example, various factors such as differences in the distribution of transportation demand due to the presence or absence of entertainment districts, ease of travel on roads, and differences in the scale of supply and demand are thought to affect customer acquisition opportunities, but it is difficult to incorporate the influence of these factors into a model and quantify the merits of each.
[0017] Furthermore, driving continuously within a relatively small specific sub-area for a long period of time places a heavy mental burden on the driver, as there is no opportunity for a change of pace.
[0018] As described above, from the viewpoint of equalizing the opportunities for each vehicle to acquire customers and reducing the psychological fatigue of drivers, it is necessary to reallocate each vehicle so that the destinations to which it is dispatched are diversified.
[0019] In order to solve the above problems, the following techniques are disclosed.
[0020] (1) An information processing method according to one aspect of the present disclosure is an information processing method in a computer that deploys multiple vehicles in multiple routing areas for multiple time periods, and acquires multiple vehicle identification information for identifying the multiple vehicles and demand forecast information that predicts transportation demand for each of the multiple routing areas for each of the multiple time periods, deploys the multiple vehicles based on the multiple vehicle identification information and the demand forecast information so as to balance demand and supply in the multiple routing areas for each of the multiple time periods, and creates a routing plan that deploys at least one of the multiple vehicles in a routing area different from the first time period during a second time period that is after a first time period among the multiple time periods, and outputs the routing plan.
[0021] According to this configuration, a plurality of vehicles are arranged so as to balance the supply and demand in a plurality of travel areas in each of a plurality of time periods, and at least one of the plurality of vehicles is arranged so as not to be arranged consecutively in the same travel area, thereby making it possible to make the opportunities for the plurality of vehicles arranged in the plurality of travel areas to acquire customers fair.
[0022] (2) In the information processing method described in (1) above, when acquiring the vehicle identification information and the demand forecast information, route area adjacency information indicating whether the multiple route areas are adjacent to each other may be further acquired, and when creating the route plan, the route plan may be created based on the route area adjacency information to position the multiple vehicles so that the route area in the time period before the movement and the route area in the time period after the movement are adjacent to each other.
[0023] According to this configuration, multiple vehicles are positioned so that the patrol area in the time period before the movement and the patrol area in the time period after the movement are adjacent to each other, thereby shortening the time required to move from the current patrol area to the next patrol area and preventing a shortening of transport business hours.
[0024] (3) In the information processing method described in (1) or (2) above, when creating the route plan, a route plan is created in which the multiple vehicles are placed in the multiple route areas for each of the multiple time periods, a first index value representing the error between supply and demand in the route plan is calculated, a second index value is calculated based on the length of the time interval between the last time the same vehicle was placed in the same route area and the time it is placed again in the route plan, an evaluation value is calculated by adding the first index value and the second index value, and the route plan is updated so that the calculated evaluation value is minimized.
[0025] According to this configuration, an optimal route plan can be created using an evaluation value obtained by adding a first index value representing the error between supply and demand in the route plan and a second index value given according to the length of the time interval between the last time the same vehicle was deployed in the same route area in the route plan and the time it is deployed again.
[0026] (4) In the information processing method described in (3) above, in calculating the first index value, an ideal number of vehicles to be dispatched is calculated for each of the multiple time periods based on the multiple vehicle identification information and the demand forecast information, by proportionally allocating the number of vehicles according to the transportation demand forecast value for each of the multiple routing areas; an actual number of vehicles to be dispatched is calculated for each of the multiple time periods based on the routing plan, by allocating the number of vehicles to each of the multiple routing areas; an absolute error between the actual number of vehicles to be dispatched and the ideal number of vehicles to be dispatched for each of the multiple routing areas is calculated for each of the multiple time periods; and an average value of the calculated absolute errors may be calculated as the first index value.
[0027] According to this configuration, the average value of the absolute error between the actual number of vehicles dispatched and the ideal number of vehicles dispatched for each of multiple patrol areas in multiple time periods can be used as the first index value, and by arranging multiple vehicles so that the first index value is minimized, it is possible to balance the supply and demand in multiple patrol areas in multiple time periods.
[0028] (5) In the information processing method described in (3) above, in calculating the first index value, the actual number of vehicles allocated to each of the plurality of route areas based on the route plan may be calculated for each of the plurality of time periods, the ratio between the actual number of vehicles allocated to each of the plurality of route areas and the transportation demand forecast value may be calculated for each of the plurality of time periods, the mean absolute error of the calculated ratios may be calculated for each of the plurality of time periods, and the average value of the mean absolute error for each of the plurality of time periods may be calculated as the first index value.
[0029] According to this configuration, the average value of the mean absolute error for each of multiple time periods of the ratio between the actual number of dispatched vehicles and the transportation demand forecast value for each of multiple travel areas in multiple time periods can be used as the first index value, and by arranging multiple vehicles so that the first index value is minimized, it is possible to balance the supply and demand in multiple travel areas in multiple time periods.
[0030] (6) In the information processing method described in (3) above, when calculating the second index value, if a vehicle is redeployed in the same patrol area as the vehicle was previously deployed in based on the patrol plan, a weight value corresponding to the difference between the time period in which the vehicle is redeployed and the time period in which the vehicle was previously deployed may be calculated for each of the plurality of vehicles, and the sum of the weight values for each of the plurality of vehicles may be calculated as the second index value.
[0031] According to this configuration, the smaller the difference between the time period in which a device is relocated to the same circulating area in which it was previously located and the time period in which it was previously located, the larger the weight value is set, thereby making it possible to prevent devices from being continuously located in the same circulating area.
[0032] (7) In the information processing method described in any one of (1) to (6) above, when outputting the patrol plan, the patrol plan may be transmitted to each of a plurality of terminals corresponding to the plurality of vehicles, and each of the plurality of terminals may present to the driver the patrol area of the vehicle in the current time zone and the patrol area of the vehicle in the next time zone.
[0033] According to this configuration, the driver can recognize the travel area of the vehicle in the current time period and the travel area of the vehicle in the next time period.
[0034] (8) In the information processing method described in (7) above, each of the plurality of terminals may display a map divided into the plurality of patrol areas, and may highlight the patrol area of the vehicle in the current time zone and the patrol area of the vehicle in the next time zone.
[0035] With this configuration, the driver can easily recognize the vehicle's patrol area in the current time period and the vehicle's patrol area in the next time period by looking at a map that highlights the vehicle's patrol area in the current time period and the vehicle's patrol area in the next time period.
[0036] (9) In the information processing method described in (7) above, each of the plurality of terminals may display in a table format the patrol area of the vehicle in the current time period and the patrol area of the vehicle in the next time period.
[0037] With this configuration, the driver can easily recognize the patrol area of his / her vehicle in the current time period and the patrol area of his / her vehicle in the next time period by looking at a table showing the patrol area of his / her vehicle in the current time period and the patrol area of his / her vehicle in the next time period.
[0038] Furthermore, the present disclosure can be realized not only as an information processing method that executes the characteristic processes described above, but also as an information processing device having a characteristic configuration corresponding to the characteristic processes executed by the information processing method. Furthermore, the present disclosure can also be realized as a computer program that causes a computer to execute the characteristic processes included in such an information processing method. Therefore, the same effects as those of the above information processing method can also be achieved in the following other aspects.
[0039] (10) An information processing device according to another aspect of the present disclosure is an information processing device that deploys multiple vehicles in multiple patrol areas for multiple time periods, and includes: an acquisition unit that acquires multiple vehicle identification information for identifying the multiple vehicles and demand forecast information that predicts transportation demand for each of the multiple patrol areas for each of the multiple time periods; a creation unit that creates a patrol plan based on the multiple vehicle identification information and the demand forecast information to deploy the multiple vehicles so as to balance supply and demand in the multiple patrol areas for each of the multiple time periods, and deploys at least one of the multiple vehicles in a patrol area different from the first time period in a second time period that is after a first time period among the multiple time periods; and an output unit that outputs the patrol plan.
[0040] (11) Another aspect of the present disclosure is an information processing program for deploying multiple vehicles in multiple route areas for multiple time periods, which program acquires multiple vehicle identification information for identifying the multiple vehicles and demand forecast information that predicts transportation demand for each of the multiple route areas for each of the multiple time periods, deploys the multiple vehicles based on the multiple vehicle identification information and the demand forecast information so as to balance demand and supply in the multiple route areas for each of the multiple time periods, and creates a route plan for deploying at least one of the multiple vehicles in a route area different from the first time period in a second time period that is after a first time period among the multiple time periods, and causes a computer to function in the following manner: outputting the route plan.
[0041] (12) A non-transitory computer-readable recording medium according to another aspect of the present disclosure records an information processing program, and the information processing program causes a computer to acquire multiple vehicle identification information for identifying the multiple vehicles and demand forecast information that predicts transportation demand for each of the multiple patrol areas for each of the multiple time periods, and, based on the multiple vehicle identification information and the demand forecast information, allocate the multiple vehicles so as to balance demand and supply in the multiple patrol areas in each of the multiple time periods, and create a patrol plan that allocates at least one of the multiple vehicles to a patrol area different from the first time period in a second time period that is after a first time period among the multiple time periods, and output the patrol plan.
[0042] Hereinafter, embodiments of the present disclosure will be described with reference to the accompanying drawings. Note that each of the embodiments described below represents a specific example of the present disclosure. The numerical values, shapes, components, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure. Furthermore, among the components in the following embodiments, components that are not described in the independent claims that represent the highest concept are described as optional components. Furthermore, in all embodiments, the respective contents can be combined.
[0043] (Embodiment) FIG. 1 is a diagram showing the overall configuration of a vehicle dispatch management system according to an embodiment of the present disclosure.
[0044] The vehicle dispatch management system shown in FIG. 1 includes a vehicle management server 1 and a plurality of driver terminals 2 .
[0045] The driver terminal 2 is, for example, a smartphone, a tablet computer, or a car navigation device mounted on a vehicle, and is carried by the driver who drives the vehicle. The vehicle is, for example, a taxi for transporting people. The driver terminal 2 receives a dispatch instruction sent by the vehicle management server 1. The dispatch instruction includes a dispatch plan indicating in which sub-area (patrol area) the vehicle will be placed for each of a number of time periods. The driver terminal 2 presents the dispatch plan included in the received dispatch instruction to the driver. The driver moves the vehicle to the sub-area in which it is placed according to the presented route plan, and picks up customers within the sub-area. Each of the multiple driver terminals 2 has the same basic configuration.
[0046] In this embodiment, a predetermined area on the map is divided into a plurality of sub-areas, and the vehicle travels within the sub-area to find and pick up customers who wish to be transported. The vehicle then changes sub-areas at predetermined intervals (for example, every hour).
[0047] Furthermore, although the vehicle in this embodiment is a taxi, the present disclosure is not particularly limited to this, and the vehicle may also be a vehicle for delivering food or the like from a store to a location specified by a customer in response to a transportation request from the customer.
[0048] The vehicle management server 1 is connected to a plurality of driver terminals 2 via a network so that they can communicate with each other. The network is, for example, the Internet.
[0049] The vehicle management server 1 includes a setting database 11 , an information acquisition unit 12 , a route plan creation unit 13 , a transmission unit 14 , and a current solution storage unit 17 .
[0050] The information acquisition unit 12 and the travel schedule creation unit 13 are realized by a processor. The processor is configured by, for example, a central processing unit (CPU).
[0051] The setting database 11 and the current solution storage unit 17 are realized by a memory, which may be, for example, a read-only memory (ROM) or an electrically erasable programmable read-only memory (EEPROM).
[0052] The transmitter 14 is realized by a communication module.
[0053] The setting database 11 stores in advance subarea definition data, subarea adjacency matrix data, transportation demand expected value table data, and vehicle definition data.
[0054] FIG. 2 is a diagram showing an example of sub-area definition data in this embodiment, FIG. 3 is a diagram showing an example of sub-area adjacency matrix data in this embodiment, FIG. 4 is a diagram showing an example of transportation demand expected value table data in this embodiment, and FIG. 5 is a diagram showing an example of vehicle definition data in this embodiment.
[0055] The subarea definition data is data that indicates boundary lines for dividing a map into a plurality of subareas. As shown in Fig. 2, in this embodiment, the subarea definition data defines the positions on the map of four subareas, for example, a first subarea A, a second subarea B, a third subarea C, and a fourth subarea D.
[0056] The subarea adjacency matrix data indicates whether multiple subareas are adjacent to each other. The vertical and horizontal axes of the subarea adjacency matrix data represent subareas, with 1 set to elements where subareas are adjacent and 0 set to elements where subareas are not adjacent. As shown in FIG. 3 , in this embodiment, the first subarea A and the second subarea B are adjacent, so 1 is set to elements corresponding to the first subarea A and the second subarea B. Furthermore, the first subarea A and the third subarea C are not adjacent, so 0 is set to elements corresponding to the first subarea A and the third subarea C. Furthermore, the first subarea A and the fourth subarea D are adjacent, so 1 is set to elements corresponding to the first subarea A and the fourth subarea D.
[0057] The transportation demand expectation table data is data showing demand forecast information that predicts transportation demand for each of multiple sub-areas for each of multiple time periods. The demand forecast information shows the expected number of transportation demand occurrences for each sub-area in each time period. In this embodiment, the multiple time periods include 24 time periods divided into hourly intervals from midnight to 11:59 PM. As shown in FIG. 4 , for example, in the midnight time period, the expected value of transportation demand for the first sub-area A is 10.11, the expected value of transportation demand for the second sub-area B is 12.21, the expected value of transportation demand for the third sub-area C is 11.38, and the expected value of transportation demand for the fourth sub-area D is 78.49. The expected value of transportation demand for each sub-area in each time period is calculated based on past history and is the average value of the past number of transportation demand occurrences. The transportation demand expectation table data may be created for each day of the week, each month, or each season.
[0058] The vehicle definition data is data indicating a plurality of pieces of vehicle identification information for identifying a plurality of vehicles. As shown in Fig. 5, in this embodiment, the vehicle definition data includes the vehicle identification information of three vehicles: a first vehicle v1, a second vehicle v2, and a third vehicle v3. Note that the vehicle definition data may include not only the vehicle identification information of each of the plurality of vehicles, but also information about the driver and the vehicle model.
[0059] The information acquisition unit 12 acquires vehicle definition data indicating a plurality of vehicle identification information for identifying a plurality of vehicles, and transportation demand expected value table data indicating demand forecast information predicting transportation demand for each of a plurality of sub-areas for each of a plurality of time periods. The information acquisition unit 12 also acquires sub-area adjacency matrix data (travel area adjacency information) indicating whether a plurality of sub-areas are adjacent to each other.
[0060] The route plan creation unit 13 creates a route plan based on the plurality of vehicle identification information and the demand forecast information to allocate a plurality of vehicles so as to balance supply and demand in a plurality of sub-areas in each of a plurality of time periods, and to allocate at least one of the plurality of vehicles in a sub-area different from the first time period in a second time period that is after a first time period among the plurality of time periods. Furthermore, the route plan creation unit 13 further creates a route plan based on the sub-area adjacency matrix data (route area adjacency information) to allocate a plurality of vehicles so that a sub-area in a time period before movement and a sub-area in a time period after movement are adjacent to each other.
[0061] The travel schedule creation unit 13 includes a solution creation unit 15 and a solution evaluation unit 16 .
[0062] The solution creating unit 15 creates a route plan in which multiple vehicles are allocated to multiple sub-areas for multiple time periods. The solution creating unit 15 also updates the route plan so that the evaluation value calculated by the solution evaluating unit 16 is minimized.
[0063] The solution generating unit 15 includes an initial solution generating unit 151 and an improved solution generating unit 152 .
[0064] The initial solution creation unit 151 creates an initial solution for a route plan for each of a plurality of vehicles, in which subareas are randomly assigned to each of a plurality of time periods. At this time, the initial solution creation unit 151 creates an initial solution for a route plan for each of a plurality of vehicles that satisfies a predetermined constraint condition. The predetermined constraint condition is that a subarea in a time period before movement and a subarea in a time period after movement are adjacent to each other. The initial solution creation unit 151 outputs the created initial solution for the route plan to the solution evaluation unit 16, and acquires an evaluation value for the initial solution from the solution evaluation unit 16. The initial solution creation unit 151 outputs the initial solution and the evaluation value of the initial solution to the improved solution creation unit 152.
[0065] The improved solution creation unit 152 acquires the initial solution of the travel plan and the evaluation value of the initial solution output by the initial solution creation unit 151, and stores the acquired initial solution and the evaluation value of the initial solution in the current solution memory unit 17 as the current solution of the travel plan and the evaluation value of the current solution.
[0066] The current solution storage unit 17 stores the current solution of the tour plan and the evaluation value of the current solution.
[0067] Note that the number of combinations of route plans to be evaluated is (number of subareas * number of time periods)^number of vehicles, so it is difficult to evaluate all route plans by exhaustive search. For this reason, in this embodiment, an algorithm that searches for a quasi-optimal solution is used. As a specific algorithm, for example, Very Large-scale Neighborhood Search (VLNS) is used. VLNS has been disclosed in a conventional literature, for example (Ravindra K. Ahuja, James B. Orlin, and Dushyant Sharma, "Very large-scale neighborhood search," International Transactions in Operational Research, 2000, Volume 7, Issues 4-5, Pages 301-317).
[0068] The improved solution creation unit 152 acquires the current solution of the travel plan from the current solution storage unit 17 and randomly extracts a predetermined number of subsequences from the current solution sequences for multiple subareas arranged in chronological order for each vehicle. The improved solution creation unit 152 creates a group of hypothesis sequences that lists all hypothesis sequences for multiple subareas, the number of which is the same as the extracted subsequences and which satisfy predetermined constraints, through an exhaustive search. The improved solution creation unit 152 creates a hypothetical solution for the travel plan in which the subsequence of the current solution is replaced with one hypothesis sequence from the group of hypothesis sequences. The improved solution creation unit 152 outputs the created hypothetical solution of the travel plan to the solution evaluation unit 16 and acquires an evaluation value of the hypothetical solution from the solution evaluation unit 16.
[0069] The improved solution creating unit 152 determines whether the evaluation value of the hypothetical solution is smaller than the evaluation value of the current solution stored in the current solution storage unit 17, and if the evaluation value of the hypothetical solution is smaller than the evaluation value of the current solution, stores the hypothetical solution and its evaluation value as the current solution and its evaluation value in the current solution storage unit 17. On the other hand, if the evaluation value of the hypothetical solution is equal to or greater than the evaluation value of the current solution, the improved solution creating unit 152 creates a hypothetical solution in which the subsequence of the current solution is replaced with another hypothesis sequence from the group of hypothesis sequences. If the improved solution creating unit 152 cannot obtain an evaluation value of a hypothetical solution smaller than the evaluation value of the current solution even after replacing all of the group of hypothesis sequences, it randomly extracts a predetermined number of subsequences again from the sequence of the current solution.
[0070] The improved solution creating unit 152 creates an optimal solution for the travel plan by repeatedly creating a hypothetical solution for the travel plan and updating the current solution a predetermined number of times. After repeatedly creating a hypothetical solution for the travel plan and updating the current solution a predetermined number of times, the improved solution creating unit 152 outputs the current solution of the travel plan stored in the current solution storage unit 17 to the transmission unit 14 as the final solution.
[0071] The solution evaluation unit 16 calculates a first index value that represents the error between supply and demand in the routing plan created by the solution creation unit 15, calculates a second index value that is given according to the length of the time interval between the last time the same vehicle was deployed in the same sub-area in the routing plan and the time when it is deployed again, and calculates an evaluation value by adding the first index value and the second index value. The solution evaluation unit 16 acquires an initial solution from the initial solution creation unit 151 and calculates an evaluation value of the acquired initial solution. The solution evaluation unit 16 also acquires a hypothetical solution from the improved solution creation unit 152 and calculates an evaluation value of the acquired hypothetical solution.
[0072] The solution evaluation unit 16 includes a supply and demand balance evaluation unit 161 , a relocation evaluation unit 162 , and an evaluation value calculation unit 163 .
[0073] The supply and demand balance evaluation unit 161 calculates an ideal number of vehicles to be allocated for each of a plurality of time periods, by proportionally allocating the number of vehicles to each of a plurality of subareas according to the transportation demand forecast value for each of a plurality of subareas, based on the vehicle identification information and the demand forecast information. The supply and demand balance evaluation unit 161 calculates an actual number of vehicles to be allocated for each of a plurality of time periods, by allocating the number of vehicles to each of a plurality of subareas based on the routing plan. The routing plan is an initial solution or a hypothetical solution routing plan. The supply and demand balance evaluation unit 161 calculates an absolute error (Absolute Error) between the actual number of vehicles to be allocated for each of a plurality of subareas and the ideal number of vehicles to be allocated, for each of a plurality of time periods. The supply and demand balance evaluation unit 161 calculates the average value of the calculated absolute errors as a first index value F1. The supply and demand balance evaluation unit 161 evaluates the error in the supply and demand rate for each subarea with a level of importance proportional to the magnitude of demand.
[0074] The first index value F1 in this embodiment is expressed by the following equations (1) to (4).
[0075] F1=Σ_AREA Σ_TZ DSAE(area, tz) / (|AREA|*|TZ|)...(1) DSAE (area, tz) = | Spl (area, tz) - Spl * (area, tz) | ... (2) Spl (area, tz) = | {v∈V | Plan (v, tz) = area} | ... (3) Spl*(area, tz)=|V|*Dem(area, tz) / Σ_area∈AREA Dem(area, tz)...(4) In the above equations (1) to (4), DSAE(area, tz) represents the absolute error from the ideal number of vehicles to be dispatched in the sub-area area during the time period tz, Spl(area, tz) represents the actual number of vehicles to be dispatched in the sub-area area during the time period tz, Spl*(area, tz) represents the ideal number of vehicles to be dispatched (proportional allocation) to the sub-area area during the time period tz, Dem(area, tz) represents the expected value of transportation demand for the sub-area area during the time period tz, Plan(v, tz) represents the sub-area for the time period tz in the route plan of vehicle v, V represents a set of vehicles, AREA represents a set of sub-areas, and TZ represents a set of time periods.
[0076] The rearrangement evaluation unit 162 detects, based on the routing plan, whether each of the multiple vehicles has been relocated to the same sub-area in which it was previously deployed. The routing plan is a routing plan of an initial solution or a hypothetical solution. When, based on the routing plan, the multiple vehicles have been relocated to the same routing area in which they were previously deployed, the rearrangement evaluation unit 162 calculates, for each of the multiple vehicles, a weight value corresponding to the difference between the time period in which they are relocated and the time period in which they were previously deployed. The rearrangement evaluation unit 162 calculates the sum of the weight values for each of the multiple vehicles as the second index value F2.
[0077] The second index value F2 in this embodiment is expressed by the following equations (5) to (7).
[0078] F2=Σ_v∈V PenRV(v) / |V|...(5) PenRV(v)=Σ_i=1toT RV(v,i)*w_i...(6) RV(v,i)={tz∈TZ|Plan(v,tz)==Plan(v,tz-i)}...(7) In the above equations (5) to (7), PenRV(v) represents the rearrangement penalty value for rearrangement of the nearest subarea of vehicle v, RV(v, i) represents the number of rearrangements of vehicle v to the subarea i steps ago, Plan(v, tz) represents the subarea of time period tz in the patrol plan of vehicle v, T represents the maximum retrospective width for checking rearrangements, w_i represents a weight value (1 < i ≦ T) to be added to the rearrangement penalty value, V represents a set of vehicles, and TZ represents a set of time periods.
[0079] The evaluation value calculation unit 163 calculates an evaluation value by adding the first index value F1 and the second index value F2. More specifically, the evaluation value calculation unit 163 calculates the evaluation value based on the following equation (8).
[0080] Evaluation value=first index value F1+coefficient α*second index value F2 (8) In the above equation (8), the coefficient α is a predetermined value, which is a real number equal to or greater than 0.
[0081] The evaluation value calculation unit 163 calculates an evaluation value of the initial solution by adding the first index value F1 and the second index value F2 calculated based on the initial solution, and outputs the calculated evaluation value of the initial solution to the initial solution creation unit 151. The evaluation value calculation unit 163 also calculates an evaluation value of the hypothetical solution by adding the first index value F1 and the second index value F2 calculated based on the hypothetical solution, and outputs the calculated evaluation value of the hypothetical solution to the improved solution creation unit 152.
[0082] The transmission unit 14 outputs the tour plan created by the tour plan creation unit 13. More specifically, the transmission unit 14 acquires sub-area definition data from the setting database 11. Then, the transmission unit 14 outputs the final solution of the tour plan created by the improved solution creation unit 152 and the sub-area definition data acquired from the setting database 11. The transmission unit 14 transmits a dispatch instruction including the tour plan and the sub-area definition data to the driver terminal 2.
[0083] Next, the operation of the vehicle management server 1 according to the embodiment of the present disclosure will be described.
[0084] FIG. 6 is a flowchart for explaining the operation of the vehicle management server 1 according to the embodiment of the present disclosure.
[0085] First, in step S1, the information acquisition unit 12 acquires vehicle definition data, transportation demand expected value table data, and sub-area adjacency matrix data from the setting database 11. The information acquisition unit 12 outputs the vehicle definition data, transportation demand expected value table data, and sub-area adjacency matrix data to the travel schedule creation unit 13. More specifically, the information acquisition unit 12 outputs the vehicle definition data and the sub-area adjacency matrix data to the solution creation unit 15, and outputs the vehicle definition data and the transportation demand expected value table data to the solution evaluation unit 16.
[0086] Next, in step S2, the route plan creation unit 13 executes a route plan creation process to create a route plan based on the vehicle definition data, the transportation demand expected value table data, and the subarea adjacency matrix data, in which a plurality of vehicles are allocated so as to balance supply and demand in a plurality of subareas in each of a plurality of time periods, and in which at least one of the plurality of vehicles is allocated in a subarea different from the first time period in a second time period that is after the first time period among the plurality of time periods, and in which the plurality of vehicles are allocated so that the subarea in the time period before the movement and the subarea in the time period after the movement are adjacent to each other. The route plan creation process will be described later.
[0087] Next, in step S3, the transmission unit 14 outputs the route plan created by the route plan creation unit 13. At this time, the transmission unit 14 transmits a dispatch instruction including the route plan and the sub-area definition data to the driver terminal 2.
[0088] In this way, a plurality of vehicles are arranged so that the supply and demand of a plurality of travel areas in each of a plurality of time periods are balanced, and at least one of the plurality of vehicles is arranged so that two or more vehicles are not arranged consecutively in the same travel area, so that the chances of acquiring customers for the plurality of vehicles arranged in a plurality of travel areas can be made fair.
[0089] Next, the details of the travel schedule creation process in step S2 of FIG. 6 will be described.
[0090] Figure 7 is a first flowchart for explaining the route plan creation process of the vehicle management server 1 in this embodiment, Figure 8 is a second flowchart for explaining the route plan creation process of the vehicle management server 1 in this embodiment, and Figure 9 is a third flowchart for explaining the route plan creation process of the vehicle management server 1 in this embodiment.
[0091] First, in step S11 , the initial solution creating unit 151 acquires the vehicle definition data and the sub-area adjacency matrix data output from the information acquiring unit 12 .
[0092] Next, in step S12, the initial solution generating unit 151 randomly determines a sub-area for one of the multiple vehicles in the midnight time slot.
[0093] Next, in step S13, the initial solution creation unit 151 determines subareas for the time period from 1:00 to 23:00 for vehicle 1 by random walk. At this time, the initial solution creation unit 151 determines subareas for each time period so as to satisfy the constraint that a subarea in the time period before movement and a subarea in the time period after movement are adjacent. The initial solution creation unit 151 refers to the subarea adjacency matrix data and determines subareas for each time period so that adjacent subareas are arranged in chronological order.
[0094] Next, in step S14, the initial solution creation unit 151 determines whether route plans have been created for all of the multiple vehicles. If it is determined that route plans have not been created for all of the multiple vehicles (NO in step S14), the process returns to step S12. Then, the initial solution creation unit 151 randomly determines sub-areas for the time slot between midnight and 12 o'clock for the remaining vehicles among the multiple vehicles for which route plans have not been created.
[0095] On the other hand, if it is determined that a route plan has been created for all of the multiple vehicles (YES in step S14), in step S15, the initial solution creation unit 151 outputs the created route plan for the multiple vehicles to the solution evaluation unit 16 as an initial solution.
[0096] FIG. 10 is a diagram showing an example of an initial solution of a travel plan in this embodiment.
[0097] As shown in FIG. 10 , the initial solution creation unit 151 creates a daily route plan from midnight to 11:59 PM for each of a plurality of vehicles. Each vehicle moves through a sub-area every hour. Therefore, the initial solution creation unit 151 determines the sub-area that each vehicle will patrol every hour. For example, the time period between midnight and 12:00 AM refers to the time period from midnight to 12:59 AM, and the time period between 11:00 PM and 11:59 PM refers to the time period from 11:00 PM to 11:59 PM. FIG. 10 shows a route plan for three vehicles: a first vehicle v1, a second vehicle v2, and a third vehicle v3.
[0098] The initial solution of the travel plan is significantly different from the optimal solution because subareas are randomly assigned to each time period. However, it satisfies the constraint that the subarea in the time period before the movement and the subarea in the time period after the movement are adjacent to each other.
[0099] Next, in step S16, the solution evaluation unit 16 executes a solution evaluation process to calculate an evaluation value of the initial solution of the travel plan created by the initial solution creation unit 151. The solution evaluation process will be described later.
[0100] Next, in step S17, the initial solution creation unit 151 acquires an evaluation value of the initial solution of the travel plan from the solution evaluation unit 16. The initial solution creation unit 151 outputs the initial solution of the travel plan and the evaluation value of the initial solution to the improved solution creation unit 152.
[0101] Next, in step S18, the improved solution creation unit 152 acquires the initial solution of the travel plan and the evaluation value of the initial solution output from the initial solution creation unit 151, and stores the acquired initial solution and the evaluation value of the initial solution in the current solution memory unit 17 as the current solution of the travel plan and the evaluation value of the current solution.
[0102] Next, in step S19, the improved solution creating unit 152 initializes the count value of the number of processing times. That is, the improved solution creating unit 152 sets the count value of the number of processing times to 0.
[0103] Next, in step S20, the improved solution creation unit 152 acquires the current solution of the travel plan from the current solution storage unit 17, and randomly extracts a predetermined number of subsequences from the current solution series of multiple subareas arranged in chronological order for each vehicle.
[0104] For example, if a first vehicle v1, a second vehicle v2, and a third vehicle v3 are located in the following subareas between the time slots of midnight and 11 a.m., the improved solution creation unit 152 extracts a subsequence (B-C-D-A) of the four subareas for the third vehicle v3 between the time slots of 5 a.m. and 8 a.m. The number of sequences to be extracted and the locations to be extracted are random.
[0105] First vehicle v1: A-B-C-D-A-B-C-D-A-B-C-D-... Second vehicle v2: A-B-C-D-A-B-C-D-A-B-C-D-... Third vehicle v3: A-B-C-D-A-(B-C-D-A)-B-C-D-... Note that the above "A", "B", "C", and "D" represent the first sub-area A, second sub-area B, third sub-area C, and fourth sub-area D, respectively.
[0106] Next, in step S21, the improved solution creation unit 152 creates a group of hypothesis sequences by exhaustively searching all hypothesis sequences for multiple subareas that are the same in number as the extracted partial sequences and that satisfy a predetermined constraint. The predetermined constraint is that the subarea in the time slot before the movement and the subarea in the time slot after the movement are adjacent to each other. The improved solution creation unit 152 references the subarea adjacency matrix data to create a hypothesis sequence in which adjacent subareas are arranged in chronological order. For example, if a partial sequence (B-C-D-A) for four subareas from the 5:00 to 8:00 time slots of the third vehicle v3 is extracted as described above, the improved solution creation unit 152 creates a group of hypothesis sequences consisting of hypothesis sequences such as (B-C-B-A), (B-D-B-A), and (D-B-C-D).
[0107] Next, in step S22, the improved solution creating unit 152 acquires one hypothesis sequence from the created group of hypothesis sequences.
[0108] Next, in step S23, the improved solution creating unit 152 creates a hypothetical solution of the tour plan by replacing the subsequence of the current solution with the acquired single hypothetical sequence.
[0109] Next, in step S24 , the improved solution creating unit 152 outputs the created hypothetical solution of the route plan for multiple vehicles to the solution evaluating unit 16 .
[0110] Next, in step S25, the solution evaluation unit 16 executes a solution evaluation process to calculate an evaluation value of the hypothetical solution of the tour plan created by the improved solution creation unit 152. The solution evaluation process will be described later.
[0111] Next, in step S26 , the improved solution generating unit 152 acquires the evaluation value of the hypothetical solution of the tour plan from the solution evaluating unit 16 .
[0112] Next, in step S27 , the improved solution generating unit 152 determines whether the evaluation value of the acquired tentative solution is smaller than the evaluation value of the current solution stored in the current solution storage unit 17 .
[0113] Here, if it is determined that the evaluation value of the hypothetical solution is smaller than the evaluation value of the current solution (YES in step S27), in step S28, the improved solution creation unit 152 stores the hypothetical solution and the evaluation value of the hypothetical solution in the current solution storage unit 17 as the current solution and the evaluation value of the current solution.
[0114] On the other hand, if it is determined that the evaluation value of the hypothesis solution is equal to or greater than the evaluation value of the current solution (NO in step S27), then in step S29 the improved solution creating unit 152 determines whether all hypothesis sequences in the group of hypothesis sequences have been acquired. If it is determined that all hypothesis sequences in the group of hypothesis sequences have not been acquired (NO in step S29), the processing returns to step S22. Then, the improved solution creating unit 152 acquires another hypothesis sequence that has not yet been acquired from the created group of hypothesis sequences.
[0115] On the other hand, if it is determined that all of the hypothesis sequences in the hypothesis sequence group have been acquired (YES in step S29), the process proceeds to step S30.
[0116] Next, in step S30, the improved solution creating unit 152 determines whether the count value of the number of processing times is a predetermined number. If it is determined that the count value of the number of processing times is not the predetermined number (NO in step S30), the improved solution creating unit 152 increments the count value of the number of processing times in step S31. Then, the process returns to step S20.
[0117] On the other hand, if it is determined that the count value of the number of processing times is a predetermined number (YES in step S30), in step S32, the improved solution creation unit 152 obtains the current solution of the tour plan from the current solution storage unit 17 as the final solution.
[0118] Next, in step S33, the improved solution creating unit 152 outputs the final solution of the tour plan to the transmitting unit 14.
[0119] Next, the solution evaluation process in step S16 in FIG. 7 and step S25 in FIG. 8 will be described in detail.
[0120] Figure 11 is a first flowchart for explaining the solution evaluation processing of the vehicle management server 1 in this embodiment, Figure 12 is a second flowchart for explaining the solution evaluation processing of the vehicle management server 1 in this embodiment, and Figure 13 is a third flowchart for explaining the solution evaluation processing of the vehicle management server 1 in this embodiment.
[0121] First, in step S41, the supply and demand balance evaluation unit 161 acquires an initial solution of the traveling plan created by the initial solution creation unit 151 or a hypothetical solution of the traveling plan created by the improved solution creation unit 152. In the solution evaluation process of step S16 in Fig. 7, the supply and demand balance evaluation unit 161 acquires the initial solution of the traveling plan created by the initial solution creation unit 151. Furthermore, in the solution evaluation process of step S25 in Fig. 8, the supply and demand balance evaluation unit 161 acquires a hypothetical solution of the traveling plan created by the improved solution creation unit 152.
[0122] Next, in step S42 , the supply and demand balance evaluation unit 161 acquires the vehicle definition data and the transportation demand expected value table data output from the information acquisition unit 12 .
[0123] Next, in step S43, the supply and demand balance evaluation unit 161 acquires the transportation demand expected values of all sub-areas in one time period out of the plurality of time periods from the transportation demand expected value table data. First, the supply and demand balance evaluation unit 161 acquires the transportation demand expected values of all sub-areas in the time period between midnight and midnight from the transportation demand expected value table data.
[0124] Next, in step S44, the supply and demand balance evaluation unit 161 calculates the number of owned vehicles based on the vehicle definition data. The number of vehicle identification information included in the vehicle definition data is the number of owned vehicles.
[0125] Next, in step S45, the supply and demand balance evaluation unit 161 calculates the ideal number of vehicles to be dispatched for each sub-area in one time period by proportionally allocating the number of vehicles owned in accordance with the expected transportation demand value of each sub-area in one time period.
[0126] Next, in step S46, the supply and demand balance evaluation unit 161 calculates the number of vehicles actually dispatched to each sub-area in one time period based on the initial solution or hypothetical solution of the route plan.
[0127] Next, in step S47, the supply and demand balance evaluation unit 161 calculates the absolute error between the actual number of vehicles to be allocated and the ideal number of vehicles to be allocated in each sub-area in one time period. The absolute error is the absolute value of the difference between the actual number of vehicles to be allocated and the ideal number of vehicles to be allocated.
[0128] Next, in step S48, the supply and demand balance evaluation unit 161 determines whether the absolute error for each sub-area for all time periods has been calculated. If it is determined that the absolute error for each sub-area for all time periods has not been calculated (NO in step S48), the process returns to step S43. Then, the supply and demand balance evaluation unit 161 acquires, from the transportation demand expected value table data, transportation demand expected values for all sub-areas for another time period that has not yet been acquired among the multiple time periods. The processes of steps S43 to S48 are repeated until the absolute error for each sub-area for all time periods from the midnight time period to the 11:00 p.m. time period has been calculated.
[0129] On the other hand, if it is determined that the absolute errors for each sub-area for all time periods have been calculated (YES in step S48), in step S49, the supply and demand balance evaluation unit 161 calculates the average value of the absolute errors for all sub-areas for all time periods as a first index value F1. The supply and demand balance evaluation unit 161 temporarily stores the calculated first index value F1 in a memory (not shown).
[0130] 14 is a schematic diagram for explaining the process of calculating the first index value F1 by the supply and demand balance evaluation unit 161 in this embodiment. For ease of explanation, FIG. 14 uses four time periods from midnight to 3:00, four sub-areas from the first sub-area A to the fourth sub-area D, and ten vehicles from the first vehicle v1 to the tenth vehicle v10.
[0131] As shown in FIG. 14 , the supply and demand balance evaluation unit 161 calculates the ideal number of vehicles to be allocated to each subarea in all time periods by proportionally allocating the number of vehicles owned (10) in accordance with the transportation demand expectation value in the transportation demand expectation value table data. The supply and demand balance evaluation unit 161 also calculates the actual number of vehicles to be allocated to each subarea in all time periods by aggregating the initial or hypothetical solutions of the route plan. The supply and demand balance evaluation unit 161 then calculates the absolute error for each subarea in all time periods, i.e., the absolute error for each element. Finally, the supply and demand balance evaluation unit 161 calculates the average value of the absolute errors for all subareas in all time periods, i.e., the average value of the absolute errors for all elements, as the first index value F1.
[0132] 11 , next, in step S50, the reallocation evaluation unit 162 initializes the reallocation penalty value. That is, the reallocation evaluation unit 162 sets the reallocation penalty value to 0. The reallocation penalty value is stored in a memory (not shown).
[0133] Next, in step S51, the rearrangement evaluation unit 162 acquires a route plan for one vehicle from the initial solution or the hypothetical solution. In the solution evaluation process in step S16 of Fig. 7, the rearrangement evaluation unit 162 acquires a route plan for one vehicle from the initial solution of the route plan created by the initial solution creation unit 151. Also, in the solution evaluation process in step S25 of Fig. 8, the rearrangement evaluation unit 162 acquires a route plan for one vehicle from the hypothetical solution of the route plan created by the improved solution creation unit 152. The route plan for one vehicle indicates in which sub-area one vehicle is to be deployed in each of a plurality of time periods.
[0134] Next, in step S52, the rearrangement evaluation unit 162 acquires a sub-area for one of the multiple time periods from the acquired one vehicle route plan.
[0135] Next, in step S53, the rearrangement evaluation unit 162 acquires a retroactive width of 1 from the retroactive width group. The retroactive width group is a set made up of integers between 1 and T inclusive. The retroactive width group is a numerical value indicating how far back in time to go from the current time period. For example, if the retroactive width group includes three retroactive widths {1, 2, 3}, retroactive width "1", retroactive width "2", and retroactive width "3" are acquired in that order.
[0136] Next, in step S54, the rearrangement evaluation unit 162 determines whether the sub-area of time period 1 is the same as the sub-area of time period 1 obtained by adding the retroactive width 1 to time period 1. If it is determined that the sub-area of time period 1 is not the same as the sub-area of time period 1 obtained by adding the retroactive width 1 to time period 1 (NO in step S54), the process proceeds to step S56.
[0137] On the other hand, if it is determined that the sub-area of time period 1 is the same as the sub-area of time period 1 plus the retroactive width of 1 (YES in step S54), in step S55, the rearrangement evaluation unit 162 adds a predetermined weight value to the rearrangement penalty value.
[0138] The predetermined weight value is set in advance. The predetermined weight value may be increased as the retroactive width becomes smaller. For example, if the retroactive width is "1", the weight value may be set to "3", if the retroactive width is "2", the weight value may be set to "2", and if the retroactive width is "3", the weight value may be set to "1". As a result, the shorter the time interval between placements in the same sub-area, the greater the penalty. Therefore, in the optimization process, it is possible to preferentially avoid relocations in the same sub-area at short time intervals.
[0139] Next, in step S56, the rearrangement evaluation unit 162 determines whether all retroactive widths have been acquired from the retroactive width group. If it is determined that all retroactive widths have not been acquired from the retroactive width group (NO in step S56), the process returns to step S53. Then, the rearrangement evaluation unit 162 acquires another retroactive width that has not yet been acquired from the retroactive width group.
[0140] On the other hand, if it is determined that all retrospective widths have been obtained from the retrospective width group (YES in step S56), in step S57, the rearrangement evaluation unit 162 determines whether sub-areas for all of the multiple time periods have been obtained from the acquired vehicle patrol plan.
[0141] If it is determined that the sub-areas for all of the time periods have not been acquired from the acquired vehicle route plan (NO in step S57), the process returns to step S52. Then, the rearrangement evaluation unit 162 acquires a sub-area for another time period that has not yet been acquired from the acquired vehicle route plan.
[0142] On the other hand, if it is determined that subareas for all of the multiple time periods have been acquired from the acquired vehicle route plan (YES in step S57), in step S58, the rearrangement evaluation unit 162 determines whether route plans for all vehicles have been acquired from the initial solution or the hypothetical solution. Here, if it is determined that route plans for all vehicles have not been acquired from the initial solution or the hypothetical solution (NO in step S58), the processing returns to step S51. Then, the rearrangement evaluation unit 162 acquires a route plan for another vehicle that has not yet been acquired from the initial solution or the hypothetical solution.
[0143] On the other hand, if it is determined that the route plans for all vehicles have been obtained from the initial solution or the hypothetical solution (YES in step S58), in step S59, the rearrangement evaluation unit 162 acquires the current value of the rearrangement penalty value as the second index value F2.
[0144] 15 is a schematic diagram for explaining the process of calculating the second index value F2 by the rearrangement evaluation unit 162 in this embodiment. For ease of explanation, FIG. 15 uses four time periods from midnight to 3:00, four sub-areas from the first sub-area A to the fourth sub-area D, and ten vehicles from the first vehicle v1 to the tenth vehicle v10.
[0145] As shown in FIG. 15 , the rearrangement evaluation unit 162 detects, for each of the multiple vehicles, whether the vehicle has been rearranged to the same subarea where it was previously located, based on the initial solution or hypothetical solution of the route plan. For example, for the third vehicle v3, the fourth vehicle v4, the fifth vehicle v5, and the sixth vehicle v6, the subarea for the 3:00 a.m. time slot is the same as the subarea for the previous 2:00 a.m. time slot. In this case, the rearrangement evaluation unit 162 adds four first weight values to the rearrangement penalty value. Furthermore, for the first vehicle v1, the second vehicle v2, the third vehicle v3, and the fourth vehicle v4, the subarea for the 2:00 a.m. time slot is the same as the subarea for the previous midnight time slot. In this case, the rearrangement evaluation unit 162 adds four second weight values, each smaller than the first weight value, to the rearrangement penalty value. Finally, the rearrangement evaluation unit 162 obtains the current location of the rearrangement penalty value as a second index value F2.
[0146] Returning to Fig. 12 , next, in step S60, the evaluation value calculation unit 163 calculates an evaluation value by adding the first index value F1 and the second index value F2. More specifically, the evaluation value calculation unit 163 calculates the evaluation value based on the above equation (8). In the solution evaluation process in step S16 of Fig. 7 , the evaluation value calculation unit 163 calculates an evaluation value of the initial solution of the tour plan created by the initial solution creation unit 151. Furthermore, in the solution evaluation process in step S25 of Fig. 8 , the evaluation value calculation unit 163 calculates an evaluation value of the hypothetical solution of the tour plan created by the improved solution creation unit 152.
[0147] Next, in step S61, the evaluation value calculation unit 163 outputs the calculated evaluation value to the solution generation unit 15. In the solution evaluation process in step S16 of Fig. 7, the evaluation value calculation unit 163 outputs the calculated evaluation value of the initial solution to the initial solution generation unit 151. In addition, in the solution evaluation process in step S25 of Fig. 8, the evaluation value calculation unit 163 outputs the calculated evaluation value of the hypothetical solution to the improved solution generation unit 152.
[0148] Next, the tour plan presentation screen displayed on the driver terminal 2 will be described.
[0149] FIG. 16 is a diagram showing an example of a tour plan presentation screen displayed on the driver terminal 2 in this embodiment.
[0150] The transmitter 14 of the vehicle management server 1 transmits the tour plan to each of the plurality of driver terminals 2 corresponding to the plurality of vehicles. Each of the plurality of driver terminals 2 receives the tour plan transmitted by the vehicle management server 1. Each of the plurality of driver terminals 2 presents to the driver the sub-area of the vehicle in the current time zone and the sub-area of the vehicle in the next time zone.
[0151] Each of the plurality of driver terminals 2 displays a map divided into a plurality of sub-areas, and highlights the sub-area of the vehicle in the current time zone and the sub-area of the vehicle in the next time zone.
[0152] Each of the driver terminals 2 is equipped with a display unit 21 configured with a liquid crystal display device or a touch panel. As shown in Fig. 16, the display unit 21 displays a map divided into a plurality of sub-areas. Furthermore, if the current time zone is the 1 PM time zone, and the host vehicle is located in the third sub-area C during the 1 PM time zone and in the second sub-area B during the 2 PM time zone, the display unit 21 highlights the third sub-area C in which the host vehicle should patrol during the current time zone and the second sub-area B in which the host vehicle should patrol in the next time zone.
[0153] For example, the display unit 21 displays in red the characters indicating the sub-area in which the vehicle should patrol in the current time period, in blue the characters indicating the sub-area in which the vehicle should patrol in the next time period, and in black the characters indicating the other sub-areas. In this way, the display unit 21 may display the sub-area in which the vehicle should patrol in the current time period, the sub-area in which the vehicle should patrol in the next time period, and the other sub-areas in different ways.
[0154] Furthermore, in this embodiment, the sub-areas that the vehicle should patrol in the current time period and the sub-areas that the vehicle should patrol in the next time period are highlighted, but the present disclosure is not limited to this, and the sub-areas that the vehicle should patrol in the next time period and thereafter may be highlighted.
[0155] FIG. 17 is a diagram showing another example of the tour plan presentation screen displayed on the driver terminal 2 in this embodiment.
[0156] Each of the plurality of driver terminals 2 may display, in a table format, the sub-area of the vehicle in the current time zone and the sub-area of the vehicle in the next time zone. As shown in Fig. 17 , the display unit 21 may display, in a table format, the sub-areas that the vehicle should travel after the current time zone.
[0157] Each of the plurality of driver terminals 2 may combine the display of the route plan using the map shown in FIG. 16 with the display of the route plan using the table shown in FIG.
[0158] The driver, while viewing the displayed route plan, determines the route to find the customer. At this time, the driver determines the route within the indicated subarea. Furthermore, if the current time slot is nearing the end, the driver may patrol from the subarea of the current time slot to approach the subarea of the next time slot. After picking up the customer, the driver moves according to the customer's transportation request. As a result, if the customer gets off in a subarea other than the current subarea, it is preferable that the driver promptly return to the current subarea.
[0159] Next, a solution evaluation process of the vehicle management server 1 in a modification of this embodiment will be described. In this modification of this embodiment, the operation of the supply and demand balance evaluation unit 161 differs from that in the above embodiment.
[0160] The supply and demand balance evaluation unit 161 calculates the number of actually allocated vehicles for each of multiple sub-areas for each of multiple time periods based on the route plan. The supply and demand balance evaluation unit 161 calculates the ratio between the number of actually allocated vehicles for each of the multiple sub-areas and the expected value of transportation demand (forecasted transportation demand value) for each of the multiple sub-areas for each of the multiple time periods. The supply and demand balance evaluation unit 161 calculates the mean absolute error (Mean Absolute Error) of the calculated ratios for each of the multiple time periods for each of the multiple time periods. The supply and demand balance evaluation unit 161 calculates the average value of the mean absolute error for each of the multiple time periods as a first index value F1. The supply and demand balance evaluation unit 161 evaluates the error in the supply and demand rate for each sub-area with the same importance regardless of the magnitude of demand.
[0161] The first index value F1 in the modified example of this embodiment is expressed by the following equations (9) to (13).
[0162] F1=Σ_area∈AREA Σ_tz∈TZ DSMAE(area, tz) / (|AREA|*|TZ|)...(9) DSMAE (area, tz) = | DSR (area, tz) - DSM (tz) | / | AREA | (10) DSM (tz) = Σ_area∈AREA DSR (area, tz) / | AREA | (11) DSR(area, tz)=Spl(area, tz) / Dem(area, tz)...(12) Spl(area, tz)=|{v∈V|Plan(v,tz)=area}|...(13) In the above equations (9) to (13), DSMAE(area, tz) represents the mean absolute error of the supply and demand ratio in the sub-area area for the time slot tz, DSM(tz) represents the sub-area average value of the supply and demand ratio in the time slot tz, DSR(area, tz) represents the supply and demand ratio in the sub-area area for the time slot tz, Spl(area, tz) represents the actual number of dispatched vehicles in the sub-area area for the time slot tz, Dem(area, tz) represents the expected transport demand value for the sub-area area for the time slot tz, Plan(v, tz) represents the sub-area for the time slot tz in the route plan of vehicle v, V represents a set of vehicles, AREA represents a set of sub-areas, and TZ represents a set of time slots.
[0163] FIG. 18 is a flowchart for explaining the solution evaluation process of the vehicle management server 1 in the modified example of this embodiment.
[0164] The process of step S71 is the same as the process of step S41 shown in FIG. 11, and therefore a description thereof will be omitted.
[0165] Next, in step S72 , the supply and demand balance evaluation unit 161 acquires the transportation demand expected value table data output from the information acquisition unit 12 .
[0166] Next, in step S73, the supply and demand balance evaluation unit 161 calculates the actual number of vehicles to be dispatched in each sub-area in each time period based on the initial solution or hypothetical solution of the route plan.
[0167] Next, in step S74, the supply-demand balance evaluation unit 161 calculates the supply-demand ratio for each sub-area in each time period based on the calculated number of actually allocated vehicles and the acquired transportation demand expected value table data. The supply-demand ratio is the ratio between the actually allocated number of vehicles and the transportation demand expected value, and is the value obtained by dividing the actually allocated number of vehicles by the transportation demand expected value.
[0168] Next, in step S75, the supply and demand balance evaluation unit 161 acquires the supply and demand ratios of all sub-areas in one of the multiple time periods.
[0169] Next, in step S76, the supply and demand balance evaluation unit 161 calculates the average value of the supply and demand ratios of all the sub-areas in one time period.
[0170] Next, in step S77, the supply and demand balance evaluation unit 161 calculates the mean absolute error of the supply and demand ratio in one time slot based on the calculated average value of the supply and demand ratio and the supply and demand ratios of all sub-areas in one time slot. The supply and demand balance evaluation unit 161 subtracts the supply and demand ratio of each sub-area in one time slot from the average value, and calculates the average value of the subtracted values as the mean absolute error.
[0171] Next, in step S78, the supply and demand balance evaluation unit 161 determines whether the mean absolute error of the supply and demand ratio for all time periods has been calculated. If it is determined that the mean absolute error of the supply and demand ratio for all time periods has not been calculated (NO in step S78), the process returns to step S75. Then, the supply and demand balance evaluation unit 161 acquires the supply and demand ratios of all sub-areas for another time period that has not yet been acquired from among the multiple time periods.
[0172] On the other hand, if it is determined that the mean absolute error of the supply and demand ratio for all time periods has been calculated (YES in step S78), in step S79, the supply and demand balance evaluation unit 161 calculates the average value of the mean absolute error of the supply and demand ratio for all time periods as the first index value F1.
[0173] The process from step S79 onwards is the same as the process from step S50 onwards in FIG. 11, and therefore a description thereof will be omitted.
[0174] 19 is a schematic diagram for explaining the process of calculating the first index value F1 by the supply and demand balance evaluation unit 161 in a modification of this embodiment. For ease of explanation, FIG. 19 uses four time periods from midnight to 3:00, four sub-areas from the first sub-area A to the fourth sub-area D, and ten vehicles from the first vehicle v1 to the tenth vehicle v10.
[0175] As shown in FIG. 19 , the supply and demand balance evaluation unit 161 calculates the actual number of vehicles to be allocated to each sub-area in all time periods by aggregating the initial solution or hypothetical solution of the route plan. Then, the supply and demand balance evaluation unit 161 calculates the supply and demand ratio for each sub-area in each time period based on the calculated actual number of vehicles to be allocated and the acquired transportation demand expected value table data. Then, the supply and demand balance evaluation unit 161 calculates the average value of the supply and demand ratio for all sub-areas in each time period. Then, the supply and demand balance evaluation unit 161 calculates the mean absolute error of the supply and demand ratio for each of the multiple time periods. Finally, the supply and demand balance evaluation unit 161 calculates the average value of the mean absolute error of the supply and demand ratio for all time periods as the first index value F1.
[0176] In each of the above embodiments, each component may be configured with dedicated hardware, or may be realized by executing a software program suitable for that component. Each component may be realized by a program execution unit such as a CPU or processor reading and executing a software program recorded on a recording medium such as a hard disk or semiconductor memory. Furthermore, the program may be executed by another independent computer system by recording the program on a recording medium and transferring it, or by transferring the program via a network.
[0177] Some or all of the functions of the device according to the embodiment of the present disclosure are typically realized as an LSI (Large Scale Integration), which is an integrated circuit. These may be individually integrated into a single chip, or some or all of them may be integrated into a single chip. Furthermore, the integrated circuit is not limited to an LSI, and may be realized using a dedicated circuit or a general-purpose processor. It is also possible to use an FPGA (Field Programmable Gate Array), which can be programmed after LSI manufacturing, or a reconfigurable processor, which can reconfigure the connections and settings of circuit cells within an LSI.
[0178] Furthermore, some or all of the functions of the device according to the embodiment of the present disclosure may be realized by a processor such as a CPU executing a program.
[0179] Furthermore, all the numbers used above are merely examples to specifically explain the present disclosure, and the present disclosure is not limited to the numbers used as examples.
[0180] The order in which the steps are executed in the above flowchart is merely an example for specifically explaining the present disclosure, and other orders may be used as long as similar effects are obtained. Also, some of the steps may be executed simultaneously (in parallel) with other steps.
[0181] The technology disclosed herein can equalize the opportunities for multiple vehicles deployed in multiple route areas to acquire customers, and is therefore useful as a technology for creating route plans that deploy multiple vehicles in multiple route areas for multiple time periods.
Claims
1. An information processing method in a computer for deploying a plurality of vehicles in a plurality of routing areas for a plurality of time periods, comprising the steps of: acquiring a plurality of vehicle identification information for identifying the plurality of vehicles and demand forecast information that predicts transportation demand for each of the plurality of routing areas for the plurality of time periods; deploying the plurality of vehicles based on the plurality of vehicle identification information and the demand forecast information so as to balance demand and supply in the plurality of routing areas in each of the plurality of time periods; creating a routing plan for deploying at least one of the plurality of vehicles in a routing area different from the first time period in a second time period that is after a first time period among the plurality of time periods; and outputting the routing plan.
2. An information processing method as described in claim 1, further comprising the steps of: acquiring, in acquiring the vehicle identification information and the demand forecast information, route area adjacency information indicating whether the multiple route areas are adjacent to one another; and creating, in creating the route plan, further comprising the steps of: based on the route area adjacency information, creating the route plan for positioning the multiple vehicles so that the route area in the time period before the movement and the route area in the time period after the movement are adjacent to each other.
3. An information processing method as described in claim 1 or 2, wherein in creating the route plan, a route plan is created in which the vehicles are deployed in the route areas for each of the time periods, a first index value is calculated to represent an error between demand and supply in the route plan, a second index value is calculated according to the length of the time interval from when the same vehicle was deployed in the same route area last time to when it is deployed again in the route plan, an evaluation value is calculated by adding the first index value and the second index value, and the route plan is updated so that the calculated evaluation value is minimized.
4. An information processing method as described in claim 3, wherein in calculating the first index value, an ideal number of vehicles to be allocated proportionally to the number of vehicles according to the transportation demand forecast value for each of the plurality of routing areas is calculated for each of the plurality of time periods based on the plurality of vehicle identification information and the demand forecast information, an actual number of vehicles to be allocated to each of the plurality of routing areas based on the routing plan is calculated for each of the plurality of time periods, an absolute error between the actual number of vehicles to be allocated for each of the plurality of routing areas and the ideal number of vehicles to be allocated for each of the plurality of time periods, and an average value of the calculated absolute errors is calculated as the first index value.
5. An information processing method as described in claim 3, wherein in calculating the first index value, an actual number of vehicles allocated to each of the plurality of routing areas based on the routing plan is calculated for each of the plurality of time periods, a ratio between the actual number of vehicles allocated to each of the plurality of routing areas and a transportation demand forecast value is calculated for each of the plurality of time periods, a mean absolute error of the calculated ratios is calculated for each of the plurality of time periods, and an average value of the mean absolute error for each of the plurality of time periods is calculated as the first index value.
6. The information processing method of claim 3, wherein in calculating the second index value, when a vehicle is redeployed in the same patrol area as the vehicle was previously deployed in based on the patrol plan, a weight value corresponding to the difference between the time period in which the vehicle is redeployed and the time period in which the vehicle was previously deployed is calculated for each of the plurality of vehicles, and the sum of the weight values for each of the plurality of vehicles is calculated as the second index value.
7. An information processing method as described in claim 1 or 2, wherein in outputting the route plan, the route plan is transmitted to each of a plurality of terminals corresponding to the plurality of vehicles, and each of the plurality of terminals presents to the driver the route area of the vehicle in the current time period and the route area of the vehicle in the next time period.
8. The information processing method according to claim 7, wherein each of the plurality of terminals displays a map divided into the plurality of patrol areas, and highlights the patrol area of the vehicle in the current time period and the patrol area of the vehicle in the next time period.
9. The information processing method according to claim 7, wherein each of the plurality of terminals displays in a table format the vehicle's patrol area in the current time period and the vehicle's patrol area in the next time period.
10. An information processing device that deploys a plurality of vehicles in a plurality of routing areas for each of a plurality of time periods, comprising: an acquisition unit that acquires a plurality of vehicle identification information for identifying the plurality of vehicles and demand forecast information that predicts transportation demand for each of the plurality of routing areas for each of the plurality of time periods; a creation unit that creates a routing plan that deploys the plurality of vehicles based on the plurality of vehicle identification information and the demand forecast information so as to balance demand and supply in the plurality of routing areas in each of the plurality of time periods, and deploys at least one of the plurality of vehicles in a routing area different from the first time period in a second time period that is after a first time period among the plurality of time periods; and an output unit that outputs the routing plan.
11. An information processing program for deploying a plurality of vehicles in a plurality of routing areas for a plurality of time periods, comprising: acquiring a plurality of vehicle identification information for identifying the plurality of vehicles and demand forecast information predicting transportation demand for each of the plurality of routing areas for the plurality of time periods; deploying the plurality of vehicles based on the plurality of vehicle identification information and the demand forecast information so as to balance demand and supply in the plurality of routing areas in each of the plurality of time periods; and creating a routing plan for deploying at least one of the plurality of vehicles in a routing area different from the first time period in a second time period that is after a first time period among the plurality of time periods; and causing a computer to function as follows: outputting the routing plan.
Citation Information
Patent Citations
Vehicle demand prediction system
JP1997153098A
Optimum arrangement system for taxis
JP2014006890A
Vehicle management system and vehicle management method
JP2019219845A
