Electric power distribution system
The power distribution system dynamically allocates power to electrical devices based on usage probability and importance, optimizing energy use and promoting renewable energy adoption by integrating a battery unit, private power generation, and advanced power management.
Patent Information
- Application Number
- PCT/JP2024/012637
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-29
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-03
AI Technical Summary
Conventional power distribution systems fail to effectively manage power supply to multiple electrical devices, especially during peak demand and energy crises, and hinder the adoption of renewable energy sources due to inflexible priority control methods and high costs associated with solar power generation equipment.
A power distribution system that includes a battery unit with a private power generation module, a power supply management device, and a power conditioner, which measures power consumption, prioritizes electrical devices based on usage probability and importance, and switches between grid power and stored energy to optimize power allocation.
This system ensures efficient power distribution, promotes the use of renewable energy sources by dynamically allocating power based on demand, reducing waste and enhancing user convenience while minimizing equipment costs.
Smart Images

Figure JP2024012637_03102024_PF_FP_ABST
Abstract
Description
Power Distribution System
[0001] The present invention relates to a technique for managing power supply to a plurality of electrical devices and power distribution to a plurality of power consuming facilities.
[0002] Recently, abnormal weather and natural disasters have led to tight power supplies and calls for restrictions on power usage. Furthermore, in light of global warming, we are moving into an era in which natural energy is required, rather than power generation using fossil fuels.
[0003] Conventionally, the idea has been to adjust the amount of power generated to meet the demand for electricity. However, in the current situation where there are calls to reduce carbon dioxide emissions as a measure against global warming, the inventors of the present application thought that power generation using fossil fuels would be curbed and that the demand side would be adjusted to match the amount of power generated.
[0004] Power demand is the aggregate of the power consumed by multiple electrical devices. Therefore, in order to adjust power demand, it is effective to prioritize the use of each electrical device. Priority control here refers to a control method in which, among multiple processing targets (in this example, electrical devices), the one with the highest priority is selected and processed. In other words, it does not assume that power is supplied to all electrical devices at all times, but rather prioritizes the power supply.
[0005] Furthermore, with regard to reducing carbon dioxide emissions, there is also a technology that reduces the use of external electricity from the power grid (system power supply) by combining renewable energy sources such as solar power generation (Patent Document 3).
[0006] Japanese Patent No. 5893995 Japanese Patent Application Laid-Open No. 2020-167815 Japanese Patent No. 7346211
[0007] Patent Document 1 discloses a power supply system that can stably supply power to a load even in the event of a power outage. Patent Document 2 discloses a technology that increases power consumption in response to a request from a power supplier to increase power consumption, thereby promoting the effective use of surplus power. These technologies perform priority control regarding power consumption. However, both Patent Documents 1 and 2 are technologies that continue to use the previously set priorities for power supply destinations.
[0008] There are many different types of electrical appliances that use electricity, and they are used in a variety of situations. It is common for one electrical appliance to be used in a situation where another is not, and conversely, for one electrical appliance to be used in a situation where another is not. This means that the need for electrical appliances changes from time to time.
[0009] Therefore, simply assigning a priority to each electrical device does not meet the realistic demand for using multiple electrical devices appropriately depending on the situation. In particular, it is important to allocate power skillfully to adapt to changing power supply conditions.
[0010] Furthermore, when solar power generation is used for each home in addition to the power grid, as in Patent Document 3, the cost burden for the solar power generation equipment is large, which is an obstacle to the widespread use of power generation modules that use renewable energy.
[0011] The present invention was developed based on the above-mentioned recognition, and its main purpose is to effectively distribute power to multiple electrical devices. It also aims to promote the use of power generation modules that are used in conjunction with a power grid.
[0012] In one embodiment of the present invention, the battery unit includes a power input / output unit that receives and supplies power to an external device, an external supply storage unit that stores the received power, and a power supply management device that controls the power supply from the external supply storage unit to an electrical device connected to the external device.
[0013] According to an aspect of the present invention, a battery unit includes a private power generation module and the battery unit. The external device is a power conditioner, and the electrical equipment is connected to the power conditioner via a distribution board.
[0014] A power supply management system in one aspect of the present invention includes a supply measurement unit connected to a plurality of electrical devices and measuring the power that can be supplied to the plurality of electrical devices, and an equipment control unit that disables one of the plurality of electrical devices when the total value of the power consumed by each of the plurality of electrical devices is greater than the power that can be supplied.
[0015] In another aspect of the present invention, a power distribution system includes a power generation module shared by a plurality of power users, and a plurality of power conditioners provided for each of the power users' power consumption equipment, which switch between a first power supplied from a power grid and a second power supplied from the power generation module and pass the first power to the power consumption equipment.
[0016] According to the present invention, it is possible to effectively distribute power to a plurality of electrical devices, and it is also possible to promote the use of power generation modules that are used in conjunction with a power grid.
[0017] 1 is a configuration diagram of a residential power facility. FIG. 1 is a configuration diagram of a battery unit. FIG. 1 is an overview diagram of communications. FIG. 1 is a screen diagram of a power supply plan. FIG. 1 is a screen diagram of a power supply plan when use of an oxygen inhaler is started. FIG. 1 is a screen diagram of a power supply plan when use of an air conditioner is started. FIG. 2 is a screen diagram of a power supply plan when operation of a vacuum cleaner is stopped. FIG. 2 is a screen diagram of a power supply plan when operation of an iron is manually permitted. FIG. 3 is a screen diagram of a power supply plan when operation of a hair dryer is manually prohibited. FIG. 3 is a screen diagram of a power supply plan when operation of an air conditioner cannot be manually permitted. FIG. 4 is a functional block diagram of a power supply management device. FIG. 4 is a data configuration diagram of a power supply plan. FIG. 14 (A) is a functional block diagram of an electric device. FIG. 14 (B) is a functional block diagram of a control panel 700. FIG. 15 (A) is a sequence diagram when operation of an electric device is permitted. FIG. 15 (B) is a sequence diagram when operation of an electric device is prohibited. A flowchart showing a power supply plan generation process. A sequence diagram when operation of an electric device is stopped. A sequence diagram when operation of an electric device is manually permitted. FIG. 23 is a sequence diagram of energization in response to a usage schedule inquiry. FIG. 23 is a sequence diagram of power ON in response to a usage status inquiry. FIG. 23 is a configuration diagram of power equipment in a second embodiment. FIG. 23 is an outline diagram of communication in a second embodiment. FIG. 23(A) is a transition diagram of power consumption in a home. FIG. 23(B) is a transition diagram of first power consumption and second power consumption in a home. FIG. 23 is a screen diagram of a power consumption exceeding warning.
[0018] [First embodiment] Fig. 1 is a configuration diagram of a residential power facility. In this embodiment, an on-grid home is assumed. The on-grid home uses a power grid 300 (sometimes called a "power transmission system" or "power grid") to which power is provided by a power company, and its own power generation facility. The power grid 300 is a general power source.
[0019] 1 , the independent power generation facility is a private power generation module 500 that includes, as power sources, a solar cell module 502, a fuel cell module 504, and a wind power generation module 506. The private power generation module 500 may include all or some of the solar cell module 502, the fuel cell module 504, and the wind power generation module 506. The direct current generated by the private power generation module 500 is input to a power conditioner 600.
[0020] The independent power generation facility also uses a battery unit 100 for storing unused power. The battery unit 100 includes a storage battery (e.g., a lead-acid battery, a lithium-ion secondary battery, or a lithium-ion polymer secondary battery) that stores power to be supplied to an electrical device 400 (e.g., an oxygen inhaler, an air conditioner, etc.). The electrical device 400 may be any device that operates using electricity. The electrical device 400 will be described in detail later. The battery unit 100 in this embodiment has a communication function and an information processing function. The configuration of the battery unit 100 will be described later with reference to FIG. 2.
[0021] The power conditioner 600 converts the direct current obtained from the private power generation module 500 into alternating current and sends it to the distribution board 200. When the power obtained from the private power generation module 500 is not consumed, the power conditioner 600 sends the direct current directly to the battery unit 100 and controls it so that it is stored in the battery unit 100. Furthermore, when the power obtained from the private power generation module 500 alone is not enough to meet the power consumption, the power conditioner 600 also controls the battery unit 100 to discharge.
[0022] The battery unit 100 stores the DC current input from the power conditioner 600. The battery unit 100 also outputs the discharged DC current to the power conditioner 600. The power conditioner 600 converts the input DC current into AC current and sends it to the distribution board 200.
[0023] The power conditioner 600 does not use power from the power grid 300 when the power obtained from the private power generation module 500 and the battery unit 100 is sufficient. On the other hand, when the power obtained from the private power generation module 500 and the battery unit 100 is not sufficient, the power conditioner 600 obtains power from the power grid 300 and sends it to the distribution board 200. The power conditioner 600 measures the power obtained from the private power generation module 500, the power obtained from the battery unit 100, and the power obtained from the power grid 300.
[0024] The distribution board 200 transmits the AC current (electric power) input from the power conditioner 600 to each electrical device 400 via wiring, an outlet, a power strip, and the like within the house.
[0025] In this way, the multiple electrical devices 400 operate by receiving power from a common power source. The electrical devices 400 may be devices that operate electronic components such as arithmetic circuits, memory circuits, or light-emitting elements, or devices that operate mechanical components such as motors, pumps, or heating coils. Examples of electrical devices 400 include a refrigerator, a vacuum cleaner, an oxygen inhaler, an air conditioner, a hair dryer, a charger, a personal computer, a television, a microwave oven, a dryer, an iron, a game console, and a shredder. In the case of an on-grid home, the common power source refers to the battery unit 100, the private power generation module 500, and the power grid 300. The power source is a device or facility that supplies power to other devices or facilities. The battery unit 100 has a function of managing the power supply to each electrical device 400.
[0026] 2 is a configuration diagram of the battery unit 100. The battery unit 100 has an external power supply storage unit 102. The external power supply storage unit 102 is, for example, a lead acid battery, a lithium ion secondary battery, or a lithium ion polymer secondary battery. However, the type is not limited. The external power supply storage unit 102 is used to supply power to the electrical device 400. Therefore, unlike an internal power supply storage battery built into a smartphone or the like, the external power supply storage unit 102 has a large capacity.
[0027] The power input / output unit 104 is an interface for taking in power from outside the battery unit 100 or discharging power to the outside. For example, during charging, a direct current from the power conditioner 600 is input to the power input / output unit 104. During discharging, a direct current is output from the power input / output unit 104 to the power conditioner 600. The external supply power storage unit 102 may be charged with power supplied from the private power generation module 500 or may be charged with power supplied from the power grid 300 (an example of an external power generation source).
[0028] In this way, the power input / output unit 104 supplies and receives power to and from the power conditioner 600. The power conditioner 600 is an example of an external device. The power input / output unit 104 may supply and receive power to and from an external device other than the power conditioner 600.
[0029] The battery unit 100 includes a power supply management device 101. The power supply management device 101 manages power supply to a plurality of electrical devices 400 that operate by receiving power from a common power source.
[0030] The power supply management device 101 has a communication module 106 for communication. Communication methods include mobile communication (for example, a fifth-generation mobile communication system), Internet communication, wireless LAN (Local Area Network), wired LAN, BLE (Bluetooth Low Energy), Wi-SUN (Wireless Smart Utility Network), and satellite communication. The communication module 106 may support multiple communication methods. Power line communication may be used in part of the communication path. An overview of communication will be described later with reference to FIG. 3.
[0031] The power supply management device 101 has a storage unit 108 for storing various information and programs. The storage unit 108 uses a memory device such as a random access memory (RAM), a read only memory (ROM), a flash memory, or a hard disk drive (HDD). A combination of multiple types of memory devices may also be used. The storage unit 108 is not limited to an internal memory device, and may also use a removable memory device such as a universal serial bus (USB) memory.
[0032] The power supply management device 101 has a calculation unit 112 that executes calculation processing. The calculation unit 112 uses a general-purpose processor such as a CPU (Central Processing Unit), a coprocessor, a GPU (Graphics Processing Unit), a TPU (Tensor Processing Unit), an FPGA (Field-Programmable Gate Array), etc. The calculation unit 112 performs processing for power supply management, which will be described later with reference to FIGS. 15 to 18 .
[0033] The battery unit 100 has a sensor 110. The sensor 110 measures the storage current, storage power, and storage voltage during storage, and the discharge current, discharge power, and discharge voltage during discharge. The sensor 110 also measures the charge rate (also called the "charge rate" or "SOC (States Of Charge)") of the external supply power storage unit 102.
[0034] 3 is a schematic diagram of communication. Each module in the private power generation module 500 has a communication module (not shown) for communicating with the communication module 106 (see FIG. 2) of the power supply management device 101. Each electrical device 400 also has a communication module (not shown) for communicating with the communication module 106 of the power supply management device 101.
[0035] The operation panel 700 is a remote terminal that provides a user interface for the power supply management device 101. A user can use the operation panel 700 to understand the status of power supply management in the power supply management device 101 and issue various instructions to the power supply management device 101. The operation panel 700 has a touch panel (not shown), displays a screen provided by the power supply management device 101, and accepts user operations. The operation panel 700 has a communication module (not shown) for communicating with the communication module 106 of the power supply management device 101. The operation panel 700 is attached to, for example, a wall of a house. Alternatively, the operation panel 700 may be configured to be disposed inside the battery unit 100.
[0036] The power supply management device 101 can communicate with a user terminal 720 used by a resident. The user terminal 720 is used for the same purpose as the operation panel 700, for example. The user terminal 720 is a smartphone, a tablet terminal, a personal computer, or the like. The user terminal 720 displays a screen provided by the power supply management device 101 and accepts user operations. The user can use the user terminal 720 in the same way as the operation panel 700. The user terminal 720 can be used both inside and outside the home.
[0037] The battery unit 100 can transmit and receive information to and from a web server 800. The battery unit 100 uses the web server 800 for purposes such as collecting various types of information. The type of web server 800 is not limited. The web server 800 may be, for example, a server that provides information on the power supply status in a power grid or a server that provides information on traffic conditions. The web server 800 may be a dedicated server that supports the use of the battery unit 100. The web server 800 may be a server that is publicly available. The battery unit 100 may have the functionality of the web server 800. For example, the battery unit 100 can provide information as the web server 800. The battery unit 100 may transmit and receive information to and from devices in the home, such as a home server (not shown). The battery unit 100 can obtain information from the home server and store the information in the home server.
[0038] As described above, the power conditioner 600 measures the power obtained from the private power generation module 500, the power obtained from the battery unit 100, and the power grid 300. The power supply management device 101 receives the power measurement values obtained by the power conditioner 600 (see FIG. 2 ) and grasps changes in the power supply status. Specifically, the power supply management device 101 calculates the power that can be supplied to the electrical devices 400 in the home (hereinafter referred to as "supplyable power"). The power supply management device 101 may obtain the status of the power grid 300 from the web server 800 and calculate the supplyable power based on that information. The supplyable power is the power that a common power source can supply to all of the multiple electrical devices. The supplyable power is, for example, the sum of the power obtained from the private power generation module 500, the power obtained from the battery unit 100, and the power obtained from the power grid 300. In this embodiment, the supplyable power is not unlimited. Therefore, the priority control of electronic devices is performed assuming that the power demand may exceed the available power supply. The priority control method in this embodiment will be described in detail later.
[0039] The power supply management device 101 generates a power supply plan for supplying power to each electric device 400 in accordance with changes in the power supply situation. The power supply plan is updated as appropriate, taking into account the operating status of the electric device 400. The power supply management device 101 then controls whether to permit operation of each electric device 400 in accordance with the latest power supply plan. In this way, the power supply to the multiple electric devices 400 is managed. The power supply plan is data that defines in advance whether or not to permit use of power for an electric device 400 that attempts to use power. Not permitting an operation is synonymous with prohibiting an operation. Permitting an operation and prohibiting an operation correspond to the presence or absence of an operation restriction.
[0040] A system including the private power generation module 500 and the battery unit 100 is referred to as a "battery system." The battery system may also include an operation panel 700, a power conditioner 600, a user terminal 720, and a web server 800. The battery system may also include devices within the home, such as a home server (not shown).
[0041] Fig. 4 is a diagram of a power supply plan screen. The power supply plan screen is generated in the power supply management device 101 and displayed on the operation panel 700 or the user terminal 720. Fig. 4 shows an example of a display at a certain timing. As will be described later, when the situation changes and the power supply plan is updated, the power supply plan screen is updated as needed and redisplayed.
[0042] First, a brief overview of the power supply plan screen illustrated in FIG. 4 will be given. The terms related to the electrical device 400 used in this figure will be outlined below. More detailed explanations will be provided later, including examples. The electrical device 400 is either in an operating state or in an inoperating state. "Operating" in the figure indicates that the device is currently operating. Hereinafter, an inoperating state will be referred to as "stopped" (not shown). "Stopped" electrical devices 400 include those that can be used immediately and those that cannot be used immediately. "Permitted" indicates that operation is not restricted and can be used immediately, and "Prohibited" indicates that operation is restricted and cannot be used immediately. In the figure, electrical devices 400 displayed as "Permitted" or "Prohibited" are both "stopped."
[0043] "Importance" indicates the degree of importance to the user (for example, an integer from 1 to 5). The importance is determined mainly by the function and purpose of the electrical device 400. An electrical device that is difficult to use when desired is considered to be of high importance. An electrical device that can be tolerated even if it is not available when desired is considered to be of low importance. Generally, electrical devices related to health, daily life, or occupation are considered to be of high importance. An electrical device that is highly preferred or optional is considered to be of low importance. In short, when a user wants to use two electrical devices 400 simultaneously, the one that is absolutely necessary is considered to be of high importance, and the one that can be dispensed with is considered to be of low importance. In many cases, it is acceptable to determine the importance based on general standards, but there are also cases where it is better to determine the importance individually depending on individual circumstances. For example, a game console that is generally considered to be of low importance may be considered to be of high importance to a professional gamer.
[0044] The "importance" does not necessarily relate to the frequency of use. For example, an electrical device 400 that is used only occasionally, such as a steam inhaler used for sore throats, may be important. Also, an electrical device 400 that is used frequently, such as an indoor lighting device for creating an atmosphere, may not be important.
[0045] The importance may be set by a user or may be set automatically by power supply management device 101. Furthermore, the importance automatically set by power supply management device 101 may be adjusted and operated by a user. As a method for automatically setting the importance, power supply management device 101 may acquire the importance stored in electric device 400. Alternatively, power supply management device 101 may acquire the importance of electric device 400 from web server 800 of a provider of power supply management device 101, or may acquire the importance of electric device 400 from web server 800 of a manufacturer or seller of electric device 400. In this way, the importance of electric device 400 can be arbitrarily set by the user or the manufacturer, seller, etc. of electric device 400.
[0046] A parameter called "operation probability" is also set for the electrical device 400. The "operation probability" is a value statistically determined based on usage history to predict whether a user will want to use the device. The usage history may be measured in units of one day or a predetermined time period (e.g., 30 minutes or one hour). A parameter called "power consumption" is set for the electrical device 400. "Power consumption" is the power required for the electrical device 400 to operate, and is a value (e.g., a specification value) that is independent of whether the electrical device 400 is "operating" or "stopped." In other words, the power consumption is the power expected to be consumed when the electrical device 400 is in operation. The "in-use power" set for the electrical device 400 indicates the power that is currently being used. The "in-use power" is a concept that only arises when the electrical device 400 is "operating" and is used to calculate the distribution of available power. Normally, the in-use power of the electrical device 400 is zero when not in use, and is equal to the power consumption when the electrical device 400 is in use. The "reserved power" of the electrical device 400 is power reserved for future use of the electrical device 400. "Reserved power" is a concept established to ensure the use of the electrical device 400 by reserving power in a power supply plan for the electrical device 400 that is statistically likely to be used soon. "Reserved power" corresponds to the power consumption when the electrical device 400 is used, and so may also be called "planned power to be used" or "planned power to be consumed." "Reserved power" refers to the power that will be required when the electrical device 400 is used when it is not in use, and is power that should be reserved in advance for this stopped electrical device 400.
[0047] The power that can be supplied by the private power generation module 500, battery unit 100, and power grid 300: 2500 W is allocated to the currently running refrigerator (50 W) and vacuum cleaner (1000 W). The remaining power is 2500 W - 50 W - 1000 W = 1450 W. This is allocated to the oxygen inhaler (150 W), hair dryer (1000 W), personal computer (100 W), and television (100 W) that are statistically predicted to be used by the user at this time.
[0048] Whether or not the user wants to use these electrical devices 400 is predicted based on a statistically determined probability of operation. By reserving and securing the power for these devices in a plan, it is possible to ensure that there is no shortage of power when the user wants to use them.
[0049] At this stage, the remaining power is 1450W - 150W - 1000W - 100W - 100W = 100W. From a statistical perspective, the user would also want to use the dryer (1000W), but due to insufficient power, it is decided that it cannot be used. Similarly, the user would also want to use the game console (200W), but due to insufficient power, it is decided that it cannot be used. Based on the importance, the dryer and game console are determined to be relatively unimportant, so the user is asked to refrain from using them. If the user refrains from using the dryer and game console, they can freely use the oxygen inhaler, hair dryer, computer, and television. From a statistical perspective, it is predicted that the air conditioner, charger, and microwave will probably not be used in the future, but since they are somewhat important, they will still be allowed to be used. From a statistical perspective, it is predicted that the iron and shredder will probably not be used and are not very important, so they will be decided to be restricted to use. Whether the likelihood of use is high or low, as long as the importance level is above a certain level (in this example, "3" or higher), those electrical appliances 400 can be used. Details will be explained later, so here we will only provide a rough explanation.
[0050] The concept of the power supply plan will be explained again. The power supply plan determines which electrical devices 400 are to be allocated the available power supply. If the available power supply does not cover the power consumption of all electrical devices 400, it is determined that the operation of one of the electrical devices 400 is prohibited. For electrical devices 400 whose operation is not prohibited, it is determined that operation is permitted. This control makes it possible to ensure that the actual power consumption does not exceed the available power supply, regardless of which electrical device 400 the user uses. Since the operating status of the electrical devices 400 changes and the available power supply fluctuates, the power supply plan is reviewed accordingly. When formulating a power supply plan, the key point is to determine which electrical device 400 should be prioritized for use at the current time. The concept of prioritizing the electrical devices 400 in this embodiment is described below.
[0051] First, the operation of the electrical devices 400 is controlled to minimize interruptions. This is because a sudden stop of an operating electrical device 400 can cause inconvenience to the user. Operating electrical devices 400 are displayed in the upper section of the power supply plan screen (the area above the dividing line 714). The dividing line 714 is an example of a display format for dividing the areas. The two areas may be displayed separately by changing the background color or the text color. The dividing line 714 may also be referred to as an "operation level." In this example, a refrigerator and a vacuum cleaner are currently operating. Forcibly stopping the refrigerator or the vacuum cleaner is avoided as much as possible. In this way, the continued operation of the operating electrical devices 400 is given top priority. In the power supply plan, available power is preferentially allocated to operating electrical devices 400. An operating electrical device 400 is displayed as "operating" in the "status" field. The allocation here refers to an estimate in the planning process, not to actual electrical control of the flow of power.
[0052] In the upper section of the power supply plan screen, electrical appliances 400 that are in operation are displayed from top to bottom in the order in which they started operating. Therefore, a refrigerator that is constantly operating is displayed at the top, and a vacuum cleaner that is temporarily operating is displayed at the bottom. "Power in use" is the power that is expected to be used by an electrical appliance 400 that is in operation, and coincides with the "power consumption" of that electrical appliance 400. Power consumption is, in principle, a value determined as a specification, but it is also possible to measure the power actually used and use the measured value as the power consumption and power in use. For electrical appliances 400 that are constantly operating, such as refrigerators, the highest value "5" can be set as the importance level, or another value (for example, "6") that indicates a form of constant use can be set as the importance level.
[0053] Next, the electrical devices 400 that are not operating will be described. The electrical devices 400 that are not operating will hereinafter be referred to as "stopped electrical devices 400." The stopped electrical devices 400 are displayed in the lower part of the power supply plan screen (the area below the dividing line 714). In this example, the electrical devices 400 shown in the figure, from the oxygen inhaler to the shredder, are stopped.
[0054] It is assumed that power may not be available for all of the power consumption of the stopped electrical devices 400. In this embodiment, the electrical devices 400 are not simply operated in the order in which their power switches were turned on, but rather the electrical devices 400 that may be used are determined in advance. That is, some of the stopped electrical devices 400 are determined to be permitted to operate so that they can operate stably upon request. On the other hand, the remaining electrical devices 400 are determined to be prohibited from operating so that they will not operate even upon request. Among the stopped electrical devices 400, those that are permitted to operate are displayed as "Permitted" in the "Status" field on the power supply plan screen. Among the stopped electrical devices 400, those that are prohibited from operating are displayed as "Prohibited" in the "Status" field. For electrical devices 400 that are displayed as "Permitted," power is normally turned on when the user turns on the power switch. For electrical devices 400 that are displayed as "Prohibited," power is not turned on even when the user turns on the power switch. Users are asked to refrain from using electrical devices 400 that are prohibited from operating. In this example, you would be asked to refrain from using dryers, irons, game consoles, and shredders.
[0055] To summarize, in Fig. 4, the refrigerator and vacuum cleaner are in operation, and the other electrical appliances 400 are stopped. Of the stopped electrical appliances 400, the oxygen inhaler, air conditioner, etc. are in the "permitted" state. The electrical appliances 400 in the permitted state are ready to be used. On the other hand, the dryer, etc., in the prohibited state, cannot be turned on. Of the electrical appliances 400 in the permitted state, reserved power may not be secured for electrical appliances 400 with a low operation probability (described later).
[0056] In principle, the power supply management device 101 monitors the daily use of the electrical devices 400 and controls whether or not to allow each electrical device 400 to be used based on the monitoring results. On the other hand, when a certain electrical device 400 needs to be used at a time that differs from the normal use, control is performed to optimize the overall use. As described in a modified example below, a specification is assumed in which the importance of the electrical device 400 is changed depending on the usage status of the electrical device 400. A user may occasionally want to use an electrical device 400 that is set to "prohibited" during a time period when the electrical device 400 is not normally used and has low importance (e.g., late at night). In such a case, the user can manually switch the electrical device 400 to "permitted," as described below with reference to FIGS. 8 and 18. This causes the power supply management device 101 to re-plan the power supply and allow the user to use the "prohibited" electrical device 400.
[0057] The boundary between permitted and prohibited operation is determined based on the priority of the stopped electrical appliances 400. Basically, the priority of the electrical appliances 400 is increased in descending order of importance. Then, for multiple electrical appliances 400 with the same importance, the priority of the electrical appliance 400 with a higher probability of operation is increased. An electrical appliance 400 with a higher priority is permitted to operate, and an electrical appliance 400 with a lower priority is prohibited from operating. The electrical appliances 400 are displayed from the top in descending order of priority. In this example, the oxygen inhaler has the highest priority, and the shredder has the lowest priority.
[0058] A dashed line indicating a prohibition level 716 is displayed at the boundary between permitted and prohibited operations. It is clear at a glance that the electrical appliances 400 from the top to the microwave oven are permitted to operate, while the electrical appliances 400 from the dryer down are prohibited from operating. The prohibition level 716 is an example of a form for displaying the boundary between the electrical appliances 400 whose operation is permitted and the electrical appliances 400 whose operation is prohibited. The boundary between the two may be indicated by changing the background color or the color of the text. As described above, it is possible to manually enable the use of prohibited electrical appliances 400 (see FIGS. 8 and 18 ).
[0059] Next, the priority order of the stopped electrical devices 400 will be described. First, an electrical device 400 with a high level of importance is ranked higher, and an electrical device 400 with a low level of importance is ranked lower. The level of importance represents the degree to which it is important for the user to operate the electrical device 400. The level of importance is determined mainly by the function and use of the electrical device 400. As described above, the level of importance may be set by the user or may be automatically set by the power supply management device 101. In this embodiment, the level of importance of the electrical device 400 is described as being fixed. However, as will be described later in a modified example, the level of importance of the electrical device 400 may be changed depending on the usage status of the electrical device 400.
[0060] An item that has a large impact on the user has a high importance. For example, an oxygen inhaler and an air conditioner have a high importance because they affect the user's health. An oxygen inhaler is an example of a health device. An air conditioner is an example of an air conditioning device. An item that provides a function that the user desires to be able to use immediately also has a high importance. For example, a hair dryer has a high importance because a user who has washed their hair wants to dry their wet hair quickly. A hair dryer is an example of a beauty appliance. Also, a charger may want to be used immediately to charge rechargeable batteries, so a charger has a high importance. A charger is an example of a power device. Note that devices that run on batteries do not receive power from an external source and are therefore not monitored by the power supply management device 101.
[0061] Personal computers are relatively important because they are involved in business and social communication. Personal computers are an example of information processing devices. Televisions, which are used to obtain information such as weather forecasts and traffic conditions, are also relatively important. However, when it comes to obtaining information, it is taken into consideration that battery-powered radios and other devices can be used instead. Televisions are an example of AV (Audio / Visual) equipment. Microwave ovens, which are used for cooking, are also relatively important. When it comes to cooking, it is taken into consideration that gas stoves can be used instead. Microwave ovens are an example of cooking equipment.
[0062] Dryers, irons, game consoles, and shredders are not indispensable unless they can be used immediately, so their importance is low. Of these, dryers and irons are more important than game consoles and shredders because they are involved in maintaining daily life. Dryers and irons are examples of household appliances. Game consoles are an example of amusement devices. Shredders are an example of office equipment. For other types of equipment, such as lighting equipment, the importance can also be set appropriately.
[0063] For multiple electrical devices 400 with the same importance, the electrical device 400 with the higher operation probability is given priority. The operation probability is the probability that it is statistically estimated that the electrical device 400 will be used soon. In other words, the operation probability means the degree to which it is predicted that the user will want to use the electrical device 400 in the immediate situation.
[0064] In this example, for an oxygen inhaler and an air conditioner, both of which have an importance level of 5, the oxygen inhaler, which has an 80% probability of operation, is prioritized over the air conditioner, which has a 15% probability of operation. The operation probability is statistically determined based on a usage history that identifies the period during which the user used electrical appliance 400 in the past (from the date and time when use began to the date and time when use ended). Specifically, the operation probability is the probability that electrical appliance 400 will operate within the most recent period. The most recent period refers to the period from the present time until a predetermined time has elapsed. For example, the most recent period corresponds to 30 minutes from the present time. The predetermined time may be shorter than 30 minutes, such as 1 minute, 5 minutes, 10 minutes, or 15 minutes. The predetermined time may be longer than 30 minutes, such as 45 minutes or 60 minutes. Regardless of the length of operation time, the focus is on whether electrical appliance 400 will operate at some point during the most recent period. The operation probability value is an empirical value (a numerical value obtained by estimation from past experience) based on past usage history.
[0065] The operation probability may change successively depending on the user's lifestyle patterns, such as the day of the week and the time of day. For example, if an oxygen inhaler is often used in the morning and not infrequently used in the evening, the operation probability in the morning will be high and the operation probability in the evening will be low. As mentioned above, the operation probability may vary not only depending on the time of day but also on the day of the week, etc. The operation probability may also be affected by which resident is at home. The indoor environment (room temperature, indoor humidity, etc.) may also have an effect. In addition to the situation inside the house, external conditions such as weather (temperature, outdoor humidity, etc.) and traffic conditions may also have an effect. The parameters used to determine the situation affecting the operation probability may be freely determined. The parameters used to determine the situation may be different for each electrical device 400 or may be common. The current operation probability of electrical device 400 can be identified by calculating the proportion of times that electrical device 400 was used in past situations that are similar to the current situation.
[0066] In this way, the priorities are determined from the oxygen inhaler to the shredder as shown in the figure. For electrical devices 400 of equal importance, the priorities may change depending on the situation. This is because the operation probability of each electrical device 400 changes depending on the situation. For example, assume that the operation probability of an oxygen inhaler is high in the morning and low in the evening. Also assume that the operation probability of an air conditioner is low in the morning and high in the evening. In this case, the oxygen inhaler may be ranked higher than the air conditioner in the morning, and the air conditioner may be ranked higher than the oxygen inhaler in the evening.
[0067] In the process of generating the power supply plan, a process is performed in which the available power supply is allocated to each electric device 400. First, a portion of the available power supply is allocated to the electric devices in use. Then, the remaining power is allocated to the electric devices 400 that are stopped. At this time, the remaining power is allocated to the electric devices 400 according to priority, and when the remaining power becomes insufficient, the allocation of the available power supply is finalized. The electric devices 400 that have been allocated power are permitted to operate, and the electric devices 400 that have not been allocated power are prohibited from operating.
[0068] However, not all electrical devices 400 are subject to power allocation. Power is not allocated to electrical devices 400 that are unlikely to be used in the near future. For example, in warm weather, it is assumed that there is no need to adjust the room temperature and the air conditioner will not be used. In such cases, the power consumption of the air conditioner is not taken into account. If power is allocated to electrical devices 400 that are not in use, that power will not actually be used, unnecessarily limiting the use of other electrical devices 400. In this way, conserving the allocated power without using it wastes the power supply capacity. Power is not allocated to an air conditioner (1200 W) that is unlikely to be used, and the equivalent power is allocated to a hair dryer (1000 W), a personal computer (100 W), and a television (100 W) that are likely to be used. This allows the electrical devices 400 that the user wants to use to operate smoothly, thereby improving convenience for the user.
[0069] Let us summarize the concept. Based on past usage history, it is possible to predict which electrical devices 400 are likely to be used in the future, even if they are not currently being used. The probability that an electrical device 400 will be used is defined as the operation probability. An electrical device 400 with a high operation probability is likely to be turned on by a user, so the power required by that electrical device 400 is secured in advance in a plan. However, since there is a limit to the power that can be supplied, a level for securing power (prohibition level 716) is set. This level is determined by the range to which power can be allocated, starting with the most important.
[0070] Based on this concept, electrical appliances 400 are divided into those with an operation probability equal to or greater than a reference value and those with an operation probability less than the reference value. In this example, the reference value is 50%. On the power supply plan screen, operation probabilities equal to or greater than the reference value are underlined. Operation probabilities equal to or greater than the reference value may be distinguished by a display format other than underlining. For example, the distinction may be made by using reversed text, a different color for the text, or a different background color for the text. Electrical appliances 400 with a high operation probability (oxygen inhalers, hair dryers, personal computers, televisions, dryers, and game consoles) may be allocated power. This power is called "reserved power." The value of the reserved power is equal to the power consumption value of the electrical appliance 400. An electrical appliance 400 for which reserved power is allocated is called a "reserved electrical appliance 400." The reserved electrical appliances 400 (oxygen inhalers, hair dryers, personal computers, and televisions) are permitted to operate and use the reserved power.
[0071] The remaining power, excluding the power currently in use, from the available power is allocated as reserved power to electrical appliances 400 that are likely to be used within the next period, in order of priority, and this process continues until the remaining power is used up. The remaining power indicates the value obtained by subtracting the actual demand (power currently in use) and the predicted demand (power reserved) from the available power. After the remaining power is used up, no power is allocated to electrical appliances 400, even if the demand is likely to be high. Electrical appliances 400 (dryers and game consoles) that have not been allocated power in this way are prohibited from operating and do not operate. The value of the remaining power for each electrical appliance 400 may be displayed on the power supply plan screen as the "remaining amount of available power." Displaying the "remaining amount of available power" makes it easier to understand the power distribution status (such as the electrical appliances 400 that users can use).
[0072] Next, we will explain the electrical devices 400 that are unlikely to be used in the upcoming period. On the power supply plan screen, operation probabilities below the reference value are not underlined. Power is not allocated to electrical devices 400 (air conditioners, chargers, microwave ovens, irons, and shredders) that have a low operation probability (no underline).
[0073] However, these electrical devices 400 are not necessarily prohibited from operating. If they have the same importance as the reserved electrical device 400, they are permitted to operate. For example, when a personal computer and a television, which have an importance level of 3, are permitted to operate, a microwave oven (importance level: 3), which is equally important, is also permitted to operate and can be used. By unifying the permission / prohibition of electrical devices 400 of the same importance, it is easier for the user to understand. In this example, the personal computer, television, and microwave oven, which have an importance level of 3, can all be used regardless of the likelihood of their use. Note that air conditioners and chargers, which have an importance level of 3 or higher, are also permitted. These are displayed above the prohibition level 716.
[0074] On the other hand, electrical appliances 400 with the same importance as the electrical appliance 400 for which power allocation was not granted are prohibited from operating. In this example, an iron with the same importance of 2 as the dryer for which power allocation was not granted, and a shredder with the same importance of 1 as the game console for which power allocation was not granted, are "prohibited." In this way, by setting permission / prohibition for rarely used electrical appliances 400 based on importance, the user can easily understand what can and cannot be used. In other words, permission / prohibition can be intuitively distinguished between forbidden and permitted appliances for each group of importance.
[0075] Below, three examples of the next development of the power supply plan in FIG. 4 will be introduced with reference to FIGS. 5 to 7.
[0076] Fig. 5 is a diagram showing the power supply plan screen when the use of the oxygen inhaler is started. When the power supply plan of Fig. 4 is displayed and the user turns on the power switch of the oxygen inhaler, the screen switches to the power supply plan screen of Fig. 5.
[0077] Since the operation of the oxygen inhaler is permitted in the power supply plan of Figure 4, the oxygen inhaler receives power and begins operating normally. As described above, 150 W of reserved power for the oxygen inhaler has been secured in advance. Accordingly, the row for the oxygen inhaler moves to the bottom of the top row. The bottom position is just an example, and the oxygen inhaler's row may also move to the top or middle of the top row. The status of the oxygen inhaler becomes "operating." The in-use power of the oxygen inhaler becomes the power reserved in the power supply plan of Figure 4: 150 W.
[0078] The order of the rows remains the same as in Figure 4, as the priority of the electrical devices 400 below the air conditioner remains unchanged. The total power in use increases by 150 W, but the reserved power of 150 W for the oxygen inhaler is eliminated, so the power allocation to each electrical device 400 remains unchanged. The prohibition level 716 does not move, and the states ("permitted" and "prohibited") of the devices from the air conditioner to the shredder remain unchanged.
[0079] In this way, when a reserved electrical appliance 400 is operated, the display position of that electrical appliance 400 simply moves up, and the basic configuration of the power supply plan is maintained. Similarly, when the power switch of a hair dryer, a personal computer, or a television is turned on, the row of that electrical appliance 400 moves up.
[0080] Fig. 6 is a diagram showing the power supply plan screen when the air conditioner starts to be used. When the user turns on the power switch of the air conditioner while the power supply plan of Fig. 4 is displayed, the screen switches to the power supply plan screen of Fig. 6. At the stage shown in Fig. 4, reserved power for the air conditioner has not been secured.
[0081] Since the power supply plan in Figure 4 allows the air conditioner to operate, it receives power and begins operating normally. In response, the air conditioner's row moves to the bottom of the upper row (it can also be the top or middle). The air conditioner's status becomes "operating." The air conditioner's in-use power becomes 1200 W, the same as the power consumption. This power was not reserved in the power supply plan in Figure 4.
[0082] The priority order of the electrical devices 400 in the lower row remains the same except that the air conditioner has been removed. Therefore, the order of the rows is the same as in FIG. 4 except that the row for the air conditioner has been removed.
[0083] For the air conditioner, the power allocation is revised because the reserved power was not included in the power supply plan in Figure 4. The total power in use increases significantly to 50W + 1000W + 1200W = 2250W. Therefore, the remaining power decreases significantly to 250W.
[0084] The remaining power is allocated to the stopped electrical appliances 400 shown in the lower row, but once the reserved power of 150 has been allocated to the oxygen inhaler, the remaining power is 250W - 150W = 100W, which is almost exhausted. Therefore, power cannot be allocated to the hair dryer (1000W). All electrical appliances 400 after the hair dryer are prohibited from operating. Therefore, the prohibition level 716 moves significantly upward from the position shown in Figure 4. This is because the air conditioner, which was expected to be used rarely, was used, requiring 1200W of power, leaving no room for power to be allocated to the stopped electrical appliances 400. By canceling the reserved power of the hair dryer, power for the air conditioner is secured.
[0085] However, since the probability of an air conditioner being used is 15%, this scenario does not occur very often. For example, it is assumed that there was a special reason for this, such as a user with a cold feeling chills and wanting to raise the room temperature. Although this is a rare scenario, it concerns the user's health, so it needs to be dealt with appropriately. If the user then takes action such as turning off the vacuum cleaner (1000W), the power reserve will be restored and the situation will improve somewhat. At the very least, the hair dryer, which consumes the same amount of power as the vacuum cleaner (1000W), will be able to be used. Details of this scenario will be omitted.
[0086] Fig. 7 is a diagram showing the power supply plan screen when the vacuum cleaner is stopped. When the user turns off the power switch of the vacuum cleaner while the power supply plan of Fig. 4 is displayed, the screen switches to the power supply plan screen of Fig. 7. Since the vacuum cleaner was in use at the stage of Fig. 4, there is a surplus of power when the vacuum cleaner is stopped.
[0087] The row of the stopped vacuum cleaner moves to the bottom row. The insertion position is determined according to the priority concept described above. In this example, the vacuum cleaner is placed between the dryer and the iron. The total power in use is 50W, a significant decrease. The remaining power increases significantly to 2450W.
[0088] The remaining power: 2450 W is allocated to the stopped electrical devices 400. As in the case of Figure 4, power is allocated to the electrical devices 400 (oxygen inhaler, hair dryer, personal computer, and television) with a high probability of operation (underlined). At this stage, the remaining power is 2450 W - 150 W - 1000 W - 100 W - 100 W = 1100 W. Power can also be allocated to the dryer (1000 W). Therefore, the dryer, vacuum cleaner, and iron, which have importance level 2, are allowed to operate. Since the remaining power at this stage is 100 W, no power is allocated to the game console (200 W).
[0089] 4, by stopping the vacuum cleaner, the prohibition level 716 falls to between the iron and the game console, which makes it possible to use the dryer and iron.
[0090] 4 to 5, 4 to 6, and 4 to 7, there is no need to operate the operation panel 700 or the user terminal 720. The user simply turns the power switch of the electrical device 400 on or off. When the power switch of an authorized electrical device 400 is turned on, the device starts operating. When the power switch of an operating electrical device 400 is turned off, the device stops operating.
[0091] However, when the power switch of a dryer, iron, game console, or shredder that is "prohibited" in the power supply plan of Fig. 4 is turned on, the operation will not start. The processing at this time will be described later in relation to Fig. 15(B).
[0092] FIG. 8 is a screen diagram of the power supply plan when the operation of an iron is manually permitted. If the user wishes to operate electrical appliances 400 (dryer, iron, game console, and shredder) that are "prohibited" in the power supply plan of FIG. 4, the user can manually switch the setting to "permitted." If the user wishes to use an iron that is "prohibited," the user touches the permission button 712. This allows the iron to be manually switched to "permitted." The permission button 712 is an example of a permission operation means.
[0093] In FIG. 8 , which is displayed next to FIG. 4 , the row for the iron, which has been switched to “Allowed,” moves to the top of the bottom row. The top position is an example, and the row for the iron will move at least to a higher position. The Allow button 712 is inverted to indicate that it is ON. Alternatively, the Disable button 710 may be displayed in inverted. This indicates that the priority has been forcibly raised, rather than the priority planned by the power supply management device 101. If the user touches the Allow button 712 again (or the Disable button 710 inverted), the state returns to the original state. By forcibly raising the priority, power is allocated to the iron with the highest priority among the stopped electrical appliances 400. Since the remaining power is reduced by the amount of power allocated to the iron, the Disable level 716 rises. In this example, the Disable level 716 rises to the level between the air conditioner and the hair dryer, and the electrical appliances 400 from the hair dryer to the microwave oven shown in the figure are switched to “Prohibited.” While using the iron, refrain from using these appliances, and when you have finished using the iron, touch the inverted black and white permission button 712 (or the inverted black and white prohibition button 710) to return to the power supply plan screen of Fig. 4. Therefore, you will be able to use the microwave oven and other appliances again.
[0094] If the power supply limit is not exceeded even when the iron is operated, the priority of the iron is raised as described above. On the other hand, if the sum of the iron's power consumption and in-use power exceeds the power supply limit, the iron cannot be operated, and the priority of the iron is not raised. Alternatively, the iron's priority may be raised and then placed in a "prohibited" state, as described below in connection with FIG. 10 . If the sum exceeds the power supply limit, the iron cannot be operated in either case, and a power margin is required. Therefore, the power supply management device 101 displays a message on the operation panel 700 or the user terminal 720 urging the user to stop the currently operating electrical appliance 400. The message may be, for example, "Operating the iron will exceed the power supply limit. Please stop the currently operating electrical appliance." The name of the currently operating electrical appliance (e.g., "vacuum cleaner") may be displayed instead of "currently operating electrical appliance." If the user stops the currently operating electrical appliance 400, a power supply plan is regenerated. As a result, a power margin may be created, allowing the iron to be operated. If there is not enough power margin when only one electrical appliance 400 is stopped, another electrical appliance 400 may be stopped to provide more power margin and enable the operation of the iron.
[0095] FIG. 9 is a diagram of a power supply plan screen in which the operation of the dryer is manually prohibited. It is also possible to manually switch the "permitted" electrical device 400 to "prohibited." FIG. 9 shows a case in which reserved power is secured in FIG. 4 (in other words, permitted for use) but the use of a dryer that is not actually being used is prohibited. For example, suppose a user looking at the power supply plan screen in FIG. 4 thinks, "I don't use the dryer, so there is no need to allocate power." When the user touches the prohibit button 710 for the dryer, the dryer can be switched to "prohibited." This creates a power surplus. The prohibit button 710 is an example of a prohibition operation means.
[0096] In FIG. 9, which is displayed next to FIG. 4, the row for the hair dryer that has been switched to "prohibited" moves to the bottom of the lower row. The bottom position is just an example, and the row for the hair dryer will move at least to a lower position. The prohibit button 710 is inverted to indicate that it is ON. Alternatively, an inverted permit button 712 may be displayed. This operation postpones the allocation of power to the hair dryer. Since the remaining power increases by the amount of power not allocated to the hair dryer, the prohibit level 716 is lowered. In this example, the prohibit level 716 is lowered to between the iron and the game console, and the operation of the dryer and iron is permitted. When it becomes necessary to use the hair dryer, the user can return to the power supply plan screen of FIG. 4 by touching the inverted prohibit button 710 (or the inverted permit button 712).
[0097] 10 is a diagram showing a power supply plan screen when the operation of the air conditioner cannot be manually permitted. Even if an electrical device 400 is above the prohibition level 716, it may be set to "prohibited" and cannot be manually switched to "permitted." This is because using that electrical device 400 may cause the total power in use to exceed the available power supply.
[0098] In FIG. 4, the power consumption of the air conditioner (permitted state, no reserved power secured) was 1200 W, but in FIG. 10, it is assumed to be 1500 W. If the air conditioner (1500 W) is operated in this state, the total power in use will be 50 W + 1000 W + 1500 W = 2550 W, exceeding the available power supply of 2500 W. Therefore, the air conditioner must not be operated. For this reason, it is set to "prohibited" and manual switching to "permitted" is also not possible. The allow button 712 is disabled. In other words, touching the allow button 712 does not produce any response. The display form of the allow button 712 is changed to indicate that it is disabled. In this way, it is possible to prevent power consumption in excess of the available power supply.
[0099] Furthermore, when the user touches the "Prohibit," "Air Conditioner," or "Allow" button 712, the power supply management device 101 may display a message on the operation panel 700 or the user terminal 720 urging the user to stop the running electrical appliance 400. For example, the message may read, "Operating the air conditioner will exceed the available power supply. Please stop the running electrical appliance." The name of the running electrical appliance (for example, "vacuum cleaner") may be displayed instead of "operating electrical appliance." In this way, the user can be informed of what to do if the available power supply is exceeded.
[0100] Fig. 11 is a diagram showing a power supply plan screen in a case where the operation of an iron cannot be manually permitted. There are cases where an electric appliance 400 that is "prohibited" below the prohibition level 716 cannot be manually switched to "permitted." Fig. 11 shows a state in which the iron cannot be switched to "permitted." In other words, if using the electric appliance 400 would cause the total power consumption during use to exceed the available power supply, the use of the electric appliance 400 is prohibited.
[0101] In FIG. 4, the power consumption of the iron (prohibited, no reserved power secured) was 1200 W, but in FIG. 11, it is assumed to be 1500 W. If the iron (1500 W) is operated in this state, the total power in use will be 50 W + 1000 W + 1500 W = 2550 W, exceeding the available power supply of 2500 W. Therefore, to prevent the iron from operating, manual switching to "allowed" is rejected. In this way, power consumption exceeding the available power supply can be prevented.
[0102] Furthermore, when the user touches the "Iron" or the "Allow" button 712, the power supply management device 101 may display a message on the operation panel 700 or the user terminal 720 urging the user to stop the running electrical appliance 400. For example, the message may read, "Operating the iron will exceed the available power supply. Please stop the running electrical appliance." In this way, the user can be informed of what to do if they cannot manually switch to "Allow."
[0103] In the above example, it is assumed that the electrical device 400 is used in a home. However, the technology of this embodiment or the modified example described below may be applied to the electrical device 400 used in facilities other than a home (such as a factory, a store, an office, a school, or a government office). For example, the controlled object may be lighting equipment or an air conditioner in a factory or an office. Alternatively, the controlled object may be manufacturing equipment, office equipment, or educational equipment.
[0104] In the above example, the power supply plan screen visually notifies the user of the power supply plan and the corresponding measures. However, the operation panel 700 or the user terminal 720 may also provide audio notification of the power supply plan and the corresponding measures. That is, the output form of the operation panel 700 or the user terminal 720 is not limited to a display, but may also be audio output. For example, the names of prohibited electrical devices 400 may be audio output. Alternatively, the names of permitted electrical devices 400 or the names of operating electrical devices 400 may be audio output. A message explaining the status based on the importance or priority, such as "Up to priority level '3' is permitted" or "Up to priority level 7 is permitted," may also be audio output. Audio output may also be provided from an audio output device (e.g., a landline telephone) or an audio output system (e.g., an in-house broadcasting system or a school broadcasting system) other than the operation panel 700 or the user terminal 720.
[0105] FIG. 12 is a functional block diagram of the power supply management device 101. Each component of the power supply management device 101 is implemented by hardware, including computing units such as a CPU and various coprocessors, storage devices such as memory and storage, and wired or wireless communication lines connecting them, as well as software stored in the storage devices and providing processing instructions to the computing units. The computer program may be composed of device drivers, an operating system, various application programs located at higher levels, and libraries that provide common functions to these programs. Each block shown in the figure primarily represents a functional unit. Each block may be implemented by having a computing unit execute a program stored in a storage device. The same applies to the functional block diagrams of the electrical device 400 shown in FIG. 14(A) and the control panel 700 shown in FIG. 14(B).
[0106] The power supply management device 101 includes a data processing unit 120, a communication processing unit 150, and a data storage unit 140. The communication processing unit 150 is responsible for communication processing via a network or the like. The data storage unit 140 stores various data. The data processing unit 120 executes various processes based on the data acquired by the communication processing unit 150 and the data stored in the data storage unit 140. The data processing unit 120 also functions as an interface for the communication processing unit 150 and the data storage unit 140.
[0107] The data processing unit 120 is realized by the calculation unit 112 (FIG. 2) sequentially reading and executing program code stored in the storage unit 108 (FIG. 2). A data area used when executing the program is also reserved in the storage unit 108. The data storage unit 140 is realized using the storage unit 108. The communication processing unit 150 is realized by the calculation unit 112 sequentially reading and executing program code for the communication interface stored in the storage unit 108 to control the communication module 106 (FIG. 2). In other words, the calculation unit 112 and the communication module 106 work together to realize the communication processing unit 150.
[0108] The data processing unit 120 has a notification unit 122, a plan generation unit 124, a screen providing unit 126, a history generation unit 128, and an information collection unit 130. The notification unit 122 sends various notifications to the electric device 400. The plan generation unit 124 generates a power supply plan. The plan generation unit 124 also calculates an operation probability. The plan generation unit 124 may also calculate importance. The screen providing unit 126 generates a screen such as a power supply plan screen and provides it to the operation panel 700 or the user terminal 720. The history generation unit 128 generates history information related to the use and operation of the electric device 400. The information collection unit 130 collects situation information (people at home, indoor environment, weather, traffic conditions, etc.) from the web server 800 or the like.
[0109] The data storage unit 140 has a power supply plan storage unit 142, a history information storage unit 144, and a situation information storage unit 146. The power supply plan storage unit 142 stores a power supply plan. The history information storage unit 144 stores history information. The situation information storage unit 146 stores situation information. The data storage unit 140 may be provided in the home server or the web server 800. The data processing unit 120 may read information from or write information to the data storage unit 140 of the home server or the web server 800.
[0110] The communication processing unit 150 includes a transmitting unit 152 and a receiving unit 154. The transmitting unit 152 transmits various types of information. The receiving unit 154 receives various types of information.
[0111] FIG. 13 is a data configuration diagram of a power supply plan. The power supply plan is, for example, data in a table format. In this example, the power supply plan has a record for each electrical device 400. The record number indicates the order of the record. The record has fields for the electrical device name, power consumption, operation status, importance, operation probability, in-use power, reserved power, cumulative value, availability status, manual prohibition flag, and manual permission flag. The electrical device name, power consumption, and importance included in the record may be set by a user or may be automatically set by the power supply management device 101. Furthermore, the electrical device name, power consumption, and importance automatically set by the power supply management device 101 may be adjusted by a user for operation. As a method of automatically setting the importance, the power supply management device 101 may acquire the electrical device name, power consumption, and importance stored in the electrical device 400. Alternatively, power supply management device 101 may acquire the electrical device name, power consumption, and importance of electrical device 400 from web server 800 of the provider of power supply management device 101, or may acquire the electrical device name, power consumption, and importance of electrical device 400 from web server 800 of the manufacturer or seller of electrical device 400. Power supply management device 101 may acquire product identification information such as a product number or product name from electrical device 400, and use the product identification information to query each web server 800 for the above information.
[0112] The electrical device name is the name of the electrical device 400. The power consumption represents the power used by the electrical device 400. For example, the maximum value of the fluctuating power amounts while each electrical device 400 is operating is taken as the power consumption. In principle, the power consumption is published as a specification. The operating state indicates "operating" or "stopped." The cumulative value indicates the total amount of power allocated (the sum of the power in use and the reserved power) from top to bottom. To facilitate understanding of the calculation process, an example is shown in which the cumulative value is included in the power supply plan. However, in an implementation, the cumulative value can be calculated using internal parameters, so the cumulative value does not need to be included in the power supply plan. In this example, the remaining power is not included in the power supply plan, but it may be included in the power supply plan. When the remaining power value is displayed on the power supply plan screen as the "remaining amount of available power," including the remaining power in the power supply plan is easier to process. The availability status indicates "permitted" or "prohibited." The manual prohibition flag is turned ON when manually switched to "prohibited." The manual permission flag is turned ON when manually switched to "permitted." The manual prohibition flag and manual permission flag are referenced when determining the display format of the prohibition button 710 and the permission button 712 in the process of generating the power supply plan screen. The manual prohibition flag and manual permission flag may be unified into a single manual flag. In a specification where the flag is unified into a single manual flag, if the permission status is "permitted" and the manual flag is ON, it means that manual permission has been granted. Also, if the permission status is "prohibited" and the manual flag is ON, it means that manual prohibition has been granted. The example in FIG. 13 corresponds to the power supply plan screen in FIG. 4. As an internal process, the plan generation unit 124 generates the power supply plan in FIG. 13, and the power supply plan screen in FIG. 4 is displayed according to the generated power supply plan. The generation of a power supply plan will be described later with reference to FIGS. 15 to 18.
[0113] 14A is a functional block diagram of an electrical device 400. The electrical device 400 has a transmitting unit 402, a receiving unit 404, a power supply control unit 406, an output unit 408, an information providing unit 410, an information storage unit 412, and a receiving unit 414. The transmitting unit 402 transmits various types of information. The receiving unit 404 receives various types of information. The power supply control unit 406 controls a power supply circuit (not shown). The output unit 408 controls the output of an output device (not shown). The information providing unit 410 provides various types of information. The information storage unit 412 stores various types of information. The receiving unit 414 receives user operations.
[0114] Electrical device 400 has, as hardware, a calculation unit such as a general-purpose processor, a storage unit such as RAM, ROM, or flash memory (not shown), a power supply circuit (not shown) that obtains power from distribution board 200 and supplies power to internal components, and output devices (display, speaker, lamp, etc., not shown). Transmitting unit 402, receiving unit 404, power supply control unit 406, output unit 408, information providing unit 410, and accepting unit 414 are realized by the calculation unit sequentially reading and executing program codes stored in the storage unit.
[0115] 14(B) is a functional block diagram of the operation panel 700. The operation panel 700 has a transmission unit 702, a reception unit 704, a display processing unit 706, and a reception unit 708. The transmission unit 702 transmits various types of information. The reception unit 704 receives various types of information. The display processing unit 706 displays various types of information on a touch panel (not shown). The reception unit 708 receives user operations.
[0116] The operation panel 700 has, as hardware, a calculation unit such as a general-purpose processor, a storage unit such as RAM, ROM, or flash memory (not shown), a touch panel, and an output device (speaker, lamp, etc., not shown). The touch panel functions as an input device and an output device. The transmission unit 702, reception unit 704, display processing unit 706, and acceptance unit 708 are realized by the calculation unit sequentially reading and executing program codes stored in the storage unit.
[0117] 15A is a sequence diagram showing a case where the operation of electrical device 400 is permitted. For example, this corresponds to a case where the user is about to use an oxygen inhaler or an air conditioner, which are displayed as "permitted" on the power supply plan screen in FIG.
[0118] When the user turns on the power switch of electrical device 400 and receiving unit 414 receives the ON operation (S10), transmitting unit 402 transmits an inquiry about the availability of power to power supply management device 101 (S12). Electrical device 400 receives a small amount of power from distribution board 200 to perform the operations of S10, S12, S16, and S18 in FIG. 15A (operations when the power is not turned on). The power consumption at this time is assumed to be such that it does not affect the power supply plan. Alternatively, electrical device 400 may perform these operations using power from an internal battery. The same applies to the operations of S10, S12, S32, and S36 in FIG. 15B, which will be described later.
[0119] When receiving unit 154 of power supply management device 101 receives the permission inquiry, notification unit 122 refers to the permission state ( FIG. 13 ) of electric device 400 that is the sender. In the example shown in FIG. 15(A ), the permission state is permission ( S14 ), so notification unit 122 notifies electric device 400 that permission to use power is granted ( S16 ). Specifically, transmission unit 152 transmits a permission notification addressed to electric device 400.
[0120] When receiving unit 404 of electrical device 400 receives the permission notification, power supply control unit 406 instructs the power supply circuit to turn on the power (S18), which causes electrical device 400 to start operating and allows the user to use electrical device 400 normally.
[0121] The plan generation unit 124 rearranges the records in the power supply plan ( FIG. 13 ) ( S20 ). This rearrangement corresponds to the process of moving the row of the electrical device 400 that has started operating from the bottom to the top on the power supply plan screen, as described with reference to FIGS. 5 and 6 . The plan generation unit 124 moves the record of the electrical device 400 to the top of the power supply plan ( FIG. 13 ) and moves it to the bottom of the records that are operating. For example, if an air conditioner is operated, the record for the air conditioner and the record for the oxygen inhaler are swapped. The plan generation unit 124 changes the operation state of the moved record to operating ( S22 ). The plan generation unit 124 sets the value of the power consumption value in the in-use power of the record ( S24 ). The plan generation unit 124 clears the reserved power of the record ( S26 ). Then, the plan generation unit 124 executes the power supply plan generation process ( S28 ). In the power supply plan generation process, the operation probability of electric device 400 is calculated and the available power supply is allocated. This will be described in detail later with reference to Fig. 16. In this case, history generation unit 128 records the date and time when use of electric device 400 started in the history information.
[0122] 15B is a sequence diagram when the operation of electrical device 400 is prohibited. For example, this corresponds to a case where the user is about to use a dryer that is displayed as "prohibited" on the power supply plan screen in FIG.
[0123] The processes of S10 and S12 are the same as those in Fig. 15(A). If the availability state of the transmission source electric device 400 is prohibited (S30), the notification unit 122 of the power supply management device 101 notifies the electric device 400 that power usage is prohibited (S32). Specifically, at this time, the transmission unit 152 transmits a prohibition notification addressed to the electric device 400. The history generation unit 128 records the date and time when the use of the electric device 400 was prohibited in the history information.
[0124] When the receiving unit 404 of the electrical device 400 receives the prohibition notification, the power supply control unit 406 does not instruct the power supply circuit to turn on the power (S34). Therefore, the user cannot use the electrical device 400. At this time, the output unit 408 outputs a prohibition warning (S36). For example, a message indicating that the device cannot be used due to insufficient power is displayed on the display. The message may also be output as audio. Alternatively, a lamp indicating the power shortage may be displayed. An alarm indicating the power shortage may also be emitted from the speaker.
[0125] 16 is a flowchart showing the power supply plan generation process. When the power supply plan generation process is executed, it is assumed that the electrical devices 400 in the home to which power is to be supplied have been identified. It is also assumed that the value of the available power supply has been identified. The value of the available power supply may be calculated by the plan generation unit 124, or may be obtained from the power conditioner 600 or the web server 800. For example, the web server 800 of the electric power company that operates the power grid 300 may provide the value of the available power supply to the home.
[0126] The plan generating unit 124 sets an initial value of 1 to an internal variable i indicating a record number in the power supply plan (FIG. 13) (S39).
[0127] The plan generation unit 124 calculates the operation probability of each electrical device 400 (S40). The plan generation unit 124 acquires parameter values that represent conditions such as the current time, day of the week, number of people at home, room temperature, indoor humidity, air temperature, outdoor humidity, and traffic conditions. These parameter values are obtained from a clock unit, various sensors, or the web server 800. Whether a resident is at home can be determined by acquiring location information of the resident's smartphone (an example of a device carried by a user) from the web server 800 of a mobile phone carrier.
[0128] The plan generating unit 124 references the situation information storage unit 146 and samples many dates and times when the situation was similar to the current situation. Next, the plan generating unit 124 references the history information storage unit 144 and determines whether the electrical device 400 was used during a period from the date and time of the sample until a predetermined time has elapsed. The predetermined time is, for example, 30 minutes. The predetermined time is determined by the definition of the most recent period.
[0129] Then, the plan generating unit 124 divides the number of samples in which the electric device 400 was used by the total number of samples to obtain the operation probability of the electric device 400. For example, when calculating the operation probability of the game console at 9:00 on a certain Sunday, if 100 usage histories of the game console from 9:00 to 9:30 on past Sundays are referenced and the game console was used in 85 of those cases, the operation probability of the game console is 85 cases / 100 cases=85%.
[0130] The parameters used to determine the approximate status are not limited to the time and day of the week. Other status parameters may also be used. Adding people at home to the status determination parameters also takes into account whether there is someone who regularly plays a game console. In addition to the fact that a particular resident frequently plays a game console, a particular resident may frequently use a particular electrical device 400 (e.g., health equipment, air conditioning equipment, beauty appliances, power equipment, information processing equipment, AV equipment, cooking appliances, household appliances, gaming devices, office equipment, or lighting equipment). For such electrical devices 400, it is effective to add people at home (examples of people who are present at the location where the electrical device 400 is installed) to the status determination parameters. When calculating the probability of an air conditioner operating, adding temperature and outdoor humidity to the status determination parameters takes weather conditions into account.
[0131] The plan generation unit 124 sequentially adds up the power in use for records whose operating status is "active" starting from the top, and records the sum as a cumulative value (S42). The cumulative value (FIG. 13) is a parameter for calculating the total power allocated in order from the top record. The remaining power described above is equal to the suppliable power minus the cumulative value. For example, the cumulative value of 50 W for the first record in FIG. 13 is the same as the power in use: 50 W. The cumulative value of the second record is 1050 W, which is obtained by adding the power in use: 1000 W. In other words, the power supply plan in FIG. 13 estimates that a total of 1050 W of power is being used.
[0132] Next, the plan generation unit 124 determines whether the i-th record (also referred to as the i-th record) is "Stopped" (S44). If the i-th record is not "Stopped" (N in S44), the plan generation unit 124 skips and proceeds to processing in S59. If the i-th record is "Stopped" (S in S44), the plan generation unit 124 proceeds to processing in S46. In the example of FIG. 13 , the first and second records, which have an operating status of "operating," are skipped, and the third, fourth, fifth, and so on, which have an operating status of "Stopped," are sequentially subjected to processing in S46 and thereafter.
[0133] The plan generating unit 124 determines whether the operation probability in that record is equal to or greater than a reference value (S46). In this example, the reference value is 50%. If the operation probability is equal to or greater than the reference value (Y in S46), this means that there is a high probability that the electrical device 400 will be used within the upcoming period. In this case, power should be reserved in advance. Therefore, the plan generating unit 124 sets the reserved power to the power consumption value (S48). The plan generating unit 124 also adds the reserved power value to obtain a cumulative value (S50). In the third record in FIG. 13 , a power consumption of 150 W is set as the reserved power, and 150 W is added to the cumulative value of 1050 W in the second record, resulting in a cumulative value of 1200 W for the third record.
[0134] On the other hand, if the operation probability is less than the reference value, this means that there is a low possibility that the electrical device 400 will be used within the upcoming period. In this case, power is not reserved. Therefore, the plan generation unit 124 sets the reserved power to 0 W (S52). The plan generation unit 124 does not change the accumulated value (S54). In the fourth record in FIG. 13 , the reserved power for the air conditioner (operation probability: 15%) is 0 W, and the accumulated value is 1200 W, the same as in the second record.
[0135] The plan generation unit 124 determines whether the cumulative value of the record is equal to or less than the available power supply (S56). If the cumulative value is equal to or less than the available power supply (Y in S56), this means that there is still power to spare. In this case, the plan generation unit 124 sets the availability status to "Allowed" (S58). In the ninth record of FIG. 13, the cumulative value is 2400 W, which is within the available power supply range of 2500 W, so the status is set to "Allowed." The plan generation unit 124 then increments i (S59). If there is an i-th record (Y in S60), the plan generation unit 124 returns to the process of S44 and processes the next record. If there is no i-th record (N in S60), this means that all electrical devices 400 have been processed, and the power supply plan generation process ends.
[0136] On the other hand, if the accumulated value exceeds the available power supply (Y in S56), this means that there will be a power shortage. Therefore, the plan generation unit 124 sets the availability status to "prohibited" (S62). The plan generation unit 124 also cancels the reserved power set in S48 and sets it to 0 W (S64). In the tenth record in FIG. 13, the accumulated value is 3400 W, which exceeds the available power supply of 2500 W, so the status is set to "prohibited." The plan generation unit 124 similarly sets the availability status to "prohibited" for each record below this record and sets the reserved power to 0 W. The power supply plan generation process then ends.
[0137] When the power supply plan generation process is performed, an updated power supply plan screen is displayed on the operation panel 700 or the user terminal 720. Specifically, the screen providing unit 126 generates a power supply plan screen based on the generated power supply plan and provides it to the operation panel 700. At this time, the transmitting unit 152 transmits data of the updated power supply plan screen to the operation panel 700 or the user terminal 720. When the receiving unit 704 of the operation panel 700 or the user terminal 720 receives the data of the updated power supply plan screen, the display processing unit 706 displays the updated power supply plan screen on the touch panel.
[0138] Fig. 17 is a sequence diagram for stopping the operation of electrical device 400. For example, this corresponds to a case where the user finishes using the vacuum cleaner that is "in operation" when the power supply plan screen of Fig. 4 is displayed.
[0139] When the user turns off the power switch of electrical device 400 and receiving unit 414 receives the OFF operation (S70), transmitting unit 402 transmits a stop notification indicating that the operation will end to power supply management device 101 (S72). Then, power supply control unit 406 instructs the power circuit to turn OFF (S74). This causes, for example, a vacuum cleaner to stop suctioning. Note that the order of transmitting the stop notification (S72) and turning the power OFF (S74) may be reversed, or they may occur simultaneously.
[0140] When the receiving unit 154 of the power supply management device 101 receives the stop notification, the plan generating unit 124 rearranges the records in the power supply plan ( FIG. 13 ) ( S76 ). This rearrangement corresponds to the process of moving down the row of the stopped electric device 400, as described in relation to FIG. 7 . The plan generating unit 124 moves the record of the stopped electric device 400 to the stopped records in the power supply plan ( FIG. 13 ) in accordance with the priority order. The plan generating unit 124 switches the operation status of the moved record to stopped ( S78 ). The plan generating unit 124 clears the power in use of the record ( S80 ). Then, the plan generating unit 124 executes the power supply plan generation process ( S82 ). In this case, the history generating unit 128 records the date and time when use of the electric device 400 ended in the history information.
[0141] 18 is a sequence diagram for manually permitting the operation of electrical device 400. For example, when an iron cannot be used due to a power shortage, the user displays the power supply plan screen of FIG. 4 on operation panel 700 or user terminal 720 and touches permission button 712 for the iron to enable use of the iron. While the following describes an example in which the user operates operation panel 700, the same applies to the case in which user terminal 720 is operated.
[0142] The receiving unit 708 of the operation panel 700 receives an operation for displaying the power supply plan screen (S90). For example, the receiving unit 708 receives a press of the main switch of the operation panel 700. In the case of the user terminal 720, the receiving unit 708 receives a touch operation of the power supply plan icon. The transmitting unit 702 transmits a screen request to the power supply management device 101 (S92).
[0143] When the receiving unit 154 of the power supply management device 101 receives the screen request, the screen providing unit 126 generates a power supply plan screen based on the latest power supply plan (S94) and provides it to the operation panel 700 (S96). At this time, the transmitting unit 152 transmits data of the power supply plan screen to the operation panel 700.
[0144] When the receiving unit 704 of the operation panel 700 receives the data for the power supply plan screen, the display processing unit 706 displays the power supply plan screen on the touch panel (S98). At this time, it is assumed that the iron is in a prohibited state. The user, viewing the power supply plan screen of FIG. 4, touches the "Allow" permission button 712 for the iron. In this operation, the receiving unit 708 accepts the touch operation on the permission button 712 (S100). The transmitting unit 702 transmits a permission request that identifies the electrical device 400 to be permitted to the power supply management device 101 (S102).
[0145] When the receiving unit 154 of the power supply management device 101 receives the permission request, the plan generating unit 124 rearranges the records in the power supply plan ( FIG. 13 ) ( S104 ). This rearrangement corresponds to the process of moving the row of the electric device 400 to be switched to “Permitted” to the top of the stopped electric device 400, as described in relation to FIG. 8 . The record of the electric device 400 is moved to the top of the stopped records. The plan generating unit 124 switches the manual permission flag of the moved record to ON ( S106 ). Then, the plan generating unit 124 executes a power supply plan generation process ( S108 ). This is because the order of the records has been changed, and the power allocation needs to be reviewed. The screen providing unit 126 generates a power supply plan screen based on the generated power supply plan ( S110 ) and provides it to the operation panel 700 ( S112 ). At this time, the transmitting unit 152 transmits data of the updated power supply plan screen to the operation panel 700.
[0146] When the receiving unit 704 of the operation panel 700 receives the data of the updated power supply plan screen, the display processing unit 706 displays the updated power supply plan screen on the touch panel (S114). In this way, the screen switches to the power supply plan screen of FIG. 8.
[0147] When the inverted permission button 712 (or the inverted prohibition button 710) is touched on the power supply plan screen in Fig. 8 , manual permission is canceled. The plan generation unit 124 returns the record of the electric device 400 to its original position in the power supply plan ( Fig. 13 ) and switches the manual permission flag to OFF. Then, the plan generation unit 124 performs the power supply plan generation process ( Fig. 16 ).
[0148] 18 , only differences will be described with respect to the case where the operation of electrical device 400 is manually prohibited. In S100, reception unit 708 receives a touch operation on prohibition button 710. In S102, transmission unit 702 transmits a prohibition request that identifies electrical device 400 to be prohibited to power supply management device 101.
[0149] When the receiving unit 154 of the power supply management device 101 receives the prohibition request, the record of the electrical device 400 is moved to the end of the stopped records in the record rearrangement in S104. In addition, in S106, the plan generating unit 124 switches the manual prohibition flag of the moved record to ON. In S114, the power supply plan screen of FIG. 9 is displayed.
[0150] When the prohibit button 710 (or the permission button 712) inverted in black and white is touched on the power supply plan screen in Fig. 9 , the manual prohibition is canceled. The plan generation unit 124 returns the record of the electric device 400 to its original position on the power supply plan and switches the manual prohibition flag to OFF. Then, the plan generation unit 124 performs the power supply plan generation process (Fig. 16).
[0151] If the available power supply varies, the power supply plan screen is updated accordingly. For example, the available power supply may be changed if the power supply of the power grid 300 varies, if the output power of the private power generation module 500 varies, or if the output power of the battery unit 100 varies. Although not shown, if the available power supply varies, the plan generation unit 124 performs a power supply plan generation process based on the changed available power supply. The power supply plan screen is also updated if the most recent period has passed without an update. Alternatively, the power supply plan screen may be updated at intervals shorter than the most recent period. The screen providing unit 126 generates a power supply plan screen based on the updated power supply plan and provides it to the operation panel 700 or the user terminal 720. In this way, the operation panel 700 or the user terminal 720 displays a power supply plan screen according to the power supply capacity at that time.
[0152] As described above, the user will be able to naturally respond to fluctuations in the power supply without being overly conscious of managing power.
[0153] In this embodiment, a power supply plan is generated to supply power to multiple electrical devices 400 in accordance with changing power supply conditions, so that the power supplied at each time is not wasted and power can be effectively allocated without compromising user convenience.
[0154] Furthermore, since each electric device 400 is notified of whether it can use power according to the latest power supply plan, it is possible to issue instructions for power use that are appropriate for the current situation from a comprehensive perspective. Since the electric device 400 itself is allowed to suppress power use without resorting to compulsory measures such as interrupting power transmission, it is unlikely that a malfunction will occur in the electric device 400.
[0155] Furthermore, in the power supply plan, the power consumption of the electric device 400 that is expected to operate within the next period is reserved, so that it is possible to reduce the number of cases where the electric device 400 that the user intends to use is not activated.
[0156] Furthermore, whether or not to use power for each electrical device 400 is determined based on the probability that each electrical device 400 will operate within the most recent period, so that power usage of electrical devices 400 that the user is likely to want to use can be prioritized.
[0157] [Modification] The plan generating unit 124 may change the importance of the electric device 400 depending on the usage status of the electric device 400. For example, the importance of the electric device 400 may be lowered when the continuous use time of the electric device 400 exceeds a reference time. If the continuous use time exceeds the reference time, it is assumed that the electric device 400 is not being used normally, such as for drying hair. The importance may be lowered to prevent accidents or malfunctions due to overheating during continuous use. Alternatively, the importance of the electric device 400 may be increased when the indoor or outdoor humidity is higher than the reference humidity. This is to enable quick drying of hair that has become wet in the rain. The plan generating unit 124 may change the importance depending on the person at home (an example of a person present at the installation location of the electric device 400). For example, when a specific resident is present in the home, the importance of the specific electric device 400 may be increased or decreased. When the specific resident is not present in the home, the importance of the specific electric device 400 may be increased or decreased.
[0158] The importance level may be managed in the electric device 400. The electric device 400 may change the importance level depending on its own usage status and provide the changed importance level to the power supply management device 101. In this case, the power supply management device 101 uses the importance level acquired from the electric device 400. The importance level may be used as a parameter for the above-mentioned permission inquiry (see FIG. 15 ), or may be provided on a different occasion from the permission inquiry. For example, the importance level may be increased while a personal computer is updating software (such as an operating system). In this way, the personal computer is more likely to be set to "permitted," making it easier to restart after a software update.
[0159] The power supply management device 101 or the electrical device 400 may manage the power consumption value of the electrical device 400. The power supply management device 101 or the electrical device 400 may change the power consumption value depending on the usage status of the electrical device 400. For example, if a microwave oven is used for cooking from 7:00 to 9:00 and operates in 600 W mode, and is used for warming drinks from 9:00 to 11:00 and operates in 300 W mode, the power consumption may be set to 600 W from 7:00 to 9:00 and 300 W from 9:00 to 11:00. The electrical device 400 may provide the power consumption value to the power supply management device 101. The power consumption may be used as a parameter for the above-mentioned availability inquiry (see FIG. 15 ) or may be provided on a different occasion from the availability inquiry. The power supply management device 101 uses the power consumption value acquired from the electrical device 400.
[0160] Electrical device 400 may be configured to calculate the operation probability within the most recent period. If electrical device 400 records history information and situation information, electrical device 400 can calculate its own operation probability based on that information. For example, it is possible for a television to learn that the operation probability is 95% from 8:00 PM to 9:00 PM on Saturdays. Electrical device 400 may provide the operation probability within the most recent period to power supply management device 101, and power supply management device 101 may use the obtained operation probability. The operation probability may be used as a parameter for the above-described possibility inquiry (see FIG. 15 ), or may be provided on a different occasion from the possibility inquiry.
[0161] A prohibition release mode may be provided in which the operation of the prohibited electrical device 400 is not restricted. When a prohibition release mode button (not shown) displayed on the power supply plan screen is touched, the power supply management device 101 transitions to the prohibition release mode. In the prohibition release mode, when the power switch of the prohibited electrical device 400 is turned on, the electrical device 400 starts operating. The processing in this case will be described based on the sequences of FIGS. 15(A) and 15(B). S10 and S12 are executed as described above. When the permission state is determined to be prohibited in S30, the notification unit 122 determines whether operating the electrical device 400 will exceed the available power supply. Specifically, it is determined whether the total value of the power consumption and the in-use power of the electrical device 400 exceeds the available power supply. When the total value does not exceed the available power supply, a permission notification is transmitted (S16), and the electrical device 400 is powered on (S18). The power supply management device 101 rearranges the records and updates the power supply plan (S20 to S28).
[0162] On the other hand, if the total value exceeds the available power supply, a prohibition notice is sent (S32), the power is not turned on (S34), and a prohibition warning is output (S36). The power supply management device 101 displays a message on the operation panel 700 or the user terminal 720 urging the user to stop the running electrical appliances 400. For example, the message may read, "Operating the dryer will exceed the available power supply. Please stop the running electrical appliances." The "dryer" is an example of an electrical appliance 400 that has not been turned on. The name of the running electrical appliance (e.g., "vacuum cleaner") may be displayed instead of "operating electrical appliance." If the user stops the running electrical appliance 400, a power supply plan is regenerated as shown in FIG. 17. As a result, a power surplus may be created, and the electrical appliance 400 that could not be turned on may be able to be turned on.
[0163] The display of the prohibition button 710 may be "prohibited" instead of "prohibit", and the display of the permission button 712 may be "permitted" instead of "permit".
[0164] A better power supply plan can be generated by communication and cooperation between the communication module of the power supply management device 101 and the communication module of the electrical device 400. Furthermore, in the configurations of Figures 1 and 3, a plurality of battery units 100 may be provided. The power supply management devices 101 included in the respective battery units 100 may cooperate with each other to share processing loads and negotiate (for example, adjust the power supply plan).
[0165] The power supply management device 101 may be built into a device other than the battery unit 100. For example, it may be built into the power conditioner 600 or the distribution board 200. The power supply management device 101 may be independent from the electrical equipment.
[0166] Two or more electrical appliances 400 may perform time sharing (time division processing). For example, an electric heater and a humidifier may be operated alternately.
[0167] The rules for generating a power supply plan may be changeable from the operation panel 700 or the user terminal 720. For example, the reference value for determining the above-mentioned operation probability: 50% may be changeable. The predetermined time period defining the most recent period: 30 minutes may be changeable. The method for determining priorities may be changeable.
[0168] The power supply management device 101 may notify the electric device 400 of the available power supply. The electric device 400 may calculate its own importance, operation probability, or power consumption value based on the available power supply.
[0169] A system including a supply measurement unit connected to a plurality of electrical devices 400 and measuring the power that can be supplied to the plurality of electrical devices 400, and an equipment control unit that disables the use of one of the plurality of electrical devices 400 when the total value of the power consumed by the plurality of electrical devices 400 is greater than the power that can be supplied, is referred to as a "power supply management system." The power conditioner 600 is an example of the supply measurement unit. The power supply management device 101 is an example of the equipment control unit. The power supply management system may include a private power generation module 500, a battery unit 100 (excluding the power supply management device 101), an operation panel 700, a user terminal 720, and a web server 800.
[0170] When the total power consumption of each of the plurality of electrical devices 400 is greater than the available power, the power supply management device 101 may repeatedly disable each of the electrical devices 400 one by one, thereby gradually reducing the total power consumption. Specifically, the power supply management device 101 first disables the first electrical device 400 and calculates the total power consumption of the electrical devices 400 other than the first electrical device 400. If the calculated total power consumption is equal to or less than the available power, the power supply management device 101 terminates the process of disabling the use of the electrical devices 400. On the other hand, if the calculated total power consumption exceeds the available power, the power supply management device 101 disables the second electrical device 400 and recalculates the total power consumption of the electrical devices 400 other than the first electrical device 400 and the second electrical device 400. If the recalculated total power consumption is equal to or less than the available power, the power supply management device 101 terminates the process of disabling the use of the electrical devices 400. If the calculated total power consumption exceeds the available power, the same process is repeated for the third electrical device 400, the fourth electrical device 400, .... In this way, electrical devices 400 that are set to be prohibited from use are added until the total power consumption of the electrical devices 400 that are permitted to be used becomes equal to or less than the available power.
[0171] For example, if ten lighting devices are installed on the ceiling and all of the lighting devices are operated to be turned on at the same time, the power supply management device 101 will disable the lighting devices one by one, adjusting the total power consumption of the lighting devices that are turned on so that it is equal to or less than the available power. This makes it possible to reduce power consumption while maintaining an overall lighting balance.
[0172] In the above process, the power supply management device 101 may disable the use of the electrical devices 400 in order of decreasing importance (giving priority). In the above example, the importance of the lighting devices to be preferentially thinned out is set lower in consideration of the installation location of each lighting device. The power supply management device 101 may disable the use of the electrical devices 400 in order of decreasing operation probability (giving priority). In the above example, the lighting devices are thinned out in order of increasing probability of being turned off. The power supply management device 101 has an operation probability calculation unit that refers to the usage history of each of the multiple electrical devices and calculates the operation probability, which is the probability that each of the multiple electrical devices will be used. The operation probability calculation unit may be included in the plan generation unit 124 or may be provided separately from the plan generation unit 124.
[0173] The power conditioner 600 may measure a change in the available power supply. For example, the amount of increase or decrease in the available power supply is calculated. The power supply management device 101 may change whether or not to allow each of the multiple electrical devices 400 to be used depending on the change in the available power supply. For example, when an increase in the available power supply is measured, the power supply management device 101 cancels the prohibition on the use of the electrical devices 400 that operate with power consumption equal to or less than the increase. Alternatively, when a decrease in the available power supply is measured, the power supply management device 101 prohibits the use of the electrical devices 400 that operate with power consumption equal to or greater than the decrease. In this way, the total power consumption can be maintained so as not to exceed the available power supply.
[0174] The home may be off-grid. That is, the common power source may be the self-power generation module 500 and the battery unit 100. The common power source may be only the self-power generation module 500. The common power source may be only the battery unit 100. The home does not have to have the self-power generation module 500 and the battery unit 100. That is, the common power source may be only the power grid. A storage battery of an electric vehicle may be used as the common power source. The type of common power source is not limited.
[0175] 19 is a sequence diagram of energization in response to a usage schedule inquiry. More specifically, the battery unit 100 may inquire about the usage schedule of each electric device 400, and energize the electric device 400 based on the response.
[0176] First, the battery unit 100 checks the power usage status (S120). The power usage status is checked at predetermined intervals. If the battery unit 100 determines that there is no available power (N in S122), the process returns to S120. If the battery unit 100 determines that there is available power (Y in S122), the battery unit 100 inquires of the unused electrical devices 400a, b, c, n about whether they are scheduled to be used.
[0177] In this example, the battery unit 100 transmits a usage plan inquiry to the electrical device 400a (S124), and the electrical device 400a transmits a response indicating that it has no usage plan (denoted as "Not in use" in the figure) to the battery unit 100 (S126).
[0178] Similarly, the battery unit 100 transmits a usage plan inquiry to the electric device 400b (S128), and the electric device 400b transmits a response indicating that it plans to use the electric device (denoted as "Used" in the figure) to the battery unit 100 (S130). The battery unit 100 transmits a usage plan inquiry to the electric device 400c (S132), and the electric device 400c transmits a response indicating that it does not plan to use the electric device to the battery unit 100 (S134). The battery unit 100 transmits a usage plan inquiry to the electric device 400n (S136), and the electric device 400n transmits a response indicating that it does not plan to use the electric device to the battery unit 100 (S138).
[0179] The battery unit 100 energizes the electric device 400b that responded that it is scheduled to be used (S140). It does not energize the electric devices 400a, c, n that responded that it is not scheduled to be used. Thereafter, the battery unit 100 updates the usage status (S142) and returns to the processing of S120.
[0180] 20 is a sequence diagram of power-on in response to a usage status inquiry. More specifically, an electrical device 400a that is about to be powered on inquires about the usage status of the other electrical devices 400b, c, and n, and determines whether to energize, i.e., whether to operate, based on the response. Here, if the available power amount exceeds the maximum power supplyable by the battery unit 100 when the electrical device 400a is powered on, the electrical device 400a may be powered off and then powered on. Note that each electrical device 400a, b, c, and n is assumed to be aware of its own status.
[0181] In this example, the electric device 400a transmits an inquiry about the electricity usage status to the battery unit 100 (S150). The battery unit 100 transmits the amount of available power to the electric device 400a (S152). The battery unit 100 may transmit the amount of power currently being used to the electric device 400a. Alternatively, the battery unit 100 may notify the maximum amount of power that can be supplied instead of the amount of available power. In this case, the frequency of the inquiry about the electricity usage status (S150) may be reduced.
[0182] The electric device 400a inquires about the usage status of each of the other electric devices 400b, 400c, and 400n. If the available power amount alone is sufficient, the electric device 400a does not need to make an inquiry every time.
[0183] Electric device 400a transmits a usage status inquiry to electric device 400b (S154), and electric device 400b transmits its own status and importance to electric device 400a (S156). Similarly, electric device 400a transmits a usage status inquiry to electric device 400c (S158), and electric device 400c transmits its own status and importance to electric device 400a (S160). Furthermore, electric device 400a transmits a usage status inquiry to electric device 400n (S162), and electric device 400n transmits its own status and importance to electric device 400a (S164).
[0184] The electric device 400a compiles the responses from the electric devices 400b, 400c, and 400n to generate a list (S166). If the electric device 400a determines that it is possible to power on (Y in S168), it powers on itself (S170).
[0185] On the other hand, if the electric device 400a determines that it cannot be powered on (N in S168), the electric device 400a transmits a power-off request to the electric device 400c whose importance (priority) is lower than that of the electric device 400a (S172). If there is no electric device 400 whose importance (priority) is lower than that of the electric device 400a, the electric device 400a does not transmit a power-off request.
[0186] However, even if there is no electrical device 400 with low importance (priority), the power required for the operation of the electrical device 400a may be secured by requesting the electrical device 400 that satisfies a predetermined condition (for example, the electrical device 400 with the lowest importance (priority)) to be powered off. Here, if the power required for the operation of the electrical device 400a cannot be secured even when one electrical device 400 is powered off, the electrical devices 400 with lower importance (priority) may be requested to be powered off sequentially.
[0187] Upon receiving the power-off request, the electric device 400c turns off its own power (S174) and transmits a power-off response to the electric device 400a (S176). Upon receiving the power-off response, the electric device 400a turns on its own power (S178).
[0188] The installation location of the electrical device 400 to which the above-described technology is applied is not limited to a residence. The above-described technology may also be applied to facilities other than residences (such as factories, stores, offices, schools, or government offices). The application target is not limited to buildings, and may be a certain area. Alternatively, the application target may be a moving object such as an airplane, a drone, or a ship.
[0189] 1 and 3 in the first embodiment, providing a private power generation module 500 for each home would impose a large financial burden on the installation. In the second embodiment, a power generation module is shared by multiple homes, thereby reducing the burden of equipment costs.
[0190] Fig. 21 is a configuration diagram of power equipment in the second embodiment. An apartment building 900 includes a plurality of residences 902. The apartment building 900 is, for example, an apartment building or condominium. A plurality of electrical devices 400 are used in each residence 902. Each electrical device 400 operates by receiving a supply of power through wiring extended from a distribution board 200. The distribution board 200 and the plurality of electrical devices 400 are examples of "power consumption equipment of a power user."
[0191] A power grid 300 (sometimes referred to as a "power transmission system" or "power system") operated by a regional power company supplies power to each residence 902. The power supplied by the power grid 300 is hereinafter referred to as "first power." A smart meter 302 is provided on a first power line 301 drawn from the power grid 300 to each residence 902. The smart meter 302 is a watt-hour meter that digitally measures the amount of power used by the residence 902 and has a communication function.
[0192] Here, an example is shown in which a smart meter 302 with a communication function is used to make it easier for a wide-area electric power company to collect data on the amount of electricity. The wide-area electric power company may use a watt-hour meter other than the smart meter 302. The wide-area electric power company may use, for example, an analog watt-hour meter or a digital watt-hour meter without a communication function. The wide-area electric power company may also collect data on the amount of electricity by a method that does not use communication (such as a method in which an operator reads the amount of electricity using an operator terminal).
[0193] The apartment building 900 includes a fuel cell module 504. The fuel cell module 504 is an example of a power generation module. The fuel cell module 504 preferably uses biomass (such as biomethanol or bioethanol) as fuel, for example. The fuel cell module 504 supplies power to each of the residences 902 included in the apartment building 900 via a second power line 501. In other words, the fuel cell module 504 is shared by multiple residences 902. The power supplied by the fuel cell module 504 is hereinafter referred to as "second power."
[0194] Each house 902 has a power conditioner 600. The power conditioner 600 transmits the first power sent from the power grid 300 and the second power sent from the fuel cell module 504 to the distribution board 200. The power conditioner 600 incorporates a first watt-hour meter that measures the flow rate of the first power and a second watt-hour meter that measures the flow rate of the second power.
[0195] Since the first power is provided as AC current, the power conditioner 600 passes the AC current directly to the distribution board 200, and each electrical device 400 operates on the AC current. On the other hand, the second power is provided as DC current. The power conditioner 600 converts the DC current into AC current and sends the converted AC current to the distribution board 200. Each electrical device 400 operates on the AC current. In other words, the power conditioner 600 has an inverter function that converts DC current into AC current, a switch function that switches between the first power and the second power as an input source, and a communication function that will be described later in relation to FIG. 22 .
[0196] The power grid 300, the first power line 301, and the smart meter 302 are managed by a wide-area power company. The fuel cell module 504, the second power line 501, and the power conditioner 600 are managed by a local power company. The local power company is a company that generates small-scale power and provides a service of supplying power to homes 902 within a relatively small area. The power generation by the local power company is mainly performed using renewable energy.
[0197] The local electric power company may cover multiple apartment buildings 900, or may cover only one apartment building 900. The local electric power company may be managed by a real estate company that provides the apartment building 900. The real estate company may also perform the business of the local electric power company. In other words, the operator of the power distribution system (the system that supplies the second power) in this embodiment may be an organization (for example, a company or a local government) whose main business is not power supply.
[0198] The second embodiment realizes more efficient power distribution by combining power supply from a regional power company and power supply from a local power company. If this trend spreads widely throughout society, it will contribute to reducing carbon dioxide emissions throughout society.
[0199] 22 is a schematic diagram of communication in the second embodiment. The wide-area electric power company is operated using a wide-area electric power company server 303 and a smart meter 302 as communication means. The wide-area electric power company server 303 and the smart meter 302 are connected via a first network 305. The first network 305 may be a network system unique to the wide-area electric power company, or may utilize an existing network system such as a mobile communication network or the Internet.
[0200] The local electric power company is operated using a local electric power company server 503 and a power conditioner 600 as communication means. The local electric power company server 503 and the power conditioner 600 are connected via a second network 505. The second network 505 may be a network system unique to the local electric power company, or may utilize an existing network system such as a mobile communication network or the Internet.
[0201] The wide-area electric power company server 303 and the local electric power company server 503 are connected to the Internet 605 and are capable of communicating with the user terminal 720 of an electric power user. The wide-area electric power company server 303 mainly manages the usage status of the first electric power and provides information about the first electric power to the electric power user. The local electric power company server 503 mainly manages the usage status of the second electric power and provides information about the second electric power to the electric power user.
[0202] The wide-area electric power company server 303, the power conditioner 600, and the local electric power company server 503 each have, as hardware configurations, a storage unit for storing various information and programs, and a calculation unit for executing calculation processing. Furthermore, the wide-area electric power company server 303, the power conditioner 600, and the local electric power company server 503 each have, as functional blocks, a transmission unit for transmitting various information, a reception unit for receiving various information, and a data processing unit for performing various data processing.
[0203] Similarly, the smart meter 302 and the user terminal 720 each have a hardware configuration including a memory unit and a calculation unit, and functional blocks including a transmission unit, a reception unit, and a data processing unit. The user terminal 720 also has an input unit that accepts user operations and an output unit that outputs images and sounds.
[0204] 21 and 22 , the local power company provides a power distribution system including a fuel cell module 504, a power conditioner 600, and a local power company server 503. The power distribution system may include an application program (commonly known as an “app”) that runs on a user terminal 720.
[0205] 23A is a diagram showing the transition of power consumption in a residence. A solid line 903 shows an example of the transition of power consumption in a residence 902 included in an apartment building 900. The power consumption is the total amount of power (Wh or kWh) used by each electrical device 400 in the residence 902. The amount of power corresponds to the value obtained by multiplying the power consumption (W) of the electrical device 400 by the time (h).
[0206] When an electrical appliance 400 that operates constantly, such as a refrigerator, is included, the amount of power consumption continues to increase over time. When an electrical appliance 400 that consumes a large amount of power (W) is used (for example, an air conditioner or an iron), the pace of power consumption increases, and the gradient of the solid line 903 becomes steeper. When the use of the electrical appliance 400 is reduced, the pace of power consumption decreases, and the gradient of the solid line 903 becomes shallower. In this example, 10 kWh of power is ultimately consumed.
[0207] In the second embodiment, it is assumed that a reference value is set for power consumption for each residence 902. In this example, the reference value is 8 kWh, as indicated by the dashed line 905. By setting the reference value as a target for reducing power consumption, power users are encouraged to save energy. The reference value for power consumption is managed by a regional power company. For example, the reference value is set according to the floor area of the residence 902. If the floor area is large, the reference value is higher. If the floor area is small, the reference value is lower.
[0208] In the example of Fig. 23(A), it is assumed that only the first power is used without using the second power. The fee structure for the first power is set up so that a different fee is set between the rate for power consumption below a reference value and the rate for power consumption exceeding the reference value. A lower fee (e.g., 40 yen / kWh) is applied to the amount below the reference value, and a higher fee (e.g., 80 yen / kWh) is applied to the amount exceeding the reference value.
[0209] A lower rate is applied to the usage fee for 8 kWh of power consumption, which corresponds to the standard value, resulting in 8 kWh x 40 yen / kWh = 320 yen. A higher rate is applied to the usage fee for 2 kWh of power consumption, which exceeds the standard value, resulting in 2 kWh x 80 yen / kWh = 160 yen. The usage fee for the first power source on this day is 320 yen + 160 yen = 480 yen. By setting different rates in this way, electricity users are expected to avoid paying higher fees. In other words, they are expected to make efforts to conserve electricity so that their electricity consumption does not exceed the standard value. Of course, if daily electricity consumption is within the standard value, no higher fees will be incurred. It is assumed that in the future, we will move to a social system in which penalties are imposed for excessive electricity use, providing an incentive to reduce electricity consumption.
[0210] In this way, it is assumed that the wide-area electric power company sets a reference value for the first electric power, and it is considered to effectively utilize the second electric power of the local electric power company.
[0211] FIG. 23B is a transition diagram of the consumption of the first power and the second power in the residence 902. The pace of power consumption by the electrical appliance 400 is the same as in FIG. 23A. In the second embodiment, the use of the first power is prioritized, but is switched to the use of the second power midway. The first power is used until the power consumption reaches a reference value, and the first power is consumed as indicated by the thick line 907. After the reference value is reached, the second power is used, and the second power is consumed as indicated by the thin line 909. The power conditioner 600 repeatedly determines whether the power consumption of the first power has reached the reference value, and stops supplying the first power when the power consumption of the first power reaches the reference value. At the same time, the power conditioner 600 receives the second power and starts supplying the second power converted from direct current to alternating current. Furthermore, at midnight (midnight the next day), the supply of the second power is stopped and the supply of the first power is started.
[0212] In this example, the usage fee for the first power is 8 kWh x 40 yen / kWh = 320 yen, which is the lower rate applied to the 8 kWh of power consumption corresponding to the reference value. After that, only 2 kWh of second power is consumed. Assume that the rate for the second power is set lower than the higher rate for the first power. For example, assume that the rate for the first power is 80 yen / kWh, while the rate for the second power is 60 yen / kWh. In this case, the usage fee for the second power is 2 kWh x 60 yen / kWh = 120 yen. The total usage fee for the first power and the second power is 320 yen + 120 yen = 440 yen, which is 40 yen cheaper than when only the first power is used (the example of Figure 23 (A)).
[0213] Furthermore, when the consumption of the first power is predicted to reach the reference value, the power distribution system notifies the user terminal 720 of an advance notice of the power consumption exceeding the reference value.
[0214] The power distribution system updates the first power consumption at predetermined intervals (e.g., every five minutes) and predicts the first power consumption at the end of the day based on the first power consumption up to the present time.
[0215] Three exemplary methods for predicting the final first power consumption are described below. (1) Predicting future first power consumption assuming that the most recent power consumption (Wh) will be maintained. For example, assume that the first power consumption until 2:00 PM is 5.0 kWh and the first power consumption until 4:00 PM is 6.0 kWh. While this does not match the graph in FIG. 23A , this assumption will be used to simplify the calculation example. From these values, it can be seen that the first power consumption for the most recent two hours (from 2:00 PM to 4:00 PM) is 1.0 kWh. Therefore, the most recent power consumption (total power consumption of electrical devices 400) is 1.0 kWh / 2 h = 0.5 kW. Since there are 8 hours remaining from 4:00 PM to midnight, future power consumption is predicted to be 0.5 kW x 8 h = 4.0 kWh. Adding to this the first power consumption of 6.0 kWh up to the present time (4:00 p.m.), the final first power consumption at 12:00 p.m. is predicted to be 10.0 kWh. This prediction method is based on the assumption that the power user will continue to use the electric device 400 in the same manner as currently.
[0216] (2) Predicting future first power consumption based on power consumption trends for a specified period immediately preceding the current time. For example, from actual power consumption data, the amount of power consumed from the current time to the end of the last seven days (4:00 PM to midnight) is identified, and the average value of these power consumption amounts is calculated. If the average value is 4.0 kWh, the first power consumption up to the current time (4:00 PM) is 6.0 kWh, and the average value of 4.0 kWh is added to obtain a final predicted value of 10.0 kWh of first power consumption. This prediction method is based on the assumption that the usage of electrical device 400 has become habitual. The seven days mentioned above are an example of the number of days to be referenced. The number of days to be referenced is not limited to seven.
[0217] (3) The final power consumption is estimated based on past samples that approximate the power consumption pattern up to the present time on that day (corresponding to the transition graph from midnight to 4:00 p.m. shown in FIG. 23A ). For example, actual data for a past day having a transition that approximates the transition of the power consumption of the first power from midnight to 4:00 p.m. shown in FIG. 23A is referenced. The final power consumption of the first power on that day is then estimated as the final power consumption of the first power on that day. This prediction method is based on the assumption that if electrical device 400 has been used in the same way as on a certain day in the past up to the present time, electrical device 400 will likely be used in the same way until midnight.
[0218] When it is determined that the final power consumption of the first power predicted in this manner will exceed the reference value, the power distribution system notifies the user terminal 720 of an advance notice of the power consumption exceeding the reference value.
[0219] The determination of whether the final consumption amount of the first power reaches the reference value may be performed by any of the power conditioner 600, the local power company server 503, and the application program of the user terminal 720. Note that the wide-area power company server 303 determines whether the consumption amount of the first power reaches the reference value in order to calculate the price for the first power. Separately from this process in the wide-area power company server 303, the local power company server 503 may also determine whether the consumption amount of the first power reaches the reference value as an operation of the power distribution system. This process makes it possible to predict the timing at which the rate for the price of the first power will change. It is then conceivable that the local power company server 503 controls the power conditioner 600.
[0220] When the local power company server 503 or the user terminal 720 determines the reference value, it transmits an instruction to the power conditioner 600 to switch to using the second power at the timing when it determines that the consumption of the first power has reached the reference value. Furthermore, the local power company server 503 or the user terminal 720 transmits an instruction to switch to using the first power to the power conditioner 600 at the beginning of the day (midnight). The power conditioner 600 switches between inputting the first power and inputting the second power in response to these instructions. That is, the power conditioner 600 starts supplying the first power and shuts off the second power in response to the instruction to switch to using the first power. If the first power is being supplied at midnight, the power conditioner 600 maintains that state. Furthermore, the power conditioner 600 starts supplying the second power, which involves DC-AC conversion, and shuts off the first power in response to an instruction issued when the consumption of the first power has reached the reference value. When the power conditioner 600 judges the reference value and the time, it similarly switches between the input of the first power and the input of the second power based on the result of its own judgment.
[0221] The first power consumption amount at each time point is measured by the smart meter 302 or the first watt-hour meter built into the power conditioner 600. The measured first power consumption amount is sent to devices that perform processing to determine the reference value (the power conditioner 600, the local power company server 503, and the user terminal 720). When the value measured by the smart meter 302 is used, the wide-area power company server 303 discloses the measurement value obtained from the smart meter 302 to the local power company, and transmits the measurement value (first power consumption amount) to the device that performs processing to determine the reference value (the power conditioner 600, the local power company server 503, or the user terminal 720).
[0222] The data used to predict power consumption and the prediction results are shared among the devices in the power distribution system. Then, the local power company server 503 or the power conditioner 600 generates a power consumption exceeding warning screen and notifies the user terminal 720. Alternatively, an application program in the user terminal 720 generates a power consumption exceeding warning screen. As a result, the power consumption exceeding warning screen is displayed on the user terminal 720. Notification may be made via a web page, push notification, email, or group communication.
[0223] 24 is a screen shot of a power consumption exceedance warning. A first comment 910 informs the user that the first power consumption is expected to exceed the reference value during the current day and switch to the second power. A current first power consumption 912 indicates the amount of first power consumed from the beginning of the current day to the current time. In this example, the first power consumption is 6.0 kWh from midnight to 4:00 PM.
[0224] The predicted consumption of the first power 914 represents the amount of the first power that is expected to be consumed by the end of the day. In this example, it indicates that 10.0 kWh of the first power is expected to be consumed from 0:00 to 24:00.
[0225] The first power consumption reference value 916 indicates the reference value (for one day) of the first power consumption amount allocated to the power consumer. In this example, the reference value of the first power consumed by the house 902 is 8.0 kWh.
[0226] The predicted excess amount of first power 918 represents the amount of power consumption that is expected to eventually exceed the reference value. In this example, it is expected that the amount will exceed the reference value by 2.0 kWh, which is calculated by subtracting the reference value of 8.0 kWh from the predicted consumption of 10.0 kWh. The excess amount is allocated as the second power.
[0227] In this example, a local power company adopts a pre-purchase system, and the power consumer purchases the second power in advance. The local power company supplies the second power within the range of the power amount held by the power consumer.
[0228] The second reserved power amount 920 indicates the amount of second power currently reserved by the power consumer. In this example, the power consumer has reserved 3.0 kWh of power. Since the predicted excess amount 918 is 2.0 kWh, if the power consumer consumes power as predicted, the reserved amount of second power will be sufficient.
[0229] However, since there is not much margin, the purchase of the second power is recommended. The power distribution system determines to recommend the purchase of the second power when the difference between the second power reserve amount 920 and the predicted excess amount 918 falls below a predetermined value (e.g., 5.0 kWh). Alternatively, the power distribution system may recommend the purchase of the second power when the difference between the first power consumption reference value 916 and the first power predicted consumption amount 914 falls below a predetermined value. In this case, the power distribution system does not need to refer to the second power reserve amount 920.
[0230] The second comment 922 indicates that the purchase of the second power is recommended. The power user operates the power amount button 926 and the power amount button 928 to input the second power purchase amount 924. Initially, the second power purchase amount 924 is 0 kWh, and the corresponding fee is 0 yen.
[0231] In this example, the rate for the second power is 60 yen / kWh. When the power user taps (or clicks) the power amount button 926, 1.0 kWh is added to the second power purchase amount 924, and 60 yen is added to the fee. When the power user taps (or clicks) the power amount button 928, 10.0 kWh is added to the second power purchase amount 924, and 600 yen is added to the fee.
[0232] When the electricity user double-tap (or double-click) the electricity amount button 926, 1.0 kWh is subtracted from the second electricity purchase amount 924 and 60 yen is subtracted from the fee. When the electricity user double-tap (or double-click) the electricity amount button 928, 10.0 kWh is subtracted from the second electricity purchase amount 924 and 600 yen is subtracted from the fee.
[0233] When the power user inputs the second power purchase amount 924 and taps (or clicks) the OK button 930, the power distribution system performs the purchase process for the second power. The second power purchase amount 924 is transmitted to the local power company server 503 and added to the second power reserve amount corresponding to the power user. The purchase price is immediately settled by credit card payment or bank account debit, for example. If the power user taps (or clicks) the Cancel button 932, the purchase process is not performed.
[0234] [Modification] Although an example of a housing complex such as a condominium or apartment has been shown, the fuel cell module 504 may be shared by a group of detached houses.
[0235] Although a residence has been used as an example of a unit that uses power, the above-described power distribution system can also be used when power is used as a unit for other facilities such as a store or office.
[0236] Although an example in which the user terminal 720 is used as the device of the power user has been shown, the operation panel 700 described in the first embodiment may also be used as the device of the power user. In other words, the operation panel 700 may be positioned equivalent to the user terminal 720.
[0237] Although the fuel cell module 504 is shown as an example of the power generation module, a solar power generation module 502 or a wind power generation module 506 may also be used. It is desirable for the power generation module to use renewable energy.
[0238] A power generation module such as a fuel cell module 504 may be connected to the second network 505 so that the local power company server 503 can remotely control the power generation module.
[0239] The power distribution system may include the battery unit 100 described in the first embodiment. In this case, the power supply management device 101 included in the battery unit 100 may perform a process of determining whether or not a reference value is reached and a process of notifying a user of the battery unit 100.
[0240] Although the days for counting power consumption (an example of a unit period for setting a reference value) have been described as being divided at midnight (24:00), the days may be divided at other times. The division times may be different for each of the multiple power conditioners 600. Because the use of the second power tends to concentrate before the end of the measurement period, using different division times makes it easier to smooth out the use of the second power. This distributes the load on the power generation modules and improves the efficiency of use of the second power.
[0241] Although an example of a day (24 hours) as the predetermined period for measuring power consumption has been shown, the predetermined period for measuring power consumption may be shorter or longer than a day. The power consumption may be totaled in half-day units to set a half-day reference value. The power consumption may be totaled over a week to set a weekly reference value. Alternatively, the power consumption may be totaled over a month to set a monthly reference value.
[0242] Although an example in which the rate for the second power is constant has been shown, the rate may be varied depending on the amount of second power used. In this case, the local power company server 503 calculates the fee by applying a rate that varies depending on the amount of second power used. The rate may also be varied depending on the amount of power purchased in advance for one purchase for the second power. In other words, the local power company server 503 determines the purchase price by applying a rate that varies depending on the amount of power purchased in advance. For example, setting a rate system such that the rate is lower when a large amount of power is purchased in one purchase can encourage the purchase of second power. As a result, the local power company server 503 can speed up collection of payments and stabilize cash flow.
[0243] Although the example in which the local power company adopts a pre-purchase system has been shown, the local power company may adopt a deferred payment system (for example, payment in the following month based on a January bill). In the case of deferred payment, the notice of excess power consumption shown in FIG. 24 may be omitted.
[0244] The power conditioner 600 may have a built-in power storage device, and the power discharged from the power storage device may be supplied to the distribution board 200. For example, the power conditioner 600 may charge the first power in the power storage device and the second power in the power storage device. The first power and the second power mixed in the power storage device are not distinguished as power output during the discharging operation. In this case, the power conditioner 600 may not have a switch function for switching between the first power and the second power as input sources. In this configuration, the power conditioner 600 has a converter function for converting the AC current of the first power into DC current. The power conditioner 600 charges the power storage device with the DC current of the first power converted by the converter function. The power conditioner 600 also converts the DC current discharged from the power storage device into AC current by using an inverter function and supplies the AC current to the distribution board 200. In summary, the power conditioner is equipped with a storage device, and mixes and stores the first power and the second power in the storage device, and supplies the discharged power to power consumption equipment (distribution board 200 and multiple electrical devices 400) without distinguishing between the first power and the second power.
[0245] [Summary of Second Embodiment] As shown in Fig. 21 , the power distribution system includes a fuel cell module 504 shared by a plurality of power consumers. The fuel cell module 504 is an example of a power generation module. The power distribution system further includes a power conditioner 600 provided for each power consumption facility of the power consumers. The power conditioner 600 switches between a first power supplied from the power grid 300 and a second power supplied from the fuel cell module 504 and passes the power to the power consumption facility. Therefore, there is no need for the power consumers to prepare their own equipment, and the burden associated with using the power generation module is small for the power consumers.
[0246] Furthermore, the power generation module generates electricity using renewable energy such as solar or wind power. A fuel cell module 504 that uses biomass (such as biomethanol or bioethanol) as fuel also falls under the category of a power generation module that generates electricity using renewable energy. Furthermore, a fuel cell module 504 that uses hydrogen, methane, ammonia, or other fuel that is not derived from fossil fuels is also considered to fall under the category of a power generation module that generates electricity using renewable energy. This can contribute to reducing carbon dioxide emissions. Furthermore, the power generation module may generate hydroelectric power by using hydroelectric power as renewable energy.
[0247] Furthermore, the fuel cell module 504 supplies the second power as DC. The power conditioner 600 converts the supplied second power into AC and passes it to the power consumption equipment. Sending the second power from the fuel cell module 504 as DC in this way improves power transmission efficiency compared to AC, and reduces loss of the second power.
[0248] 23(B), the power conditioner 600 uses the first power with priority, and when the consumption of the first power reaches the reference value during a predetermined period of time for counting the consumption of the first power, it switches to using the second power. This encourages the combined use of renewable energy, reduces the load on the power grid 300, and contributes to reducing carbon dioxide emissions.
[0249] Furthermore, as shown in Fig. 24, when the consumption of the first power is predicted to reach the reference value, the power distribution system notifies the user terminal 720 of the power consumption excess notice. The user terminal 720 is an example of a device of a power user. This can raise awareness of power saving among power users.
[0250] Furthermore, the power consumption excess warning screen includes an interface for accepting advance purchase of the second power, as shown in Fig. 24. This prevents trouble caused by forgetting to purchase the second power.
[0251] [Note] The following inventions can be understood from the description of the first embodiment and its modified examples: A1. A battery unit comprising: a power input / output unit that supplies and receives power to and from an external device; an external supply storage unit that stores the supplied power; and a power supply management device that controls power supply from the external supply storage unit to an electrical device connected to the external device.
[0252] A2. The battery unit according to A1, wherein the power supply management device generates a power supply plan based on the power supply to and from the external device and the power supply to the electrical device.
[0253] A3. The battery unit according to A1, wherein the power supply management device includes a calculation unit that acquires the amount of power managed by the external device and calculates a change in a power supply status, and the calculation unit calculates the power that can be supplied to the electrical device according to the change in the power supply status.
[0254] A4. The battery unit according to A3, wherein the power supply management device generates a power supply plan for the electrical equipment in accordance with a change in the power supply status.
[0255] A5. The battery unit according to A2 or A4, wherein the power supply management device controls power supply to the electrical device based on the power supply plan.
[0256] A6. The battery unit according to A1, further comprising a sensor unit that measures at least one of current, voltage, and power when power is supplied to the power input / output unit.
[0257] A7. The battery unit according to A6, wherein the sensor unit measures a charge rate of the external supply power storage unit.
[0258] A8. A battery system comprising: a private power generation module; and the battery unit according to any one of A1 to A7, wherein the external device is a power conditioner, and the electrical equipment is connected to the power conditioner via a distribution board.
[0259] A9. The battery system according to A8, wherein the power conditioner measures the power obtained from the private power generation module, the power obtained from the electric battery unit, and the power obtained from the power grid, and notifies the battery unit of the results.
[0260] A10. A power supply management system comprising: a supply measurement unit connected to a plurality of electrical devices and measuring power that can be supplied to the plurality of electrical devices; and a device control unit that disables use of one of the plurality of electrical devices when a total value of power consumption of each of the plurality of electrical devices is greater than the power that can be supplied.
[0261] A11. The power supply management system according to A10, wherein when a first electric device among the plurality of electric devices is prohibited from use, the device control unit recalculates a total value of power consumption of the electric devices other than the first electric device, and when the recalculated total value of power consumption is greater than the available power, further prohibits use of one of the plurality of electric devices, thereby adding an electric device that is set to be prohibited from use until the total value of power consumption of the electric devices that are permitted to be used becomes equal to or less than the available power.
[0262] A12. The power supply management system according to A10, which is connected to a secondary battery that is charged with power supplied from an external power generation source, and the supply measurement unit measures the power that can be supplied by measuring the charging rate of the secondary battery.
[0263] A13. The power supply management system according to A12, wherein the secondary battery is charged by power supplied from a private power generation source.
[0264] A14. The power supply management system according to A10, wherein the supply measurement unit measures a change in the suppliable power, and the device control unit changes whether or not each of the plurality of electrical devices is usable in accordance with the change in the suppliable power.
[0265] A15. The power supply management system according to A10, wherein an importance level is set for each of the plurality of electrical devices, and when a total value of power consumption of each of the plurality of electrical devices is greater than the available power, the device control unit preferentially sets electrical devices with lower importance as disabled.
[0266] The power supply management system according to A10, further comprising an operation probability calculation unit that refers to a usage history of each of the plurality of electrical devices and calculates an operation probability, which is a probability that each of the plurality of electrical devices will be used, and the device control unit that, when a total value of power consumption of each of the plurality of electrical devices is greater than the available power, preferentially sets electrical devices with a lower operation probability to be disabled for use.
[0267] A17. The power supply management system according to A10, wherein the device control unit updates power supply plan information indicating whether each of the plurality of electrical devices is usable when a power source of the electrical device that is permitted to be used is turned on.
[0268] A18. The power supply management system according to A10, wherein the device control unit determines whether or not one or more unused electrical devices can be used based on a difference between the available power and a total value of power consumption of electrical devices in use.
[0269] The present invention is not limited to the above-described embodiments and modifications, and the components can be modified without departing from the spirit of the invention. Various inventions can be formed by appropriately combining multiple components disclosed in the above-described embodiments and modifications. Furthermore, some components can be omitted from all the components shown in the above-described embodiments and modifications.
Claims
1. A power distribution system including: a power generation module shared by a plurality of power users; and a plurality of power conditioners provided for each of the power users' power consumption equipment, switching between a first power supplied from a power grid and a second power supplied from the power generation module and passing the power to the power consumption equipment.
2. The power distribution system according to claim 1, wherein the power generation module generates power using renewable energy.
3. The power distribution system according to claim 1, characterized in that the power generation module supplies the second power as a direct current, and the power conditioner converts the supplied second power into an alternating current and passes it to the power consumption equipment.
4. The power distribution system of claim 1, characterized in that the power conditioner uses the first power preferentially, and switches to using the second power when the consumption of the first power reaches a reference value during a specified period in which the consumption of the first power is counted.
5. The power distribution system according to claim 4, characterized in that, when the consumption is predicted to reach the reference value, the power distribution system notifies the power user's device of an excessive power consumption warning.
6. The power distribution system of claim 5, wherein the screen for notifying the advance notice includes an interface for accepting advance purchase of the second power.
7. The power distribution system according to claim 1, characterized in that the power conditioner is provided with a power storage device, the first power and the second power are mixed and stored in the power storage device, and the discharged power is supplied to the power consumption equipment without distinguishing between the first power and the second power.
Citation Information
Patent Citations
Fuel cell power supply system
JP2007172841A
Storage battery sharing system and storage battery sharing method
JP2008029104A
Power supply system
JP2011135651A
Alarm output device, and alarm output method
JP2013148531A
Power management system for multiple dwelling house
JP2014187830A