Method for detecting incorrect installation of measurement device and energy storage system using same

The method employs a processor to analyze power fluctuations and detect incorrect installations in energy storage systems, addressing the issue of inaccurate measurements and ensuring system stability and compliance with safety standards.

WO2024205162A1PCT designated stage expired Publication Date: 2024-10-03HANWHA SOLUTIONS CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/KR2024/003689
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-27
Filing Date
2024-03-25
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Incorrect installation of measuring devices in energy storage systems leads to inaccurate power measurement, disrupting normal operation and potentially causing energy wastage or electrical damage, especially in renewable energy systems with high output uncertainty.

Method used

A method using a processor to detect incorrect installation by analyzing power fluctuations between initial and changed measurement data from measuring devices, identifying excessive fluctuations, and determining incorrect installation based on the frequency of such occurrences without requiring additional hardware configurations, applicable to single-phase and 3-phase systems.

Benefits of technology

Enables robust and accurate detection of incorrect installations, preventing operational disruptions and ensuring compliance with safety standards, even in unstable environments, with scalability for various system configurations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure KR2024003689_03102024_PF_FP_ABST
    Figure KR2024003689_03102024_PF_FP_ABST
Patent Text Reader

Abstract

An energy storage system according to an aspect includes a processor for: identifying a first power amount of a load by using first measurement information received from at least one measurement device; identifying a second power amount of the load by using second measurement information received from the measurement device according to a change in charging power amount of a battery; identifying an occurrence of a power fluctuation of the load on the basis of a difference between the first power amount and the second power amount; and detecting incorrect installation of the measurement device on the basis of the number of occurrences of power fluctuations.
Need to check novelty before this filing date? Find Prior Art

Description

Method for detecting incorrect installation of measuring device and energy storage system using same

[0001] The present invention relates to a method for detecting whether a measuring device is incorrectly installed and an energy storage system using the same.

[0002] Recently, interest in renewable energy sources, such as solar thermal, photovoltaic, biomass, wind, microhydro, geothermal, ocean energy, and waste-to-energy, is growing worldwide. Because these sources have high output uncertainty, energy storage systems (ESSs) are being installed to mitigate this uncertainty.

[0003] Meanwhile, in order to measure the electrical quantity (load) of the power grid and load, not only ESS but also measuring devices (e.g., current transducer (CT), energy meter (EM), etc.) are installed.

[0004] If the operator incorrectly installs the measuring device (e.g., reverse direction, reverse phase, or unconnected), the device will not accurately measure current or power values. This hinders the normal operation of the ESS. In this case, even though the load is connected to the ESS, no output may be generated, resulting in energy waste. Alternatively, excessive output may occur in the load and grid connected to the ESS, resulting in electrical damage.

[0005] The present invention provides a method for detecting incorrect installation of a measuring device and an energy storage system utilizing the method. Furthermore, the present invention provides a computer-readable recording medium containing a program for executing the method on a computer. The technical challenges to be addressed are not limited to the technical challenges described above, and other technical challenges may exist.

[0006] An energy storage system according to one aspect includes a processor that identifies a first power amount of a load using first measurement information received from at least one measuring device, identifies second power amounts of the load using second measurement information received from the measuring device as the charge power amount of a battery changes, identifies whether power of the load fluctuates excessively based on a difference between the first power amount and the second power amounts, and detects incorrect installation of the measuring device based on the number of times the power overfluctuates occur.

[0007] A method for detecting whether at least one measuring device is incorrectly installed according to another aspect includes: identifying a first power amount of a load using first measurement information received from the at least one measuring device; identifying second power amounts of the load using second measurement information received from the measuring device as the amount of charge power of a battery changes; identifying whether power of the load fluctuates excessively based on a difference between the first power amount and the second power amounts; and detecting the incorrect installation of the measuring device based on the number of times the power overfluctuates occur.

[0008] According to another aspect, a computer-readable recording medium includes a recording medium having recorded thereon a program for executing the above-described method on a computer.

[0009] According to the present invention, whether a measuring device is installed incorrectly can be easily detected using only an algorithm that controls and operates in a processor without additional hardware configuration.

[0010] In addition, the present invention is a fundamental technology that can prevent incorrect installation of a measuring device, and has expandability that can be applied to single-phase 2-wire / 3-wire and even 3-phase systems.

[0011] Furthermore, according to the present invention, misinstallation of measuring devices can be reliably detected even in unstable real-world installation environments, including power system and load imbalances. Therefore, the present invention can provide a robust algorithm with low sensitivity to external factors.

[0012] In addition, according to the present invention, not only the protection of the energy storage system but also the installation expandability of the product can be guaranteed by satisfying the regulations of the country where national system safety certification standards are essential.

[0013] FIG. 1 is a schematic diagram illustrating a system for detecting misinstallation of a measuring device according to one embodiment.

[0014] FIG. 2 is a flowchart illustrating an example of how an energy storage system according to one embodiment operates.

[0015] FIG. 3 is a drawing illustrating an example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0016] FIG. 4 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0017] FIG. 5 is a drawing showing an example of an equivalent circuit diagram of an energy storage system according to one embodiment.

[0018] FIG. 6 is a graph illustrating an example of controlling the charging power of a battery according to one embodiment.

[0019] FIG. 7 is a flowchart illustrating an example of how an energy storage system according to one embodiment operates.

[0020] FIG. 8 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0021] FIG. 9 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0022] An energy storage system according to one aspect includes a processor that identifies a first power amount of a load using first measurement information received from at least one measuring device, identifies a second power amount of the load using second measurement information received from the measuring device as the charge power amount of a battery changes, identifies whether power of the load fluctuates excessively based on a difference between the first power amount and the second power amount, and detects incorrect installation of the measuring device based on the number of times the power fluctuates.

[0023] The terms used in the examples are selected from widely used, current terms, as much as possible. However, these terms may vary depending on the intentions of those skilled in the art, precedents, the emergence of new technologies, etc. Furthermore, in certain cases, the applicant may arbitrarily select terms, in which case their meanings will be described in detail in the relevant description. Therefore, the terms used in the specification should be defined based on their intended meaning and the overall content of the specification, rather than simply their names.

[0024] When a part of a specification is said to "include" a component, this does not mean that it excludes other components, but rather that it may include other components, unless otherwise stated.

[0025] Additionally, terms including ordinal numbers, such as "first" or "second," used in the specification may be used to describe various components, but the components should not be limited by the terms. The terms may be used to distinguish one component from another.

[0026] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. The detailed description set forth below, together with the accompanying drawings, is intended to explain exemplary embodiments of the present invention and is not intended to represent the only embodiments in which the present invention may be practiced. In the drawings, portions irrelevant to the description may be omitted for clarity in describing the present invention, and the same reference numerals may be used throughout the specification for identical or similar components.

[0027] FIG. 1 is a schematic diagram illustrating a system for detecting misinstallation of a measuring device according to one embodiment.

[0028] Referring to Fig. 1, a system for detecting misinstallation of a measuring device (hereinafter referred to as a “misinstallation detection system”) (1) includes an ESS (100) and a measuring device (200). Meanwhile, in addition to the components illustrated in Fig. 1, other general-purpose components may be further included in the misinstallation detection system (1).

[0029] ESS (100) is a system that increases energy efficiency by controlling power demand and supply, and includes a battery (110), a power conditioning system (hereinafter referred to as 'PCS') (120), a load (130), and a power system (140). Meanwhile, in addition to the components illustrated in FIG. 1, other general-purpose components may be further included in ESS (100).

[0030] A battery (110) is a device that stores power generated by a renewable energy source, power supplied from a power system (140), etc., and supplies power as needed. For example, the battery may include at least one module and a plurality of battery cells included in each module.

[0031] PCS (120) is a device that controls the overall operations of components within ESS (100) for power operation. For example, PCS (1) may include an inverter, etc.

[0032] The processor (121) included in the PCS (120) can detect whether the measuring device (200) is installed incorrectly. The processor (121) can process instructions of a computer program by performing basic arithmetic, logic, and input / output operations. Here, the instructions can be provided from a memory within the PCS (120) or an external device. In addition, the processor (121) can generally control the operations of other components included in the PCS (120).

[0033] For example, the processor (121) may be implemented as an array of a plurality of logic gates, or may be implemented as a combination of a general-purpose microprocessor and a memory storing a program that can be executed on the microprocessor. For example, the processor (121) may include a general-purpose processor, a central processing unit (CPU), a graphics processing unit (GPU), a neural network processing unit (NPU), a microprocessor, a digital signal processor (DSP), a controller, a microcontroller, a state machine, and the like. In some environments, the processor (160) may include an application-specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), and the like. For example, the processor (121) may also refer to a combination of processing devices, such as a combination of a digital signal processor (DSP) and a microprocessor, a combination of a plurality of microprocessors, a combination of one or more microprocessors coupled with a digital signal processor (DSP) core, or any other such combination of configurations. For example, the processor (121) may include an MCU (Microcontroller Unit) for power control.

[0034] Meanwhile, although FIG. 1 illustrates that the processor (121) is included in the PCS (120), this is not limited thereto. In other words, the processor (121) may be included in a device other than the PCS (120) to detect whether the measuring device (200) is incorrectly installed.

[0035] The measuring device (200) is a device physically connected to the ESS (100) to measure the internal power amount of the ESS (100). For example, the measuring device (200) can measure the power flow of the power system (140) to predict the power amount of the power system (140), the power amount of the load (130), etc.

[0036] The measuring device (200) may include a current transducer (hereinafter referred to as 'CT') or an energy meter (hereinafter referred to as 'EM'). However, the present invention is not limited thereto, and two or more types of measuring devices (200) may be included in the misinstallation detection system (1) as needed. In addition, depending on the structure of the ESS (100), one or two or more measuring devices may be included in the misinstallation detection system (1).

[0037] The measuring device (200) can be installed at an appropriate location inside or outside the ESS (100) so as to measure values ​​that require measurement, such as the power amount of the power system (140) and the power amount of the load (130). In addition, the installation location of the measuring device (200) is not limited to a single location.

[0038] The measuring device (200) is manually installed by the operator, but as a consumable product, it requires periodic replacement and maintenance. Furthermore, the measuring device (200) may be incorrectly installed due to operator error during the installation or replacement process. Therefore, a method is needed to ensure normal power operation of the entire power system and to ensure proper utilization of power from renewable energy sources and batteries (110).

[0039] According to one embodiment, the processor (121) detects whether the measuring device (200) is installed incorrectly by checking whether the power amount of the load (130) fluctuates excessively due to the change in the charging power amount of the battery (110). Hereinafter, the operation of the ESS (100) and the measuring device (200) according to one embodiment of the present invention will be described in detail with reference to the drawings.

[0040] FIG. 2 is a flowchart illustrating an example of how an energy storage system according to one embodiment operates.

[0041] At step S10, the processor (121) identifies the first power amount of the load (130) using first measurement information received from at least one measuring device (200).

[0042] For example, depending on the structure of the ESS (100) (e.g., single-phase 2-wire, single-phase 3-wire, etc.), the installation location and number of the measuring device (200) may vary. As an example, an example of a single-phase 3-wire system in which the measuring device (200) is a CT is illustrated in FIG. 3. In addition, a single-phase 2-wire system in which the measuring device (200) is a CT is illustrated in FIG. 4. As another example, a single-phase 3-wire system in which the measuring device (200) is an EM is illustrated in FIG. 8. In addition, a single-phase 2-wire system in which the measuring device (200) is an EM is illustrated in FIG. 9. However, the present invention is not limited thereto, and the operation of the processor (121) described with reference to FIGS. 2 to 9 may be applied even when the ESS (100) is a 3-phase system.

[0043] Additionally, the measurement information received from the measuring device (200) may vary depending on the type of the measuring device (200). For example, if the measuring device (200) is a CT, the measurement information may include the current value of the system. As another example, if the measuring device (200) is an EM, the measurement information may include the power amount of the system.

[0044] The processor (121) can identify the power amount of the load (130) through the difference between the power amount of the power system (140) and the power amount of the PCS (120) using the measurement information received from the measuring device (200). An example of the processor (121) identifying the power amount of the load (130) will be described below with reference to the equivalent circuit diagram of the ESS (100) illustrated in FIG. 5.

[0045] More specifically, the processor (121) can identify the power amount of the power system (140) by using the measurement information received from the measuring device (200) and the voltage value of the power system (140) measured within the PCS (120). At this time, the power amount of the PCS (120) can be measured within the PCS (120). For example, the power amount of the PCS (120) can be a value corresponding to the charging power amount of the battery (110) controlled by the PCS (120).

[0046] Meanwhile, the first power amount of the load (130) may be a reference power amount when the charging power amount of the battery (110) is a reference value. The processor (121) determines whether the measuring device (200) is incorrectly installed based on the power fluctuation of the load (130), because the reference value is required to determine the power fluctuation of the load (130).

[0047] For example, if the reference value of the charging power is 0W, the reference power of the load (130) may be the power of the power system (140). However, the reference value of the charging power is not limited to 0W.

[0048] Accordingly, when the charging power of the battery (110) is a reference value, the processor (121) can identify the reference power amount (hereinafter referred to as “first power amount”) of the load (130) using the measurement information (hereinafter referred to as “first measurement information”) received from the measuring device (200).

[0049] At step S20, the processor (121) identifies the second power amounts of the load (130) using the second measurement information received from the measuring device (200) as the charging power amount of the battery (110) changes.

[0050] The method by which the processor (121) changes the charging power of the battery (110) can be applied in various ways. For example, the processor (121) can change the charging power of the battery (110) by repeatedly increasing and decreasing it in a stepwise manner within a predetermined time period.

[0051] At step S30, the processor (121) identifies whether the power of the load (130) fluctuates excessively based on the difference between the first power amount and the second power amount.

[0052] For example, the processor (121) can identify the minimum and maximum values ​​among the second power amounts. In addition, the processor (121) can identify that power over-fluctuation has occurred if the difference between the first power amount and any one of the minimum and maximum values ​​exceeds a predefined value. Alternatively, the processor (121) can identify that power over-fluctuation has occurred if the average value of the differences between the first power amount and the second power amounts exceeds a predefined value. In addition, there may be various methods for the processor (121) to identify whether the load (130) experiences power over-fluctuation.

[0053] At step S40, the processor (121) detects misinstallation of the measuring device (200) based on the number of times power over-fluctuation has occurred.

[0054] For example, if the number of times power over-fluctuations occur exceeds a predefined number, the processor (121) may determine that the measuring device (200) is incorrectly installed.

[0055] In general, in order to supply a constant amount of power to the load (130), even if the charging power of the battery (110) changes, the power of the power system (140) changes accordingly. That is, in reality, it is highly unlikely that the change in the power of the load (130) will match the change in the charging power of the battery (110). Therefore, if an excessive change occurs in the power of the load (130) when the charging power of the battery (110) changes rapidly, it can be seen that a problem has occurred in the measuring device (200).

[0056] When the processor (121) identifies whether there is an excessive power fluctuation of the load while changing the charging power of the battery (110) within a predefined time, the processor (121) can identify the occurrence of an excessive power fluctuation by accumulating the number of times the excessive power fluctuation occurred during a plurality of cycles with the predefined time as one cycle.

[0057] Misinstallation of the measuring device (200) refers to derailment or failure of the measuring device (200), reverse misinstallation, reverse phase misinstallation, O-phase wiring, etc. The detection of misinstallation may be performed by a worker during the initial installation of the product, or may be performed automatically during normal operation of the product. The conventional technology that identifies misinstallation by simply determining whether the measured value is close to 0 can only detect derailment, failure, etc. of the measuring device (200). On the other hand, the processor (121) according to one aspect can detect all types of misinstallations described above.

[0058] Meanwhile, the processor (121) may perform at least a portion of data analysis, processing, and result information generation for performing operations using at least one of a machine learning, neural network, or deep learning algorithm as a rule-based or artificial intelligence algorithm. For example, the processor may include models such as a neural network, a convolutional neural network (CNN), a deep neural network (DNN), or a recurrent neural network (RNN).

[0059] According to the present invention, whether the measuring device (200) is installed incorrectly can be easily detected using only an algorithm that controls and operates in the processor (121) without additional hardware configuration.

[0060] In addition, the present invention is a fundamental technology that can prevent incorrect installation of a measuring device (200), and has expandability that can be applied to single-phase 2-wire / 3-wire and further 3-phase systems.

[0061] Furthermore, according to the present invention, incorrect installation of the measuring device (200) can be reliably detected even in an unstable actual installation environment including an imbalance of the power system (140) and the load (140). Therefore, the present invention can provide a robust algorithm with low sensitivity to external factors.

[0062] In addition, according to the present invention, since the regulations of a country requiring national system safety certification standards are satisfied, not only the protection of the ESS (100) but also the installation expandability of the product can be guaranteed.

[0063] FIG. 3 is a drawing illustrating an example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0064] Fig. 3 illustrates an example of an ESS (101) being a single-phase, three-wire system. For example, in the ESS (101), a load (130) is connected between a PCS (120) and a power system (140), and a U-phase CT (201) and a W-phase CT (202) are connected between the load (130) and the power system (140). In the case of a single-phase, three-wire system, a U-phase CT (201) for measuring the flow of U-phase power based on the system and a W-phase CT (202) for measuring the flow of W-phase power may be installed.

[0065] As described above in step S10 of FIG. 2, the power amount (Ptotal_load) of the load (130) can be identified through the difference between the power amount (Pgrid) of the power system (140) and the power amount (Ppcs) of the PCS (120). For example, the power amount (Ptotal_load) can be calculated by mathematical expression 1.

[0066]

[0067] For example, the power amount of the power grid (Pgrid) and the power amount of the PCS (Ppcs) can be calculated by mathematical expressions 2 and 3, respectively.

[0068]

[0069]

[0070] At this time, the power amount (Ppcs) of the PCS is a value corresponding to the charging power amount of the battery (110) controlled by the processor (121).

[0071] FIG. 4 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0072] Fig. 4 illustrates an example in which the ESS (102) is a single-phase, two-wire system. For example, in the ESS (102), a load (130) is connected between the PCS (120) and the power system (140), and one CT (203) is connected between the load (130) and the power system (140).

[0073] In the same manner as described above with reference to FIG. 3, the power amount (Ptotal_load) of the load (130) can be identified through the difference between the power amount (Pgrid) of the power system (140) and the power amount (Ppcs) of the PCS (120).

[0074] FIG. 5 is a drawing showing an example of an equivalent circuit diagram of an energy storage system according to one embodiment.

[0075] In Fig. 5, the ESS (101) of Fig. 3 and the ESS (102) of Fig. 4 are schematically illustrated. In addition, as described above with reference to Fig. 3, the power amount (Ppcs) of the PCS (120) is a value corresponding to the charging power amount of the battery (110) controlled by the processor (121).

[0076] FIG. 6 is a graph illustrating an example of controlling the charging power of a battery according to one embodiment.

[0077] FIG. 6 shows a graph showing a waveform in which the charging power of a battery (110) changes over a predefined period of time.

[0078] The processor (121) can apply a control signal (hereinafter referred to as a "charge control signal") that changes the charging power amount of the battery (110). At this time, the charging power amount included in the charge control signal can be changed. For example, a charge control signal indicating a level 1 charging power amount may be applied between 0 and 1 second, and a charge control signal indicating a level 2 charging power amount and a charge control signal indicating a level 3 charging power amount may be applied alternately between 1 and 6 seconds.

[0079] Here, the first-stage charging power amount may be the reference value described above with reference to step S10 of FIG. 2. For example, the processor (121) may identify the first power amount of the load (130) using the first-stage charging power amount.

[0080] Afterwards, the processor (121) can identify the second power amounts of the load (130) while changing the charging power amount in two or three stages.

[0081] For example, in order to increase the accuracy and reliability of the algorithm, the basic operation execution cycle is set to a very short time in the unit of several seconds, and the charging power of the battery (110) can be applied by rapidly changing in a stepwise manner. At this time, the maximum / minimum value of the charging power according to the charging control signal must not exceed the rated capacity of the system, and must be determined within the power operation range in which the stability of the battery (110) is secured. On the other hand, if the change cycle of the charging power of the battery (110) is relatively long, or the difference in the power of each step is minimal (for example, within several percent of the overall rating), there is a possibility that it may operate unintentionally depending on errors and actual load conditions.

[0082] That is, the core of the algorithm is to rapidly derive the power of the load in each section by greatly changing the charging power of the battery (110) in a short period of time.

[0083] The processor (121) identifies whether there is excessive fluctuation in the power of the load (130) during one cycle of basic operation, and detects whether there is an incorrect installation of the measuring device (200) based on the number of excessive fluctuations during multiple cycles.

[0084] According to one embodiment, the processor (121) measures the power of the load (130) while rapidly changing the charging power of the battery (110) within a short period of time, thereby identifying whether there is a change in the power of the load (130).

[0085] FIG. 7 is a flowchart illustrating an example of how an energy storage system according to one embodiment operates.

[0086] Figure 7 illustrates the operation of the processor (121) illustrated in Figure 2 in more detail. Therefore, in the following, detailed descriptions of the same content as described above with reference to Figure 2 are omitted.

[0087] At step S710, the processor (121) identifies the first power amount of the load while the battery charge power amount is a reference value.

[0088] At step S720, the processor (121) identifies the second power amounts of the load while changing the battery charging power amount within one cycle.

[0089] At step S730, the processor (121) identifies the minimum and maximum values ​​among the second power amounts of the load.

[0090] At step S740, the processor (121) identifies whether the difference in power between the minimum and maximum values ​​of the first power amount and the second power amount exceeds a threshold value.

[0091] If the power difference exceeds the threshold value (Yes in S740), in step S750, the processor (121) accumulates the number of load over-fluctuations.

[0092] If the power difference does not exceed the threshold value (No in S740), in step S760, the processor (121) maintains the number of load over-fluctuations.

[0093] At step S770, the processor (121) determines whether the number of detections (the number of times over-variation is measured) exceeds a threshold value. The reason step S770 is performed is that the number of times over-variation is measured must be a certain number or more, which will serve as a reliable indicator for determining whether the measuring device (200) is installed incorrectly.

[0094] If the number of detections does not exceed the threshold value (No in S770), the processor (121) returns to step S710 and performs one more cycle of detection for load over-fluctuation.

[0095] If the number of detections exceeds the threshold value (Yes in S770), in step S780, the processor (121) determines whether the number of load over-fluctuations exceeds the threshold value.

[0096] If the number of load over-fluctuations exceeds the threshold value (Yes in S780), in step S790, the processor (121) detects that the measuring device (200) is incorrectly installed.

[0097] If the number of load over-fluctuations does not exceed the threshold value (No in S780), in step S800, the processor (121) detects that the measuring device (200) is normally installed.

[0098] FIG. 8 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0099] Comparing FIG. 3 and FIG. 8, ESS (103) is a single-phase, three-wire system, the same as ESS (101) of FIG. 3, but the measuring device is EM (204) rather than CT (201, 202) of FIG. 3.

[0100] Since EM (204) can directly measure the power amount of the system (150), the processor (121) does not need to calculate the power amount of the system (150). Therefore, there is an advantage in that the calculation process of the processor (121) is reduced.

[0101] FIG. 9 is a diagram illustrating another example of a detailed circuit diagram of an energy storage system according to one embodiment.

[0102] Comparing FIG. 4 and FIG. 9, ESS (104) is a single-phase, two-wire system, the same as ESS (102) of FIG. 4, but the measuring device is EM (205) rather than CT (203) of FIG. 3.

[0103] As described above with reference to FIG. 8, since the EM (205) can directly measure the power amount of the system (150), the processor (121) does not need to calculate the power amount of the system (150). Therefore, there is an advantage in that the calculation process of the processor (121) is reduced.

[0104] Meanwhile, the above-described method can be written as a program that can be executed on a computer, and can be implemented on a general-purpose digital computer that runs the program using a computer-readable recording medium. In addition, the structure of the data used in the above-described method can be recorded on a computer-readable recording medium through various means. The computer-readable recording medium includes storage media such as magnetic storage media (e.g., ROM, RAM, USB, floppy disk, hard disk, etc.) and optical reading media (e.g., CD-ROM, DVD, etc.).

[0105] Those skilled in the art will appreciate that the present invention can be implemented in modified forms without departing from the essential characteristics of the above-described invention. Therefore, the disclosed methods should be considered illustrative rather than restrictive. The scope of the claims, not the foregoing description, is defined by the scope of the patent, and should be interpreted to encompass all differences within the scope equivalent thereto.

Claims

1. Identifying a first power amount of a load using first measurement information received from at least one measuring device, Identifying the second power amounts of the load using the second measurement information received from the measuring device as the charge power amount of the battery changes, Identifying whether the load has excessive power fluctuations based on the difference between the first power amount and the second power amount, An energy storage system comprising a processor that detects misinstallation of the measuring device based on the number of times the power over-fluctuation has occurred.

2. In paragraph 1, The above first power amount is, An energy storage system including a reference power amount when the charge power amount of the above battery is a reference value.

3. In paragraph 1, The above measuring device, An energy storage system comprising a current transducer (CT) or an energy meter (EM).

4. In paragraph 1, The above processor, Identify the minimum and maximum values ​​among the above second power quantities, An energy storage system that identifies that a power over-fluctuation has occurred when the difference between the first power amount and any one of the minimum and maximum values ​​exceeds a predefined value.

5. In paragraph 1, The above processor, Identifying the amount of power in the power system using the measurement information received from the above measuring device, An energy storage system that identifies the power amount of the load through the difference between the power amount of the power system and the charged power amount of the battery.

6. In paragraph 1, The above processor, An energy storage system that changes the charge power of the battery in a stepwise manner by repeatedly increasing and decreasing it within a predetermined time period.

7. In paragraph 6, The above processor, An energy storage system that identifies and accumulates the number of times power over-fluctuations occur over multiple cycles, with the above-mentioned time being one cycle.

8. A method for detecting whether at least one measuring device is incorrectly installed, A step of identifying a first power amount of a load using first measurement information received from at least one measuring device; A step of identifying second power amounts of the load using second measurement information received from the measuring device as the charge power amount of the battery changes; A step of identifying whether the load has excessive power fluctuations based on the difference between the first power amount and the second power amount; and A method comprising: a step of detecting an incorrect installation of the measuring device based on the number of times the power over-fluctuation occurs; 9. In paragraph 8, The above first power amount is, A method including a reference power amount when the charging power amount of the above battery is a reference value.

10. In paragraph 8, The above measuring device, A method comprising a current transducer (CT) or an energy meter (EM).

11. In paragraph 8, The step of identifying whether the power of the above load fluctuates excessively is as follows: A step of identifying the minimum and maximum values ​​among the second power amounts; and A method comprising: a step of identifying that power over-fluctuation has occurred when a difference between the first power amount and any one of the minimum value and the maximum value exceeds a predefined value; 12. In paragraph 8, The step of identifying the first power amount and the second power amount of the above load is: A step of identifying the amount of power of the power system using measurement information received from the measuring device; and A method comprising: a step of identifying the power amount of the load through a difference between the power amount of the power system and the charged power amount of the battery; 13. In paragraph 8, The step of identifying the second power amounts of the above load is: A method comprising: a step of changing the charging power of the battery by repeatedly increasing and decreasing it in a stepwise manner within a predetermined time period; 14. In paragraph 13, The step of detecting the misinstallation of the above measuring device is: A method comprising: a step of accumulating and identifying the number of times power over-fluctuation occurs during a plurality of cycles, with the above-mentioned pre-defined time as one cycle.

15. A computer-readable recording medium recording a program for executing the method of Article 8 on a computer.

Citation Information

Patent Citations

  • System for supplying power to an apparatus and method for the lifetime and capacity of a power-storage

    KR100146269B1

  • Energy storage system

    KR1020170048992A

  • Apparatus for Diagnosing Battery Conditioning System, Energy Storage System including That Apparatus

    KR1020170050519A

  • Composition for Cat Litter(sand) Made of Soy Bean Hull Comprising Hydrolysate with Organic Acid of Waste Shell and Manufacturing Method Thereof

    KR102864701B1

  • Overpower protection in a power supply system

    US20220094153A1