Tunnel groundwater recycling device based on dynamic regulation and control of ecological water requirements
By designing circumferential drainage pipes, longitudinal water conduits and water storage recharge devices in the tunnel, combined with real-time control of water pressure and flow monitoring sensors, the recycling of tunnel groundwater is realized, solving the problems of waste of groundwater resources and damage to the ecological environment. , improving the control accuracy of the recharge amount.
Patent Information
- Application Number
- PCT/CN2023/087502
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-11
- Publication Date
- 2024-10-17
AI Technical Summary
Existing tunnels are undergoing limited drainage treatment, resulting in waste of groundwater resources and damage to the ecological environment, and lack of effective recycling technology.
Design a tunnel groundwater recycling device based on dynamic control of ecological water demand, including circumferential drainage pipes, longitudinal water conduits, transverse water outlet pipes, water storage and recharge devices, water pressure monitoring sensors and flow monitoring sensors, which can be used in real time through the terminal controller Monitor and control water pressure and flow to achieve water recycling.
Under the conditions of taking into account tunnel safety and ecological water demand, the recycling of groundwater is achieved, reducing water waste and ecological environment damage, and improving the control accuracy of recharge volume.
Smart Images

Figure CN2023087502_17102024_PF_FP_ABST
Abstract
Description
A tunnel groundwater recycling device based on dynamic regulation of ecological water demand Technical Field
[0001] The present invention relates to the technical field of tunnel groundwater, and in particular to a tunnel groundwater recycling device based on dynamic regulation of ecological water demand. Background Art
[0002] With the in-depth development of the limited drainage concept, more and more tunnels use limited drainage to treat groundwater. Although this concept can protect the environment to a certain extent, excessive discharge of groundwater has damaged the ecological environment to a certain extent and there is also the problem of how to deal with the discharged groundwater, which wastes water resources.
[0003] Summary of the Invention
[0004] The purpose of the present invention is to provide a tunnel groundwater recycling device based on dynamic regulation of ecological water demand, which can effectively realize the recycling of groundwater while taking into account both ecological water demand and tunnel safety conditions, thereby protecting the ecological environment to the greatest extent and reducing the waste of water resources.
[0005] To achieve the above-mentioned purpose, the technical solution of the present invention is: a tunnel groundwater recycling device based on dynamic regulation of ecological water demand, including an annular drainage pipe located between the initial support and the secondary lining, wherein a plurality of the annular drainage pipes are distributed at certain intervals along the longitudinal direction of the tunnel, and adjacent annular drainage pipes are connected by longitudinal water pipes. Both sides of the bottom of each annular drainage pipe are connected to horizontal water outlet pipes, and the horizontal water outlet pipes are connected to the corresponding water storage and recharge devices. An electric water valve is provided on the horizontal water outlet pipe, and the electric water valve is connected to the terminal controller.
[0006] Furthermore, a sediment filter is installed on the horizontal water outlet pipe, and a detachable filter element is provided in the sediment filter for filtering coarse particles of sediment.
[0007] Furthermore, the water storage and recharge device includes a water storage chamber, multiple recharge shafts and a recharge booster pump. The multiple recharge shafts are located between the water storage chambers and are connected to the water storage chambers through connecting pipes. The recharge booster pump and electric water valve are installed on the connecting pipes. The recharge booster pump and electric water valve are connected to the terminal controller.
[0008] Furthermore, a detachable filter tip is provided at the end of the transverse water outlet pipe in the water storage chamber for secondary filtration of fine particles of sediment.
[0009] Furthermore, each recharge shaft includes a shaft body and a stainless steel pipe. The shaft body is located at the bottom of the tunnel invert arch, and a stainless steel pipe is provided inside it. A plurality of water outlet holes are opened at the lower part of the side wall of the stainless steel pipe. The stainless steel pipe passes downward through the secondary lining and the initial support into the surrounding rock in sequence. A clay layer and a sand filling layer are provided on the outside of the stainless steel pipe located in the surrounding rock from top to bottom, and the water outlet holes are located in the sand filling layer.
[0010] Furthermore, the number of multiple reinjection shafts is obtained according to the following formula:
[0011] Where n is the number of recharge shafts; Q is the maximum water storage capacity of a single water storage chamber; and q is the recharge water volume of a single recharge shaft.
[0012] Furthermore, the water storage chamber is located at the inverted arch at the bottom of the tunnel and is symmetrically arranged. A detachable filter screen is provided in the water storage chamber for filtering impurities. The end of the horizontal water outlet pipe is located above the filter screen. A fixable manhole cover is provided on the top of each water storage chamber.
[0013] Furthermore, water pressure monitoring sensors are provided on the outside of the primary support and the outside of the secondary lining to monitor changes in water pressure; flow monitoring sensors are provided on the lateral outlet pipe and the connecting pipe to monitor the drainage volume and recharge volume respectively; the water pressure monitoring sensor and the flow monitoring sensor are both connected to the terminal controller.
[0014] As a further step, the recharge amount is obtained in the following manner:
[0015] Where Q 补 is the total groundwater recharge, according to the formula Q 补 =αW; α is the rainfall infiltration coefficient; W is the local rainfall; Q 回 is the recharge volume; Q 排 is the tunnel groundwater drainage volume; K is the aquifer conductivity; R is the tunnel drainage influence radius; H is the initial height of the aquifer; and h is the groundwater head height.
[0016] As a further step, the method for dynamically regulating ecological water demand based on the above-mentioned tunnel groundwater recycling device is as follows: the water pressure monitoring sensor monitors the water pressure outside the tunnel in real time and transmits the pressure information to the terminal controller. When it exceeds the set stable water pressure value, the terminal controller controls the electric water valve on the horizontal outlet pipe to open. At this time, the flow monitoring sensor on the horizontal outlet pipe monitors the drainage volume in real time. The water flows through the longitudinal water guide pipe, the annular drainage pipe, the horizontal outlet pipe and multiple filters to the water storage chamber; when the water pressure outside the tunnel monitored in real time by the water pressure monitoring sensor is equal to the set stable water pressure value, the terminal controller controls the electric water valve to close and records the tunnel groundwater drainage volume Q monitored in real time by the flow monitoring sensor on the horizontal outlet pipe排 , in order to achieve the purpose of tunnel drainage and water storage; the total groundwater supply Q 补 >Q 排 When the total groundwater recharge is Q 补 排 When the pressure of the recharge booster pump reaches a certain value, the terminal controller will open the electric water valve on the connecting pipe to recharge the groundwater stored in the rainy season into the ecological environment. The flow monitoring sensor on the connecting pipe monitors the recharge volume in real time. When the recharge volume received by the terminal controller reaches Q 回 When the water is recharged, the terminal controller turns off the recharge booster pump and the electric water valve on the connecting pipe to achieve the purpose of recharge.
[0017] Compared with the existing technology, the above technical solution adopted by the present invention has the following advantages: This device can effectively realize the recycling of groundwater while taking into account the ecological water demand and tunnel safety conditions. In the rainy season, the discharged water will be stored. When there is a lack of rainfall supply, the stored water will be recharged into the ecological environment. The recharge volume control accuracy is high, which can not only further reduce the damage of the tunnel to the ecological environment, but also protect the safety of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] FIG1 is a schematic longitudinal cross-sectional view of a tunnel groundwater recycling device;
[0019] Figure 2 is a three-dimensional diagram of the distribution of pipelines in the tunnel lining structure;
[0020] FIG3 is a side view of the tunnel groundwater recycling device;
[0021] FIG4 is a schematic diagram of the installation position of the water pressure monitoring sensor.
[0022] In the figure: 1-primary support; 2-secondary lining; 3-annular drainage pipe; 4-longitudinal water pipe; 5-longitudinal water pipe; 6-sediment filter; 7-filter element; 8-electric water valve; 9-flow monitoring sensor; 10-recharge booster pump; 11-filter tip; 12-filter screen; 13-water storage chamber; 14-recharge shaft; 15-terminal controller; 16-fixable manhole cover; 17-electric water valve; 18-flow monitoring sensor; 19-surrounding rock; 20-water outlet; 21-water pressure monitoring sensor; 22-stainless steel pipe; 23-shaft; 24-clay layer; 25-sand fill layer. DETAILED DESCRIPTION
[0023] The technical solution of the present invention is described below with reference to the accompanying drawings. It should be understood that the detailed implementation methods and specific operating processes described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0024] Example 1
[0025] The technical solution of the present invention mainly provides a tunnel groundwater recycling device based on dynamic regulation of ecological water demand, including a longitudinal water guide pipe, a circular drainage pipe, a transverse water outlet pipe, a water storage and recharge device, a water pressure monitoring sensor, a flow monitoring sensor, an electric water valve, and a terminal controller.
[0026] In this embodiment, the annular drainage pipes are distributed at intervals of 1 to 10 meters in the longitudinal direction of the tunnel and are interconnected with the longitudinal aqueduct and the transverse outlet pipe at the arch foot. The transverse outlet pipe is equipped with a sediment filter with a removable filter element for filtering coarse sediment particles. An electric water valve is installed at the front end of the sediment filter.
[0027] In this embodiment, the water storage and recharge device includes a water storage chamber, multiple recharge shafts, a filter screen and a recharge booster pump. The water storage chamber is located at the inverted arch at the bottom of the tunnel and is symmetrically distributed on both sides of the tunnel. There is a fixable manhole cover above it and it is connected to the horizontal water outlet pipe. The water storage chamber serves the purpose of storing water; the end of the horizontal water outlet pipe is located in the water storage chamber and is provided with a detachable filter tip at the end. The filter tip can be made of steel wire or adjusted according to actual conditions for secondary filtration of fine particles of sediment.
[0028] In this embodiment, multiple recharge shafts are located between two water storage chambers and are connected to the water storage chambers through connecting pipes, which can be stainless steel pipes. Each recharge shaft includes a shaft body and a stainless steel pipe. The shaft body is located at the bottom of the tunnel invert arch and is provided with a stainless steel pipe inside. A number of water outlets are provided at the lower part of the side wall of the stainless steel pipe to reasonably divert water, effectively reduce water and soil loss at the bottom of the shaft, and ensure tunnel safety. The stainless steel pipe passes through the secondary lining and primary support of the tunnel downward to the surrounding rock. The outer side of the stainless steel pipe located in the surrounding rock is provided with a clay layer and a sand filling layer from top to bottom. The water outlet is located in the sand filling layer to ensure that groundwater can be efficiently recharged into the ecological environment. At the same time, it can also be changed to other highly permeable soil layers according to actual conditions. The number of multiple recharge shafts is obtained according to the following formula:
[0029] Where n is the number of recharge shafts; Q is the maximum water storage capacity of a single water storage chamber; and q is the recharge volume of a single recharge shaft. This formula effectively determines the number of recharge shafts, ensuring they are sufficient to meet the recharge process's safety and effectiveness.
[0030] In this embodiment, the filter screen is located in the water storage chamber and is detachable. It filters impurities that do not belong to the original groundwater or other impurities that are generated when the groundwater comes into contact with air during exposure.
[0031] In this embodiment, the recharge booster pump is located on the connecting pipe between the water storage chamber and the multiple recharge shafts; the recharge booster pump is connected to the terminal controller, and the pressure is controlled in real time by the terminal controller.
[0032] In this embodiment, water pressure monitoring sensors are located outside the primary support and the secondary lining to monitor changes in water pressure. Flow monitoring sensors are located at the front end of the electric water valve on the horizontal outlet pipe and on the connecting pipes between the water storage chamber and multiple recharge shafts to monitor drainage and recharge volumes. Both the water pressure monitoring sensor and the flow monitoring sensor are connected to the terminal controller. The recharge volume is obtained as follows:
[0033] Where Q 补 is the total groundwater recharge, according to the formula Q 补 =αW; α is the rainfall infiltration coefficient, which can be obtained based on local geological conditions or survey data; W is the local rainfall, which can be obtained based on local previous rainfall or real-time rainfall; Q 回 is the recharge volume; Q 排 is the tunnel groundwater discharge; K is the aquifer conductivity obtained based on local geological data and surveys; R is the tunnel drainage influence radius obtained by Theis formula; H is the initial height of the aquifer; and h is the groundwater head height designed based on local annual ecological water demand data and lining safety.
[0034] Example 2
[0035] A method for realizing dynamic regulation of ecological water demand based on the tunnel groundwater recycling device described in Example 1 is as follows: a water pressure monitoring sensor monitors the water pressure outside the tunnel in real time and transmits the pressure information to a terminal controller; when the pressure of any water pressure monitoring sensor exceeds the stable water pressure value (the stable water pressure value obtained by converting the groundwater head height h), the terminal controller controls the electric water valve to open, and at the same time monitors the drainage volume in real time through the flow monitoring sensor; the water flows through the longitudinal water pipe, the annular drainage pipe, the horizontal outlet pipe and multiple filters to the water storage chamber; when the water pressure outside the tunnel monitored in real time by the water pressure monitoring sensor is equal to the set stable water pressure value, the terminal controller controls the electric water valve to close and records the tunnel groundwater drainage volume Q monitored in real time by the flow monitoring sensor 排 , in order to achieve the purpose of tunnel drainage and water storage; when Q 补 >Q 排 When Q 补 排 Considering the ecological water demand, the tunnel does not drain water, the electric water valve of the horizontal outlet pipe is closed, and the terminal controller turns on the recharge booster pump. The recharge booster pump transmits the pressure value information to the terminal controller in real time. At the same time, the terminal controller will get the recharge volume Q 回 When the pressure of the recharge booster pump reaches a certain value, the terminal controller opens the electric water valve on the connecting pipe to recharge the groundwater stored in the rainy season into the ecological environment. The flow monitoring sensor monitors the recharge volume in real time. When the recharge volume received by the terminal controller reaches Q 回 When the water is recharged, the terminal controller turns off the recharge booster pump and the electric water valve on the connecting pipe to achieve the purpose of recharge.
Claims
1. A tunnel groundwater recycling device based on dynamic regulation of ecological water demand, comprising an annular drainage pipe located between the primary support and the secondary lining, wherein a plurality of the annular drainage pipes are distributed at a certain interval along the longitudinal direction of the tunnel, and adjacent annular drainage pipes are connected by longitudinal water guide pipes, and both sides of the bottom of each annular drainage pipe are connected to lateral water outlet pipes, characterized in that: The transverse water outlet pipe is connected to the corresponding water storage and recharging device, and an electric water valve is arranged on the transverse water outlet pipe, and the electric water valve is connected to the terminal controller.
2. A tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 1, characterized in that: A sediment filter is installed on the horizontal water outlet pipe, and a detachable filter element is arranged in the sediment filter for filtering coarse-grained sediment.
3. According to claim 1, a tunnel groundwater recycling device based on dynamic regulation of ecological water demand is characterized in that: The water storage and recharging device includes a water storage chamber, a plurality of recharging shafts and a recharging booster pump. The plurality of recharging shafts are located between the water storage chambers and are connected to the water storage chambers through connecting pipes. The recharging booster pump and an electric water valve are installed on the connecting pipes. The recharging booster pump and the electric water valve are connected to the terminal controller.
4. A tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 3, characterized in that: A detachable filter tip is provided at the end of the transverse water outlet pipe in the water storage chamber for secondary filtration of fine-grained sediment.
5. The tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 3 is characterized in that: Each recharge shaft includes a shaft body and a stainless steel pipe. The shaft body is located at the bottom of the tunnel invert, and a stainless steel pipe is arranged inside the shaft body. A plurality of water outlet holes are opened at the lower part of the side wall of the stainless steel pipe. The stainless steel pipe passes through the secondary lining and the initial support downward into the surrounding rock in sequence. A clay layer and a sand filling layer are arranged on the outside of the stainless steel pipe located in the surrounding rock from top to bottom, and the water outlet holes are located in the sand filling layer.
6. The tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 3 is characterized in that: The number of multiple reinjection shafts is obtained according to the following formula: Where n is the number of recharge shafts; Q is the maximum water storage capacity of a single water storage chamber; q is the recharge water volume of a single recharge shaft.
7. The tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 3 is characterized in that: The water storage chamber is located at the inverted arch at the bottom of the tunnel and is symmetrically arranged. A detachable filter screen is provided in the water storage chamber to filter impurities. The end of the horizontal water outlet pipe is located above the filter screen. A fixable manhole cover is provided on the top of each water storage chamber.
8. The tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 1 is characterized in that: Water pressure monitoring sensors are provided on the outside of the initial support and the outside of the secondary lining to monitor changes in water pressure; flow monitoring sensors are provided on the lateral water outlet pipe and the connecting pipe to monitor the drainage volume and the reinjection volume respectively; the water pressure monitoring sensor and the flow monitoring sensor are both connected to the terminal controller.
9. A tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 8, characterized in that: The method for obtaining the recharge amount is: Where Q 补 is the total groundwater recharge, according to the formula Q 补 =αW; α is the rainfall infiltration coefficient, W is the local rainfall, Q 回 is the recharge volume; Q 排 is the tunnel groundwater drainage volume; K is the water conductivity of the aquifer; R is the tunnel drainage influence radius; H is the initial height of the aquifer; h is Height of groundwater head.
10. The tunnel groundwater recycling device based on dynamic regulation of ecological water demand according to claim 1 is characterized in that: The dynamic regulation method of ecological water demand is as follows: the water pressure monitoring sensor monitors the water pressure outside the tunnel in real time and transmits the pressure information to the terminal controller. When it exceeds the set stable water pressure value, the terminal controller controls the electric water valve on the horizontal outlet pipe to open. At this time, the flow monitoring sensor on the horizontal outlet pipe monitors the drainage volume in real time. The water flows through the longitudinal water guide pipe, the annular drainage pipe, the horizontal outlet pipe and multiple filters to the water storage chamber; when the water pressure outside the tunnel monitored by the water pressure monitoring sensor in real time is equal to the set stable water pressure value, the terminal controller controls the electric water valve to close and records the tunnel groundwater drainage volume Q monitored by the flow monitoring sensor on the horizontal outlet pipe in real time 排 , in order to achieve the purpose of tunnel drainage and water storage; The total groundwater recharge Q 补 >Q 排 When the total groundwater recharge is Q 补 排 When the pressure of the recharging booster pump reaches a certain value, the terminal controller will open the electric water valve on the connecting pipe to recharge the groundwater stored in the rainy season to the ecological environment. The flow monitoring sensor on the connecting pipe monitors the recharging volume in real time. When the recharging volume received by the terminal controller reaches Q 回 When the water is refilled, the terminal controller turns off the reinjection booster pump and the electric water valve on the connecting pipe to achieve the purpose of reinjection.
Citation Information
Patent Citations
Automatic pressure regulation type sluicing control device for tunnel in high-pressure water-abundant area
CN106761919A
Tunnel secondary lining water pressure control structure
CN107178393A
Dynamic monitoring, dredging and drainage guiding method for back water pressure and flow rate of tunnel lining
CN111119995A
Double-layer pressure reduction waterproof and drainage system for karst water-rich tunnel and construction method of double-layer pressure reduction waterproof and drainage system
CN111425250A
Tunnel underground water limited discharge lining structure form and calculation method
CN115434723A