Communication method and communication apparatus

By determining the frequency domain resource where the handover time is located between user equipment and network equipment, the problem of low spectrum resource utilization in flexible spectrum access technology is solved and more efficient spectrum resource management is achieved.

WO2024213130A1PCT designated stage expired Publication Date: 2024-10-17HUAWEI TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/087557
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-14
Filing Date
2024-04-12
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

In flexible spectrum access technology, when user equipment dynamically switches between multiple frequency bands, it is difficult to effectively determine the frequency band where the switching time is located, resulting in reduced spectrum resource utilization, especially when the same frequency band with the highest priority exists in the frequency bands before and after the switching. In this case, existing methods cannot determine the switching time position.

Method used

Provide a communication method and communication device to determine the frequency domain resource where the switching time is located when switching from M frequency domain resources to N frequency domain resources. The method includes excluding the highest priority frequency domain resource and setting the lowest priority frequency domain resource. The frequency domain resource is used as the frequency domain resource where the handover time is located. When the same frequency band exists before and after the handover, the handover time position is determined by comparing the priority of the frequency domain resource and the number of transmission chains to improve the utilization of spectrum resources.

Benefits of technology

Effectively determine the handover time position, reduce spectrum resource waste, and improve spectrum resource utilization. Especially when the priority of the frequency bands before and after the handover is the same, the handover time can be accurately determined to avoid the waste of spectrum resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024087557_17102024_PF_FP_ABST
    Figure CN2024087557_17102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided in the present application are a communication method and a communication apparatus. The method comprises: when a communication apparatus switches from M frequency domain resources to N frequency domain resources, determining from the M frequency domain resources and the N frequency domain resources a frequency domain resource where a switching period is located, M and N being positive integers, the sum of M and N being greater than 2, and the switching period being a period for switching from the M frequency domain resources to the N frequency domain resources. Optionally, the method further comprises: the communication apparatus switches, within the switching period, from the M frequency domain resources to the N frequency domain resources. The solution provided by the present application can improve the validity of determining a frequency domain resource where a switching period is located, thereby improving the spectrum utilization rate.
Need to check novelty before this filing date? Find Prior Art

Description

Communication method and communication device

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office of the People's Republic of China on April 14, 2023, with application number 202310417633.1 and application name "A Communication Method and Communication Device", the entire contents of which are incorporated by reference into this application. Technical Field

[0003] The present application relates to the field of communication technology, and in particular to a communication method and a communication device. Background Art

[0004] In current flexible spectrum access technology, user equipment (UE) can dynamically switch the frequency band used for uplink transmission between multiple bands based on the frequency band load, thereby making better use of uplink resources and improving uplink communication quality.

[0005] Currently, when a UE dynamically switches between different frequency bands, the UE's radio frequency needs to be interrupted for a switching period to ensure switching to another frequency band. This can also be understood as requiring a certain amount of time (i.e., switching period) for the UE to complete the switch from one frequency band to another due to UE capability limitations. Furthermore, the UE must also clearly know the switching period location, i.e., the frequency band on which the switching interval is located. When the switching period is located on the frequency band before the switch, the UE interrupts information transmission on the frequency domain resources before the switch. During the interruption period (i.e., switching period), the UE completes tuning or retuning of the radio frequency (RF) chain, and then switches to another frequency band. When the switching period is located on the frequency band after the switch, the UE interrupts information transmission on the frequency domain resources after the switch. During the interruption period, the UE completes tuning or retuning of the RF chain, thereby completing the frequency band switch.

[0006] Currently, when a UE switches between two frequency bands (i.e., switches from one frequency band to another), according to the provisions of relevant technical standards, the UE can determine that the switching time is in the pre-switching frequency band or the post-switching frequency band, excluding the frequency band with the highest priority. However, when the UE switches between more frequency bands (i.e., switches from multiple frequency bands to one or more frequency bands or from one frequency band to multiple frequency bands), according to the methods specified in the above technical standards, the UE can determine the frequency band where the switching time is located in certain specific scenarios, but cannot determine the frequency band where the switching time is located in other specific scenarios (for example, a scenario where the frequency bands before and after the switching include the same frequency band and the frequency band has the highest priority), resulting in reduced spectrum resource utilization.

[0007] Summary of the Invention

[0008] The present application provides a communication method and a communication device for improving the effectiveness of determining frequency domain resources where a switching time is located, thereby improving spectrum utilization.

[0009] In a first aspect, an embodiment of the present application provides a communication method, which can be executed by a terminal device or a network device, or by a component in the terminal device or the network device (such as a processor, a chip, or a chip system, etc.). The method includes: when switching from M frequency domain resources to N frequency domain resources, determining the frequency domain resource where the switching time is located from the M frequency domain resources and the N frequency domain resources; wherein M and N are positive integers and the sum of M and N is greater than 2; the switching time is the time for switching from the M frequency domain resources to the N frequency domain resources; wherein the frequency domain resource where the switching time is located meets at least one of the following conditions: the frequency domain resource where the switching time is located is the frequency domain resource that does not have the highest priority among the frequency domain resources of the M frequency domain resources and the N frequency domain resources except the first frequency domain resource, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, and the first frequency domain resource is the frequency domain resource contained in the M frequency domain resources. domain resources, and the first frequency domain resources are the frequency domain resources included in the N frequency domain resources; the frequency domain resources where the switching time is located are the frequency domain resources that do not have the highest priority among the frequency domain resources of the first set type among the M frequency domain resources and the N frequency domain resources, and the frequency domain resources where the switching time is located are the M frequency domain resources or the N frequency domain resources; the frequency domain resources where the switching time is located are the M frequency domain resources or the N frequency domain resources, wherein the M frequency domain resources include the first frequency domain resource, and the N frequency domain resources include the first frequency domain resource; the frequency domain resource where the switching time is located is the frequency domain resource among the M frequency domain resources or the N frequency domain resources, excluding the frequency domain resource where the physical uplink control channel is located.

[0010] This method provides multiple methods for determining the switching time location, helping communications devices effectively determine the switching time location in a wider range of frequency domain resource switching scenarios. This improves the effectiveness of determining the frequency domain resource where the switching time occurs, reduces spectrum resource waste, and improves spectrum resource utilization. For example, in a scenario where the same frequency domain resource exists before and after the switching and the same frequency domain resource has the highest priority, the switching time location cannot be determined based on existing solutions. However, the solution provided by the above embodiment can effectively determine the switching time location.

[0011] In the above method, the M frequency domain resources are the frequency domain resources before switching, that is, the frequency domain resources before switching or the frequency domain resources switched from or switched from the frequency domain resources, and the N frequency domain resources are the frequency domain resources after switching, that is, the frequency domain resources after switching or the frequency domain resources switched to or switched to the frequency domain resources. The frequency domain resources where the switching time is located are M frequency domain resources, that is: the frequency domain resources where the switching time is located are the frequency domain resources before switching; the frequency domain resources where the switching time is located are N frequency domain resources, that is: the frequency domain resources where the switching time is located are the frequency domain resources after switching. The frequency domain resources belonging to the first set type can also be understood as the frequency domain resources of the first set type. The highest priority can be understood as a higher priority, and the lowest priority can be understood as a lower priority.

[0012] In the above method, the frequency domain resources at the switching time being M frequency domain resources can be understood as at least one of the following: the frequency domain resources at the switching time belong to the M frequency domain resources; the frequency domain resources at the switching time are contained in / included by the M frequency domain resources; the frequency domain resources at the switching time are the frequency domain resources before the switching; the frequency domain resources at the switching time belong to the frequency domain resources before the switching. The frequency domain resources at the switching time being N frequency domain resources can be understood as at least one of the following: the frequency domain resources at the switching time belong to the N frequency domain resources; the frequency domain resources at the switching time are contained in / included by the N frequency domain resources; the frequency domain resources at the switching time are the frequency domain resources after the switching; the frequency domain resources at the switching time belong to the frequency domain resources after the switching.

[0013] In the above method, the frequency domain resource that does not have the highest priority can be understood as the frequency domain resource with the lowest priority. That is, when determining the frequency domain resource where the switching time is located, the pre-switching frequency domain resource or the post-switching frequency domain resource where the highest priority frequency domain resource is located is excluded. This can also be understood as: when determining the frequency domain resource where the switching time is located, the pre-switching frequency domain resource or the post-switching frequency domain resource where the lowest priority frequency domain resource is located is set as the frequency domain resource where the switching time is located.

[0014] In one possible design, the first setting type includes at least one of the following: scheduled uplink transmission, and the frequency domain resources at the set position in the scheduled frequency domain resources have uplink transmission; the physical uplink control channel does not exist / is not included; and the associated frequency band is not included.

[0015] In a scenario where the frequency domain resources before and after the switch include frequency domain resources of the first set type, it may be impossible to determine the frequency domain resources where the switch time is located based on the existing solution, or the frequency domain resource switching based on the existing solution may have a significant impact on the uplink communication quality. Therefore, in the above-mentioned solution of the present application, by configuring a corresponding solution for determining the frequency domain resources where the switch time is located for this scenario, it is possible to more efficiently determine the frequency domain resources where the switch time is located, thereby more efficiently implementing frequency domain resource switching and minimizing the impact on the uplink communication quality.

[0016] In one possible design, the M frequency domain resources are the frequency domain resources before switching, and the N frequency domain resources are the frequency domain resources after switching; the frequency domain resources where the switching time is located are the M frequency domain resources, specifically: the frequency domain resources where the switching time is located are the frequency domain resources before switching; the frequency domain resources where the switching time is located are the N frequency domain resources, specifically: the frequency domain resources where the switching time is located are the frequency domain resources after switching.

[0017] In one possible design, when the frequency domain resource where the switching time is located is the frequency domain resource after switching, the priority of the information carried by the first frequency domain resource among the M frequency domain resources is higher than the priority of the information carried by the first frequency domain resource among the N frequency domain resources; or, when the frequency domain resource where the switching time is located is the frequency domain resource before switching, the priority of the information carried by the first frequency domain resource among the N frequency domain resources is higher than the priority of the information carried by the first frequency domain resource among the M frequency domain resources.

[0018] In this method, the frequency domain resource where the switching time is located is the side where the first frequency domain resource with lower priority carrying information before and after the switching is located (the frequency domain resource before the switching or the frequency domain resource after the switching), which can ensure that the uplink transmission corresponding to the information with higher priority is not affected by the switching of frequency domain resources, that is, to ensure that the execution of communication services with higher priority is not affected.

[0019] In one possible design, if the frequency domain resources where the physical uplink control channel is located belong to the M frequency domain resources, the frequency domain resources where the switching time is located are the N frequency domain resources; or, if the frequency domain resources where the physical uplink control channel is located belong to the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources.

[0020] In this method, by using the pre-switching frequency domain resources or post-switching frequency domain resources that do not include the physical uplink control channel as the frequency domain resources where the switching time is located, it is possible to avoid interference or impact on the transmission of the physical uplink control channel caused by the frequency domain resource switching process, thereby ensuring the communication quality of the physical uplink control channel while performing frequency domain resource switching.

[0021] In one possible design, the frequency domain resources where the switching time is located are the M frequency domain resources or the N frequency domain resources, specifically including: if the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources; or, if the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources, the frequency domain resources where the switching time is located are the N frequency domain resources.

[0022] In this method, by using the pre-switching frequency domain resources or post-switching frequency domain resources with a smaller number of uplink transmission chains or scheduling ports as the frequency domain resources where the switching time is located, the impact of the frequency domain resource switching process on uplink transmission can be minimized.

[0023] In one possible design, the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, specifically including: if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the N frequency domain resources, the frequency domain resource where the switching time is located is the M frequency domain resources; or, if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the M frequency domain resources, the frequency domain resource where the switching time is located is the N frequency domain resources.

[0024] In this method, by using the pre-switching frequency domain resources or post-switching frequency domain resources with a smaller number of uplink transmission chains or scheduling ports other than the first frequency domain resources as the frequency domain resources where the switching time is located, it is possible to avoid affecting the transmission of the party with greater transmission demand, thereby minimizing the impact of the frequency domain resource switching process on the uplink transmission.

[0025] In one possible design, among the M frequency domain resources and the N frequency domain resources, the priority of the first frequency domain resource is higher than the priority of other frequency domain resources.

[0026] In this scenario, the first frequency domain resource has the highest priority. In scenarios where the first frequency domain resource is both a pre-switching and a post-switching frequency domain resource, and the first frequency domain resource has the highest priority, the above method can effectively determine the frequency domain resource at the switching time, thereby ensuring smooth execution of the frequency domain resource switching.

[0027] In one possible design, when the second frequency domain resource is in an intra-band carrier aggregation state, the second frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the second frequency domain resource is not used, wherein the second frequency domain resource belongs to the M frequency domain resources or the N frequency domain resources.

[0028] When an associated frequency band is configured for the second frequency band and is used, there may be a situation where an uplink transmission link exists on the associated frequency band of the second frequency band but no valid content is actually transmitted. In this case, the associated frequency band may be switched during the frequency domain resource switching process, but because the associated frequency band does not carry valid information, this switching is actually unnecessary. Therefore, by not configuring or using the associated frequency band of the second frequency domain resource, unnecessary switching related to the associated frequency band can be avoided in the frequency domain resource switching scenario, thereby reducing spectrum resource waste and improving spectrum resource utilization.

[0029] In one possible design, the uplink transmission on the two carriers within the second frequency domain resources corresponds to transmission of an uplink transmission chain or one-port transmission.

[0030] In one possible design, if the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resource changes when switching from the M frequency domain resources to the N frequency domain resources, the third frequency domain resource is not switched or there is no switching time on the third frequency domain resource; wherein the third frequency domain resource belongs to the M frequency domain resources and / or the N frequency domain resources. The absence of switching time on the third frequency domain resource can also be understood as: on the third frequency domain resource, the communication device does not switch the frequency domain resource, or does not interrupt information transmission. Information transmission includes at least one of data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can be at least one of uplink data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can also be at least one of downlink data information transmission, control information transmission, or reference signal transmission.

[0031] In the above method, if the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resource changes when switching from the M frequency domain resources to the N frequency domain resources, if frequency domain resource switching is to be performed on the third frequency domain resource, the frequency domain resource switching performed is a frequency domain resource switching between carriers within the same frequency domain resource, i.e., the third frequency domain resource. This switching does not actually require switching time. Therefore, if the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resource changes when switching from the M frequency domain resources to the N frequency domain resources, frequency domain resource switching based on switching time may not be performed or it may be considered that there is no switching time on the third frequency domain resource, which can avoid causing interruption of carriers within the same frequency domain resource, thereby reducing spectrum resource waste and improving spectrum resource utilization.

[0032] In one possible design, when the third frequency domain resource is scheduled for one-port transmission and there are no other scheduled frequency domain resources, the third frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the third frequency domain resource is not used.

[0033] In the above method, by not configuring or using the associated frequency band of the third frequency domain resource, unnecessary switching related to the associated frequency band can be avoided in the frequency domain resource switching scenario, thereby reducing spectrum resource waste and improving spectrum resource utilization.

[0034] In a second aspect, an embodiment of the present application provides a communication method, which can be performed by a terminal device or a network device, or by a component (e.g., a processor, a chip, or a chip system) in the terminal device or the network device. The method includes: when a first frequency domain resource is in an intra-band carrier aggregation state, the first frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the first frequency domain resource is not used.

[0035] When an associated frequency band is configured for a first frequency band and is used, there may be a situation where an uplink transmission link exists on the associated frequency band of the first frequency band but no valid content is actually transmitted. In this case, the associated frequency band may be switched during the frequency domain resource switching process, but because the associated frequency band does not carry valid information, this switching is actually unnecessary. Therefore, by not configuring or using the associated frequency band of the first frequency domain resource, unnecessary switching related to the associated frequency band can be avoided in the frequency domain resource switching scenario, thereby reducing spectrum resource waste and improving spectrum resource utilization.

[0036] In one possible design, the uplink transmission on the two carriers within the first frequency domain resources corresponds to transmission of an uplink transmission chain or one-port transmission.

[0037] In a third aspect, an embodiment of the present application provides a communication device, which may be a terminal device or a network device, or a device in a terminal device or a network device (such as a chip or a chip system or a circuit, etc.). The communication device includes a processing unit and a storage unit, the storage unit being used to store program instructions or store data that can be executed by the processing unit; the processing unit is used to determine the frequency domain resource where the switching time is located from the M frequency domain resources and the N frequency domain resources when switching from M frequency domain resources to N frequency domain resources; wherein M and N are positive integers and the sum of M and N is greater than 2; the switching time is the time for switching from the M frequency domain resources to the N frequency domain resources; wherein the frequency domain resource where the switching time is located meets at least one of the following conditions: the frequency domain resource where the switching time is located is the frequency domain resource that does not have the highest priority among the frequency domain resources of the M frequency domain resources and the N frequency domain resources except the first frequency domain resource, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources. resources, the first frequency domain resource is the frequency domain resource included in the M frequency domain resources, and the first frequency domain resource is the frequency domain resource included in the N frequency domain resources; the frequency domain resource where the switching time is located is the frequency domain resource that does not have the highest priority among the frequency domain resources of the first set type among the M frequency domain resources and the N frequency domain resources, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources; the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, wherein the M frequency domain resources include the first frequency domain resource, and the N frequency domain resources include the first frequency domain resource; the frequency domain resource where the switching time is located is the frequency domain resource among the M frequency domain resources or the N frequency domain resources, excluding the frequency domain resource where the physical uplink control channel is located.

[0038] Among them, M frequency domain resources are frequency domain resources before switching, that is, frequency domain resources before switching or switched from frequency domain resources or switched from the frequency domain resources, and N frequency domain resources are frequency domain resources after switching, that is, frequency domain resources after switching or switched to frequency domain resources or switched to frequency domain resources. The frequency domain resources where the switching time is located are M frequency domain resources, that is: the frequency domain resources where the switching time is located are the frequency domain resources before switching; the frequency domain resources where the switching time is located are N frequency domain resources, that is: the frequency domain resources where the switching time is located are the frequency domain resources after switching. Frequency domain resources belonging to the first setting type can also be understood as frequency domain resources of the first setting type. The highest priority can be understood as a higher priority, and the lowest priority can be understood as a lower priority.

[0039] The fact that the frequency domain resources at the switching time are M frequency domain resources can be understood as at least one of the following: the frequency domain resources at the switching time belong to the M frequency domain resources; the frequency domain resources at the switching time are contained in / included by the M frequency domain resources; the frequency domain resources at the switching time are the frequency domain resources before the switching; the frequency domain resources at the switching time belong to the frequency domain resources before the switching. The fact that the frequency domain resources at the switching time are N frequency domain resources can be understood as at least one of the following: the frequency domain resources at the switching time belong to the N frequency domain resources; the frequency domain resources at the switching time are contained in / included by the N frequency domain resources; the frequency domain resources at the switching time are the frequency domain resources after the switching; the frequency domain resources at the switching time belong to the frequency domain resources after the switching.

[0040] Frequency domain resources that do not have the highest priority can be understood as frequency domain resources with the lowest priority. That is, when determining the frequency domain resources where the switching time is located, the pre-switching frequency domain resources or post-switching frequency domain resources where the highest priority frequency domain resources are located are excluded. This can also be understood as: when determining the frequency domain resources where the switching time is located, the pre-switching frequency domain resources or post-switching frequency domain resources where the lowest priority frequency domain resources are located are set as the frequency domain resources where the switching time is located.

[0041] In one possible design, the first setting type includes at least one of the following: scheduled uplink transmission, and the frequency domain resources at the set position in the scheduled frequency domain resources have uplink transmission; the physical uplink control channel does not exist / is not included; and the associated frequency band is not included.

[0042] In one possible design, the M frequency domain resources are the frequency domain resources before switching, and the N frequency domain resources are the frequency domain resources after switching; the frequency domain resources where the switching time is located are the M frequency domain resources, specifically: the frequency domain resources where the switching time is located are the frequency domain resources before switching; the frequency domain resources where the switching time is located are the N frequency domain resources, specifically: the frequency domain resources where the switching time is located are the frequency domain resources after switching.

[0043] In one possible design, when the frequency domain resource where the switching time is located is the frequency domain resource after switching, the priority of the information carried by the first frequency domain resource among the M frequency domain resources is higher than the priority of the information carried by the first frequency domain resource among the N frequency domain resources; or, when the frequency domain resource where the switching time is located is the frequency domain resource before switching, the priority of the information carried by the first frequency domain resource among the N frequency domain resources is higher than the priority of the information carried by the first frequency domain resource among the M frequency domain resources.

[0044] In one possible design, if the frequency domain resources where the physical uplink control channel is located belong to the M frequency domain resources, the frequency domain resources where the switching time is located are the N frequency domain resources; or, if the frequency domain resources where the physical uplink control channel is located belong to the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources.

[0045] In one possible design, the frequency domain resources where the switching time is located are the M frequency domain resources or the N frequency domain resources, specifically including: if the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources; or, if the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources, the frequency domain resources where the switching time is located are the N frequency domain resources.

[0046] In one possible design, the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, specifically including: if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the N frequency domain resources, the frequency domain resource where the switching time is located is the M frequency domain resources; or, if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the M frequency domain resources, the frequency domain resource where the switching time is located is the N frequency domain resources.

[0047] In one possible design, among the M frequency domain resources and the N frequency domain resources, the priority of the first frequency domain resource is higher than the priority of other frequency domain resources.

[0048] In one possible design, when the second frequency domain resource is in an intra-band carrier aggregation state, the second frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the second frequency domain resource is not used, wherein the second frequency domain resource belongs to the M frequency domain resources or the N frequency domain resources.

[0049] In one possible design, the uplink transmission on the two carriers within the second frequency domain resources corresponds to transmission of an uplink transmission chain or one-port transmission.

[0050] In one possible design, if the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resource changes when switching from the M frequency domain resources to the N frequency domain resources, the third frequency domain resource is not switched or there is no switching time on the third frequency domain resource; wherein the third frequency domain resource belongs to the M frequency domain resources and / or the N frequency domain resources. The absence of switching time on the third frequency domain resource can also be understood as: on the third frequency domain resource, the communication device does not switch the frequency domain resource, or does not interrupt information transmission. Information transmission includes at least one of data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can be at least one of uplink data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can also be at least one of downlink data information transmission, control information transmission, or reference signal transmission.

[0051] In one possible design, when the third frequency domain resource is scheduled for one-port transmission and there are no other scheduled frequency domain resources, the third frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the third frequency domain resource is not used.

[0052] In a fourth aspect, an embodiment of the present application provides a communication device, which may be a terminal device or a network device, or a device in a terminal device or a network device (such as a chip or a chip system or a circuit, etc.). The communication device includes a processing unit and a storage unit, wherein the storage unit is used to store program instructions or store data that can be executed by the processing unit; the processing unit is used to not configure or use the associated frequency band of the first frequency domain resource when the first frequency domain resource is in an intra-band carrier aggregation state. That is, when the first frequency domain resource is in an intra-band carrier aggregation state, the first frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the first frequency domain resource is not used.

[0053] In one possible design, the uplink transmission on the two carriers within the first frequency domain resources corresponds to transmission of an uplink transmission chain or one-port transmission.

[0054] In a fifth aspect, an embodiment of the present application provides a communication device, comprising: at least one processor; and a memory and a communication interface communicatively connected to the at least one processor;

[0055] The communication interface is configured to receive signals from other communication devices other than the communication device and transmit the signals to the processor or to transmit the signals from the processor to other communication devices other than the communication device;

[0056] The memory stores instructions that can be executed by the at least one processor, and the at least one processor executes the instructions stored in the memory, so that the communication device executes the above-mentioned first aspect or any one of the methods in the first aspect; or executes the above-mentioned second aspect or any one of the methods in the second aspect.

[0057] In a sixth aspect, an embodiment of the present application provides a communication system, the communication system including a terminal device for executing the above-mentioned first aspect or any one of the methods in the first aspect. Optionally, the communication system also includes a network device for executing the above-mentioned first aspect or any one of the methods in the first aspect.

[0058] In the seventh aspect, the present application provides a computer-readable storage medium, which stores a computer program or instruction. When the computer program or instruction is run on a communication device, the communication device executes the above-mentioned first aspect or any one of the methods in the first aspect; or executes the above-mentioned second aspect or any one of the methods in the second aspect.

[0059] In an eighth aspect, the present application provides a computer program product, which includes a computer program or instructions. When the computer program or instructions are executed by a communication device, it implements the above-mentioned first aspect or any one of the methods in the first aspect; or implements the above-mentioned second aspect or any one of the methods in the second aspect.

[0060] In the ninth aspect, the present application provides a chip system, which includes a processor, which is coupled to a memory and is used to read and execute a software program stored in the memory to implement the above-mentioned first aspect or any one of the methods in the first aspect; or to implement the above-mentioned second aspect or any one of the methods in the second aspect.

[0061] The technical effects that can be achieved in any of the third to ninth aspects mentioned above can refer to the description of the beneficial effects of the first or second aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1a is a schematic diagram of a frequency band reuse scenario;

[0063] Figure 1b is a schematic diagram of a frequency band reuse scenario;

[0064] FIG2 is a schematic diagram of a frequency band reuse scenario;

[0065] FIG3 is a schematic diagram of the architecture of a communication system;

[0066] FIG4 is a schematic diagram of a frequency band switching scenario;

[0067] FIG5 is a schematic diagram of the architecture of a communication system;

[0068] FIG6 is a schematic diagram of a communication method provided in an embodiment of the present application;

[0069] FIG7 is a schematic diagram of a frequency band switching scenario provided in an embodiment of the present application;

[0070] FIG8 is a schematic diagram of a frequency band switching scenario provided in an embodiment of the present application;

[0071] FIG9 is a schematic diagram of a frequency band switching scenario provided in an embodiment of the present application;

[0072] FIG10 is a schematic diagram of a frequency band switching scenario provided in an embodiment of the present application;

[0073] FIG11 is a schematic diagram of a frequency band switching scenario provided in an embodiment of the present application;

[0074] FIG12 is a schematic diagram of a communication device provided in an embodiment of the present application;

[0075] FIG13 is a schematic structural diagram of a communication device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0076] The embodiments of the present application will be described in detail below with reference to the accompanying drawings.

[0077] Among them, the method and the device are based on the same technical concept. Since the principles of solving problems by the method and the device are similar, the implementation of the device and the method can refer to each other, and the repeated parts will not be repeated.

[0078] Below, some terms in this application are explained to facilitate understanding by those skilled in the art.

[0079] 1) A terminal device is a user-side entity used to receive or transmit signals and has wireless transceiver capabilities. Optionally, a terminal device includes a device that provides voice and / or data connectivity to the user. A terminal device may also be referred to as user equipment (UE), mobile station (MS), or mobile terminal (MT). For ease of description, the terminal device in this application embodiment is described using a UE as an example.

[0080] For example, the terminal device may be a handheld device with wireless connection capability, or a processing device connected to a wireless modem. The terminal device may exchange voice and / or data with the RAN. The terminal device may include a V2X terminal device, a wireless terminal device, a mobile terminal device, a device-to-device communication (D2D) terminal device, a machine-to-machine / machine-type communication (M2M / MTC) terminal device, an Internet of Things (IoT) terminal device, a virtual reality (VR) device, an augmented reality (AR) device, an industrial control device, a self-driving device, a remote medical device, a smart grid device, a smart home device, a smart office device, an intelligent transportation device, a drone, a robot, an access point (AP), a remote terminal, an access terminal, a user agent, or a user device, a wearable device, an in-vehicle device, etc.

[0081] 2) Network equipment: This is a network-side entity used to transmit and / or receive signals. It can be used as a device in a communication system to connect terminal devices to a wireless network. As a node in a radio access network, the network equipment can also be called a base station, a radio access network (RAN) device, or a radio access network node.

[0082] Exemplary, wireless access network equipment includes but is not limited to base stations (base transceiver station (BTS), Node B, evolved Node B (eNodeB / eNB), gNodeB / gNB, transmission reception point (TRP), base stations subsequently evolved by the 3rd Generation Partnership Project (3GPP), radio network controller (RNC), access point (AP), base station controller (BSC), home base station (e.g., home evolved NodeB, or home Node B, HNB), or base band unit (BBU), wireless fidelity (wireless The base station may be an access node, a wireless relay node, a wireless backhaul node, etc. in a wireless fidelity (Wi-Fi) system. The base station may be: a macro base station, a micro base station, a pico base station, a small station, a relay station, etc. or any other wireless access device, or a base station in the next generation of communications, etc. Multiple base stations may support networks with the same access technology, or networks with different access technologies. A base station may include one or more co-sited or non-co-sited transmission and receiving points. Exemplarily, the wireless access network device may also be a wireless controller, a centralized unit (CU), and / or a distributed unit (DU) in a cloud radio access network (CRAN) scenario. The wireless access network device may also be a server, etc. For example, the network device in vehicle to everything (V2X) technology may be a road side unit (RSU).

[0083] 3) Communication device: A device or equipment that supports wireless communication technology and can communicate with other devices. In the embodiments of the present application, the specific form of the communication device is not limited. For example, the communication device can be a terminal device, a network device, etc.

[0084] It should be noted that, in the present application, "and / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent three situations: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the previous and subsequent associated objects are in an "or" relationship. The multiple involved in this application refers to two or more. At least one refers to one or more. In addition, it should be understood that in the description of this application, words such as "first" and "second" are only used for the purpose of distinguishing the description, and cannot be understood as indicating or implying relative importance, nor can they be understood as indicating or implying order.

[0085] In the 5G NR system, the uplink transmission of the terminal device is usually power-limited, so the received signal strength of the uplink transmission signal when it reaches the network device (such as the base station) may not be sufficient to ensure the coverage performance of the network device. In addition, there may be a situation where the uplink spectrum resources are insufficient, so the uplink coverage performance of the network device cannot be guaranteed by relying on the terminal device to retransmit the data. Currently, the NR system has introduced a supplementary uplink (SUL) as an alternative when the uplink coverage of the NR system is insufficient. Since the low frequency band of LTE usually has better coverage performance, SUL considers selecting a carrier from the lower frequency band of LTE (such as 700MHz / 800MHz, 1.8GHz, 2.1GHz, etc.) to complete the uplink transmission in the NR system. Based on this, when the terminal device transmits uplink data on the NR band (normal UL, NUL), it can select a carrier from the lower frequency band of LTE for NR uplink transmission according to the channel conditions. Among them, the switching between NUL and SUL can be called two-band switching. Currently, when terminal devices use the LTE frequency band for NR transmission, they can reuse the LTE frequency band with the uplink transmission time division duplex (TDD) in the LTE system.

[0086] For example, as shown in Figure 1a, the terminal device can time-division multiplex the 3.5GHz frequency band (belonging to the NR frequency band) and the 2.1GHz frequency band (belonging to the LTE frequency band) provided by the network device for uplink transmission, which can improve the uplink transmission quality of the terminal device. Among them, by adding the 2.1GHz LTE frequency band, the coverage range of the network device is increased, which helps to improve the coverage performance of the network device. For another example, as shown in Figure 1b, in independent networking or non-independent networking, the network equipment can provide NR frequency bands and SUL frequency bands, and the terminal equipment can multiplex the NR uplink and SUL link for uplink transmission.

[0087] In addition, the new 4.9GHz frequency band currently has the prospect of being used. This frequency band provides spectrum resources with higher bandwidth and can provide more sufficient uplink resources. Therefore, it is possible to consider expanding uplink coverage on this frequency band. For example, as shown in Figure 2, this frequency band and the 700MHz frequency band can both be used as SUL frequency bands, so that this frequency band and the 700MHz frequency band can be used to form SUL 2band, thereby further expanding the uplink coverage range. Among them, the 4.9GHz frequency band can be co-sited or off-sited. Among them, as shown in the schematic diagram (a) in Figure 3, co-sited refers to adding a new higher-frequency spectrum of 4.9GHz to the macro base station. As shown in the schematic diagram (b) in Figure 3, off-site refers to using the new higher-frequency spectrum of 4.9GHz on the micro base station (small cell TP) (for example, in the case of factory coverage).

[0088] Regardless of whether the site is co-located or distributed as shown in the figure above, the UE is expected to dynamically switch between multiple frequency bands such as 700MHz / 800MHz / 900MHz, 1.8GHz, 2.1GHz, 3.5GHz, and 4.9GHz based on the channel status and load conditions of the corresponding frequency band. This is the current flexible spectrum access technology.

[0089] The dynamic switching of the terminal device among multiple frequency bands may be two-band switching, three-band switching, four-band switching or even more-band switching.

[0090] When dynamically switching between frequency bands, the terminal device's radio frequency must be interrupted for a period corresponding to the switching period to ensure it can switch to the other frequency band. This can also be understood as the time required for the terminal device to switch frequency bands due to the device's limited capabilities. Specifically, when switching between two, three, four, or more frequency bands, the terminal device requires a switching period to switch from one frequency band to another. The switching period can also be referred to as the switching time, switching gap, or other such periods.

[0091] The interruption of a frequency band due to frequency band switching by a terminal device can be referred to as the switching time being configured on the frequency band, or as the switching time being located on the frequency band, etc., which is not specifically limited in the embodiments of the present application. It is necessary to specify which frequency band or carrier the switching time is located on. In particular, when the switching time value reported by the terminal device is greater than the interval between two uplink transmissions scheduled by the network device, the terminal device needs to clearly know the switching time location (switching period location). Among them, the switching time location is the location of the switching time, that is, on which frequency band or carrier the switching time is located.

[0092] Currently, in a two-band switching scenario, the band switching method is unique, that is, when switching from one band to another, the network device can configure the carrier index and indicate the switching time position through the carrier index. However, in scenarios of three-band switching, four-band switching or more band switching, the band switching method to achieve the effect of three-band switching, four-band switching or more band switching is not unique, and the switching time corresponding to different switching methods may be different. Therefore, if the switching time is indicated by the carrier index according to the two-band switching method, the switching time position corresponding to each possible switching method needs to be indicated one by one through the carrier index, which will result in a large consumption of signaling resources. Therefore, the method for the terminal device to determine the switching time position in the two-band switching scenario is not applicable to scenarios of three-band switching, four-band switching or more band switching.

[0093] Regarding how terminal devices determine the switching time position, the current 3GPP protocol has relevant provisions. Specifically, the network device configures a priority for each frequency band or carrier. For the frequency band involved in a switch (UL Tx switching band), the terminal device determines the switching time position as the pre-switching frequency band (switching-from band(s)) or the post-switching frequency band (switching-to band(s)) where the frequency band that does not have the highest priority is located. In other words, if the pre-switching frequency band does not include the highest priority frequency band, the pre-switching frequency band is used as the frequency band where the switching time is located; if the post-switching frequency band does not include the highest priority frequency band, the post-switching frequency band is used as the frequency band where the switching time is located. The network device can also determine the switching time position according to this rule, thereby obtaining a result that is consistent with that of the terminal device. The above method can be used by terminal devices and network devices to determine the switching time position in a multi-band switching scenario.

[0094] The 3GPP protocol further stipulates that there are the following switching scenarios in three-band switching or four-band switching: in the first time unit, there is an uplink transmission link on band A and band B respectively (referred to as 1T or 1Tx in the embodiment of the present application). In the second time period element, one port (1port) is scheduled for transmission on band A and band C respectively, or one port is scheduled for transmission on band B and band C respectively. Among them, the first time period element and the second time unit are adjacent time units. In the embodiment of the present application, the time unit can be a time slot (slot), a subframe (subframe), a mini-slot (mini-slot / sub-slot), a mini-subframe (mini-subframe) or a symbol, etc. In the above switching scenarios, the terminal device can switch from bands A and B to bands A and C or to bands B and C. The first time unit can be understood as the last time unit before switching, and the second time unit can be understood as the first time unit after switching.

[0095] In particular, a frequency band can have up to two uplink transmission chains (abbreviated as 2T or 2Tx in the embodiments of this application) at the same time. The two uplink transmission chains on a frequency band can be on the same carrier or different carriers within the frequency band. The two uplink transmission chains on a frequency band can be transmitted through one port (1port) or two ports (2port(s)). When transmitting through two ports, each port transmission can correspond to one transmission chain.

[0096] In the prior art, when a network device instructs a UE to send uplink data, the downlink control information (DCI) scheduling of the network device only indicates the port configuration (such as the number of ports or the port number), and does not specify the transmission chain Tx. That is to say, the current network device can schedule the terminal device to perform uplink transmission through DCI and can indicate the port information of the terminal device when performing uplink transmission, but will not indicate the number of transmission chains when the terminal device performs uplink transmission. In the embodiment of the present application, specifying the transmission chain Tx can also be understood as specifying which carrier has several uplink transmission chains or how many transmissions there are (for example: 1T or 1Tx can be called 1 transmission, and 2T or 2Tx can be called 2 transmissions). In practice, for a terminal device, 2Tx can correspond to transmission on 1port, and 1Tx can also correspond to transmission on 1port.

[0097] It should be noted that the uplink transmission chain described in the embodiment of the present application may also be referred to as a transmission chain (transmission chain or radio frequency chain or transmission chain, etc.). The name of the transmission chain is not specifically limited in the embodiment of the present application.

[0098] For ease of explanation, in the embodiment of the present application, one uplink transmission chain or one uplink RF chain transmission is referred to as 1T or 1Tx, two uplink transmission chains or two uplink RF chain transmissions are referred to as 2T or 2Tx, and the uplink transmission chain or uplink RF chain transmission is referred to as T or Tx.

[0099] The above-mentioned terminal device determines the switching time position based on the priority of the frequency band involved in the switching (i.e., the frequency band where the switching occurs) and the implementation of the solution is relatively simple, but it can only realize the selection of the frequency band where the switching time is located and then obtain the switching time position in some scenarios. In other specific scenarios, the selection of the frequency band where the switching time is located cannot be realized.

[0100] In addition, the 3GPP protocol also defines associated bands. Specifically, when a terminal device's two transmission chains are currently on bands A and B, respectively, and the next uplink transmission is a single-port transmission on band C, if the network device indicates 1T through radio resource control (RRC) signaling (for example, uplinkTxSwitching-DualUL-TxState), this indicates that the terminal device needs to transmit a transmission chain on band C through one port. In this case, one of the transmission chains on bands A and B will be switched to band C. In this case, it is unclear whether the transmission chain on band A or band B is switched. Therefore, the 3GPP standard defines associated bands. That is, for any band, the network device can configure the associated band of that band through RRC signaling. When the network device schedules single-port transmission on that band, if the network device indicates 1T through RRC signaling, in addition to the 1T transmission on the single port on that band, there is also 1T on the associated band of that band. Applied to the above scenario, after the switch, there is a transmission chain on the frequency band C, and there is a transmission chain on the associated frequency band of the frequency band C.

[0101] Based on the above scheme, each frequency band in a three-band, four-band, or more frequency band switching operation has its own associated frequency band. If one of the two transmission chains is on a frequency band, the other transmission chain is always on the associated frequency band of that frequency band. For example, for frequency bands A, B, C, and D, B can be configured as the associated frequency band of A (denoted as {B for A}), A as the associated frequency band of B (denoted as {A for B}), A as the associated frequency band of C (denoted as {A for C}), and C as the associated frequency band of D (denoted as {C ​​for D}). When one-port transmission on frequency band C is scheduled, if the two transmission chains are currently on frequency bands A and B, respectively, the transmission chain on frequency band B is switched to frequency band C. Since frequency band A is the associated frequency band of frequency band C, the transmission chain on frequency band A remains unchanged. After the switch, one transmission chain is on the scheduled frequency band C, and the other transmission chain is on frequency band A, the associated frequency band of frequency band C. When the 1-port transmission of frequency band D is scheduled, if the two transmission chains are currently located on frequency bands A and B respectively, the transmission chain on frequency band A is switched to frequency band D, and the transmission chain on frequency band B is switched to the associated frequency band of frequency band D, namely frequency band C. Alternatively, the transmission chain on frequency band B is switched to frequency band D, and the transmission chain on frequency band A is switched to the associated frequency band of frequency band D, namely frequency band C. In this way, after the switching, one transmission chain is located on the scheduled frequency band D, and the other transmission chain is located on the associated frequency band of frequency band D, namely frequency band C.

[0102] The above definitions of associated frequency bands are based on the assumption that simultaneous transmission on two frequency bands can be supported.

[0103] In the above scheme, when the associated frequency band has the highest priority, if the switching time position is still determined based on the priority of the frequency band involved in the switching, it is impossible to make corresponding selections according to the actual priority of each frequency band, which will reduce spectrum efficiency.

[0104] The above problem will be further explained below with reference to specific examples.

[0105] Question 1: When there is an identical frequency band before and after the switch, and this identical frequency band is not only involved in the switch but also has the highest priority, how to determine the switching time position?

[0106] It should be noted that in the embodiments of the present application, the frequency band before switching can be referred to as the frequency band before switching (can be referred to as switch from), and the frequency band after switching can be referred to as the frequency band after switching (can be referred to as switch to). The frequency band involved in switching in the embodiments of the present application can be understood as the frequency band where switching occurs.

[0107] Example 1

[0108] A three-band switching scenario may be: 1T transmission on band A and 1T transmission on band B is switched to 1T transmission on band B and 1T transmission on band C. In this scenario, the terminal device may perform the following switching operations:

[0109] Switching operation 1: Band B is not switched, and Band A is switched to Band C. When the terminal device has low capability, Band B is not switched, but the switching time needs to be interrupted to ensure successful completion of the switch from Band A to Band C.

[0110] In this method, the frequency bands involved in switching include bands A, B, and C. When determining the switching time position, the terminal device needs to compare the priorities of bands A, B, and C. Among the three frequency bands, when band A has the highest priority, according to the above-mentioned scheme for determining the switching time position based on the priority of the frequency bands involved in switching, band A is excluded, and the terminal device can determine the switching time position to be bands B and C after switching. In this case, the use of bands B and C after switching requires switching the terminal interval. Among the three frequency bands, when band C has the highest priority, according to the above-mentioned scheme for determining the switching time position based on the priority of the frequency bands involved in switching, band C is excluded, and the terminal device can determine the switching time position to be bands A and B before switching. Among the three frequency bands, when frequency band B has the highest priority, according to the above-mentioned scheme of determining the switching time position based on the priority of the frequency bands involved in the switching, frequency band B is excluded. Therefore, the pre-switching frequency band or the post-switching frequency band where frequency band B is located cannot be selected, and the terminal device cannot obtain the switching time position. Similarly, the network device cannot determine the switching time position.

[0111] Switching operation 2: Band B does not switch, and Band A switches to Band C. When the terminal device has a high capability, Band B does not need to interrupt the switching time, and the terminal device can successfully complete the switch from Band A to Band C.

[0112] On the one hand, from the perspective of the switching scenario, the above-mentioned switching scenario is switching from frequency bands A and B to frequency bands B and C, so it can be considered that the frequency bands involved in the switching include frequency bands A, B, and C. On the other hand, from the perspective of the actual switching, the frequency bands actually switching in this method include frequency bands A and C, so it can be considered that the frequency bands involved in the switching include frequency bands A and C. Specifically, whether frequency bands A, B, and C are the frequency bands involved in the switching or frequency bands A and C are the frequency bands involved in the switching is not clearly specified in the current relevant standards. Therefore, in this scenario, it is difficult for terminal devices and network devices to uniformly determine the frequency bands involved in the switching, and it is even more difficult to uniformly determine the switching time and location.

[0113] Switching operation 3: Band A switches to Band B, and Band B switches to Band C.

[0114] In this method, the frequency bands involved in the switching include frequency bands A, B, and C. The solution for determining the switching time position is the same as that described in the switching operation 1 above. When frequency band B has the highest priority, the terminal device and the network device cannot determine the switching time position.

[0115] In summary, in the above-mentioned switching scenario, when there is the same frequency band (i.e., frequency band B) in the frequency bands before and after the switching, and this same frequency band is not only involved in the switching but also has the highest priority, the terminal device and the network device cannot uniquely determine the switching time position. Therefore, the above-mentioned switching scenario has the problem described in Question 1 above.

[0116] Question 2: When there is an identical frequency band before and after the switch, and this identical frequency band is not only involved in the switch but also has the highest priority, and the number of transmission chains for this identical frequency band before and after the switch is different, how to determine the switching time position?

[0117] Example 2

[0118] A frequency band switching scenario might involve switching from 1T transmission on Band A and 1T transmission on Band B to 1T transmission on Band C, where Band B is an associated band of Band C. Since Band B is an associated band of Band C, 1T transmission also exists on Band B, but no content is actually transmitted on the 1T transmission on Band B. After the switching is complete, the network device schedules 2T transmission on Band C. In this case, the terminal device needs to switch from 1T transmission on Band C and 1T transmission on Band B (which does not actually transmit content) to 2T transmission on Band C.

[0119] For example, as shown in Figure 4, the carrier in band C is denoted as CCO, and the carrier in band B is denoted as CC1. After bands A and B are switched to band C, when CC0 in band C changes from being scheduled as 1T to being scheduled as 2T (at which point 1T transmission on band C needs to be switched to 2T transmission), no switching time is actually required on band C.

[0120] If the switching time is to be reserved, one possible solution may be the above-mentioned solution of determining the switching time position based on the priority of the frequency bands involved in the switching. In this case, there are the following two possible situations:

[0121] Case 1: CC1 has a higher priority than CC0, so the frequency band before the handover where CC1 is located (including CC0 and CC1 before the handover) is excluded, and CC0 after the handover can be selected as the handover time position.

[0122] In this method, when the associated frequency band (the frequency band where CC1 is located, i.e., frequency band B) has a higher priority, if the above-mentioned scheme of determining the switching time position based on the priority of the frequency band involved in the switching is adopted, the actually scheduled high-priority frequency band (such as frequency band C) may be used as the switching time position, which will cause the actually scheduled high-priority frequency band to be interrupted, thereby reducing the spectrum efficiency.

[0123] Case 2: CC0 has a higher priority than CC1, so the frequency band before switching (including CC0 and CC1 before switching) and the frequency band after switching (including CC0 after switching) where CC0 is located are both excluded, and the switching time position cannot be determined.

[0124] Optionally, when frequency band B is not an associated frequency band of frequency band C but a frequency band actually scheduled for 1T, the switching time position may also be determined in the above manner.

[0125] If handover time is to be reserved, another possible solution is to exclude associated frequency bands from the handover. In this case, if CC1 is an associated frequency band, the frequency bands involved in the handover will not include CC1, but only CC0. Therefore, when determining the handover time location, only CC0 can be referenced, not CC1. Since both the pre-handover and post-handover frequency bands are CC0, neither can be selected as the handover time location.

[0126] Furthermore, the above situation can be understood as follows:

[0127] 1) Regardless of whether the frequency band to which CC1 belongs is an associated frequency band or an actually scheduled transmission frequency band, when the CC1 priority (i.e., the priority of the frequency band to which CC1 belongs) is higher than the priority of other carriers or frequency bands, the switching time position can be determined. When the CC1 priority is lower than the priority of other carriers or frequency bands, the switching time position cannot be determined.

[0128] 2) When the associated frequency band (eg, frequency band B to which CC1 belongs) belongs to the frequency band before handover, whether the associated frequency band is considered as a frequency band involved in handover is not clearly defined in the current relevant standards.

[0129] In one possible scenario, when the associated frequency band is the frequency band involved in the handover, if the priority of the associated frequency band is higher than that of other frequency bands, the method described in Case 1 above can be used. However, this will sacrifice the transmission time of the frequency band after the handover, which is actually unnecessary. If the priority of the associated frequency band is lower than that of other frequency bands, the handover time position cannot be determined.

[0130] In another possible situation, when the associated frequency band is not a frequency band involved in the switching, among the frequency bands involved in the switching, the priorities of the frequency bands before and after the switching are the same, and therefore the switching time position cannot be determined.

[0131] In summary, in the above-mentioned switching scenario, when there is the same frequency band (i.e., frequency band C) in the frequency bands before and after the switching, this same frequency band is not only involved in the switching, but also has the highest priority, and the number of transmission chains on the same frequency band before and after the switching is different, the terminal device and the network device cannot uniquely determine the switching time position. Therefore, the above-mentioned switching scenario has the problem described in Question 2 above.

[0132] In order to determine the switching time position in more scenarios and improve spectrum efficiency, the embodiments of the present application provide a communication method and a communication device.

[0133] Figure 5 illustrates a communication system applicable to the communication method provided in an embodiment of the present application. As shown in Figure 5 , the communication scenario includes at least a terminal device and a network device, where the network device may be a wireless access network device. Optionally, the communication system may also include a core network device.

[0134] It should be noted that the above-mentioned communication system may include more terminal devices and network devices, and the embodiments of the present application do not limit the number of terminal devices and network devices in the above-mentioned communication system.

[0135] It should also be noted that the communication system shown in Figure 5 is an example and does not limit the communication system to which the method provided in the embodiments of the present application is applicable. For example, various communication technologies can be used between the terminal device and the network device, such as the fifth generation (5G) communication technology (i.e., NR technology), the fourth generation (5G) communication technology (i.e., long term evolution (LTE) technology), the sixth generation (6G) communication technology, and communication technologies based on the above technologies.

[0136] In addition, the solution provided in the embodiment of the present application can also be applied to the communication system shown in Figure 3 above or a communication system with a similar architecture.

[0137] Referring to FIG6 , a communication method provided in an embodiment of the present application may include:

[0138] S601: When a communication device switches from M frequency domain resources to N frequency domain resources, the communication device determines a frequency domain resource at a switching time from the M frequency domain resources and the N frequency domain resources. M and N are positive integers, and the sum of M and N is greater than 2. The switching time is the time required to switch from the M frequency domain resources to the N frequency domain resources.

[0139] In an embodiment of the present application, the communication device may be a terminal device or a network device. The network device may schedule frequency domain resources for uplink transmission by the terminal device, and the terminal device may use the frequency domain resources scheduled by the network device for uplink transmission. The network device and the terminal device may switch from M frequency domain resources to N frequency domain resources when the frequency domain resources scheduled by the network device change.

[0140] In the embodiment of the present application, the switching of the terminal device from M frequency domain resources to N frequency domain resources can be understood as the switching of the terminal device from communicating with the network device using M frequency domain resources to communicating with the network device using N frequency domain resources. The switching of the network device from M frequency domain resources to N frequency domain resources can be understood as the switching of the network device from communicating with the terminal device using M frequency domain resources to communicating with the terminal device using N frequency domain resources.

[0141] In the embodiment of the present application, the frequency domain resource may be a frequency band or a carrier. "Utilize" may be "through".

[0142] In an embodiment of the present application, M frequency domain resources are the frequency domain resources before switching (switch from), that is, the frequency domain resources before switching or the frequency domain resources switched from or switched from the frequency domain resources, and N frequency domain resources are the frequency domain resources after switching, that is, the frequency domain resources after switching or the frequency domain resources switched to or switched to the frequency domain resources.

[0143] In the embodiment of the present application, the frequency domain resource where the switching time is located is the switching time position. The switching time mentioned in step S601 is a general term. When switching from M frequency domain resources to N frequency domain resources, there are the following situations:

[0144] 1) If the switching times required to switch from one of the M frequency domain resources to one of the N frequency domain resources are different, and the switching time positions belong to the same side (specifically, the multiple required switching times belong to the same frequency domain resource before switching or the same frequency domain resource after switching), then the final switching time is the maximum value of the multiple required switching times.

[0145] For example, taking M frequency domain resources including frequency bands A and B, and N frequency domain resources including frequency bands C and D as an example, if the switching time required to switch from frequency band A to frequency band C is the first switching time, the switching time required to switch from frequency band A to frequency band D is the second switching time, the switching time required to switch from frequency band B to frequency band C is the third switching time, and the switching time required to switch from frequency band B to frequency band D is the fourth switching time, then the final switching time can be the largest switching time among the first switching time, the second switching time, the third switching time and the fourth switching time.

[0146] 2) If the switching time required to switch from one of the M frequency domain resources to one of the N frequency domain resources is different, and the switching time positions belong to different sides (specifically, among the multiple required switching times, part of the switching time belongs to (or is located in) the frequency domain resource before switching, and the other part of the switching time belongs to the frequency domain resource after switching), then the final switching time is the union of the multiple required switching times, or multiple independent switching times.

[0147] For example, taking M frequency domain resources including frequency bands A and B, and N frequency domain resources including frequency bands C and D as an example, in a possible switching method, if the switching time required to switch from frequency band A to frequency band C is the first switching time, and the first switching time is located on frequency band A, and the switching time required to switch from frequency band B to frequency band D is the second switching time, and the second switching time is located on frequency band D, then the final switching time can be the union of the first switching time and the second switching time (which can be understood as the time obtained by adding the first switching time to the second switching time, or the range of the first switching time and the second switching time in the time domain, or the time between the start time of the first switching time and the end time of the second switching time), or the final switching time is the first switching time and the second switching time respectively.

[0148] For example, taking M frequency domain resources including frequency bands A and B, and N frequency domain resources including frequency bands C and D as an example, in a possible switching method, if the switching time required to switch from frequency band A to frequency band C is the first switching time, and the first switching time is located on frequency band A, if the switching time required to switch from frequency band A to frequency band D is the third switching time, and the third switching time is located on frequency band A, the switching time required to switch from frequency band B to frequency band D is the second switching time, and the second switching time is located on frequency band D, the switching time required to switch from frequency band B to frequency band C is the fourth switching time, and the fourth switching time is located on frequency band D, then the final switching time can be the first switching time. The corresponding switching time is obtained by taking the maximum value of the first switching time and the third switching time, the corresponding switching time is obtained by taking the maximum value of the second switching time and the fourth switching time, and then the union of the switching times corresponding to the two maximum values ​​is taken (which can be understood as the time obtained by adding the switching times corresponding to the two maximum values, or the range of the switching times corresponding to the two maximum values ​​in the time domain, or the time from the starting moment of obtaining the corresponding switching time by taking the maximum value of the first switching time and the third switching time to the end moment of obtaining the corresponding switching time by taking the maximum value of the second switching time and the fourth switching time), or the final switching time is the switching time corresponding to the two maximum values ​​respectively.

[0149] 3) If the switching time required to switch from one of the M frequency domain resources to one of the N frequency domain resources is the same and the switching time positions are on the same side, the final switching time is the required switching time.

[0150] For example, taking M frequency domain resources including frequency bands A and B, and N frequency domain resources including frequency bands C and D as an example, in a possible switching method, if the switching time required to switch from frequency band A to frequency band C is the first switching time, and the first switching time is located on frequency band A, the switching time required to switch from frequency band B to frequency band D is the second switching time, and the second switching time is located on frequency band B, and the first switching time and the second switching time are the same in length, then the final switching time can be the first switching time or the second switching time.

[0151] 4) If the switching time required to switch from one of the M frequency domain resources to one of the N frequency domain resources is the same, and the switching time positions belong to different sides, then the final switching time is the union of the required multiple switching times, or multiple independent switching times.

[0152] For example, taking M frequency domain resources including frequency bands A and B, and N frequency domain resources including frequency bands C and D as an example, in a possible switching method, if the switching time required to switch from frequency band A to frequency band D is the first switching time, and the first switching time is located on frequency band D, and the switching time required to switch from frequency band B to frequency band C is the second switching time, and the second switching time is located on frequency band B, then the final switching time can be the union of the first switching time and the second switching time (which can be understood as the time obtained by adding the second switching time to the first switching time or the time from the start time of the second switching time to the end time of the first switching time), or, the final switching time is the first switching time and the second switching time respectively.

[0153] In some embodiments of the present application, the frequency domain resource where the switching time is located may be a frequency domain resource determined in at least one of the following ways.

[0154] Mode 1: The frequency domain resource where the switching time is located is a frequency domain resource that does not have the highest priority among the M frequency domain resources and the N frequency domain resources except the first frequency domain resource, and the frequency domain resource where the switching time is located is the M frequency domain resource or the N frequency domain resources. The first frequency domain resource is a frequency domain resource included in the M frequency domain resources, and the first frequency domain resource is a frequency domain resource included in the N frequency domain resources.

[0155] Method 2: The frequency domain resource where the switching time is located is the frequency domain resource of the first set type among the M frequency domain resources and the N frequency domain resources, and does not have the highest priority, and the frequency domain resource where the switching time is located is M frequency domain resources or N frequency domain resources.

[0156] Among them, the first setting type may include at least one of the following: scheduled uplink transmission, and the frequency domain resources at the set position in the scheduled frequency domain resources have uplink transmission; there is no / no physical uplink control channel; and the associated frequency band is not included.

[0157] In the embodiment of the present application, the frequency domain resources belonging to the first set type can also be understood as the frequency domain resources of the first set type.

[0158] In some embodiments of the present application, the set position is a time domain position, and the frequency domain resource at the set position has uplink transmission, which can be understood as the frequency domain resource having uplink transmission at the time corresponding to the set position. In some embodiments of the present application, the set position can be the position at the tail of the last time unit before the switch or the position at the head of the first time unit after the switch. The duration of the tail or the head can be the set duration or can be equal to the duration of the switching time. When the frequency domain resource to be scheduled is the frequency domain resource before the switch, the set position can be the position at the tail of the last time unit before the switch; when the frequency domain resource to be scheduled is the frequency domain resource after the switch, the set position can be the position at the head of the first time unit after the switch.

[0159] This application uses the switching time of 4 symbols as an example. The corresponding switching time is 140 microseconds (us), and the subcarrier spacing of the frequency domain resources is 30 kHz. The switching time can also be any value among 35 us, 210 us, or 280 us.

[0160] For example, as shown in FIG7 , in a scenario where a switch is made from 1T transmission on frequency band A and 1T transmission on frequency band B to 1T transmission on frequency band B and 1T transmission on frequency band C, with frequency band B having the highest priority, based on the above definition of the set position, it can be seen that the set position can be a position within the first time period shown in FIG7 or a position within the second time period; wherein the first time period is the time period at the end of the last time unit before the switch, i.e., the first time unit, and the second time period is the time period at the beginning of the first time unit after the switch, i.e., the first time unit. For example, as shown in FIG7 , when the first time unit and the second time unit constitute a time slot, the first time period can be the four symbols at the end of the first time unit. If the set position is at the end of the last time unit before the switch, the set position can be at least one of the four symbols. The second time period can be the four symbols at the beginning of the second time unit. If the set position is at the beginning of the first time unit after the switch, the set position can be at least one of the four symbols.

[0161] In this manner, the M frequency domain resources may include the first frequency domain resource, and the N frequency domain resources may include the first frequency domain resource.

[0162] Mode 3: The frequency domain resources where the switching time is located are M frequency domain resources or N frequency domain resources, wherein the M frequency domain resources include the first frequency domain resources, and the N frequency domain resources include the first frequency domain resources.

[0163] In the embodiment of the present application, the frequency domain resources where the switching time is located are M frequency domain resources or N frequency domain resources, which can also be understood as belonging to.

[0164] In some embodiments of the present application, when the priority of information carried by the first frequency domain resource among M frequency domain resources is higher than the priority of information carried by the first frequency domain resource among N frequency domain resources, it can be determined that the frequency domain resources where the switching time is located are N frequency domain resources. When the priority of information carried by the first frequency domain resource among N frequency domain resources is higher than the priority of information carried by the first frequency domain resource among M frequency domain resources, it can be determined that the frequency domain resources where the switching time is located are M frequency domain resources. Among them, the first frequency domain resource among M frequency domain resources can be understood as the first frequency domain resource before switching, and the first frequency domain resource among N frequency domain resources can be understood as the first frequency domain resource after switching.

[0165] Regarding the priority of the carried information, the carried information may be: physical random access channel (PRACH), or physical uplink control channel (PUCCH) / physical uplink shared channel (PUSCH) containing hybrid automatic repeat request (HARQ), or PUCCH / PUSCH without HARQ, or PUCCH / PUSCH containing only channel state information (CSI), or PUCCH / PUSCH containing CSI (where CSI is periodic CSI, and / or CSI only contains channel quality indication (CQI) / precoding matrix indicator (PMI)), or periodic / aperiodic sounding reference signal (SRS), etc. For example, the priority order may be all or part of the following list: PRACH > PUCCH / PUSCH with HARQ > PUCCH / PUSCH without HARQ > PUCCH / PUSCH with only CSI > PUCCH / PUSCH with CSI (where CSI is periodic CSI and / or CSI includes only CQI / PMI) > aperiodic SRS > periodic SRS. These are not listed one by one.

[0166] In some embodiments of the present application, when the number of uplink transmission chains or the number of scheduling ports of M frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of N frequency domain resources, the frequency domain resources where the switching time is located can be determined to be the M frequency domain resources. When the number of uplink transmission chains or the number of scheduling ports of N frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of M frequency domain resources, the frequency domain resources where the switching time is located can be determined to be the N frequency domain resources. The number of scheduling ports is the number of ports scheduled for uplink transmission.

[0167] In some embodiments of the present application, when the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the N frequency domain resources, it can be determined that the frequency domain resources where the switching time is located are M frequency domain resources; or, when the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the M frequency domain resources, it can be determined that the frequency domain resources where the switching time is located are N frequency domain resources.

[0168] For example, for the following scenario: in addition to the first frequency domain resource, the frequency domain resource before switching also includes a fourth frequency domain resource, and in addition to the first frequency domain resource, the frequency domain resource after switching also includes a fifth frequency domain resource. Among them, the number of uplink transmission chains or the number of scheduled ports on the fourth frequency domain resource is less than the number of uplink transmission chains or the number of scheduled ports on the fifth frequency domain resource. The following rule is satisfied: if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resource in the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources. Therefore, the frequency domain resources where the switching time is located in the above scenario are the frequency domain resources before the switching.

[0169] For another example, for the following scenario: before the switching, the frequency domain resources include the first frequency domain resources and the fourth frequency domain resources, and after the switching, the frequency domain resources include the first frequency domain resources and no other frequency domain resources. Among them, the number of uplink transmission chains or the number of scheduled ports on the fourth frequency domain resource is 1. And after the switching, there are no other frequency domain resources except the first frequency domain resources, that is, the number of uplink transmission chains or the number of scheduled ports is 0. The following rule is satisfied: if the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduled ports in the frequency domain resources other than the first frequency domain resources in the M frequency domain resources, the frequency domain resources where the switching time is located are N frequency domain resources. Therefore, the frequency domain resources where the switching time is located in the above scenario are the frequency domain resources after the switching.

[0170] In the embodiments of the present application, “less than” can also be understood as “less than”, and “more than” can also be understood as “greater than”.

[0171] Mode 4: The frequency domain resource where the switching time is located is a frequency domain resource among the M frequency domain resources or the N frequency domain resources, excluding the frequency domain resource where the physical uplink control channel is located.

[0172] In this manner, the M frequency domain resources may include the first frequency domain resource, and the N frequency domain resources may include the first frequency domain resource.

[0173] In some embodiments of the present application, when the frequency domain resources where the physical uplink control channel is located belong to M frequency domain resources, the frequency domain resources where the switching time is located can be determined to be N frequency domain resources. When the frequency domain resources where the physical uplink control channel is located belong to N frequency domain resources, the frequency domain resources where the switching time is located can be determined to be M frequency domain resources.

[0174] The first frequency domain resource described in the above four methods is the same frequency domain resource included in the M frequency domain resources and the N frequency domain resources. In other words, the first frequency domain resource belongs to both the M frequency domain resources and the N frequency domain resources. The frequency domain resources not having the highest priority described in the above four methods can be understood as frequency domain resources other than the frequency domain resources having the highest priority.

[0175] The frequency domain resources where the switching time is located in the embodiment of the present application are M frequency domain resources, which can be understood as at least one of the following: the frequency domain resources where the switching time is located belongs to the M frequency domain resources; the frequency domain resources where the switching time is located is included in / contained in the M frequency domain resources; the frequency domain resources where the switching time is located is the frequency domain resources before the switching; the frequency domain resources where the switching time is located belongs to the frequency domain resources before the switching. The frequency domain resources where the switching time is located in the embodiment of the present application are N frequency domain resources, which can be understood as at least one of the following: the frequency domain resources where the switching time is located belongs to the N frequency domain resources; the frequency domain resources where the switching time is located is included in / contained in the N frequency domain resources; the frequency domain resources where the switching time is located is the frequency domain resources after the switching; the frequency domain resources where the switching time is located belongs to the frequency domain resources after the switching.

[0176] The frequency domain resources that do not have the highest priority described in the embodiments of the present application can be understood as the frequency domain resources with the lowest priority. That is, when determining the frequency domain resources where the switching time is located, the pre-switching frequency domain resources or post-switching frequency domain resources where the highest priority frequency domain resources are located are excluded. This can also be understood as: when determining the frequency domain resources where the switching time is located, the pre-switching frequency domain resources or post-switching frequency domain resources where the lowest priority frequency domain resources are located are set as the frequency domain resources where the switching time is located.

[0177] In some embodiments of the present application, the highest priority may be understood as a higher priority, and the lowest priority may be understood as a lower priority.

[0178] In some embodiments of the present application, in the above four methods, among the M frequency bands and the N frequency bands, the priority of the first frequency band is higher than the priorities of other frequency bands.

[0179] In some embodiments of the present application, when determining the frequency domain resource at the switching time from the M frequency domain resources and the N frequency domain resources, the communication device may first determine the frequency domain resource involved in the switching from the M frequency domain resources and the N frequency domain resources, and then determine the frequency domain resource at the switching time from the frequency domain resources involved in the switching. The frequency domain resource involved in the switching is: the M frequency domain resources and the N frequency domain resources, or the frequency domain resources other than the first frequency domain resource from the M frequency domain resources and the N frequency domain resources.

[0180] In some embodiments of the present application, when the number of uplink transmission links of the first frequency domain resource does not change before and after the switch, the frequency domain resources involved in the switch include the frequency domain resources of the M frequency domain resources and the N frequency domain resources other than the first frequency domain resource. In this manner, the frequency domain resource where the switching interval is located can be a frequency domain resource of the M frequency domain resources and the N frequency domain resources other than the frequency domain resource with the highest priority, and the frequency domain resource where the switching interval is located belongs to the M frequency domain resources or the N frequency domain resources.

[0181] In some embodiments of the present application, when the second frequency domain resource is in an intra-band carrier aggregation state, the second frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the second frequency domain resource is not used, wherein the second frequency domain resource belongs to M frequency domain resources or N frequency domain resources. Optionally, the uplink transmission on the two carriers within the second frequency domain resource is transmission corresponding to one uplink transmission chain or one-port transmission.

[0182] The one-port transmission described in the embodiment of the present application is transmission with a port number of 1.

[0183] Optionally, the communication method may further include the following step S602:

[0184] S602: The communication device switches from M frequency domain resources to N frequency domain resources within a switching time.

[0185] Among them, the communication device switches from M frequency domain resources to N frequency domain resources within the switching time, which can also be understood as: the communication device switches from M frequency domain resources to N frequency domain resources based on the switching time and / or the frequency domain resources where the switching time is located.

[0186] In the embodiments of the present application, based on can be understood as based on.

[0187] In some embodiments of the present application, if the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resources changes when switching from M frequency domain resources to N frequency domain resources, the communication device may not switch the third frequency domain resources or there may be no switching time on the third frequency domain resources; wherein the third frequency domain resources belong to M frequency domain resources and / or N frequency domain resources.

[0188] In some embodiments of the present application, when the third frequency domain resource is scheduled for one-port transmission and there are no other scheduled frequency domain resources, the third frequency domain resource may not be configured with an associated frequency band, or the associated frequency band of the third frequency domain resource may not be used.

[0189] In the embodiment of the present application, the absence of a switching time on the third frequency domain resource can also be understood as: on the third frequency domain resource, the communication device does not perform frequency domain resource switching or does not interrupt information transmission. In the present application, information transmission includes at least one of data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can be at least one of uplink data information transmission, control information transmission, or reference signal transmission. Optionally, information transmission can also be at least one of downlink data information transmission, control information transmission, or reference signal transmission.

[0190] The above embodiments provide multiple methods for determining the time location of a handoff, helping communications devices effectively determine the time location of a handoff in a wider range of frequency domain resource handoff scenarios, thereby reducing spectrum resource waste and improving spectrum resource utilization. For example, in a scenario where the same frequency domain resource exists before and after a handoff and the same frequency domain resource has the highest priority, existing solutions cannot determine the time location of a handoff. However, the solutions provided by the above embodiments can effectively determine the time location of a handoff.

[0191] Based on the communication method provided in the above embodiment, the present application also provides the following embodiments 1 to 5. Each embodiment is described below.

[0192] Example 1

[0193] In this embodiment, the communication device may determine the switching time position when switching frequency domain resources according to the method 1 provided in the above embodiment.

[0194] In a possible solution, when the communication device switches frequency domain resources, the frequency domain resources before switching (which may be referred to as before switching or switching from) can be used as one party, and the frequency domain resources after switching (which may be referred to as after switching or switching to) can be used as one party. When the frequency domain resources before switching and the frequency domain resources after switching both include the first frequency domain resources (or there are frequency domain resources with the same priority in the frequency domain resources before switching and the frequency domain resources after switching, wherein the frequency domain resources with the same priority are recorded as the first frequency domain resources), and the priority of the first frequency domain resources is the highest (or the priorities of frequency domain resources other than the first frequency domain resources are lower than the priority of the first frequency domain resources), and the number of uplink transmission chains of the first frequency domain resources does not change before and after switching, the communication device can determine that the party with the highest priority other than the first frequency domain resources is not used as the frequency domain resource where the switching time is located, or the party with the lower priority other than the first frequency domain resources is used as the frequency domain resource where the switching time is located. Among them, the frequency domain resources involved in the switching can be the frequency domain resources of all scheduled uplink transmission chains.

[0195] That is to say, when the number of uplink transmission chains of the first frequency domain resource remains unchanged, and the first frequency domain resource exists in both the frequency domain resources before switching and the frequency domain resources after switching, the first frequency domain resource is listed as the frequency domain resource involved in the switching. When the priority of the first frequency domain resource is the highest, the communication device can compare the priorities of the frequency domain resources other than the first frequency domain resource, and determine the fourth frequency domain resource with the highest priority. If the fourth frequency domain resource belongs to the frequency domain resource before switching, the frequency domain resource after switching can be determined as the frequency domain resource where the switching time is located; if the fourth frequency domain resource belongs to the frequency domain resource after switching, the frequency domain resource before switching can be determined as the frequency domain resource where the switching time is located.

[0196] Among them, the frequency domain resources involved in the switching can be called switching frequency domain resources, the frequency domain resources before the switching can be understood as the switching frequency domain resources in the first time unit, and the frequency domain resources after the switching can be understood as the switching frequency domain resources in the second time unit, wherein the first time unit is adjacent to the second time unit, and the first time unit is earlier than the second time unit.

[0197] Exemplarily, taking the frequency domain resource switching scenario as the three-band switching scenario described in Example 1 in the above embodiment, in this scenario, the frequency domain resources before switching are frequency bands A and B, and the frequency domain resources after switching are frequency bands B and C. When frequency band B has the highest priority, the method for determining the frequency domain resources where the switching time is located provided in this embodiment can determine that the frequency domain resources involved in the switching are frequency bands A, B, and C. If the priority of frequency band A is higher than that of frequency band C, the frequency domain resource where the switching time is located is frequency band C; if the priority of frequency band C is higher than that of frequency band A, the frequency band where the switching time is located is frequency band A. Therefore, the method provided in this embodiment can solve problem 1 described in the above embodiment.

[0198] Based on the above method, the communication device can effectively determine the switching time position when the same frequency domain resources (such as the same frequency band (or called common frequency band) or even the same carrier) exist before and after the frequency domain resource switching, and when it is impossible to distinguish the priority of the frequency domain resources, thereby reducing the waste of spectrum resources and improving the utilization rate of spectrum resources.

[0199] Example 2

[0200] In this embodiment, the communication device may determine the switching time position when switching frequency domain resources according to the method 3 and / or the method 4 provided in the above embodiment.

[0201] In one possible solution, when the communication device switches frequency domain resources, the frequency domain resources before switching (which may be referred to as before switching or switching from) can be used as one party, and the frequency domain resources after switching (which may be referred to as after switching or switching to) can be used as one party. When the frequency domain resources before switching and the frequency domain resources after switching both include first frequency domain resources (or there are frequency domain resources with the same priority in the frequency domain resources before switching and the frequency domain resources after switching, wherein the frequency domain resources with the same priority are recorded as first frequency domain resources), and the priority of the first frequency domain resources is the highest (or the priorities of frequency domain resources other than the first frequency domain resources are lower than the priority of the first frequency domain resources), and the number of uplink transmission chains of the first frequency domain resources does not change before and after switching, as an optional implementation method, the communication device may use the frequency domain resources before switching / the frequency domain resources after switching as the frequency domain resources where the switching time is located; as another optional implementation method, the communication device may use the party other than the frequency domain resources where the physical uplink control channel is located as the frequency domain resource where the switching time is located. As another optional implementation, the communication device can compare the priority of the content carried by the first frequency domain resource in the frequency domain resources before switching and the frequency domain resources after switching. When the priority of the content carried by the first frequency domain resource in the frequency domain resources before switching is higher than the priority of the content carried by the first frequency domain resource in the frequency domain resources after switching, the communication device can determine that the frequency domain resource after switching is the frequency domain resource where the switching time is located, and vice versa, determine that the frequency domain resource before switching is the frequency domain resource where the switching time is located. Optionally, the priority order of the content carried by the frequency domain resources can be that the priority of the physical random access channel is higher than that of the physical uplink control channel, and the priority of the physical uplink control channel is higher than that of the physical uplink shared channel. It should be understood that the priority order is not limited to the above order, and can also be other arrangements, and no specific restrictions are made in the embodiments of the present application.

[0202] Based on the above method, the communication device can effectively determine the switching time position when the same frequency domain resources (such as the same frequency band (or called common frequency band) or even the same carrier) exist before and after the frequency domain resource switching, and when it is impossible to distinguish the priority of the frequency domain resources, thereby reducing the waste of spectrum resources and improving the utilization rate of spectrum resources.

[0203] Example 3

[0204] In some embodiments of the present application, when the communication device switches frequency domain resources, if the frequency domain resources before switching and the frequency domain resources after switching both include the first frequency domain resources (or there are frequency domain resources with the same priority in the frequency domain resources before switching and the frequency domain resources after switching, wherein the frequency domain resources with the same priority are recorded as the first frequency domain resources), and the priority of the first frequency domain resources is the highest (or the priorities of frequency domain resources other than the first frequency domain resources are lower than the priority of the first frequency domain resources), and the number of uplink transmission chains of the first frequency domain resources does not change before and after the switching, then the communication device may not list the first frequency domain resources as the frequency domain resources involved in the switching. That is to say, when determining the frequency domain resources where the switching interval is located, the communication device does not consider the first frequency domain resources (it can also be understood as excluding the first frequency domain resources).

[0205] Exemplarily, taking the frequency domain resource switching scenario as the three-band switching scenario described in Example 1 in the above embodiment, in this scenario, the frequency domain resources before switching are frequency bands A and B, and the frequency domain resources after switching are frequency bands B and C. When frequency band B has the highest priority, the method for determining the frequency domain resources where the switching time is located provided in this embodiment can determine that the frequency bands involved in the switching are frequency bands A and C. If the priority of frequency band A is higher than that of frequency band C, the frequency domain resource where the switching time is located is frequency band C; if the priority of frequency band C is higher than that of frequency band A, the frequency band where the switching time is located is frequency band A. Therefore, the method provided in this embodiment can solve problem 1 described in the above embodiment.

[0206] In some embodiments of the present application, if the frequency domain resources before switching and the frequency domain resources after switching both include first frequency domain resources (or there are frequency domain resources with the same priority in the frequency domain resources before switching and the frequency domain resources after switching, wherein the frequency domain resources with the same priority are recorded as first frequency domain resources), and the priority of the first frequency domain resource is the highest (or the priorities of frequency domain resources other than the first frequency domain resource are lower than the priority of the first frequency domain resource), and no transmission occurs on the first frequency domain resource after switching, then the communication device may not list the first frequency domain resource as a frequency domain resource involved in the switching. When the duration of no transmission on the first frequency domain resource after switching is greater than the duration of the switching time, it can be considered that no transmission occurs on the first frequency domain resource. The occurrence of transmission or non-transmission in the embodiments of the present application can be for a time unit (for example, a time slot). For example, the duration of no transmission on the first frequency domain resource after switching is greater than the duration of the switching time can be understood as: within the first time unit after switching, the duration of no transmission on the first frequency domain resource is greater than the duration of the switching time.

[0207] For example, as shown in FIG8 , in a scenario where frequency bands A and B are switched to frequency bands A and C, with frequency band A having a higher priority than frequency band B, frequency band B having a higher priority than frequency band C, the first time unit and the second time unit being one time slot, and the switching time being four symbols, based on the above method, when there is no uplink transmission on the first seven symbols of the second time unit in frequency band A after switching, the number of time slots in which no transmission occurs on frequency band A after switching is seven, which is greater than the number of time slots corresponding to the switching time, four. Therefore, although frequency band A is included in the frequency domain resources before and after the switching, frequency band A is not listed as a frequency domain resource involved in the switching. Therefore, in this scenario, the frequency domain resources involved in the switching include frequency bands B and C. Since frequency band B has a higher priority than frequency band C, it can be determined that the frequency domain resource at the switching time is frequency band C.

[0208] Based on the above method, the communication device can effectively determine the switching time position when the same frequency domain resources (such as the same frequency band (or called common frequency band) or even the same carrier) exist before and after the frequency domain resource switching, and when it is impossible to distinguish the priority of the frequency domain resources, thereby reducing the waste of spectrum resources and improving the utilization rate of spectrum resources.

[0209] Example 4

[0210] In this embodiment, the communication device may determine the switching time position when switching frequency domain resources according to the method 3 provided in the above embodiment.

[0211] In a possible solution, when the communication device switches frequency domain resources, the frequency domain resources before switching (which may be referred to as before switching or switching from) can be used as one party, and the frequency domain resources after switching (which may be referred to as after switching or switching to) can be used as one party. When the frequency domain resources before switching and the frequency domain resources after switching both include the first frequency domain resources (or there are frequency domain resources with the same priority in the frequency domain resources before switching and the frequency domain resources after switching, wherein the frequency domain resources with the same priority are recorded as the first frequency domain resources), and the priority of the first frequency domain resources is the highest (or the priorities of frequency domain resources other than the first frequency domain resources are lower than the priority of the first frequency domain resources), the communication device can use the party with fewer uplink transmission chains or scheduling ports as the frequency domain resource where the switching time is located. Then, when the number of uplink transmission chains or scheduling ports of the frequency domain resources before switching is less than the number of uplink transmission chains or scheduling ports of the frequency domain resources after switching, the frequency domain resource where the switching interval is located is the frequency domain resource before switching. When the number of uplink transmission chains or scheduling ports of the frequency domain resources after the handover is less than the number of uplink transmission chains or scheduling ports of the frequency domain resources before the handover, the frequency domain resources in the handover interval are the frequency domain resources after the handover. The frequency domain resources involved in the handover are the frequency domain resources scheduled for uplink transmission except for the associated frequency band, or all frequency domain resources scheduled for uplink transmission, or all frequency domain resources including the associated frequency band.

[0212] For example, the frequency domain resource switching scenario is taken as the frequency band switching scenario described in Example 2 in the above embodiment. In this scenario, as shown in FIG9 , the frequency domain resources before switching are frequency bands B and C, and the frequency domain resources after switching are frequency band C. Based on the method for determining the frequency domain resources where the switching time is located provided in this embodiment, it can be determined that: the frequency bands involved in the switching can be all frequency domain resources including the associated frequency bands, namely, frequency bands B and C. Since the number of transmission chains on frequency band C changes before and after switching, and the number of transmission chains (1) on frequency band C before switching is less than the number of transmission chains (2) on frequency band C after switching, the frequency band where the switching time is located can be the frequency band before switching, namely, frequency bands B and C. Therefore, the method provided in this embodiment can solve problem 2 described in the above embodiment.

[0213] For example, as shown in FIG10 , a frequency band switching scenario may be: frequency band B is an associated frequency band of frequency band A. When the 2T transmission on carrier CC0 in frequency band A is switched to 1T transmission, based on the definition of the aforementioned associated frequency band, it can be determined that frequency band B associated with frequency band A will also carry 1T transmission (for example, carrier CC1 in frequency band B carries 1T transmission), but no content is sent. Therefore, in this scenario, the frequency domain resources before switching are frequency band A, and the frequency band resources after switching are frequency bands A and B. Based on the method for determining the frequency domain resources where the switching time is located provided in this embodiment, it can be determined that the frequency band involved in the switching can be the frequency domain resources scheduled for uplink transmission other than the associated frequency band, namely frequency band A. Since the number of transmission chains on frequency band A will change before and after switching, and the number of transmission chains (1) on frequency band A after switching is less than the number of transmission chains (2) on frequency band A before switching, the frequency band where the switching time is located can be the frequency band after switching, namely frequency band A after switching. Therefore, the method provided in this embodiment can solve problem 2 described in the above embodiment.

[0214] Based on the above method, the communication device can effectively determine the switching time position when the same frequency domain resources (for example, the same frequency band (or called common frequency band) or even the same carrier) exist before and after the frequency domain resource switching, and when the number of transmission chains of the same frequency domain resources before and after the switching is different, thereby reducing the waste of spectrum resources and improving the utilization rate of spectrum resources.

[0215] Example 5

[0216] In one possible solution, in the scenario of switching from M frequency domain resources to N frequency domain resources described in the aforementioned embodiment, when the second frequency domain resource is in an in-band carrier aggregation state, the second frequency domain resource is not configured with an associated frequency band (that is, the terminal device or network device does not configure an associated frequency band for the second frequency domain resource), or the associated frequency band of the second frequency domain resource is not used (that is, even if the terminal device or network device configures an associated frequency band for the second frequency domain resource, the terminal device or network device does not use the associated frequency band of the second frequency domain resource). When the second frequency domain resource is not in an in-band carrier aggregation state, the second frequency domain resource can be configured with an associated frequency band, and the associated frequency band can be used (that is, the terminal device or network device can configure an associated frequency band for the second frequency domain resource, or use the associated frequency band of the second frequency domain resource). The second frequency domain resource belongs to M frequency domain resources or N frequency domain resources.

[0217] As an optional implementation manner, the uplink transmission on the two carriers in the second frequency domain resource is the transmission corresponding to one uplink transmission chain or one-port transmission. Specifically, when the switching mode is dual uplink transmission in the second frequency domain resource (i.e., two carriers correspond to one uplink transmission chain) and after switching, dual 1T transmission is scheduled in the second frequency domain resource, and the second frequency domain resource is scheduled for one-port transmission, if the second frequency domain resource is in an in-band carrier aggregation state (or the two carriers in the second frequency domain resource are scheduled for the one-port transmission), the second frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the second frequency domain resource is not used, then 2T is switched to the second frequency domain resource.

[0218] For example, as shown in Figure 11, when associated frequency bands are defined, frequency band B is an associated frequency band of frequency band A, and carriers CC0 and CC1 in frequency band A are in a carrier aggregation state. Before the handover, there is a total of 1T transmission on carriers CC0 and CC1. Since frequency band B is an associated frequency band of frequency band A, there is 1T transmission on frequency band B (specifically, carrier CC2 in frequency band B) but no content is sent. In this scenario, when a 1T transmission is scheduled on frequency band A, according to the above method, it can be determined that: frequency band B, the associated frequency band of frequency band A, is not used. In this case, frequency band switching is required, specifically switching the 1T transmission on frequency band A and the 1T transmission on frequency band B to 2T transmission on frequency band A. The frequency domain resources before the handover are frequency bands A and B, and the frequency domain resources after the handover are frequency band A. Since frequency band B is not used and the number of uplink transmission chains of frequency band A before the handover is less than the number of uplink transmission chains of frequency band A after the handover, frequency band A before the handover can be used as the frequency band for the handover time.

[0219] Based on the above method, the communication device can effectively determine the switching time position when the same frequency domain resources (for example, the same frequency band (or called common frequency band) or even the same carrier) exist before and after the frequency domain resource switching, and when the number of transmission chains of the same frequency domain resources before and after the switching is different, thereby reducing the waste of spectrum resources and improving the utilization rate of spectrum resources.

[0220] In some embodiments of the present application, the frequency domain resources where the switching time is located are determined in the scenarios shown in Figures 9, 10, or 11 above. However, since the frequency domain resources (such as frequency band C in Figure 9, frequency band A in Figure 10, and frequency band A in Figure 11) scheduled for uplink transmission (or with uplink transmission content) before and after the switching do not change, what changes is the number of uplink transmission chains of the carrier within the frequency domain resources, there is no need to reserve switching time. In view of this, in one possible solution, when a frequency domain resource is scheduled and there are no other frequency domain resources scheduled in parallel, if the number of uplink transmission chains of the frequency domain resource (or the carrier within the frequency domain resource) changes, switching may not occur, that is, the frequency domain resource is not switched. According to this method, in the scenarios shown in Figures 9, 10, or 11 above, the communication device may not switch the frequency domain resources, thereby avoiding the interruption of the carrier usage time of the carrier aggregation frequency band, further reducing the waste of spectrum resources, and improving the utilization rate of spectrum resources.

[0221] Based on the above method, the communication device can avoid some unnecessary frequency domain resource switching, further reduce spectrum resource waste, and improve spectrum resource utilization.

[0222] It should be noted that the scheme of the aforementioned embodiment provides multiple methods for determining the frequency domain resources where the switching time is located, and introduces the methods for determining the frequency domain resources where the switching time is located in combination with some specific scenarios (such as the frequency domain resource switching scenarios shown in Figures 7 to 11), but these scenarios are only for illustrative purposes and do not constitute a limitation on the applicable scenarios of the scheme of this application.

[0223] In some embodiments of the present application, the prerequisite for the terminal device and the network device to determine the frequency domain resources where the switching time is located is that the time domain range or time difference (gap) between the information transmission on the first time unit scheduled by the network device and the information transmission on the second time unit in which no uplink transmission is required or no uplink transmission is performed is less than the switching time required by the terminal device. Among them, the time difference in which no uplink transmission is required or no uplink transmission is performed can be understood as an idle symbol. These time differences in which no uplink transmission is required or no uplink transmission is performed are continuous idle symbols. The first time unit is the last time unit before the frequency domain resource is switched, and the second time unit is the first time unit after the frequency domain resource is switched. In some embodiments of the present application, when the communication device (terminal device or network device) determines that the switching scenario from M frequency domain resources to N frequency domain resources meets the above-mentioned prerequisite, it can adopt the scheme for determining the frequency domain resources where the switching time is located provided in the aforementioned embodiment to determine the frequency domain resources where the switching time is located in this scenario.

[0224] In some embodiments of the present application, in the frequency domain resource switching scenarios shown in Figures 7 to 11, in the frequency domain resource switching scenarios after the roles of the frequency domain resources before switching and the frequency domain resources after switching are swapped (that is, the original frequency domain resources before switching become the frequency domain resources after switching, and the original frequency domain resources after switching become the frequency domain resources before switching), the scheme provided in the above embodiments can still be used to determine the frequency domain resources at the switching time. The specific implementation method can refer to the relevant descriptions in the above embodiments and will not be repeated here.

[0225] For example, in the switching scenario shown in FIG7 , the frequency domain resource switching scenario after the roles of the frequency domain resources before the switching and the frequency domain resources after the switching are swapped is: switching from 1T transmission on frequency band B and 1T transmission on frequency band C to 1T transmission on frequency band A and 1T transmission on frequency band B, and frequency band B has the highest priority. In this scenario, the method provided in the above embodiment can also be used to determine the frequency domain resource where the switching time is located.

[0226] The above is an introduction to the solutions provided by the embodiments of the present application. It is understandable that, in order to implement the above functions, the terminal device or network device may include hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily appreciate that, in combination with the units and algorithm steps of the various examples described in the embodiments disclosed herein, the embodiments of the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in a hardware or computer software driven hardware manner depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0227] In the embodiments of the present application, the terminal device and the network device can be divided into functional units according to the above method examples. For example, each functional unit can be divided according to each function, or two or more functions can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or software functional units.

[0228] Based on the above embodiments and the same technical concept, the present application also provides a communication device for implementing the functions of the terminal device or network device provided in the embodiments of the present application. As shown in Figure 12, the communication device 1200 may include a processing unit 1201 and a storage unit 1202. The processing unit 1201 is used to control and manage the operations of the communication device 1200. The storage unit 1202 is used to store the program code and data of the communication device 1200.

[0229] The processing unit 1201 may be a processor or controller, such as a general-purpose central processing unit (CPU), a general-purpose processor, a digital signal processing (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute the various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processor may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and the like.

[0230] The storage unit 1202 may be a memory.

[0231] The communication device 1200 may be a terminal device or a network device in any of the above embodiments, or the communication device 1200 may be a device applied to a terminal device or a network device in any of the above embodiments.

[0232] As an implementation, the communication device 1200 may further include a transmitting unit 1203 and a receiving unit 1204. The transmitting unit 1203 and the receiving unit 1204 are interface circuits of the device, configured to receive signals from other devices. For example, when the device is implemented as a chip, the transmitting unit 1203 is the interface circuit of the chip used to transmit signals to other chips or devices, or the receiving unit 1204 is the interface circuit of the chip used to receive signals from other chips or devices.

[0233] The communication device 1200 can be used to implement the functions of the terminal device or network device provided in the embodiments of the present application.

[0234] When the communication device 1200 is used to implement the functions of the terminal device or network device provided in the embodiment of the present application, the processing unit 1201 can be used to determine the frequency domain resource where the switching time is located from the M frequency domain resources and the N frequency domain resources when switching from M frequency domain resources to N frequency domain resources; wherein M and N are positive integers and the sum of M and N is greater than 2; the switching time is the time for switching from the M frequency domain resources to the N frequency domain resources; wherein the frequency domain resource where the switching time is located meets at least one of the following conditions: the frequency domain resource where the switching time is located is the frequency domain resource that does not have the highest priority among the frequency domain resources of the M frequency domain resources and the N frequency domain resources except the first frequency domain resource, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, The first frequency domain resource is the frequency domain resource included in the M frequency domain resources, and the first frequency domain resource is the frequency domain resource included in the N frequency domain resources; the frequency domain resource where the switching time is located is the frequency domain resource that does not have the highest priority among the frequency domain resources of the first set type among the M frequency domain resources and the N frequency domain resources, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources; the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, wherein the M frequency domain resources include the first frequency domain resource, and the N frequency domain resources include the first frequency domain resource; the frequency domain resource where the switching time is located is the frequency domain resource among the M frequency domain resources or the N frequency domain resources, excluding the frequency domain resource where the physical uplink control channel is located.

[0235] The above examples illustrate the method for the communication device 1200 to execute some operations of the terminal device or network device. It can be understood that the processing unit 1201 can also be used to execute other processing-related steps or operations performed by the terminal device or network device in the above method embodiment in addition to the above processing. For details, please refer to the relevant instructions in the above method embodiment, and no further details will be given here.

[0236] It should be understood that the division of functional units in the embodiments of the present application is schematic and is only a logical functional division. In actual implementation, there may be other division methods. For example, the above-mentioned sending unit 1203 and receiving unit 1204 can be combined into a transceiver unit. In addition, the functional modules in the various embodiments of the present application can be integrated into a processor, or can exist physically separately, or two or more modules can be integrated into a single module. The above-mentioned integrated modules can be implemented in the form of hardware or in the form of software functional modules.

[0237] Based on the above embodiments and the same technical concept, the present application further provides a communication device, as shown in FIG13 . This communication device can be a hardware circuit implementation of the communication device shown in FIG12 . This communication device can be adapted to perform the functions of a terminal device or network device in the above method embodiments. For ease of illustration, FIG13 only shows the main components of the communication device.

[0238] As shown in Figure 13, communication device 1300 includes a communication interface 1301, at least one processor 1302, and memory 1303. Processor 1302 is configured to execute instructions or programs stored in memory 1303. When the instructions or programs stored in memory 1303 are executed, processor 1302 is configured to perform the operations performed by processing unit 1201 in the above-described embodiment, and communication interface 1301 is configured to perform the operations performed by sending unit 1203 and receiving unit 1204 in the above-described embodiment.

[0239] Memory 1303 is used to store program instructions and / or data. Memory 1303 is coupled to processor 1302. Coupling in the embodiments of the present application refers to an indirect coupling or communication connection between devices, units, or modules, which can be electrical, mechanical, or other forms, and is used for information exchange between devices, units, or modules. Processor 1302 may operate in conjunction with memory 1303. Processor 1302 may execute program instructions stored in memory 1303. At least one of the at least one memory may be included in the processor.

[0240] During implementation, each step of the above method can be completed by an integrated logic circuit of the hardware in the processor or by instructions in the form of software. The steps of the method disclosed in conjunction with the embodiments of the present application can be embodied as being executed by a hardware processor, or can be executed by a combination of hardware and software modules in the processor. The software module can be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in conjunction with its hardware. To avoid repetition, it will not be described in detail here.

[0241] It should be noted that the processor in the embodiment of the present application can be an integrated circuit chip with signal processing capabilities. During implementation, each step of the above method embodiment can be completed by an integrated logic circuit of hardware in the processor or instructions in the form of software. The above processor can be a general-purpose processor, a digital signal processing circuit (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic device, or discrete hardware component.

[0242] It is understood that the memory in the embodiments of the present application can be a volatile memory or a non-volatile memory, or can include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. It should be noted that the memory of the systems and methods described herein is intended to include, but is not limited to, these and any other suitable types of memory.

[0243] Communication interface 1301 is used to communicate with other devices via a transmission medium, thereby enabling the device in communication apparatus 1300 to communicate with other devices. In embodiments of the present application, the communication interface may be a transceiver, circuit, bus, module, or other type of communication interface. In embodiments of the present application, when the communication interface is a transceiver, the transceiver may include an independent receiver or an independent transmitter; it may also include a transceiver with integrated transceiver functions, or an interface circuit.

[0244] Communication device 1300 may further include a communication line 1304. Communication interface 1301, processor 1302, and memory 1303 may be interconnected via communication line 1304; communication line 1304 may be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, for example. Communication line 1304 may be divided into an address bus, a data bus, a control bus, and the like. For ease of illustration, FIG13 shows only one thick line, but this does not imply that there is only one bus or only one type of bus.

[0245] Based on the above embodiments and the same technical concept, an embodiment of the present application also provides a computer-readable storage medium, in which a computer program or instruction is stored. When the computer program or instruction is run on a communication device, the communication device executes the method provided in the above embodiment and applied to a terminal device or a network device.

[0246] Based on the above embodiments and the same technical concept, an embodiment of the present application also provides a computer program product, which includes a computer program or instructions. When the computer program or instructions are executed by a communication device, the method provided in the above embodiments and applied to a terminal device or a network device is implemented.

[0247] Based on the above embodiments and the same technical concept, an embodiment of the present application also provides a chip system, which includes a processor, which is coupled to a memory and is used to read and execute a software program stored in the memory to implement the method provided in the above embodiments for application to a terminal device or a network device.

[0248] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to magnetic disk storage, optical storage, etc.) that contain computer-usable program code.

[0249] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the present application. It should be understood that each flow and / or box in the flow chart and / or block diagram, as well as the combination of the flow chart and / or box in the flow chart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for implementing the functions specified in one or more flow charts and / or one or more boxes in the block diagram.

[0250] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0251] Obviously, those skilled in the art may make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is intended to include these modifications and variations.

Claims

1. A communication method, characterized in that: include: When switching from M frequency domain resources to N frequency domain resources, determining the frequency domain resource where the switching time is located from the M frequency domain resources and the N frequency domain resources; wherein M and N are positive integers and the sum of M and N is greater than 2; the switching time is the time for switching from the M frequency domain resources to the N frequency domain resources; The frequency domain resource where the switching time is located meets at least one of the following conditions: The frequency domain resource where the switching time is located is a frequency domain resource that does not have the highest priority among the M frequency domain resources and the N frequency domain resources except the first frequency domain resource, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, the first frequency domain resource is a frequency domain resource included in the M frequency domain resources, and the first frequency domain resource is a frequency domain resource included in the N frequency domain resources; The frequency domain resource where the switching time is located is a frequency domain resource that does not have the highest priority among the frequency domain resources of the first set type among the M frequency domain resources and the N frequency domain resources, and the frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources; The frequency domain resource where the switching time is located is the M frequency domain resources or the N frequency domain resources, wherein the M frequency domain resources include the first frequency domain resource, and the N frequency domain resources include the first frequency domain resource; The frequency domain resource where the switching time is located is a frequency domain resource among the M frequency domain resources or the N frequency domain resources except the frequency domain resource where the physical uplink control channel is located.

2. The method according to claim 1, characterized in that The first setting type includes at least one of the following: Uplink transmission is scheduled, and the frequency domain resources at the set position in the scheduled frequency domain resources have uplink transmission; Physical uplink control channel does not exist / does not include; Associated frequency bands are not included.

3. The method according to claim 1 or 2, characterized in that The M frequency domain resources are frequency domain resources before switching, and the N frequency domain resources are frequency domain resources after switching; The frequency domain resource where the switching time is located is the M frequency domain resources, specifically: the frequency domain resource where the switching time is located is the frequency domain resource before the switching; The frequency domain resource where the switching time is located is the N frequency domain resources, specifically: the frequency domain resource where the switching time is located is the frequency domain resource after switching.

4. The method according to claim 3, characterized in that When the frequency domain resource at which the switching time is located is the frequency domain resource after switching, the priority of information carried by the first frequency domain resource in the M frequency domain resources is higher than the priority of information carried by the first frequency domain resource in the N frequency domain resources; or When the frequency domain resource where the switching time is located is the frequency domain resource before the switching, the priority of information carried by the first frequency domain resource among the N frequency domain resources is higher than the priority of information carried by the first frequency domain resource among the M frequency domain resources.

5. The method according to any one of claims 1 to 4, characterized in that: If the frequency domain resource where the physical uplink control channel is located belongs to the M frequency domain resources, the frequency domain resource where the switching time is located is the N frequency domain resources; or If the frequency domain resource where the physical uplink control channel is located belongs to the N frequency domain resources, the frequency domain resource where the switching time is located is the M frequency domain resources.

6. The method according to any one of claims 1 to 5, characterized in that: The frequency domain resources where the switching time is located are the M frequency domain resources or the N frequency domain resources, and specifically include: If the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources, the frequency domain resources where the switching time is located are the M frequency domain resources; or If the number of uplink transmission chains or the number of scheduling ports of the N frequency domain resources is less than the number of uplink transmission chains or the number of scheduling ports of the M frequency domain resources, the frequency domain resources where the switching time is located are the N frequency domain resources.

7. The method according to any one of claims 1 to 6, characterized in that: Among the M frequency domain resources and the N frequency domain resources, the priority of the first frequency domain resource is higher than the priority of other frequency domain resources.

8. The method according to any one of claims 1 to 7, characterized in that: When the second frequency domain resource is in an intra-band carrier aggregation state, the second frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the second frequency domain resource is not used, wherein the second frequency domain resource belongs to the M frequency domain resources or the N frequency domain resources.

9. The method according to claim 8, characterized in that The uplink transmission on the two carriers in the second frequency domain resources is transmission corresponding to one uplink transmission link or one-port transmission.

10. The method according to any one of claims 1 to 9, characterized in that: If the number of uplink transmission chains or the number of scheduled ports on the third frequency domain resources changes when switching from the M frequency domain resources to the N frequency domain resources, the third frequency domain resources are not switched or there is no switching time on the third frequency domain resources; wherein the third frequency domain resources belong to the M frequency domain resources and / or the N frequency domain resources.

11. The method according to claim 10, characterized in that When the third frequency domain resource is scheduled for one-port transmission and there are no other scheduled frequency domain resources, the third frequency domain resource is not configured with an associated frequency band, or the associated frequency band of the third frequency domain resource is not used.

12. A communication device, characterized in that: comprising at least one processor; and a memory and a communication interface communicatively connected to the at least one processor; The communication interface is used to receive a signal from another communication device other than the communication device and transmit it to the processor or to send a signal from the processor to another communication device other than the communication device; The memory stores instructions that can be executed by the at least one processor, and the at least one processor causes the communication device to perform the method according to any one of claims 1 to 11 by executing the instructions stored in the memory.

13. A communication device, characterized in that: include: A module for executing the method according to any one of claims 1 to 11.

14. A computer-readable storage medium, characterized in that: The storage medium stores a computer program or an instruction. When the computer program or the instruction is executed on the communication device, the communication device executes the method according to any one of claims 1 to 11.

15. A computer program product, characterized in that The computer program product comprises a computer program or instructions, and when the computer program or instructions are executed by a communication device, the method according to any one of claims 1 to 11 is implemented.

Citation Information

Patent Citations

  • Communication method and device

    CN115119312A

  • Communications device, infrastructure equipment and methods

    WO2022017992A1

  • Carrier switching method and apparatus

    WO2022161051A1

  • Transmit chain switching preparation time for uplink shared channel

    WO2022226877A1