Method and apparatus for reserving battery swapping, and cloud server and terminal device

By receiving scheduled power swap requests and sending power swap cost information to the cloud server of the power swap station, the problem of insufficient full power during the peak period of the power swap station is solved, and the user's power swap experience and efficiency are improved.

WO2024216599A1PCT designated stage expired Publication Date: 2024-10-24CONTEMPORARY AMPEREX TECHNOLOGY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/089598
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

The power swap station has insufficient fully charged batteries during peak periods, resulting in low battery swap efficiency. Users are unable to know the battery swap cost in advance, which affects the battery swap experience.

Method used

Through the scheduled power swap method and device, the cloud server receives the scheduled power swap request and sends a response message containing the power swap cost information. The user can know the cost of the scheduled power swap in advance, including the estimated departure location, departure time and required battery information, and perform precise search A battery swap station that meets your needs.

Benefits of technology

It improves the user's battery swap experience, reduces the gap between estimated and actual battery swap prices, and enhances battery swap efficiency and user satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023089598_24102024_PF_FP_ABST
    Figure CN2023089598_24102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided in the embodiments of the present application are a method and apparatus for reserving battery swapping, and a cloud server and a terminal device. The method comprises: receiving a reservation battery swapping request; and in response to the reservation battery swapping request, sending a reservation response message, wherein the reservation response message comprises battery swapping cost information. In the embodiments of the present application, corresponding battery swapping cost information can be prompted to a user, such that the user can know of battery swapping costs, which correspond to a reservation battery swapping request, in advance, and compared with a mode whereby battery swapping costs can only be known of after battery swapping is completed, the present application can improve the battery swapping experience of the user.
Need to check novelty before this filing date? Find Prior Art

Description

Method and device for booking battery replacement, cloud server and terminal device Technical Field

[0001] The present application relates to the field of battery technology, and in particular to a method and apparatus for scheduling battery replacement, a cloud server, and a terminal device. Background Art

[0002] Battery swap stations can quickly replace batteries in electric vehicles, but their capacity is limited, and during peak swapping periods, fully charged batteries may not be available. This results in low swapping efficiency and an inability to meet user demand. While swapping can be improved through scheduled appointments, users typically only learn the cost of the swap after it's completed, resulting in a poor user experience.

[0003] Summary of the Invention

[0004] This application proposes a method and device for battery replacement reservation, a cloud server and a terminal device, which can prompt the user with corresponding battery replacement cost information based on the battery replacement reservation request, so that the user can know the corresponding battery replacement cost of the battery replacement reservation request in advance, thereby improving the user's battery replacement experience.

[0005] In a first aspect, a method for reserving battery replacement is provided, comprising: receiving a request for reserving battery replacement; sending a reservation response message in response to the request for reserving battery replacement; wherein the reservation response message includes battery replacement cost information.

[0006] In an embodiment of the present application, the cloud server can prompt the user with corresponding battery replacement cost information based on the battery replacement reservation request, so that the user can query the corresponding battery replacement cost according to different battery replacement needs. Compared with only knowing the battery replacement cost after the battery replacement is completed, the user's battery replacement experience can be improved.

[0007] In one possible implementation, the battery replacement reservation request includes information on the expected departure location, expected departure time, and required battery.

[0008] In an embodiment of the present application, by carrying information about the expected departure location, expected departure time, and required battery in the battery swap reservation request, the cloud server can accurately search for battery swap stations that meet the user's needs and send the corresponding battery swap cost information to the user, thereby improving the user's battery swap experience.

[0009] In a possible implementation, the information of the required battery includes the power level of the required battery.

[0010] In an embodiment of the present application, since the battery replacement cost is closely related to the power level of the required battery, by including the power level of the required battery in the information of the required battery, the cloud server can more reasonably estimate and send the battery replacement cost information corresponding to the battery replacement reservation request, thereby improving the user's battery replacement experience.

[0011] In one possible implementation, the information of the demand battery also includes at least one of the number of the demand battery, the state of health (SOH) of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery, and the mileage that the demand battery can travel.

[0012] In this embodiment, the information on the required battery may include at least one of the above-mentioned multiple information. Users can set personalized plans based on different battery requirements. The cloud server can reasonably estimate the battery replacement cost information corresponding to the personalized plan, thereby improving the user's battery replacement experience.

[0013] In a possible implementation, the battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, the best duration, and the shortest distance.

[0014] In this embodiment, by carrying a battery replacement tag in the battery replacement reservation request, the user can select the corresponding battery replacement tag according to his actual needs. The cloud server can send the corresponding battery replacement cost information to the user according to the battery replacement tag requirements, thereby improving the user's battery replacement experience.

[0015] In a possible implementation, before sending the reservation response message, the method further includes: determining the battery replacement cost information according to the battery replacement reservation request.

[0016] In one possible implementation, determining the battery replacement cost information includes: determining at least one battery replacement station that meets the expected departure time and the required battery information within a preset distance range from the expected departure location; determining a target battery replacement station that is closest to the expected departure location among the at least one battery replacement station; determining an expected arrival time at the target battery replacement station; and determining the battery replacement fee based on the electricity price at the expected arrival time and the required battery information; wherein the battery replacement cost information includes the information of the target battery replacement station and the battery replacement fee.

[0017] In this embodiment, the battery replacement cost corresponding to the target battery replacement station is estimated based on the electricity price at the time of expected arrival at the target battery replacement station. Compared with estimating the battery replacement cost based on the electricity price when sending the battery replacement reservation request (placing an order), it is closer to the actual battery replacement price, thereby reducing the gap between the estimated battery replacement cost and the actual battery replacement price and improving the user's battery replacement experience.

[0018] In one possible implementation, determining the expected arrival time at the target battery swap station includes: obtaining road condition information between the expected departure point and the target battery swap station at the expected departure time; and determining the expected arrival time based on the expected departure time, the distance between the expected departure point and the target battery swap station, and the road condition information.

[0019] In this embodiment, the estimated arrival time is determined by the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information, which is closer to the actual arrival time. Then, the battery swap cost estimated based on the electricity price at the estimated arrival time is more reasonable and closer to the actual battery swap price, thereby improving the user's battery swap experience.

[0020] In one possible implementation, sending the reservation response message includes sending the battery swap cost information when the battery swap tag indicates the closest distance. In other words, when the user sets the battery swap tag to the closest distance, the corresponding battery swap cost information is sent to the user. This allows for providing battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0021] In one possible implementation, determining the battery swap cost information includes: determining at least one battery swap station that meets the expected departure time and the required battery information within a preset distance range from the expected departure location; determining a target battery swap station corresponding to the shortest time required to reach the at least one battery swap station; determining an expected arrival time at the target battery swap station; and determining the battery swap fee based on the electricity price at the expected time and the required battery information; wherein the battery swap cost information includes the information of the target battery swap station and the battery swap fee.

[0022] In this embodiment, the electricity price at the estimated time of arrival at the battery swap station is used to estimate the battery swap cost corresponding to the battery swap station. Compared with estimating the battery swap cost by the electricity price when sending the battery swap appointment request (placing an order), this is closer to the actual battery swap price, and can reduce the gap between the estimated battery swap cost and the actual battery swap price, thereby improving the user's battery swap experience.

[0023] In one possible implementation, determining the expected arrival time at the target battery swap station includes: obtaining road condition information between the expected departure point and the target battery swap station at the expected departure time; and determining the expected arrival time based on the expected departure time, the distance between the expected departure point and the target battery swap station, and the road condition information.

[0024] In one possible implementation, sending the reservation response message includes sending the battery swap cost information when the battery swap tag indicates the optimal duration. In other words, when the user sets the battery swap tag to the optimal duration, the corresponding battery swap cost information is sent to the user. This allows for providing battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0025] In one possible implementation, determining the battery exchange cost information includes: determining at least one battery exchange station that meets the expected departure time and the required battery information within a preset distance range from the expected departure location; determining at least one battery exchange fee corresponding to the at least one battery exchange station; determining the lowest battery exchange fee among the at least one battery exchange fee, and the target battery exchange station corresponding to the lowest battery exchange fee; wherein the battery exchange cost information includes the information of the target battery exchange station and the lowest battery exchange fee.

[0026] In one possible implementation, determining at least one battery exchange fee corresponding to the at least one battery exchange station includes: determining an scheduled arrival time at the at least one battery exchange station; and determining the at least one battery exchange fee based on the electricity price at the scheduled arrival time and the information of the demand battery.

[0027] In this embodiment, the electricity price at the estimated time of arrival at the battery swap station is used to estimate the battery swap cost corresponding to the battery swap station. Compared with estimating the battery swap cost by the electricity price when sending the battery swap appointment request (placing an order), this is closer to the actual battery swap price, and can reduce the gap between the estimated battery swap cost and the actual battery swap price, thereby improving the user's battery swap experience.

[0028] In one possible implementation, determining the expected arrival time at the at least one battery swap station includes: obtaining road condition information between the expected departure point and the at least one battery swap station at the expected departure time; and determining the expected arrival time based on the expected departure time, the distance between the expected departure point and the at least one battery swap station, and the road condition information.

[0029] In an embodiment of the present application, the estimated arrival time at each battery swap station is estimated based on road condition information, which is closer to the actual arrival time than the estimated arrival time is estimated only by the distance between the estimated departure point and each battery swap station. In this way, the battery swap cost estimated based on the electricity price at the estimated arrival time is more reasonable and closer to the actual battery swap price, thereby improving the user's battery swap experience.

[0030] In one possible implementation, determining the battery replacement cost corresponding to at least one battery replacement station based on the battery replacement reservation request includes: determining the pre-consumption of electricity required to reach the at least one battery replacement station based on the expected departure time and the expected departure location; and determining the battery replacement fee of the at least one battery replacement station based on the information of the required battery, the pre-consumption of electricity and the electricity price at the expected arrival time.

[0031] In the above embodiment, the cloud server can estimate the expected power consumption corresponding to driving to each battery swap station by estimating the distance between the departure location and each battery swap station, so as to take the expected power consumption into consideration when estimating the battery swap cost, which can make the estimated battery swap cost closer to the actual battery swap price and improve the user's battery swap experience.

[0032] In one possible implementation, sending the reservation response message includes sending the battery swap cost information when the battery swap tag is set to the optimal cost. In other words, when the user sets the battery swap tag to the optimal cost, the corresponding battery swap cost information is sent to the user. This allows for providing battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0033] In the above embodiment, when the user selects the battery swap label as the most cost-effective, the cloud platform can prompt the user with the battery swap station corresponding to the lowest battery swap cost based on the user's choice, so that the user can choose according to the actual situation, thereby improving the user's battery swap experience.

[0034] In a possible implementation, the reservation response message further includes an estimated arrival time corresponding to the target battery swap station.

[0035] In a possible implementation, the method further includes: receiving a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

[0036] In this embodiment, in addition to providing the user with the battery replacement cost information corresponding to the battery replacement reservation request, the cloud server can provide the user with the service of reserving the target battery replacement station for battery replacement based on the user's confirmation instructions, thereby improving the user's battery replacement experience.

[0037] In a second aspect, a method for reserving battery replacement is provided, comprising: sending a request for reserving battery replacement; and receiving a reservation response message, wherein the reservation response message includes battery replacement cost information.

[0038] In one possible implementation, the battery replacement reservation request includes information on the expected departure location, expected departure time, and required battery.

[0039] In a possible implementation, the information of the required battery includes the power level of the required battery.

[0040] In one possible implementation, the information of the demand battery also includes at least one of the number of the demand battery, the state of health (SOH) of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery, and the mileage that the demand battery can travel.

[0041] In a possible implementation, the battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, the best duration, and the shortest distance.

[0042] In a possible implementation, the method further includes: sending a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

[0043] According to a third aspect, a device for battery replacement reservation is provided, which is characterized by comprising: a receiving unit for receiving a battery replacement reservation request; a sending unit for sending a reservation response message in response to the battery replacement reservation request; wherein the reservation response message includes battery replacement cost information.

[0044] In one possible implementation, the battery replacement reservation request includes information on the expected departure location, expected departure time, and required battery.

[0045] In a possible implementation, the information of the required battery includes the power level of the required battery.

[0046] In one possible implementation, the information of the demand battery also includes at least one of the number of the demand battery, the state of health (SOH) of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery, and the mileage that the demand battery can travel.

[0047] In a possible implementation, the battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, the best duration, and the shortest distance.

[0048] In a possible implementation, the device further includes a determination unit, which is configured to determine the battery replacement cost information based on the received battery replacement reservation request.

[0049] In one possible implementation, the determination unit is used to: determine at least one battery swap station that meets the expected departure time and the information of the required battery within a preset distance range of the expected departure place; determine the target battery swap station that is closest to the expected departure place among the at least one battery swap station; determine the expected arrival time at the target battery swap station; determine the battery swap fee based on the electricity price at the expected arrival time and the information of the required battery; wherein the battery swap cost information includes the information of the target battery swap station and the battery swap fee.

[0050] In one possible implementation, the determination unit is used to: obtain road condition information between the expected departure point and the target battery swap station at the expected departure time; and determine the expected arrival time based on the expected departure time, the distance between the expected departure point and the target battery swap station, and the road condition information.

[0051] In a possible implementation, the sending unit is used to send the battery replacement cost information when the battery replacement tag is at the shortest distance.

[0052] In one possible implementation, the determination unit is used to: determine at least one battery swap station that meets the expected departure time and the information of the required battery within a preset distance range of the expected departure place; determine the target battery swap station corresponding to the shortest time required to reach the at least one battery swap station; determine the expected arrival time at the target battery swap station; determine the battery swap fee based on the electricity price at the expected time and the information of the required battery; wherein the battery swap cost information includes the information of the target battery swap station and the battery swap fee.

[0053] In one possible implementation, the determination unit is used to: obtain road condition information between the expected departure point and the target battery swap station at the expected departure time; and determine the expected arrival time based on the expected departure time, the distance between the expected departure point and the target battery swap station, and the road condition information.

[0054] In a possible implementation, the sending unit is used to send the battery replacement cost information when the battery replacement label is the optimal duration.

[0055] In one possible implementation, the determination unit is used to: determine at least one battery swap station that meets the expected departure time and the required battery information within a preset distance range of the expected departure location; determine at least one battery swap fee corresponding to the at least one battery swap fee; determine the lowest battery swap fee among the at least one battery swap fee, and the target battery swap station corresponding to the lowest battery swap fee; wherein the battery swap cost information includes the information of the target battery swap station and the lowest battery swap fee.

[0056] In one possible implementation, the determination unit is used to: determine the scheduled arrival time at the at least one battery swap station; and determine the at least one battery swap fee based on the electricity price at the scheduled arrival time and the information of the required battery.

[0057] In one possible implementation, the determination unit is used to: obtain road condition information between the expected departure point and the at least one battery swap station at the expected departure time; and determine the expected arrival time based on the expected departure time, the distance between the expected departure point and the at least one battery swap station, and the road condition information.

[0058] In one possible implementation, the determination unit is used to: determine the pre-consumption power required to reach the at least one battery swap station based on the expected departure time and the expected departure location; and determine the battery swap fee at the at least one battery swap station based on the information of the required battery, the pre-consumption power and the electricity price at the expected arrival time.

[0059] In a possible implementation, the sending unit is used to send the battery replacement cost information when the battery replacement tag is the cost-optimal.

[0060] In a possible implementation, the reservation response message further includes an estimated arrival time corresponding to the target battery swap station.

[0061] In a possible implementation, the receiving unit is further used to: receive a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

[0062] In a fourth aspect, a device for reserving battery replacement is provided, comprising: sending a request for reserving battery replacement; receiving a reservation response message, wherein the reservation response message includes battery replacement cost information.

[0063] In one possible implementation, the battery replacement reservation request includes information on the expected departure location, expected departure time, and required battery.

[0064] In a possible implementation, the information of the required battery includes the power level of the required battery.

[0065] In one possible implementation, the information of the demand battery also includes at least one of the number of the demand battery, the state of health (SOH) of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery, and the mileage that the demand battery can travel.

[0066] In a possible implementation, the battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, the best duration, and the shortest distance.

[0067] In a possible implementation, the method further includes: sending a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

[0068] In a fifth aspect, a cloud server is provided, comprising a memory and a processor, wherein the memory is used to store instructions, and the processor is used to read the instructions and execute the method in the first aspect and any possible implementation of the first aspect according to the instructions.

[0069] In a sixth aspect, a terminal device is provided, comprising a memory and a processor, wherein the memory is used to store instructions, and the processor is used to read the instructions and execute the method in the second aspect and any possible implementation of the second aspect according to the instructions.

[0070] In the seventh aspect, a computer-readable storage medium is provided for storing a computer program, wherein the computer program enables a computer to execute the method described in the first aspect and any possible implementation of the first aspect, or the method described in the second aspect and any possible implementation of the second aspect.

[0071] In the eighth aspect, a chip is provided, comprising a processor for calling and running a computer program from a memory, so that a device equipped with the chip executes a method as described in the first aspect and any possible implementation of the first aspect, or a method as described in the second aspect and any possible implementation of the second aspect.

[0072] In a ninth aspect, a computer program is provided, which enables a computer to execute the method as described in the first aspect and any possible implementation of the first aspect, or the method as described in the second aspect and any possible implementation of the second aspect.

[0073] In the tenth aspect, a computer program product is provided, comprising computer program instructions, which enable a computer to execute the method described in the first aspect and any possible implementation of the first aspect, or the method described in the second aspect and any possible implementation of the second aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments of the present application. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the drawings without creative work.

[0075] FIG1 is a schematic diagram of a battery replacement scenario according to an embodiment of the present application;

[0076] FIG2 is a first schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0077] FIG3 is a second schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0078] FIG4 is a third schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0079] FIG5 is a fourth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0080] FIG6 is a fifth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0081] FIG7 is a sixth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0082] FIG8 is a seventh schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0083] FIG9 is an eighth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0084] FIG10 is a ninth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0085] FIG11 is a tenth schematic flow chart of a method for scheduling battery replacement according to an embodiment of the present application;

[0086] FIG12 is a schematic flow chart of another method for scheduling battery replacement according to an embodiment of the present application;

[0087] FIG13 is a schematic block diagram of a device for scheduling battery replacement according to an embodiment of the present application;

[0088] FIG14 is a schematic structural diagram of another device for scheduling battery replacement according to an embodiment of the present application;

[0089] FIG15 is a schematic block diagram of a cloud server according to an embodiment of the present application;

[0090] FIG16 is a schematic block diagram of a terminal device according to an embodiment of the present application.

[0091] In the drawings, the drawings are not drawn to scale. DETAILED DESCRIPTION

[0092] The following detailed description of the embodiments of the present application is provided in conjunction with the accompanying drawings and examples. The following detailed description of the embodiments and the accompanying drawings are used to illustrate the principles of the present application, but are not intended to limit the scope of the present application, that is, the present application is not limited to the described embodiments.

[0093] In the description of this application, it should be noted that, unless otherwise specified, "multiple" means more than two; the terms "upper", "lower", "left", "right", "inside", "outside", etc., indicating directions or positional relationships, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on this application. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. "Vertical" is not strictly perpendicular, but is within the allowable error range. "Parallel" is not strictly parallel, but is within the allowable error range.

[0094] The directional words appearing in the following description are all directions shown in the figures, and do not limit the specific structure of this application. In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0095] Unless otherwise defined, all technical and scientific terms used in this application have the same meanings as commonly understood by technicians in the technical field to which this application belongs; the terms used in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.

[0096] References to "embodiments" in this application mean that a particular feature, structure, or characteristic described in connection with the embodiment may be included in at least one embodiment of the application. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor does it constitute an independent or alternative embodiment that is mutually exclusive of other embodiments. It is understood, both explicitly and implicitly, by those skilled in the art that the embodiments described in this application may be combined with other embodiments.

[0097] With the development of new energy technologies, batteries are being used in increasingly diverse fields, such as as a power source for vehicles, reducing the use of non-renewable resources. When the battery power in a vehicle is insufficient to support continued driving, charging equipment such as charging piles can be used to charge the vehicle, that is, to charge the battery in the vehicle, thereby achieving a battery charge and discharge cycle. Alternatively, battery swap services can be provided for vehicles through battery swap stations, where batteries can be quickly removed or installed from the vehicle. Batteries removed from the vehicle can be placed in the battery storage facility of the battery swap station for charging, ready for subsequent battery swaps with vehicles entering the station.

[0098] Battery swap stations enable rapid battery replacement for electric vehicles, but their capacity is limited. During peak swapping periods, fully charged batteries may not be available, resulting in low swap efficiency and an inability to meet owner needs. To improve the user experience, battery swap reservations can be implemented to mitigate the impact. While users can schedule battery swaps through the terminal, improving swap efficiency, the cost is only available after the swap is complete, with no way to predict the cost in advance, resulting in a poor user experience.

[0099] In view of this, an embodiment of the present application provides a method for making an appointment for battery replacement, which can prompt the user with corresponding battery replacement cost information based on the user's appointment request for battery replacement, so that the user can predict the corresponding battery replacement cost for the appointment request in advance. Compared with only knowing the battery replacement cost after the battery replacement is completed, the user's battery replacement experience is improved.

[0100] Figure 1 shows a schematic diagram of an application scenario of the battery replacement method according to an embodiment of the present application. As shown in Figure 1 , the application scenario of the battery replacement method may involve a battery swap station 11, a vehicle 12, and a battery.

[0101] The battery swap station 11 may refer to a location that provides battery swap services for vehicles. For example, the battery swap station 11 may be a fixed location, or the battery swap station 11 may be a mobile location such as a mobile battery swap vehicle, which is not limited here.

[0102] The vehicle 12 may be detachably connected to the battery. In some examples, the vehicle 12 may be a car, truck, or other vehicle that uses a power battery as a power source.

[0103] The battery may include a battery provided in the vehicle 12 and a battery located in the battery swap station 11 for battery swapping. For ease of distinction, as shown in FIG1 , the battery to be replaced in the vehicle 12 is recorded as battery 141, and the battery used for battery swapping in the battery swap station is recorded as battery 142. The battery may be a lithium-ion battery, a lithium metal battery, a lead-acid battery, a nickel-cathode battery, a nickel-hydrogen battery, a lithium-sulfur battery, a lithium-air battery or a sodium-ion battery, etc., but is not limited here. In terms of scale, the battery may be a battery cell, a battery module or a battery pack, but is not limited here. In addition to being used as a power source to power the motor of the vehicle 12, the battery can also power other electrical devices in the vehicle 12. For example, the battery can also power the in-vehicle air conditioner, a car player, etc.

[0104] When vehicle 12 equipped with battery 141 enters battery swap station 11, battery 141 is removed from vehicle 12 using a battery swapping device, battery 142 is removed from station 11, and battery 142 is then installed on vehicle 12. Vehicle 12 with battery 142 installed can then leave station 11. This battery swapping technology allows for rapid energy replenishment of vehicles within minutes or even tens of seconds, improving the user experience.

[0105] As shown in Figure 1, a battery swap cabinet 13 may be provided in the battery swap station 11. The battery swap cabinet 13 includes a first battery management unit 131 and a charging unit 132. The battery swap cabinet 13 may also be provided with multiple charging compartments 133, and the batteries used for battery swapping may be placed in the charging compartments 133 of the battery swap cabinet 13 of the battery swap station 11. The first battery management unit 131 may be a battery management unit provided in the battery swap cabinet 13. For example, the first battery management unit 131 may be referred to as a central battery management unit (CBMU). The charging unit 132 may charge the batteries in the charging compartment 133. In some examples, the charging unit may include an AC / DC module, i.e., an AC / DC module, and other components, devices, or equipment with a charging function, which is not limited here. The charging unit 132 may be provided in a one-to-one correspondence with the charging compartment 133, or multiple charging compartments 133 may share one charging unit 132, which is not limited here.

[0106] The battery may be provided with a corresponding second battery management unit 143. For example, the second battery management unit 143 may be called a slave battery management unit (SBMU).

[0107] The vehicle 12 is further provided with a third battery management unit 121. The third battery management unit 121 can be used to manage multiple batteries 141 installed on the vehicle. For example, the third battery management unit 121 can be called a main battery management unit (MBMU).

[0108] In one possible implementation, the SBMU may be implemented using the battery management system (BMS) of the corresponding battery; the MBMU may be implemented through a control module of a battery disconnect unit (BDU) or through the BMS of one of the batteries.

[0109] The battery swap station 11 may also be provided with a corresponding management device. The management device may be a centralized structure or a distributed structure, which is not limited here. The management device may be arranged inside the battery swap station 11 or outside the battery swap station 11. In the case where the management device is a distributed structure, the management device may also be partially arranged inside the battery swap station 11 and partially arranged outside the battery swap station 11. For example, as shown in Figure 1, the management device may include a station control system 151 inside the battery swap station 11 and a cloud server 152 outside the battery swap station 11, which is not limited here. The station control system 151 may also be referred to as a battery management unit in the battery swap station 11, which is used to manage and control the batteries 142 in the battery swap station 11.

[0110] Optionally, the first battery management unit 131 can communicate and interact with other units, modules, devices, etc. via wired or wireless means. The second battery management unit 143 can communicate and interact with other units, modules, devices, etc. via wired or wireless means. The third battery management unit 121 can communicate and interact with other units, modules, devices, etc. via wired or wireless means. The station control system 151 can communicate and interact with other units, modules, devices, etc. via wired or wireless means. Wired communication methods include, for example, the CAN communication bus. Wireless communication methods include, but are not limited to, various methods such as Bluetooth, WiFi, and ZigBee.

[0111] For example, the first battery management unit 131 can communicate with the second battery management unit 143 to control the charging of the battery 142 in the battery compartment 133. For another example, the third battery management unit 121 can communicate with the second battery management unit 143 to centrally manage multiple batteries 141 on the vehicle 12. For another example, the station control system 151 can communicate with the first battery management unit 131, the second battery management unit 143, or the third battery management unit 121 to obtain relevant information about the battery 141 on the vehicle 12 or the battery 142 in the charging compartment 133. For another example, the station control system 151 can also communicate with the cloud server 152 to obtain relevant information about the battery 141 on the vehicle 12 or the battery 142 in the charging compartment 133.

[0112] FIG2 shows a schematic flow chart of a method 200 for scheduling a battery swap according to an embodiment of the present application. The method 200 for scheduling a battery swap can be executed by a cloud server, which can be a server that manages a battery swap station and can analyze and process relevant data for scheduling a battery swap. Optionally, the method 200 can be executed by the cloud server 152 shown in FIG1 . As shown in FIG2 , the method 200 for scheduling a battery swap can include some or all of the following contents.

[0113] S210, receiving a request for battery replacement reservation.

[0114] S230: In response to the battery swap reservation request, a reservation response message is sent, wherein the reservation response message includes battery swap cost information.

[0115] First, it should be noted that the embodiments of the present application are applicable to scheduled battery replacement for electrical devices. The electrical devices may be vehicles, and in the future, may also be devices as small as robots or as large as ships and airplanes that use batteries to provide power or electricity.

[0116] In S210, the cloud server can receive a battery replacement reservation request sent by the terminal device. For example, the user finds that the vehicle's battery is running low, and performs a one-click battery replacement reservation operation on the mobile phone APP. The terminal device can send the battery replacement reservation request clicked by the user to the cloud server. For another example, when the battery level is less than a preset threshold, the vehicle-mounted terminal can automatically send a battery replacement reservation request to the cloud server. After sending the battery replacement reservation request to the cloud server, the vehicle-mounted terminal should also notify the user. For another example, the cloud server can also obtain relevant information about the power-consuming device in real time. For example, the cloud server can obtain information about the battery on the power-consuming device in real time. When the battery level is less than a preset threshold, the user can be reminded through the user's mobile phone or vehicle-mounted terminal so that the user can send a battery replacement reservation request to the cloud server by clicking on the mobile phone or vehicle-mounted terminal. Different battery replacement reservation requests may carry different information to indicate different battery replacement requirements. For example, the information includes but is not limited to the scheduled battery replacement time and location, the capacity, quantity, and chemical system requirements of the battery, etc.

[0117] In S230, after receiving the battery swap reservation request, the cloud server can obtain the user's battery swap demand and screen the battery swap stations that meet the demand conditions according to the battery swap demand. For example, if the cloud server obtains that the chemical system of the battery on the power-consuming device is lithium iron phosphate, the cloud server can first exclude the battery swap stations that do not have lithium iron phosphate batteries. For another example, if the cloud server obtains that the health status (SOH) of the battery on the power-consuming device is 80%, the cloud server can first exclude the battery swap stations or mobile battery swap devices that do not have batteries with SOH greater than or equal to 80%. Then, after estimating the battery swap cost corresponding to each battery swap station that meets the demand conditions, the cloud server sends a reservation response message to the terminal device. The reservation response message may include the battery swap cost information corresponding to the battery swap demand. The reservation response message may include multiple battery swap cost information corresponding to multiple battery swap stations that meet the demand conditions, or it may be a default battery swap cost information, such as the battery swap cost information with the lowest battery swap cost.

[0118] In this embodiment, in response to the user's scheduled battery replacement request, the cloud server can send a reservation response message to the user including the battery replacement cost information corresponding to the scheduled battery replacement request, so that the user can know the corresponding battery replacement cost of the scheduled battery replacement request in advance. Compared with only knowing the battery replacement cost after the battery replacement is completed, the user's battery replacement experience is improved.

[0119] Optionally, in an embodiment of the present application, the battery replacement reservation request may include information on the expected departure location, expected departure time and required battery.

[0120] Specifically, the battery swap reservation request carries information about the expected departure location, which refers to the location where the user plans to depart for the battery swap. The user can select any expected departure location based on their specific circumstances. For example, if a user plans to swap their battery after finishing their business at the bank in the afternoon, the expected departure location could be the bank entrance. Of course, the scheduled departure location could also be the current location of the user or the power-consuming device. In some embodiments, the current location of the power-consuming device can be used as the default expected departure location.

[0121] Specifically, the battery replacement reservation request may also carry information about the expected departure time, which refers to the time when the user plans to go to replace the battery. Optionally, the expected departure time is a certain time point, such as 16:00, 16:15, etc. Of course, the expected departure time can also be a time period, such as 16:00-16:30, 18:20-19:20, etc. When the user clicks on the reservation operation, he can select the expected departure time based on the actual situation. For example, the user selects the time of the current click operation as the expected departure time, or selects other possible times as the expected departure time. In some embodiments, the time point of the current click operation can be used as the default expected departure time.

[0122] It should be understood that in some embodiments, the estimated departure time can also be replaced by the estimated arrival time. The estimated arrival time can be understood as the time when the battery is reached at the battery swap station and can or will be swapped. Whether the time type is the estimated arrival time or the estimated departure time can be selected according to the actual needs of the user. The embodiment of the present application is described with the time type as the estimated departure time.

[0123] Specifically, the battery swap reservation request may also include information about the required battery. By way of example and not limitation, the required battery information may include the number or capacity of batteries, the battery chemistry, etc. The required battery information may be set or selected by the user, or generated by the vehicle terminal based on the current state of the vehicle.

[0124] It should be understood that the information of the expected departure location, expected departure time and required battery may not be included in the battery replacement reservation request. That is to say, the battery replacement reservation request may only include part of the information of the expected departure location, expected departure time and required battery, and the other part of the information can be obtained separately by the cloud server. As an example and not limitation, the cloud server can obtain the location of the power consumer in real time and default the location of the power consumer to the expected departure location. For another example, the cloud server can obtain the information of the battery on the power consumer in real time and default the information of the battery to the required battery.

[0125] In this embodiment, by carrying information about the expected departure location, expected departure time, and required battery in the battery swap reservation request, the cloud server can accurately search for battery swap stations that meet the user's needs and send the corresponding battery swap cost information to the user, thereby improving the user's battery swap experience.

[0126] Optionally, in some embodiments, the information of the required battery may include the required battery power. The required battery power refers to the remaining battery power that the user expects after the battery replacement is completed.

[0127] The amount of electricity in the demand battery can also be referred to as the electric energy or electric work of the demand battery. Optionally, the amount of electricity in the demand battery can be measured in kilowatt-hours. For example, when the amount of electricity in the demand battery is 30kwh, that is, the user hopes that after the battery swap is completed, the amount of electricity that the vehicle can use in the battery is 30kwh. Optionally, the amount of electricity in the demand battery can also be replaced by the SOC of the demand battery. For example, when the SOC of the demand battery is 98%, that is, the user hopes that after the battery swap is completed, the SOC of the battery that the vehicle can use is 98%. At this time, the cloud server can search for batteries with an SOC greater than or equal to 98% in various battery swap stations and determine at least one battery swap station.

[0128] Generally, all other conditions being equal, the cost of battery swaps is closely related to the battery capacity. For example, the more battery capacity swapped at a given time, the higher the cost. Another example is that, given the same battery chemistry, the more battery capacity swapped at a given time, the higher the cost.

[0129] In this embodiment, since the battery replacement cost is closely related to the power of the replacement battery, by including the power of the required battery in the information of the required battery, the cloud server can more reasonably estimate and send the battery replacement cost information corresponding to the battery replacement reservation request, thereby improving the user's battery replacement experience.

[0130] Optionally, in some embodiments, the information of the demand battery may also include at least one of the number of demand batteries, the power of the demand battery, the SOH of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery, and the mileage that the demand battery can travel.

[0131] The number of required batteries refers to the number of batteries that need to be installed on the electrical device. For example, it can be 1, 2, or even more. Optionally, the number of required batteries can also be considered as the number of batteries that can be installed on the electrical device. That is, the number of batteries that can be installed on the electrical device is the number of batteries that need to be replaced on the electrical device. Optionally, the number of required batteries can be considered as the number of batteries that need to be installed on the electrical device. For example, the electrical device can be installed with 3 batteries, and currently 1 battery is fully charged and does not need to be replaced, then the number of required batteries can be 2. Optionally, the number of required batteries can also be replaced by a battery replacement mode. For example, the battery replacement mode can refer to replacing 1 battery on the electrical device with 2 batteries, that is, one for two. In this battery replacement mode, the electrical device can be installed with 2 batteries, but the electrical device currently only has 1 battery installed. The other battery installation position can be filled with a battery filling block. For another example, the battery replacement mode may also refer to replacing two batteries on an electrical device with one battery, that is, two for one. In this battery replacement mode, one battery and one battery filling block in the battery replacement station can be installed together on the electrical device.

[0132] The state of health (SOH) of a battery in demand refers to its capacity, health, and performance. Simply put, it's the ratio of a battery's performance parameters to its nominal parameters after a period of use. It's also the ratio of the battery's capacity when discharged from a fully charged state at a certain rate to the cutoff voltage to the corresponding nominal capacity. The cloud server can determine at least one battery swap solution based on battery swap stations and mobile battery swap devices with batteries that have an SOH greater than or equal to the SOH of the battery in demand.

[0133] Currently, battery chemistries are categorized by cathode material into ternary batteries, lithium manganese oxide batteries, and lithium iron phosphate batteries. Different electrical devices may be suitable for batteries with different chemistries. Furthermore, batteries with different chemistries have different replacement costs. Therefore, including the battery chemistry in a battery replacement request helps the cloud server recommend a more cost-effective replacement solution that is more suitable for the device.

[0134] The required battery size can refer to the length, width, and height of the required battery. For example, the cloud server can obtain various information such as the length, width, and height of the required battery from the battery swap reservation request. The cloud server can then determine whether batteries of the required length, width, and height are available at various battery swap stations and mobile battery swap devices, and then generate at least one battery swap solution.

[0135] The type of battery required, such as the battery model. For example, different battery sizes have different models, with large batteries being model A and small batteries being model B. If the cloud server receives battery types AB from the battery swap request, the cloud server can assume that the device requires both a large battery and a small battery. The cloud server can then determine whether batteries of type AB are available at each battery swap station.

[0136] Usually, the mileage that a battery can travel is related to the capacity of the battery. Based on the subsequent use of the power-consuming device, the user can send the required mileage of the battery to the cloud server through a battery replacement reservation request. After obtaining the mileage, the cloud server can convert it into the capacity of the battery, and then determine whether there is a battery replacement station that meets the battery capacity from various battery replacement stations, and then prompt the user with the corresponding battery replacement cost information. It should be noted that the battery replacement reservation request can also directly carry the required battery capacity converted based on the mileage.

[0137] Those skilled in the art will appreciate that the information on the required battery in the embodiments of the present application includes but is not limited to the various embodiments described above.

[0138] It should also be understood that even if the required battery capacity is the same, the battery replacement cost may vary if any of the following factors are different: the number of required batteries, the required battery state of health (SOH), the required battery chemistry, the required battery size, the required battery type, and the required battery range. For example, at the same capacity, the manufacturing cost, size, and weight of a ternary battery and a lithium manganese oxide battery are different, resulting in completely different battery replacement prices.

[0139] In this embodiment, the information on the required battery may include at least one of the above-mentioned multiple information. Users can set personalized plans based on different battery requirements. The cloud server can reasonably estimate the battery replacement cost information corresponding to the personalized plan, thereby improving the user's battery replacement experience.

[0140] Optionally, in an embodiment of the present application, the battery replacement plan may further include a battery replacement label, which may be one of the best cost, best duration, and shortest distance.

[0141] Cost-optimal means that the cloud server searches for at least one battery swap station that meets the various conditions in the battery swap reservation request, and then selects the battery swap station with the lowest battery swap cost for battery swap.

[0142] Optimal time means that the cloud server searches for at least one battery swap station that meets the various conditions in the battery swap reservation request, and then selects the battery swap station with the shortest arrival time for battery swapping.

[0143] Optimal distance means that the cloud server searches for at least one battery swap station that meets the various conditions in the battery swap reservation request, and then selects the nearest battery swap station for battery swapping.

[0144] Specifically, after the user sets the battery replacement tag, the cloud server will send the corresponding battery replacement cost information to the user based on the user's settings.

[0145] In one implementation, if the user has not set a battery replacement tag, the cloud server can use any one of the optimal cost, optimal duration, and shortest distance as the default option, and send the default option to the user to send the battery replacement cost information corresponding to the default option.

[0146] In this embodiment, by carrying a battery replacement tag in the battery replacement reservation request, the user can select the corresponding battery replacement tag according to his actual needs. The cloud server can send the corresponding battery replacement cost information to the user according to the battery replacement tag requirements, thereby improving the user's battery replacement experience.

[0147] Optionally, in an embodiment of the present application, as shown in FIG3 , before step S230 , the method 200 may further include: S220 , determining the battery replacement cost information based on the battery replacement reservation request.

[0148] In step S220, after receiving the battery swap reservation request, the cloud server can determine at least one battery swap station that meets the expected departure location, expected departure time, and required battery information based on various rules stored in the cloud server, and then estimate the battery swap cost corresponding to the at least one battery swap station to determine the battery swap cost information.

[0149] Specifically, the cloud server can use the preset distance range of the expected departure location and the preset time range of the expected departure time as the search range to search for at least one battery swap station that meets the required battery information, and then calculate the corresponding battery swap cost of at least one battery swap station, and prompt the user with the corresponding battery swap cost information.

[0150] It should be understood that if the cloud server fails to find a battery swap station that meets the required battery information within the preset distance range of the expected departure location and the preset time range of the expected departure time, it can automatically adjust the search range or suggest to the user to modify the request conditions. Modification request conditions include but are not limited to the preset distance range, preset time range, expected departure time, expected departure location, required battery information, etc.

[0151] Optionally, in some embodiments, as a first embodiment, as shown in FIG4 , the above-mentioned S220 for determining the battery replacement cost information may specifically include the following steps S221 - S224 .

[0152] S221, determining at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and required battery information.

[0153] Specifically, the cloud server can obtain information about battery swap stations within a preset time range of the expected departure time and within a preset distance range of the expected departure location. For example, based on the expected departure location where the user requests a battery swap, the cloud server can determine the battery swap stations within the preset distance range of the expected departure location, and based on interactions with the battery swap stations within the preset distance range of the expected departure location, determine whether any battery swap stations within the preset distance range of the expected departure location have battery swap tasks within the preset time range of the user's expected departure time. Furthermore, the cloud server can determine whether any battery swap stations within the preset distance range of the expected departure location that do not have battery swap tasks meet the required battery information.

[0154] For example, the expected departure point is the entrance of the shopping mall, the expected departure time is 9:00 in the morning, the preset time range is 9:00-9:30, and the preset distance range is within 3 kilometers of the entrance of the shopping mall. The cloud server can first obtain the battery swap stations within 3 kilometers of the entrance of the shopping mall based on the location information of each battery swap station, such as battery swap station 1, battery swap station 2, and battery swap station 3. The cloud server further combines the battery swap tasks in the battery swap stations within 3 kilometers to determine whether battery swap stations 1, 2, and 3 are idle between 9:00 and 9:30. Assuming that battery swap stations 2 and 3 are idle between 9:00 and 9:30, the cloud server can further combine the battery resource information in battery swap stations 2 and 3 to determine whether the required battery information is met. If both battery swap stations 2 and 3 meet the requirements, it can be determined that both battery swap stations 2 and 3 can provide battery swap services to users.

[0155] It should be understood that the preset distance range and the preset time range in the embodiment of the present application can both be empirical values ​​and can be determined in combination with the user's tolerance. The embodiment of the present application does not specifically limit the values ​​of the preset distance range and the preset time range.

[0156] S222: Determine a target battery swap station that is closest to the estimated departure location among at least one battery swap station.

[0157] Specifically, after determining at least one battery swap station that meets the condition information in the battery swap reservation request in S221, the nearest battery swap station is used as the target battery swap station.

[0158] Continuing with the above example, if both battery swap station 2 and battery swap station 3 meet the requirements, and battery swap station 2 is closer to the expected departure location than battery swap station 3, battery swap station 2 is selected as the target battery swap station.

[0159] S223: Determine the estimated arrival time at the target battery swap station.

[0160] Specifically, the cloud server can estimate the expected arrival time of the user at the target battery swap station based on the expected departure time and the distance to the target battery swap station.

[0161] In one embodiment, the cloud server can estimate the energy consumption per 100 kilometers of the vehicle model based on the historical driving data of the vehicle model, and then estimate the time required for the vehicle to travel to the target battery swap station based on the energy consumption per 100 kilometers and the distance between the departure location and the battery swap station. Then, based on the expected departure time and the required time, the cloud server can estimate the expected arrival time at the target battery swap station.

[0162] In another implementation method, the vehicle's energy consumption per 100 kilometers can be estimated based on the user's historical driving data, and then the time required for the vehicle to travel to the target battery swap station can be estimated based on the energy consumption per 100 kilometers and the distance between the departure location and the battery swap station. Then, the expected arrival time at the target battery swap station can be estimated based on the expected departure time and the required time.

[0163] S224, determining the battery replacement cost based on the electricity price at the estimated arrival time and the information of the required battery, wherein the battery replacement cost information includes the information of the target battery replacement station and the battery replacement cost.

[0164] The electricity price at the estimated arrival time is generally positively correlated with the market price. Since battery swap stations provide battery swap services to users, the electricity price at the estimated arrival time may also include certain service fees or may be increased based on the market price. The target battery swap station information may include, but is not limited to, the target station's identification information, location information, and distance information from the estimated departure point.

[0165] Due to my country's tiered electricity policy, which means that market electricity prices fluctuate over time, the price of scheduled battery swaps will also fluctuate over time. When users place their scheduled battery swap orders, the price they estimate the replacement cost is often based on the current electricity price. This can cause a discrepancy between the actual replacement price and the price they receive, resulting in a poor user experience.

[0166] In an embodiment of the present application, the battery replacement cost is estimated based on the electricity price at the expected time of arrival at the target battery replacement station. Compared with estimating the battery replacement cost based on the electricity price at the time of order placement, the estimation method of the present application is more reasonable and closer to the actual battery replacement price, thereby reducing the gap between the estimated battery replacement cost and the actual battery replacement price and improving the user's battery replacement experience.

[0167] Optionally, in some embodiments, as shown in FIG5 , the above step S223 may specifically include the following steps S2231 - S2232 .

[0168] S2231, obtaining road condition information between the estimated departure time, the estimated departure location and the target battery swap station.

[0169] It should be understood that at different times, the same distance may have different road conditions, such as whether it is smooth or congested, whether there are ups and downs, etc. Different road conditions may take different times to travel the same distance, which may also result in different arrival times at the target battery swap station.

[0170] Optionally, the cloud server may obtain, through big data, road condition information of the road section between the expected departure time and the target battery swap station.

[0171] S2232: Determine the estimated arrival time based on the estimated departure time, the distance between the estimated departure location and the target battery swap station, and the road condition information.

[0172] The cloud server can estimate the time required to reach the target battery swap station based on the distance between the expected departure point and the target battery swap station and the road conditions, and then determine the expected arrival time through the expected departure time and the required time.

[0173] In this embodiment, the estimated arrival time is determined by the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information, which is closer to the actual arrival time. Then, the battery swap cost estimated based on the electricity price at the estimated arrival time is more reasonable and closer to the actual battery swap price, thereby improving the user's battery swap experience.

[0174] Optionally, in some embodiments, sending a reservation response message may include: sending the above-mentioned battery replacement cost information when the battery replacement tag is the closest.

[0175] In other words, when the user sets the battery swap tag to the closest distance, the corresponding battery swap cost information is sent to the user. This can provide battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0176] Optionally, in some embodiments, as a second embodiment, as shown in FIG6 , the above-mentioned S220 for determining the battery replacement cost information may specifically include the following steps S310 - S340 .

[0177] S310, determining at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and required battery information.

[0178] The specific implementation of this step can refer to the above S221, and for the sake of brevity, it will not be repeated here.

[0179] S320: Determine a target battery swap station corresponding to the shortest time required to reach at least one battery swap station.

[0180] Specifically, after determining at least one battery swap station that meets the condition information in the battery swap reservation request in S310, the cloud server can estimate the time required to reach each of the at least one battery swap station from the expected departure point, and select the battery swap station corresponding to the shortest required time as the target battery swap station.

[0181] More specifically, the cloud server can first obtain the road condition information from the expected departure point to the at least one of the above-mentioned battery swap stations at the expected departure time, and determine the time required to reach each battery swap station based on the road condition information corresponding to each battery swap station.

[0182] Continuing with the above example, if both battery swap station 2 and battery swap station 3 meet all the conditions in the battery swap reservation request, and the time from the scheduled battery swap location to battery swap station 2 is shorter than the time from the scheduled battery swap location to battery swap station 3, then battery swap station 2 is selected as the target battery swap station.

[0183] S330: Determine the estimated arrival time at the target battery swap station.

[0184] The estimated arrival time can be determined based on the estimated departure time and the shortest required time.

[0185] S340: Determine the battery swapping cost based on the electricity price at the expected time and the information about the required battery. The battery swapping cost information includes the information about the target battery swapping station and the battery swapping cost.

[0186] The information of the target battery swap station may include, but is not limited to, one of identification information, location information, and distance information from the expected departure point of the target battery swap station.

[0187] Due to my country's tiered electricity policy, which means that market electricity prices fluctuate over time, the price of scheduled battery swaps will also fluctuate over time. When users place their scheduled battery swap orders, the price they estimate the replacement cost is often based on the current electricity price. This can cause a discrepancy between the actual replacement price and the price they receive, resulting in a poor user experience.

[0188] In this embodiment, the battery replacement cost corresponding to the target battery replacement station is estimated based on the electricity price at the time of expected arrival at the target battery replacement station. Compared with estimating the battery replacement cost based on the electricity price when sending the battery replacement reservation request (placing an order), it is closer to the actual battery replacement price, thereby reducing the gap between the estimated battery replacement cost and the actual battery replacement price and improving the user's battery replacement experience.

[0189] Optionally, in some embodiments, the above step S330 of determining the estimated arrival time at the target battery swap station may specifically include the following steps S331-S332.

[0190] S331, obtaining road condition information between the estimated departure time, the estimated departure location and the target battery swap station.

[0191] S332: Determine the estimated arrival time based on the estimated departure time, the distance between the estimated departure location and the target battery swap station, and road condition information.

[0192] The specific implementation of steps S331 and S332 in this embodiment can refer to the above S2231-S2232, and for the sake of brevity, they are not repeated here.

[0193] Optionally, in some embodiments, step S230 of sending a reservation response message may include: sending the battery replacement cost information when the battery replacement tag is the optimal duration.

[0194] In other words, when the user sets the battery swap tag to the optimal duration, the corresponding battery swap cost information is sent to the user. This can provide battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0195] Optionally, in some embodiments, as a third embodiment, as shown in FIG7 , the above-mentioned S220 for determining the battery replacement cost information may specifically include the following steps S410 - S430 .

[0196] S410, determining at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and required battery information.

[0197] The specific implementation of this step can refer to the above S221, and for the sake of brevity, it will not be repeated here.

[0198] S420, determining at least one battery swapping fee corresponding to at least one battery swapping station.

[0199] It should be understood that for the same battery swap request, the cost of swapping batteries from the scheduled departure location to at least one battery swap station may vary significantly depending on the distance, arrival time, etc. Different users have different requirements for battery swap fees or costs. After the cloud server determines the battery swap cost corresponding to at least one battery swap station, it can provide the user with the lowest or highest battery swap cost.

[0200] S430: Determine the lowest battery swapping fee among at least one battery swapping fee and the target battery swapping station corresponding to the lowest battery swapping fee. The battery swapping cost information includes information about the target battery swapping station and the lowest battery swapping fee.

[0201] In an embodiment of the present application, after the cloud server determines the lowest battery exchange fee, it determines the battery exchange station corresponding to the lowest battery exchange fee as the target battery exchange station, and sends the information of the target battery exchange station and the lowest battery exchange fee to the user, so that the user can directly view the battery exchange cost corresponding to the lowest cost, thereby improving the user's battery exchange experience.

[0202] Optionally, in some embodiments, as shown in FIG8 , the above S420 may specifically include:

[0203] S421, determining a scheduled arrival time at at least one battery swap station.

[0204] Specifically, the cloud server can estimate the expected arrival time of the user at the target battery swap station based on the expected departure time and the distance to the target battery swap station.

[0205] In one embodiment, the cloud server can estimate the energy consumption per 100 kilometers of the vehicle model based on the historical driving data of the vehicle model, and then estimate the time required for the vehicle to travel to the target battery swap station based on the energy consumption per 100 kilometers and the distance between the departure location and the battery swap station. Then, based on the expected departure time and the required time, the cloud server can estimate the expected arrival time at the target battery swap station.

[0206] In another implementation method, the vehicle's energy consumption per 100 kilometers can be estimated based on the user's historical driving data, and then the time required for the vehicle to travel to the target battery swap station can be estimated based on the energy consumption per 100 kilometers and the distance between the departure location and the battery swap station. Then, the expected arrival time at the target battery swap station can be estimated based on the expected departure time and the required time.

[0207] S422, determining at least one battery replacement fee based on the electricity price at the scheduled arrival time and the information of the required battery.

[0208] Due to my country's tiered electricity policy, which means electricity prices fluctuate over time, the price of scheduled battery swaps will also fluctuate over time. When users place their scheduled battery swap orders, the price they estimate the cost of the battery swap is often based on the current electricity price. This can cause a discrepancy between the actual price and the price they receive, resulting in a poor user experience.

[0209] In this embodiment, the electricity price at the estimated time of arrival at the battery swap station is used to estimate the battery swap cost corresponding to the battery swap station. Compared with estimating the battery swap cost by the electricity price when sending the battery swap appointment request (placing an order), this is closer to the actual battery swap price, and can reduce the gap between the estimated battery swap cost and the actual battery swap price, thereby improving the user's battery swap experience.

[0210] Optionally, in some embodiments, as shown in FIG9 , the above step S421 of determining the estimated arrival time at at least one battery swap station may specifically include the following steps S4211 - S4212 .

[0211] S4211, obtaining road condition information between the estimated departure time, the estimated departure location and at least one battery swap station.

[0212] It should be understood that the road condition information between different battery swap stations starting at the same time and from the same departure point is different. Specifically, the cloud server can obtain the road condition information between the estimated departure time and the estimated departure point and each of the at least one battery swap stations through big data.

[0213] It should also be understood that the above-mentioned road condition information includes road condition information between the expected departure point and each of the at least one battery swap station.

[0214] S4212: Determine an estimated arrival time based on the estimated departure time, the distance between the estimated departure location and at least one battery swap station, and road condition information.

[0215] Specifically, the cloud server can estimate the travel time from the expected departure point to each of the at least one battery swap stations based on the road condition information and distance corresponding to each station. The estimated arrival time at each battery swap station can be estimated based on the travel time required to reach each station and the estimated departure time.

[0216] It should be understood that the above-mentioned estimated arrival time includes the estimated arrival time from the estimated departure point to each of the at least one battery swap stations.

[0217] In an embodiment of the present application, the estimated arrival time at each battery swap station is estimated based on road condition information, which is closer to the actual arrival time than the estimated arrival time is estimated only by the distance between the estimated departure point and each battery swap station. In this way, the battery swap cost estimated based on the electricity price at the estimated arrival time is more reasonable and closer to the actual battery swap price, thereby improving the user's battery swap experience.

[0218] Optionally, in some embodiments, as shown in FIG10 , the above-mentioned S422 may include the following steps S4221-S4222 of determining the battery replacement cost corresponding to at least one battery replacement station based on the battery replacement reservation request.

[0219] S4221: Determine the estimated power consumption required to reach at least one battery swap station based on the estimated departure time and the estimated departure location.

[0220] It should be understood that when the user drives to the battery swap station, a certain amount of electricity will be consumed, and this amount of electricity will be recorded as pre-consumption electricity.

[0221] In one implementation, the cloud server can estimate the vehicle's energy consumption per 100 kilometers based on the historical driving data of the user's vehicle or the historical driving data of the vehicle model, and then estimate the vehicle's expected power consumption when traveling to each battery swap station based on the energy consumption per 100 kilometers and the distance between the expected departure point and each battery swap station, thereby obtaining the expected power consumption corresponding to each battery swap station.

[0222] In another implementation method, the cloud server can estimate the expected power consumption of the vehicle when traveling to each battery swap station based on the historical driving data of the user's vehicle or the historical driving data of the vehicle model, as well as the distance between the vehicle and each battery swap station and road condition information, thereby obtaining the expected power consumption corresponding to each battery swap station.

[0223] S4222: Determine the battery replacement cost of at least one battery replacement station based on the information of the required battery, the expected power consumption, and the electricity price at the estimated arrival time.

[0224] The required battery capacity refers to the capacity of the vehicle that the user expects after battery replacement. This capacity can be the capacity of a fully charged battery or the capacity of a partially charged battery.

[0225] The cost of battery replacement is generally calculated by the difference between the remaining power of the vehicle before the battery replacement and the remaining power of the vehicle after the battery replacement. When a user sends a request for battery replacement, the cloud server can only obtain the remaining power of the vehicle when the user sends the request for battery replacement (places an order), and cannot know the remaining power of the vehicle battery before the battery replacement. Therefore, when calculating the battery replacement cost, the cloud server does not take into account the pre-consumption power consumed by the vehicle when traveling to the battery replacement station, which will cause a gap between the battery replacement cost and the actual battery replacement cost. In this embodiment, the cloud server can take the impact of pre-consumption power into account when calculating the battery replacement cost to reduce the gap between the estimated battery replacement cost and the actual battery replacement cost.

[0226] It should be understood that the remaining power of the vehicle before the battery replacement should be the remaining power of the vehicle when the user sends the battery replacement reservation request (places an order) minus the pre-consumption power.

[0227] It should be understood that when actually calculating the battery swap price, it is generally estimated based on the electricity price at the time of battery swap and the remaining power of the vehicle at the time of battery swap, and not calculated according to the required battery power set when placing an order, that is, the battery swap cost = the electricity price at the actual battery swap time × (the power of the vehicle after battery swap - the power of the vehicle before battery swap).

[0228] For example, a user expects the vehicle's battery capacity after battery swapping to be 40 kWh. When placing an order, the vehicle's remaining battery capacity is 10 kWh. The power required to travel from the departure point to a battery swap station, i.e., the pre-consumption, is 3 kWh. Therefore, the vehicle's battery capacity before swapping should be 7 kWh. Therefore, when estimating the battery swap cost, the swapped battery capacity should be calculated as 40 - 7 = 33 kWh. In other words, the impact of pre-consumption should be considered when estimating the battery swap cost.

[0229] In the above implementation, when estimating the battery replacement cost, the cloud server takes into account the pre-consumption of electricity required from the departure point to the battery replacement station, and can estimate the battery replacement cost more reasonably to reduce the gap between the estimated battery replacement cost and the actual battery replacement price, thereby improving the user's battery replacement experience.

[0230] Optionally, in some embodiments, the above-mentioned step S230 of sending a reservation response message may include: sending battery replacement cost information when the battery replacement tag is the most cost-effective.

[0231] In other words, when the user sets the battery swap tag to the most cost-effective, the corresponding battery swap cost information is sent to the user. This can provide battery swap cost information based on the user's actual needs for the battery swap tag, thereby improving the user's battery swap experience.

[0232] Optionally, in some embodiments, the reservation response message may further include an estimated arrival time corresponding to the target battery swap station.

[0233] The estimated time of arrival can be a time point or a time period. Since the road conditions of a route may change over time or in actual conditions, the arrival time is also dynamic. When an accurate estimated time of arrival cannot be provided, a time period can be provided to the user.

[0234] The above embodiment, by carrying the estimated arrival time at the target battery swap station in the reservation response message, can facilitate the user to arrange other trips according to the estimated arrival time, thereby improving the user's battery swap experience.

[0235] Optionally, in some embodiments, as shown in FIG11 , method 200 may further include: S240, receiving a confirmation instruction, the confirmation instruction being used to confirm a reservation for battery replacement at a target battery replacement station corresponding to the battery replacement cost information.

[0236] Specifically, the cloud server can send the user the battery swap cost information corresponding to the default battery swap tag or the battery swap tag set by the user, as well as the target battery swap station information, and at the same time prompt whether to confirm the reservation. The user can decide whether to make an appointment for battery swapping at the target battery swap station based on the battery swap cost information corresponding to the battery swap reservation request. When the user confirms the appointment, he can click Confirm to send a confirmation instruction to the cloud server to confirm the appointment for battery swapping at the target battery swap station.

[0237] In this embodiment, in addition to providing the user with the battery replacement cost information corresponding to the battery replacement reservation request, the cloud server can provide the user with the service of reserving the target battery replacement station for battery replacement based on the user's confirmation instructions, thereby improving the user's battery replacement experience.

[0238] Figure 12 shows a schematic block diagram of a method 500 for reserving battery replacement according to an embodiment of the present application. The method 500 can be executed by a terminal device, for example, a mobile terminal such as a user's mobile phone or tablet. For another example, it can also be an in-vehicle terminal with a human-computer interaction interface. The embodiment of the present application does not limit the execution subject of the method 500. Optionally, as shown in Figure 12, the method 500 can include some or all of the following contents.

[0239] S510, sending a request for battery replacement reservation.

[0240] S520, receiving a reservation response message, the reservation response message including battery replacement cost information.

[0241] Optionally, in an embodiment of the present application, the battery replacement reservation request includes information on the expected departure location, information on the expected departure time, and information on the required battery.

[0242] Optionally, in the embodiment of the present application, the information of the required battery may include the power level of the required battery.

[0243] Optionally, in an embodiment of the present application, the information of the required batteries may also include at least one of the number of required batteries, the power of the required batteries, the SOH of the required batteries, the chemical system of the required batteries, the size of the required batteries, the type of the required batteries, and the mileage that the required batteries can travel.

[0244] Optionally, in an embodiment of the present application, the battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, best duration and shortest distance.

[0245] Optionally, in an embodiment of the present application, the method 500 may further include: S530, sending a confirmation instruction, the confirmation instruction being used to confirm that the target battery swap station corresponding to the scheduled battery swap cost information performs the battery swap.

[0246] The above describes in detail the method for scheduling battery replacement according to an embodiment of the present application. The following will describe the device for scheduling battery replacement according to an embodiment of the present application in combination with Figures 13 to 14. The technical features described in the method embodiment are applicable to the following device embodiments.

[0247] Figure 13 shows a schematic block diagram of a device 600 for scheduling battery replacement according to an embodiment of the present application. As shown in Figure 13, the device 600 may include some or all of the following contents.

[0248] The receiving module 610 is used to receive a request for battery replacement reservation.

[0249] The sending module 620 is used to send a reservation response message in response to the battery replacement reservation request.

[0250] Optionally, in an embodiment of the present application, the device 600 further includes a determination unit 630, which can be used to determine battery replacement cost information based on the received battery replacement reservation request.

[0251] It should be understood that the device 600 according to the embodiment of the present application may correspond to the cloud server in the embodiment of the method 200 of the present application, and the above-mentioned and other operations and / or functions of each unit in the device 600 are respectively for realizing the corresponding processes of the cloud server in the method 200 in Figures 2 to 11. For the sake of brevity, they will not be repeated here.

[0252] Figure 14 shows a schematic block diagram of a device 700 for scheduling battery replacement according to an embodiment of the present application. As shown in Figure 14, the device 700 may include some or all of the following contents.

[0253] The sending module 710 is used to send a request for battery replacement reservation.

[0254] The receiving module 720 is used to receive a reservation response message, which includes battery replacement cost information.

[0255] It should be understood that the device 700 according to the embodiment of the present application may correspond to the terminal device in the embodiment of the method 500 of the present application, and the above-mentioned and other operations and / or functions of each unit in the device 700 are respectively for realizing the corresponding processes of the terminal device in the method 500 in Figures 2 to 11. For the sake of brevity, they will not be repeated here.

[0256] As shown in FIG15 , an embodiment of the present application further provides a cloud server 800, which may be the apparatus 600 in FIG13 , and which can be used to execute the cloud server content corresponding to each method in FIG2 to FIG11 . The cloud server 800 shown in FIG15 includes a processor 810, which can call and execute a computer program from a memory to implement the method in the embodiment of the present application.

[0257] Optionally, as shown in FIG15 , the cloud server 800 may further include a memory 820 , wherein the processor 810 may call and execute a computer program from the memory 820 to implement the method in the embodiment of the present application.

[0258] The memory 820 may be a separate device independent of the processor 810 , or may be integrated into the processor 810 .

[0259] Optionally, as shown in FIG15 , the cloud server 800 may further include a transceiver 830 , and the processor 810 may control the transceiver 830 to communicate with other devices. Specifically, it may send information or data to other devices, or receive information or data sent by other devices.

[0260] The transceiver 830 may include a transmitter and a receiver. The transceiver 830 may further include an antenna, and the number of antennas may be one or more.

[0261] In a specific implementation, the sending unit and the receiving unit in the apparatus 600 may be implemented by the transceiver 830 in Figure 15. The acquiring unit and the generating unit in the apparatus 600 may be implemented by the processor 810 in Figure 15.

[0262] As shown in FIG16 , an embodiment of the present application further provides a terminal device 900, which may be the apparatus 700 in FIG14 , and which can be used to execute the content of the terminal device corresponding to FIG5 . The terminal device 900 shown in FIG16 includes a processor 910, which can call and execute a computer program from a memory to implement the method in the embodiment of the present application.

[0263] Optionally, as shown in FIG16 , the terminal device 900 may further include a memory 920 , wherein the processor 910 may call and execute a computer program from the memory 920 to implement the method in the embodiment of the present application.

[0264] The memory 920 may be a separate device independent of the processor 910 , or may be integrated into the processor 910 .

[0265] Optionally, as shown in FIG16 , the terminal device 900 may further include a transceiver 930 , and the processor 910 may control the transceiver 930 to communicate with other devices. Specifically, the transceiver 930 may send information or data to other devices, or receive information or data sent by other devices.

[0266] The transceiver 930 may include a transmitter and a receiver. The transceiver 930 may further include an antenna, and the number of antennas may be one or more.

[0267] In a specific implementation, the sending unit and the receiving unit in the apparatus 700 may be implemented by the transceiver 930 in FIG. 16 .

[0268] Optionally, an embodiment of the present application further provides a chip, including a processor, which can call and run a computer program from a memory to implement the method in the embodiment of the present application.

[0269] Optionally, an embodiment of the present application further provides a computer-readable storage medium for storing a computer program, which enables a computer to execute the method in the embodiment of the present application.

[0270] Optionally, an embodiment of the present application further provides a computer program product, including computer program instructions, which enable a computer to execute the method in the embodiment of the present application.

[0271] Optionally, the embodiments of the present application further provide a computer program that enables a computer to execute the method in the embodiments of the present application.

[0272] It should be understood that the processor of the embodiments of the present application may be an integrated circuit chip with signal processing capabilities. During implementation, each step of the above method embodiment can be completed by hardware integrated logic circuits in the processor or software instructions. The above processor can be a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components. The various methods, steps, and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or any conventional processor. The steps of the method disclosed in the embodiments of the present application can be directly embodied as being executed by a hardware decoding processor, or can be executed by a combination of hardware and software modules in the decoding processor. The software module can be located in a storage medium mature in the art, such as random access memory, flash memory, read-only memory, programmable read-only memory, electrically erasable programmable memory, registers, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.

[0273] It is understood that the memory in the embodiments of the present application may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct RAM bus random access memory (DR RAM). It should be noted that the memory of the systems and methods described herein is intended to include, but is not limited to, these and any other suitable types of memory.

[0274] Although the present application has been described with reference to preferred embodiments, various modifications may be made thereto and components may be substituted with equivalents without departing from the scope of the present application. In particular, the various technical features described in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present application is not limited to the specific embodiments disclosed herein, but encompasses all technical solutions within the scope of the claims.

Claims

1. A method for booking battery replacement, characterized in that: include: Receive reservation requests for battery replacement; In response to the battery replacement reservation request, sending a reservation response message; Wherein, the reservation response message includes battery replacement cost information.

2. The method according to claim 1, characterized in that The battery replacement reservation request includes information on the expected departure location, expected departure time and required battery.

3. The method according to claim 2, characterized in that The information of the required battery includes the power level of the required battery.

4. The method according to claim 3, characterized in that The information of the demand battery also includes at least one of the number of the demand battery, the health state SOH of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery and the mileage that the demand battery can travel.

5. The method according to any one of claims 2 to 4, characterized in that The battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, best duration and shortest distance.

6. The method according to any one of claims 2 to 5, characterized in that Before sending the reservation response message, the method further includes: The battery replacement cost information is determined based on the battery replacement reservation request.

7. The method according to claim 6, characterized in that Determining the battery replacement cost information includes: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determine a target battery swap station among the at least one battery swap station that is closest to the estimated departure location; Determining an estimated arrival time at the target battery swap station; Determine the battery replacement fee according to the electricity price at the estimated arrival time and the information of the required battery; Among them, the battery replacement cost information includes the information of the target battery replacement station and the battery replacement fee.

8. The method according to claim 7, characterized in that The determining of the estimated arrival time at the target battery swap station includes: Acquire the road condition information between the estimated departure location and the target battery swap station at the estimated departure time; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information.

9. The method according to any one of claims 7 or 8, characterized in that The sending of the reservation response message includes: sending the battery replacement cost information when the battery replacement tag is the closest.

10. The method according to claim 6, characterized in that Determining the battery replacement cost information includes: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determine a target battery swap station corresponding to the shortest time required to reach the at least one battery swap station; Determining an estimated arrival time at the target battery swap station; Determine the battery replacement fee based on the electricity price at the estimated time and the information of the required battery; Among them, the battery replacement cost information includes the information of the target battery replacement station and the battery replacement fee.

11. The method according to claim 10, characterized in that The determining of the estimated arrival time at the target battery swap station includes: Acquire the road condition information between the estimated departure location and the target battery swap station at the estimated departure time; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information.

12. The method according to claim 10 or 11, characterized in that: The sending of the reservation response message includes: sending the battery replacement cost information when the battery replacement tag is the optimal duration.

13. The method according to claim 6, characterized in that Determining the battery replacement cost information includes: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determining at least one battery swapping fee corresponding to the at least one battery swapping station; Determine a minimum battery swapping fee among the at least one battery swapping fee, and a target battery swapping station corresponding to the minimum battery swapping fee; Among them, the battery replacement cost information includes the information of the target battery replacement station and the minimum battery replacement fee.

14. The method according to claim 13, characterized in that The determining of at least one battery swapping fee corresponding to the at least one battery swapping station comprises: Determining a scheduled arrival time at the at least one battery swap station; The at least one battery replacement fee is determined based on the electricity price at the scheduled arrival time and the information of the required battery.

15. The method according to claim 14, characterized in that The determining of the estimated arrival time at the at least one battery swap station comprises: Acquire, at the estimated departure time, road condition information between the estimated departure location and the at least one battery swap station; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure location and the at least one battery swap station, and the road condition information.

16. The method according to claim 14 or 15, characterized in that The determining, according to the battery swap reservation request, a battery swap cost corresponding to at least one battery swap station comprises: Determining the estimated power consumption required to reach the at least one battery swap station according to the estimated departure time and the estimated departure location; The battery replacement cost of the at least one battery replacement station is determined based on the information of the demand battery, the expected power consumption and the electricity price at the estimated arrival time.

17. The method according to any one of claims 13 to 16, characterized in that The sending of the reservation response message includes: sending the battery replacement cost information when the battery replacement tag is the most cost-effective.

18. The method according to any one of claims 7 to 17, characterized in that The reservation response message also includes an estimated arrival time corresponding to the target battery swap station.

19. The method according to any one of claims 1 to 18, characterized in that The method further comprises: Receive a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

20. A method for booking battery replacement, characterized in that: include: Send a request for battery replacement appointment; A reservation response message is received, wherein the reservation response message includes battery replacement cost information.

21. The method according to claim 20, characterized in that The battery replacement reservation request includes information on the expected departure location, expected departure time and required battery.

22. The method according to claim 21, characterized in that The information of the required battery includes the power level of the required battery.

23. The method according to claim 22, characterized in that The information of the demand battery also includes at least one of the number of the demand battery, the health state SOH of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery and the mileage that the demand battery can travel.

24. The method according to any one of claims 21 to 23, characterized in that The battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, best duration and shortest distance.

25. The method according to any one of claims 20 to 24, characterized in that The method also includes: sending a confirmation instruction, wherein the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

26. A device for scheduling battery replacement, characterized in that: include: A receiving unit, used for receiving a request for battery replacement reservation; A sending unit, configured to send a reservation response message in response to the reservation request for battery replacement; Wherein, the reservation response message includes battery replacement cost information.

27. The device according to claim 26, characterized in that The battery replacement reservation request includes information on the expected departure location, expected departure time and required battery.

28. The device according to claim 27, characterized in that The information of the required battery includes the power level of the required battery.

29. The device according to claim 28, characterized in that The information of the demand battery also includes at least one of the number of the demand battery, the health state SOH of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery and the mileage that the demand battery can travel.

30. The device according to any one of claims 27 to 29, characterized in that The battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, best duration and shortest distance.

31. The device according to any one of claims 27 to 30, characterized in that The device also includes a determination unit, which is used to determine the battery replacement cost information based on the received battery replacement reservation request.

32. The device according to claim 31, characterized in that The determining unit is used for: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determine a target battery swap station among the at least one battery swap station that is closest to the estimated departure location; Determining an estimated arrival time at the target battery swap station; Determine the battery replacement fee according to the electricity price at the estimated arrival time and the information of the required battery; Among them, the battery replacement cost information includes the information of the target battery replacement station and the battery replacement fee.

33. The device according to claim 32, characterized in that The determining unit is used for: Acquire the road condition information between the estimated departure location and the target battery swap station at the estimated departure time; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information.

34. The device according to any one of claims 32 or 33, characterized in that The sending unit is used to send the battery replacement cost information when the battery replacement tag is at the shortest distance.

35. The device according to claim 31, characterized in that The determining unit is used for: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determine a target battery swap station corresponding to the shortest time required to reach the at least one battery swap station; Determining an estimated arrival time at the target battery swap station; Determine the battery replacement fee based on the electricity price at the estimated time and the information of the required battery; Among them, the battery replacement cost information includes the information of the target battery replacement station and the battery replacement fee.

36. The device according to claim 35, characterized in that The determining unit is used for: Acquire the road condition information between the estimated departure location and the target battery swap station at the estimated departure time; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure point and the target battery swap station, and the road condition information.

37. The device according to claim 35 or 36, characterized in that The sending unit is used to send the battery replacement cost information when the battery replacement label is the optimal duration.

38. The device according to claim 31, characterized in that The determining unit is used for: Determine at least one battery swap station within a preset distance range of the expected departure location that meets the expected departure time and the required battery information; Determining at least one battery swapping fee corresponding to the at least one battery swapping station; Determine a minimum battery swapping fee among the at least one battery swapping fee, and a target battery swapping station corresponding to the minimum battery swapping fee; Among them, the battery replacement cost information includes the information of the target battery replacement station and the minimum battery replacement fee.

39. The device according to claim 38, characterized in that The determining unit is used for: Determining a scheduled arrival time at the at least one battery swap station; The at least one battery replacement fee is determined based on the electricity price at the scheduled arrival time and the information of the required battery.

40. The device according to claim 39, characterized in that The determining unit is used for: Acquire, at the estimated departure time, road condition information between the estimated departure location and the at least one battery swap station; The estimated arrival time is determined according to the estimated departure time, the distance between the estimated departure location and the at least one battery swap station, and the road condition information.

41. The device according to claim 39 or 40, characterized in that The determining unit is used for: Determining the estimated power consumption required to reach the at least one battery swap station according to the estimated departure time and the estimated departure location; The battery replacement cost of the at least one battery replacement station is determined based on the information of the demand battery, the expected power consumption and the electricity price at the estimated arrival time.

42. The device according to any one of claims 38 to 41, characterized in that The sending unit is used to send the battery replacement cost information when the battery replacement label is the most cost-effective.

43. The device according to any one of claims 33 to 42, characterized in that The reservation response message also includes an estimated arrival time corresponding to the target battery swap station.

44. The device according to any one of claims 26 to 43, characterized in that The receiving unit is also used for: Receive a confirmation instruction, where the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

45. A device for scheduling battery replacement, characterized in that: include: Send a request for battery replacement appointment; A reservation response message is received, wherein the reservation response message includes battery replacement cost information.

46. ​​The device according to claim 45, characterized in that The battery replacement reservation request includes information on the expected departure location, expected departure time and required battery.

47. The device according to claim 46, characterized in that The information of the required battery includes the power level of the required battery.

48. The device according to claim 47, characterized in that The information of the demand battery also includes at least one of the number of the demand battery, the health state SOH of the demand battery, the chemical system of the demand battery, the size of the demand battery, the type of the demand battery and the mileage that the demand battery can travel.

49. The device according to any one of claims 46 to 48, characterized in that The battery replacement reservation request also includes a battery replacement tag, and the battery replacement tag is one of the best cost, best duration and shortest distance.

50. The device according to any one of claims 45 to 49, characterized in that The method also includes: sending a confirmation instruction, wherein the confirmation instruction is used to confirm the reservation for battery replacement at the target battery replacement station corresponding to the battery replacement cost information.

51. A cloud server, characterized in that: The method comprises a memory and a processor, wherein the memory is used to store instructions, and the processor is used to read the instructions and execute the method according to any one of claims 1 to 19 according to the instructions.

52. A terminal device, characterized in that: The method comprises a memory and a processor, wherein the memory is used to store instructions, and the processor is used to read the instructions and execute the method according to any one of claims 20 to 25 according to the instructions.

53. A computer-readable storage medium, characterized in that: Used to store a computer program, wherein the computer program causes a computer to execute the method according to any one of claims 1 to 19, or the method according to any one of claims 20 to 25.

54. A chip, characterized in that: It comprises a processor, which is used to call and run a computer program from a memory, so that a device equipped with the chip executes the method according to any one of claims 1 to 19, or the method according to any one of claims 20 to 25.

Citation Information

Patent Citations

  • Charge and battery replacement appointment method based on time and space scheduling and charge and battery replacement appointment device thereof

    CN106127320A

  • Battery replacement reservation method and system and computer readable storage medium

    CN110782056A

  • Power battery replacement reservation method, computer equipment and readable storage medium

    CN110826744A

  • Battery replacing station control method

    CN113547951A

  • Battery replacement method for electric vehicle

    CN113657631A