Method and system for detecting amount of over-excavation and under-excavation of tunnel surrounding rock, storage medium, and terminal
Three-dimensional laser scanning technology is used to obtain and compare tunnel data and generate a three-dimensional model of over- and under-excavation, which solves the problem of difficulty in quickly and accurately determining the over- and under-excavation of tunnels in the existing technology, and improves the stability of tunnel surrounding rocks and construction efficiency.
Patent Information
- Application Number
- PCT/CN2023/113274
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-18
- Filing Date
- 2023-08-16
- Publication Date
- 2024-10-24
AI Technical Summary
It is difficult to quickly and accurately determine the specific location and parameter data of over and under excavation in the tunnel with existing technology, which affects the overall stability of the tunnel's surrounding rock and the construction cost.
Three-dimensional laser scanning technology is used to obtain photo data and three-dimensional point cloud data of the tunnel section, and a scene three-dimensional model and a real three-dimensional model are established. By comparing the real three-dimensional model and the designed three-dimensional model, an over-under-excavation three-dimensional model is generated, and its time stamp is marked. parameters to achieve fast and accurate positioning and analysis.
It improves the efficiency of rapid positioning and risk analysis of over- and under-excavated areas in the tunnel, and ensures the stability of the surrounding rock of the tunnel and construction efficiency.
Smart Images

Figure CN2023113274_24102024_PF_FP_ABST
Abstract
Description
Tunnel surrounding rock over-excavation and under-excavation detection method, system, storage medium and terminal Technical Field
[0001] The present invention relates to the technical field of tunnel detection, and in particular to a method and system for detecting over-excavation and under-excavation of tunnel surrounding rock, a storage medium and a terminal. Background Art
[0002] Tunnel overbreak and underbreak refers to the deviation between the surrounding rock profile formed during tunnel excavation and the designed excavation profile. The portion of the surrounding rock profile outside the designed excavation profile is called overbreak, while the portion within the designed excavation profile is called underbreak.
[0003] During tunnel excavation, over-excavation and under-excavation are common. This not only increases construction costs but also causes localized stress concentration in the tunnel's surrounding rock, impacting the tunnel's overall stability. Three-dimensional laser scanning technology, a new technology discovered this century, has been widely used in surveying and mapping. It utilizes the principle of laser ranging to record the 3D coordinates, reflectivity, and texture information of a large number of densely packed points on the surface of the measured object. This technology can rapidly reconstruct a 3D model of the measured target and various mapping data, including line, surface, and volume data. This unique technical feature has led to extensive research in the field of tunnel surveying.
[0004] However, existing methods for detecting tunnel overbreak and underbreak cannot quickly and accurately determine the specific location of the overbreak and underbreak in the tunnel and the parameter data of the overbreak and underbreak.
[0005] Summary of the Invention
[0006] In order to solve the above technical problems, the present invention provides a method and system for detecting over-excavation and under-excavation of tunnel surrounding rock, a storage medium and a terminal.
[0007] The present invention adopts the following technical solution: a method for detecting over-excavation and under-excavation of tunnel surrounding rock, the method comprising:
[0008] Divide the tunnel surrounding rock into multiple tunnel segments;
[0009] Acquire photo data and three-dimensional point cloud data of the tunnel section, wherein the photo data and the three-dimensional point cloud data corresponding to each tunnel section have the same time stamp;
[0010] Acquiring design data of the tunnel surrounding rock, and establishing a design three-dimensional model of the tunnel surrounding rock based on the design data;
[0011] Establishing a scene three-dimensional model of the tunnel surrounding rock based on the photo data, and establishing a real three-dimensional model of the tunnel surrounding rock based on the three-dimensional point cloud data;
[0012] Comparing the actual three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data;
[0013] The overbreak and underbreak three-dimensional model and its model parameters are marked at corresponding positions in the scene three-dimensional model according to the time stamp.
[0014] According to an embodiment of the present invention, a method for detecting overbreak and underbreak of tunnel surrounding rock can determine a scene 3D model based on photographic data, a real 3D model based on 3D point cloud data, and a designed 3D model of the tunnel surrounding rock based on design data. The overbreak and underbreak 3D model can be determined by analyzing and comparing the real 3D model and the designed 3D model. Since the overbreak and underbreak 3D model is determined by the real 3D model and the designed 3D model, the overbreak and underbreak 3D model can correspond to the real 3D model. The real 3D model is determined by 3D point cloud data, and the 3D point cloud data and photographic data are associated with a time stamp. Therefore, the overbreak and underbreak 3D model can correspond to the scene 3D model via the time stamp. The overbreak and underbreak 3D model and its model parameters can be marked at corresponding locations in the scene 3D model. In this way, designers can quickly and accurately view the marked overbreak and underbreak 3D model and its model parameters in the scene 3D model, thereby quickly and accurately locating the overbreak and underbreak areas in the tunnel. Furthermore, the model parameters can be used to quickly and accurately analyze and determine the overbreak and underbreak areas, promptly identify risks, and effectively improve work efficiency.
[0015] Furthermore, the step of obtaining the photo data and three-dimensional point cloud data of the tunnel section specifically includes:
[0016] S201: Associating a multi-channel photographing device with a 3D laser scanning device, so that the multi-channel photographing device and the 3D laser scanning device are synchronously activated at an end of the tunnel section near the entrance of the tunnel surrounding rock; wherein the photographing range of the multi-channel photographing device covers at least the range of a single tunnel section, and the scanning range of the 3D laser scanning device covers at least the range of a single tunnel section, and the initial positions of the multi-channel photographing device and the 3D laser scanning device are at the entrance of the tunnel surrounding rock;
[0017] S202: Starting the multi-channel photographing device and the three-dimensional laser scanning device to start static photographing and static scanning;
[0018] S203: Using a timestamp when the multi-channel photographing device or the 3D laser scanning device is started as the timestamp, and associating the timestamp with the photographic data and the 3D point cloud data generated in the tunnel section, respectively;
[0019] S204: When the multi-channel photographing device and the 3D laser scanning device complete static photographing and static scanning, respectively, at one end of the tunnel segment, the multi-channel photographing device and the 3D laser scanning device are turned off and moved to an end of the next tunnel segment near the tunnel surrounding rock entrance;
[0020] S205: Repeat the above steps S202 to S204 to obtain multiple sets of the photo data and multiple sets of the three-dimensional point cloud data corresponding to the multiple tunnel sections.
[0021] Furthermore, the steps of establishing a scene 3D model of the tunnel surrounding rock based on the photo data and establishing a true 3D model of the tunnel surrounding rock based on the 3D point cloud data specifically include:
[0022] Using oblique photography technology to build a three-dimensional model of the tunnel section scene corresponding to the tunnel section for each set of photo data;
[0023] splicing the three-dimensional models of the tunnel section scenes in the order of the time stamps to obtain the three-dimensional model of the scene corresponding to the tunnel surrounding rock;
[0024] Performing noise reduction processing on the three-dimensional point cloud data according to the difference method and the mean method;
[0025] Using the Delaunay triangulation modeling method for each group of the three-dimensional point cloud data after noise reduction to establish a real three-dimensional model of the tunnel section corresponding to the tunnel section;
[0026] The real three-dimensional models of the tunnel sections are spliced in the order of time stamps to obtain the real three-dimensional model corresponding to the tunnel surrounding rock.
[0027] Furthermore, the step of comparing the actual three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data specifically includes:
[0028] Overlapping the common characteristic lines or points with the same distribution characteristics of the real three-dimensional model and the designed three-dimensional model;
[0029] Preprocessing the real three-dimensional model and the designed three-dimensional model using a difference method;
[0030] The three-dimensional point cloud data overlapping with the designed three-dimensional model in the real three-dimensional model preprocessed by the difference method is deleted, and the model composed of the remaining three-dimensional point cloud data in the real three-dimensional model is the over-and-underbreak three-dimensional model.
[0031] Furthermore, the steps of the difference method specifically include:
[0032] Taking a plurality of row difference points with equal spacing on the tunnel centerline of the real 3D model, extending the row difference points along the radius of the real 3D model to obtain a first intersection point with the real 3D model and a second intersection point with the designed 3D model;
[0033] Calculating an intersection distance between the first intersection point and the second intersection point, and if the intersection distance is greater than a preset threshold distance, deleting the three-dimensional point cloud data corresponding to the first intersection point and deleting the design data corresponding to the second intersection point;
[0034] If the intersection distance is less than or equal to a preset threshold distance, the first intersection point and the second intersection point are retained.
[0035] Furthermore, the step of marking the overbreak and underbreak three-dimensional model and its parameters at corresponding positions in the scene three-dimensional model according to the time stamp specifically includes:
[0036] making the overbreak and underbreak three-dimensional model correspond to the scene three-dimensional model according to the time stamp;
[0037] Obtaining model parameters of the over-break and under-break three-dimensional model, wherein the model parameters include the over-break and under-break amount, the over-break risk value, and the under-break risk value;
[0038] The overbreak and underbreak three-dimensional model and the model parameters are marked at positions corresponding to the scene three-dimensional model by color marking or shadow marking.
[0039] Furthermore, the step of obtaining the model parameters of the overbreak and underbreak three-dimensional model specifically includes:
[0040] Reversing the overbreak and underbreak three-dimensional model to obtain a model in which the real three-dimensional model and the designed three-dimensional model overlap;
[0041] Obtain a cross-sectional view when the real three-dimensional model and the designed three-dimensional model overlap, place the cross-sectional view in the first quadrant of the two-dimensional coordinate system, and obtain the over-excavation and under-excavation amount D i :
[0042] Among them, (x i ,y i ) is the coordinate of the i-th point on the cross-sectional profile of the real three-dimensional model in the cross-sectional view, (x k ,y k )、(x j ,y j ) are the coordinates of the kth point and the jth point that intersect the cross-sectional contour of the designed three-dimensional model when the i-th point is connected to the origin of the two-dimensional coordinate system, and the j-th point is close to the origin of the two-dimensional coordinate system; if the over-excavation amount Di If the over-excavation amount D is greater than 0, it means that the area is an over-excavation area. i Less than 0 means that the area is undercut. If the over-undercut amount D i Equal to 0 means that the area is a standard area;
[0043] According to the over-excavation and under-excavation amount D i Get the over-excavation risk value F i And the undercut risk value E i :
[0044] Among them, max A i is the maximum allowable over-excavation value, max A i >|G i |,max B i is the maximum allowable undercut value, max B i >|G i |.
[0045] The present invention also provides a system for detecting over-excavation and under-excavation of surrounding rock in a tunnel, the system comprising:
[0046] Segmentation module, used to divide the tunnel surrounding rock into multiple tunnel segments;
[0047] a first acquisition module, configured to acquire photo data and three-dimensional point cloud data of the tunnel segment, wherein the photo data and the three-dimensional point cloud data corresponding to each tunnel segment have the same time stamp;
[0048] A second acquisition module is used to acquire design data of the tunnel surrounding rock and establish a design three-dimensional model of the tunnel surrounding rock according to the design data;
[0049] A building module, configured to build a scene three-dimensional model of the tunnel surrounding rock based on the photo data, and to build a real three-dimensional model of the tunnel surrounding rock based on the three-dimensional point cloud data;
[0050] a comparison module, configured to compare the real three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data;
[0051] A marking module is used to mark the overbreak and underbreak three-dimensional model and its model parameters at corresponding positions in the scene three-dimensional model according to the time stamp.
[0052] A tunnel surrounding rock overbreak and underbreak detection system according to an embodiment of the present invention can determine a scene 3D model based on photographic data, a real 3D model based on 3D point cloud data, and a designed 3D model of the tunnel surrounding rock based on design data. The overbreak and underbreak 3D model can be determined by analyzing and comparing the real 3D model and the designed 3D model. Because the overbreak and underbreak 3D model is determined by the real 3D model and the designed 3D model, it can correspond to the real 3D model. The real 3D model is determined by 3D point cloud data, and the 3D point cloud data and photographic data are associated with a time stamp. Therefore, the overbreak and underbreak 3D model can correspond to the scene 3D model via the time stamp. The overbreak and underbreak 3D model and its model parameters can be marked at corresponding locations in the scene 3D model. In this way, designers can quickly and accurately view the marked overbreak and underbreak 3D model and its model parameters in the scene 3D model, thereby quickly and accurately locating the overbreak and underbreak areas in the tunnel. Furthermore, the model parameters can be used to quickly and accurately analyze and determine the overbreak and underbreak areas, promptly identify risks, and effectively improve work efficiency.
[0053] A computer-readable storage medium includes instructions, which, when executed on a computer, enable the computer to execute the above-mentioned method for detecting over-break and under-break of surrounding rock of a tunnel.
[0054] A terminal comprising: a processor and a memory; the processor and the memory communicate with each other;
[0055] The memory is used to store instructions;
[0056] The processor is used to execute the instructions in the memory and perform the above-mentioned method for detecting over-break and under-break of tunnel surrounding rock. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0058] FIG1 is a flow chart of a method for detecting overbreak and underbreak of surrounding rock in a tunnel according to a first embodiment of the present invention;
[0059] FIG2 is a flow chart of obtaining photo data and three-dimensional point cloud data in a method for detecting overbreak and underbreak of tunnel surrounding rock according to a first embodiment of the present invention;
[0060] 3 is a cross-sectional view of a method for detecting over-excavation and under-excavation of surrounding rock of a tunnel according to a first embodiment of the present invention;
[0061] FIG4 is a second cross-sectional view of the method for detecting over-excavation and under-excavation of surrounding rock of a tunnel according to the first embodiment of the present invention;
[0062] FIG5 is a structural block diagram of a tunnel surrounding rock overbreak and underbreak detection system according to a second embodiment of the present invention. DETAILED DESCRIPTION
[0063] The following describes embodiments of the present invention in detail, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the embodiments of the present invention, and should not be construed as limiting the present invention.
[0064] In the description of the embodiments of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.
[0065] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of the technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present invention, "plurality" means two or more, unless otherwise specifically defined.
[0066] In the embodiments of the present invention, unless otherwise expressly specified or limited, the terms "installed," "connected," "connected," "fixed," etc. should be understood in a broad sense. For example, they may refer to fixed connection, detachable connection, or integration; mechanical connection or electrical connection; direct connection or indirect connection through an intermediate medium; internal communication between two components or interaction between two components. Those skilled in the art will understand the specific meanings of the above terms in the embodiments of the present invention based on specific circumstances.
[0067] Example 1
[0068] 1 to 4 , a first embodiment of the present invention provides a method for detecting overbreak and underbreak of surrounding rock in a tunnel, the method comprising:
[0069] S1: Divide the tunnel surrounding rock into multiple tunnel segments;
[0070] In this embodiment, considering that the tunnel surrounding rock is long, the shooting range of the multi-channel camera equipment is limited, and if the shooting range is too large, the photo data will not be clear enough, which will affect the clarity of the determined three-dimensional model of the scene. Therefore, the tunnel surrounding rock can be segmented first. In specific implementation, the tunnel surrounding rock can be segmented once at preset distances along the extension direction of the tunnel surrounding rock. Moreover, it should be noted that the more segments the tunnel surrounding rock is divided into, the more accurate the obtained three-dimensional model of the scene and the real three-dimensional model will be.
[0071] S2: Acquire photo data and 3D point cloud data of the tunnel segment, wherein the photo data and 3D point cloud data corresponding to each tunnel segment have the same time stamp; the specific steps include:
[0072] S201: Associating a multi-channel camera with a 3D laser scanning device, so that the multi-channel camera and the 3D laser scanning device are simultaneously activated at an end of the tunnel section near the tunnel surrounding rock entrance; wherein the camera range of the multi-channel camera covers at least the range of a single tunnel section, and the scanning range of the 3D laser scanning device covers at least the range of a single tunnel section, and the initial positions of the multi-channel camera and the 3D laser scanning device are at the tunnel surrounding rock entrance;
[0073] S202: Start the multi-channel camera and the 3D laser scanning device to start static photography and static scanning;
[0074] S203: Using the timestamp when the multi-channel photographing device or the 3D laser scanning device is started as a timestamp, and associating the timestamp with the photographic data and 3D point cloud data generated in the tunnel section respectively;
[0075] S204: When the multi-channel photographing device and the 3D laser scanning device complete static photographing and static scanning at one end of the tunnel section, respectively, the multi-channel photographing device and the 3D laser scanning device are turned off and moved to the end of the next tunnel section near the tunnel surrounding rock entrance;
[0076] S205: Repeat the above steps S202 to S204 to obtain multiple sets of photo data and multiple sets of three-dimensional point cloud data corresponding to multiple tunnel sections.
[0077] In this embodiment, the multi-channel camera and the three-dimensional laser scanning device are both installed on the same vehicle-mounted device. The multi-channel camera can capture the internal conditions of the tunnel surrounding rock from multiple angles. In specific implementation, four-channel camera devices can be set up to capture the tunnel surrounding rock in all directions, up and down, left and right. The three-dimensional laser scanning device can use the principle of laser ranging to quickly reconstruct a three-dimensional model of the measured target by recording the three-dimensional coordinates, reflectivity, texture and other information of points on the surface of the measured object. This embodiment uses a combination of technologies such as a three-dimensional laser scanning device, a global positioning system (GPS), an inertial measurement unit (IMU) and an odometer to scan the tunnel surrounding rock. Specifically, GPS is used to provide positioning information outside the tunnel, and the IMU and odometer are used to provide positioning information when the GPS signal is lost inside the tunnel.
[0078] S3: Obtain design data of the tunnel surrounding rock and establish a design 3D model of the tunnel surrounding rock based on the design data;
[0079] In this embodiment, the design data is data generated by the designer when designing the tunnel surrounding rock according to safety standards.
[0080] S4: Establishing a three-dimensional model of the tunnel surrounding rock scene based on the photo data, and establishing a true three-dimensional model of the tunnel surrounding rock based on the three-dimensional point cloud data; the steps specifically include:
[0081] Each set of photo data is used to establish a three-dimensional model of the tunnel section scene corresponding to the tunnel section using the oblique photography technology;
[0082] The three-dimensional models of the tunnel scene are spliced in the order of time stamps to obtain a three-dimensional model of the scene corresponding to the tunnel surrounding rock;
[0083] De-noising the 3D point cloud data using the difference and mean methods. This is because the air inside the tunnel surrounding rock is turbid, contains a large amount of suspended solids, and contains a large number of construction objects. Therefore, de-noising and other processing are required on the acquired 3D point cloud data.
[0084] Each set of 3D point cloud data after noise reduction is used to build a real 3D model of the tunnel section corresponding to the tunnel section using the Delaunay triangulation modeling method;
[0085] The real 3D models of the tunnel sections are spliced in the order of time stamps to obtain a real 3D model corresponding to the tunnel surrounding rock.
[0086] S5: Compare the actual 3D model with the designed 3D model to obtain a 3D model of over-excavation and under-excavation composed of 3D point cloud data. The steps specifically include:
[0087] Overlapping the common characteristic lines or points with the same distribution characteristics of the real 3D model and the designed 3D model;
[0088] The real 3D model and the designed 3D model are preprocessed using the difference method;
[0089] The 3D point cloud data that overlaps with the design 3D model in the real 3D model preprocessed by the difference method is deleted, and the model composed of the remaining 3D point cloud data in the real 3D model is the over-excavation and under-excavation 3D model;
[0090] The steps of the differential method include:
[0091] A plurality of difference points with equal spacing are selected on the tunnel centerline of the real 3D model, and the difference points are extended along the radius of the real 3D model to obtain a first intersection point with the real 3D model and a second intersection point with the designed 3D model;
[0092] Calculating the intersection distance between the first intersection point and the second intersection point, and if the intersection distance is greater than a preset threshold distance, deleting the three-dimensional point cloud data corresponding to the first intersection point and deleting the design data corresponding to the second intersection point;
[0093] If the intersection point distance is less than or equal to a preset threshold distance, the first intersection point and the second intersection point are retained.
[0094] In this embodiment, the accuracy of the real three-dimensional model can be improved by using the difference method to delete three-dimensional points and data with large errors; in this embodiment, the tunnel centerline of the real three-dimensional model is overlapped with the tunnel centerline of the designed three-dimensional model, so that the real three-dimensional model and the designed three-dimensional model can roughly overlap, and the non-overlapping model area is the over-excavation and under-excavation three-dimensional model.
[0095] S6: Marking the over-excavation and under-excavation 3D model and its model parameters at corresponding positions in the scene 3D model according to the time stamp; the steps specifically include:
[0096] Make the over-excavation and under-excavation three-dimensional model correspond to the scene three-dimensional model according to the time stamp;
[0097] Obtaining model parameters of the over-excavation and under-excavation three-dimensional model, wherein the model parameters include the over-excavation and under-excavation amount, the over-excavation risk value, and the under-excavation risk value;
[0098] Mark the over-excavation and under-excavation 3D model and model parameters at corresponding positions on the scene 3D model by color marking or shading;
[0099] The steps of obtaining the model parameters of the overbreak and underbreak three-dimensional model specifically include:
[0100] The over-excavation and under-excavation 3D model is reversed to obtain a model in which the real 3D model and the designed 3D model coincide with each other;
[0101] Obtain the cross-sectional view when the real 3D model and the designed 3D model coincide, place the cross-sectional view in the first quadrant of the 2D coordinate system, and obtain the over-excavation and under-excavation amount D i :
[0102] Among them, (x i ,y i ) is the coordinate of the i-th point on the cross-sectional contour of the real three-dimensional model in the cross-sectional view, denoted as C1, (x k ,y k )、(x j ,y j ) are the coordinates of the kth point and the jth point that intersect the cross-sectional contour of the designed three-dimensional model when the i-th point is connected to the origin of the two-dimensional coordinate system, respectively, and are denoted as C2 and C3. The j-th point is close to the origin of the two-dimensional coordinate system, as shown in Figures 3 and 4. If the over-excavation amount D i If the over-excavation amount D is greater than 0, it means that the area is over-excavation area. i Less than 0 means the area is under-excavated. If the over-excavation amount D i Equal to 0 means that the area is a standard area;
[0103] According to the over-excavation and under-excavation amount D i Get the over-excavation risk value F i and under-excavation risk value E i :
[0104] Among them, max A i is the maximum allowable over-excavation value, max A i >|G i |,max B i is the maximum allowable undercut value, max B i >|G i |.
[0105] In this embodiment, the cross-sectional view is a plane obtained by projecting the three-dimensional model after the real three-dimensional model and the designed three-dimensional model overlap along a plane perpendicular to the extension direction of the tunnel surrounding rock. In this cross-sectional view, the real cross-sectional outline of the tunnel surrounding rock, the designed cross-sectional outline of the tunnel surrounding rock, the over-excavation area and the under-excavation area can be seen; in specific implementation, the over-excavation and under-excavation amount can be marked in the scene three-dimensional model, and the staff can use the display device to intuitively see the over-excavation and under-excavation amount of the over-excavation and under-excavation area, and the larger over-excavation and under-excavation value (over-excavation risk value) and the smaller over-excavation and under-excavation value (under-excavation risk value) can be distinguished by different colors when marking, so that the staff can find the place with the greatest safety risk in the tunnel surrounding rock in a targeted manner, and check the risks in time, which can improve work efficiency to a certain extent.
[0106] In this embodiment, the maximum allowable over-excavation value max A i and the maximum allowable undercut value max B i The over-excavation risk value F can be obtained by analyzing the staff based on their own experience, professional skills, geological survey data and mechanical knowledge. i and under-excavation risk value E i The larger the value is, the higher the safety risk of the surrounding rock of the tunnel is. In specific implementation, the value marked with over-excavation risk F i and undercut risk value E i The areas in the three-dimensional model of the scene are arranged according to the level of safety risks, so as to remind designers to make timely repairs and designs according to the level of safety risks and avoid risks to a certain extent.
[0107] In this embodiment, a three-dimensional coordinate system can also be established in the tunnel surrounding rock, and the direction of the tunnel surrounding rock axis is the Z axis. According to the above cross-sectional diagram, the difference S between the actual cross-sectional area of the tunnel surrounding rock and the area of the designed cross-sectional area of the tunnel surrounding rock can be calculated. A1 , calculate the sum of the over-excavation area and the under-excavation area S A2 ; Among them, the true cross-sectional area of the tunnel surrounding rock is the area of the area enclosed by the true cross-sectional outline of the tunnel surrounding rock, and the designed cross-sectional area of the tunnel surrounding rock is the area of the area enclosed by the designed cross-sectional outline of the tunnel surrounding rock; then S A1 With S A2 It can be calculated by the following formula:
[0108] Among them, x a , -x a They represent the horizontal coordinates of the leftmost and rightmost points in the real cross section of the tunnel surrounding rock, y a represents the ordinate of point a in the actual section of the tunnel surrounding rock, R represents the design radius of the design section of the tunnel surrounding rock, and x represents the abscissa of the point in the design section of the tunnel surrounding rock.
[0109] By S A1 With S A2 You can also calculate the super mining value S 超 and undermining value S 欠 ;
[0110] Super Digging Value S 超 :
[0111] Under-excavation value S 欠 :
[0112] The over-excavation volume v can be obtained using the following formula:
[0113] Among them, d L is the perimeter of the designed section of the tunnel surrounding rock. In practical applications, the overbreak volume v obtained using the above formula can also be marked at the corresponding position in the scene 3D model.
[0114] According to an embodiment of the present invention, a method for detecting overbreak and underbreak of tunnel surrounding rock can determine a scene 3D model based on photographic data, a real 3D model based on 3D point cloud data, and a designed 3D model of the tunnel surrounding rock based on design data. The overbreak and underbreak 3D model can be determined by analyzing and comparing the real 3D model and the designed 3D model. Since the overbreak and underbreak 3D model is determined by the real 3D model and the designed 3D model, the overbreak and underbreak 3D model can correspond to the real 3D model. The real 3D model is determined by 3D point cloud data, and the 3D point cloud data and photographic data are associated with a time stamp. Therefore, the overbreak and underbreak 3D model can correspond to the scene 3D model via the time stamp. The overbreak and underbreak 3D model and its model parameters can be marked at corresponding locations in the scene 3D model. In this way, designers can quickly and accurately view the marked overbreak and underbreak 3D model and its model parameters in the scene 3D model, thereby quickly and accurately locating the overbreak and underbreak areas in the tunnel. Furthermore, the model parameters can be used to quickly and accurately analyze and determine the overbreak and underbreak areas, promptly identify risks, and effectively improve work efficiency.
[0115] Example 2
[0116] The present invention also provides a tunnel surrounding rock over-excavation and under-excavation detection system, the system comprising:
[0117] Segmentation module, used to divide the tunnel surrounding rock into multiple tunnel segments;
[0118] A first acquisition module is configured to acquire photo data and three-dimensional point cloud data of a tunnel segment, wherein the photo data and three-dimensional point cloud data corresponding to each tunnel segment have the same time stamp;
[0119] The second acquisition module is used to obtain the design data of the tunnel surrounding rock and establish a design three-dimensional model of the tunnel surrounding rock based on the design data;
[0120] A building module is used to build a scene 3D model of the tunnel surrounding rock based on the photo data, and to build a real 3D model of the tunnel surrounding rock based on the 3D point cloud data;
[0121] The comparison module is used to compare the real 3D model with the designed 3D model to obtain a 3D model of over-excavation and under-excavation composed of 3D point cloud data;
[0122] The marking module is used to mark the over-excavation and under-excavation three-dimensional model and its model parameters at corresponding positions in the scene three-dimensional model according to the time stamp.
[0123] The first acquisition module is specifically used for:
[0124] S201: Associating a multi-channel camera with a 3D laser scanning device, so that the multi-channel camera and the 3D laser scanning device are simultaneously activated at an end of the tunnel section near the tunnel surrounding rock entrance; wherein the camera range of the multi-channel camera covers at least the range of a single tunnel section, and the scanning range of the 3D laser scanning device covers at least the range of a single tunnel section, and the initial positions of the multi-channel camera and the 3D laser scanning device are at the tunnel surrounding rock entrance;
[0125] S202: Start the multi-channel camera and the 3D laser scanning device to start static photography and static scanning;
[0126] S203: Using the timestamp when the multi-channel photographing device or the 3D laser scanning device is started as a timestamp, and associating the timestamp with the photographic data and 3D point cloud data generated in the tunnel section respectively;
[0127] S204: When the multi-channel photographing device and the 3D laser scanning device complete static photographing and static scanning at one end of the tunnel section, respectively, the multi-channel photographing device and the 3D laser scanning device are turned off and moved to the end of the next tunnel section near the tunnel surrounding rock entrance;
[0128] S205: Repeat the above steps S202 to S204 to obtain multiple sets of photo data and multiple sets of three-dimensional point cloud data corresponding to multiple tunnel sections.
[0129] In this embodiment, the multi-channel camera and the three-dimensional laser scanning device are both installed on the same vehicle-mounted device. The multi-channel camera can capture the internal conditions of the tunnel surrounding rock from multiple angles. In specific implementation, four-channel camera devices can be set up to capture the tunnel surrounding rock in all directions, up and down, left and right. The three-dimensional laser scanning device can use the principle of laser ranging to quickly reconstruct a three-dimensional model of the measured target by recording the three-dimensional coordinates, reflectivity, texture and other information of points on the surface of the measured object. This embodiment uses a combination of technologies such as a three-dimensional laser scanning device, a global positioning system (GPS), an inertial measurement unit (IMU) and an odometer to scan the tunnel surrounding rock. Specifically, GPS is used to provide positioning information outside the tunnel, and the IMU and odometer are used to provide positioning information when the GPS signal is lost inside the tunnel.
[0130] The establishment module is specifically used for:
[0131] Each set of photo data is used to establish a three-dimensional model of the tunnel section scene corresponding to the tunnel section using the oblique photography technology;
[0132] The three-dimensional models of the tunnel scene are spliced in the order of time stamps to obtain a three-dimensional model of the scene corresponding to the tunnel surrounding rock;
[0133] Perform noise reduction on 3D point cloud data using difference method and mean method;
[0134] Each set of 3D point cloud data after noise reduction is used to build a real 3D model of the tunnel section corresponding to the tunnel section using the Delaunay triangulation modeling method;
[0135] The real 3D models of the tunnel sections are spliced in the order of time stamps to obtain a real 3D model corresponding to the tunnel surrounding rock.
[0136] The comparison module is specifically used for:
[0137] Overlapping the common characteristic lines or points with the same distribution characteristics of the real 3D model and the designed 3D model;
[0138] The real 3D model and the designed 3D model are preprocessed using the difference method;
[0139] The 3D point cloud data that overlaps with the design 3D model in the real 3D model preprocessed by the difference method is deleted, and the model composed of the remaining 3D point cloud data in the real 3D model is the over-excavation and under-excavation 3D model.
[0140] The steps of the differential method include:
[0141] A plurality of difference points with equal spacing are selected on the tunnel centerline of the real 3D model, and the difference points are extended along the radius of the real 3D model to obtain a first intersection point with the real 3D model and a second intersection point with the designed 3D model;
[0142] Calculating the intersection distance between the first intersection point and the second intersection point, and if the intersection distance is greater than a preset threshold distance, deleting the three-dimensional point cloud data corresponding to the first intersection point and deleting the design data corresponding to the second intersection point;
[0143] If the intersection point distance is less than or equal to a preset threshold distance, the first intersection point and the second intersection point are retained.
[0144] In this embodiment, the accuracy of the real three-dimensional model can be improved by using the difference method to delete three-dimensional points and data with large errors; in this embodiment, the tunnel centerline of the real three-dimensional model is overlapped with the tunnel centerline of the designed three-dimensional model, so that the real three-dimensional model and the designed three-dimensional model can roughly overlap, and the non-overlapping model area is the over-excavation and under-excavation three-dimensional model.
[0145] The tag module is specifically used for:
[0146] Make the over-excavation and under-excavation three-dimensional model correspond to the scene three-dimensional model according to the time stamp;
[0147] Obtaining model parameters of the over-excavation and under-excavation three-dimensional model, wherein the model parameters include the over-excavation and under-excavation amount, the over-excavation risk value, and the under-excavation risk value;
[0148] The over-excavation and under-excavation three-dimensional models and model parameters are marked at corresponding positions on the scene three-dimensional model by color marking or shadow marking.
[0149] The steps of obtaining the model parameters of the overbreak and underbreak three-dimensional model specifically include:
[0150] The over-excavation and under-excavation 3D model is reversed to obtain a model in which the real 3D model and the designed 3D model coincide with each other;
[0151] Obtain the cross-sectional view when the real 3D model and the designed 3D model coincide, place the cross-sectional view in the first quadrant of the 2D coordinate system, and obtain the over-excavation and under-excavation amount D i :
[0152] Among them, (x i ,y i ) is the coordinate of the i-th point on the cross-sectional contour of the real three-dimensional model in the cross-sectional view, (x k ,y k )、(x j ,y j) are the coordinates of the kth point and the jth point that intersect with the cross-sectional contour of the designed three-dimensional model when the i-th point is connected to the origin of the two-dimensional coordinate system. The j-th point is close to the origin of the two-dimensional coordinate system. If the over-excavation amount D i If the over-excavation amount D is greater than 0, it means that the area is over-excavation area. i Less than 0 means the area is under-excavated. If the over-excavation amount D i Equal to 0 means that the area is a standard area;
[0153] According to the over-excavation and under-excavation amount D i Get the over-excavation risk value F i and under-excavation risk value E i :
[0154] Among them, max A i is the maximum allowable over-excavation value, max A i >|G i |,max B i is the maximum allowable undercut value, max B i >|G i |.
[0155] In this embodiment, the cross-sectional view is a plane obtained by projecting the three-dimensional model after the real three-dimensional model and the designed three-dimensional model overlap along a plane perpendicular to the extension direction of the tunnel surrounding rock. In this cross-sectional view, the real cross-sectional outline of the tunnel surrounding rock, the designed cross-sectional outline of the tunnel surrounding rock, the over-excavation area and the under-excavation area can be seen; in specific implementation, the over-excavation and under-excavation amount can be marked in the scene three-dimensional model, and the staff can use the display device to intuitively see the over-excavation and under-excavation amount of the over-excavation and under-excavation area, and the larger over-excavation and under-excavation value (over-excavation risk value) and the smaller over-excavation and under-excavation value (under-excavation risk value) can be distinguished by different colors when marking, so that the staff can find the place with the greatest safety risk in the tunnel surrounding rock in a targeted manner, and check the risks in time, which can improve work efficiency to a certain extent.
[0156] In this embodiment, the maximum allowable over-excavation value max A i and the maximum allowable undercut value max B i The over-excavation risk value F can be obtained by analyzing the staff based on their own experience, professional skills, geological survey data and mechanical knowledge. i and under-excavation risk value E i The larger the value is, the higher the safety risk of the surrounding rock of the tunnel is. In specific implementation, the value marked with over-excavation risk F i and undercut risk value E iThe areas in the three-dimensional model of the scene are arranged according to the level of safety risks, so as to remind designers to make timely repairs and designs according to the level of safety risks and avoid risks to a certain extent.
[0157] In this embodiment, a three-dimensional coordinate system can also be established in the tunnel surrounding rock, and the direction of the tunnel surrounding rock axis is the Z axis. According to the above cross-sectional diagram, the difference S between the actual cross-sectional area of the tunnel surrounding rock and the area of the designed cross-sectional area of the tunnel surrounding rock can be calculated. A1 , calculate the sum of the over-excavation area and the under-excavation area S A2 ; Among them, the true cross-sectional area of the tunnel surrounding rock is the area of the area enclosed by the true cross-sectional outline of the tunnel surrounding rock, and the designed cross-sectional area of the tunnel surrounding rock is the area of the area enclosed by the designed cross-sectional outline of the tunnel surrounding rock; then S A1 With S A2 It can be calculated by the following formula:
[0158] Among them, x a , -x a They represent the horizontal coordinates of the leftmost and rightmost points in the real cross section of the tunnel surrounding rock, y a represents the ordinate of point a in the actual section of the tunnel surrounding rock, R represents the design radius of the design section of the tunnel surrounding rock, and x represents the abscissa of the point in the design section of the tunnel surrounding rock.
[0159] By S A1 With S A2 You can also calculate the super mining value S 超 and undermining value S 欠 ;
[0160] Super Digging Value S 超 :
[0161] Under-excavation value S 欠 :
[0162] The over-excavation volume v can be obtained using the following formula:
[0163] Among them, d L is the perimeter of the designed section of the tunnel surrounding rock. In practical applications, the overbreak volume v obtained using the above formula can also be marked at the corresponding position in the scene 3D model.
[0164] A tunnel surrounding rock overbreak and underbreak detection system according to an embodiment of the present invention can determine a scene 3D model based on photographic data, a real 3D model based on 3D point cloud data, and a designed 3D model of the tunnel surrounding rock based on design data. The overbreak and underbreak 3D model can be determined by analyzing and comparing the real 3D model and the designed 3D model. Because the overbreak and underbreak 3D model is determined by the real 3D model and the designed 3D model, it can correspond to the real 3D model. The real 3D model is determined by 3D point cloud data, and the 3D point cloud data and photographic data are associated with a time stamp. Therefore, the overbreak and underbreak 3D model can correspond to the scene 3D model via the time stamp. The overbreak and underbreak 3D model and its model parameters can be marked at corresponding locations in the scene 3D model. In this way, designers can quickly and accurately view the marked overbreak and underbreak 3D model and its model parameters in the scene 3D model, thereby quickly and accurately locating the overbreak and underbreak areas in the tunnel. Furthermore, the model parameters can be used to quickly and accurately analyze and determine the overbreak and underbreak areas, promptly identify risks, and effectively improve work efficiency.
[0165] Example 3
[0166] Based on the same inventive concept, the present invention proposes a computer-readable storage medium, which includes instructions. When the computer-readable storage medium is executed, the computer executes the above-mentioned method for detecting over-excavation and under-excavation of surrounding rock of a tunnel.
[0167] The logic and / or steps represented in the flowcharts or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing the logical functions, and can be embodied in any computer-readable medium for use by, or in conjunction with, an instruction execution system, apparatus, or device (e.g., a computer-based system, a system including a processor, or other system that can fetch and execute instructions from an instruction execution system, apparatus, or device). For purposes of this specification, "computer-readable medium" can be any device that stores, communicates, propagates, or transmits a program for use by, or in conjunction with, an instruction execution system, apparatus, or device.
[0168] More specific examples (a non-exhaustive list) of computer-readable media include the following: an electrical connection with one or more wires (electronic devices), a portable computer disk cartridge (magnetic devices), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disc read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering, or processing in another suitable manner as necessary, and then stored in a computer memory.
[0169] Among them, the memory may include a large-capacity memory for data or instructions. By way of example and not limitation, the memory may include a hard disk drive (HDD), a floppy disk drive, a solid-state drive (SSD), a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive, or a combination of two or more of these. Where appropriate, the memory may include a removable or non-removable (or fixed) medium. Where appropriate, the memory may be inside or outside the data processing device. In a specific embodiment, the memory is a non-volatile memory. In a specific embodiment, the memory includes a read-only memory (ROM) and a random access memory (RAM). Where appropriate, the ROM may be a mask-programmed ROM, a programmable ROM (PROM), an erasable PROM (EPROM), an electrically erasable PROM (EEPROM), an electrically alterable ROM (EAROM) or a flash memory (FLASH), or a combination of two or more of these. Under appropriate circumstances, the RAM can be a static random access memory (SRAM) or a dynamic random access memory (DRAM), where the DRAM can be a fast page mode dynamic random access memory (FPMDRAM), an extended data output dynamic random access memory (EDODRAM), a synchronous dynamic random access memory (SDRAM), etc.
[0170] Example 4
[0171] Based on the same inventive concept, the present invention proposes a terminal, which includes: a processor and a memory; the processor and the memory communicate with each other; the memory is used to store instructions; the processor is used to execute the instructions in the memory to execute the above-mentioned method for detecting over-excavation and under-excavation of tunnel surrounding rock.
[0172] It should be understood that various parts of the present invention can be implemented using hardware, software, firmware, or a combination thereof. In the above-described embodiments, multiple steps or methods can be implemented using software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented using hardware, as in another embodiment, any one of the following technologies known in the art or a combination thereof can be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application-specific integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0173] The technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, not all possible combinations of the technical features in the above-mentioned embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0174] The above-described embodiments merely represent several implementation methods of the present application. While the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that a person skilled in the art could make various modifications and improvements without departing from the spirit of the present application, all of which fall within the scope of protection of the present application. Therefore, the scope of protection of the present patent application shall be determined by the appended claims.
Claims
1. A method for detecting over-excavation and under-excavation of tunnel surrounding rock, characterized in that: The method comprises: Divide the tunnel surrounding rock into multiple tunnel sections; Acquire the photo data and the three-dimensional point cloud data of the tunnel section, wherein the photo data and the three-dimensional point cloud data corresponding to each tunnel section have the same time stamp; Acquiring design data of the tunnel surrounding rock, and establishing a design three-dimensional model of the tunnel surrounding rock according to the design data; Establishing a scene three-dimensional model of the tunnel surrounding rock according to the photo data, and establishing a real three-dimensional model of the tunnel surrounding rock according to the three-dimensional point cloud data; Comparing the real three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data; The over-and-underbreak three-dimensional model and its model parameters are marked at corresponding positions in the scene three-dimensional model according to the time stamp.
2. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 1, characterized in that: The steps of obtaining the photo data and three-dimensional point cloud data of the tunnel section specifically include: S201: Associating a multi-channel photographing device with a three-dimensional laser scanning device, so that the multi-channel photographing device and the three-dimensional laser scanning device are synchronously started at one end of the tunnel section close to the entrance of the tunnel surrounding rock; wherein the photographing range of the multi-channel photographing device at least covers the range of a single tunnel section, the scanning range of the three-dimensional laser scanning device at least covers the range of a single tunnel section, and the initial positions of the multi-channel photographing device and the three-dimensional laser scanning device are at the entrance of the tunnel surrounding rock; S202: starting the multi-channel photographing device and the three-dimensional laser scanning device to start static photographing and static scanning; S203: using the timestamp when the multi-channel photographing device or the three-dimensional laser scanning device is started as the timestamp, and associating the timestamp with the photo data and the three-dimensional point cloud data generated in the tunnel section respectively; S204: When the multi-channel camera and the three-dimensional laser scanning device are at one end of the tunnel section When static photography and static scanning are completed respectively, the multi-channel photography device and the three-dimensional laser scanning device are turned off and moved to one end of the next tunnel section close to the tunnel surrounding rock entrance; S205: Repeat the above steps S202 to S204 to obtain multiple groups of the photo data and multiple groups of the three-dimensional point cloud data corresponding to the multiple tunnel sections.
3. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 1, characterized in that: The steps of establishing a scene three-dimensional model of the tunnel surrounding rock according to the photo data, and establishing a real three-dimensional model of the tunnel surrounding rock according to the three-dimensional point cloud data specifically include: Using oblique photography technology to build a three-dimensional model of the tunnel section scene corresponding to the tunnel section for each group of the photo data; splicing the three-dimensional models of the tunnel section scenes in the order of the time stamps to obtain the three-dimensional models of the scenes corresponding to the surrounding rock of the tunnel; Performing noise reduction processing on the three-dimensional point cloud data according to a difference method and a mean method; Using the Delaunay triangulation modeling method for each group of the three-dimensional point cloud data after noise reduction to establish a real three-dimensional model of the tunnel section corresponding to the tunnel section; The real three-dimensional model of the tunnel section is spliced in the order of time stamps to obtain the real three-dimensional model corresponding to the surrounding rock of the tunnel.
4. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 1, characterized in that: The step of comparing the real three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data specifically includes: Overlapping the common characteristic lines or points with the same distribution characteristics of the real three-dimensional model and the designed three-dimensional model; Preprocessing the real three-dimensional model and the designed three-dimensional model by using a difference method; The three-dimensional point cloud data overlapping with the designed three-dimensional model in the real three-dimensional model preprocessed by the difference method is deleted, and the model composed of the remaining three-dimensional point cloud data in the real three-dimensional model is the over-excavation and under-excavation three-dimensional model.
5. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 4, characterized in that: The steps of the differential method specifically include: A plurality of difference points with the same spacing are selected on the tunnel centerline of the real three-dimensional model, and the difference points are extended along the radius direction of the real three-dimensional model to obtain a first intersection point intersecting with the real three-dimensional model and a second intersection point intersecting with the designed three-dimensional model; Calculating an intersection distance between the first intersection point and the second intersection point, and if the intersection distance is greater than a preset threshold distance, deleting the three-dimensional point cloud data corresponding to the first intersection point and deleting the design data corresponding to the second intersection point; If the intersection point distance is less than or equal to a preset threshold distance, the first intersection point and the second intersection point are retained.
6. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 1, characterized in that: The step of marking the over-underbreak three-dimensional model and its model parameters at corresponding positions in the scene three-dimensional model according to the time stamp specifically includes: Make the over-and-underbreak three-dimensional model correspond to the scene three-dimensional model according to the time stamp; Acquire model parameters of the over-break and under-break three-dimensional model, wherein the model parameters include over-break and under-break, over-break risk value and under-break risk value; The over-break and under-break three-dimensional model and the model parameters are marked at positions corresponding to the scene three-dimensional model by color marking or shadow marking.
7. The method for detecting over-excavation and under-excavation of tunnel surrounding rock according to claim 6, characterized in that: The step of obtaining the model parameters of the overbreak and underbreak three-dimensional model specifically includes: Reversing the overbreak and underbreak three-dimensional model to obtain a model in which the real three-dimensional model and the designed three-dimensional model overlap; Obtain a cross-sectional view when the real three-dimensional model and the designed three-dimensional model overlap, place the cross-sectional view in the first quadrant of the two-dimensional coordinate system, and obtain the over-excavation and under-excavation amount D i : Among them, (x i ,y i ) is the coordinate of the i-th point on the cross-sectional contour of the real three-dimensional model in the cross-sectional view. Standard, (x k ,y k )、(x j ,y j ) are the coordinates of the kth point and the jth point that intersect the cross-sectional contour of the designed three-dimensional model when the i-th point is connected to the origin of the two-dimensional coordinate system, and the j-th point is close to the origin of the two-dimensional coordinate system; if the over-excavation amount D i If the over-excavation amount D i Less than 0 indicates that the area is under-excavated. If the over-excavation amount D i If it is equal to 0, it means that the area is a standard area; According to the over-excavation amount D i Get the over-digging risk value F i And the undercut risk value E i : Among them, max A i is the maximum allowable over-excavation value, max A i >|G i |,max B i is the maximum allowable undercut value, max B i >|G i |.
8. A tunnel surrounding rock over-break and under-break detection system, characterized in that: The system comprises: Segmentation module, used to divide the tunnel surrounding rock into multiple tunnel segments; A first acquisition module is used to acquire the photo data and the three-dimensional point cloud data of the tunnel section, wherein the photo data and the three-dimensional point cloud data corresponding to each tunnel section have the same time stamp; A second acquisition module is used to acquire the design data of the tunnel surrounding rock and establish a design three-dimensional model of the tunnel surrounding rock according to the design data; A building module, used to build a scene three-dimensional model of the tunnel surrounding rock according to the photo data, and to build a real three-dimensional model of the tunnel surrounding rock according to the three-dimensional point cloud data; A comparison module, used for comparing the real three-dimensional model with the designed three-dimensional model to obtain a three-dimensional model of over-excavation and under-excavation composed of the three-dimensional point cloud data; A marking module is used to mark the over-and-underbreak three-dimensional model and its model parameters at corresponding positions in the scene three-dimensional model according to the time stamp.
9. A computer-readable storage medium, characterized in that: The method comprises instructions which, when executed on a computer, cause the computer to execute the method according to any one of claims 1 to 7.
10. A terminal, characterized in that: The terminal comprises: a processor and a memory; the processor and the memory communicate with each other; The memory is used to store instructions; The processor is configured to execute the instructions in the memory to perform the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Tunnel early supporting and second lining beyond limit value and thickness analysis method
CN110108217A
Railway business line construction method and system
CN111768112A
Visual display method and system for over-excavation and under-excavation of tunnel
CN114677478A
Multi-model fusion tunnel construction risk prediction method, system and device and medium
CN114997003A
Scene three-dimensional reconstruction method and device, computing equipment and storage medium
CN115147535A
Cited By
Method for generating blindage range above tunnel
CN118378326A
Tunnel back break identification and volume calculation method based on laser point cloud
CN119784814A
Geological defect area boundary extraction method, device, equipment, medium and product
CN119810135A
Construction method for 3D printing backfill body of soft rock tunnel
CN120798430A
Tunnel back break measurement method and system without control point photogrammetry registration
CN121140740A