Base station downlink control channel resource scheduling optimization method and apparatus, and computer device

By using CQI parameters with demodulation performance factors in the base station scheduler to perform resource allocation and scheduling processing within the control resource set, the problem of insufficient adaptive performance of the scheduler in the existing technology is solved, and wireless performance and resource constraints are achieved. Balanced, improved resource scheduling performance.

WO2024216914A1PCT designated stage expired Publication Date: 2024-10-24SUNWAVE COMM +2
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/128440
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-19
Filing Date
2023-10-31
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Existing base station schedulers cannot take into account wireless performance changes and resource constraints in control channel resource scheduling, resulting in insufficient adaptive performance.

Method used

By initializing the downlink control channel of the base station scheduler, using CQI parameters with demodulation performance factors to allocate resources within the control resource set, and recording the actual allocation results and statistical information, generating DCI scheduling information to implement control resource sets. Scheduling processing, optimizing resource scheduling.

Benefits of technology

It improves the adaptive performance of the base station scheduler, achieves a balance between wireless performance and resource constraints, and improves the overall performance of resource scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023128440_24102024_PF_FP_ABST
    Figure CN2023128440_24102024_PF_FP_ABST
Patent Text Reader

Abstract

A base station downlink control channel resource scheduling optimization method and apparatus, and a computer device. The method comprises: initializing downlink scheduling information of a downlink control channel of a base station scheduler; according to a resource scheduling algorithm and a CQI parameter having a demodulation performance factor, performing resource allocation of a control-channel element corresponding to each user terminal in a same control resource set, and recording actual allocation result information and related statistical information values of different processes; and performing scheduling processing among control resource sets according to the actual allocation result information and the related statistical information values of different processes, to generate carried DCI scheduling information to replace the downlink scheduling information.
Need to check novelty before this filing date? Find Prior Art

Description

Base station downlink control channel resource scheduling optimization method, device and computer equipment

[0001] Related applications

[0002] This application claims priority to Chinese patent application number 202310420049.1, filed on April 19, 2023, entitled “Base station downlink control channel resource scheduling optimization method, device and computer equipment,” the entire text of which is hereby incorporated by reference. Technical Field

[0003] The present application relates to the field of communication technology, and in particular to a method, apparatus, and computer equipment for optimizing scheduling of downlink control channel resources of a base station. Background Art

[0004] In the base station scheduler, the downlink control channel (Physical downlink control channel, PDCCH) is mainly used to complete the uplink and downlink scheduling of user terminals (User equipment, UE). Among them, downlink scheduling information (such as DCI1_0, DCI1_1, etc.) is sent to the UE for the UE to receive and demodulate the physical downlink shared channel (Physical downlink shared channel, PDSCH). Uplink scheduling information (such as DCI0_0, DCI0_1, etc.) is sent to the UE for the UE to send the physical uplink shared channel (Physical uplink shared channel, PUSCH), where the downlink control information (Downlink control information, DCI) is the specific content information carried by the PDCCH resources. Therefore, the quality of the control channel resource performance will directly affect the performance of the scheduler. In the NR protocol, once the control channel resources are configured, the time and frequency resources will be relatively fixed after the signaling is sent to the terminal to take effect.

[0005] The current solution for optimizing control channel resource scheduling involves allocating control-channel elements (CCEs) through a scheduling algorithm after control channel resource configuration. However, this resource allocation process doesn't factor in demodulation performance, and the search strategy typically adopts an ergodic approach. This fails to balance wireless performance fluctuations with resource constraints, leading to insufficient scheduler adaptability.

[0006] Currently, no effective solution has been proposed to the problem of insufficient scheduler adaptive performance in related technologies.

[0007] Summary of the Invention

[0008] According to various embodiments of the present application, a method, apparatus, and computer device for optimizing scheduling of downlink control channel resources of a base station are provided.

[0009] In a first aspect, a method for optimizing downlink control channel resource scheduling of a base station is provided, comprising:

[0010] Initializing downlink scheduling information of a downlink control channel of a base station scheduler; the downlink control channel corresponds to a plurality of user terminals; each of the user terminals corresponds to a plurality of control resource sets;

[0011] Allocate resources to a control channel element corresponding to each user terminal within the same control resource set according to a resource scheduling algorithm and a CQI (Channel Quality Indicator) parameter having a demodulation performance factor, and record actual allocation result information of the control channel element and related statistical information values ​​of different processes;

[0012] The scheduling states of the control resource sets at different levels are set according to resource requirements, and one of the scheduling states is selected for initialization; scheduling processing is performed between the control resource sets according to the actual allocation result information and the relevant different process statistical information values, and the carrying DCI scheduling information is generated to replace the downlink scheduling information.

[0013] In some embodiments, allocating resources to a control channel element corresponding to each user terminal within the same control resource set based on a resource scheduling algorithm and a CQI parameter having a demodulation performance factor, and recording actual allocation result information of the control channel element and related statistical information values ​​of different processes, includes:

[0014] determining a CQI parameter having a demodulation performance factor for each of the user terminals;

[0015] Dividing a preset CQI range parameter into a plurality of intervals based on a modulation method, and performing interval mapping between the intervals and the aggregation levels of the control channel elements; and selecting a reference control channel element and a corresponding reference aggregation level based on the CQI parameter and the interval mapping result;

[0016] Search and allocate available control channel unit resources based on the reference aggregation level according to a preset resource allocation strategy, and record actual allocation result information of the control channel unit and relevant statistical information values ​​of different processes;

[0017] The user terminals required for scheduling in the same control resource set are traversed until resource allocation of the control channel units corresponding to all the user terminals is completed.

[0018] In some embodiments, determining a CQI parameter having a demodulation performance factor for each user terminal includes:

[0019] Acquire a current CQI parameter, an ack (acknowledgement, positive confirmation) threshold, and a nack (negative acknowledgement, negative confirmation) threshold from the user terminal;

[0020] The number of ack feedbacks is counted as ack number; the number of nack feedbacks is counted as nack number;

[0021] The current CQI parameter is adjusted according to the ack threshold, the nack threshold, the ack number, the nack number, and the preset CQI range threshold to obtain a CQI parameter with a demodulation performance factor.

[0022] In some embodiments, dividing the preset CQI range parameter into a plurality of intervals based on the modulation method, and performing interval mapping on the intervals and the aggregation level of the control channel unit, includes:

[0023] The preset CQI range parameter is divided into four intervals according to the modulation method, and the CQI parameters represented by the intervals are mapped to the aggregation level of the control channel unit.

[0024] In some embodiments, searching and allocating available control channel unit resources based on the reference aggregation level according to a preset resource allocation strategy, and recording actual allocation result information of the control channel units and related statistical information values ​​of different processes include:

[0025] Determining whether control channel unit resources for the candidate set space search corresponding to the reference aggregation level are available;

[0026] If the control channel unit resources searched in the candidate set space corresponding to the reference aggregation level are available, recording actual allocation result information and related statistical information values ​​of the control channel unit;

[0027] If the control channel unit resources of the candidate set space search corresponding to the reference aggregation level are not available, determining whether the control channel unit resources of the candidate set space search traversing the candidate set greater than the reference aggregation level are available;

[0028] If the control channel unit resources searched for in the candidate set space greater than the reference aggregation level are available, recording actual allocation result information and related statistical information values ​​of the control channel unit;

[0029] If the control channel unit resources searched through the candidate set space greater than the reference aggregation level are not available, determining whether the control channel unit resources searched through the candidate set space less than the reference aggregation level are available;

[0030] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are available, recording actual allocation result information and related statistical information values ​​of the control channel unit;

[0031] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are unavailable, actual allocation result information and related statistical information values ​​of the control channel unit are recorded.

[0032] In some embodiments, performing scheduling between the control resource sets according to the actual allocation result information and the relevant different process statistical information values, and generating bearer DCI scheduling information to replace the downlink scheduling information, includes:

[0033] Calculating the statistical parameter information value at the current scheduling moment according to the actual allocation result information and the statistical information values ​​of the relevant different processes;

[0034] According to the statistical parameter information value and the scheduling conversion condition, scheduling processing is performed between the control resource sets, and bearer DCI scheduling information is generated to replace the downlink scheduling information.

[0035] In some embodiments, the method further comprises:

[0036] After selecting one of the scheduling states for initialization, determining whether the built-in scheduling timing of the base station scheduler satisfies a preset processing cycle parameter;

[0037] When the built-in scheduling timing of the base station scheduler meets the preset processing cycle parameters, resource scheduling processing between the control resource sets is performed.

[0038] In a second aspect, a base station downlink control channel resource scheduling optimization device is provided, comprising: an initialization module, an internal processing module, and an inter-processing module;

[0039] The initialization module is used to initialize downlink scheduling information of a downlink control channel of a base station scheduler; the downlink control channel corresponds to multiple user terminals; each of the user terminals corresponds to multiple control resource sets;

[0040] The internal processing module allocates resources to the control channel element corresponding to each user terminal in the same control resource set according to the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, and records actual allocation result information of the control channel element and related statistical information values ​​of different processes;

[0041] The inter-processing module sets the scheduling states of different levels of the control resource set according to resource requirements, and selects one of the scheduling states for initialization; performs scheduling processing between the control resource sets according to the actual allocation result information and the relevant different process statistical information values, and generates the bearer DCI scheduling information to replace the downlink scheduling information.

[0042] In a third aspect, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the base station downlink control channel resource scheduling optimization method described in the first aspect is implemented.

[0043] In a fourth aspect, a storage medium is provided, on which a computer program is stored. When the program is executed by a processor, the base station downlink control channel resource scheduling optimization method described in the first aspect is implemented.

[0044] The details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the following briefly introduces the drawings required for use in the embodiments or related technical descriptions. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0046] FIG1 is a block diagram of the hardware structure of a terminal device of a base station downlink control channel resource scheduling optimization method provided in an embodiment of the present application.

[0047] FIG2 is a flowchart of a method for optimizing scheduling of downlink control channel resources of a base station provided in an embodiment of the present application.

[0048] FIG3 is a flow chart of step S220 in FIG2 .

[0049] FIG4 is a schematic diagram of a resource allocation process according to an embodiment of the present application.

[0050] FIG5 is a schematic diagram of the inter-CORESET scheduling process provided in an embodiment of the present application.

[0051] FIG6 is a structural block diagram of a base station downlink control channel resource scheduling optimization device provided in an embodiment of the present application.

[0052] In the figure: 102, processor; 104, memory; 106, transmission device; 108, input and output device; 210, initialization module; 220, internal processing module; 230, inter-processing module. DETAILED DESCRIPTION

[0053] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0054] Unless otherwise defined, the technical terms or scientific terms involved in this application should have the general meaning understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "an", "a", "the", "these" and the like in this application do not indicate quantitative restrictions, and they can be singular or plural. The terms "include", "comprise", "have" and any variants thereof involved in this application are intended to cover non-exclusive inclusions; for example, a process, method and system, product or device comprising a series of steps or modules (units) is not limited to the listed steps or modules (units), but may include unlisted steps or modules (units), or may include other steps or modules (units) inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "plurality" involved in this application refers to two or more. "And / or" describes the relationship between related objects, indicating that three possible relationships exist. For example, "A and / or B" can represent: A exists alone, A and B exist simultaneously, and B exists alone. Generally, the character " / " indicates that the related objects are in an "or" relationship. The terms "first," "second," "third," etc., used in this application, simply distinguish between similar objects and do not represent a specific ordering of the objects.

[0055] The method embodiment provided in this embodiment can be executed in a terminal, a computer or a similar computing device. The terminal can be a scheduler of a base station. For example, when running on the scheduler of a base station, FIG1 is a hardware structure block diagram of the scheduler of the base station downlink control channel resource scheduling optimization method of this embodiment. As shown in FIG1 , the scheduler may include one or more (only one is shown in FIG1 ) processors 102 and a memory 104 for storing data, wherein the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA. The above-mentioned scheduler may also include a transmission device 106 and an input and output device 108 for communication functions. It will be understood by those skilled in the art that the structure shown in FIG1 is only illustrative and does not limit the structure of the above-mentioned scheduler. For example, the scheduler may also include more or fewer components than those shown in FIG1 , or have a different configuration than that shown in FIG1 .

[0056] The memory 104 can be used to store computer programs, such as software programs and modules of application software, such as the computer program corresponding to the base station downlink control channel resource scheduling optimization method in this embodiment. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, implementing the above-mentioned method. The memory 104 may include high-speed random access memory and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include memory remotely located relative to the processor 102, and these remote memories may be connected to the scheduler via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0057] The transmission device 106 is configured to receive or transmit data via a network. The network may include a wireless network provided by the dispatcher's communications provider. In one embodiment, the transmission device 106 includes a network interface controller (NIC), which can be connected to other network devices via a base station to enable communication with the Internet. In another embodiment, the transmission device 106 may be a radio frequency (RF) module configured to communicate with the Internet wirelessly.

[0058] In this embodiment, a method for optimizing downlink control channel resource scheduling of a base station is provided. FIG2 is a flow chart of the method for optimizing downlink control channel resource scheduling of a base station in this embodiment. As shown in FIG2 , the flow chart includes the following steps:

[0059] Step S210, initializing downlink scheduling information of a downlink control channel of a base station scheduler; the downlink control channel corresponds to multiple user terminals; each user terminal corresponds to multiple control resource sets;

[0060] Step S220: Allocate resources to the control channel element corresponding to each user terminal within the same control resource set based on the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, and record the actual allocation result information of the control channel element and the relevant statistical information values ​​of different processes;

[0061] Step S230, set the scheduling states of different levels of the control resource set according to resource requirements, select one of the scheduling states to initialize; perform scheduling processing between the control resource sets based on the actual allocation result information and the relevant statistical information values ​​of different processes, and generate the bearer DCI scheduling information to replace the downlink scheduling information.

[0062] Specifically, the base station scheduler's physical downlink control channel (PDCCH) is primarily used to schedule uplink and downlink traffic for user equipment (UE). The downlink control channel's parameter information is downlink scheduling information for different UEs (e.g., DCI1_0, DCI1_1, etc.; DCI1_0 is primarily used for downlink scheduling of UEs during access, while DCI1_1 is primarily used for downlink scheduling of UEs after access). Typically, after the scheduler completes configuration of downlink scheduling information, the downlink scheduling information remains unchanged. Therefore, the downlink scheduling information for the downlink control channel needs to be initialized.

[0063] The CQI parameter includes a demodulation performance factor, which is calculated from the current CQI parameter reported by the current user terminal and, in combination with an allocation algorithm, allocates resources to the control channel unit corresponding to each user terminal within the same control resource set, thereby balancing changes in wireless performance and resource constraints. At this time, the actual allocation result information of the control channel unit and the statistical information values ​​of different related processes are recorded; for example, the aggregation level ultimately allocated by the control channel unit and the statistical information values ​​of the corresponding process. Resource scheduling algorithms include, but are not limited to, maximum carrier-to-interference ratio (C / I) (also known as maximum rate algorithm), round-robin scheduling algorithm, proportional fairness algorithm, etc., and are not limited to these algorithms.

[0064] After completing processing within the same control resource set, processing between control resource sets is performed. Specifically, different levels of scheduling states are set for the control resource set based on resource requirements, and one of these scheduling states is selected for initialization. For example, if there are three control resource sets, each defines three scheduling states based on resource requirements: CORESET1, CORESET2, and CORESET3. CORESET1's resource requirement is lower than CORESET2's, and CORESET2's resource requirement is lower than CORESET3's. Initialization with CORESET1, which has a lower resource requirement, can improve resource utilization. Based on the initialized CORESET1, scheduling between control resource sets is performed based on the actual allocation results and relevant statistical information from different processes. The DCI scheduling information is generated to replace the downlink scheduling information. The DCI scheduling information includes parameters such as the CCE starting position and CCE aggregation level.

[0065] In related technologies, after control channel resource configuration is complete, control-channel elements (CCEs) are allocated through a scheduling algorithm. However, demodulation performance is not considered during resource allocation, and the search strategy generally adopts an ergodic approach. This results in an inability to balance wireless performance fluctuations with resource constraints, leading to insufficient scheduler adaptability.

[0066] Through the above steps, the present application optimizes resource scheduling of the parameter information of the downlink control channel of the base station scheduler during the resource allocation process, first initializes the parameter information of the downlink control channel of the base station scheduler; then completes the resource allocation within the control resource set: specifically, the parameter information includes multiple user terminals and multiple control resource sets corresponding to each user terminal; according to the resource scheduling algorithm and the CQI parameter with a demodulation performance factor, the resource allocation of the control channel unit corresponding to each user terminal in the same control resource set is performed, and the actual allocation result information of the control channel unit and the relevant statistical information values ​​of different processes are recorded, so as to achieve a balance between wireless performance and resource constraints; finally, the resource scheduling switching between the control resource sets is completed: specifically, different levels of scheduling states of the control resource set are set according to resource requirements, and one of the scheduling states is selected for initialization; scheduling processing is performed between the control resource sets according to the actual allocation result information and the relevant statistical information values ​​of different processes, and the bearer DCI scheduling information is generated, so as to achieve overall optimization and improvement of the adaptive performance of resource scheduling; and solves the problem of insufficient adaptive performance of the scheduler in the related technology.

[0067] The following is a detailed description of the above steps:

[0068] First, the resource allocation within the same control resource set is explained:

[0069] In some embodiments, as shown in FIG3 , step S220 allocates resources to a control channel element corresponding to each user terminal within the same control resource set based on a resource scheduling algorithm and a CQI parameter having a demodulation performance factor, and records actual allocation result information of the control channel element and related statistical information values ​​of different processes, including the following steps:

[0070] Step S221, determining a CQI parameter with a demodulation performance factor for each user terminal;

[0071] Step S222: Divide the preset CQI range parameter into multiple intervals based on the modulation method, and perform interval mapping on the intervals and the aggregation levels of the control channel elements; and select a reference control channel element and a corresponding reference aggregation level based on the CQI parameter and interval mapping result.

[0072] Step S223: Search and allocate available control channel unit resources based on the reference aggregation level according to the preset resource allocation strategy, and record the actual allocation result information of the control channel unit and the relevant statistical information values ​​of different processes;

[0073] Step S224: traverse the user terminals required for scheduling in the same control resource set until resource allocation of the control channel elements corresponding to all user terminals is completed.

[0074] Specifically, within the same control resource set, the process is performed based on the number of scheduled user terminals. Steps S221 to S223 are performed for each user terminal, thereby completing resource allocation for the control channel element corresponding to each user terminal. In other embodiments, resource allocation for the control channel element corresponding to each user terminal may be performed in parallel or separately through steps S221 to S223, which will not be repeated here.

[0075] Among them, the CQI parameter has a demodulation performance factor, which is calculated by the current CQI parameter reported by the current user terminal, the number of ack feedbacks, and the number of nack feedbacks. Among them, the modulation method refers to the communication coding format. Usually, digital modulation includes BPSK (Binary Phase Shift Keying), QPSK (Quadrature Phase Shift Keying), 16QAM (Quadrature Amplitude Modulation, Quadrature Amplitude Modulation), 64QAM, 256QAM, 1024QAM, etc. The preset CQI range parameter (0-15 in this embodiment) can be divided into multiple intervals according to digital modulation; for example: taking protocol 38.212 as an example, the CQI parameters from 0 to 15 are divided into 4 intervals according to QPSK, 16QAM, 64QAM, and 256QAM respectively. Each interval corresponds to the aggregation level of a control channel element. For example, the interval (CQI range parameter 12-15) corresponds to aggregation level 1; the interval (CQI range parameter 7-11) corresponds to aggregation level 2; the interval (CQI range parameter 4-6) corresponds to aggregation level 4; and the interval (CQI range parameter 0-3) corresponds to aggregation level 8, as shown in Table 1. For another example, the preset range parameter 0-15 is divided into five intervals, each of which corresponds to the aggregation level of a control channel element. The interval (CQI range parameter 14-15) corresponds to aggregation level 1; the interval (CQI range parameter 12-13) corresponds to aggregation level 2; the interval (CQI range parameter 6-11) corresponds to aggregation level 4; the interval (CQI range parameter 2-5) corresponds to aggregation level 8; and the interval (CQI range parameter 0-1) corresponds to aggregation level 16, as shown in Table 2. It can be considered that the larger the CQI, the smaller the CCE aggregation level. At the same time, the CCE aggregation levels 2 and 4 are as high as possible. The division interval can also be adjusted according to actual usage. In other embodiments, the preset CQI range parameter can be other range values, or the preset CQI range parameter can be divided into 2, 3, 5, etc. intervals, which are not exemplified one by one.

[0076] Table 1

[0077] Table 2

[0078] Among them, the resource allocation strategy is a priority strategy adopted in the search process, for example: the control channel unit resources searched in the candidate set space corresponding to the benchmark aggregation level have the highest priority; the control channel unit resources searched in the candidate set space greater than the benchmark aggregation level have the second highest priority; the control channel unit resources searched in the candidate set space less than the benchmark aggregation level have the lowest priority; after the search allocation is completed, the actual allocation result information of the control channel unit and the related statistical information values ​​of different processes are recorded, so as to improve the search allocation efficiency.

[0079] In this embodiment, by determining a CQI parameter with a demodulation performance factor and a preset resource allocation strategy, adaptive allocation optimization of resource allocation within a control resource set is achieved, thereby achieving a balance between wireless performance and resource constraints.

[0080] In some embodiments, determining the CQI parameter with a demodulation performance factor for each user terminal in step S221 includes the following steps:

[0081] Obtain the current CQI parameter, ACK threshold value, and NACK threshold value from the user terminal;

[0082] The number of ack feedbacks is counted as ack number; the number of nack feedbacks is counted as nack number;

[0083] According to the ack threshold, the nack threshold, the ack number, the nack number and the preset CQI range threshold, the current CQI parameter is adjusted to obtain a CQI parameter with a demodulation performance factor.

[0084] Specifically, the user terminal reports its current CQI parameter; the ack threshold and the nack threshold can be preset, for example, the ack threshold is set to 920; the nack threshold is set to 80; these two thresholds can be adjusted according to actual field conditions.

[0085] When calculating a CQI parameter with a demodulation performance factor, first count the number of ack feedbacks as the ack number and the number of nack feedbacks as the nack number; compare the ack threshold value with the ack number, adjust the current CQI parameter based on the comparison result, and obtain a CQI parameter with a demodulation performance factor; and / or compare the nack threshold value with the nack number, adjust the current CQI parameter based on the comparison result, and obtain a CQI parameter with a demodulation performance factor; and it is necessary to ensure that the final CQI parameter meets the CQI range threshold. For example: the CQI range threshold is 0-15; if the final CQI parameter is 16, then adjust it to 15; if the CQI parameter is -2; then adjust it to 0. In other embodiments, if the preset CQI range parameter is other range values, then the CQI range threshold also needs to be adjusted accordingly.

[0086] In this embodiment, the current CQI parameter is adjusted to quickly generate a CQI parameter with a demodulation performance factor, while balancing the change in wireless performance and resource constraints.

[0087] Table 3

[0088] In some embodiments, the step S222 of dividing the preset CQI range parameter into multiple intervals based on the modulation method and mapping the intervals to the aggregation levels of the control channel elements includes the following steps:

[0089] The preset CQI range parameter is divided into four intervals according to the modulation method, and the CQI parameter represented by the interval is mapped to the aggregation level of the control channel unit.

[0090] Specifically, the CQI range parameter is pre-set based on demand and is directly divided into four intervals according to the modulation method. For example, Table 3 of protocol 38.214 is used as an example. Based on the communication coding format (adjustment method), digital modulation typically includes BPSK, QPSK, 16QAM, 64QAM, 256QAM, and 1024QAM. This can be understood as the Modulation column in Table 3. QPSK, 16QAM, 64QAM, and 256QAM are divided into four intervals, respectively. These intervals are then mapped to the aggregation level of the control channel unit.

[0091] In this embodiment, the preset CQI range parameters are divided into four intervals according to the modulation method, and the intervals are mapped to the aggregation levels of the control channel units. This can quickly complete the interval division and improve the mapping efficiency with the aggregation levels of the control channel units. The number of intervals is consistent with the number of aggregation levels to avoid errors.

[0092] In some embodiments, the step S223 of searching and allocating available control channel unit resources based on a preset resource allocation strategy and a reference aggregation level, and recording actual allocation result information of the control channel units and related statistical information values ​​of different processes, includes the following steps:

[0093] Determine whether control channel unit resources for the candidate set space search corresponding to the reference aggregation level are available;

[0094] If the control channel unit resources searched in the candidate set space corresponding to the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0095] If the control channel unit resources of the candidate set space search corresponding to the reference aggregation level are not available, determining whether the control channel unit resources of the candidate set space search traversing the candidate set greater than the reference aggregation level are available;

[0096] If the control channel unit resources searched for in the candidate set space greater than the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0097] If the control channel unit resources searched through the candidate set space with a level greater than the reference aggregation level are not available, determining whether the control channel unit resources searched through the candidate set space with a level less than the reference aggregation level are available;

[0098] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0099] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are unavailable, actual allocation result information and related statistical information values ​​of the control channel unit are recorded.

[0100] Specifically, the reference aggregation level of the reference CCE selected in step S222 is used as the search value for the reference CCERef, and a search for available CCE resources based on the candidate set begins. The search process adopts a "same level first, then higher, then lower" search strategy until allocation is successful or fails. This approach leverages the CCE resource hashing mechanism while prioritizing performance. After the allocation process is complete, the actual allocation results and related statistical information are recorded for subsequent scheduling. A schematic diagram of the specific resource allocation process is shown in Figure 4. S41, initialize the search value, CCERef; S42, whether the CCE resources for the candidate set space search at the aggregation level corresponding to CCERef are available; if so, record the CCE information and CCENormalnum; S43, if not, traverse whether the CCE resources for the candidate set space search at an aggregation level greater than CCERef are available; if so, record the CCE information and CCEHighnum; S44, if not, traverse whether the CCE resources for the candidate set space search at an aggregation level less than CCERef are available; if so, record the CCE information and CCELownum; if not, record the CCE information and CCEFailnum.

[0101] Next, we will explain the resource scheduling between control resource sets:

[0102] In some embodiments, performing scheduling between control resource sets according to actual allocation result information and relevant statistical information values ​​of different processes in step S230 to generate bearer DCI scheduling information includes the following steps:

[0103] Step S231, calculating the statistical parameter information value at the current scheduling moment based on the actual allocation result information and the statistical information values ​​of different related processes;

[0104] Step S232: Perform scheduling processing between control resource sets according to the statistical parameter information value and the scheduling conversion condition, and generate bearer DCI scheduling information.

[0105] Specifically, the current processing result takes effect in the next scheduling period; the statistical parameter information value at the current scheduling moment includes a CCE usage rate and an indication parameter indicating a restricted trend in CCE resource allocation.

[0106] The CCE usage rate CceUseRate is determined by the following formula: CceUseRate = (CCE1num + 2*CCE2num + 4*CCE4num + 8*CCE8num) / CCETotalnum;

[0107] Where CCE1num, CCE2num, CCE4num, and CCE8num are the statistics of aggregation levels 1, 2, 4, and 8, respectively, scheduled by user terminals, and are derived from the actual allocation result information. CCETotalnum is the total aggregation level. In other embodiments, a scheduling may involve only two user terminals (aggregation level 2 and aggregation level 4). In this case, the CCE utilization rate is: CceUseRate = (2*CCE2num + 4*CCE4num) / CCETotalnum.

[0108] The CCE scheduling statistics CceSchnum is determined by the following formula: CceSchnum = CCENormalnum + CCEHighnum + CCELownum + CCEFailnum;

[0109] The parameter indicating that CCE resource allocation has a restricted trend is CceLowRate: CceLowRate = (CCELownum + CCEFailnum) / CCESchnum;

[0110] Corresponding to the two parameters above, the upward and downward scheduling state transition thresholds UpThreshHold1, UpThreshHold2, DownThreshHold1, and DownThreshHold2 are set, respectively. The upward and downward scheduling state transition thresholds are set to 0.7, 0.8, 0.3, and 0.2, respectively. In other embodiments, the threshold information can be adjusted based on changes in the total amount of resources between different CORESETs, and can also be adjusted and optimized based on different field requirements.

[0111] Then, according to the above two types of parameters, the respective scheduling conversion conditions are as follows:

[0112] Condition 1: CceUseRate > UpThreshHold1, or CceLowRate > UpThreshHold2;

[0113] Condition 2: CceUseRate < DownThreshHold1, and CceLowRate < DownThreshHold2;

[0114] Condition 3: CceUseRate > UpThreshHold1, or CceLowRate > UpThreshHold2;

[0115] Condition 4: CceUseRate < DownThreshHold1, and CceLowRate < DownThreshHold2.

[0116] In other cases, the original scheduling state remains unchanged, thus completing the processing between CORESETs. For example: As shown in Figure 5, CORESET1, CORESET2, and CORESET3 can be understood as three variables of the current scheduling state. Assume the current scheduling state is CORESET2. If Condition 2 is satisfied, it is switched to the CORESET1 state. If Condition 3 is satisfied, it is switched to the CORESET3 state. If neither is satisfied, the CORESET2 state is maintained. At the same time, at the next scheduling moment, the control channel resources are searched, scheduled, and allocated in the corresponding resource allocation space.

[0117] In this embodiment, by configuring different resource allocation parameters between different control resource sets, and based on the actual CCE allocation result information obtained from the scheduling results within the control resource set, combined with the difference information statistics between the actual allocation result information and the allocation expectation, it is determined whether resource scheduling switching between CORESETs is required, thereby achieving the overall optimization and improvement of the adaptive performance of control channel resource scheduling.

[0118] In some of these embodiments, in order to reduce the frequency of conversion between CORESETs and prevent the ping-pong effect, the base station downlink control channel resource scheduling optimization method further includes the following steps:

[0119] After initializing one of the scheduling states, it is judged whether the built-in scheduling timing of the base station scheduler meets the preset processing cycle parameters;

[0120] When the built-in scheduling timing of the base station scheduler meets the preset processing cycle parameters, the resource scheduling processing between control resource sets is executed.

[0121] Among them, the processing period parameter HandPeriod is pre-set, and its value can be configured. For example: [1, 10, 100, 1000], etc., the unit is slot. Among them, 1 is equivalent to no period restriction, that is, the minimum scheduling period. Assume: the scheduling sequence of the scheduler is shedualslot, and the initialization is 0. Each scheduling slot will be increased by 1. Before executing the resource scheduling process between the control resource sets, first determine whether (shedualslot) mod HandPeriod is 0. If it is 0, the resource scheduling process between the control resource sets is executed, otherwise it is not executed. If the processing period parameter HandPeriod is 10, it will be executed in the corresponding time slots such as shedualslot 0, 10, 20... That is to say, the resource scheduling process between the control resource sets will only be executed when the previous period condition is met, and it will take effect in the next scheduling period according to the processing result.

[0122] The present embodiment is described and illustrated below through optional embodiments.

[0123] For example, a base station configures three user terminal (UE)-specific control resource sets (CORESETs): CORESET1, CORESET2, and CORESET3. These three CORESETs have different resource requirements (CORESET1's resource requirement is less than CORESET2's, which is in turn less than CORESET3's). For example, the three CORESETs are configured with identical frequency domain resources, but with time domain durations of 1, 2, and 3, respectively. (In other embodiments, the number of CORESETs and the time-frequency domain resources are variable and can be adjusted as needed, maintaining the principle of an increasing total amount of time-frequency resources.) The corresponding search spaces are assumed to be SearchSpace1, SearchSpace2, and SearchSpace3. The downlink control channel (PDCCH) is configured as a combination of CORESETs and search spaces. The PDCCH is aggregated from one or more CCEs (Control Channel Elements). The number of CCEs, or the aggregation level, is one of {1, 2, 4, 8, 16}. In this embodiment, the number of candidate sets corresponding to 1, 2, 4, and 8 represents an adjustment based on the desired aggregation level, such as (4, 4, 2, 2), (2, 4, 4, 2), (4, 2, 2, 4), etc.

[0124] Based on the above scenarios, the processing is mainly divided into intra-control resource set and inter-control resource set processing. Intra-control resource set processing prioritizes demodulation performance and implements adaptive optimization and adjustment of CCEs. Inter-control resource set processing aims to transform the total amount of resources and maximize resource utilization, thereby achieving the goal of dynamic scheduling optimization.

[0125] The process of controlling the processing within the resource set is as follows:

[0126] In the same control resource set, traversal processing is performed according to the number of scheduled user terminals. For each user terminal, the following processing flow is executed respectively.

[0127] 1. Determine the CQI parameters of the demodulation performance factors.

[0128] Specifically: count the number of ack feedbacks as ack number (acknum); count the number of nack feedbacks as nack number (nacknum);

[0129] If acknum>=ACKTHRESHOLD

[0130] cqi=CqiOrigin+1;

[0131] acknum=0;

[0132] If nacknum>=NACKTHRESHOLD

[0133] cqi=CqiOrigin-1;

[0134] nacknum=0;

[0135] At the same time, ensure that cqi is within the range of 0-15.

[0136] CqiOrigin is the most recently received CQI parameter reported by the terminal. ACKTHRESHOLD and NACKTHRESHOLD are the ACK threshold and NACK threshold, respectively, initialized to 920 / 80 and adjustable based on actual field conditions. The reference control channel element and the corresponding reference aggregation level are selected based on the CQI parameter and interval mapping results.

[0137] 2. Select the CCE aggregation level.

[0138] Based on the preset CQI range parameters, taking Table 3 of protocol 38.214 as an example, the preset CQI range parameters are divided into four intervals according to the modulation method, and the intervals are mapped to the aggregation levels of the control channel units. The mapping results are shown in Table 2.

[0139] 3. CCE resource allocation

[0140] CCE resource allocation uses the CCE selected in step 2 as the reference control channel element (CCERef) as the search value. The search begins with a search for available CCE resources within the candidate set. The search adopts a "same-level first, higher-level, then lower-level" strategy until allocation is successful or unsuccessful. This approach leverages the CCE resource hashing mechanism while prioritizing performance. After the allocation process is complete, the actual CCE allocation results and related statistical information are recorded for subsequent scheduling.

[0141] The initial state is CORESET1, where resource demand is relatively low. To reduce the frequency of switching between control resource sets and prevent the ping-pong effect, the processing period parameter HandPeriod is set. Before executing resource scheduling between control resource sets, the parameter (shedualslot) mod HandPeriod is checked to see if it is 0. If it is 0, resource scheduling between control resource sets is executed; otherwise, it is not executed. shedualslot is the scheduler's scheduling time, which is initially 0.

[0142] The resource scheduling process between control resource sets is as follows:

[0143] The statistical parameter values ​​at the current scheduling moment include CCE utilization and parameters indicating a trend toward restricted CCE resource allocation. Schedule transition conditions are set. Based on these conditions, inter-CORESET processing is performed to generate DCI scheduling information. This DCI information primarily includes parameters such as the CCE starting position and CCE aggregation level. The scheduler sends this DCI scheduling information to the physical layer for further channel coding and ultimately transmits it to the user terminal via the RF module.

[0144] In this optional embodiment, during CCE resource allocation within the same CORESET, channel quality statistics are obtained using a CQI parameter with a demodulation performance factor, combined with a resource allocation strategy that incorporates priority factors. This allows for adaptive optimization of resource allocation within the CORESET, achieving a balance between wireless performance and resource constraints. Furthermore, by configuring different resource allocation parameters between different CORESETs, and based on actual CCE allocation information obtained from scheduling within the control resource set, and combining statistical information on the difference between the actual allocation information and the expected allocation, the need for inter-CORESET resource scheduling switching is determined, thereby achieving overall optimization and improvement of the adaptive performance of control channel resource scheduling.

[0145] It should be noted that the steps shown in the above process or the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0146] This embodiment also provides a base station downlink control channel resource scheduling optimization device, which is used to implement the above-mentioned embodiments and optional implementations. Details already described are not repeated here. The terms "module," "unit," "subunit," etc. used below refer to a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, implementation using hardware, or a combination of software and hardware, is also possible and contemplated.

[0147] FIG6 is a structural block diagram of a base station downlink control channel resource scheduling optimization device according to this embodiment. As shown in FIG6 , the device includes: an initialization module 210, an internal processing module 220, and an inter-processing module 230;

[0148] Initialization module 210, configured to initialize downlink scheduling information of a downlink control channel of a base station scheduler; the downlink control channel corresponds to multiple user terminals; each user terminal corresponds to multiple control resource sets;

[0149] The internal processing module 220 allocates resources to the control channel elements corresponding to each user terminal within the same control resource set based on the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, and records the actual allocation result information of the control channel elements and the relevant statistical information values ​​of different processes;

[0150] The inter-processing module 230 sets the scheduling states of different levels of the control resource set according to resource requirements, selects one of the scheduling states for initialization; performs scheduling processing between the control resource sets based on the actual allocation result information and the relevant statistical information values ​​of different processes, and generates the bearer DCI scheduling information to replace the downlink scheduling information.

[0151] The above device solves the problem of insufficient adaptive performance of the scheduler in the related art, realizes flexible scheduling and allocation of downlink control channel resources, and improves adaptive performance.

[0152] In some of these embodiments, the internal processing module 220 is further configured to determine a CQI parameter having a demodulation performance factor for each user terminal;

[0153] Divide the preset CQI range parameter into multiple intervals based on the modulation method, and perform interval mapping on the intervals and the aggregation levels of the control channel elements; and select a reference control channel element and a corresponding reference aggregation level based on the CQI parameter and interval mapping results;

[0154] According to the preset resource allocation strategy, search and allocate available control channel unit resources based on the benchmark aggregation level, and record the actual allocation result information of the control channel unit and the relevant statistical information values ​​of different processes;

[0155] The user terminals required for scheduling in the same control resource set are traversed until resource allocation of the control channel units corresponding to all user terminals is completed.

[0156] In some embodiments, the internal processing module 220 is further configured to obtain a current CQI parameter, an ack threshold value, and a nack threshold value from the user terminal;

[0157] The number of ack feedbacks is counted as ack number; the number of nack feedbacks is counted as nack number;

[0158] According to the ack threshold, the nack threshold, the ack number, the nack number and the preset CQI range threshold, the current CQI parameter is adjusted to obtain a CQI parameter with a demodulation performance factor.

[0159] In some embodiments, the internal processing module 220 is further configured to divide the preset CQI range parameter into four intervals according to the modulation method, and perform interval mapping between the CQI parameters represented by the intervals and the aggregation levels of the control channel elements.

[0160] In some of the embodiments, the internal processing module 220 is further configured to determine whether control channel unit resources for the candidate set space search corresponding to the reference aggregation level are available;

[0161] If the control channel unit resources searched in the candidate set space corresponding to the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0162] If the control channel unit resources of the candidate set space search corresponding to the reference aggregation level are not available, determining whether the control channel unit resources of the candidate set space search traversing the candidate set greater than the reference aggregation level are available;

[0163] If the control channel unit resources searched for in the candidate set space greater than the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0164] If the control channel unit resources searched through the candidate set space with a level greater than the reference aggregation level are not available, determining whether the control channel unit resources searched through the candidate set space with a level less than the reference aggregation level are available;

[0165] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are available, then the actual allocation result information and related statistical information values ​​of the control channel unit are recorded;

[0166] If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are unavailable, actual allocation result information and related statistical information values ​​of the control channel unit are recorded.

[0167] In some embodiments, the time processing module 230 is further configured to calculate the statistical parameter information value at the current scheduling moment based on the actual allocation result information and the statistical information values ​​of the relevant different processes;

[0168] According to the statistical parameter information value and the scheduling conversion condition, the scheduling process between the control resource sets is performed to generate the bearer DCI scheduling information to replace the downlink scheduling information.

[0169] In some embodiments, the internal processing module 220 is further configured to determine whether the built-in scheduling sequence of the base station scheduler satisfies a preset processing cycle parameter after selecting one of the scheduling states for initialization;

[0170] When the built-in scheduling timing of the base station scheduler meets the preset processing cycle parameters, resource scheduling processing between the control resource sets is performed.

[0171] It should be noted that the above modules can be functional modules or program modules, and can be implemented through software or hardware. For modules implemented through hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.

[0172] This embodiment further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0173] Optionally, the computer device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0174] Optionally, in this embodiment, the processor may be configured to execute the following steps through a computer program:

[0175] S1, initialize downlink scheduling information of the downlink control channel of the base station scheduler; the downlink control channel corresponds to multiple user terminals; each user terminal corresponds to multiple control resource sets;

[0176] S2, based on the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, allocates resources to the control channel element corresponding to each user terminal in the same control resource set, and records the actual allocation result information of the control channel element and the relevant statistical information values ​​of different processes;

[0177] S3, set the scheduling status of different levels of the control resource set according to resource requirements, select one of the scheduling states for initialization; perform scheduling processing between the control resource sets based on the actual allocation result information and the relevant statistical information values ​​of different processes, and generate the bearer DCI scheduling information to replace the downlink scheduling information.

[0178] It should be noted that, for specific examples in this embodiment, reference may be made to the examples described in the above embodiments and optional implementation modes, and will not be repeated in this embodiment.

[0179] In addition, in conjunction with the base station downlink control channel resource scheduling optimization method provided in the above embodiments, this embodiment may also provide a storage medium for implementation. The storage medium stores a computer program; when the computer program is executed by a processor, it implements any of the base station downlink control channel resource scheduling optimization methods in the above embodiments.

[0180] It should be understood that the specific embodiments described herein are only used to explain this application and are not used to limit it. Based on the embodiments provided in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0181] Obviously, the accompanying drawings are merely examples or embodiments of the present application. A person skilled in the art can also apply the present application to other similar situations based on these drawings without inventive effort. Furthermore, it is understandable that, although the work involved in this development process may be complex and lengthy, certain design, manufacturing, or production changes based on the technical content disclosed in this application are merely routine technical means for a person skilled in the art and should not be considered to constitute a deficiency in the disclosure of the present application.

[0182] The term "embodiment" as used in this application refers to specific features, structures, or characteristics described in conjunction with the embodiment that can be included in at least one embodiment of this application. The appearance of this phrase in various places in the specification does not necessarily mean that the embodiment is the same, nor does it mean that it is mutually exclusive with other embodiments and is independent or optional. It is understood, either explicitly or implicitly, by those skilled in the art that the embodiments described in this application can be combined with other embodiments when there is no conflict.

[0183] The above-described embodiments merely represent several implementation methods of the present application. While the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of patent protection. It should be noted that a person of ordinary skill in the art may make various modifications and improvements without departing from the spirit of the present application, and these modifications and improvements fall within the scope of protection of the present application. Therefore, the scope of protection of the present application shall be determined by the appended claims.

Claims

1. A method for optimizing downlink control channel resource scheduling of a base station, characterized in that: include: Initialize downlink scheduling information of a downlink control channel of a base station scheduler; The downlink control channel corresponds to multiple user terminals; Each of the user terminals corresponds to a plurality of control resource sets; Allocate resources of the control channel unit corresponding to each user terminal in the same control resource set according to the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, and record actual allocation result information of the control channel unit and related statistical information values ​​of different processes; The scheduling states of the control resource sets of different levels are set according to resource requirements, and one of the scheduling states is selected for initialization; scheduling processing is performed between the control resource sets according to the actual allocation result information and the relevant statistical information values ​​of different processes, and the DCI scheduling information is generated to replace the downlink scheduling information.

2. The method for optimizing downlink control channel resource scheduling of a base station according to claim 1, wherein: The allocating resources of the control channel unit corresponding to each user terminal in the same control resource set according to the resource scheduling algorithm and the CQI parameter with the demodulation performance factor, and recording the actual allocation result information of the control channel unit and the related different process statistical information values, including: Determining a CQI parameter having a demodulation performance factor for each of the user terminals; Dividing a preset CQI range parameter into a plurality of intervals based on a modulation method, and performing interval mapping between the intervals and the aggregation level of the control channel unit; and selecting a reference control channel unit and a corresponding reference aggregation level according to the CQI parameter and the interval mapping result; According to a preset resource allocation strategy, searching and allocating available control channel unit resources based on the reference aggregation level, and recording actual allocation result information of the control channel unit and related statistical information values ​​of different processes; The user terminals required for scheduling in the same control resource set are traversed until resource allocation of control channel units corresponding to all the user terminals is completed.

3. The method for optimizing downlink control channel resource scheduling of a base station according to claim 2, wherein: The determining of a CQI parameter having a demodulation performance factor for each of the user terminals comprises: Acquire a current CQI parameter, an ack threshold value, and a nack threshold value from the user terminal; The number of ack feedbacks is counted as the ack number; the number of nack feedbacks is counted as the nack number; The current CQI parameter is adjusted according to the ack threshold value, the nack threshold value, the ack number, the nack number and the preset CQI range threshold value to obtain a CQI parameter with a demodulation performance factor.

4. The method for optimizing downlink control channel resource scheduling of a base station according to claim 2, wherein: The method of dividing the preset CQI range parameter into a plurality of intervals based on the modulation method, and performing interval mapping between the intervals and the aggregation level of the control channel unit, includes: The preset CQI range parameter is divided into four intervals according to the modulation method, and the CQI parameter represented by the interval is mapped to the aggregation level of the control channel unit.

5. The method for optimizing downlink control channel resource scheduling of a base station according to claim 2, wherein: The searching and allocating the available control channel unit resources based on the reference aggregation level according to the preset resource allocation strategy, and recording the actual allocation result information of the control channel unit and the related statistical information values ​​of different processes include: Determining whether control channel unit resources for the candidate set space search corresponding to the reference aggregation level are available; If the control channel unit resources searched in the candidate set space corresponding to the reference aggregation level are available, then recording the actual allocation result information and related statistical information values ​​of the control channel unit; If the control channel unit resources of the candidate set space search corresponding to the reference aggregation level are not available, determining whether the control channel unit resources of the candidate set space search traversing a level greater than the reference aggregation level are available; If the control channel unit resources searched for the candidate set space greater than the reference aggregation level are available, then recording the actual allocation result information and related statistical information values ​​of the control channel unit; If the control channel unit resources for spatial search of candidate sets greater than the reference aggregation level are not available, determining whether the control channel unit resources for spatial search of candidate sets less than the reference aggregation level are available; If the control channel unit resources searched for the candidate set space smaller than the reference aggregation level are available, then recording the actual allocation result information and related statistical information values ​​of the control channel unit; If the control channel unit resources searched for in the candidate set space smaller than the reference aggregation level are not available, actual allocation result information and related statistical information values ​​of the control channel unit are recorded.

6. The method for optimizing downlink control channel resource scheduling of a base station according to claim 1, wherein: The performing scheduling processing between the control resource sets according to the actual allocation result information and the relevant different process statistical information values, and generating bearer DCI scheduling information to replace the downlink scheduling information, includes: Calculate the statistical parameter information value at the current scheduling moment according to the actual allocation result information and the relevant statistical information values ​​of different processes; According to the statistical parameter information value and the scheduling conversion condition, scheduling processing is performed between the control resource sets, and bearer DCI scheduling information is generated to replace the downlink scheduling information.

7. The method for optimizing downlink control channel resource scheduling of a base station according to claim 1, wherein: The method further comprises: After selecting one of the scheduling states for initialization, determining whether the built-in scheduling timing of the base station scheduler satisfies a preset processing cycle parameter; When the built-in scheduling timing of the base station scheduler meets the preset processing cycle parameters, the resource scheduling processing between the control resource sets is performed.

8. A device for optimizing downlink control channel resource scheduling of a base station, characterized in that: include: Initialization module, internal processing module and external processing module; The initialization module is used to initialize the downlink scheduling information of the downlink control channel of the base station scheduler; The downlink control channel corresponds to a plurality of user terminals; each of the user terminals corresponds to a plurality of control resource sets; The internal processing module allocates resources to the control channel unit corresponding to each user terminal in the same control resource set according to the resource scheduling algorithm and the CQI parameter with a demodulation performance factor, and records actual allocation result information of the control channel unit and related statistical information values ​​of different processes; The inter-processing module sets the scheduling states of different levels of the control resource set according to resource requirements, and selects one of the scheduling states for initialization; performs scheduling processing between the control resource sets according to the actual allocation result information and the relevant statistical information values ​​of different processes, and generates the bearer DCI scheduling information to replace the downlink scheduling information.

9. A computer device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to run the computer program to execute the steps of the base station downlink control channel resource scheduling optimization method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for optimizing scheduling of downlink control channel resources of a base station described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Long term evolution (LTE) downlink control information channel resource allocation method and base station

    CN102404857A

  • Resource mapping method and blind detection method based on same

    CN104734809A

  • Method and device for configuring control channel resources

    CN105846974A

  • Method and device for adjusting aggregation level of control channel element (CCE)

    CN113037442A

  • Base station downlink control channel resource scheduling optimization method and device and computer equipment

    CN116155469A