Power supply management method, battery management method, device, network management system, and medium

By decoupling power management and battery management services in the communication power system, using CSU and SCU to process power and battery data respectively, and achieving compatibility with multiple lithium battery models through dynamic link libraries and incremental upgrade packages, it solves the current problem of There are compatibility and version management issues in technology, which reduces maintenance costs and improves user experience.

WO2024217267A1PCT designated stage expired Publication Date: 2024-10-24ZTE CORP

Patent Information

Application Number
PCT/CN2024/085233
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-20
Filing Date
2024-04-01
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

The existing technology is difficult to be compatible with multiple lithium battery models, resulting in an explosion of communication power supply versions, and cannot effectively support battery data collection and battery management services, especially when battery protocols are not unified.

Method used

By decoupling the power management business from the battery management business, the centralized control unit (CSU) and the site management unit (SCU) are respectively responsible for the collection and management of power data and battery data to achieve data aggregation and transmission to the network management system, using dynamic The link library parses the battery protocol and deploys it through incremental upgrade packages to avoid extensive modifications to the communication power supply.

Benefits of technology

It achieves compatibility with lithium batteries from different manufacturers, reduces communication power supply maintenance costs, improves system flexibility and user experience, avoids version explosion, and supports the incremental deployment of battery management services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024085233_24102024_PF_FP_ABST
    Figure CN2024085233_24102024_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure provides a power supply management method applied to a centralized control unit, comprising: collecting power supply data of a communication power supply; and receiving a request instruction of a station management unit, and transmitting the power supply data to the station management unit, so that the station management unit aggregates the power supply data and battery data of an energy storage battery acquired by the station management unit and then transmits the aggregated data to a network management system.
Need to check novelty before this filing date? Find Prior Art

Description

Power management method, battery management method and equipment, network management system, medium Technical Field

[0001] The present disclosure relates to the field of communication technology, and in particular to a power management method, a battery management method, an electronic device, a network management system, and a computer-readable medium. Background Art

[0002] With the large-scale construction of 5G networks and the trend of "lead out, lithium in" in the context of dual carbon emissions, the installed capacity of lithium batteries for telecom energy storage is expanding. This demand primarily includes new site construction, battery expansion for older power supplies, and lead-acid replacement for older sites. Due to the numerous lithium battery manufacturers and the lack of a unified protocol definition, telecom power supplies are forced to accommodate a wide range of lithium battery models, resulting in a large number of customized versions and a power supply version explosion. To address this issue, one solution is to convert the battery protocols of different manufacturers into power supply measurement point configurations on the telecom power supply, enabling support for batteries from different manufacturers. Another solution is to encapsulate the battery protocol parsing of different manufacturers into a dynamic link library, which the telecom power supply can then call to perform battery data analysis.

[0003] Summary of the Invention

[0004] Embodiments of the present disclosure provide a power management method, a battery management method, an electronic device, a network management system, and a computer-readable medium.

[0005] In a first aspect, an embodiment of the present disclosure provides a power management method, which is applied to a centralized control unit, including: collecting power data of a communication power supply; receiving a request instruction from a site management unit, and sending the power data to the site management unit, so that the site management unit aggregates the power data and battery data of the energy storage battery obtained by the site management unit and then transmits the aggregated data to a network management system.

[0006] In a second aspect, an embodiment of the present disclosure provides a battery management method, which is applied to a site management unit, including: in response to a first control instruction of a network management system, sending a query signaling to at least one energy storage battery to obtain battery data of the energy storage battery; sending a request instruction to a centralized control unit to request power data of a communication power supply; receiving the power data from the centralized control unit; and after aggregating the power data with the battery data, transmitting the aggregated data to the network management system.

[0007] In a third aspect, an embodiment of the present disclosure provides a power management method, which is applied to a network management system, including: sending a first control instruction to a site management unit; receiving battery data of an energy storage battery and power data of a communication power supply transmitted by the site management unit; and sending a second control instruction to the site management unit to control the energy storage battery.

[0008] In a fourth aspect, an embodiment of the present disclosure provides an electronic device, comprising: one or more processors; a memory on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement at least one of the following methods: the power management method described in the first aspect of the embodiment of the present disclosure; the battery management method described in the second aspect of the embodiment of the present disclosure.

[0009] In the fifth aspect, an embodiment of the present disclosure provides a network management system, comprising: one or more processors; a memory on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the power management method described in the third aspect of the embodiment of the present disclosure.

[0010] In the sixth aspect, an embodiment of the present disclosure provides a computer-readable medium on which a computer program is stored, and when the program is executed by a processor, at least one of the following methods is implemented: the power management method described in the first aspect of the embodiment of the present disclosure, the battery management method described in the second aspect of the embodiment of the present disclosure, and the power management method described in the third aspect of the embodiment of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] FIG1 is a flow chart of a power management method according to an embodiment of the present disclosure;

[0012] FIG2 is a flow chart of a power management method according to an embodiment of the present disclosure;

[0013] FIG3 is a flow chart of a battery management method according to an embodiment of the present disclosure;

[0014] FIG4 is a flow chart of a power management method according to an embodiment of the present disclosure;

[0015] FIG5 is a schematic diagram of an electronic device according to an embodiment of the present disclosure;

[0016] FIG6 is a schematic diagram of a network management system according to an embodiment of the present disclosure;

[0017] FIG7 is a schematic diagram of a communication power supply system according to an embodiment of the present disclosure;

[0018] FIG8 is a schematic diagram of a site management unit according to an embodiment of the present disclosure;

[0019] FIG9 is a flowchart of an implementation of a communication power supply system according to an embodiment of the present disclosure;

[0020] FIG10 is a schematic diagram of an incremental upgrade package according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0021] To enable those skilled in the art to better understand the technical solutions of the present disclosure, the power management method, battery management method, electronic device, network management system, and computer-readable medium provided by the present disclosure are described in detail below with reference to the accompanying drawings.

[0022] Example embodiments will be described more fully hereinafter with reference to the accompanying drawings, but the example embodiments may be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete and will fully convey the scope of this disclosure to those skilled in the art.

[0023] In the absence of conflict, the various embodiments of the present disclosure and the various features therein may be combined with each other.

[0024] As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.

[0025] The terms used herein are used only to describe specific embodiments and are not intended to limit the present disclosure. As used herein, the singular forms "a," "an," and "the" are also intended to include the plural forms, unless the context clearly indicates otherwise. It will also be understood that when the terms "comprising" and / or "made of" are used in this specification, the presence of the features, wholes, steps, operations, elements, and / or components is specified, but the presence or addition of one or more other features, wholes, steps, operations, elements, components, and / or groups thereof is not excluded.

[0026] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art. It will also be understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant art and the present disclosure, and will not be interpreted as having an idealized or overly formal meaning unless expressly defined as such herein.

[0027] The solution of converting different manufacturers' battery protocols into power measurement point configurations on the communication power supply to support the connection of batteries from different manufacturers can only solve the problem of battery data collection. It is only applicable in scenarios where the battery already supports the corresponding battery protocol and the different manufacturers only have different data dictionaries. The solution of encapsulating the battery protocol parsing of different manufacturers into a dynamic link library and having the communication power supply call the dynamic link library to complete the battery data parsing requires the communication power supply and the battery to pre-agree on the interaction interface. This cannot effectively guarantee support from all manufacturers and cannot support battery management services such as current balancing and peak shaving beyond battery data collection. In this solution, the main logic for battery management still needs to be completed by the communication power supply, which requires extensive modification and adaptation to the communication power supply and cannot meet all scenarios. In addition, due to the limitations of its embedded device characteristics, the common solution for incremental deployment is to use dynamic library import. However, not all communication power supplies support dynamic library import, and when using dynamic library import for incremental deployment, it is impossible to call new interfaces.

[0028] There is an urgent need for a communication power supply solution that is easy to maintain and low-cost.

[0029] FIG1 is a flow chart of a power management method according to an embodiment of the present disclosure.

[0030] 1 , the power management method according to an embodiment of the present disclosure is applied to a central supervision unit (CSU), and includes steps S11 and S12 .

[0031] In step S11, power supply data of the communication power supply is collected.

[0032] In step S12, a request instruction from a site control unit (SCU) is received, and the power data is sent to the site control unit, so that the site control unit aggregates the power data and the battery data of the energy storage battery obtained by the site control unit and transmits the aggregated data to the network management system.

[0033] In the embodiment of the present disclosure, a communication power supply system is composed of a CSU, an SCU, and interactive components between the SCU and the CSU. The CSU can also be called a communication power management unit, and the SCU can also be called an energy storage battery management unit. The CSU is responsible for the power management business of the communication power supply, and the SCU is responsible for the battery management business of the energy storage battery. In the embodiment of the present disclosure, when the CSU runs the power management business, it can collect power data of the communication power supply, and can send the power data to the SCU in response to a request instruction from the SCU. When running the battery management business, the SCU can collect battery data of the energy storage battery, and can also obtain power data from the CSU in response to the control instruction of the network management system, and then transmit the aggregated data to the network management system after aggregating the power data and the battery data. This achieves the decoupling of the power management business and the battery management business.

[0034] In the embodiments of the present disclosure, the SCU and the CSU can be deployed on the same hardware device, for example, both the SCU and the CSU can be deployed on communication power hardware. The SCU and the CSU can also be deployed on different hardware devices, that is, the SCU can operate independently of the CSU, for example, the SCU can be deployed on a site controller, an integrated collector, etc. This embodiment of the present disclosure does not specifically limit this.

[0035] In the embodiment of the present disclosure, power data refers to data related to the communication power supply, such as DC power distribution data, AC power distribution data, rectifier data, battery information directly connected to the communication power supply, etc. Battery data refers to data related to the energy storage battery.

[0036] It's important to note that with the power management and battery management services decoupled, the telecom power supply doesn't need to be compatible with a wide range of lithium-ion battery models. This eliminates the need for a large number of customized telecom power supply versions and prevents version explosion. Compatibility with different lithium-ion battery models can be achieved through upgrades to the SCU. Upgrading the SCU and the CSU does not affect each other, increasing the flexibility of telecom power supply maintenance and management, reducing deployment and maintenance costs, and improving the user experience.

[0037] In some embodiments, when the SCU and CSU are deployed on the same hardware device, the SCU and CSU are separate processes, and the CSU and SCU can transmit instructions and data via an inter-process interface (socket). In some embodiments, when the SCU and CSU are deployed on different hardware devices, the CSU and SCU can transmit instructions and data via a network socket.

[0038] In some embodiments, a site management unit configuration flag is set in the SCU to identify whether the SCU and the CSU are deployed on the same hardware device or on different hardware devices.

[0039] Accordingly, in some embodiments, sending the power data to the site management unit includes: obtaining a site management unit configuration tag; when the site management unit configuration tag is a first tag value, sending the power data to the management unit through a network interface; when the site management unit configuration tag is a second tag value, sending the power data to the site management unit through an inter-process interface.

[0040] In the embodiment of the present disclosure, the site management unit configuration mark is a first mark value, indicating that the SCU and CSU are deployed on different hardware devices, and the site management unit configuration mark is a second mark value, indicating that the SCU and CSU are deployed on the same hardware device.

[0041] The present disclosure does not specifically limit the first tag value and the second tag value. For example, if the site management unit configuration tag is non-empty, it indicates that the site management unit configuration tag is the first tag value; if the site management unit configuration tag is empty, it indicates that the site management unit configuration tag is the second tag value. For example, the first tag value is 1 and the second tag value is 0.

[0042] In some embodiments, the CSU can control the SCU to start or restart, and can monitor the operating status of the SCU.

[0043] Accordingly, in some embodiments, the power management method further includes: detecting the operating status of the site management unit; in the event that the site management unit operates abnormally, sending an instruction to restart the site management unit; in the event that the site management unit fails to restart, sending an abnormal alarm to the network management system and transmitting power data to the network management system.

[0044] The embodiments of the present disclosure do not specifically limit how the CSU monitors the operating status of the SCU. In some embodiments, the CSU detects whether the operating status of the SCU is normal through heartbeat messages.

[0045] In the embodiment of the present disclosure, if the SCU cannot be restarted and restored to normal once, it means that the SCU restart has failed; or if the SCU cannot be restarted and restored to normal after multiple restarts, it means that the SCU restart has failed. The embodiment of the present disclosure does not specifically limit this.

[0046] In the embodiment of the present disclosure, when the power management service is decoupled from the battery management service, the upgrade of the SCU and the upgrade of the CSU will not affect each other. The SCU can also independently run battery management services such as battery data collection, issuing control commands, current balancing, peak shaving and valley filling. When the power management service is decoupled from the battery management service, new battery management service functions can be realized by incrementally upgrading the SCU.

[0047] In some embodiments, the incremental upgrade package is transmitted to the CSU through the network management system to trigger the upgrade, and the incremental upgrade deployment of the SCU is completed under the control of the CSU.

[0048] FIG2 is a flow chart of a power management method according to an embodiment of the present disclosure.

[0049] 2 , the power management method of the embodiment of the present disclosure further includes steps S11 to S14 . Steps S11 and S12 described with reference to FIG2 are the same as steps S11 and S12 described with reference to FIG1 , and are not described again herein.

[0050] In step S13, an incremental upgrade package is received.

[0051] In step S14, the site management unit is upgraded according to the incremental upgrade package.

[0052] In the embodiment of the present disclosure, the incremental upgrade of the SCU may be to add a new battery management service function, or to increase support for new energy storage battery manufacturers and new energy storage battery models. This embodiment of the present disclosure does not specifically limit this.

[0053] In the disclosed embodiment, the SCU is incrementally upgraded without affecting the CSU, thereby improving the flexibility of the upgrade deployment, making the communication power supply system more scalable and easier to deploy, and helping to reduce maintenance costs.

[0054] The embodiments of the present disclosure do not impose any special restrictions on how to perform incremental upgrade deployment on the SCU according to the incremental upgrade package.

[0055] In some embodiments, the site management unit is upgraded according to the incremental upgrade package, including: detecting the incremental upgrade package according to the feature vector of the incremental upgrade package; backing up the original startup program if the detection passes; replacing the original startup program according to the upgrade boot program in the incremental upgrade package; updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package; and restoring the startup program in the site management unit to the original startup program.

[0056] It should be noted that in the disclosed embodiments, the SCU is incrementally upgraded based on the CSU upgrade interface. The feature vector of the incremental upgrade package is constructed based on the CSU upgrade package, and the feature vector of the incremental upgrade package is consistent with the feature vector of the CSU upgrade package, enabling the CSU upgrade interface to recognize the incremental upgrade package and initiate the upgrade process. In some embodiments, the consistency of the feature vector of the incremental upgrade package with the feature vector of the CSU upgrade package means that the feature vectors include the same file name, file size, and required files.

[0057] In the embodiment of the present disclosure, the SCU is incrementally upgraded according to the upgrade interface of the CSU, without changing the upgrade interface of the CSU, thereby avoiding the impact of the upgrade of the battery management service on the power management service.

[0058] In this disclosed embodiment, the original boot program is the upgrade boot program for the CSU upgrade interface. The original boot program is replaced with the upgrade boot program in the incremental upgrade package to ensure the incremental upgrade logic is used. Backing up the original boot program and restoring it after the incremental upgrade is complete restores the CSU upgrade interface, preventing the incremental upgrade of the SCU from affecting subsequent CSU upgrades.

[0059] In some embodiments, before updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package, it also includes: obtaining the site management unit configuration tag; when the site management unit configuration tag is a first tag value, backing up the original northbound management process file; when the site management unit configuration tag is a second tag value, updating the site management unit configuration tag according to the site management unit configuration tag to be updated in the incremental upgrade package.

[0060] In the disclosed embodiments, data transmission between the CSU and SCU, data transmission between the CSU and the network management system, and data transmission between the SCU and the network management system is referred to as northbound transmission; the northbound management process refers to the interface or process used to upload data from the CSU to the SCU, or vice versa. In the disclosed embodiments, when performing an incremental upgrade of the SCU, the northbound management process can be upgraded synchronously or not. This disclosed embodiment does not impose any specific limitations on this.

[0061] In some embodiments, whether the northbound management process needs to be upgraded is indicated according to a northbound management process update flag in the incremental upgrade package.

[0062] Accordingly, in some embodiments, before updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package, it also includes: when there is a northbound management process update flag in the incremental upgrade package, updating the original northbound management process file according to the northbound management process file to be updated in the incremental upgrade package.

[0063] In the embodiment of the present disclosure, the SCU is incrementally upgraded according to the upgrade interface of the CSU, and an incremental upgrade package needs to be constructed according to the characteristics of the CSU upgrade package.

[0064] Accordingly, in some embodiments, the power management method also includes: extracting the upgrade package feature vector of the centralized control unit; constructing an incremental upgrade package based on the upgrade package feature vector, and the feature vector of the incremental upgrade package is consistent with the upgrade package feature vector; wherein the incremental upgrade package includes at least one of an upgrade boot program, a process file of the site management unit to be updated, a configuration mark of the site management unit to be updated, a northbound management process update flag, and a northbound management process file to be updated.

[0065] FIG3 is a flow chart of a battery management method according to an embodiment of the present disclosure.

[0066] 3 , the battery management method according to an embodiment of the present disclosure is applied to a site management unit and includes steps S21 to S24 .

[0067] In step S21, in response to a first control instruction of the network management system, a query signaling is sent to at least one energy storage battery to obtain battery data of the energy storage battery.

[0068] In step S22, a request instruction for acquiring power data of the communication power supply is sent to the centralized control unit.

[0069] In step S23, power supply data is received from the centralized control unit.

[0070] In step S24, after the power source data and the battery data are aggregated, the aggregated data is transmitted to the network management system.

[0071] In the embodiment of the present disclosure, a communication power supply system is composed of a CSU, an SCU, and interactive components between the SCU and the CSU. The CSU can also be called a communication power management unit, and the SCU can also be called an energy storage battery management unit. The CSU is responsible for the power management business of the communication power supply, and the SCU is responsible for the battery management business of the energy storage battery. In the embodiment of the present disclosure, when the CSU runs the power management business, it can collect power data of the communication power supply, and can send the power data to the SCU in response to a request instruction from the SCU. When running the battery management business, the SCU can collect battery data of the energy storage battery, and can also obtain power data from the CSU in response to the control instruction of the network management system, and then transmit the aggregated data to the network management system after aggregating the power data and the battery data. This achieves the decoupling of the power management business and the battery management business.

[0072] In some embodiments, the battery management method further includes: sending a control signaling to the energy storage battery in response to a second control instruction of the network management system to control the energy storage battery.

[0073] FIG4 is a flow chart of a power management method according to an embodiment of the present disclosure.

[0074] 4 , the power management method according to an embodiment of the present disclosure is applied to a network management system and includes steps S31 to S33 .

[0075] In step S31, a first control instruction is sent to the site management unit.

[0076] In step S32, the battery data of the energy storage battery and the power data of the communication power supply transmitted by the site management unit are received.

[0077] In step S33, a second control instruction is sent to the site management unit to control the energy storage battery.

[0078] In the embodiment of the present disclosure, a communication power supply system is composed of a CSU, an SCU, and interactive components between the SCU and the CSU. The CSU can also be called a communication power management unit, and the SCU can also be called an energy storage battery management unit. The CSU is responsible for the power management business of the communication power supply, and the SCU is responsible for the battery management business of the energy storage battery. In the embodiment of the present disclosure, when the CSU runs the power management business, it can collect power data of the communication power supply, and can send the power data to the SCU in response to a request instruction from the SCU. When running the battery management business, the SCU can collect battery data of the energy storage battery, and can also obtain power data from the CSU in response to the control instruction of the network management system, and then transmit the aggregated data to the network management system after aggregating the power data and the battery data. This achieves the decoupling of the power management business and the battery management business.

[0079] FIG5 is a schematic diagram of an electronic device according to an embodiment of the present disclosure.

[0080] 5 , the electronic device of an embodiment of the present disclosure includes: one or more processors 101; a memory 102 on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the battery management method described above with reference to FIG1 and FIG2 ; and one or more I / O interfaces 103, connected between the processor and the memory, and configured to implement information interaction between the processor and the memory.

[0081] The processor 101 is a device with data processing capabilities, including but not limited to a central processing unit (CPU); the memory 102 is a device with data storage capabilities, including but not limited to random access memory (RAM, more specifically SDRAM, DDR, etc.), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), and flash memory (FLASH); the I / O interface (read-write interface) 103 is connected between the processor 101 and the memory 102, and can realize information exchange between the processor 101 and the memory 102, including but not limited to a data bus (Bus), etc.

[0082] In some embodiments, the processor 101 , the memory 102 , and the I / O interface 103 are connected to each other via a bus 104 , and further connected to other components of the computing device.

[0083] FIG6 is a schematic diagram of a network management system according to an embodiment of the present disclosure.

[0084] 6 , the network management system of an embodiment of the present disclosure includes: one or more processors 201; a memory 202 on which one or more programs are stored, and when the one or more programs are executed by one or more processors, the one or more processors implement the power management method as described above with reference to FIG3 ; and one or more I / O interfaces 203, connected between the processor and the memory, and configured to implement information interaction between the processor and the memory.

[0085] The processor 201 is a device with data processing capabilities, including but not limited to a central processing unit (CPU); the memory 202 is a device with data storage capabilities, including but not limited to random access memory (RAM, more specifically SDRAM, DDR, etc.), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), and flash memory (FLASH); the I / O interface (read-write interface) 203 is connected between the processor 201 and the memory 202, and can realize information exchange between the processor 201 and the memory 202, including but not limited to a data bus (Bus).

[0086] In some embodiments, the processor 201 , the memory 202 , and the I / O interface 203 are connected to each other via a bus 204 , and further connected to other components of the computing device.

[0087] An embodiment of the present disclosure provides a computer-readable medium having a computer program stored thereon. When the program is executed by a processor, the power management method described above with reference to FIG. 1 to FIG. 3 is implemented.

[0088] In order to enable those skilled in the art to more clearly understand the technical solutions provided by the embodiments of the present disclosure, the technical solutions provided by the embodiments of the present disclosure are described in detail below through specific examples.

[0089] Example 1

[0090] This example provides a communications power system that decouples power management from battery management and enables incremental deployment of battery management services. In this example, battery management services are transferred from the CSU to the SCU, and the SCU is incrementally upgraded using the CSU's upgrade interface, eliminating the need to modify or add new CSU interfaces.

[0091] Figure 7 is a schematic diagram of a communications power supply system according to an embodiment of the present disclosure. As shown in Figure 7, the communications power supply system includes a battery cluster consisting of multiple energy storage batteries, a communications power supply, and a network management system. The communications power supply, battery cluster, and network management system are networked via RS485, Ethernet, and other communication methods. Both the CSU and SCU are deployed on the communications power supply, and the CSU and SCU exchange data via inter-process sockets.

[0092] In this example, the SCU consists of three components: the Battery System Management Unit (BSMU), which is responsible for energy storage battery business management; the Field Supervision Unit (FSU), which is responsible for the access of energy storage batteries and communication power supplies and other extended access; and the Site Gateway (SGW), which is responsible for sending battery data and power data to the network application layer and receiving network application layer instructions.

[0093] FIG8 is a schematic diagram of a site management unit according to an embodiment of the present disclosure, and the SCU will be described in conjunction with FIG8 .

[0094] The BSMU is responsible for specific battery management tasks, including data collection, control command issuance, current balancing, and peak load shifting. The BSMU uses multi-threaded parallel management, with the number of threads matching the number of RS485 interfaces connected to the energy storage batteries. Each thread manages a battery cluster connected to an RS485 interface.

[0095] The FSU is responsible for collecting and aggregating power and battery data, as well as transparently transmitting SGW commands. Power data is connected to the SCU's FSU module via a socket from the CSU, while battery data is transferred from the BSMU to the FSU via shared memory. This allows for the aggregation of power and battery data at the FSU layer.

[0096] The SGW is responsible for responding to network management instructions, including sending data and issuing control commands. It transmits the power and battery data collected by the FSU to the EDM network management system, which is fully compatible with the original EDM network management system structure.

[0097] In this example, the CSU transmits power supply data (such as rectifiers and lead-acid batteries) to the SCU via sockets, where it is aggregated and then transmitted to the EDM network management system. The CSU includes an SCU configuration tag and uses this tag to determine whether the CSU uses a network socket or an inter-process socket. If the SCU configuration tag is detected and the SCU software is not deployed on the CSU hardware, the CSU and SCU exchange data via a network socket. If the SCU software is deployed on the CSU hardware, the CSU and SCU exchange data via an inter-process socket.

[0098] FIG9 is an implementation flow chart of the communication power supply system according to an embodiment of the present disclosure. Referring to FIG9 , specific implementation steps include steps S401 to S406 .

[0099] In step S401, the CSU starts and checks whether the CSU has an SCU configuration flag.

[0100] In step S402, if the CSU contains the SCU configuration flag, it means that the system configures the SCU hardware, the CSU starts its own northbound transmission process, and uses the network socket to transmit the power data to the SCU.

[0101] In step S403, if the CSU does not contain the SCU configuration mark, it means that the system is not configured with SCU hardware, then the CSU starts the SCU process, and both the SCU and the CSU run on the power hardware. After the SCU is started, it is included in the unified management of the CSU.

[0102] In step S404, the CSU starts its own northbound transmission process and communicates with relevant components in the SCU software using inter-process sockets;

[0103] In step S405, the CSU checks whether the SCU is running normally through the heartbeat message; if the SCU heartbeat is not detected, the CSU will try to restart the SCU process; if the SCU cannot be restarted, jump to S406.

[0104] In step S406, if the SCU fails to recover after multiple attempts, the CSU generates an SCU function abnormality alarm and takes over the network management parameters in the SCU. The CSU northbound transmission process directly transmits basic power data to the network management.

[0105] In this example, the CSU takes on the power management business and transfers the battery management business to the SCU, thereby decoupling the power and battery management businesses.

[0106] Example 2

[0107] This example, based on the communications power system in Example 1, incrementally deploys the SCU. This upgrade is completed by calling the SCU incremental upgrade package using the CSU's native full upgrade interface. This process primarily involves designing the incremental upgrade package and executing the upgrade.

[0108] Figure 10 is a schematic diagram of an incremental upgrade package according to an embodiment of the present disclosure. As shown in Figure 10, the incremental upgrade package includes six components: a feature vector, an upgrade boot program, an SCU process file to be updated, an SCU configuration flag, a CSU northbound management flag, and a CSU northbound management update file. The feature vector generally includes the file name, file size, and required files to ensure that the incremental upgrade package can enter the upgrade process through the CSU upgrade interface check. The upgrade boot program triggers the execution logic after the upgrade using the CSU upgrade interface. The upgrade boot program must have the same name as the original boot program to ensure that it can overwrite the original boot program corresponding to the CSU. This is a key component for completing the incremental upgrade. The SCU configuration flag primarily indicates whether the upgrade requires an SCU configuration flag update. The SCU process file to be updated is the core component of the incremental upgrade and completes the SCU update. The CSU northbound management flag and CSU northbound management update file primarily indicate whether the CSU northbound management process needs to be updated. This component is primarily used to upload CSU data to the SCU and can be used to update the CSU-SCU interaction services.

[0109] The process of implementing SCU incremental deployment using the CSU upgrade interface is as follows:

[0110] Transfer the incremental upgrade package to the CSU through the network management system, web, or USB flash drive to trigger the upgrade.

[0111] The CSU upgrade interface checks the incremental upgrade package. If the check passes, the upgrade process continues; if the check fails, the upgrade process exits.

[0112] The CSU decompresses the incremental upgrade package, restarts the system, and enters the upgrade process;

[0113] Back up the original startup program;

[0114] Check whether the CSU northbound management process update flag is present in the incremental upgrade package. If so, replace the original CSU northbound management process file with the one in the incremental upgrade package.

[0115] Check whether the SCU configuration flag on the CSU exists. If not, the CSU has never been configured with the SCU software and is a new deployment. Back up the original northbound network management parameters of the CSU so that in the event of an SCU component failure, the CSU can take over communication with the network management system and send power data and alarms. If present, overwrite the original flag with the SCU flag in the incremental upgrade package.

[0116] Use the SCU process file to be updated in the incremental upgrade package to overwrite the original SCU process file to complete the SCU update;

[0117] Update program version number;

[0118] Restore the CSU startup program using the backed-up original startup program to complete the incremental upgrade process.

[0119] The incremental upgrade package and upgrade process of this embodiment can use the CSU upgrade interface to implement incremental deployment or update of the SCU. The upgrade process does not involve changes to the power management service, which can avoid the impact on the power service.

[0120] Example 3

[0121] With the large-scale construction and commissioning of 5G base stations, domestic operators are paying more and more attention to the demand for peak-shaving and valley-filling, and have successively launched peak-shaving and valley-filling stations in many places. The configuration of energy storage batteries is generally below 1000AH. In order to facilitate remote management and maintenance of the communication power supply system, customers require the power supply system to be connected to the network management. However, due to limited IP resources, the power supply system (including power supply and battery) of each site only uses one IP resource. Application scenarios include: (1) Providing new sites with supporting power supplies and batteries; (2) Communication power supplies and lead-acid batteries have been deployed on site, and smart lithium batteries need to be provided for peak-shaving and valley-filling transformation; (3) Third-party power supplies are deployed on site, and smart lithium batteries need to be provided for peak-shaving and valley-filling transformation.

[0122] Due to the complex on-site communication power supply situation, it is necessary to decouple the battery management service from the power management service to achieve peak shaving and valley filling functions and facilitate subsequent maintenance of other battery management services.

[0123] This example uses a CSU (equipped with one southbound RS485 interface and one northbound Ethernet port) and an SCU to decouple power management from battery management. The SCU implements battery data collection and peak load shifting. This example uses 10 battery packs. To address the above issues, design and operational implementation steps are provided.

[0124] Design implementation steps:

[0125] Analyze the power supply and battery configurations at the sites to be networked and determine the network design. Connect 10 battery packs to the CSU via the RS485 interface. Deploy the SCU on the power supply hardware, and connect the CSU to the network management system via the northbound Ethernet port.

[0126] CSU Design and Deployment: The CSU includes power management and interaction with the SCU. It offloads current sharing and data management services for communication energy storage batteries in traditional power supplies to the SCU. The CSU software collects power supply information (such as DC distribution, AC distribution, and rectifiers) and information about the lead-acid batteries directly connected to the power supply. The SCU configuration flag in the CSU is set to false. The CSU transmits collected data to the SCU via a process socket, reusing the power supply's native northbound protocol, 1104.

[0127] SCU Design and Deployment: The SCU is deployed on the CSU hardware and connects to a cluster of energy storage batteries via the CSU's single southbound RS485 port. The SCU software consists of three components: the BSMU, FSU, and SGW. The BSMU implements energy storage battery access, data analysis, and battery management services such as peak load shifting. The FSU aggregates battery and power supply data and transparently transmits network management commands. The GSW responds to network management commands.

[0128] Operational implementation steps:

[0129] Complete system software and hardware deployment according to the design state design;

[0130] CSU Startup: CSU starts to carry out power supply related business;

[0131] The CSU checks the SCU configuration flag to determine the existence of the SCU. In this embodiment, if the SCU configuration flag in the CSU is no, the SCU process is started;

[0132] After the SCU is started, the BSMU, FSU, and SGW are started accordingly, and the shared memory mapping of the BSMU, FSU, and SGW is completed. The BSMU starts a sub-thread, which polls and sends modus instructions according to addresses 1-32 and parses the energy storage battery data according to the response results and stores it in the shared memory. Battery management services such as peak shaving and valley filling are also implemented in this module. The FSU uses an inter-process socket to establish a link with the CSU, and sends the 1104 instruction and parses the power-related data according to the response results and stores it in the shared memory. The SGW receives the network management SNMP V3 instruction and obtains the power and battery data from the shared memory according to the instruction content and encapsulates it into the corresponding protocol format to respond to the network management instruction. After the SCU is started, it is included in the unified management of the CSU;

[0133] Start the CSU northbound process, enter the inter-process socket response process, wait for the 1104 command sent by the SCU process and respond;

[0134] The CSU process management module checks whether the SCU is running normally through heartbeat messages. If no SCU heartbeat is detected, the CSU will try to restart the SCU process.

[0135] If the SCU fails to recover after repeated attempts, the CSU generates an SCU function abnormality alarm and takes over the network management parameters in the SCU. The CSU northbound transmission process directly transmits basic power data to the network management and sends an SCU module abnormality alarm.

[0136] Through this embodiment, the energy storage battery connection and peak load shifting services are transferred to the BSMU module in the SCU for implementation, and the CSU is only responsible for the power management service, thereby achieving decoupling of the power management service from the battery management service.

[0137] Example 4

[0138] Based on Example 3, this example provides a solution for incremental upgrade of the SCU. It uses the CSU upgrade interface to complete the incremental deployment of the SCU and uses the network management system to trigger the upgrade.

[0139] In this example, the feature vectors of the incremental upgrade package and the full CSU upgrade package are the same, including:

[0140] Feature 1: The upgrade package size must be less than 20M;

[0141] Feature 2: The upgrade package contains key process files, identified by the process name mainapp;

[0142] Feature 3: The upgrade package contains an upgrade startup script, identified by its name;

[0143] Feature 4: The upgrade package contains an integrity check code.

[0144] After extracting the feature vector, the CSU upgrade interface uses the feature vector to complete the identification of the incremental upgrade package, thereby ensuring that the CSU upgrade interface can identify the incremental upgrade package and trigger the upgrade.

[0145] The SCU incremental upgrade package in this example includes:

[0146] SCU configuration flag: set to No, indicating that the SCU runs on CSU hardware;

[0147] SCU process files to be updated: to achieve energy storage battery docking and peak shaving and valley filling functions;

[0148] Upgrade boot program: core component, used to guide the upgrade process execution;

[0149] Required attachment files for upgrade: correspond to the feature vector of the upgrade package and are required files to ensure that the upgrade verification passes.

[0150] This example does not involve the CSU northbound transmission process update, and the relevant optional parts are not included in the incremental upgrade package of this embodiment. The implementation steps of the incremental upgrade using the CSU upgrade interface and the above incremental upgrade package are as follows:

[0151] Use the EDM to transfer the incremental upgrade package to the CSU and trigger the upgrade.

[0152] The CSU upgrade interface checks the incremental upgrade package. If the check passes, the upgrade process continues; if the check fails, the upgrade process exits.

[0153] The CSU decompresses the incremental upgrade package, restarts the system, and enters the upgrade process;

[0154] Back up the original startup program;

[0155] Determine whether the upgrade package contains a CSU northbound management process update flag. This embodiment does not contain an update flag.

[0156] Determine whether the SCU configuration flag exists on the CSU. In this embodiment, the CSU has never been configured with the SCU software and is a newly deployed one.

[0157] Back up the original northbound network management parameters of the CSU;

[0158] Convert the SCU configuration mark in the incremental upgrade package to a running state mark;

[0159] Use the SCU process file to be updated in the incremental upgrade package to overwrite the original SCU process file to complete the SCU update, thereby realizing the new peak shaving and valley filling function;

[0160] Update program version number;

[0161] Restore the CSU startup program using the backed-up original startup program to complete the incremental upgrade process.

[0162] This example demonstrates incremental SCU deployment using the power CSU upgrade interface, minimizing impact on power management services and significantly improving upgrade efficiency.

[0163] Example 5

[0164] In this example, the SCU can run on hardware devices other than communication power hardware, such as site controllers and integrated collectors. This example uses the SCU deployed on a site controller as an example.

[0165] The site controller's primary function is southbound data collection, so it typically has strong access capabilities, including multiple RS485 interfaces and southbound network ports. The SCU is deployed on the site controller and works with the power supply CSU to manage the entire system.

[0166] The SCU uses the site controller's southbound RS485 interface to connect multiple battery clusters. Based on the RS485 configuration, the SCU initiates threads to manage each battery cluster concurrently. Furthermore, the site controller's southbound Ethernet port is directly connected to the CSU's northbound Ethernet port for CSU access. The SCU deployed on the site controller interacts with the SCU via a network socket. The remaining process is similar to Example 3.

[0167] In this example, the incremental deployment of the SCU can also adopt a method similar to that of Example 4.

[0168] It will be appreciated by those skilled in the art that all or some of the steps, systems, and functional modules / units in the methods disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. In hardware implementations, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or non-transitory medium) and a communication medium (or temporary medium). As is well known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable, and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by a computer. In addition, it is well known to those skilled in the art that communication media typically embodies computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0169] Example embodiments have been disclosed herein, and although specific terms are employed, they are used and should be interpreted only in a general illustrative sense and not for purposes of limitation. In some instances, it will be apparent to those skilled in the art that, unless otherwise expressly indicated, features, characteristics, and / or elements described in conjunction with a particular embodiment may be used alone or in combination with features, characteristics, and / or elements described in conjunction with other embodiments. Therefore, it will be understood by those skilled in the art that various changes in form and detail may be made without departing from the scope of the present disclosure as set forth in the appended claims.

Claims

1. A power management method, applied to a centralized control unit, comprising: Collect power data of communication power supply; as well as Receive a request instruction from the site management unit, and send the power data to the site management unit, so that the site management unit aggregates the power data and the battery data of the energy storage battery acquired by the site management unit and then transmits the aggregated data to the network management system.

2. The power management method according to claim 1, wherein: Sending the power data to the site management unit includes: Get the site management unit configuration flag; In a case where the site management unit configuration mark is a first mark value, sending the power data to the site management unit through a network interface; and In a case where the site management unit configuration tag is a second tag value, the power data is sent to the site management unit through an inter-process interface.

3. The power management method according to claim 1, further comprising: Detecting the operating status of the site management unit; When the site management unit runs abnormally, sending an instruction to restart the site management unit; as well as In the case where the site management unit fails to restart, an abnormal alarm is sent to the network management system, and the power supply data is transmitted to the network management system.

4. The power management method according to any one of claims 1 to 3, further comprising: Receive incremental upgrade packages; as well as The site management unit is upgraded according to the incremental upgrade package.

5. The power management method according to claim 4, wherein: Upgrading the site management unit according to the incremental upgrade package includes: Detecting the incremental upgrade package according to the feature vector of the incremental upgrade package; If the test passes, back up the original startup program; Replace the original startup program according to the upgrade boot program in the incremental upgrade package; Updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package; and The startup program in the site management unit is restored to the original startup program.

6. The power management method according to claim 5, wherein: Before updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package, the method further includes: Get the site management unit configuration flag; When the site management unit configuration mark is a first mark value, backing up the original northbound management process file; and When the site management unit configuration flag is a second flag value, the site management unit configuration flag is updated according to the site management unit configuration flag to be updated in the incremental upgrade package.

7. The power management method according to claim 5, wherein: Before updating the original site management unit process file according to the site management unit process file to be updated in the incremental upgrade package, the method further includes: In the case where the northbound management process update flag exists in the incremental upgrade package, the original northbound management process file is updated according to the northbound management process file to be updated in the incremental upgrade package.

8. The power management method according to claim 4, further comprising: Extracting a feature vector of an upgrade package of the centralized control unit; as well as The incremental upgrade package is constructed according to the upgrade package feature vector, the feature vector of the incremental upgrade package is consistent with the upgrade package feature vector, The incremental upgrade package includes an upgrade guide, a site management program to be updated, At least one of a unit process file, a site management unit configuration mark to be updated, a northbound management process update mark, and a northbound management process file to be updated.

9. A battery management method, applied to a site management unit, comprising: In response to a first control instruction of the network management system, a query signaling is sent to at least one energy storage battery to obtain battery data of the energy storage battery; Sending a request instruction to the centralized control unit to request to obtain power data of the communication power supply; receiving the power supply data from the centralized control unit; After the power source data and the battery data are aggregated, the aggregated data is transmitted to the network management system.

10. The battery management method according to claim 9, further comprising: In response to the second control instruction of the network management system, a control signaling is sent to the energy storage battery to control the energy storage battery.

11. A power management method, applied to a network management system, comprising: Sending a first control instruction to the site management unit; Receiving battery data of the energy storage battery and power data of the communication power supply transmitted by the site management unit; A second control instruction is sent to the site management unit to control the energy storage battery.

12. An electronic device comprising: one or more processors; A memory having one or more programs stored thereon, when the one or more programs are executed by the one or more processors, the one or more processors implement at least one of the following methods: The power management method according to any one of claims 1 to 8; The battery management method according to claim 9 or 10.

13. A network management system, comprising: one or more processors; A memory having one or more programs stored thereon, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the power management method according to claim 11.

14. A non-transitory computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the power management method according to any one of claims 1 to 11 is implemented.

Citation Information

Patent Citations

  • Data increment upgrading method, power supply equipment system, network management and storage medium

    CN115794185A

  • Management system and method for power supply and energy storage battery pack network

    CN116667469A

  • Gateway system

    CN1466313A

  • Energy storage management device, distributed energy storage management system and energy storage system

    CN209571836U

  • Method for upgrading energy storage system remotely, energy management system, and battery management system

    US20210117180A1

Cited By

  • Battery management system upgrading method and electronic equipment

    CN119271244A

  • Configuration backup method, device, equipment and system

    CN121283862A

  • A configuration backup method, device, apparatus and system

    CN121283862B