Battery control device and vehicle control device
By adjusting measurement timing to account for deviations, the battery control device ensures accurate internal resistance calculations, addressing the challenge of timing errors and improving battery control in vehicle systems.
Patent Information
- Application Number
- PCT/JP2024/014850
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-19
- Filing Date
- 2024-04-12
- Publication Date
- 2024-10-24
AI Technical Summary
Existing battery control systems face challenges in accurately calculating the internal resistance value due to measurement timing deviations between current and voltage values, leading to unreliable results.
A battery control device calculates internal resistance by measuring current and voltage values at specific target times, with voltage measurements delayed by a predetermined time to account for timing deviations, ensuring accurate and reliable calculations.
This approach improves the reliability and accuracy of internal resistance calculations, enhancing battery performance and control, particularly in vehicle systems.
Smart Images

Figure JP2024014850_24102024_PF_FP_ABST
Abstract
Description
Battery control device and vehicle control device
[0001] The present invention relates to a battery control device and a vehicle control device.
[0002] 2. Description of the Related Art Conventionally, a technique for calculating the internal resistance value of a battery in order to know the deterioration state of the battery has been known (see Patent Document 1).
[0003] Japanese Patent Application Laid-Open No. 2021-092403
[0004] In battery and vehicle control, there is a demand for improved reliability in the calculated internal resistance value of a battery. To calculate the internal resistance value of a battery, the battery's current and voltage values are measured. Due to battery measurement errors, even a slight time difference can cause the battery's current and voltage values to not be measured at the same time, resulting in the battery voltage value being measured relatively earlier than the current value. In this case, there is a possibility that the battery's current and voltage values have changed significantly in the short time between the measurement of the battery voltage value and the measurement of the current value.
[0005] A battery control device according to one aspect of the present invention includes a calculation device that calculates an internal resistance value of a battery. The calculation device calculates a current difference value based on a first current value measured at a first time as a target measurement time and a second current value measured at a second time that is a predetermined time after the first time as a target measurement time. The calculation device calculates a voltage difference value based on a first voltage value measured at a predetermined time after the first time as a target measurement time and a second voltage value measured at a third time that is after the predetermined time and is a predetermined time after the second time as a target measurement time. The calculation device calculates the internal resistance value of the battery based on the current difference value and the voltage difference value.
[0006] A vehicle control device according to one aspect of the present invention includes the battery control device described above. The vehicle control device controls a vehicle having the battery and electrical equipment that operates using power from the battery.
[0007] According to the present invention, the reliability of the calculated internal resistance value of the battery can be improved.
[0008] FIG. 1 is a diagram showing a schematic configuration of a vehicle 1 equipped with a battery control device 100 according to an embodiment. FIG. 2 is a diagram showing an example of the hardware configuration of a vehicle control system equipped in the vehicle 1. FIG. 3 is a functional block diagram of the battery control device 100. FIG. 4 is a graph showing the time variation of the current value I measured by the current sensor 102 and the time variation of the voltage value V measured by the voltage sensor 103, with respect to ideal (error-free) measurement timing, and shows the deviation in the measurement timing of the voltage value V. FIG. 5 is a graph showing the time variation of the current value I measured by the current sensor 102 and the time variation of the voltage value V measured by the voltage sensor 103, with respect to comparative measurement timing, and shows an example in which the internal resistance value is underestimated. FIG. 6 is a graph showing the time variation of the current value I measured by the current sensor 102 and the time variation of the voltage value V measured by the voltage sensor 103, with respect to the measurement timing of this embodiment, and shows the measurement timing of the current value I and the voltage value V. FIG. 7 is a flowchart showing an example of the processing flow executed by the battery controller 101. Fig. 8 is a table showing the target measurement times, the time from a predetermined time to each target measurement time, and the actual measurement values (current and voltage values). Fig. 9 is a table showing the target measurement times, the time from a predetermined time to each target measurement time, and the actual measurement values (current and voltage values), and shows an example in which the measurement period for current values is half that of voltage values.
[0009] (Configuration of the embodiment) The configuration of a battery control device 100 according to the embodiment and a vehicle control device 10 including the battery control device 100 will be described with reference to FIG.
[0010] FIG. 1 is a diagram showing a schematic configuration of a vehicle 1 equipped with a battery control device 100 according to an embodiment.
[0011] As shown in Fig. 1, the vehicle 1 is, for example, a hybrid electric vehicle. The hybrid electric vehicle is, for example, a hybrid electric vehicle (HEV) or a plug-in hybrid electric vehicle (PHEV). Hybrid electric vehicles include strong hybrid electric vehicles with an output voltage of, for example, several hundred volts, and mild hybrid electric vehicles with an output voltage of, for example, 48 volts. The vehicle 1 may also be an electric vehicle (EV).
[0012] If the vehicle 1 is a hybrid electric vehicle, the vehicle 1 is equipped with a motor 600, which is an electric device used to drive the vehicle 1, and an engine 700, which is an internal combustion engine. The power generated by the motor 600 and the engine 700 is transmitted to tires via a power transmission mechanism. If the vehicle 1 is an EV (Electric Vehicle), the vehicle 1 is not equipped with an engine 700. Therefore, the power generated by the motor 600 is transmitted to tires via a power transmission mechanism. The motor 600 is operated by electric power from the battery pack 20 and generates power.
[0013] The vehicle 1 includes a vehicle control device 10, a battery 300, a relay 400, a power converter 500, a motor 600, and an engine 700. The vehicle control device 10 includes a battery control device 100 and a vehicle equipment control device 200. The battery pack 20 includes the battery control device 100 and a battery 300. Details of the vehicle control device 10 will be described later.
[0014] The battery 300 is configured, for example, by a battery pack. The battery pack includes a plurality of single cells. The multiple secondary batteries are connected in series, parallel, or both series and parallel via a bus bar. The single cells are, for example, secondary batteries. The secondary batteries are, for example, lithium-ion batteries. The secondary batteries may be configured by devices with power storage functions, such as nickel-metal hydride batteries, all-solid-state batteries, lead batteries, and electric double-layer capacitors. The battery 300 is not limited to being configured by a plurality of secondary batteries, but may also be configured by a single secondary battery. The battery 300 is not limited to being configured by a plurality of secondary batteries, but may also be configured by a primary battery. Power from the battery 300 is supplied to the motor 600 via a relay 400 and a power converter 500.
[0015] The relay 400 is electrically connected to the battery 300 and the power converter 500. The relay 400 passes current from the battery 300 to the motor 600 and cuts off current from the battery 300 to the motor 600.
[0016] The power converter 500 transforms power while converting it between direct current (DC) and alternating current (AC). The power converter 500 is electrically connected to the relay 400 and the motor 600. The power converter 500 includes an inverter circuit and a converter circuit.
[0017] The motor 600 performs a power running operation to generate driving force and a regenerative operation to recover energy, depending on the running state of the vehicle 1. When the motor 600 is running, the power converter 500 converts the power of the battery 300 from direct current to alternating current, transforms the voltage, and supplies the power to the motor 600. This causes the motor 600 to generate power, and the vehicle 1 runs. Also, when the vehicle 1 is running using the power of the engine 700, the power of the motor 600 accelerates the vehicle 1. When the motor 600 is running in a regenerative operation, the power converter 500 converts the power generated by the motor 600 from alternating current to direct current, transforms the voltage, and supplies the power to the battery 300. This charges the battery 300.
[0018] The engine 700 is an example of an internal combustion engine. The engine 700 is used to drive the vehicle 1. The engine 700 is used to power the tires of the vehicle 1. If the vehicle 1 is an EV (electric vehicle), the engine 700 is not necessary.
[0019] The battery control device 100 and the vehicle equipment control device 200 that make up the vehicle control device 10 are each configured as an ECU (Electronic Control Unit). Note that the vehicle control device 10 may be configured as a single ECU that has the functions of the battery control device 100 and the vehicle equipment control device 200. The battery control device 100 is also referred to as a battery management system (BMS), for example.
[0020] The vehicle equipment control device 200 controls the driving equipment of the vehicle 1 based on the battery information and the like output by the battery control device 100. The driving equipment of the vehicle 1 includes a relay 400, a power converter 500, a motor 600, and an engine 700.
[0021] (Hardware Configuration of Vehicle Control System) Fig. 2 is a diagram showing an example of the hardware configuration of a vehicle control system mounted on vehicle 1. As shown in Fig. 2, battery control device 100 includes a battery controller 101, a current sensor 102 connected in series with battery 300, and a voltage sensor 103 connected in parallel with battery 300. Current sensor 102 measures the value I of the charge / discharge current of battery 300 (hereinafter also referred to as the current value). Voltage sensor 103 measures the value V of the voltage of battery 300 (hereinafter also referred to as the voltage value). The measurement results of current sensor 102 and voltage sensor 103 are input to battery controller 101.
[0022] The battery controller 101 is configured with a computer equipped with a processing device 101a, a storage device 101b, an input interface, an output interface, and other peripheral circuits. These hardware components work together to run software and realize multiple functions (see FIG. 3) described below. The battery controller 101 may be configured with one computer or multiple computers.
[0023] The processing device 101a includes, for example, a central processing unit (CPU), a micro processing unit (MPU), a digital signal processor (DSP), etc. The storage device 101b includes non-volatile memory such as a read-only memory (ROM), a flash memory, a hard disk drive, etc. The storage device 101b also includes volatile memory known as a random access memory (RAM).
[0024] The nonvolatile memory of the storage device 101b stores programs capable of executing various calculations. In other words, the nonvolatile memory is a storage medium (storage device) from which the programs that realize the functions of this embodiment can be read. The volatile memory is a storage medium (storage device) that temporarily stores the results of calculations performed by the processing device 101a and signals input from the input interface. The processing device 101a is a device that loads the programs stored in the nonvolatile memory into the volatile memory and executes calculations, and performs predetermined calculations on data taken in from the input interface and the storage device 101b in accordance with the programs.
[0025] (Functions of Battery Control Device 100) Fig. 3 is a functional block diagram of the battery control device 100. As shown in Fig. 3, the battery controller 101 has a timer unit 110, a battery information acquisition unit 111, an internal resistance calculation unit 112, an SOC calculation unit 113, an allowable current calculation unit 114, and an SOHR calculation unit 115.
[0026] The timer 110 measures time. The battery information acquisition unit 111 acquires battery information, which is information about the state of the battery 300, at predetermined time intervals based on the time measured by the timer 110. The battery information includes the measurement results of the current sensor 102 and the voltage sensor 103.
[0027] The internal resistance calculation unit 112 calculates the internal resistance R of the battery 300 based on the voltage value V and current value I of the battery 300 acquired by the battery information acquisition unit 111. The method of calculating the internal resistance R will be described in detail later.
[0028] The SOC calculation unit 113 calculates the state of charge (SOC) of the battery 300. The SOC calculation unit 113 calculates the state of charge SOC by, for example, integrating the current value I acquired by the battery information acquisition unit 111. Note that the SOC calculation unit 113 may also calculate the state of charge SOC from an open circuit voltage OCV when no charging or discharging is being performed.
[0029] The allowable current calculation unit 114 calculates an allowable current value based on the internal resistance value R calculated by the internal resistance calculation unit 112 and the charging rate SOC calculated by the SOC calculation unit 113. The calculation result of the allowable current calculation unit 114 is input to the vehicle equipment control device 200.
[0030] The SOHR calculation unit 115 calculates the resistance increase rate SOHR based on the internal resistance value R calculated by the internal resistance calculation unit 112 and the reference resistance value Ri, which is the internal resistance value when the battery is new and stored in the memory device 101b. The resistance increase rate SOHR is calculated by dividing the internal resistance value R by the reference resistance value Ri (SOHR=R / Ri). The calculation result of the SOHR calculation unit 115 is input to the vehicle equipment control device 200. The resistance increase rate SOHR is one of the indicators that indicate the deterioration state of the battery 300.
[0031] The vehicle equipment control device 200 controls each part of the vehicle 1 based on the battery information acquired from the battery control device 100. For example, the vehicle equipment control device 200 controls the electric equipment (motor 600, etc.) based on the allowable current and the resistance increase rate SOHR acquired from the battery control device 100.
[0032] 4 to 6 are graphs showing the time change of the current value I measured by the current sensor 102 and the time change of the voltage value V measured by the voltage sensor 103. FIG. 4 relates to ideal (error-free) measurement timing. FIG. 5 relates to comparative measurement timing. FIG. 6 relates to the measurement timing of this embodiment.
[0033] When the current value I changes, the internal resistance calculation unit 112 calculates the internal resistance value R (DC resistance value DCR) using the following formula (1): R=(V2-V1) / (I2-I1) (1) Here, the first current value I1 is the current value before the current value I changes. The first voltage value V1 is the voltage value before the current value I changes. The second current value I2 is the current value after the current value I changes. The second voltage value V2 is the voltage value after the current value I changes.
[0034] As shown in Figure 4, the internal resistance R can be calculated appropriately if the current value I and the voltage value V are measured at the same time before and after a large current change, as in the ideal (error-free) measurement timing. However, the current value I and the voltage value V are measured using different circuits (see Figure 2). Therefore, even if the target measurement times for the current value I and the voltage value V are set to the same time, a slight difference occurs between the actual measurement times for the current value I and the voltage value V. This difference can cause a large error in the estimation of the internal resistance R.
[0035] The deviation of the actual measurement time of the second voltage value V2 from the actual measurement time of the second current value I2 occurs within a deviation range ΔN (= 2 × n) between time (t2-n) and time (t2+n). The deviation range ΔN in measurement timing is the maximum deviation in the measurement timing of the voltage value V that occurs due to design. The maximum deviation in measurement timing is determined by multiple factors, such as synchronization deviation between the processing device 101a and the voltage sensor 103, communication delay variations, and clock accuracy variations. The deviation range ΔN in measurement timing is determined by required specifications, such as the allowable calculation error for the internal resistance value (DC resistance value) of the battery 300. The multiple factors are designed to satisfy the required specification of the deviation range ΔN. n is the maximum deviation (maximum deviation on the negative side and maximum deviation on the positive side) of the actual measurement time of the second voltage value V2 when the actual measurement time of the second current value I2 is used as the reference. The negative side is the side on which time is relatively earlier. The positive side is the side where the time becomes relatively slower.
[0036] 5 , for example, when the voltage value V measured at time t20 before the current value I changes is used as the second voltage value V2 in the calculation of equation (1), the following problem may occur: The calculated internal resistance value R may be too small compared to the actual value, i.e., may be an unreliable value. As a result, the reliability of the calculation results of calculation processes using the internal resistance value R, such as the calculation process for the resistance increase rate SOHR, may decrease.
[0037] The deviation between the actual measurement time of the current value I and the actual measurement time of the voltage value V occurs due to design and is difficult to completely prevent. Therefore, in this embodiment, the measurement timing of the current value I and the voltage value V is intentionally shifted in consideration of the deviation width ΔN. Specifically, the measurement timing of the voltage value V is controlled so that the actual measurement time of the second voltage value V2 used in calculating the internal resistance value R is later than the actual measurement time of the second current value I2 measured after the current change.
[0038] The timings for measuring the current value I and the voltage value V in this embodiment will be described with reference to FIG. 6 . By delaying the target value for the timing for measuring the voltage value by a predetermined time relative to the target value for the timing for measuring the current value, the internal resistance value R is calculated from the voltage value V measured after a change in the current value I, regardless of the magnitude of the difference between the timing for measuring the current value I and the timing for measuring the voltage value V. This prevents the calculated internal resistance value R from being too small. In other words, it is possible to reduce the influence of a difference in the measurement timing on the calculation of the internal resistance value R. Therefore, according to this embodiment, the robustness of the calculation of the internal resistance value R is improved against the error factor of a difference in the timing for measuring the current value I and the voltage value V, and the reliability and accuracy of the calculated internal resistance value R are improved.
[0039] In Fig. 6 , the first time t1 is the target measurement time for the first current value I1, and the second time t2 is the target measurement time for the second current value I2. For ease of explanation, Fig. 6 shows an example in which the target measurement time for the current value I coincides with the actual measurement time. Also, in Fig. 6 , the fourth time t4 is the target measurement time for the first voltage value V1, and the third time t3 is the target measurement time for the second voltage value V2. In Fig. 6 , the time from the target measurement time for the current value I to the target measurement time for the voltage value V is exaggerated. In reality, the time from the target measurement time for the current value I to the target measurement time for the voltage value V is, for example, approximately 1 / 100 of the predetermined time Δtn, which is the measurement period for the current value I and the voltage value V.
[0040] As shown in Fig. 6, in this embodiment, the current value I is measured repeatedly at a predetermined time Δtn, which is a measurement cycle. The voltage value V is measured repeatedly at a predetermined time Δtn. The predetermined time Δtn is, for example, approximately several tens to several hundreds of milliseconds (ms). The predetermined time Δtn is determined in advance based on the control specifications of the vehicle 1, specifications such as the direct current resistance DCR, the state of charge SOC, and the discharge performance SOF, as well as specifications for monitoring and protecting the battery 300.
[0041] In this embodiment, the target measurement time for the voltage value V is set a predetermined time Δtm (a fixed value) after the target measurement time for the current value I, regardless of changes in the current value I. For example, the third time t3, which is the target measurement time for the second voltage value V2 after the current change, is set a predetermined time Δtm after the second time t2. Similarly, the fourth time t4, which is the target measurement time for the first voltage value V1 before the current change, is set a predetermined time Δtm after the first time t1. The predetermined time Δtm is, for example, approximately 0.5 to several milliseconds. It is preferable to set the predetermined time Δtm to be greater than the maximum deviation n, which is half the deviation ΔN between the actual measurement time of the second voltage value V2 and the actual measurement time of the second current value I2.
[0042] As described above, the predetermined time Δtn for the current value I and the predetermined time Δtn for the voltage value V are set to the same value. Therefore, the time Δtm from the first time t1 to the fourth time t4 is equal to the time Δtm from the second time t2 to the third time t3.
[0043] The predetermined time Δtm is determined as follows when the actual measurement time of the second current value I2 deviates from the target measurement time by the largest positive deviation and the actual measurement time of the second voltage value V2 deviates by the largest negative deviation from the target measurement time. That is, the predetermined time Δtm is determined so that the actual measurement time of the second voltage value V2 is later than the actual measurement time of the second current value I2. In other words, the predetermined time Δtm is determined so that it is greater than the maximum time from the actual measurement time of the second current value I2 to the actual measurement time of the second voltage value V2 when the target measurement times of the second current value I2 and the second voltage value V2 are the same. Note that if the predetermined time Δtm is too long, the reliability of the calculated internal resistance value R decreases. Therefore, the predetermined time Δtm is at least shorter than the time from the fourth time t4 to the second time t2. Note that the predetermined time Δtm is preferably set as short as possible while satisfying the above conditions.
[0044] (Example of Processing Flow Executed by Battery Controller 101) Fig. 7 is a flowchart showing an example of processing flow executed by the battery controller 101. The processing shown in the flowchart of Fig. 7 is started, for example, when an ignition switch (not shown) of the vehicle 1 is turned on, and is executed repeatedly.
[0045] 7 , in step S110, the battery controller 101 acquires the detection result of the current sensor 102. In the next step S120, the battery controller 101 acquires the detection result of the voltage sensor 103 after a predetermined time Δtm has elapsed since step S110. In other words, the battery controller 101 acquires the detection result of the voltage sensor 103, setting the target measurement time to be the time when the predetermined time Δtm has elapsed from the target measurement time of the current value I.
[0046] In the next step S130, the battery controller 101 calculates a current difference value ΔI, which is the difference between the current value and the previous value of the current value acquired in step S110.
[0047] In the next step S140, the battery controller 101 determines whether the current value I has changed based on the current difference value ΔI calculated in step S130. If the absolute value |ΔI| of the current difference value ΔI is equal to or greater than the threshold value ΔI0, the battery controller 101 determines that the current value I has changed. In this case, the process proceeds to step S150. If the absolute value |ΔI| of the current difference value ΔI is less than the threshold value ΔI0, the battery controller 101 determines that the current value I has not changed. In this case, the process returns to step S110.
[0048] In step S150, the battery controller 101 calculates a voltage difference value ΔV, which is the difference between the current voltage value and the previous voltage value acquired in step S120.
[0049] In the next step S160, the battery controller 101 calculates the internal resistance value R based on the current difference value ΔI calculated in step S130 and the voltage difference value ΔV calculated in step S150 (R = ΔV / ΔI = (V2 - V1) / (I2 - I1)).
[0050] In the next step S170, the battery controller 101 calculates the resistance increase rate SOHR and the allowable current using the internal resistance value R calculated in step S160 and the charging rate SOC calculated by a process not shown.
[0051] In the next step S180, the battery controller 101 outputs the calculation results of steps S160 and S170 to the vehicle equipment control device 200.
[0052] (Example of Operation of Battery Controller 101) An example of operation of the battery controller 101 of this embodiment will be described with reference to Fig. 8. Fig. 8 is a table showing target measurement times, the time from a predetermined time to each target measurement time, and actual measurement values (current values and voltage values). Note that the numerical values are merely examples.
[0053] As shown in FIG. 8 , the predetermined time Δtn, which is the measurement period for the current value I and the voltage value V, is 100 ms each. The target measurement time for the voltage value V is set a predetermined time Δtm = 2 ms later, which is the offset time from the target measurement time for the current value I. In other words, the offset between the measurement timing of the voltage value and the measurement timing of the current value is fixed. Note that the battery controller 101 does not set the target measurement time itself. The battery controller 101 sets the predetermined time Δtn and the predetermined time Δtm, which is the offset time between the measurement timing of the voltage value V and the measurement timing of the current value I. The target measurement time is determined by setting the predetermined time Δtn and the predetermined time Δtm for the measurement timing.
[0054] When the current flowing through the battery 300 changes from 0 A to 100 A, the battery controller 101 selects 0 A, measured at a first time t1 immediately before the current change as the target measurement time, as the first current value I1. The battery controller 101 also selects 3.5 V, measured at a fourth time t4, a predetermined time Δtm = 2 ms after the first time t1, as the target measurement time, as the first voltage value V1. The battery controller 101 selects 100 A, measured at a second time t2 immediately after the current change as the target measurement time, as the second current value I2. The battery controller 101 also selects 3.8 V, measured at a third time t3, a predetermined time Δtm after the second time t2, as the target measurement time, as the second voltage value V2. The battery controller 101 calculates the internal resistance value R based on the selected first current value I1, second current value I2, first voltage value V1, and second voltage value V2.
[0055] In this embodiment, the target measurement time for the current value I and the target measurement time for the voltage value V are intentionally shifted by a predetermined time Δtm. This ensures that the actual measurement timing for the voltage value V is always later than the actual measurement timing for the current value I. The actual measurement timing can be confirmed at the time of product shipment and during maintenance work.
[0056] For example, a maintenance worker connects a maintenance device to battery 300 during maintenance. The maintenance device is a device that can control the current flowing through battery 300 and can measure the voltage value V and current value I of battery 300. The maintenance worker uses the maintenance device to change the current flowing through battery 300 with a predetermined current waveform. The maintenance device changes the charging current of battery 300 with a charging waveform of, for example, 0 [A] for 100 seconds, 100 [A] for 1 second, 0 [A] for 100 seconds, 100 [A] for 1 second, and so on.
[0057] The maintenance device tally up the voltage values (equivalent to second voltage values) measured after the current change. The maintenance device reverse-calculates the time at which the voltage value was actually measured (voltage measurement time) based on the tally up voltage values and characteristic data of the change in voltage value after the current change. The maintenance device calculates the voltage measurement time for all tally up voltage values after the current change. The current change time and voltage measurement time are stored in the storage device of the maintenance device. This allows the variation in voltage measurement time when the current of the battery 300 changes to be measured multiple times.
[0058] The maintenance device displays the data of current change times and voltage measurement times stored in the storage device on a display device. The maintenance worker checks the current change times and voltage measurement times displayed on the display device. If, for each current change time, the voltage measurement time closest to that current change time is after that current change time, it can be confirmed that the calculation function of this embodiment is working properly.
[0059] (Operations and Effects of the Embodiment) According to the present embodiment, the following operations and effects are achieved.
[0060] As shown in FIG. 3 , the battery control device 100 includes a battery controller 101 as a calculation device that calculates the internal resistance value R of the battery 300. As shown in FIGS. 6 and 7 , the battery controller 101 calculates a current difference value ΔI (ΔI = I2 - I1) based on a first current value I1 and a second current value I2. The first current value I1 is a value measured at a first time t1, which is the target measurement time. The second current value I2 is a value measured at a second time t2, which is a predetermined time Δtn after the first time t1, which is the target measurement time. The battery controller 101 calculates a voltage difference value ΔV (ΔV = V2 - V1) based on a first voltage value V1 and a second voltage value V2. The first voltage value V1 is a value measured at a predetermined time after the first time t1 (fourth time t4 in this embodiment), which is the target measurement time. The second voltage value V2 is a value measured at a third time t3, which is after the predetermined time (fourth time t4 in this embodiment) and a predetermined time Δtm after the second time t2, as the target measurement time. The battery controller 101 calculates the internal resistance value R of the battery 300 based on the current difference value ΔI and the voltage difference value ΔV (R = ΔV / ΔI). This configuration prevents the second voltage value V2 used in calculating the internal resistance value R from being measured before the current change occurs when the current changes between the first time t1 and the second time t2. Therefore, this embodiment improves the reliability of the calculated internal resistance value R. As a result, the battery 300 can maximize its battery performance, for example, until the end of its life (EOL: End Of Life).
[0061] The battery controller 101 measures the first voltage value V1 at a fourth time t4, which is after the first time t1 and before the second time t2, as the target measurement time. This configuration allows the first voltage value V1 before the current change to be appropriately measured.
[0062] The time Δtm from the first time t1 to the fourth time t4 is equal to the time Δtm from the second time t2 to the third time t3. In other words, the measurement period of the current value I and the measurement period of the voltage value V by the battery controller 101 are equal. In this way, a configuration in which the target measurement time of the current value I and the target measurement time of the voltage value V are always shifted makes the control design easy and simple. Furthermore, since the processing of the battery controller 101 is simplified, memory usage can be reduced.
[0063] The predetermined time Δtm is greater than half (=n) of the difference ΔN [ms] between the measurement time of the second voltage value V2 and the measurement time of the second current value I2. With this configuration, the voltage difference ΔV used to calculate the internal resistance value R is always calculated based on the second voltage value V2 measured after the current change and the first voltage value V1 measured before the current change. As a result, a highly reliable internal resistance value R can be obtained.
[0064] The battery control device 100 includes a voltage sensor 103 that measures the voltage of the battery 300 and a current sensor 102 that measures the current of the battery 300. With this configuration, a highly reliable internal resistance value R can be obtained based on the detection results of the voltage sensor 103 and current sensor 102 included in the battery control device 100.
[0065] 1, the vehicle control device 10 includes a battery control device 100. The vehicle control device 10 controls a vehicle 1 having a battery 300 and electrical equipment (such as a motor 600) that operates using power from the battery 300. This configuration improves the reliability of the internal resistance value R used in the calculations of the vehicle control device 10, allowing the vehicle control device 10 to more appropriately control the electrical equipment (such as the motor 600).
[0066] 1, the vehicle 1 has an internal combustion engine (engine 700) that drives the vehicle 1. Since the reliability of the internal resistance value R used for various calculations in the vehicle control device 10 is improved, the vehicle control device 10 can more appropriately control the motor 600 and the engine 700 while the vehicle is running.
[0067] The following modified examples are also within the scope of the present invention, and it is possible to combine the configuration shown in the modified example with the configuration described in the above embodiment, or to combine the configurations described in the different modified examples below.
[0068] (Variation 1) In the above embodiment, an example has been described in which the predetermined time that is the measurement period of the current value I and the predetermined time that is the measurement period of the voltage value V are the same, but the present invention is not limited to this. The measurement period of the current value I and the measurement period of the voltage value V may be different. For example, as shown in FIG. 9 , the measurement period of the current value I may be half the measurement period of the voltage value V.
[0069] (Variation 2) In the above embodiment, an example was described in which the measurement period of the voltage value V was constant. However, it is also possible to change only the measurement timing of the voltage value measured after a current change in the battery 300. In this configuration, when the current difference value ΔI of the battery 300 exceeds a predetermined value, the battery controller 101 calculates the voltage difference value ΔV based on the first voltage value V1 and the second voltage value V2 of the battery 300. The predetermined value is, for example, 100 times or more the fluctuation range of the current value I of the battery 300 when the current value of the battery 300 is not intentionally changed. 100 times is merely an example and is defined based on the fluctuation range of the current value I of the battery 300, etc. In Variation 2, when there is no current change in the battery 300, the target measurement time of the current value I and the target measurement time of the voltage value V are made to coincide. The battery controller 101 monitors the change in current, and when it determines that the current has changed (when it determines that the current difference value ΔI has exceeded the predetermined value), it delays the target measurement time of the voltage value by a predetermined time. That is, the target measurement time for the first current value I1 and the first voltage value V1 is the first time t1, and the target measurement time for the second voltage value V2 is set a predetermined time later than the target measurement time for the second current value I2. Even with this configuration, the reliability of the internal resistance value R can be improved.
[0070] (Variation 3) In the above embodiment, when the battery 300 is an assembled battery having a plurality of cells, the internal resistance value of the assembled battery is calculated using the voltage of the assembled battery. However, the present invention may also be applied to calculating the internal resistance value of a cell using the voltage of the cell that constitutes the assembled battery.
[0071] Although the embodiments of the present invention have been described above, the above embodiments merely illustrate some of the application examples of the present invention, and the technical scope of the present invention is not intended to be limited to the specific configurations of the above embodiments. For example, the present invention is not limited to application to a battery control device 100 that controls a battery 300 mounted on a vehicle 1 as shown in FIG. 1. The present invention can also be applied to a battery control device 100 that controls a battery 300 as a power source for operating various industrial machines such as aircraft and machine tools.
[0072] The configuration of the embodiment of the present invention can also be specified as follows.
[0073] The battery control device 100 includes a calculation device (battery controller 101) that calculates the internal resistance value R of the battery 300. The calculation device calculates a current difference value ΔI based on a first current value I1 measured at a first time t1 as a target measurement time and a second current value I2 measured at a second time t2, which is a predetermined time Δtn after the first time t1 as a target measurement time. The calculation device calculates a voltage difference value ΔV based on a first voltage value V1 measured at a predetermined time after the first time t1 but before the second time t2 as a target measurement time and a second voltage value V2 measured at a third time t3, which is a predetermined time Δtm after the second time t2 as a target measurement time. The calculation device calculates the internal resistance value R of the battery 300 based on the current difference value ΔI and the voltage difference value ΔV. This configuration prevents the current and voltage from being measured at significantly different times, allowing the state of the target battery 300 to be calculated with high accuracy.
[0074] The battery control device 100 includes a calculation unit (battery controller 101) that receives the voltage value V and current value I of the battery 300 and calculates the internal resistance value R of the battery 300. The calculation unit calculates a current difference value ΔI based on a second current value I2 measured and input at a second time t2, which is a predetermined time Δtn after a predetermined first time t1, and a first current value I1 measured and input at the first time t1 (ΔI = I2 - I1). The calculation unit calculates a voltage difference value ΔV based on a predetermined second voltage value V2 measured and input between the second time t2 and a third time t3, which is a predetermined time after the second time t2, and a first voltage value V1 measured and input at the first time t1 (ΔV = V2 - V1). The calculation unit calculates the internal resistance value R of the battery 300 based on the voltage difference value ΔV and the current difference value ΔI.
[0075] The battery control device 100 includes a calculation unit that receives voltage values of the battery 300 measured at predetermined times and current values of the battery 300 measured at the predetermined times and calculates an internal resistance value of the battery 300. The predetermined times include a first time t1 < a second time t2 < a third time t3. The calculation unit calculates a current difference value ΔI (ΔI = I2 - I1) based on a second current value I2 measured by the current measurement unit (current sensor 102) at the second time t2 and a first current value I1 measured by the current measurement unit (current sensor 102) at the first time t1. The calculation unit calculates a voltage difference value ΔV (ΔV = V2 - V1) based on a predetermined second voltage value V2 measured by the voltage measurement unit (voltage sensor 103) between the second time t2 and the third time t3 and a first voltage value V1 measured by the voltage measurement unit (voltage sensor 103) at the first time t1. The calculation unit calculates the internal resistance R of the battery 300 based on the voltage difference ΔV and the current difference ΔI (I2-I1).
[0076] 1...vehicle, 10...vehicle control device, 20...battery pack, 100...battery control device, 101...battery controller (arithmetic device, arithmetic unit), 101a...processing device, 101b...storage device, 102...current sensor, 103...voltage sensor, 110...timekeeping unit, 111...battery information acquisition unit, 112...internal resistance calculation unit, 113...SOC calculation unit, 114...allowable current calculation unit, 115...SOHR calculation unit, 200...vehicle equipment control device, 300...battery, 400...relay, 500...power converter, 600...motor ( Electrical equipment), 700...engine (internal combustion engine), DCR...DC resistance value, I...current value, I1...first current value, I2...second current value, R...internal resistance value, Ri...reference resistance value, SOC...charging rate, SOF...discharge performance, SOHR...resistance increase rate, V...voltage value, V1...first voltage value, V2...second voltage value, n...maximum deviation amount, t1...first time, t2...second time, t3...third time, t4...fourth time, ΔI...current difference value, ΔI0...threshold value, ΔN...deviation width, ΔV...voltage difference value, Δtm...predetermined time, Δtn...predetermined time
Claims
1. A battery control device comprising a calculation device that calculates an internal resistance value of a battery, wherein the calculation device calculates a current difference value based on a first current value measured at a first time as a target measurement time and a second current value measured at a second time which is a predetermined time after the first time as a target measurement time, calculates a voltage difference value based on a first voltage value measured at a predetermined time after the first time as a target measurement time and a second voltage value measured at a third time which is after the predetermined time and which is a predetermined time after the second time as a target measurement time, and calculates the internal resistance value of the battery based on the current difference value and the voltage difference value.
2. A battery control device according to claim 1, wherein the calculation device measures the first voltage value by setting a fourth time, which is later than the first time and earlier than the second time, as a target measurement time.
3. A battery control device according to claim 2, wherein the time from the first time to the fourth time is equal to the time from the second time to the third time.
4. A battery control device according to claim 1, wherein the calculation device calculates the voltage difference value based on the first voltage value and the second voltage value when the current difference value exceeds a predetermined value.
5. A battery control device according to claim 1, further comprising: a voltage sensor for measuring a voltage value of the battery; and a current sensor for measuring a current value of the battery.
6. A vehicle control device comprising the battery control device according to claim 1, which controls a vehicle having the battery and an electric device that operates using power from the battery.
7. A vehicle control device according to claim 6, wherein the vehicle has an internal combustion engine for driving the vehicle.
Citation Information
Patent Citations
Storage battery device, method, and program
JP2021092403A
Internal resistance measuring device of battery
JP2008032683A
Battery internal state estimating device mounted on vehicle
JP2013221790A
Internal resistance calculation device, method for calculating internal resistance, and internal resistance calculation program
JP2018096803A
Battery system
JP2019203745A