Long-endurance operation human–computer interaction method and apparatus based on dynamic time pressure

By constructing a performance-time pressure function curve and dynamically adjusting response time, the problem of pilot cognitive load and cumulative fatigue in long-endurance operations is solved, and pilot performance and flight safety are improved.

WO2024221416A1PCT designated stage expired Publication Date: 2024-10-31ZHEJIANG LAB
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/091655
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2023-04-28
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

It is difficult for pilots to remain vigilant in cognitive awareness during long-endurance operations, leading to human errors. Traditional methods such as external intervention fatigue monitoring have errors and are not effective enough. They cannot fundamentally solve the problem of cognitive load and affect flight safety.

Method used

A human-computer interaction method for long-endurance operations based on dynamic time pressure, by constructing a performance-time pressure function curve, calculating the response time and optimal reservation time, and dynamically adjusting the system reservation time to reduce the pilot's cognitive load and accumulation fatigue.

Benefits of technology

It effectively reduces human errors in long-endurance operations, improves pilot performance levels and flight safety, and optimizes the average performance of human-machine interaction through dynamic time pressure adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023091655_31102024_PF_FP_ABST
    Figure CN2023091655_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of human–computer ergonomics. Disclosed are a long-endurance operation human–computer interaction method and apparatus based on a dynamic time pressure. The method specifically comprises: constructing a highest performance-time pressure-time function curve according to a performance-time pressure function curve corresponding to a long-endurance operation; after the current long-endurance operation ends, calculating a response time of the next long-endurance operation according to a historical response time of human–computer interaction; according to the highest performance-time pressure-time function curve, calculating a highest performance value corresponding to the starting time of the next long-endurance operation and a time pressure corresponding to the highest performance value; and according to the response time of the next long-endurance operation and the time pressure, calculating an optimal reserved time corresponding to the highest performance value. The method and apparatus can improve the performance level of long-endurance operation human–computer interaction, reduce human errors caused by accumulated fatigue and excessively short reserved operation time, and improve flight safety.
Need to check novelty before this filing date? Find Prior Art

Description

Human-computer interaction method and device for long-duration operations based on dynamic time pressure Technical Field

[0001] The present invention belongs to the technical field of human-machine ergonomics, and in particular relates to a human-machine interaction method and device for long-duration operations based on dynamic time pressure. Background Art

[0002] Modern cockpit tasks are mostly accomplished through the collaborative interaction between the human-machine interface and the pilot. Pilots' mission decisions are 100% dependent on the presentation and control of the human-machine interface system. During long-duration operations, pilots' cognitive awareness struggles to maintain constant vigilance, and human errors arising from this cognitive process can seriously impact flight safety. To address human errors during long-duration operations, it's necessary to reduce the cognitive overload imposed on pilots by task interaction at its source.

[0003] During traditional long-duration operations, the system's reserved time remains fixed. However, pilots experience cognitive difficulties such as distracted attention after prolonged operation, which gradually increases the time it takes to respond to correct operations. When this response time continues to increase, exceeding the system's reserved task processing time, it can lead to serious human errors, compromising flight safety.

[0004] Patent document CN114742090A discloses a cockpit human-machine interaction system based on mental fatigue monitoring. This system collects information from the pilot through a cockpit human-machine interaction module, identifies mental fatigue, and issues fatigue warnings, thereby reducing the probability of pilot errors. This is an external intervention interaction method and has the following disadvantages:

[0005] a. Fatigue indicator detection is subject to certain errors, and the fatigue classification levels (normal, mild, and severe) are manually set. This judgment process inevitably contains systematic errors. As pilots operate over time, the accumulated errors gradually deepen, thus affecting the judgment of fatigue warnings.

[0006] b. External intervention methods cannot fundamentally solve the problem of pilot cognitive load, and strong reminder interactions will also cause unknown consequences.

[0007] Patent document CN112017404A discloses a human-machine interaction-based anti-fatigue driving control system. This system uses driver information to determine fatigue levels, generates and executes corresponding task commands based on the fatigue level. While this approach combines tasks with fatigue levels, in actual flight, required tasks are not necessarily skipped due to fatigue, making this technical solution impractical.

[0008] Summary of the Invention

[0009] In view of the above, the purpose of the present invention is to provide a human-computer interaction method and device for long-flight operations based on dynamic time pressure, which can effectively reduce the cognitive load of pilots, reduce human errors during long-flight operations on the basis of ergonomics theory, and improve pilot performance.

[0010] To achieve the above-mentioned purpose of the invention, an embodiment provides a human-computer interaction method for long-duration operations based on dynamic time pressure, comprising the following steps:

[0011] Construct the highest performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to long-duration operations;

[0012] After the current long-duration operation is completed, the response time of the next long-duration operation is calculated based on the historical response time of human-computer interaction;

[0013] Calculate the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve;

[0014] The optimal reserved time corresponding to the highest performance value is calculated based on the response time and time pressure of the next long-duration operation.

[0015] In one embodiment, constructing a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation includes:

[0016] Sampling different time points on the time axis of long-duration operation, constructing the performance-time pressure function curve corresponding to each sampling time point during long-duration operation;

[0017] Calculate the highest performance value corresponding to the sampling time point and the time pressure corresponding to the highest performance value based on the performance-time pressure function curve;

[0018] Based on the highest performance value and time pressure corresponding to all sampling time points, a highest performance-time pressure-time function curve is constructed with time as one horizontal axis, time pressure as another horizontal axis, and the highest performance value as the vertical axis.

[0019] In one embodiment, the step of calculating the response time of the next long-duration operation based on the historical response time of human-computer interaction includes:

[0020] Calculate the average response time based on historical response times;

[0021] Calculate the correction time based on the response time of the current long-duration operation and the previous long-duration operation;

[0022] Calculate the response time for the next long-duration operation based on the average response time and correction time.

[0023] In one embodiment, the calculation of the correction time based on the response time of the current long-duration operation and the previous long-duration operation includes:

[0024] The difference between the response time of the current long-duration operation and the response time of the previous long-duration operation is taken as the correction time.

[0025] In one embodiment, the method further includes: updating a reserved time corresponding to the long-flight operation in the interactive system according to the optimal reserved time.

[0026] To achieve the above-mentioned purpose of the invention, the embodiment further provides a long-duration operation human-computer interaction device based on dynamic time pressure, comprising a curve construction module, a response time calculation module, a time pressure calculation module, and an optimal reserved time calculation module;

[0027] The curve construction module is used to construct a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation;

[0028] The response time calculation module is used to calculate the response time of the next long-flight operation based on the historical response time of human-computer interaction after the current long-flight operation is completed;

[0029] The time pressure calculation module is used to calculate the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve;

[0030] The optimal reservation time calculation module is used to calculate the optimal reservation time corresponding to the highest performance value according to the response time and time pressure of the next long-flight operation.

[0031] In one embodiment, in the curve construction module, constructing a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation includes:

[0032] Sampling different time points on the time axis of long-duration operation, constructing the performance-time pressure function curve corresponding to each sampling time point during long-duration operation;

[0033] Calculate the highest performance value corresponding to the sampling time point and the time pressure corresponding to the highest performance value based on the performance-time pressure function curve;

[0034] Based on the highest performance value and time pressure corresponding to all sampling time points, a highest performance-time pressure-time function curve is constructed with time as one horizontal axis, time pressure as another horizontal axis, and the highest performance value as the vertical axis.

[0035] In one embodiment, in the response time calculation module, the response time of the next long-duration operation is calculated based on the historical response time of human-computer interaction, including:

[0036] Calculate the average response time based on historical response times;

[0037] Calculate the correction time based on the response time of the current long-duration operation and the previous long-duration operation;

[0038] Calculate the response time for the next long-duration operation based on the average response time and correction time.

[0039] To achieve the above-mentioned purpose of the invention, an embodiment also provides a computing device, including a memory and one or more processors, wherein the memory stores executable code, and when the one or more processors execute the executable code, they are used to implement the above-mentioned long-flight operation human-computer interaction method based on dynamic time pressure.

[0040] To achieve the above-mentioned purpose of the invention, an embodiment further provides a computer-readable storage medium on which a program is stored. When the program is executed by a processor, the above-mentioned long-flight operation human-computer interaction method based on dynamic time pressure is implemented.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] Based on the performance-time pressure function curve, a peak performance-time pressure-time function curve is constructed. This peak performance-time pressure-time function curve can more quickly determine the peak performance value and the corresponding time pressure at a given time point. Since the time point is dynamic during long-duration operations, the resulting time pressure is also dynamic. Based on this dynamic time pressure, the optimal reserve time corresponding to the peak performance value is calculated. This improves the average performance level of human-machine interaction during long-duration operations, reduces human errors caused by cumulative fatigue and insufficient reserve time, and enhances flight safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0044] FIG1 is a flow chart of a human-computer interaction method for long-duration operations based on dynamic time pressure provided by an embodiment;

[0045] FIG2 is a schematic diagram of time pressure provided by an embodiment;

[0046] FIG3 is a performance-time pressure curve diagram provided by an embodiment;

[0047] FIG4 is a performance-time curve diagram provided by an embodiment;

[0048] FIG5 is a graph showing a function of maximum performance-time pressure-time provided by an embodiment;

[0049] FIG6 is a diagram of a human-computer interaction interface provided by an embodiment;

[0050] FIG7 is a schematic structural diagram of a human-machine interaction device for long-duration operations based on dynamic time pressure provided by an embodiment;

[0051] FIG8 is a schematic diagram of the structure of a computing device provided in an embodiment. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and do not limit the scope of protection of the present invention.

[0053] To address the problem of serious human error caused by accumulated fatigue during long-flight operations and fixed reserved time periods, which in turn affects flight safety, an embodiment provides a long-flight human-machine interaction method and device based on dynamic time pressure. Based on the definition of time pressure and the corresponding relationship between time pressure and performance, the method analyzes the pilot's cognitive process during long-flight operations and optimizes the time-performance curve using dynamic time pressure to maximize performance at each time point on the timeline during long-flight operations, that is, to achieve the highest performance on the timeline based on dynamic time pressure regulation. The purpose is to reduce the potential risk of human error by utilizing the time pressure effect of decision-making, that is, the relationship between time pressure and pilot behavioral performance output, thereby improving the overall human-machine interaction performance.

[0054] Figure 1 is a flow chart of a human-computer interaction method for long-duration operations based on dynamic time pressure provided by an embodiment. As shown in Figure 1, the human-computer interaction method for long-duration operations based on dynamic time pressure provided by an embodiment includes the following steps:

[0055] S110 , constructing a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation.

[0056] Time pressure falls under the umbrella of work stress. For a given long-duration mission, the time pressure felt by decision-makers during the completion of the mission is considered time pressure. Time pressure is a comprehensive indicator that reflects the adequacy or lack of mission time, mission data, and mission complexity, thus indicating the cognitive load on pilots during operations. The shorter the allotted time and the more complex the mission, the higher the time pressure, while the shorter the time limit and the more complex the mission, the lower the time pressure.

[0057] As shown in Figure 2, time pressure can be measured by the ratio of the response time required for pilot perception to the reserved time. That is, take a certain moment t on the time axis and define the time pressure formula according to: T * =t / T, where T * represents time pressure, t represents response time, i.e. the time from receiving external information to making a decision, and T represents reserved time, i.e. available time. All times can be expressed in seconds.

[0058] The role of time pressure is as follows: time pressure can be used as an indicator to examine pilots' performance during different tasks. To improve operational performance, pilots' time pressure should be kept within a certain range to ensure flight safety.

[0059] The performance-time pressure function curve shown in Figure 3 illustrates the relationship between time pressure and pilot performance output. Given a constant task, a pilot's performance at a given point in time changes with time pressure, following an inverted U-shaped approximation. Specifically, the faster time pressure increases on the horizontal axis, the earlier the peak performance value on the vertical axis appears, but the high performance interval decreases.

[0060] To reduce pilot time pressure at a given point in time, the available time can be increased or the time required for pilot perception can be reduced. In long-duration human-machine interaction, the available time for each task is generally fixed. However, pilot response time fluctuates depending on external factors and the pilot's own level of situational awareness, which reduces the pilot's average work efficiency and leads to human error.

[0061] Based on the above performance-time pressure function curve definition, in the embodiment, the highest performance-time pressure-time function curve is constructed according to the performance-time pressure function curve corresponding to the long-duration operation, including:

[0062] (a) Sampling different time points on the long-duration operation timeline, and constructing the performance-time pressure function curve corresponding to each sampling time point during the long-duration operation.

[0063] In the embodiment, according to the performance-time curve diagram shown in FIG4 , different time points are used on the time axis to construct a performance-time pressure function curve corresponding to each sampling time point during long-duration operations. According to the time pressure effect of the decision, each performance-time pressure function curve can be obtained as an approximate quadratic function.

[0064] (b) Calculate the highest performance value corresponding to the sampling time point and the time pressure corresponding to the highest performance value based on the performance-time pressure function curve.

[0065] For each sampling time point t, the performance-time pressure function curve corresponding to the sampling time point t is set to f = a(t)T* 2 +b(t)T*+c(t), where: a(t)=-nt 3 , b(t)=me t , n and m are constant values. By introducing n and m, the coefficients a(t) and b(t) are transformed into functions with respect to t. That is, the time pressure value corresponding to the highest performance is transformed into a function with respect to t. By solving the function, the highest performance value and the corresponding pressure time are obtained.

[0066] (c) Based on the highest performance value and time pressure corresponding to all sampling time points, a highest performance-time pressure-time function curve is constructed with time as one horizontal axis, time pressure as another horizontal axis, and the highest performance value as the vertical axis.

[0067] Specifically, when constructing the peak performance-time pressure-time function curve, a blank graph is constructed with time as one horizontal axis, time pressure as the other horizontal axis, and the peak performance value as the vertical axis. The peak performance value and time pressure corresponding to each sampling time point are filled into the blank graph as a point, and a smooth curve is used to connect all points to obtain the peak performance-time pressure-time function curve shown in Figure 5. In this way, based on the peak performance-time pressure-time function curve, the peak performance value corresponding to the time point and the time pressure corresponding to the peak performance value can be obtained simultaneously.

[0068] S120 , after the current long-flight operation is completed, the response time of the next long-flight operation is calculated based on the historical response time of the human-computer interaction.

[0069] In this embodiment, after the current long-duration operation is completed, the response time of the next long-duration operation can be predicted. Specifically, the response time of the next long-duration operation is calculated based on the historical response time of human-computer interaction, including:

[0070] (a) Calculate the average response time based on historical response times.

[0071] Specifically, the historical response time may be the response time from the start time of the long-duration operation to the current long-duration operation, or may be a period of time calculated from the current long-duration operation time and pushed forward.

[0072] (b) Calculate the correction time based on the response time of the current long-duration operation and the previous long-duration operation.

[0073] Specifically, the difference between the response time of the current long-duration operation and the response time of the previous long-duration operation is used as the correction time. This correction time is more in line with the current pilot's fatigue state.

[0074] (c) Calculate the response time for the next long-duration operation based on the average response time and the correction time.

[0075] Specifically, the sum of the average response time and the correction time can be used as the response time for the next long-duration operation. Alternatively, a correction weight can be introduced, where the product of the correction weight and the correction time plus the sum of the average response time is used as the response time for the next long-duration operation. Specifically, the correction weight can be derived based on experience.

[0076] S130 , calculating the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve.

[0077] In this embodiment, after obtaining the peak performance-time pressure-time function curve, the peak performance value and the time pressure corresponding to the next long-duration operation start time can be obtained by searching the peak performance-time pressure-time function curve based on the long-duration operation start time. This process is fast.

[0078] S140 , calculating the optimal reserved time corresponding to the highest performance value based on the response time and time pressure of the next long-duration operation.

[0079] In an embodiment, after obtaining the time pressure corresponding to the highest performance value, the reserved time corresponding to the time pressure can be calculated based on the time pressure definition and the response time of the next long-duration operation calculated in S120. Since the time pressure is the time pressure corresponding to the highest performance value, the calculated reserved time is the optimal reserved time corresponding to the highest performance value.

[0080] After obtaining the optimal reserved time, the reserved time corresponding to the long-flight operation in the interactive system is updated according to the optimal reserved time. In this way, the pilot's actual perceived time during the next long-flight operation will be less than the optimal reserved time, avoiding human errors.

[0081] The long-flight human-computer interaction method based on dynamic time pressure provided in the above embodiment proposes a new design concept for the design of long-flight human-computer interaction operations, and proposes the concept of long-flight dynamic time pressure. According to the dynamic changes in the pilot's response time, the system reserved time is reasonably planned, and the time pressure of the long-flight pilot is always controlled within the normal time pressure level, thereby reducing human errors caused by accumulated fatigue, maximizing the performance of the human-computer interaction system, and improving the performance level of the pilot.

[0082] The embodiment also provides a practical application example of the above-mentioned long-flight operation human-computer interaction method based on dynamic time pressure. A long-flight data reading task is selected, and the implementation process is set to a manual cruise flight monitoring operation with a duration of 100 minutes, without any rest in between. The operation performance data is extracted every 20 minutes as an interval, and monitoring is carried out 5 times in total. The implementation conditions are set as shown in Table 1. The implementer simulates the flight mission monitoring and performs corresponding operations when abnormal information is found. The implementation human-computer interaction interface is shown in Figure 6.

[0083] Table 1

[0084] In the case of a no-time-pressure group, the response times monitored without time reserve, that is, without time pressure, were 4.574s, 5.689s, 6.577s, 5.945s, and 5.985s, respectively. According to the method provided by the present invention, a dynamic pressure group was set, and the optimal reserve time for the task at the highest performance at each time point was 5.574s, 5.623s, 6.342s, 6.557s, and 6.970s, respectively. The embodiment also defines that the reserve time for the incremental time pressure group remains unchanged at 5.574s.

[0085] The experimental results were statistically analyzed based on three groups of different time pressures. As shown in Table 2 below. The data show that the accuracy of the group without time pressure was higher than that of the dynamic pressure group and the incremental time pressure group, indicating that time pressure has an important impact on long-duration cognitive decision-making. The accuracy of the incremental time pressure group had dropped to more than 75% at 60 minutes; while the accuracy of the dynamic time pressure group dropped to 78% at 100 minutes. That is, the dynamic time pressure regulation obtained by the method of the present invention can effectively alleviate the cumulative fatigue and cognitive load caused by the incremental time pressure under traditional task design, improve work performance, and ensure long-duration flight safety.

[0086] Table 2

[0087] Based on the same inventive concept, as shown in FIG7 , an embodiment further provides a long-duration operation human-machine interaction device 700 based on dynamic time pressure, comprising a curve construction module 710 , a response time calculation module 720 , a time pressure calculation module 730 , and an optimal reserved time calculation module 740 ;

[0088] Curve construction module 710 is used to construct a peak performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to long-duration operations. Specifically, the construction process includes: sampling different time points on the long-duration operation timeline to construct a performance-time pressure function curve corresponding to each sampling time point during the long-duration operation; calculating the peak performance value and the time pressure corresponding to the peak performance value at the sampling time point based on the performance-time pressure function curve; and constructing a peak performance-time pressure-time function curve based on the peak performance values ​​and time pressure corresponding to all sampling time points, with time as one horizontal axis, time pressure as another horizontal axis, and the peak performance value as the vertical axis.

[0089] Response time calculation module 720 is used to calculate the response time of the next long-duration operation after the current long-duration operation ends based on the historical response time of human-computer interaction. Specifically, it calculates the average response time based on the historical response time; calculates the corrected response time based on the response time of the current long-duration operation and the previous long-duration operation; and calculates the response time of the next long-duration operation based on the average response time and the corrected response time.

[0090] The time pressure calculation module 730 is used to calculate the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve.

[0091] The optimal reserve time calculation module 740 is used to calculate the optimal reserve time corresponding to the highest performance value according to the response time and time pressure of the next long-duration operation.

[0092] It should be noted that the long-flight operation human-computer interaction device based on dynamic time pressure provided in the above embodiment should be illustrated by the division of the above-mentioned functional modules when performing long-flight operation human-computer interaction based on dynamic time pressure. The above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the terminal or server is divided into different functional modules to complete all or part of the functions described above. In addition, the long-flight operation human-computer interaction device based on dynamic time pressure provided in the above embodiment and the long-flight operation human-computer interaction method embodiment based on dynamic time pressure belong to the same concept. The specific implementation process is detailed in the long-flight operation human-computer interaction method embodiment based on dynamic time pressure, which will not be repeated here.

[0093] The long-flight operation human-computer interaction device based on dynamic time pressure provided in the embodiment, based on the study of the impact of dynamic time pressure on human errors in long-flight, obtains the task reserved time on the timeline by calculating the time pressure level, provides a new scientific design idea for the long-flight human-computer interaction system, improves the overall performance level of the human-computer system, and reduces human errors caused by cumulative fatigue.

[0094] Based on the same inventive concept, an embodiment further provides a computing device including a memory and one or more processors. The memory stores executable code. When the one or more processors execute the executable code, the device is used to implement the above-mentioned long-duration operation human-computer interaction method based on dynamic time pressure, which specifically includes the following steps:

[0095] S110, constructing a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation;

[0096] S120, after the current long-flight operation is completed, calculating the response time of the next long-flight operation based on the historical response time of human-computer interaction;

[0097] S130, calculating the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve;

[0098] S140 , calculating the optimal reserved time corresponding to the highest performance value based on the response time and time pressure of the next long-duration operation.

[0099] As shown in FIG8 , the computing device provided in the embodiment, at the hardware level, includes not only a processor and memory, but also hardware required for other services such as an internal bus, a network interface, and memory. The memory is a non-volatile memory, and the processor reads the corresponding computer program from the non-volatile memory into the memory and then runs it to implement the long-flight operation human-computer interaction method described in S110-S140 above. Of course, in addition to software implementation, the present invention does not exclude other implementation methods, such as logic devices or a combination of software and hardware, etc., that is, the execution subject of the following processing flow is not limited to each logic unit, but can also be hardware or logic devices.

[0100] Based on the same inventive concept, an embodiment further provides a computer-readable storage medium having a program stored thereon. When the program is executed by a processor, the above-mentioned human-computer interaction method for long-duration operations based on dynamic time pressure is implemented, specifically comprising the following steps:

[0101] S110, constructing a maximum performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation;

[0102] S120, after the current long-flight operation is completed, calculating the response time of the next long-flight operation based on the historical response time of human-computer interaction;

[0103] S130, calculating the maximum performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve;

[0104] S140 , calculating the optimal reserved time corresponding to the highest performance value based on the response time and time pressure of the next long-duration operation.

[0105] In an embodiment, computer-readable media includes permanent and non-permanent, removable and non-removable media that can be used to store information by any method or technology. The information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disc read-only memory (CD-ROM), digital versatile disc (DVD) or other optical storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer-readable media does not include temporary computer-readable media (transitory media), such as modulated data signals and carrier waves.

[0106] The specific implementation methods described above provide a detailed description of the technical solutions and beneficial effects of the present invention. It should be understood that the above is only the most preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, supplements and equivalent substitutions made within the scope of the principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A human-computer interaction method for long-duration operations based on dynamic time pressure, characterized in that: The following steps are involved: Construct the highest performance-time pressure-time function curve based on the performance-time pressure function curve corresponding to the long-duration operation; After the current long-flight operation is completed, the response time of the next long-flight operation is calculated based on the historical response time of human-computer interaction; Calculate the highest performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the highest performance value based on the highest performance-time pressure-time function curve; The optimal reserved time corresponding to the highest performance value is calculated based on the response time and time pressure of the next long-flight operation.

2. The human-computer interaction method for long-duration operations based on dynamic time pressure according to claim 1 is characterized in that: The method of constructing the highest performance-time pressure-time function curve according to the performance-time pressure function curve corresponding to the long-duration operation includes: Sampling different time points on the time axis of long-duration operations, and constructing the performance-time pressure function curve corresponding to each sampling time point during long-duration operations; Calculate the highest performance value corresponding to the sampling time point and the time pressure corresponding to the highest performance value based on the performance-time pressure function curve; According to the highest performance value and time pressure corresponding to all sampling time points, the highest performance-time pressure-time function curve is constructed with time as one horizontal axis, time pressure as another horizontal axis, and the highest performance value as the vertical axis.

3. The human-computer interaction method for long-duration operations based on dynamic time pressure according to claim 1 is characterized in that: The calculation of the response time of the next long-flight operation based on the historical response time of human-computer interaction includes: Calculate the average response time based on historical response times; Calculate the correction time based on the response time of the current long-duration operation and the previous long-duration operation; The response time for the next long-duration operation is calculated based on the average response time and the correction time.

4. The human-computer interaction method for long-duration operations based on dynamic time pressure according to claim 3 is characterized in that: The calculation of the correction time based on the response time of the current long-flight operation and the previous long-flight operation includes: The difference between the response time of the current long-flight operation and the response time of the previous long-flight operation is taken as the correction time.

5. The human-computer interaction method for long-duration operations based on dynamic time pressure according to claim 1 is characterized in that: Also includes: Update the reserved time corresponding to the long-flight operation in the interactive system according to the optimal reserved time.

6. A long-duration human-machine interaction device based on dynamic time pressure, characterized in that: It includes a curve construction module, a response time calculation module, a time pressure calculation module, and an optimal reserved time calculation module; The curve construction module is used to construct a maximum performance-time pressure-time function curve according to the performance-time pressure function curve corresponding to the long-duration operation; The response time calculation module is used to calculate the response time of the next long-flight operation based on the historical response time of human-computer interaction after the current long-flight operation is completed; The time pressure calculation module is used to calculate the highest performance value corresponding to the start time of the next long-duration operation and the time pressure corresponding to the highest performance value according to the highest performance-time pressure-time function curve; The optimal reserved time calculation module is used to calculate the optimal reserved time corresponding to the highest performance value according to the response time and time pressure of the next long-flight operation.

7. The long-duration operation human-machine interaction device based on dynamic time pressure according to claim 6 is characterized in that: In the curve construction module, the highest performance-time pressure-time function curve is constructed according to the performance-time pressure function curve corresponding to the long-duration operation, including: Sampling different time points on the time axis of long-duration operations, and constructing the performance-time pressure function curve corresponding to each sampling time point during long-duration operations; Calculate the highest performance value corresponding to the sampling time point and the time pressure corresponding to the highest performance value based on the performance-time pressure function curve; According to the highest performance value and time pressure corresponding to all sampling time points, the highest performance-time pressure-time function curve is constructed with time as one horizontal axis, time pressure as another horizontal axis, and the highest performance value as the vertical axis.

8. The long-duration operation human-machine interaction device based on dynamic time pressure according to claim 6, characterized in that: In the response time calculation module, the response time of the next long-flight operation is calculated based on the historical response time of human-computer interaction, including: Calculate the average response time based on historical response times; Calculate the correction time based on the response time of the current long-duration operation and the previous long-duration operation; The response time for the next long-duration operation is calculated based on the average response time and the correction time.

9. A computing device comprising a memory and one or more processors, wherein the memory stores executable code, characterized in that: When the one or more processors execute the executable code, they are used to implement the long-flight operation human-computer interaction method based on dynamic time pressure as described in any one of claims 1-5.

10. A computer-readable storage medium, characterized in that: A program is stored thereon, and when the program is executed by a processor, the human-computer interaction method for long-flight operations based on dynamic time pressure as described in any one of claims 1-5 is implemented.

Citation Information

Patent Citations

  • Pilot real-time decision prediction method based on airplane survivability

    CN108303886A

  • A man-machine ergonomic test method and system

    CN109145485A

  • Space man-machine interaction system performance evaluation method

    CN112016786A

  • Pilot workload evaluation method and system based on task complexity analysis

    CN115115270A

  • System and method for rule-based analytics of temporal-spatial constraints on noisy data for commercial airlineflight operations

    US20160189080A1