Transport system
The conveyance system improves efficiency by using a controlled network of intersecting paths to prioritize cart movements, reducing collisions and increasing speed, thus optimizing the transport of articles in intersecting conveyance paths.
Patent Information
- Application Number
- PCT/JP2023/043604
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-26
- Filing Date
- 2023-12-06
- Publication Date
- 2024-10-31
AI Technical Summary
Conventional conveyance systems with lattice-shaped passages struggle to optimize the efficiency of article transport, particularly in intersecting paths, leading to potential collisions and increased transport time due to varying cart movements.
A conveyance system with a first path group of line-shaped paths and a second path group intersecting at specific transfer points, controlled by a central unit that manages cart movements to prioritize directions in each path group, ensuring higher cart flow in designated directions and reducing collisions by determining main movement directions based on cart distribution and speed.
This configuration enhances transport efficiency by allowing carts to move at higher speeds with reduced collisions and optimized route allocation, improving overall conveyance path efficiency.
Smart Images

Figure JP2023043604_31102024_PF_FP_ABST
Abstract
Description
Transport System
[0001] The present invention relates to a transport system.
[0002] BACKGROUND ART Conventionally, a grid-like passageway provided adjacent to a conveyor has been known as a passageway for a carriage that transports articles (see, for example, Patent Document 1).
[0003] Japanese Patent Application Laid-Open No. 2021-134043
[0004] In this type of passage, for example, it would be beneficial if the efficiency of transporting articles could be increased.
[0005] Therefore, one object of the present invention is to provide a conveying system that can further improve the efficiency of conveying articles, for example, in a conveying path having a plurality of paths that intersect with each other.
[0006] The conveying system of the present invention comprises a first passage group consisting of a plurality of linear passages extending in a first direction, which are passages for a plurality of carts; a second passage group consisting of a plurality of linear passages for the plurality of carts extending in a second direction intersecting the first direction; a plurality of transfer stations at which the carts stop for at least one of loading and unloading; and a control unit that controls movement of the plurality of carts in the first passage group and the second passage group, wherein at least one passage in the first passage group intersects with at least one passage in the second passage group, and the control unit controls the movement of the plurality of carts in a first passage included in the first passage group so that the number of carts moving in the first direction in a given time period is greater than the number of carts moving in the opposite direction to the first direction in the given time period.
[0007] FIG. 1 is an exemplary and schematic plan view of a transport path applied to the transport system of the first embodiment. FIG. 2 is an exemplary block diagram of a centralized control device included in the transport system of the first embodiment. FIG. 3 is an exemplary block diagram of a carriage included in the transport system of the first embodiment. FIG. 4 is a schematic plan view showing an example of a movement path of a carriage determined by the transport system of the first embodiment for the transport path of FIG. 1. FIG. 5 is a schematic plan view showing another example of a movement path of a carriage determined by the transport system of the first embodiment for the transport path of FIG. 1. FIG. 6 is an exemplary and schematic plan view of a transport path applied to the transport system of the second embodiment. FIG. 7 is an exemplary and schematic plan view of a transport path applied to the transport system of the third embodiment. FIG. 8 is an exemplary and schematic plan view of a transport path applied to the transport system of the fourth embodiment. FIG. 9 is an exemplary and schematic plan view of a transport path applied to the transport system of the fifth embodiment. FIG. 10 is an exemplary block diagram of a centralized control device included in the transport system of the sixth embodiment. FIG. 11 is an exemplary schematic plan view of a part of a transport path applied to the transport system of the seventh embodiment.
[0008] Exemplary embodiments of the present invention are disclosed below. The configurations of the embodiments described below, as well as the actions and results (effects) obtained from these configurations, are merely examples. The present invention can also be realized by configurations other than those disclosed in the following embodiments. Furthermore, according to the present invention, it is possible to obtain at least one of the various effects (including derivative effects) obtained by the following configurations.
[0009] In this specification, ordinal numbers may be assigned for convenience to distinguish between directions, passage groups, passages, etc. The ordinal numbers do not indicate priority or order, nor do they specify a number.
[0010] In addition, in some of the drawings, each direction in the conveyance system is indicated by an arrow. The X direction, Y direction, and Z direction intersect with each other and are perpendicular to each other. The Z direction is approximately along the vertical direction, and the arrow Z points vertically upward. The X direction and Y direction are approximately along the horizontal direction.
[0011] [First embodiment] [Configuration of transport path] Fig. 1 is a plan view of a transport path CP1 applied to a transport system 1000A (1000) according to the first embodiment. As shown in Fig. 1, the transport path CP1 includes a plurality of paths 111, 121, 131, 132, and 201 to 207 arranged in a grid pattern on a substantially horizontal floor F. The paths 111, 121, 131, and 132 extending substantially along the X direction intersect with the paths 201 to 207 extending substantially along the Y direction in a cross or T-shape.
[0012] A plurality of conveyors 301-303 face the Y-direction end of the conveying path CP1, and a plurality of conveyors 401-403 face the opposite Y-direction end of the conveying path CP1. Transfer positions P11-P13 and P21-P23 for item A are provided at positions on the conveying path CP1 facing each of the conveyors 301-303 and 401-403. The transfer positions P11-P13 and P21-P23 are positions of the cart 10 when transferring item A between each of the conveyors 301-303 and 401-403 and the cart 10. A transfer device (not shown) transfers item A, i.e., loads or unloads item A onto or from the cart 10, when the cart 10 is positioned at the transfer positions P11-P13 and P21-P23.
[0013] The dolly 10 can move through the conveying path CP1 between any two of the transfer positions P11-P13 and P21-P23. That is, the dolly 10 passing through the conveying path CP1 can transport an item A between any two of the conveyors 301-303 and 401-403. Furthermore, an empty dolly 10 not carrying an item A can move through the conveying path CP1 between any two of the transfer positions P11-P13 and P21-P23. Furthermore, if a pool (not shown) for empty dollies 10 that the dolly 10 can travel between is provided outside the conveying path CP1, the dolly 10 can move between the pool and the transfer positions P11-P13 and P21-P23. Note that in FIG. 1 , the outline arrow indicates the direction of movement of the dolly 10 or the item A, and the circle indicates a state in which the dolly 10 is temporarily stopped.
[0014] In the transport path CP1, the multiple paths 111, 121, 131, and 132 extending in the X direction are an example of paths included in the first path group 100, and the multiple paths 201 to 207 extending in the Y direction are an example of paths included in the second path group 200. The X direction is an example of a first direction, and the Y direction is an example of a second direction. In addition, the transfer positions P11 to P13 and P21 to P23 are examples of transfer sections.
[0015] In this embodiment, the cart 10 is, for example, a route-guided automated guided vehicle. In this case, the passages 111, 121, 131, 132, 201 to 207 are determined by a plurality of inductors (not shown) installed on the floor F. The inductors may be, for example, magnetic inductors such as magnetic bars or magnetic tapes, optical inductors such as light-reflecting tapes, image recognition inductors such as one-dimensional codes or two-dimensional codes, or laser-guided inductors such as reflectors. The cart 10 has a sensor according to the inductor type.
[0016] In this embodiment, as an example, the trolley 10 moves along the paths 111, 121, 131, 132, 201 to 207 instructed by a wireless instruction signal from the central control device 1100 (see Figure 2), while being guided by multiple inductors along the route instructed by the instruction signal.
[0017] The passages 111 and 121 extend between the passage 131 and the passage 132. The passage 111 is set as a passage along which the carriage 10 moves mainly in the X direction, and the passage 121 is set as a passage along which the carriage 10 moves mainly in the opposite direction to the X direction. The movement direction of the carriage 10 is determined by the control of the carriage 10 by the centralized control device 1100. Therefore, in this case, the centralized control device 1100 controls the carriage 10 to move mainly in the X direction in the passage 111, and controls the carriage 10 to move mainly in the opposite direction to the X direction in the passage 121. The passage 111 is an example of a first passage, and the passage 121 is an example of a second passage. The centralized control device 1100 is also an example of a control unit.
[0018] Path 131 extends between path 111 and conveyors 401 to 403, and path 132 extends between path 121 and conveyors 301 to 303. Paths 131 and 132 are set as paths through which the carriage 10 can move in the X direction and the direction opposite to the X direction. That is, the centralized control device 1100 controls the carriage 10 to move in the X direction or the direction opposite to the X direction in paths 131 and 132. Paths 131 and 132 are examples of third paths.
[0019] Furthermore, the passages 201 to 207 are set as passages through which the carriage 10 can move in the Y direction and the direction opposite to the Y direction. That is, the centralized control device 1100 controls the carriage 10 to move in the Y direction or the direction opposite to the Y direction on the passages 201 to 207.
[0020] As described above, when the main movement direction of the trolleys 10 is set for the passages 111 and 121 and the main movement directions are set to be opposite to each other, it is possible to prevent multiple trolleys 10 from moving towards each other in each passage 111 and 121 and colliding with each other, and it is possible to prevent the movement speed of each trolley 10 from being reduced in order to avoid the collision, thereby preventing the transport time of item A from being extended.
[0021] The fact that the main movement direction of the trolleys 10 is set in the passages 111 and 121 in this way can be determined, for example, from the movement state of the trolleys 10 passing through the passages 111 and 121 in a predetermined time. Specifically, when all the trolleys 10 move in the X direction in the passage 111 in a predetermined time, when the majority (for example, 3 / 4 or more) of the trolleys 10 move in the X direction in the passage 111, or when the number of the trolleys 10 moving in the X direction in the passage 111 in a predetermined time is greater than the number of the trolleys 10 moving in the opposite direction to the X direction, it can be determined that the centralized control device 1100 is controlling the trolleys 10 in the passage 111 to move mainly in the X direction. Similarly, if, in a predetermined time, all of the trolleys 10 move in the opposite direction of the X direction on the aisle 121, if the majority of the trolleys 10 (for example, 3 / 4 or more) move in the opposite direction of the X direction on the aisle 121, or if the number of trolleys 10 moving in the opposite direction of the X direction on the aisle 121 in a predetermined time is greater than the number of trolleys 10 moving in the X direction on the aisle 121, it can be determined that the centralized control device 1100 is controlling the trolleys 10 in the aisle 121 to move mainly in the opposite direction of the X direction.
[0022] Here, the predetermined time can be set to, for example, at least a time equal to or greater than the average time required for the carriage 10 to move between any two of the transfer positions P11-P13 and P21-P23 on the conveying path CP1. Furthermore, the predetermined time may be set to, for example, the time from when a carriage 10 enters the passage 111 or the passage 121 when there are no carriages 10 in either the passage 111 or the passage 121 until there are no carriages 10 in either the passage 111 or the passage 121 again. The centralized control device 1100 can interchange the primary movement direction of the carriage 10 set for the passage 111 with the primary movement direction of the carriage 10 set for the passage 121. In this case, the predetermined time is set so as not to overlap the timing of the interchange.
[0023] Furthermore, when the trolleys 10 are controlled to move in the main movement direction in the passages 111 and 121 and are controlled to be movable in the X direction and the direction opposite to the X direction in the passages 131 and 132, (1) the ratio of the number of trolleys 10 moving in the X direction to the number of all trolleys 10 moving in the passage 131 in a given time period is lower than the ratio of the number of trolleys 10 moving in the X direction to the number of all trolleys 10 moving in the passage 111 in a given time period, and the ratio of the number of trolleys 10 moving in the opposite direction to the X direction to the number of all trolleys 10 moving in the passage 132 in a given time period is lower than the ratio of the number of trolleys 10 moving in the opposite direction to the X direction to the number of all trolleys 10 moving in the passage 121 in a given time period. Also, (2) the absolute value of the average speed of all trolleys 10 moving in the passages 111 and 121 in a given time period is greater than the absolute value of the average speed of all trolleys 10 moving in the passages 131 and 132 in a given time period. The above (1) and (2) can be evidence that the main movement direction of the carriage 10 is set along the paths 111 and 121, and that the paths 131 and 132 are used as paths along which the carriage 10 can move in the X direction and in the direction opposite to the X direction.
[0024] [Configuration of the Centralized Control Device] Figure 2 is a block diagram of the centralized control device 1100. As shown in Figure 2, the centralized control device 1100 is configured as a computer having, for example, an arithmetic processing unit 1110, a main memory unit 1120, an auxiliary memory unit 1130, etc. The arithmetic processing unit 1110 is, for example, a central processing unit (CPU), the main memory unit 1120 is, for example, a random access memory (RAM) or a read only memory (ROM), etc., and the auxiliary memory unit 1130 is, for example, a solid state drive (SSD) or a hard disk drive (HDD), etc. The arithmetic processing unit 1110 has a bogie information acquisition unit 1110a, a transportation information acquisition unit 1110b, a current traffic information acquisition unit 1110c, a future traffic information calculation unit 1110d, a route determination unit 1110e, a bogie control unit 1110f, etc. The calculation processing unit 1110 operates in accordance with the installed program, and functions as the trolley information acquisition unit 1110a, the transport information acquisition unit 1110b, the current traffic information acquisition unit 1110c, the future traffic information calculation unit 1110d, the route determination unit 1110e, the trolley control unit 1110f, etc., and executes processing according to a predetermined algorithm defined in the program.
[0025] The trolley information acquisition unit 1110a acquires trolley information indicating the position, speed, etc. of each trolley 10 wirelessly via the communication device 1200 from sensors installed on the floor F or each trolley 10, for example.
[0026] The transport information acquisition unit 1110b acquires transport information indicating transport instructions for the item A via the conveyors 301 to 303 and 401 to 403 from, for example, a higher-level device via the communication device 1200.
[0027] The current traffic information acquisition unit 1110c acquires current traffic information indicating the arrangement of the carts 10 on the transport path CP1 and the movement speed of each cart 10, for example, from the cart information about the multiple carts 10 acquired by the cart information acquisition unit 1110a. The current traffic information acquisition unit 1110c calculates and updates the traffic information at predetermined time intervals.
[0028] The future traffic information calculation unit 1110d predicts the location and movement speed of the carts 10 on the transport path CP1 at a predetermined future time based on the traffic information acquired by the current traffic information acquisition unit 1110c and the cart information acquired by the cart information acquisition unit 1110a, and calculates traffic information at that time. The future traffic information calculation unit 1110d also determines whether the traffic information at the predetermined future time satisfies an acceptable condition. The acceptable condition may be, for example, that the distance between two close carts 10 is equal to or greater than a predetermined distance. Furthermore, if the acceptable condition is not satisfied, the future traffic information calculation unit 1110d can modify the location, movement speed, etc. of the two carts 10.
[0029] The route determination unit 1110e determines the allocation of the carts 10, the movement routes, etc., based on, for example, future traffic information calculated by the future traffic information calculation unit 1110d and the transport information acquired by the transport information acquisition unit 1110b. Note that, hereinafter, the conveyors 301-303 and 401-403 that carry the item A into the transport path CP1 will be simply referred to as carry-in conveyors, and the conveyors 301-303 and 401-403 that discharge the item A from the transport path CP1 will be referred to as carry-out conveyors.
[0030] Specifically, the route determination unit 1110e can determine, for example, (1) allocation of a trolley 10 to transport the item A from among the empty trolleys 10, (2) a movement route of the allocated trolley 10 to a transfer position corresponding to the loading conveyor, (3) a movement route from the transfer position corresponding to the loading conveyor to a transfer position corresponding to the unloading conveyor, and (4) a subsequent movement route of the empty trolley 10 after the item A has been transferred to the unloading conveyor.
[0031] Thereafter, the future traffic information calculation unit 1110d may calculate traffic information at a predetermined time in the future including the cart 10 whose movement route has been determined by the route determination unit 1110e, determine whether or not the allowable conditions are satisfied, and modify the location and movement speed of the cart 10. If the allowable conditions cannot be satisfied even after the modification, the route determination unit 1110e may change the movement route of the cart 10.
[0032] The bogie control unit 1110f calculates control information for controlling each bogie 10 to the position and movement speed from, for example, traffic information at a predetermined future timing determined by the future traffic information calculation unit 1110d, i.e., the position and movement speed of each bogie 10, and transmits the control information wirelessly to the bogie 10 via the communication device 1200. The control information may also be referred to as instruction information.
[0033] [Configuration of the bogie] Figure 3 is a block diagram of the bogie 10. As shown in Figure 3, the control device 11 of the bogie 10 is configured as a computer having, for example, an arithmetic processing unit 11a, a main memory unit 11b, an auxiliary memory unit 11c, etc. The arithmetic processing unit 11a is, for example, a central processing unit (CPU), the main memory unit 11b is, for example, a RAM or a ROM, etc., and the auxiliary memory unit 11c is, for example, an SSD or an HDD, etc. The arithmetic processing unit 11a has a control information acquisition unit 11a1, a detection control unit 11a2, a traveling control unit 11a3, an information output control unit 11a4, etc. The arithmetic processing unit 11a operates in accordance with an installed program to function as the control information acquisition unit 11a1, the detection control unit 11a2, the traveling control unit 11a3, the information output control unit 11a4, etc.
[0034] The control information acquisition unit 11a1 acquires the control information from the central control device 1100 wirelessly via the communication device 12, for example.
[0035] The detection control unit 11a2 acquires detection information from, for example, the sensor 13. The sensor 13 is, for example, a position sensor that detects the position of the cart 10 on the conveying path CP1, or a speed sensor that detects the speed of the cart 10. The speed sensor detects, for example, the rotation speed of a motor serving as the drive device 14.
[0036] The traveling control unit 11a3 controls the drive device 14 of the bogie 10 based on, for example, the control information acquired by the control information acquisition unit 11a1 and the detection information acquired by the detection control unit 11a2 so that the bogie 10 is in a state instructed by the control information. The drive device 14 includes, for example, an electric motor, an inverter that drives the electric motor, a brake, a brake actuator, etc.
[0037] The information output control unit 11a4 controls the communication device 12 to wirelessly transmit, for example, detection information acquired by the detection control unit 11a2 and information indicating the state of the drive unit 14 acquired from the driving control unit 11a3 to the centralized control device 1100.
[0038] [Movement Path Setting Example (1)] Figure 4 shows an example of setting a movement path Pt1 from transfer position P11 to transfer position P23 for a cart 10 carrying an item A. In this case, the cart 10 moves on the transport path CP1 from transfer position P11 corresponding to conveyor 301 to transfer position P23 corresponding to conveyor 403 to transport item A from conveyor 301 to conveyor 403. Transfer position P11 is the starting position on the movement path Pt1, and transfer position P23 is the arrival position on the movement path Pt1. Here, as shown in Figure 4, transfer position P23 is shifted in the X direction and in the opposite direction to the Y direction with respect to transfer position P11. In this case, the route determination unit 1110e first determines the travel route to be the travel route Pt1 in Figure 4, which includes only a section moving in the X direction and a section moving in the opposite direction to the Y direction, and ensures that the section moving in the X direction is as long as possible in the passage 111.
[0039] Furthermore, if the travel route Pt1 determined by the above-described procedure does not satisfy the allowable conditions, the route determination unit 1110e may change the travel route Pt1 to include a detour route Pt1r as shown by the thick dashed line in Fig. 4. In this case, it is preferable that the detour route Pt1r includes the passage 111.
[0040] [Movement Path Setting Example (2)] Figure 5 shows an example of setting a movement path Pt2 for a carriage 10 carrying an item A from a transfer position P22 to a transfer position P12. In this case, the carriage 10 moves on the transport path CP1 from a transfer position P22 corresponding to the conveyor 402 to a transfer position P12 corresponding to the conveyor 302 to transport the item A from the conveyor 402 to the conveyor 302. The transfer position P22 is the starting position on the movement path Pt2, and the transfer position P12 is the arrival position on the movement path Pt2. Here, as shown in Figure 5, the transfer position P12 is shifted in the opposite direction to the X direction and also in the Y direction with respect to the transfer position P22. In this case, the path determination unit 1110e first determines the path of movement to be path Pt2 in FIG. 5 so that the path of movement includes only a section moving in the opposite direction to the X direction and a section moving in the Y direction, and the section of movement in the opposite direction to the X direction is secured as long as possible in the passage 121.
[0041] Furthermore, if the travel route Pt2 determined by the above-described procedure does not satisfy the allowable conditions, the route determination unit 1110e may change the travel route Pt2 to include a detour route Pt2r as indicated by the thick dashed line in Fig. 5. In this case, it is preferable that the detour route Pt2r includes the passage 121.
[0042] [Standby of the Carriage] The carriage 10 can wait at a predetermined waiting position.
[0043] In this embodiment, as shown in FIG. 1 , standby positions 511 and 512 are provided. The standby position 511 faces the path 111 or the path 121 extending in the X direction and also faces one path 204 extending in the Y direction. The standby position 512 faces the path 111 or the path 121 extending in the X direction and also faces two paths extending in the Y direction (paths 202 and 203, or paths 204 and 205). In this case, the cart 10 can enter the standby positions 511 and 512 and wait to enter the path facing the standby positions 511 and 512. This has the effect of, for example, suppressing interference with other carts 10 in the path. The standby positions 511 and 512 are provided adjacent to one of the paths in the conveying path CP1. This provides an advantage that, for example, the carriage 10 can more smoothly and quickly enter the adjacent passage from the standby positions 511 and 512. The standby positions 511 and 512 are an example of a standby section.
[0044] The future traffic information calculation unit 1110d may determine the placement and movement speed of the cart 10, including waiting at the waiting positions 511 and 512, and the route determination unit 1110e may determine a movement route that includes the waiting positions 511 and 512.
[0045] Furthermore, the carriage 10 may wait in the passages 131, 132, and 201-207 other than the passages 111 and 121, which are set as the main direction of movement. In other words, the passages 131, 132, and 201-207 may include a waiting section. In this case, the carriage 10 may wait by temporarily stopping or moving at a speed slow enough to allow it to stop immediately. Furthermore, waiting in the passages 131, 132, and 201-207 may be waiting before entering the passages 111 and 121, or before moving to the transfer positions P11-P13 and P21-P23. This provides the advantage of being able to secure more waiting positions and more diverse locations by utilizing the passages 131, 132, and 201-207, for example. The passages 131, 132, and 201-207 are examples of waiting sections.
[0046] As described above, in this embodiment, the conveying path CP1 includes the passage 111 (first passage) or the passage 121 (second passage) in which the main movement direction is set. This allows the cart 10 to move at a higher speed in the passages 111 and 121, for example, and therefore the cart 10 can move more quickly along the conveying path CP1 compared to a case in which the conveying path CP1 does not include the passages 111 and 121. This in turn provides the effect of further improving the efficiency with which the articles A are conveyed along the conveying path CP1.
[0047] Here, the passages 111, 121 in which the main direction of movement is set may be, for example, passages in which the number of trolleys 10 moving in the main direction of movement at a given time is greater than the number of trolleys 10 moving in the direction opposite to the main direction of movement at a given time, or passages in which all passing trolleys 10 move in the main direction of movement.
[0048] Furthermore, in this embodiment, the conveying path CP1 includes the paths 131, 132, and 201-207, which are not paths 111 and 121, in which a primary movement direction is set. If a primary movement direction were set for all paths, there would be more restrictions on the movement path of the cart 10, which could actually result in a decrease in the movement speed of the cart 10. In this regard, in this embodiment, the conveying path CP1 includes the paths 131, 132 (third path) and 201-207, in which a primary movement direction is not set, in addition to the paths 111 and 121 (first path and second path). Therefore, for example, restrictions on the movement path of the cart 10 are reduced, and more flexible movement paths can be set. This suppresses a decrease in the movement speed of the cart 10, and ultimately results in an effect of further improving the efficiency of conveying the article A on the conveying path CP1.
[0049] Here, the passage 131 (third passage) for which no main direction of movement is set may be, for example, a passage in which the ratio of the number of trolleys 10 moving in the X direction to the number of all trolleys 10 passing through the passage 131 in a given time period is lower than the ratio of the number of trolleys 10 moving in the X direction to the number of all trolleys 10 passing through the passage 111 in that given time period, or a passage in which the absolute value of the average speed of all trolleys 10 passing through the passage 131 in a given time period is smaller than the absolute value of the average speed of all trolleys 10 passing through the passage 111 in that given time period. On the other hand, the passage 132 (third passage) in which a main direction of movement is not set may be a passage in which the ratio of the number of trolleys 10 moving in the opposite direction of the X direction to the number of all trolleys 10 passing through the passage 132 in a given time is lower than the ratio of the number of trolleys 10 moving in the opposite direction of the X direction to the number of all trolleys 10 passing through the passage 121 in that given time, or the passage may be a passage in which the absolute value of the average speed of all trolleys 10 passing through the passage 132 in a given time is smaller than the absolute value of the average speed of all trolleys 10 passing through the passage 121 in that given time.
[0050] 1, in this embodiment, the transfer positions P11 to P13 and P21 to P23 are included in the passage 131 or the passage 132. This has the effect of enabling, for example, the transfer positions P11 to P13 and P21 to P23 to be arranged more efficiently by utilizing the passages 131 and 132, without having to reserve special space on the floor F.
[0051] 1, in this embodiment, each of the transfer positions P11 to P13 is aligned in the Y direction with one of the passages 202 to 204. In other words, the passages 201 to 207 include the passages 202 to 204 that are aligned in the Y direction with one of the transfer positions P11 to P13. This provides the effect that, for example, the carriage 10 can move more smoothly and quickly from the transfer positions P11 to P13 to one of the passages 202 to 204.
[0052] 1, in this embodiment, the transfer positions P21 to P23 are offset in the X direction or in the opposite direction to the X direction with respect to the passages 201 to 207, respectively. In other words, the passages 201 to 207 are all offset in the X direction or in the opposite direction to the X direction with respect to the transfer positions P21 to P23. This has the effect of preventing, for example, the carriages 10 located at the transfer positions P21 to P23 from interfering with the passage of other carriages 10 between the passages 201 to 207 and the passage 131.
[0053] 6 is a plan view of a transport path CP2 applied to a transport system 1000B (1000) according to a second embodiment. As shown in FIG. 6, in this embodiment, similarly to the first embodiment, the transport path CP2 includes a plurality of passages 111, 121, 131, 132, 201 to 207 arranged in a lattice pattern on a substantially horizontal floor F.
[0054] As is clear from a comparison of Fig. 6 with Fig. 1, in this embodiment, the distances in the Y direction between the multiple paths 111, 121, 131, and 132 extending in the X direction are narrow. This has the effect of enabling, for example, the transport path CP2 to be applied to a floor F that is narrow in the Y direction.
[0055] However, in this embodiment, it is difficult to provide standby positions 511 and 512 between the passages 111, 121, 131 and 132, and it is also difficult to use the passages 201 to 207 extending in the Y direction as standby positions.
[0056] Therefore, the transport path CP2 is provided with standby positions 521 and 522 facing the passage 131 or the passage 132. This provides the effect of, for example, ensuring more standby positions.
[0057] Furthermore, each of the standby positions 521 and 522 is adjacent to at least one conveyor. The standby position 521 is adjacent to one conveyor (conveyor 303 or conveyor 403), and the standby position 522 is adjacent to two conveyors adjacent in the X direction (conveyors 301 and 302, or conveyors 401 and 402). Furthermore, in this case, for example, by providing a transfer device corresponding to each of the standby positions 521 and 522, it becomes possible to transfer the article A between the cart 10 positioned at the standby position 521 or 522 and the conveyors 301 to 303, 401 to 403. This has the effect of further improving the transport efficiency of the article A, for example. In this case, the standby positions 521 and 522 are an example of a transfer unit.
[0058] Third Embodiment Figure 7 is a plan view of a transport path CP3 applied to a transport system 1000C (1000) according to a third embodiment. In this embodiment, the transport path CP3 is provided on a substantially horizontal floor F and includes multiple ladder-shaped paths 111, 121, 201-207, but does not include paths 131 and 132 (see Figure 1). That is, in the transport path CP3, the first path group 100 includes paths 111 and 121 that are set in the primary direction of movement of the cart 10, but does not include paths 131 and 132 through which the cart 10 can move in both the X direction and the direction opposite to the X direction. In this case, for example, the effect of reducing the processing load on the centralized control device 1100 can be obtained by managing fewer paths.
[0059] 7, in this embodiment, paths 600 are provided that protrude from paths 111 and 121 in the Y direction or in the opposite direction to the Y direction toward each of conveyors 301-303 and 401-403, and transfer positions P11-P13 and P21-P23 are provided in path 600. That is, transfer positions P11-P13 and P21-P23 are provided offset in the Y direction or in the opposite direction to the Y direction with respect to paths 111 and 121. This has the effect of preventing, for example, carriages 10 positioned at transfer positions P11-P13 and P21-P23 from interfering with the passage of other carriages 10 in paths 111 and 121.
[0060] Furthermore, in this embodiment, as shown in FIG. 7 , standby positions 521 and 522 are provided. The standby position 521 faces the aisle 111 or the aisle 121 and also faces one aisle 600. The standby position 522 faces the aisle 111 or the aisle 121 and also faces two aisles 600. In this case, the trolley 10 can enter these standby positions 521 and 522 and wait to enter the aisles 111, 121, and 600. This has the effect of, for example, suppressing interference with other trolleys 10 in the aisles 111, 121, and 600. The standby positions 521 and 522 are provided adjacent to the aisles 111, 121, and 600. This has the effect of, for example, allowing the trolley 10 to enter the adjacent aisles 111, 121, and 600 more smoothly and quickly from the standby positions 521 and 522. Furthermore, the standby positions 521, 522 are adjacent to the passage 600 in which the transfer positions P11 to P13, P21 to P23 are provided. Therefore, when another cart 10 is positioned at the transfer position P11 to P13, P21 to P23 and the cart 10 is waiting at the standby position 521, 522 to move to the transfer position P11 to P13, P21 to P23, the effect is obtained that the cart 10 can move to the transfer position P11 to P13, P21 to P23 immediately after the other cart 10 moves from the transfer position P11 to P13, P21 to P23.
[0061] The path 600 in which the transfer positions P11-P13 and P21-P23 are provided may be provided in the conveying paths CP1 and CP2 (see FIGS. 1 and 6) of the first and second embodiments. In this case, the path 600 is provided between the path 131 and each of the conveyors 401-403 and between the path 132 and each of the conveyors 301-303. In this configuration, the path 131 is provided between the path 111 and the transfer positions P21-P23, and the path 132 is provided between the path 121 and the transfer positions P11-P13. In this case, for example, an effect can be obtained in which the carriages 10 located at the transfer positions P11-P13 and P21-P23 can be prevented from interfering with the passage of other carriages 10 in the paths 131 and 132.
[0062] [Fourth Embodiment] Figure 8 is a plan view of a conveying path CP4 applied to a conveying system 1000D (1000) of the fourth embodiment. As is clear from comparing Figure 8 with Figure 1, the conveying path CP4 of this embodiment differs from the conveying path CP1 of the first embodiment in that a path 133 extending in the X direction is provided between two paths 111 and 121, each having a main movement direction. This path 133 extends in the X direction and is not normally a path having a main movement direction. In other words, this path 133 is an example of a third path. In this case, for example, the cart 10 can wait in the path 133 by temporarily stopping or moving at a low speed that allows it to stop immediately before entering the paths 111 and 121. In other words, the path 133 is an example of a waiting section.
[0063] Furthermore, the passage 133 is connected to both the passage 111 and the passage 121 via a plurality of passages 201 to 207, and is located between the passages 111 and 121 and relatively close to both the passages 111 and 121. Therefore, for example, when the number of carts 10 passing through either the passage 111 or the passage 121 increases, the passage 133 can be used as a supplementary passage for the passage 111 or the passage 121 where the number of carts 10 has increased. Specifically, when the number of carts 10 moving in the X direction in the passage 111 increases, the passage 133 can be temporarily used as a passage along which the carts 10 mainly move in the X direction, and when the number of carts 10 moving in the opposite direction to the X direction in the passage 121 increases, the passage 133 can be temporarily used as a passage along which the carts 10 mainly move in the opposite direction to the X direction. This, for example, can suppress the accumulation of the carts 10 and improve the transport efficiency of the article A.
[0064] Fifth Embodiment FIG. 9 is a plan view of a transport path CP5 applied to a transport system 1000E (1000) according to a fifth embodiment. In the transport paths CP1 to CP4 of the first to fourth embodiments, the carriage 10, which is approximately rectangular in plan view, moves in an orientation that is long in the X direction and short in the Y direction. In contrast, in this embodiment, the carriage 10 moves along the transport path CP5 in an orientation that is short in the X direction and long in the Y direction, i.e., rotated 90° in plan view from the orientation of the carriage 10 along the transport paths CP1 to CP4. This provides the advantage that, for example, the transport path CP5 can be configured to be shorter in the X direction than the transport paths CP1 to CP4. In other words, the layout of the transport paths CP1 to CP5 and the orientation in which the carriage 10 moves can be appropriately selected depending on the size, shape, etc. of the floor F on which the transport paths CP1 to CP5 are installed.
[0065] Sixth Embodiment FIG. 10 is a block diagram of a centralized control device 1100 of a conveyance system 1000F (1000) according to a sixth embodiment. This embodiment includes a conveyance path CP1 (see FIG. 1) with a lattice-like passage similar to that of the first embodiment. However, in this embodiment, the conveyance system 1000F also includes a drive system 1400 including multiple linear motors. The carriages 10 are not self-propelled but are moved by the operation of the linear motors provided on the conveyance path CP1. The linear motors are arranged at predetermined intervals along the extension direction of the passages 111, 121, 131, 132, and 201-207, respectively. The centralized control device 1100 appropriately switches the direction of current supply to the multiple linear motors to change the direction of magnetic flux, thereby changing the attractive or repulsive relationship with the magnets provided on the carriage 10 and thereby changing the position and movement speed of the carriage 10. In this case, the sensor 1300 is installed on the floor F, for example, and is, for example, a position sensor that detects the position of the cart 10 on the transport path CP1, a speed sensor that detects the speed of the cart 10, an identification sensor that detects the identifier of each cart 10, etc. The cart information acquisition unit 1110a acquires cart information indicating the position, speed, etc. of each cart 10 from the sensor 1300. Then, the cart control unit 1110f calculates control information for each linear motor for controlling each cart 10 to the relevant position and movement speed from, for example, traffic information at a predetermined future timing calculated by the future traffic information calculation unit 1110d, i.e., the position and movement speed of each cart 10, and controls the linear motors.
[0066] Even with this configuration, it is possible to construct the same transport paths CP1 to CP5 as in the above-described embodiments, and to obtain the same effects as in the above-described embodiments. Furthermore, according to this embodiment, for example, it is possible to obtain the effect of simplifying the configuration of the carriage 10 applied to the transport system 1000F.
[0067] Seventh Embodiment FIG. 11 is a plan view of a portion of a conveying path CP7 applied to a conveying system 1000G (1000) according to a seventh embodiment. In the example of FIG. 11 , a path 700 is provided at the intersection of a path 111 extending in the X direction and a path 202 extending in the Y direction, along which the cart 10 moves diagonally relative to the X and Y directions. The path 700 has a shape in which the corners of the path 111 and the path 202 are chamfered. By providing such a path 700, the movement path Pt of the cart 10 can include a diagonal movement section Pts. This can achieve effects such as smoother and faster movement of the cart 10 between two intersecting paths at an intersection, suppressing sudden changes in acceleration of the cart 10, and ultimately suppressing misalignment of the article A on the cart 10. The path 700 may also be referred to as a shortcut path.
[0068] While the above describes exemplary embodiments of the present invention, the above embodiments are merely examples and are not intended to limit the scope of the invention. The above embodiments can be implemented in various other forms, and various omissions, substitutions, combinations, and modifications can be made without departing from the spirit of the invention. Furthermore, the specifications of each configuration, shape, and the like (structure, type, direction, model, size, length, width, thickness, height, number, arrangement, position, material, etc.) can be appropriately modified and implemented.
[0069] For example, the layout and specifications of the passages in the transport path can be changed in various ways. For example, the lengths of the passages included in the first passage group, the spacing between them in the second direction, the positions in the first direction, etc. can be changed in various ways, and the lengths of the passages included in the second passage group, the spacing between them in the first direction, the positions in the second direction, etc. can also be changed in various ways.
[0070] DESCRIPTION OF SYMBOLS 10...Carriage 11...Control device 11a...Calculation processing unit 11a1...Control information acquisition unit 11a2...Detection control unit 11a3...Travel control unit 11a4...Information output control unit 11b...Main memory unit 11c...Auxiliary memory unit 12...Communication device 13...Sensor 14...Drive device 100...First path group 111...Path (first path) 121...Path (second path) 131, 132, 133...Path (third path, waiting section) 200...Second path group 201 to 207...Path (waiting section) 301 to 303, 401 to 403...Conveyors 511, 512, 521, 522...Waiting position (waiting section) 600...Path 700...Path 1000, 1000A to 1000G...Conveying system 1100...Centralized control device (control unit) DESCRIPTION OF SYMBOLS 1110...Calculation processing unit 1110a...Cart information acquisition unit 1110b...Transportation information acquisition unit 1110c...Current traffic information acquisition unit 1110d...Future traffic information calculation unit 1110e...Route determination unit 1110f...Cart control unit 1120...Main memory unit 1130...Auxiliary memory unit 1200...Communication device 1300...Sensor 1400...Drive system A...Item CP1 to CP5, CP7...Transport path F...Floor P11 to P13, P21 to P23...Transfer position (transfer unit) Pt, Pt1, Pt2...Movement route Pt1r, Pt2r...Detour route Pts...Section X...Direction (first direction) Y...Direction (second direction) Z...Direction
Claims
1. A conveying system comprising: a first passage group consisting of a plurality of passages in the form of line segments extending in a first direction, which are passages for a plurality of carts; a second passage group consisting of a plurality of passages in the form of line segments extending in a second direction intersecting the first direction, which are passages for the plurality of carts; a plurality of transfer stations at which the carts stop for at least one of loading and unloading; and a control unit which controls movement of the plurality of carts in the first passage group and the second passage group, wherein at least one passage in the first passage group intersects with at least one passage in the second passage group, and the control unit controls the movement of the plurality of carts in a first passage included in the first passage group so that the number of carts moving in the first direction in a given time period is greater than the number of carts moving in the direction opposite to the first direction in the given time period.
2. The conveying system according to claim 1, wherein the control unit controls the movement of the plurality of carts so that all of the carts passing through the first passage move in the first direction.
3. The conveying system described in claim 1, wherein the control unit controls the movement of the multiple carts in a second passage that is a passage included in the first passage group and is separate from the first passage so that the number of carts moving in the opposite direction to the first direction in a given time period is greater than the number of carts moving in the first direction in the given time period.
4. The conveying system according to claim 3, wherein the control unit controls the movement of the plurality of carts so that all of the carts passing through the second passage move in a direction opposite to the first direction.
5. A transport system according to claim 3, wherein said first group of passages includes a third passage separate from said first and second passages.
6. A conveying system as described in claim 5, wherein a ratio of the number of carts moving in the first direction to the total number of carts moving on the third passage in a given time period is lower than a ratio of the number of carts moving in the first direction to the total number of carts moving on the first passage in the given time period, and a ratio of the number of carts moving in the opposite direction to the first direction to the total number of carts moving on the third passage in a given time period is lower than a ratio of the number of carts moving in the opposite direction to the first direction to the total number of carts moving on the second passage in the given time period.
7. A conveying system as described in claim 5, wherein the absolute value of the average speed of all carts moving along the third passage in a given time period is smaller than the absolute value of the average speed of all carts moving along the first passage in that given time period, and is also smaller than the absolute value of the average speed of all carts moving along the second passage in that given time period.
8. A conveying system according to claim 5 or 6, wherein the third passage includes the plurality of transfer sections.
9. A transport system according to claim 5 or 6, wherein the third passage is provided between the first passage or the second passage and the plurality of transfer sections.
10. A conveying system as described in claim 1 or 3, wherein at least a portion of the plurality of transfer sections are provided at positions offset in the second direction or in a direction opposite to the second direction with respect to the passages included in the first passage group.
11. A conveying system according to claim 1 or 3, further comprising a waiting section for waiting for the carriage to proceed to either one of the passageway or the transfer section.
12. The conveying system according to claim 11, wherein the waiting section is provided adjacent to at least one of the transfer section and the passage.
13. A conveying system as described in claim 1 or 3, wherein the control unit controls the cart to wait in an aisle included in the second aisle group until the cart advances to the aisle and one of the plurality of transfer sections.
14. A conveying system as described in claim 1 or 3, wherein the second passage group includes a passage aligned in the second direction with any of the plurality of transfer sections.
15. A conveying system as described in claim 1 or 3, wherein the second group of passages includes a passage that is offset in the first direction from any of the plurality of transfer sections.
Citation Information
Patent Citations
Conveyor
JP2021134043A
Carrier control method and carrier device
JP1998275017A
Article carrier facility
JP2003182809A
Article delivery facility
JP2018041410A
Conveyance vehicle control system, operation managing device and conveyance route generating method
JP2022072555A
