Battery management apparatus and operation method therefor
The battery management device uses linear regression analysis of OCV data to diagnose tab disconnection in battery cells, addressing the limitations of existing systems by accurately identifying disconnections through error analysis, even without sudden voltage changes, thus enhancing diagnostic efficiency and reducing resource consumption.
Patent Information
- Application Number
- PCT/KR2024/001229
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-09
- Filing Date
- 2024-01-25
- Publication Date
- 2024-11-14
AI Technical Summary
Current battery management systems struggle to diagnose tab disconnection in battery cells when there is no rapid voltage change, relying on real-time voltage measurements that consume system resources and are not effective for abnormal voltage behavior detection based on OCV after charging or discharging.
A battery management device and method that calculates a first linear regression function based on open circuit voltage (OCV) data, predicts values, and diagnoses tab disconnection by analyzing errors between predicted and measured OCV values, using maximum and minimum deviations and the coefficient of determination (R-squared) error rate, even in the absence of sudden voltage abnormalities.
Enables accurate diagnosis of tab disconnection in battery cells based on OCV behavior after charging and discharging, reducing system resource usage and improving diagnostic capabilities without relying on sudden voltage changes.
Smart Images

Figure KR2024001229_14112024_PF_FP_ABST
Abstract
Description
Battery management device and its operating method
[0001] Cross-citation with related applications
[0002] This invention claims the benefit of priority from Korean Patent Application No. 10-2023-0060037, filed on May 9, 2023, and all contents of the document in that Korean Patent Application are incorporated herein by reference.
[0003] Technology field
[0004] The embodiments disclosed in this document relate to a battery management device and a method of operating the same.
[0005] Recently, research and development on secondary batteries has been actively conducted. Here, secondary batteries are rechargeable and include both conventional Ni / Cd and Ni / MH batteries, as well as recent lithium-ion batteries. Among secondary batteries, lithium-ion batteries have the advantage of having a much higher energy density than conventional Ni / Cd and Ni / MH batteries. Furthermore, lithium-ion batteries can be manufactured in a compact and lightweight form, making them suitable for use as power sources for mobile devices. Recently, their use has expanded to include power sources for electric vehicles, attracting attention as a next-generation energy storage medium.
[0006] Diagnosing abnormal voltage behavior based on short-term and long-term moving averages, which utilize deviations from the average of battery cell voltages, can only diagnose battery cell abnormalities when a tab break occurs or when a severe voltage fluctuation occurs during the reconnection of a disconnected battery cell. Furthermore, diagnosing abnormal voltage behavior based on short-term and long-term moving averages requires significant system resources because it relies on real-time voltage data.
[0007] One purpose of the embodiments disclosed in this document is to provide a battery management device and an operating method thereof capable of diagnosing a tab open circuit of a battery cell even when the voltage does not change abruptly based on the OCV voltage of the battery cell after charging or discharging.
[0008] One purpose of the embodiments disclosed in this document is to provide a battery management device and an operating method thereof capable of diagnosing whether a tab is open based on the OCV behavior of a battery cell after charging and discharging even when no abnormal voltage behavior occurs.
[0009] The technical problems of the embodiments disclosed in this document are not limited to the technical problems mentioned above, and other technical problems not mentioned will be clearly understood by those skilled in the art from the descriptions below.
[0010] A battery management device according to one embodiment disclosed in the present document may include an information acquisition unit that acquires an open circuit voltage of each of a plurality of battery cells, a controller that calculates an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells, calculates a first linear regression function related to the open circuit voltage of the first battery cell based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage, calculates a first error between a predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, and diagnoses the first battery cell based on the first error.
[0011] In one embodiment, the information acquisition unit can acquire the open circuit voltage of each of the plurality of battery cells for each charge after the plurality of battery cells are charged multiple times.
[0012] In one embodiment, the controller may calculate the average open circuit voltage for each charge based on the open circuit voltage of each of the plurality of battery cells obtained for each charge, and may calculate the first linear regression function based on the average open circuit voltage calculated for each charge and the open circuit voltage of the first battery cell obtained for each charge.
[0013] In one embodiment, the controller may calculate a maximum deviation and a minimum deviation of a predicted value calculated based on the open circuit voltage of the first battery cell and the first linear regression function, calculate an error rate of the predicted value calculated based on the open circuit voltage of the first battery cell and the first linear regression function, and calculate a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate.
[0014] In one embodiment, the controller may calculate a first error of the open circuit voltage of the first battery cell by multiplying the difference between the maximum deviation and the minimum deviation by the error rate.
[0015] In one embodiment, the error rate can be calculated based on the coefficient of determination (R-squared) error rate.
[0016] In one embodiment, the controller can diagnose that a problem has occurred in the first battery cell if the first error is greater than or equal to a set value.
[0017] In one embodiment, a linear regression function related to the open circuit voltage of each of the plurality of battery cells is calculated based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage, an error between a predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells is calculated, and each of the plurality of battery cells can be diagnosed based on the error.
[0018] In one embodiment, the information acquisition unit can acquire the open circuit voltage of each of the plurality of battery cells by shifting for each reference number.
[0019] In one embodiment, the information acquisition unit can acquire the open circuit voltage of each of the plurality of battery cells for each discharge after the plurality of battery cells are discharged multiple times.
[0020] An operating method of a battery management device according to one embodiment disclosed in the present document may include, in one embodiment, an operation of obtaining an open circuit voltage of each of a plurality of battery cells, an operation of calculating an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells, an operation of calculating a first linear regression function related to the open circuit voltage of the first battery cell based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage, an operation of calculating a first error between a predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, and an operation of diagnosing the first battery cell based on the first error.
[0021] In one embodiment, the operation of calculating a first error between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell may include an operation of calculating a maximum deviation and a minimum deviation between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, an operation of calculating an error rate between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, and an operation of calculating a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate.
[0022] In one embodiment, the method may further include an operation of calculating a linear regression function related to the open circuit voltage of each of the plurality of battery cells based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage, an operation of calculating an error between a predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells, and an operation of diagnosing each of the plurality of battery cells based on the error.
[0023] A battery management device and its operating method according to one embodiment disclosed in this document can diagnose whether a tab of a battery cell is disconnected based on the OCV behavior after charging and discharging of the battery cell.
[0024] A battery management device and its operating method according to an embodiment disclosed in this document can project the OCV voltage of a battery cell onto an average OCV of a plurality of battery cells to produce a prediction model even when an abrupt voltage behavior abnormality does not occur, and can diagnose a tab disconnection of a battery cell based on an error between the predicted value and the measured value.
[0025] A battery management device and its operating method according to one embodiment disclosed in this document can project the OCV voltage of a battery cell onto the average OCV of a plurality of battery cells through linear regression to produce a prediction model, and can diagnose a battery cell based on the maximum deviation and the coefficient of determination (R-squared) error rate between the predicted value and the measured value.
[0026] In addition, various effects may be provided, either directly or indirectly, through this document.
[0027] Figure 1 is a block diagram showing the configuration of a typical battery pack.
[0028] FIG. 2 is a block diagram showing a battery management device according to one embodiment disclosed in this document.
[0029] FIG. 3 is a diagram showing an example of a battery management device according to one embodiment disclosed in this document calculating a linear regression function for the OCV of each of a plurality of battery cells.
[0030] FIG. 4 is a diagram showing an example of a battery management device according to one embodiment disclosed in this document calculating an error between a predicted value and a measured value of each battery cell.
[0031] FIG. 5 is a flowchart showing an operation method of a battery management device according to one embodiment disclosed in this document.
[0032] FIG. 6 and FIG. 7 are flowcharts specifically showing an operation method of a battery management device according to one embodiment disclosed in this document.
[0033] FIG. 8 is a block diagram showing the hardware configuration of a computing system for performing an operating method of a battery management device according to one embodiment disclosed in this document.
[0034] Hereinafter, embodiments disclosed in this document will be described in detail with reference to exemplary drawings. When designating components in each drawing, it should be noted that, where possible, identical components are given the same reference numerals, even if they appear in different drawings. Furthermore, when describing embodiments disclosed in this document, detailed descriptions of related known structures or functions will be omitted if they are deemed to hinder understanding of the embodiments disclosed in this document.
[0035] In describing the components of the embodiments disclosed in this document, terms such as first, second, A, B, (a), (b), etc. may be used. These terms are only intended to distinguish the components from other components and do not limit the nature, order, or sequence of the components. In addition, unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by a person of ordinary skill in the art to which the embodiments disclosed in this document belong. Terms defined in commonly used dictionaries should be interpreted as having a meaning consistent with the meaning they have in the context of the relevant technology, and shall not be interpreted in an idealized or overly formal sense unless explicitly defined in this application.
[0036] Figure 1 is a block diagram showing the configuration of a typical battery pack.
[0037] Referring to FIG. 1, a battery control system including a battery pack (1) and an upper controller (2) included in an upper system according to one embodiment of the present invention is schematically illustrated.
[0038] As illustrated in FIG. 1, a battery pack (1) is composed of one or more battery cells and includes a plurality of battery cells (10) that are rechargeable and dischargeable, a switching unit (14) that is connected in series to the (+) terminal side or the (-) terminal side of the plurality of battery cells (10) to control the charge and discharge current flow of the plurality of battery cells (10), and a battery management system (20) that monitors the voltage, current, temperature, etc. of the battery pack (1) and controls and manages to prevent overcharging, overdischarging, etc. In this case, the battery pack (1) may be equipped with a plurality of battery cells (10), sensors (12), switching units (14), and battery management systems (20).
[0039] Here, the switching unit (14) is a device for controlling the current flow for charging or discharging of a plurality of battery cells (10), and for example, at least one relay, magnetic contactor, etc. may be used depending on the specifications of the battery pack (1).
[0040] The battery management system (20) is an interface that receives values measured from the various parameters described above, and may include a plurality of terminals and a circuit that is connected to the terminals and processes the values received. In addition, the battery management system (20) may control the ON / OFF of a switching unit (14), for example, a relay or a contactor, and may be connected to a plurality of battery cells (10) and monitor the status of each of the plurality of battery cells (10). According to an embodiment, the battery management system (20) may include the battery management device (100) of FIG. 2. According to another embodiment, the battery management system (20) may be a different system from the battery management device (100) of FIG. 2. That is, the battery management device (100) of FIG. 2 may be included in the battery pack (1) or may be configured as another device external to the battery pack (1). In addition, the operation of the battery management device (100) below can be performed by a BMS (Battery Management System) in a vehicle, as well as by various devices such as a server, cloud, charger, or charger / discharger.
[0041] The upper controller (2) can transmit control signals for multiple battery cells (10) to the battery management system (20). Accordingly, the battery management system (20) can be controlled in operation based on the signals received from the upper controller (2).
[0042] FIG. 2 is a block diagram showing a battery management device according to one embodiment disclosed in this document.
[0043] Referring to FIG. 2, a battery management device (100) according to one embodiment disclosed in the present document may include an information acquisition unit (110) and a controller (120). Depending on the embodiment, the battery management device (100) may be included in the battery management system (20) of FIG. 1, or may be another device different from the battery management system (20) of FIG. 1. According to the embodiment, the battery management device (100) may be included in various devices for managing or testing battery cells.
[0044] The information acquisition unit (110) can acquire the open circuit voltage (OCV) of each of the plurality of battery cells. For example, the information acquisition unit (110) can acquire the open circuit voltage of each of the plurality of battery cells after charging and / or discharging is performed. According to an embodiment, the information acquisition unit (110) can acquire the open circuit voltage of each of the plurality of battery cells for each charge and / or discharge after the plurality of battery cells are charged and / or discharged multiple times.
[0045] According to an embodiment, the information acquisition unit (110) may acquire the open circuit voltage of each of the plurality of battery cells by shifting for each reference number of times. For example, since there may be a limit to the memory, if the reference number of times is 10, the information acquisition unit (110) may delete the open circuit voltage of each of the plurality of battery cells for the 11th time when it acquires the open circuit voltage of each of the plurality of battery cells for the 1st time. In this case, the controller (120) described below may diagnose each of the plurality of battery cells by calculating a linear regression function of each of the plurality of battery cells based on the open circuit voltage of the plurality of battery cells for the reference number of times.
[0046] The controller (120) can calculate an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells. For example, the controller (120) can calculate an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells after each of the plurality of battery cells is charged. As another example, the controller (120) can calculate an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells after each of the plurality of battery cells is discharged. According to an embodiment, when multiple charging or discharging is performed, the controller (120) can calculate an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells multiple times after each charging or discharging is performed.
[0047] The controller (120) may calculate a first linear regression function related to the open circuit voltage of the first battery cell based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage. For example, the first battery cell may be any one of the plurality of battery cells.
[0048] According to an embodiment, the controller (120) can calculate a linear regression function related to the open circuit voltage of each of the plurality of battery cells based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage.
[0049] According to an embodiment, the controller (120) can calculate an average open circuit voltage for each charge based on the open circuit voltage of each of the plurality of battery cells obtained for each charge, and can calculate a first linear regression function based on the average open circuit voltage calculated for each charge and the open circuit voltage of the first battery cell obtained for each charge.
[0050] According to an embodiment, the controller (120) can produce a first linear regression function using [Mathematical Formula 1].
[0051] [Mathematical Formula 1]
[0052] y=ax+b,
[0053] x: average open circuit voltage of multiple battery cells, y=predicted value of open circuit voltage of the first battery cell
[0054] For example, the controller (120) may calculate the values a and b such that the error between the predicted value and the measured value of the open circuit voltage of the first battery cell is minimized. According to an embodiment, the error between the predicted value and the measured value of the open circuit voltage of the first battery cell may include any one of an absolute error, a relative error, a percentage error, a root mean square error, or an R-squared error.
[0055] According to an embodiment, the controller (120) can calculate a linear regression function using [Mathematical Formula 1] for each of the plurality of battery cells.
[0056] FIG. 3 is a diagram showing an example of a battery management device according to one embodiment disclosed in this document calculating a linear regression function for the OCV of each of a plurality of battery cells.
[0057] Referring to FIG. 3, the controller (120) can calculate a linear regression function (320) for each of the plurality of battery cells based on the measured values (310) of the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage of the plurality of battery cells. For example, the controller (120) can calculate the linear regression function (320) for each of the plurality of battery cells by projecting the measured values (310) of the open circuit voltage of each of the plurality of battery cells onto the average open circuit voltage of the plurality of battery cells.
[0058] According to an embodiment, the controller (120) can calculate an open circuit voltage prediction value of each of the plurality of battery cells corresponding to an average open circuit voltage based on a linear regression function of each of the plurality of battery cells.
[0059] According to an embodiment, the controller (120) may calculate an error rate for each of the plurality of battery cells based on a coefficient of determination (R-squared) error rate between a predicted value calculated based on a measured value of an open circuit voltage of each of the plurality of battery cells and a linear regression function of each of the plurality of battery cells. For example, the controller (120) may calculate an error rate for each of the plurality of battery cells by subtracting the coefficient of determination error rate from 1. In this case, since the coefficient of determination error rate has a value closer to 1 as the error is smaller, a smaller calculated error rate (1-coefficient of determination error rate) may mean a smaller error between the measured value and the predicted value, and a larger calculated error rate (1-coefficient of determination error rate) may mean a larger error between the measured value and the predicted value.
[0060] Referring back to FIG. 2, the controller (120) can calculate a first error between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell. For example, the controller (120) can calculate a maximum deviation and a minimum deviation between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, calculate an error rate between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell, and calculate a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate.
[0061] According to an embodiment, the controller (120) can calculate a first error of the open circuit voltage of the first battery cell by multiplying the difference between the maximum deviation and the minimum deviation by the error rate.
[0062] In an embodiment, the error rate may be calculated based on the coefficient of determination (R-squared) error rate. For example, the error rate may be a value obtained by subtracting the coefficient of determination error rate from 1.
[0063] FIG. 4 is a diagram showing an example of a battery management device according to one embodiment disclosed in this document calculating an error between a predicted value and a measured value of each battery cell.
[0064] Referring to FIG. 4, the controller (120) can calculate a deviation by comparing the open circuit voltage measurement value of the first battery cell with the first linear regression function. For example, the controller (120) can calculate an open circuit voltage measurement value (410) with the largest deviation from the first linear regression function among the open circuit voltage measurement values of the first battery cell and an open circuit voltage measurement value (420) with the smallest deviation. In this case, the controller (120) can calculate the deviation between the open circuit voltage measurement value (410) with the largest deviation and the first linear regression function, and calculate the deviation between the open circuit voltage measurement value (420) with the smallest deviation and the first linear regression function to calculate the difference between the maximum deviation and the minimum deviation.
[0065] In FIG. 4, an example of calculating the maximum deviation and the minimum deviation by comparing the measured value of the open circuit voltage with the linear regression function for one battery cell is illustrated, but the present invention is not limited thereto, and the controller (120) can calculate the maximum deviation and the minimum deviation for each of the plurality of battery cells by comparing the open circuit voltage of each of the plurality of battery cells with the linear regression function of each of the plurality of battery cells.
[0066] Referring again to FIG. 2, the controller (120) can diagnose the first battery cell based on the first error. For example, if the first error is greater than a set value, the controller (120) can diagnose that a problem has occurred in the first battery cell.
[0067] According to the embodiment, since the first error is calculated by multiplying the difference between the maximum deviation and the minimum deviation of the first battery cell and the error rate (1-decision coefficient error rate), the controller (120) can diagnose whether an abnormality has occurred in the first battery cell by simultaneously considering the maximum deviation and the minimum deviation and the overall error rate.
[0068] According to an embodiment, the controller (120) may calculate a linear regression function related to the open circuit voltage of each of the plurality of battery cells based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage, calculate an error between the predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells, and diagnose each of the plurality of battery cells based on the error.
[0069] According to an embodiment, the battery management device (100) disclosed in the present document can diagnose each of the plurality of battery cells by projecting the open circuit voltage of each of the plurality of battery cells onto an average open circuit voltage after each of the plurality of battery cells is charged or discharged under the same conditions, calculating a linear regression function, and comparing the predicted value calculated based on the linear regression function with the measured value.
[0070] A battery management device (100) according to one embodiment disclosed in this document can diagnose whether a tab of a battery cell is disconnected based on the OCV behavior after charging and discharging of the battery cell.
[0071] A battery management device (100) according to an embodiment disclosed in this document can project the OCV voltage of a battery cell onto the average OCV of a plurality of battery cells to produce a prediction model even when a sudden voltage behavior abnormality does not occur, and can diagnose a tab disconnection of a battery cell based on an error between the predicted value and the measured value.
[0072] A battery management device (100) according to one embodiment disclosed in this document can project the OCV voltage of a battery cell onto the average OCV of a plurality of battery cells through linear regression to produce a prediction model, and can diagnose a battery cell based on the maximum deviation and the coefficient of determination (R-squared) error rate between the predicted value and the measured value.
[0073] In addition, the battery management device (100) according to one embodiment disclosed in this document acquires the open circuit voltage of each of a plurality of battery cells by shifting it for each reference number of times, recalculates a linear regression function for each reference number of times, and calculates an error to diagnose each battery cell, thereby accurately diagnosing each battery cell even in an environment with insufficient memory.
[0074] In addition, the battery management device (100) according to one embodiment disclosed in this document can accurately diagnose each battery cell by continuously storing the open circuit voltage of each of a plurality of battery cells in an environment with sufficient memory, calculating a more accurate linear regression function based on the continuously stored open circuit voltage, and calculating an error to diagnose each battery cell.
[0075] FIG. 5 is a flowchart illustrating an operating method of a battery management device according to one embodiment disclosed in this document. According to the embodiment, the operations illustrated in FIG. 5 may be performed through the battery management device (100) of FIG. 2.
[0076] Referring to FIG. 5, in operation S110, the information acquisition unit (110) can acquire the open circuit voltage of each of the plurality of battery cells.
[0077] In operation S120, the controller (120) can calculate an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells.
[0078] In operation S130, the controller (120) can calculate a first linear regression function related to the open circuit voltage of the first battery cell based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage.
[0079] In operation S140, the controller (120) can calculate a first error between the predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell.
[0080] In operation S150, the controller (120) can diagnose the first battery cell based on the first error.
[0081] FIGS. 6 and 7 are flowcharts specifically illustrating an operating method of a battery management device according to one embodiment disclosed in this document. According to the embodiment, the operations illustrated in FIGS. 6 and 7 may be performed through the battery management device (100) of FIG. 2.
[0082] Referring to FIG. 6, in operation S210, the controller (120) can calculate the maximum deviation and minimum deviation of the predicted value calculated based on the open circuit voltage of the first battery cell and the first linear regression function.
[0083] In operation S220, the controller (120) can calculate an error rate of a predicted value calculated based on the open circuit voltage of the first battery cell and the first linear regression function.
[0084] In operation S230, the controller (120) can calculate a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate.
[0085] According to an embodiment, operations S210 to S230 may be performed as included in operation S140 of FIG. 5.
[0086] Referring to FIG. 7, in operation S310, the controller (120) can calculate a linear regression function related to the open circuit voltage of each of the plurality of battery cells based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage.
[0087] In operation S320, the controller (120) can calculate an error between the predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells.
[0088] In operation S330, the controller (120) can diagnose each of the plurality of battery cells based on the error.
[0089] FIG. 8 is a block diagram showing the hardware configuration of a computing system for performing an operating method of a battery management device according to one embodiment disclosed in this document.
[0090] Referring to FIG. 8, a computing system (1000) according to one embodiment disclosed in the present document may include an MCU (1010), a memory (1020), an input / output I / F (1030), and a communication I / F (1040).
[0091] The MCU (1010) may be a processor that executes various programs stored in the memory (1020) (e.g., a battery cell open circuit voltage collection program, a linear regression function calculation program, an error calculation program, etc.), processes various information including the battery cell open circuit voltage, linear regression function, and error through these programs, and performs the functions of the controller included in the battery management device shown in the aforementioned FIG. 2.
[0092] The memory (1020) can store various programs, such as a battery cell open circuit voltage collection program, a linear regression function calculation program, an error calculation program, and a battery cell diagnosis program. In addition, the memory (1020) can store various information, including the battery cell open circuit voltage, linear regression function, and error.
[0093] Such memories (1020) may be provided in multiple numbers as needed. The memories (1020) may be volatile memories or non-volatile memories. As volatile memories (1020), RAM, DRAM, SRAM, etc. may be used. As non-volatile memories (1020), ROM, PROM, EAROM, EPROM, EEPROM, flash memories, etc. may be used. The examples of the memories (1020) listed above are merely examples and are not limited to these examples.
[0094] The input / output I / F (1030) can provide an interface that enables data transmission and reception between an input device (not shown) such as a keyboard, mouse, or touch panel, and an output device (not shown) such as a display and the MCU (1010).
[0095] The communication I / F (1040) is a component capable of transmitting and receiving various data with the server, and may be any device capable of supporting wired or wireless communication. For example, the battery management device can transmit and receive various information, including battery cell open-circuit voltage, linear regression function, and error, from a separately provided external server via the communication I / F (1040).
[0096] In this way, a computer program according to one embodiment disclosed in this document may be implemented as a module that is recorded in a memory (1020) and processed by an MCU (1010) to perform each function illustrated in FIG. 2, for example.
[0097] The above description is merely an example of the technical idea disclosed in this document, and those skilled in the art to which the embodiments disclosed in this document pertain may make various modifications and variations without departing from the essential characteristics of the embodiments disclosed in this document.
[0098] Accordingly, the embodiments disclosed in this document are intended to illustrate, rather than limit, the technical concepts disclosed in this document, and the scope of the technical concepts disclosed in this document is not limited by these embodiments. The scope of protection of the technical concepts disclosed in this document should be interpreted by the claims below, and all technical concepts within the equivalent scope should be interpreted as being included within the scope of the rights of this document.
Claims
1. An information acquisition unit for acquiring the open circuit voltage of each of a plurality of battery cells; and Calculate the average open circuit voltage of the open circuit voltages of each of the plurality of battery cells, A first linear regression function related to the open circuit voltage of the first battery cell is calculated based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage, Calculate the first error of the predicted value and the open circuit voltage of the first battery cell based on the first linear regression function, A battery management device comprising a controller that diagnoses the first battery cell based on the first error.
2. In paragraph 1, The above information acquisition unit, A battery management device that obtains the open circuit voltage of each of the plurality of battery cells for each charge after the plurality of battery cells are charged multiple times.
3. In paragraph 2, The above controller, Based on the open circuit voltage of each of the plurality of battery cells obtained for each charge, the average open circuit voltage is calculated for each charge, A battery management device that calculates the first linear regression function based on the average open circuit voltage calculated for each charge and the open circuit voltage of the first battery cell obtained for each charge.
4. In paragraph 1, The above controller, Calculate the maximum deviation and minimum deviation of the predicted value based on the open circuit voltage of the first battery cell and the first linear regression function, Calculate the error rate of the predicted value based on the open circuit voltage of the first battery cell and the first linear regression function, A battery management device that calculates a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate.
5. In paragraph 4, The above controller, A battery management device that calculates a first error of the open circuit voltage of the first battery cell by multiplying the difference between the maximum deviation and the minimum deviation by the error rate.
6. In paragraph 4, A battery management device in which the above error rate is calculated based on the coefficient of determination (R-squared) error rate.
7. In paragraph 1, The above controller, A battery management device that diagnoses that a problem has occurred in the first battery cell when the first error is greater than or equal to a set value.
8. In paragraph 1, The above controller, A linear regression function related to the open circuit voltage of each of the plurality of battery cells is calculated based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage, Calculate the error between the predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells, A battery management device that diagnoses each of the plurality of battery cells based on the above error.
9. In paragraph 1, The above information acquisition unit, A battery management device that obtains the open circuit voltage of each of a plurality of battery cells by shifting at each reference cycle.
10. In paragraph 1, The above information acquisition unit, A battery management device that obtains the open circuit voltage of each of the plurality of battery cells for each discharge after the plurality of battery cells are discharged multiple times.
11. An operation for obtaining the open circuit voltage of each of a plurality of battery cells; An operation of calculating an average open circuit voltage of the open circuit voltages of each of the plurality of battery cells; An operation of calculating a first linear regression function related to the open circuit voltage of the first battery cell based on the open circuit voltage of the first battery cell among the plurality of battery cells and the average open circuit voltage; An operation of calculating a first error between a predicted value calculated based on the first linear regression function and the open circuit voltage of the first battery cell; and An operating method of a battery management device, comprising: an operation of diagnosing the first battery cell based on the first error; 12. In paragraph 11, The operation of calculating the first error of the predicted value and the open circuit voltage of the first battery cell based on the first linear regression function is as follows: An operation of calculating the maximum deviation and minimum deviation of the predicted value based on the open circuit voltage of the first battery cell and the first linear regression function; An operation of calculating an error rate of a predicted value calculated based on the open circuit voltage of the first battery cell and the first linear regression function; and An operating method of a battery management device, comprising: an operation of calculating a first error of the open circuit voltage of the first battery cell based on the difference between the maximum deviation and the minimum deviation and the error rate; 13. In paragraph 11, An operation of calculating a linear regression function related to the open circuit voltage of each of the plurality of battery cells based on the open circuit voltage of each of the plurality of battery cells and the average open circuit voltage; An operation of calculating an error between a predicted value calculated based on the linear regression function and the open circuit voltage of each of the plurality of battery cells; and An operating method of a battery management device, further comprising: an operation of diagnosing each of the plurality of battery cells based on the above error.
Citation Information
Patent Citations
Battery charge state estimation method and battery charge state estimation device
JP2015227840A
Vehicle and battery state detection system thereof
JP2017219404A
Information processing device, information processing method, computer program, and information processing system
JP7214884B2
Battery management system and driving method thereof
KR1020080039654A
Apparatus for controlling battery pack, and energy storage system including the battery pack
KR1020130063406A
