CFD-dem-based method for simulating synchronous grouting at shield tail during shield tunnelling
The CFD-DEM method simulates the shield tail synchronous grouting process in shield construction, solving the problems of concealment and parameter optimization of the grouting process, realizing the simulation and parameter optimization of grouting effect, which is suitable for different geological conditions.
Patent Information
- Application Number
- PCT/CN2023/104703
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-17
- Filing Date
- 2023-06-30
- Publication Date
- 2024-11-21
AI Technical Summary
The prior art is difficult to effectively simulate and guide the shield tail synchronous grouting process in shield construction, especially the concealment and effect of grouting filling and diffusion are difficult to detect, making it difficult to optimize construction parameters.
Using a CFD-DEM-based method, geometric model grid division of shield tail synchronous grouting, multiple fluids are defined, fluid CFD model and soil DEM model are constructed, coupled calculations are performed, grouting process is simulated, and grouting is adjusted. Pressure, slurry viscosity and particle grading are used to study the grouting effect.
The simulation and parameter optimization of the grouting process are realized, the calculation cost is reduced, the slurry diffusion process is revealed, and parameter guidance is provided for shield construction, which is suitable for different engineering geological conditions.
Smart Images

Figure CN2023104703_21112024_PF_FP_ABST
Abstract
Description
Simulation method of synchronous grouting at the shield tail in shield construction based on CFD-DEM Technical Field
[0001] The present invention relates to the technical field of tunnels and underground engineering, and in particular to a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction. Background Art
[0002] The shield tunneling method is a common tunnel excavation method. Its advantages lie in its safety, efficiency, and fully automated construction process, without affecting surface buildings or underground pipelines. During construction, the shield machine uses its excavation blades to excavate the soil, while its main body serves as a temporary support for the excavated soil. Prefabricated lining segments are assembled within the machine body, and the shield tail is released to form the tunnel structure.
[0003] However, due to the size difference between the shield body and the lining, a certain gap exists between the lining and the soil after the shield tail is released. During construction, synchronous grouting of the shield tail is often used to fill the gap and reduce the ground disturbance caused by the existence of the gap. However, due to the hidden nature of the shield tail grouting, the grouting process and results are often difficult to detect.
[0004] Therefore, how to provide a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction that can simulate the grouting filling and diffusion process and provide guidance for the synchronous grouting construction parameters of shield construction is an urgent problem that technicians in this field need to solve.
[0005] Summary of the Invention
[0006] In view of this, the present invention proposes a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction includes:
[0009] The geometric model of the shield tail synchronous grouting was meshed using CFD. The VOF method was used to define various fluids, including slurry-air and slurry-air-groundwater. The fluid CFD model of the shield tail synchronous grouting was constructed by pressure-controlled grouting.
[0010] The particle parameters required for the soil DEM model are calibrated by comparing the results of the triaxial compression test of the original soil sample and the DEM numerical simulation of the triaxial compression test.
[0011] The motion characteristics of particles are calibrated by comparing the results of the angle of repose test of the original soil sample and the DEM numerical simulation of the angle of repose test;
[0012] According to the calibration results of the particle parameters and the motion characteristics, particles are generated within the required research range of the soil, and a DEM model of the soil for shield tail synchronous grouting is constructed;
[0013] The time step of the fluid CFD model, the time step of the soil DEM model, and the coupling frequency between the fluid CFD model and the soil DEM model are set, and the coupling calculation is performed until the set end time is reached to obtain the simulation results of the shield tail synchronous grouting.
[0014] Optionally, perform CFD meshing on the geometric model of the shield tail synchronous grouting, specifically:
[0015] Densify the mesh in the area near the lining within the preset distance threshold;
[0016] A sparse grid is used for areas outside the encrypted processing.
[0017] Optionally, the VOF method can be used to define multiple fluids, including slurry-air and slurry-air-groundwater, and pressure-controlled grouting, specifically:
[0018] Setting the initial area, including: the initial slurry area and soil area or the initial slurry area, groundwater area and soil area;
[0019] The pressure difference between the slurry inlet and the air outlet under the initial boundary conditions is set to meet the pressure control grouting requirements.
[0020] Optionally, control the grouting pressure as follows: p 注浆 =a1γ0h;
[0021] Among them, γ0 is the bulk density of the soil; h is the burial depth of the tunnel top; a1 is the expansion coefficient.
[0022] Optionally, the particle parameters required for the soil DEM model can be calibrated by comparing the results of the triaxial compression test of the original soil sample and the DEM numerical simulation of the triaxial compression test, specifically:
[0023] Determine the particle size distribution of the original soil sample, conduct triaxial compression tests, and obtain the stress-strain curve, Mohr stress circle, and strength envelope of the original soil sample;
[0024] DEM numerical simulation of triaxial compression test using discrete element method;
[0025] The results of triaxial compression test and DEM numerical simulation of triaxial compression test are compared to calibrate the particle parameters required for soil DEM model.
[0026] Optionally, the motion characteristics of the particles can be calibrated by comparing the results of the angle of repose test of the original soil sample with the DEM numerical simulation of the angle of repose test, specifically:
[0027] Conduct angle of repose test on the original soil sample;
[0028] DEM numerical simulation of repose angle test was carried out by discrete element method;
[0029] The results of the angle of repose test and the DEM numerical simulation of the angle of repose test were compared to calibrate the motion characteristics of the particles.
[0030] Optionally, based on the above particle calibration results, particles are generated within the required study range of the soil, including:
[0031] The particles in the area near the tunnel within the preset distance threshold are encrypted;
[0032] In areas where the slurry cannot diffuse, particles with a diameter 2-3 times the average diameter of particles in the area near the tunnel are selected.
[0033] Optional, coupled calculation, specifically:
[0034] The fluid CFD model is calculated independently according to the time step of the fluid CFD model;
[0035] The soil DEM model is calculated independently according to the time step of the soil DEM model;
[0036] The fluid CFD model and the soil DEM model are coupled and calculated based on the coupling frequency between the fluid CFD model and the soil DEM model. After updating the particle-fluid interaction force and particle position, the fluid CFD model and the soil DEM model are independently calculated.
[0037] Optionally, the motion of the fluid phase in the fluid CFD model is solved as follows:
[0038] Among them, φ f is the volume fraction of the fluid; is the fluid velocity; ρ f is the fluid density; is the fluid pressure gradient; is the stress tensor gradient; g is the gravitational acceleration in the study area; is the particle-fluid interaction force.
[0039] Optionally, the governing equations for particle motion in the soil DEM model are as follows:
[0040] Among them, mpi , I pi 、 are the mass, moment of inertia, linear velocity, and angular velocity of the i-th particle respectively; n c is the number of particles that come into contact with the i-th particle; is the contact force between the i-th particle and the j-th particle; is the gravity acting on the i-th particle; is the fluid-particle interaction force on the i-th particle; is the torque on the ith particle generated by the interaction between the ith particle and the jth particle.
[0041] It can be seen from the above technical solution that, compared with the prior art, the present invention proposes a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction, which has the following beneficial effects:
[0042] The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction proposed in the present invention simplifies the shield tail grouting process of shield construction and reduces the calculation cost.
[0043] The CFD-DEM-based shield tail synchronous grouting simulation method proposed in the present invention can reveal the hidden process of slurry diffusion in the shield tail gap and soil.
[0044] The CFD-DEM-based shield tail synchronous grouting simulation method proposed in this invention can study the influence of grouting construction parameters on grouting effect by adjusting the settings of parameters such as grouting pressure, grouting rate, slurry viscosity and density, and provide guidance for engineering.
[0045] The CFD-DEM-based shield tail synchronous grouting simulation method proposed in the present invention can simulate different soil properties by adjusting particle grading, contact model, physical properties, etc., and can be applied to different engineering geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are merely embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0047] FIG1 is a schematic flow chart of the method of the present invention.
[0048] FIG2 is a schematic plan view of the geometric model of the CFD-DEM synchronous grouting model established by the present invention.
[0049] FIG3 is a schematic diagram of a DEM numerical simulation of a triaxial compression test established in the present invention.
[0050] FIG4 is a schematic diagram of the first state of the DEM numerical simulation of the angle of repose test established in the present invention.
[0051] FIG5 is a schematic diagram of the second state of the DEM numerical simulation of the angle of repose test established in the present invention.
[0052] FIG6 is a first schematic diagram of the simulated grouting effect of the present invention.
[0053] FIG7 is a second schematic diagram of the simulated grouting effect of the present invention.
[0054] FIG8 is a third schematic diagram of the simulated grouting effect of the present invention.
[0055] FIG9 is a fourth schematic diagram of the simulated grouting effect of the present invention. DETAILED DESCRIPTION
[0056] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0057] Example 1:
[0058] Embodiment 1 of the present invention discloses a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction, as shown in FIG1 , comprising:
[0059] A geometric model for synchronous grouting at the shield tail was created using 3D modeling software. The dimensional parameters of the geometric model were then used to define the soil range, tunnel depth, and lining and grouting pipe dimensions. The boundaries of the geometric model were named to facilitate the subsequent creation of CFD and DEM models.
[0060] The geometric model of synchronous grouting at the shield tail is meshed using CFD meshing software. A semi-resolved CFD-DEM model is considered for the overall model. The mesh near the lining within the preset distance threshold is densified, focusing on the infiltration and diffusion behavior of the slurry in the shield tail voids and soil. A sparse mesh is used for areas outside the densification process.
[0061] Set the basic parameters of the CFD model, including initial boundary conditions, initial fields, basic fluid properties, and solution control parameters. Use the VOF method to define multiple fluids, including slurry-air and slurry-air-groundwater. Use the setfields function to set the initial regions, including the initial slurry region and soil region (no slurry) or the initial slurry region, groundwater region, and soil region. Set the slurry inlet (inlet) and air outlet (ground). Set the pressure difference between the inlet and outlet in the initial boundary conditions to meet pressure-controlled grouting requirements. Construct a fluid CFD model for synchronous grouting at the shield tail.
[0062] Control the grouting pressure as follows: p 注浆 =a1γ0h;
[0063] Among them, γ0 is the bulk density of the soil; h is the burial depth of the tunnel top; a1 is the expansion coefficient, which is taken as 1.1-1.2.
[0064] The motion of the fluid phase in the fluid CFD model is solved using the Navier-Stokes equations as follows:
[0065] Among them, φ f is the volume fraction of the fluid; is the fluid velocity; ρ f is the fluid density; is the fluid pressure gradient; is the stress tensor gradient; g is the gravitational acceleration in the study area; is the particle-fluid interaction force.
[0066] Conduct field sampling of the soil layer to be simulated to obtain sufficient original soil samples in preparation for establishing the soil DEM model. Determine the particle size distribution of the original soil sample and conduct triaxial compression tests to obtain the stress-strain curve, Mohr stress circle, and strength envelope of the original soil sample. Use the discrete element method to perform DEM numerical simulation of the triaxial compression test. Compare the results of the triaxial compression test of the original soil sample with the DEM numerical simulation of the triaxial compression test to calibrate the particle parameters required for the soil DEM model.
[0067] Further repose angle tests were carried out, and DEM numerical simulations of the repose angle tests were performed using the discrete element method. The results of the repose angle tests and DEM numerical simulations were compared to calibrate the particle motion characteristics.
[0068] Based on the particle calibration results, parameters related to the physical properties of the particles are set. A certain number of particles are generated using the discrete element method. After natural settlement and compaction, a soil layer is formed. Excess particles above the surface are deleted to construct a DEM model of the soil for synchronous grouting at the shield tail. Particles in the area near the tunnel within a preset distance threshold are densified. The porosity of the soil layer is restored as much as possible based on the particle grading of the original soil. The microscopic mechanism of slurry diffusion in the soil is studied. In other areas where the slurry cannot diffuse, large particles are selected, with a diameter of 2-3 times the average diameter of the particles in the densified area. In these areas, the focus is on studying the soil disturbance and surface settlement caused by the grouting process.
[0069] The motion control equations of particles in the soil DEM model are as follows:
[0070] Among them, m pi , I pi 、 are the mass, moment of inertia, linear velocity, and angular velocity of the i-th particle respectively; n c is the number of particles that come into contact with the i-th particle; is the contact force between the i-th particle and the j-th particle; is the gravity acting on the i-th particle; is the fluid-particle interaction force on the i-th particle; is the torque on the ith particle generated by the interaction between the ith particle and the jth particle.
[0071] The calculation parameters for the fluid CFD model and the soil DEM model are set separately, including the time step of the fluid CFD model, the time step of the soil DEM model, and the coupling frequency between the fluid CFD model and the soil DEM model. The fluid CFD model performs independent calculations based on the fluid CFD model time step, and the soil DEM model performs independent calculations based on the soil DEM model time step. The fluid CFD model and the soil DEM model perform coupled calculations based on the coupling frequency between the fluid CFD model and the soil DEM model. After updating the particle-fluid interaction force and particle position, independent calculations of the fluid CFD model and the soil DEM model are performed again until the set end time is reached, resulting in the simulation results of the shield tail synchronous grouting. The time step and coupling gap have a significant impact on the simulation results. The simulation results clearly demonstrate the entire grouting diffusion process and allow the extraction of other data, such as the final diffusion radius.
[0072] Example 2:
[0073] Embodiment 2 of the present invention discloses a CFD-DEM-based shield tail synchronous grouting simulation method for shield construction, comprising:
[0074] The research objective is to simulate the synchronous grouting of the shield tail during shield construction in sandy and gravel strata. The geometric model of the synchronous grouting of the shield tail during shield construction in sandy and gravel strata is established using 3D modeling software with reference to the geometric dimensions of the four-hole synchronous grouting model box test. In the reference model box, according to the similarity ratio theory of the scaled model test, the geometric similarity ratio C l = 15, the 400mm diameter model TBM used in the test was used to simulate the actual 6000mm diameter TBM. Here, half of the tunnel was selected for modeling and study, with a lining diameter of 370mm and a tunnel depth of 2D (D = 400mm). Considering computational cost, a 50mm thick soil mass was selected along the tunnel axis for study. Each component was named (inlet, wall, outlet / ground, etc.) and the geometric model was derived, as shown in Figure 2.
[0075] CFD meshing software was used to mesh the geometric model for the shield tail synchronous grouting. The tunnel perimeter is the primary area for grout diffusion, so a fine mesh was used within a 0.5D radius (D is the tunnel diameter) around the tunnel, focusing on the grout's motion and free surface. A coarse mesh was used in other areas to reduce computational cost.
[0076] The VOF method is used to define the slurry and air fluids, and the setFields function is used to set the initial slurry area and soil area (no slurry). According to the results of the model box test, the slurry kinematic viscosity is set to 6×10 -5 m / s 2 , density is 1850kg / m 3 In the initial boundary conditions, the pressure difference between the slurry inlet and the air outlet ground is set to meet the pressure control grouting requirements, and a fluid CFD model of synchronous grouting at the shield tail is constructed.
[0077] Control the grouting pressure as follows: p 注浆 =a1γ0h;
[0078] Among them, γ0 is the bulk density of the soil; h is the burial depth of the tunnel top; a1 is the expansion coefficient, which is taken as 1.1-1.2.
[0079] Here we select a1 = 1.2; the initial slurry pressure p 注浆 =a1γ0h=1.2×22kN / m 3 ×0.8m=21.12kPa, the slurry pressure at the inlet is set to 21.12kPa.
[0080] The motion of the fluid phase in the fluid CFD model is solved using the Navier-Stokes equations as follows:
[0081] Among them, φ f is the volume fraction of the fluid; is the fluid velocity; ρ f is the fluid density; is the fluid pressure gradient; is the stress tensor gradient; g is the gravitational acceleration in the study area; is the particle-fluid interaction force.
[0082] The soil used in the model box test was sampled to obtain sufficient original soil samples to prepare for the development of a soil particle DEM model. The particle size distribution of the original soil samples was determined, and a large-scale triaxial compression test was conducted to obtain the soil sample's stress-strain curve, Mohr's stress circle, and strength envelope. A DEM numerical simulation of the triaxial compression test was constructed using discrete element technology, as shown in Figure 3. The results were compared between numerical and experimental methods, and the particle parameters were calibrated.
[0083] The calibrated particles were further subjected to model test soil repose angle tests and DEM numerical simulations of the repose angle tests. The first state diagram of the DEM numerical simulation of the repose angle test is shown in Figure 4, and the second state diagram of the DEM numerical simulation of the repose angle test is shown in Figure 5. The results were compared to further calibrate the motion characteristics of the particles.
[0084] Based on the particle calibration results, the parameters related to the physical properties of the particles are set, and a certain number of particles are generated within the required research range of the soil selected in Example 2 of the present invention through the discrete element method. After natural settlement and compaction, a soil layer is formed, and the excess particles above the surface are deleted. A 300mm×600mm area is demarcated near the tunnel as a particle densification area. Spherical particles with a diameter range of 3-10mm are used in the densification area to restore the porosity and density of the soil layer, focusing on the diffusion mechanism and path of the slurry in the soil. In other areas where the slurry cannot diffuse, spherical particles with a diameter of 10mm are uniformly selected. These areas focus on studying the soil disturbance and surface settlement caused by the grouting process to construct a soil DEM model for synchronous grouting at the shield tail.
[0085] The motion control equations of particles in the soil DEM model are as follows:
[0086] Among them, m pi , I pi 、 are the mass, moment of inertia, linear velocity, and angular velocity of the i-th particle respectively; n c is the number of particles that come into contact with the i-th particle; is the contact force between the i-th particle and the j-th particle; is the gravity acting on the i-th particle; is the fluid-particle interaction force on the i-th particle; is the torque on the ith particle generated by the interaction between the ith particle and the jth particle.
[0087] The time steps for CFD and DEM, as well as the coupling frequency between them, were set separately: CFDdt = 0.0005s; DEMdt = 0.000005s; couplingInterval = 100. The coupled calculation begins, during which CFD and DEM are calculated separately and coupled at specified intervals. After updating information such as the particle-fluid interaction force and particle position, the calculations are repeated independently, repeating this cycle until the set end time is reached. The simulation results clearly show the entire grouting diffusion process, and other data such as the final diffusion radius can be extracted. Figure 1 shows the simulated grouting effect, as shown in Figure 6; Figure 2 shows the simulated grouting effect, as shown in Figure 7; Figure 3 shows the simulated grouting effect, as shown in Figure 8; and Figure 4 shows the simulated grouting effect, as shown in Figure 9.
[0088] The embodiment of the present invention discloses a CFD-DEM-based method for simulating synchronous grouting at the tail of a shield during tunneling. By constructing a fluid CFD model for synchronous grouting at the tail of a shield and a DEM model for the soil body for synchronous grouting at the tail of a shield, and combining them for coupled calculation, not only is the full process of grouting diffusion simulated, reducing computational costs, but the influence of grouting construction parameters on the grouting effect can also be studied by adjusting the settings of parameters such as grouting pressure, grouting rate, slurry viscosity, and density, providing guidance for engineering projects. Furthermore, by adjusting the particle grading, contact model, physical properties, etc., different soil layer properties can be simulated, making it suitable for different engineering geological conditions.
[0089] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. Reference can be made to the common and similar parts between the various embodiments. For the devices disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.
[0090] The above description of the disclosed embodiments is intended to enable one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not limited to the embodiments shown herein but is intended to conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction is characterized by: include: Perform CFD meshing on the geometric model of synchronous grouting at the tail of the shield, define multiple fluids using the VOF method, including slurry-air, slurry-air-groundwater, and construct the fluid CFD model of synchronous grouting at the tail of the shield by controlling the grouting through pressure; By comparing the results of the triaxial compression test of the original soil sample and the DEM numerical simulation of the triaxial compression test, the particle parameters required for the soil DEM model are calibrated; The motion characteristics of the particles are calibrated by comparing the results of the angle of repose test of the original soil sample and the DEM numerical simulation of the angle of repose test; According to the calibration results of the particle parameters and the motion characteristics, particles are generated within the required research range of the soil, and a soil DEM model of the shield tail synchronous grouting is constructed; The time step of the fluid CFD model, the time step of the soil DEM model and the coupling frequency between the fluid CFD model and the soil DEM model are set, and coupling calculation is performed until the set end time is reached to obtain the simulation result of the synchronous grouting of the shield tail.
2. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: The geometric model of synchronous grouting at the shield tail is divided into CFD meshes, specifically: Densify the mesh in the area near the lining within the preset distance threshold; A sparse grid is used for the area outside the encryption process.
3. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: The VOF method is used to define multiple fluids, including slurry-air, slurry-air-groundwater, and grouting is controlled by pressure, specifically: Setting the initial area, including: initial slurry area and soil area, initial slurry area, groundwater area and soil area; The pressure difference between the slurry inlet and the air outlet under the initial boundary conditions was set to meet the pressure-controlled grouting requirements.
4. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 3 is characterized in that: The pressure of controlling grouting is as follows: 注浆 =a1γ0h; Among them, γ0 is the bulk density of the soil; h is the burial depth of the tunnel top; a1 is the expansion coefficient.
5. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: By comparing the results of the triaxial compression test of the original soil sample and the DEM numerical simulation of the triaxial compression test, the particle parameters required for the soil DEM model are calibrated, specifically: Determine the particle size distribution of the original soil sample, perform the triaxial compression test, and obtain the stress-strain relationship curve, Mohr stress circle and strength envelope of the original soil sample; Performing DEM numerical simulation of the triaxial compression test by discrete element method; The results of the triaxial compression test and the DEM numerical simulation of the triaxial compression test are compared to calibrate the particle parameters required for the soil DEM model.
6. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: By comparing the results of the repose angle test of the original soil sample and the DEM numerical simulation of the repose angle test, the motion characteristics of the particles are calibrated, specifically: Conduct angle of repose test on the original soil sample; Performing DEM numerical simulation of the repose angle test by discrete element method; The results of the angle of repose test and the DEM numerical simulation of the angle of repose test are compared to calibrate the motion characteristics of the particles.
7. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: Based on the particle calibration results, after generating particles within the required research range of the soil, it also includes: The particles in the area near the tunnel within the preset distance threshold are encrypted; In the area where the slurry cannot diffuse, particles with a diameter 2-3 times the average diameter of the particles in the area near the tunnel are selected.
8. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: The coupling calculation is specifically: The fluid CFD model is independently calculated according to the time step of the fluid CFD model; The soil DEM model is independently calculated according to the time step of the soil DEM model; The fluid CFD model and the soil DEM model perform coupling calculation according to the coupling frequency between the fluid CFD model and the soil DEM model, and after updating the particle-fluid interaction force and the particle position, the fluid CFD model and the soil DEM model are independently calculated respectively.
9. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1 is characterized in that: The motion solution of the fluid phase in the fluid CFD model is as follows: Among them, φ f is the volume fraction of the fluid; is the fluid velocity; ρ f is the fluid density; is the fluid pressure gradient; is the stress tensor gradient; g is the gravitational acceleration in the study area; is the particle-fluid interaction force.
10. The CFD-DEM-based shield tail synchronous grouting simulation method for shield construction according to claim 1, characterized in that: The motion control equation of particles in the soil DEM model is as follows: Among them, m pi ,I pi , are the mass, moment of inertia, linear velocity, and angular velocity of the ith particle respectively; n c is the number of particles in contact with the i-th particle; is the contact force between the i-th particle and the j-th particle; is the gravity on the ith particle; is the fluid-particle interaction force on the ith particle; is the torque on the ith particle generated by the interaction between the ith particle and the jth particle.
Citation Information
Patent Citations
Discrete element combined particle and discrete element stacking test simulation method thereof
CN106290082A
Multifunctional shield synchronous grouting model test apparatus
CN109798130A
A method for simulating a high-speed railway subgrade grouting microscopic mechanism based on fluid particle coupling
CN109815573A
Equivalent calculation method and system for rock-soil body medium loss in DEM-CFD coupling calculation
CN112507418A
Methods of Designing Aggregates Optimized for Specified Properties
US20140290531A1
Cited By
Shield tunnel synchronous grouting dynamic simulation method and system under action of dynamic water
CN119808250A
A dynamic simulation method and system for synchronous grouting of shield tunnels under the action of flowing water
CN119808250B
Sandy gravel stratum grouting simulation test system and method based on three-dimensional forming technology
CN119845677A
Duct piece bearing safety early warning method and system in large-diameter shield synchronous pushing and splicing mode and storage medium
CN119849268A
Raft building slurry ball lifting method and system based on numerical simulation
CN119918152A