Overvoltage early-warning method and apparatus, and readable storage medium

By determining the target branch and circulation capacity in the battery system and predicting changes in the battery cell capacity, the problem that the protection circuit cannot predict overvoltage in advance is solved, the safety monitoring and risk avoidance of the battery cell is realized, the system design is simplified, and the system is improved Safety and reliability of battery systems.

WO2024234543A1PCT designated stage expired Publication Date: 2024-11-21CONTEMPORARY AMPEREX TECHNOLOGY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/124776
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-18
Filing Date
2023-10-16
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

The protection circuit in the battery system cannot predict the possible overvoltage problems of the battery cell in advance, resulting in the inability to take measures in advance, increasing the damage and safety risks of the battery cell.

Method used

By determining the target branch and circulation capacity in the battery system, predict the capacity changes of the battery cell, determine whether there is a risk of overvoltage, and adjust the charging strategy in the charging state to avoid the overvoltage problem.

Benefits of technology

It realizes the advance prediction and avoidance of the overvoltage risk of the battery cell, reduces the damage and safety risks of the battery cell, simplifies the protection circuit design, reduces hardware costs and energy losses, and extends the cycle life of the battery cell.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023124776_21112024_PF_FP_ABST
    Figure CN2023124776_21112024_PF_FP_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of batteries. Provided are an overvoltage early-warning method and apparatus, and a readable storage medium. The overvoltage early-warning method comprises: determining a target branch in a battery system and the circulation capacity of the target branch, wherein the target branch is a branch flowing into a circulating current among a plurality of branches; according to the capacity of a battery cell in the target branch and the circulation capacity of the target branch, determining a predicted capacity of the battery cell; and when the predicted capacity is greater than or equal to a preset capacity, determining that the battery cell has an overvoltage risk, such that advanced prediction of the overvoltage risk can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Overvoltage warning method, device and readable storage medium

[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on May 18, 2023, with application number 2023105617257 and invention name “Overvoltage Warning Method, Device and Readable Storage Medium”, the entire contents of which are incorporated by reference into this application. Technical Field

[0002] The present application relates to the field of battery technology, and in particular to an overvoltage warning method, device, and readable storage medium. Background Art

[0003] In battery systems, multiple cells are typically connected in series to form a branch, and multiple branches are connected in parallel to increase the number of cells in the battery system and thus its capacity. During battery system operation, when the consistency between cells is poor, large circulating currents can flow between the branches. Within the branch into which this circulating current flows, it charges the cells within that branch. If a cell in that branch has a high capacity, this circulating current may cause overvoltage in that cell.

[0004] Battery systems typically include a protection circuit. Upon detecting that a cell's voltage has reached a preset upper voltage limit, the circuit discharges the cell to reduce the voltage and protect it. However, this circuit only protects the cell after an overvoltage condition has occurred. It cannot predict potential overvoltage conditions in advance, making it difficult to take preventive measures. Therefore, providing a method for predicting overvoltage conditions in advance is a pressing technical issue. Technical issues

[0005] The purpose of this application is to provide an overvoltage warning method, device and readable storage medium to solve the problem that the protection circuit in the battery system cannot predict the overvoltage problem that may occur in the battery cell in advance, making it impossible to take measures in advance to solve the overvoltage problem that may occur in the battery cell. Technical Solutions

[0006] The technical solution adopted in the embodiment of this application is:

[0007] In a first aspect, an overvoltage warning method is provided, the method comprising:

[0008] Determining a target branch and a circulating current capacity of the target branch in the battery system, wherein the target branch is a branch into which a circulating current flows among multiple branches, and the circulating current capacity of the target branch includes a capacity change of the target branch under the action of the circulating current;

[0009] Determining a predicted capacity of the first battery cell according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch;

[0010] When the predicted capacity is greater than or equal to the first preset capacity, it is determined that the first battery cell has an overvoltage risk.

[0011] In one embodiment, determining the target branch and the circulation capacity of the target branch includes:

[0012] Determining the circulating current capacity of each branch after the battery system finishes charging and discharging;

[0013] A branch whose circulation capacity is in an inflow state is determined as the target branch.

[0014] In one embodiment, determining the circulating current capacity of each branch after the battery system finishes charging and discharging includes:

[0015] determining a capacity difference between a first branch and each of the parallel branches to obtain at least one capacity difference, where the first branch is any one of the multiple branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch;

[0016] The circulation capacity of the first branch is determined according to the at least one capacity difference.

[0017] In one embodiment, determining the capacity difference between the first branch and each parallel branch includes:

[0018] For each parallel branch of the first branch, determining a cumulative capacity difference according to a cumulative current difference between the first branch and the parallel branch;

[0019] The capacity difference is determined according to an initial capacity difference and the accumulated capacity difference between the first branch and the parallel branch.

[0020] In one embodiment, the method further comprises:

[0021] When the actual capacity of the first branch is less than or equal to the second preset capacity, determining the corrected capacity of the first branch according to the open circuit voltage of the battery cell in the first branch;

[0022] The initial capacity difference is corrected according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

[0023] In one embodiment, determining the cumulative capacity difference based on the cumulative current difference between the first branch and the parallel branch includes:

[0024] The cumulative capacity difference is determined according to the cumulative current difference and a state cumulative amount, wherein the state cumulative amount includes a charge difference generated by self-discharge between the first branch and the parallel branch.

[0025] In one embodiment, the first battery cell is the battery cell with the highest capacity in the target branch.

[0026] In one embodiment, after determining that the first battery cell has an overvoltage risk, the method further includes:

[0027] If the battery system is in a charging state, the charging strategy of the battery system is adjusted.

[0028] In a second aspect, an overvoltage warning device is provided, the device comprising:

[0029] a first determining module, configured to determine a target branch and a circulating current capacity of the target branch in the battery system, wherein the target branch is a branch into which a circulating current flows among multiple branches, and the circulating current capacity of the target branch includes a capacity change of the target branch under the action of the circulating current;

[0030] a second determining module, configured to determine a predicted capacity of the first battery cell in the target branch according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch;

[0031] The third determining module is configured to determine that the first battery cell has an overvoltage risk when the predicted capacity is greater than or equal to a first preset capacity.

[0032] In one embodiment, the first determining module includes:

[0033] A first determining unit, configured to determine the circulating current capacity of each branch after the battery system finishes charging and discharging;

[0034] The second determining unit is configured to determine a branch whose circulation capacity is in an inflow state as the target branch.

[0035] In one embodiment, the first determining unit includes:

[0036] a first determining subunit, configured to determine a capacity difference between a first branch and each parallel branch to obtain at least one capacity difference, wherein the first branch is any one of the multiple branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch;

[0037] The second determining subunit is configured to determine the circulating current capacity of the first branch according to the at least one capacity difference.

[0038] In one embodiment, the first determination subunit is used to determine, for each parallel branch of the first branch, a cumulative capacity difference based on a cumulative current difference between the first branch and the parallel branch; and determine the capacity difference based on an initial capacity difference and the cumulative capacity difference between the first branch and the parallel branch.

[0039] In one embodiment, the apparatus further comprises:

[0040] A correction module is used to determine a corrected capacity of the first branch according to the open-circuit voltage of the battery cell in the first branch when the actual capacity of the first branch is less than or equal to the second preset capacity; and correct the initial capacity difference according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

[0041] In one embodiment, the first determining subunit is specifically configured to determine the cumulative capacity difference based on the cumulative current difference and a state accumulation amount, wherein the state accumulation amount includes a charge difference between the first branch and the parallel branch under self-discharge.

[0042] In one embodiment, the first battery cell is the battery cell with the highest capacity in the target branch.

[0043] In one embodiment, the device further includes: an adjustment module, configured to adjust a charging strategy of the battery system if the battery system is in a charging state.

[0044] In a third aspect, a readable storage medium is provided, on which a computer program is stored. When the computer program runs on an overvoltage warning device, the overvoltage warning device executes the overvoltage warning method provided by any possible design in the first aspect.

[0045] In a fourth aspect, an overvoltage warning device is provided, comprising: a processor; a memory; and a computer program, wherein the computer program is stored in the memory. When the computer program is executed by the processor, the overvoltage warning device executes the overvoltage warning method provided in the first aspect.

[0046] In a fifth aspect, a computer program product is provided, comprising: a computer program code, which, when executed on an overvoltage warning device, enables the overvoltage warning device to execute the overvoltage warning method provided in the first aspect.

[0047] In a sixth aspect, a chip is provided, comprising: a processor for calling and running a computer program from a memory, so that an overvoltage warning device equipped with the chip executes the overvoltage warning method provided in the first aspect.

[0048] It can be understood that the overvoltage warning devices provided in the second and fourth aspects, the readable storage medium provided in the third aspect, the computer program product provided in the fifth aspect, and the chip provided in the sixth aspect are all used to execute the overvoltage warning method provided in the first aspect. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding methods provided above, and will not be repeated here. Beneficial effects

[0049] The first aspect of the present invention provides a beneficial effect: during an overvoltage warning process, a predicted capacity of a battery cell is determined based on the circulating current capacity of the branch and the capacity of the battery cells within the branch, and the presence of an overvoltage risk in the battery cell is determined based on the predicted capacity. The circulating capacity comprises the change in capacity of the branch under the influence of the circulating current after a circulating current appears between the branches. Based on the circulating capacity and the capacity of the battery cells within the branch, the predicted capacity that the battery cell can reach under the influence of the circulating current can be determined. Based on the predicted capacity, it can be determined whether the capacity of the battery cell will exceed a first preset capacity, and further, whether the battery cell will face an overvoltage risk, thereby enabling early prediction of the overvoltage risk. Once an overvoltage risk is predicted, measures can be taken to mitigate the potential overvoltage risk. This eliminates or simplifies the protection circuit in the battery system, thereby reducing the hardware cost of the battery system and reducing power loss caused by the operation of the protection circuit, thus saving energy. Furthermore, by taking early action, the probability of an overvoltage risk in the battery cell can be reduced, thereby reducing the risk of lithium plating and extending the cycle life of the battery cell. At the same time, it can reduce the probability of battery cells burning, exploding, etc., and improve the safety and reliability of the battery system. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the embodiments or exemplary technical descriptions. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0051] FIG1 shows a schematic diagram of cell connections within a battery system provided in an embodiment of the present application.

[0052] FIG2 shows a schematic diagram of a usage scenario of an overvoltage warning method provided in an embodiment of the present application.

[0053] FIG3 shows a schematic flow chart of the steps of an overvoltage warning method provided in the present application.

[0054] FIG4 shows a schematic diagram of an OCV-SOC curve provided in an embodiment of the present application.

[0055] FIG5 shows a schematic diagram of a charging curve of a battery cell provided in an embodiment of the present application.

[0056] FIG6 shows a flow chart of an overvoltage warning method provided in an embodiment of the present application.

[0057] FIG7 shows a schematic structural diagram of an overvoltage warning device provided in an embodiment of the present application.

[0058] FIG8 shows a structural block diagram of an overvoltage warning device provided in an embodiment of the present application. Modes for Carrying Out the Invention

[0059] The technical solutions of this application will be described below in conjunction with the accompanying drawings. Obviously, the embodiments described are only part of the embodiments of this application, rather than all the embodiments.

[0060] In the following description, specific details such as specific system structures and techniques are provided for purposes of illustration rather than limitation to facilitate a thorough understanding of the embodiments of the present application. However, it will be apparent to those skilled in the art that the present application may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid obscuring the description of the present application with unnecessary detail.

[0061] The term "comprising" herein indicates the presence of the described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof. The terms "comprising", "including", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized. In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present application, unless otherwise stated, "multiple" means two or more.

[0062] The term "and / or" in this document simply describes a relationship between related objects, indicating that three possible relationships exist. For example, "A and / or B" can mean: A exists alone, A and B exist simultaneously, or B exists alone. Additionally, the character " / " in this document generally indicates that the related objects are in an "or" relationship.

[0063] With the development of battery technology, the application of battery systems is becoming more and more extensive. The battery system can be a power battery system and an energy storage battery system. The power battery system is, for example, a battery pack, which can store and provide electrical energy to electrical devices. The energy storage battery system is, for example, an emergency energy storage vehicle, which can meet the requirements of emergency power supply and uninterrupted power supply for important loads. The energy storage battery system is, for example, a fixed energy storage power station, which can be used to shave peaks and fill valleys and reduce grid fluctuations. The above are only illustrative examples, and the battery system may include but is not limited to the above examples.

[0064] Figure 1 shows a schematic diagram of the connection of battery cells in a battery system provided in an embodiment of the present application. As shown in Figure 1, the battery system includes a first parallel branch 11, a second parallel branch 12, and a third parallel branch 13 connected in parallel, with multiple battery cells (also known as battery cells) connected in series in each branch. For example, multiple battery cells 14 are connected in series in the first parallel branch 11, and multiple battery cells 14 are connected in series in the third parallel branch 13. The number of branches included in the battery system and the number of battery cells included in each branch can be set according to requirements.

[0065] During battery system manufacturing, cells from the same batch and model are typically selected to ensure consistency across all parameters, including capacity, self-discharge rate, internal resistance, and voltage. However, variations in the manufacturing process can lead to variations between cells from the same batch and model. Furthermore, variations in temperature, ventilation conditions, self-discharge levels, and electrolyte density during use can also reduce consistency between cells.

[0066] As shown in Figure 1, due to the differences between the battery cells, during the charging process of the battery system, after charging is completed, the voltage across the first parallel branch 11 may be higher than the voltage across the second parallel branch 12, and the voltage across the second parallel branch 12 may be higher than the voltage across the third parallel branch 13. Since the voltages across the branches are inconsistent, after charging is completed, the battery cells in the first parallel branch 11 may charge the battery cells in the second parallel branch 12 and the third parallel branch 13, or the battery cells in the first parallel branch 11 and the second parallel branch 12 may charge the battery cells in the third parallel branch 13 at the same time, generating a current between the first parallel branch 11, the second parallel branch 12, and the third parallel branch 13. This current is called a circulating current.

[0067] When the consistency between battery cells is poor, the circulating current is large. If a cell in the branch into which the circulating current flows has a higher capacity, the circulating current may overcharge that cell, causing its voltage to exceed the preset upper voltage limit and resulting in an overvoltage problem. This overvoltage problem may lead to lithium deposition in the cell, which not only degrades the cell's performance and shortens its cycle life, but also potentially causes catastrophic consequences such as combustion and explosion.

[0068] Typically, a protection circuit is installed in the battery system. When the protection circuit detects that the voltage of a battery cell is too high, it will discharge the battery cell, transfer the power in the battery cell to other battery cells with lower capacity, or consume the power in the battery cell through a heating element to reduce the voltage of the battery cell and protect the battery cell.

[0069] The protection circuit can only protect the battery cell after an overvoltage problem occurs. It cannot predict the possibility of overvoltage problems in the battery cell in advance, making it impossible to take measures to prevent the overvoltage problem in advance. Moreover, the installation of the protection circuit not only increases the cost of the battery system, but also wastes some power during the discharge process.

[0070] An embodiment of the present application provides an overvoltage warning method. During the overvoltage warning process, the predicted capacity of the battery cell is determined based on the circulation capacity of the branch and the capacity of the battery cell in the branch, and whether the battery cell has an overvoltage risk is determined based on the predicted capacity.

[0071] Among them, the circulating capacity of the branch includes the capacity change of the branch under the action of the circulating current after the circulating current appears between the branches. In the branch where the circulating current flows, the circulating capacity corresponds to the capacity increase of the battery cell under the action of the circulating current. Therefore, based on the circulating capacity and the capacity of the battery cell in the branch, the predicted capacity that the battery cell can reach under the action of the circulating current can be determined, and then based on the predicted capacity, it can be determined whether the capacity of the battery cell will exceed the first preset capacity, and then it can be determined whether the battery cell will have an overvoltage risk, thereby realizing the early prediction of the overvoltage risk.

[0072] After predicting a cell overvoltage risk, proactive measures can be taken to mitigate potential overvoltage issues. This eliminates the need for or simplifies protection circuits within the battery system, reducing hardware costs and minimizing power losses caused by the protection circuits, thus conserving energy. Furthermore, proactive measures can reduce the probability of overvoltage issues, thereby minimizing the risk of lithium plating and extending the cycle life of the cells. Furthermore, the probability of combustion and explosion can be reduced, thereby enhancing the safety and reliability of the battery system.

[0073] Figure 2 shows a schematic diagram of a scenario in which an overvoltage warning method according to an embodiment of the present application is used. The overvoltage warning method according to an embodiment of the present application can be applied to the scenario shown in Figure 2. As shown in Figure 2, the scenario includes a battery system 2, a charging device 3, and an electrical device 4.

[0074] The battery system 2 includes an overvoltage warning device 21, as well as a fourth parallel branch 22, a fifth parallel branch 23, and a sixth parallel branch 24 connected in parallel, each of which includes multiple battery cells connected in series. Battery system 2 can be exemplified by the emergency energy storage vehicle and stationary energy storage power station described above. The overvoltage warning device 21 can be a computing device such as a computer, industrial computer, laptop computer, or desktop computer capable of executing the overvoltage warning method provided in the embodiments of the present application.

[0075] It is understood that when the battery system 2 is a battery pack in the above example, the battery system 2 can be a part of the power consumption device 4. The power consumption device 4 is, for example, an electric vehicle, and the overvoltage warning device 21 is, for example, a battery management system (BMS) in the battery pack.

[0076] As shown in Figure 2, the charging device 3 can be connected to the battery system 2 to provide electrical energy to the battery system 2. The power consumption device 4 can be connected to the battery system 2 to obtain electrical energy from the battery system 2. After the battery system 2 is connected to the charging device 3, the overvoltage warning device 21 can also control the charging of the battery cells in the fourth parallel branch 22, the fifth parallel branch 23 and the sixth parallel branch 24. After the battery system 2 is connected to the power consumption device 4, the overvoltage warning device 21 can control the battery cells in the fourth parallel branch 22, the fifth parallel branch 23 and the sixth parallel branch 24 to discharge and provide electrical energy to the power consumption device 4. During the charging and discharging process, the overvoltage warning device 21 can execute the overvoltage warning method provided in the embodiment of this application to determine whether the battery cells in the fourth parallel branch 22, the fifth parallel branch 23 and the sixth parallel branch 24 have an overvoltage risk.

[0077] The above are merely illustrative examples, and specific types of battery systems and specific application scenarios of the overvoltage warning method may include but are not limited to the above examples.

[0078] Figure 3 shows a schematic flow chart of the steps of an overvoltage warning method provided by the present application. The method can be executed by an overvoltage warning device during the charging and discharging process of the battery system. As shown in Figure 3, the overvoltage warning method can include steps 31 to 33.

[0079] Step 31: Determine a target branch in the battery system and the circulating current capacity of the target branch.

[0080] The target branch is a branch into which the circulating current flows among the multiple branches, and the circulating capacity of the target branch includes a capacity change of the target branch under the action of the circulating current.

[0081] It should be understood that when circulating current occurs between multiple branches included in a battery system, some branches are branches where the circulating current flows in, while other branches are branches where the circulating current flows out. When the circulating current flows into a branch, it charges the cells within the branch, increasing the capacity of the cells within the branch. When the circulating current flows out of the branch, it discharges the cells within the branch, reducing the capacity of the cells within the branch.

[0082] In this embodiment, the capacity of a battery cell refers to the capacity actually stored in the battery cell (also called actual capacity or remaining capacity), which can be represented by the state of charge (SOC) of the battery cell. SOC represents the ratio of the remaining capacity in the battery cell to the rated capacity of the battery cell. The rated capacity of the battery cell is the capacity measured when the battery cell leaves the factory. Multiple battery cells in a branch are connected in series, and the actual capacity of the branch can be represented by the average of the actual capacities of the multiple battery cells in the branch. The rated capacity of the branch is the rated capacity of the battery cells in the branch.

[0083] Taking the charging process of a battery system as an example, during the charging process, the overvoltage warning device can first determine from multiple branches the branch into which the circulating current would flow if a circulating current were to occur after charging is completed (this branch is the target branch), and determine the circulating current capacity of the target branch. As shown in Figure 2, during the charging process of battery system 2, the overvoltage warning device 21 can first determine from the fourth parallel branch 22, the fifth parallel branch 23, and the sixth parallel branch 24 the target branch into which the circulating current would flow if a circulating current were to occur after charging is completed, as well as the circulating current capacity of the target branch.

[0084] Optionally, step 31 may include:

[0085] Determine the circulating current capacity of each branch after the battery system finishes charging and discharging;

[0086] The branch with the circulation capacity in the inflow state is determined as the target branch.

[0087] As described above, after circulating current begins flowing between branches, the capacity of the branch into which the circulating current flows increases. For the branch with increased capacity, the circulating current capacity is the capacity flowing into the branch, and the circulating current capacity is in the inflow state. Conversely, the capacity of the branch from which the circulating current flows out decreases. For the branch with decreased capacity, the circulating current capacity is the capacity flowing out of the branch, and the circulating current capacity is in the outflow state.

[0088] In some embodiments, in the process of determining the target branch and the circulation capacity of the target branch, the overvoltage warning device can determine the circulation capacity of each branch separately, and then determine the state of the circulation capacity of each branch, and determine the branch with a circulation capacity in an inflow state as the target branch, and determine the branch with a circulation capacity in an outflow state as the non-target branch.

[0089] As shown in Figure 2, the overvoltage warning device 21 can determine the circulation capacity of the fourth parallel branch 22, the circulation capacity of the fifth parallel branch 23, and the circulation capacity of the sixth parallel branch 24 during the charging process, and then determine the state of the circulation capacity of each branch respectively. When the circulation capacity is in the inflow state, the branch is determined to be the target branch.

[0090] In an embodiment of the present application, in the process of determining the branch into which the circulating current flows, the circulating capacity of each branch in the battery system is determined, and then the branch into which the circulating current flows is determined based on the influence of the circulating capacity on the capacity of the battery cells in the branch, so that the branch into which the circulating current flows can be accurately determined.

[0091] Optionally, the step of determining the circulating current capacity of each branch after the battery system finishes charging and discharging may include:

[0092] determining a capacity difference between a first branch and each of the parallel branches to obtain at least one capacity difference, wherein the first branch is any one of the plurality of branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch;

[0093] The circulating capacity of the first branch is determined according to the at least one capacity difference.

[0094] In some embodiments, for each branch, a capacity difference between the branch and its parallel branches can be determined to obtain at least one capacity difference, and then the circulating current capacity of the branch can be determined based on the at least one capacity difference. As shown in Figure 2, the branches connected in parallel with the fourth parallel branch 22 are the fifth parallel branch 23 and the sixth parallel branch 24. When the fourth parallel branch 22 is the first branch, the parallel branches of the first branch are the fifth parallel branch 23 and the sixth parallel branch 24.

[0095] For example, in the process of determining the circulating capacity of the fourth parallel branch 22, a first capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23, and a second capacity difference between the fourth parallel branch 22 and the sixth parallel branch 24 can be determined, where the first capacity difference corresponds to the fifth parallel branch 23, and the second capacity difference corresponds to the sixth parallel branch 24. Then, an average capacity difference of the first capacity difference and the second capacity difference can be calculated and determined, and the average capacity difference is determined as the circulating capacity of the fourth parallel branch 22.

[0096] For example, the first capacity difference and the second capacity difference can be represented by the symbol ΔSOCk-branck Indicates that the circulating capacity is represented by the symbol SOC circulate , the circulating capacity of the fourth parallel branch 22 can be calculated and determined by formula (1), which is as follows:

[0097] Wherein, n is the number of capacity differences, that is, the number of parallel branches of the fourth parallel branch 22. Similarly, the circulating capacity of the fifth parallel branch 23 and the circulating capacity of the sixth parallel branch 24 can be calculated and determined.

[0098] In this embodiment of the present application, when determining the circulating capacity of a branch, the capacity difference between the branch and each of its parallel branches is determined, and the circulating capacity of the branch is determined based on at least one of the capacity differences. The circulating capacity of the branch is related to the capacity difference between the branch and each of its parallel branches, allowing for a relatively accurate circulating capacity to be obtained.

[0099] Optionally, the step of determining the capacity difference between the first branch and each parallel branch may include:

[0100] For each parallel branch of the first branch, determining a cumulative capacity difference based on a cumulative current difference between the first branch and the parallel branch;

[0101] The capacity difference is determined based on the initial capacity difference and the accumulated capacity difference between the first branch and the parallel branch.

[0102] In some embodiments, the initial capacity difference between the first branch and the parallel branch of the first branch can be the capacity difference measured experimentally before the battery system leaves the factory. Since the consistency of each battery cell before leaving the factory is high, the initial capacity difference is generally zero or close to zero. The initial usage difference can be pre-stored in the overvoltage warning device. The accumulated duration of the accumulated current difference is the charge and discharge duration of the battery system after leaving the factory, and the charge and discharge duration is also the usage duration of the battery system.

[0103] Taking the fourth parallel branch 22 as an example, after the battery system 2 leaves the factory, the overvoltage warning device 21 can obtain the current of the fourth parallel branch 22 and the current of the fifth parallel branch 23 in real time through the current sensor, and at the same time time the charging and discharging time of the battery system 2 to obtain the charging and discharging time of the battery system.

[0104] Then, the overvoltage warning device 21 can subtract the current of the fifth parallel branch 23 from the current of the fourth parallel branch 22 to obtain the current difference between the fourth parallel branch 22 and the fifth parallel branch 23, and calculate the cumulative value of the current difference during the charge and discharge period to obtain the cumulative current difference between the fourth parallel branch 22 and the fifth parallel branch 23. Then, the ratio of the cumulative current difference to the rated capacity of the fourth parallel branch 22 can be calculated to obtain the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23.

[0105] For example, if the current difference between the fourth parallel branch 22 and the fifth parallel branch 23 is ΔI, the cumulative current difference between the fourth parallel branch 22 and the fifth parallel branch 23 during the charge and discharge time is ∫ΔIdt. The rated capacity of the fourth parallel branch 22 is CAP std , the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 is ΔSOC1, and the initial capacity difference is ΔSOC2. Then the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 can be calculated and determined by formula (2), and the capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 can be calculated and determined by formula (3). Formulas (2) and (3) are as follows: ΔSOC k-branck =ΔSOC1+ΔSOC2 (3);

[0106] It can be understood that when the initial capacity difference is 0, the cumulative capacity difference ΔSOC1 between the fourth parallel branch 22 and the fifth parallel branch 23, that is, the capacity difference ΔSOC between the fourth parallel branch 22 and the fifth parallel branch 23, is k-branck After determining the capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23, and the capacity difference between the fourth parallel branch 22 and the sixth parallel branch 24, the circulating current capacity of the fourth parallel branch 22 can be calculated and determined by formula (1).

[0107] In the embodiment of the present application, the cumulative capacity difference between the branches is determined based on the cumulative current difference between the branches, and the capacity difference between the branches is determined based on the cumulative capacity difference and the initial capacity difference. The cumulative current difference is the cumulative difference between the branches during the use of the battery system. Therefore, the capacity difference determined based on the cumulative current difference can accurately represent the capacity difference between the branches. Therefore, based on the capacity difference between the branches, a more accurate circulating current capacity can be determined, and the overvoltage risk of the voltage can be more accurately predicted based on the circulating current capacity.

[0108] Optionally, the step of determining the cumulative capacity difference based on the cumulative current difference between the first branch and the parallel branch may include:

[0109] The cumulative capacity difference is determined according to the cumulative current difference and the state cumulative amount, where the state cumulative amount includes the charge difference generated by the first branch and the parallel branch under the action of self-discharge.

[0110] In one embodiment, in the process of determining the cumulative capacity difference between branches, the cumulative capacity difference between branches can be determined based on the cumulative current difference and the state accumulation amount. The state accumulation amount between branches can be measured through experiments and pre-stored in the overvoltage warning device.

[0111] For example, in the process of calculating the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23, after calculating and determining the cumulative current difference of the fourth parallel branch 22, the overvoltage warning device 21 can obtain the pre-stored state cumulative amount, and sum the cumulative current difference and the state cumulative amount, and calculate the ratio of the summation result to the rated capacity of the fourth parallel branch 22 to obtain the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23.

[0112] For example, the state accumulation between the fourth parallel branch 22 and the fifth parallel branch 23 is ΔCAP spon , then the cumulative capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 can be calculated and determined by formula (4), which is as follows:

[0113] It should be understood that the battery cells self-discharge during use, and the factors affecting the capacity difference between branches include not only the differences in the branches during the charge and discharge process, but also the differences in the branches during the self-discharge process. The state accumulation amount can be measured before the battery system leaves the factory and pre-stored in the overvoltage warning device. Alternatively, the state accumulation amount can be obtained by other means. This embodiment does not limit the specific method for obtaining the state accumulation amount.

[0114] In an embodiment of the present application, the cumulative capacity difference between the branches is determined based on the cumulative current difference between the branches and the state accumulation amount caused by the self-discharge difference. The current difference caused by charging and discharging between the branches and the current difference caused by self-discharge can be considered at the same time, which can improve the accuracy of the cumulative capacity difference, thereby improving the accuracy of the circulating current capacity, and further improving the accuracy of the early warning result.

[0115] In some embodiments, in the process of determining whether the circulation capacity is in an inflow state or an outflow state, the circulation capacity may be determined to be in an inflow state or an outflow state according to the positive or negative value of the circulation capacity.

[0116] Taking the fourth parallel branch 22 as an example, in the process of calculating and determining the cumulative capacity difference, the fourth parallel branch 22 is used as the reference branch, and the current of the fifth parallel branch 23 is subtracted from the current of the fourth parallel branch 22 to obtain the current difference between the fourth parallel branch 22 and the fifth parallel branch 23. When this current difference is positive, the cumulative current difference between the fourth parallel branch 22 and the fifth parallel branch 23 is positive, indicating that after the charge and discharge are completed, the fourth parallel branch 22 will flow capacity into the fifth parallel branch 23. Similarly, the current of the sixth parallel branch 24 can be subtracted from the current of the fourth parallel branch 22 to obtain the current difference between the fourth parallel branch 22 and the sixth parallel branch 24, and the cumulative capacity difference between the fourth parallel branch 22 and the sixth parallel branch 24 can be determined.

[0117] After the circulation capacity of the fourth parallel branch 22 is determined by calculation using formulas (1) to (4), if the circulation capacity is a positive value, the circulation capacity is determined to be the capacity flowing out of the fourth parallel branch 22, the circulation capacity is in an outflow state, and the fourth parallel branch 22 is not the target branch. Conversely, when the circulation capacity is a negative value, the circulation capacity is determined to be the capacity flowing into the fourth parallel branch 22, and the fourth parallel branch 22 is the target branch.

[0118] Of course, in the process of calculating and determining the cumulative current difference, if the current of the fourth parallel branch 22 is subtracted from the current of the fifth parallel branch 23, and the current of the fourth parallel branch 22 is subtracted from the current of the sixth parallel branch 24, then after determining the circulating current capacity of the fourth parallel branch 22, if the circulating current capacity is a positive value, it can be determined that the circulating current capacity is the capacity flowing into the fourth parallel branch 22, and the fourth parallel branch 22 is determined as the target branch.

[0119] The above are merely illustrative examples, and specific methods for determining whether the circulation capacity is in an inflow state or an outflow state may include but are not limited to the above examples.

[0120] Optionally, the method further includes:

[0121] When the actual capacity of the first branch is less than or equal to the second preset capacity, determining the corrected capacity of the first branch according to the open circuit voltage of the battery cell in the first branch;

[0122] The initial capacity difference is corrected according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

[0123] The actual capacity of the first branch may be the average value of the actual capacity of each battery cell in the branch as predicted by the overvoltage warning device. Taking the fourth parallel branch 22 as an example, during operation of the battery system, the overvoltage warning device 21 may predict the actual capacity of each battery cell in the fourth parallel branch 22 and calculate and determine the average value of the actual capacity of all battery cells included in the fourth parallel branch 22 to obtain the actual capacity of the fourth parallel branch 22.

[0124] The corrected capacity may be a relatively accurate capacity determined from an open circuit voltage (OCV)-state of charge curve according to the open circuit voltage (OCV) of the battery cells in the branch.

[0125] In other embodiments, during the operation of the battery system, the overvoltage warning device can correct the initial capacity difference between branches. When correcting the initial capacity difference, the cumulative duration of the current difference between branches can be the duration from each correction to the current moment. For example, when the battery system leaves the factory, the consistency between the cells is high and the capacity difference between the branches is close to zero. In this case, the initial capacity difference between the branches can be set to 0.

[0126] During the charge and discharge process of the battery system, after each discharge, if the actual capacity of the branch drops below the second preset capacity, the average value of the open circuit voltages of multiple battery cells in the branch can be calculated to obtain the average voltage, and then the reference capacity of the branch can be determined from the OCV-SOC curve based on the average voltage.

[0127] FIG4 shows a schematic diagram of an OCV-SOC curve provided in an embodiment of the present application. In FIG4 , the horizontal axis represents the state of charge, the vertical axis represents the voltage, and the voltage unit is millivolt (mV). Curve 41 is the OCV-SOC curve of the battery cell. The second preset capacity is, for example, 25%. During the charge and discharge process of the battery system, after a certain discharge is completed, if the actual capacity of the fourth parallel branch 22 is less than or equal to 25%, the overvoltage warning device 21 can obtain the open circuit voltage of each battery cell in the fourth parallel branch 22, and calculate the average value of the open circuit voltages of the multiple battery cells in the fourth parallel branch 22 to obtain the average voltage, and the average voltage is, for example, 3200 mV.

[0128] Then, the overvoltage warning device 21 can determine the capacity corresponding to 3200mV (e.g., 10%) from the OCV-SOC curve shown in FIG4 and determine this capacity as the corrected capacity of the fourth parallel branch 22. Similarly, the corrected capacity of the fifth parallel branch 23 can be determined.

[0129] After determining the corrected capacity of the fourth parallel branch 22 and the corrected capacity of the fifth parallel branch 23, the difference between the corrected capacity of the fourth parallel branch 22 and the corrected capacity of the fifth parallel branch 23 can be calculated and determined, and the difference can be determined as the initial capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23, thereby achieving a correction of the initial capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23.

[0130] After each correction of the initial capacity difference, the timing can be restarted to determine the charge and discharge duration of the battery system. Simultaneously, the current of the fourth parallel branch 22 and the current of the fifth parallel branch 23 are obtained in real time, the current difference between the fourth parallel branch 22 and the fifth parallel branch 23 is calculated, and the cumulative current difference between the fourth parallel branch 22 and the fifth parallel branch 23 is determined based on the timing duration and the current difference. Furthermore, the cumulative capacity difference can be determined based on the recalculated cumulative current difference, and the capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 can be determined based on the cumulative capacity difference and the initial capacity difference.

[0131] It is understandable that during the operation of the battery system, due to the reduction in consistency between the battery cells, the initial capacity difference between the branches may change, resulting in inaccurate initial capacity difference between the branches, and further making the final determined circulating current capacity inaccurate.

[0132] Figure 5 shows a schematic diagram of a charging curve for a battery cell provided in an embodiment of the present application. In Figure 5 , the horizontal axis represents the date, and the vertical axis represents the voltage of the battery cell, in volts (V). A first curve 51 represents the voltage change curve of a battery cell (e.g., the battery cell in the fourth parallel branch 22) in the battery system during charging. A second curve 52 represents the voltage change curve of another battery cell (e.g., the battery cell in the fifth parallel branch 23) during charging. Region 53 represents the correction region for the initial capacity difference.

[0133] During the charging and discharging process, when the capacities of the fourth parallel branch 22 and the fifth parallel branch 23 are both lower than the second preset capacity, the corrected capacity of the fourth parallel branch 22 can be determined from the OCV-SOC curve according to the open circuit voltage of the battery cells in the fourth parallel branch 22, and the corrected capacity of the fifth parallel branch 23 can be determined from the OCV-SOC curve according to the open circuit voltage of the battery cells in the fifth parallel branch 23, and the initial capacity difference between the fourth parallel branch 22 and the fifth parallel branch 23 can be corrected according to the corrected capacity of the fourth parallel branch 22 and the corrected capacity of the fifth parallel branch 23.

[0134] In an embodiment of the present application, during the charging and discharging process of the battery system, the capacity of the branch is corrected according to the open-circuit voltage of the battery cell in the branch, and the initial capacity difference between the branches is corrected according to the capacity of the corrected branch. A more accurate initial capacity difference can be obtained, so that a more accurate capacity difference between the branches can be determined, and then a more accurate circulating capacity of the branch can be determined based on the capacity difference, and the overvoltage risk of the battery cell in the branch can be accurately predicted based on the circulating capacity.

[0135] Step 32: Determine the predicted capacity of the first battery cell according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch.

[0136] In this embodiment, after determining the circulation capacity of the target branch, the predicted capacity of the first cell can be determined based on the circulation capacity of the target branch and the capacity of the first cell in the target branch. The first cell is any cell in the target branch. Taking the fourth parallel branch 22 as an example, the current actual capacity of a cell in the fourth parallel branch 22 is SOC r , then the predicted capacity of the battery cell is (SOC circulate +SOC r ). Similarly, the predicted capacity of each battery cell in the fourth parallel branch 22 can be determined.

[0137] Step 33: When the predicted capacity is greater than or equal to the first preset capacity, determine that the first battery cell has an overvoltage risk.

[0138] The first battery cell is any battery cell in the target branch. The first preset capacity can be pre-determined through experiments and stored in the overvoltage warning device. When the predicted capacity is higher than the first preset capacity, the first battery cell will be overcharged, and the voltage of the first battery cell may be higher than the safe voltage.

[0139] In this embodiment, after determining the predicted capacity of the first battery cell, the predicted capacity of the first battery cell can be compared with the first preset capacity. If the predicted capacity is greater than or equal to the first preset capacity, it is determined that the first battery cell has an overvoltage risk. On the contrary, if the predicted capacity is less than the first preset capacity, it is determined that the first battery cell has no overvoltage risk. For example, whether the first battery cell has an overvoltage risk can be determined by formula (5), which is as follows: SOC r +SOC circulate <SOC warning Formula (5);

[0140] Among them, SOC warning The first battery cell is determined to have no overvoltage risk when the predicted capacity is less than the first preset capacity, and vice versa, when the predicted capacity is greater than or equal to the first preset capacity, the first battery cell is determined to have an overvoltage risk.

[0141] Optionally, the first battery cell is the battery cell with the highest capacity in the target branch.

[0142] In some embodiments, when determining whether a battery cell in a branch has an overvoltage risk, only the battery cell with the largest capacity in the target branch may be determined.

[0143] For example, in the process of charging the battery system, after determining that the fourth parallel branch 22 is the target branch, the battery cell with the highest voltage in the fourth parallel branch 22 can be determined. The voltage of the battery cell is proportional to the actual capacity of the battery cell. The battery cell with the highest voltage is the battery cell with the largest actual capacity in the fourth parallel branch 22.

[0144] After determining the circulating capacity of the fourth parallel branch 22 and the first battery cell with the largest actual capacity in the fourth parallel branch 22, the circulating capacity of the fourth parallel branch 22 and the SOC of the first battery cell can be summed to obtain the predicted capacity of the first battery cell. When the predicted capacity of the first battery cell is less than the first preset capacity, it is determined that there is no overvoltage risk for the first battery cell, and it can also be determined that there is no overvoltage risk for the other battery cells in the fourth parallel branch 22. Conversely, if it is determined that there is an overvoltage risk for the first battery cell, measures can be directly taken to protect the first battery cell.

[0145] Among them, when the circulating current flows into the branch, the battery cell with the largest actual capacity in the branch reaches the overcharge state first. Therefore, after determining that the battery cell with the largest actual capacity in the branch is at risk of overvoltage, measures can be taken directly to protect the battery cells in the branch.

[0146] In an embodiment of the present application, in the process of predicting the overvoltage risk of battery cells in a branch, predicting the overvoltage problem of the battery cell with the highest capacity in the branch can reduce the number of battery cells in the prediction process, thereby improving the efficiency of overvoltage warning.

[0147] Optionally, when the battery system is in a charging state, if it is determined that there is an overvoltage risk in the battery cell, the charging strategy of the battery system can be directly adjusted.

[0148] For example, if it is determined that a cell in the fourth parallel branch 22 is at risk of overvoltage, the overvoltage warning device 21 can directly stop charging the battery system to control the battery system's depth of charge and prevent overcharging and overvoltage in the cells in the fourth parallel branch 22. Alternatively, the overvoltage warning device can reduce the battery system's charging current. Alternatively, the overvoltage warning device can stop charging the cell in the target branch and continue charging the cells in other branches.

[0149] The above are merely illustrative examples, and specific methods for adjusting the charging strategy may include but are not limited to the above examples.

[0150] In an embodiment of the present application, during the charging process of the battery system, when it is determined that there is an overvoltage risk for the battery cells in the branch, the charging strategy of the battery system is adjusted to avoid possible battery cell overvoltage problems and effectively protect the battery cells in the battery system.

[0151] FIG6 shows a flow chart of an overvoltage warning method provided by an embodiment of the present application. The method can be executed by an overvoltage warning device during the charging process of a battery system. As shown in FIG6 , the method may include:

[0152] Step 61: Obtain branch current.

[0153] Step 62: Determine the cumulative capacity difference between the branches.

[0154] Step 63: Determine the circulation capacity of the branch.

[0155] Step 64: Determine the target branch.

[0156] In this embodiment, during the charging process of the battery system, the overvoltage warning device can obtain the current of each branch in the battery system in real time through a current sensor, calculate the current difference between the branch and the parallel branches of the branch, determine the cumulative current difference based on the current difference, then determine the cumulative capacity difference based on the cumulative current difference, calculate and determine the capacity difference between the branch and the parallel branches of the branch based on the cumulative capacity difference and the initial capacity difference, and determine the circulating current capacity of the branch based on at least one capacity difference. After determining the circulating current capacity of each branch in the battery system, the target branch for the circulating current to flow can be determined based on the circulating current capacity of each branch.

[0157] For understanding of step 61 and step 64, reference may be made to step 31 shown in FIG3 , which will not be described in detail in this embodiment.

[0158] Step 65: Determine the cell with the maximum voltage in the branch.

[0159] In this embodiment, the overvoltage warning device can determine the battery cell with the highest voltage in each branch, that is, the battery cell with the largest actual capacity. Alternatively, after determining the target branch, the overvoltage warning device can determine the battery cell with the highest voltage in the target branch.

[0160] Step 66: Determine the predicted capacity of the cell with the maximum voltage.

[0161] Step 67: Determine whether the predicted capacity is greater than or equal to the first preset capacity.

[0162] Step 68: Stop charging.

[0163] In this embodiment, after determining the target branch and the cell with the highest voltage within the target branch, the predicted capacity of the cell can be determined based on the circulating current capacity of the target branch and the capacity of the cell with the highest voltage. If the predicted capacity is greater than or equal to the first preset capacity, step 68 is executed to stop charging. Conversely, if the predicted capacity is less than the first preset capacity, the process returns to steps 61 and 65.

[0164] For understanding of steps 66 to 68, reference may be made to steps 32 and 33, which will not be described in detail in this embodiment.

[0165] FIG7 shows a schematic diagram of the structure of an overvoltage warning device provided by an embodiment of the present application. As shown in FIG7 , the overvoltage warning device 7 includes: a first determination module 71 , a second determination module 72 and a third determination module 73 .

[0166] A first determining module 71 is configured to determine a target branch and a circulating current capacity of the target branch in the battery system, wherein the target branch is a branch into which a circulating current flows among multiple branches, and the circulating current capacity of the target branch includes a capacity change of the target branch under the action of the circulating current;

[0167] A second determining module 72 is configured to determine a predicted capacity of the first battery cell according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch;

[0168] The third determining module 73 is configured to determine that the first battery cell has an overvoltage risk when the predicted capacity is greater than or equal to the first preset capacity.

[0169] In some embodiments, the first determining module 71 includes:

[0170] A first determining unit is used to determine the circulating current capacity of each branch after the battery system finishes charging and discharging;

[0171] The second determining unit is configured to determine a branch whose circulation capacity is in an inflow state as a target branch.

[0172] In some embodiments, the first determining unit includes:

[0173] a first determining subunit, configured to determine a capacity difference between a first branch and each of the parallel branches to obtain at least one capacity difference, wherein the first branch is any one of the multiple branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch;

[0174] The second determining subunit is configured to determine the circulating capacity of the first branch according to at least one capacity difference.

[0175] In some embodiments, the first determination subunit is used to determine the cumulative capacity difference for each parallel branch of the first branch based on the cumulative current difference between the first branch and the parallel branch; and determine the capacity difference based on the initial capacity difference and the cumulative capacity difference between the first branch and the parallel branch.

[0176] In some embodiments, the overvoltage warning device 7 further includes:

[0177] The correction module is used to determine the corrected capacity of the first branch according to the open-circuit voltage of the battery cell in the first branch when the actual capacity of the first branch is less than or equal to the second preset capacity; and correct the initial capacity difference according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

[0178] In some embodiments, the first determining subunit is specifically configured to determine the cumulative capacity difference according to the cumulative current difference and the state cumulative amount, where the state cumulative amount includes the charge difference between the first branch and the parallel branch under self-discharge.

[0179] In some embodiments, the first battery cell is the battery cell with the highest capacity in the target branch.

[0180] In some embodiments, the overvoltage warning device 7 further includes: an adjustment module, configured to adjust a charging strategy of the battery system if the battery system is in a charging state.

[0181] FIG8 shows a block diagram of an overvoltage warning device according to an embodiment of the present invention. As shown in FIG8 , the overvoltage warning device 8 includes a processor 81 and a memory 83 , and the above components can be connected via one or more buses 84 .

[0182] The overvoltage warning device 8 also includes a computer program 82, which is stored in a memory 83. When the computer program 82 is executed by the processor 81, the overvoltage warning device performs the overvoltage warning method shown in Figures 3 and 6. All relevant content of each step involved in the above method embodiment can be referenced in the functional description of the corresponding physical device and will not be repeated here.

[0183] An embodiment of the present application further provides a readable storage medium, which includes a computer program. When the computer program is run on a computer, the computer executes the method provided in the above method embodiment.

[0184] An embodiment of the present application further provides a computer program product comprising instructions, which, when executed on a computer, enables the computer to execute the method provided in the above method embodiment.

[0185] An embodiment of the present application also provides a chip system, including a memory and a processor, wherein the memory is used to store a computer program, and the processor is used to call and run the computer program from the memory, so that an overvoltage warning device equipped with the chip system executes the method provided in the above method embodiment.

[0186] Among them, the chip system may include an input circuit or interface for sending information or data, and an output circuit or interface for receiving information or data.

[0187] It should be understood that in the embodiments of the present application, the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor.

[0188] It should also be understood that the memory in the embodiments of the present application may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), and direct rambus RAM (DR RAM).

[0189] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0190] Those skilled in the art will clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0191] In the several embodiments provided in this application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of the units is merely a logical function division. In actual implementation, there may be other division methods, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0192] The units described as separate components may or may not be physically separate, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed across multiple network units. Some or all of these units may be selected to achieve the purpose of this embodiment according to actual needs.

[0193] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0194] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0195] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of this application. Therefore, the scope of protection of this application should be based on the scope of protection of the claims.

Claims

1. An overvoltage warning method, characterized in that: The method comprises: Determine a target branch and a circulating current capacity of the target branch in the battery system, wherein the target branch is a branch into which a circulating current flows among multiple branches, and the circulating current capacity of the target branch includes a capacity change of the target branch under the action of the circulating current; Determining a predicted capacity of the first battery cell according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch; When the predicted capacity is greater than or equal to the first preset capacity, it is determined that the first battery cell has an overvoltage risk.

2. The method according to claim 1, characterized in that The determining of the target branch in the battery system and the circulating current capacity of the target branch includes: Determining the circulating current capacity of each branch after the battery system finishes charging and discharging; A branch whose circulation capacity is in an inflow state is determined as the target branch.

3. The method according to claim 2, characterized in that The determining of the circulating current capacity of each branch after the battery system finishes charging and discharging includes: Determine a capacity difference between a first branch and each parallel branch to obtain at least one capacity difference, wherein the first branch is any one of the plurality of branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch; The circulating current capacity of the first branch is determined according to the at least one capacity difference.

4. The method according to claim 3, characterized in that The determining of the capacity difference between the first branch and each parallel branch includes: For each parallel branch of the first branch, determining a cumulative capacity difference according to a cumulative current difference between the first branch and the parallel branch; The capacity difference is determined according to an initial capacity difference and the accumulated capacity difference between the first branch and the parallel branch.

5. The method according to claim 4, characterized in that The method further comprises: When the actual capacity of the first branch is less than or equal to the second preset capacity, determining the corrected capacity of the first branch according to the open circuit voltage of the battery cell in the first branch; The initial capacity difference is corrected according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

6. The method according to claim 4, characterized in that The determining the cumulative capacity difference according to the cumulative current difference between the first branch and the parallel branch comprises: The accumulated capacity difference is determined according to the accumulated current difference and the state accumulated amount, wherein the state accumulated amount includes the charge difference between the first branch and the parallel branch under the action of self-discharge.

7. The method according to claim 1, characterized in that The first battery cell is the battery cell with the highest capacity in the target branch.

8. The method according to any one of claims 1 to 7, characterized in that After determining that the first battery cell has an overvoltage risk, the method further includes: If the battery system is in a charging state, the charging strategy of the battery system is adjusted.

9. An overvoltage warning device, characterized in that: The device comprises: A first determination module is used to determine a target branch and a circulating current capacity of the target branch in the battery system, wherein the target branch is a branch into which a circulating current flows among multiple branches, and the circulating current capacity of the target branch includes a capacity change of the target branch under the action of the circulating current; A second determination module, configured to determine a predicted capacity of the first battery cell according to the capacity of the first battery cell in the target branch and the circulating current capacity of the target branch; The third determination module is used to determine that the first battery cell has an overvoltage risk when the predicted capacity is greater than or equal to the first preset capacity.

10. The device according to claim 9, characterized in that The first determining module includes: A first determining unit, used to determine the circulating current capacity of each branch after the battery system finishes charging and discharging; The second determining unit is used to determine a branch whose circulation capacity is in an inflow state as the target branch.

11. The device according to claim 10, characterized in that The first determining unit includes: a first determining subunit, configured to determine a capacity difference between a first branch and each parallel branch to obtain at least one capacity difference, wherein the first branch is any one of the plurality of branches, and the at least one capacity difference corresponds one-to-one to at least one parallel branch of the first branch; The second determining subunit is used to determine the circulation capacity of the first branch according to the at least one capacity difference.

12. The device according to claim 11, characterized in that The first determination subunit is used to determine the cumulative capacity difference for each parallel branch of the first branch according to the cumulative current difference between the first branch and the parallel branch; and determine the capacity difference according to the initial capacity difference and the cumulative capacity difference between the first branch and the parallel branch.

13. The device according to claim 12, characterized in that The device also includes: A correction module is used to determine the corrected capacity of the first branch according to the open circuit voltage of the battery cell in the first branch when the actual capacity of the first branch is less than or equal to the second preset capacity; and to correct the initial capacity difference according to the corrected capacity of the first branch and the corrected capacity of the parallel branch.

14. The device according to claim 12, characterized in that The first determination subunit is specifically used to determine the cumulative capacity difference according to the cumulative current difference and the state cumulative amount, and the state cumulative amount includes the charge difference generated by the first branch and the parallel branch under the action of self-discharge.

15. The device according to claim 9, characterized in that The first battery cell is the battery cell with the highest capacity in the target branch.

16. The device according to any one of claims 9 to 15, characterized in that The device also includes: The adjustment module is used to adjust the charging strategy of the battery system if the battery system is in a charging state.

17. A readable storage medium, characterized in that: The readable storage medium stores a computer program, and when the computer program runs on the overvoltage warning device, the overvoltage warning device executes the method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Evaluation method and device for cell-level capacity of battery and electronic equipment

    CN113311336A

  • Anti-overcharge control system of multi-branch battery system

    CN114172221A

  • Lithium battery SOH analysis and prediction method and device, electronic equipment and storage medium

    CN115792627A

  • Application method and device of battery module, storage medium and battery module

    CN115833286A

  • Overvoltage early warning method and device and readable storage medium

    CN116315207A