Container correction method, apparatus and system, and storage medium

By using the material box data generation and sending correction tasks in the automated multi-pass library, the material box correction is automatically performed, and the position offset problem caused by vibration and resonance is solved, the stability and efficiency of the automated bin is improved, and the stability and efficiency of the automated bin is reduced. Equipment collision and labor costs.

WO2024239662A1PCT designated stage expired Publication Date: 2024-11-28BEIJING JINGDONG QIANSHITECHNOLOGY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/070791
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-22
Filing Date
2024-01-05
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

The position offset of the material box in the automated multi-pass warehouse caused by vibration and resonance, resulting in abnormal equipment box extraction. The existing technology solves the problem by increasing the allowable deviation range of the equipment or manual inspection, but these methods have inefficiency and safety risks.

Method used

By generating and sending remediation tasks based on the data of the material box, using the handling equipment to automatically complete the remediation operations of the material box, and regularly generate and execute remediation tasks to ensure that the material box is corrected without the task of leaving the warehouse during handling. Reduce the risk of manual intervention and equipment collisions.

Benefits of technology

It improves the stability and efficiency of the automated bin, minimizes the frequency of collisions in equipment box collection, reduces labor costs and time, and realizes the automation and correction of the material box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024070791_28112024_PF_FP_ABST
    Figure CN2024070791_28112024_PF_FP_ABST
Patent Text Reader

Abstract

A container correction method, apparatus and system, and a storage medium, relating to the field of warehousing. The method comprises: according to container data, obtaining a set of containers to be corrected; generating a plurality of first correction tasks on the basis of said set of containers; generating a second correction task for a container satisfying a handling condition in the plurality of first correction tasks, wherein the container satisfying the handling condition is a container which is in a non-handling state and has no warehouse exit task; and sending the second correction task to a handling device so as to complete the correction of the container.
Need to check novelty before this filing date? Find Prior Art

Description

Material box correction method, device, system and storage medium

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application is based on the application with CN application number 202310582281.5 and application date May 22, 2023, and claims its priority. The disclosed content of the CN application is hereby introduced as a whole into this application. Technical Field

[0003] The present disclosure relates to the field of warehousing, and in particular to a material box correction method, device, system and storage medium. Background Art

[0004] Automated multi-pass warehouses are densely packed with aisles, layers, and rows. As shuttles move through each layer, they vibrate the boxes stored on both sides of the tracks. Strong vibrations or resonance can cause the boxes to shift and tilt. If a box is not moved for an extended period, it can shift. If this shift exceeds the permitted range for handling equipment, the equipment can collide with the box when retrieving it.

[0005] In the related technologies, most of them adopt the method of increasing the allowable deviation range of the equipment to avoid the equipment being unable to pick up the box, or manually inspect the material boxes in the warehouse regularly and manually correct the material boxes with large deviations.

[0006] Summary of the Invention

[0007] According to one aspect of the present disclosure, a material box correction method is proposed, including: obtaining a set of material boxes to be corrected based on material box data; generating multiple first correction tasks based on the set of material boxes to be corrected; generating a second correction task for the material boxes that meet the handling conditions in the multiple first correction tasks, wherein the material boxes that meet the handling conditions are material boxes that are not in handling and have no outbound tasks; and sending the second correction task to the handling equipment to complete the material box correction.

[0008] In some embodiments, generating the second correction task includes: when the material box that meets the handling conditions is a rear-entry deep material box, generating the second correction task including a forward-entry deep storage task.

[0009] In some embodiments, the first correction tasks of the containers that do not meet the handling conditions among the plurality of first correction tasks are canceled.

[0010] In some embodiments, based on the set of boxes to be corrected, generating multiple first correction tasks includes: generating a first correction task for the boxes in the set of boxes to be corrected that have no outbound tasks and are not being transported, and setting the boxes for which the first correction task is generated to a correction execution state.

[0011] In some embodiments, the set of bins to be corrected is generated when the bin correction function is enabled and the timed task triggering conditions are met.

[0012] In some embodiments, obtaining the set of bins to be corrected based on the bin data includes: obtaining the set of bins to be corrected based on the number of days the bins have not been moved, the bin status, whether the bins are to be shipped out, and whether a correction task has been performed.

[0013] In some embodiments, the boxes that have not been moved for more than a threshold number of days, are in a state of not being moved, have no outbound tasks and have not executed any correction tasks are regarded as boxes to be corrected; and based on the number of correction tasks executed, a predetermined number of targets to be corrected are selected from multiple boxes to be corrected to construct a set of boxes to be corrected.

[0014] In some embodiments, a feedback signal of the transport equipment after performing the correction task is received; and the corrected material box is set to a state of not being transported and not performing the correction task, and the last movement time of the corrected material box is updated.

[0015] In some embodiments, the starting position and the destination position of the container in the second correction task are the same.

[0016] In some embodiments, the second correction task is generated periodically.

[0017] According to another aspect of the present disclosure, a material box correction device is also proposed, including: a material box retrieval module, configured to obtain a set of material boxes to be corrected based on material box data; a first task generation module, configured to generate multiple first correction tasks based on the set of material boxes to be corrected; a second task generation module, configured to generate a second correction task for the material boxes that meet the handling conditions in the multiple first correction tasks, wherein the material boxes that meet the handling conditions are material boxes that are not in handling and have no outbound tasks; and a correction task sending module, configured to send the second correction task to the handling equipment to complete the material box correction.

[0018] In some embodiments, the correction task cancellation module is configured to cancel a first correction task for a container that does not meet the handling conditions among the plurality of first correction tasks.

[0019] In some embodiments, the correction task trigger module is configured to set whether the material box correction function is turned on and the timing task trigger conditions.

[0020] According to another aspect of the present disclosure, a container correction device is provided, comprising: a memory; and a processor coupled to the memory, wherein the processor is configured to execute the container correction method as described above based on instructions stored in the memory.

[0021] According to another aspect of the present disclosure, a material box correction system is also proposed, including: the above-mentioned material box correction device; and a handling device, which is configured to receive a second correction task sent by the material box correction device, perform the material box correction operation according to the second correction task, and send a feedback signal to the material box correction device after performing the material box correction task.

[0022] In some embodiments, a container data database is configured to store container data.

[0023] According to another aspect of the present disclosure, a non-transitory computer-readable storage medium is further provided, on which computer program instructions are stored, and when the instructions are executed by a processor, the above-mentioned material box correction method is implemented.

[0024] Other features and advantages of the present disclosure will become apparent from the following detailed description of exemplary embodiments of the present disclosure with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0026] The present disclosure can be more clearly understood from the following detailed description with reference to the accompanying drawings, in which:

[0027] FIG1 is a schematic flow chart of some embodiments of the container correction method disclosed herein;

[0028] FIG2 is a schematic flow chart of other embodiments of the material box correction method disclosed herein;

[0029] FIG3 is a schematic structural diagram of some embodiments of the material box correction device disclosed herein;

[0030] FIG4 is a schematic structural diagram of some other embodiments of the material box correcting device disclosed herein;

[0031] FIG5 is a schematic structural diagram of some other embodiments of the material box correcting device disclosed herein;

[0032] FIG6 is a schematic structural diagram of some embodiments of the container correction system disclosed herein; and

[0033] FIG7 is a schematic structural diagram of some other embodiments of the material box correction system disclosed in the present invention. DETAILED DESCRIPTION

[0034] Various exemplary embodiments of the present disclosure will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present disclosure.

[0035] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.

[0036] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present disclosure, its application, or uses.

[0037] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.

[0038] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0039] It should be noted that like reference numerals and letters refer to like items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0040] In order to make the objectives, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings.

[0041] The inventors discovered that increasing the access offset range of the device presents significant limitations. For example, in densely packed storage facilities, bins are already densely packed. Excessive access offsets can reduce storage density and overall storage efficiency. Furthermore, access offsets don't address the issue of excessive offsets. If two adjacent bins are offset, extending the fork to retrieve the bin can easily cause a collision, triggering an alarm indicating an abnormal bin retrieval.

[0042] Regular manual inspections are not timely and are prone to omissions. Inspections require on-site shutdowns and equipment pauses, which reduces operational efficiency. Manual alignment relies on experience or position markings, which can easily tilt when the markings are unclear. The overall operation is time-consuming and cannot provide targeted inspections.

[0043] FIG1 is a schematic flow chart of some embodiments of the container correction method disclosed herein.

[0044] In step 110 , a set of bins to be corrected is obtained based on the bin data.

[0045] In some embodiments, the container data is stored in a container database. For example, the container data includes the container number N, current status S, last move time L, whether there is a delivery pre-occupancy P, location C, ongoing correction task Do, etc. The current status S is used to record the operation currently being performed on the container, such as being moved or put on the shelf; the last move time L is used to record the last time the container was moved by the equipment; the delivery pre-occupancy flag P is used to record whether there is a delivery task for the container; the current location C is used during task execution and equipment scheduling; and the ongoing correction task D0 is used to mark whether a correction task has been created.

[0046] In some embodiments, a set of bins to be corrected is obtained based on the number of days the bins have not been moved, the status of the bins, whether the bins are to be shipped out, and whether a correction task has been performed.

[0047] For example, the material boxes that have not been moved for more than a threshold number of days, are in a state of not being moved, have no outbound tasks, and have not executed correction tasks are regarded as material boxes to be corrected; based on the number of correction tasks executed, a predetermined number of targets to be corrected are selected from multiple material boxes to be corrected to construct a set of material boxes to be corrected.

[0048] In some embodiments, a collection of bins awaiting correction is generated when the bin correction function is enabled and the scheduled task trigger conditions are met. For example, a task trigger can be configured with a time trigger point, and when the trigger point is reached, a collection of bins awaiting correction is generated. This scheduled task automates bin correction, reducing manual intervention. Furthermore, the task trigger allows for the ability to modify the trigger time at any time to accommodate different situations, increasing the flexibility of bin correction task execution.

[0049] In step 120 , a plurality of first correction tasks are generated based on the set of containers to be corrected.

[0050] In some embodiments, for a container in the container set to be corrected that has no outbound task and is not being transported, a first correction task is generated, and the container for which the first correction task is generated is set to a correction execution state.

[0051] For example, after retrieving the material boxes to be corrected, a correction task is generated for each material box. Before generating the correction task, it is verified again whether the material box has no outbound task and is not in transportation. This avoids the material box with the generated correction task being unable to complete the correction task later due to the addition of a new outbound task or being in transportation.

[0052] In step 130 , a second correction task is generated for the boxes that meet the transport conditions in the plurality of first correction tasks, wherein the boxes that meet the transport conditions are boxes that are not being transported and have no outbound tasks.

[0053] In some embodiments, a second correction task is generated periodically, for example, once every minute. This second correction task is a handling task, which is sent to a handling device, which then handles the bin to complete the correction task. By periodically generating this second correction task, subsequent bin correction tasks are automatically executed, reducing manual operations and labor costs.

[0054] In some embodiments, when the material box that meets the handling conditions is a rear-deep material box, a second correction task including a forward-deep storage task is generated.

[0055] For example, a vertical warehouse can store two containers at the same time from the outside to the inside in terms of physical location. If the material box to be corrected is located near the inside, the material box on the outside needs to be moved to another location first, and then the material box to be corrected on the inside can be moved. Therefore, when generating the second correction task, a derivative warehouse transfer task with forward depth is generated.

[0056] In some embodiments, the second correction task includes the handling task number, the container number, the starting position, the destination position, and the task status. Since the correction task is being executed, the starting position and the destination position are consistent, allowing the handling equipment to perform the container pickup and placement operations in situ, achieving the correction effect.

[0057] In step 140 , a second correction task is sent to the handling equipment to complete the correction of the container.

[0058] In some embodiments, after receiving the second correction task, the handling equipment first performs a box-taking operation and then performs a box-putting operation, performing the operations on the original site to achieve the effect of correcting the material box.

[0059] In the above embodiment, after obtaining a set of material boxes to be corrected, a first correction task is generated for each material box to be corrected, and a second correction task is generated for the material boxes that meet the handling conditions. The second correction task is sent to the handling equipment, and the handling equipment automatically performs the material box correction, thereby minimizing the frequency of collisions when the equipment takes the boxes. In addition, since no manual intervention is required, the material box correction efficiency is improved and the stability of the automated warehouse is improved.

[0060] FIG2 is a schematic flow chart of other embodiments of the material box correction method disclosed herein.

[0061] In step 210, according to the configured timed task, the system triggers a correction search.

[0062] In some embodiments, a task trigger is configured with a time starting point and an on / off switch, a threshold for the number of days a container has not been moved, and a maximum number of containers per execution. The on / off switch determines whether to enable the container remediation function. This time trigger can be represented by a cron expression, for example, to implement remediation at a fixed period, such as every two minutes, or at fixed times, such as at 10:30 AM, 12:30 PM, or once a week at 12:00 AM.

[0063] In some embodiments, the trigger configuration information structure is shown in Figure 1, including the switch S, trigger point T, number of days not moved D, and number of bins MQ. For example, a task trigger is configured to enable bin remediation, execute at 12:00 every day, query bins that have not been moved in the warehouse for more than 10 days, and create a maximum of 50 bin tasks.

[0064] Table 1

[0065] In step 220 , it is determined whether the switch is on. If so, step 230 is executed. Otherwise, step 210 is executed to wait for the next trigger time.

[0066] In step 230 , the container database is searched to obtain a set of containers to be corrected.

[0067] In some embodiments, the container data structure is as shown in Table 2.

[0068] Table 2

[0069] In the above Table 2, the numbers corresponding to the current status, for example, 60 indicates that the current material box status is in the warehouse, and 50 indicates that the current material box status is in transit. Those skilled in the art should understand that other numbers can also be used to represent the material box status.

[0070] In some embodiments, data is retrieved from the bin database based on the number of days D of unmoved bins and the maximum number of bins MQ. For example, if the current time is NOW, the retrieval condition is F = (NOW - L) > D & P == 0 & S == 60 & Do == 0. In other words, bins with a movement time greater than D, no pre-delivery reservations, no shelving and no longer in transit, and no bins undergoing correction are considered to be bins awaiting correction. After retrieving the data, the preceding MQ data is sorted in ascending order of L to form the bin set awaiting correction.

[0071] In step 240 , a plurality of first correction tasks are generated based on the set of containers to be corrected.

[0072] In some embodiments, before generating the first correction task, it is dynamically determined whether the current material box has any outbound reservation or is being transported, that is, the condition F=P==0&&S==60 is verified again, that is, the material box has no outbound reservation and is no longer being transported. For the material box that meets the conditions, the first correction task Job is generated, and the material box data correction execution status Do is changed to 1, that is, the material box is in the correction execution state.

[0073] In some embodiments, the structure of the first correction task Job is shown in Table 3. The first correction task Job includes the task number JobNo, the container number, the last move time, the task status, and the location. The task status is, for example, 0 for the initial state, 1 for the executing state, 10 for the completed state, and 404 for the canceled state.

[0074] Table 3

[0075] In step 250 , it is determined whether the material box with the first correction task meets the handling conditions. If so, step 260 is executed; otherwise, step 251 is executed.

[0076] For example, every minute, the initial state of the restoration task is scheduled. The initial state refers to the restoration task state. The control scheduling only searches for tasks with a restoration task state of 0 (initial) to perform operations.

[0077] First, sort the items according to the last movement time, then traverse each task for calculation and retrieve the container data again. If the outbound pre-occupancy P = 1 or S <> 60, it means that the container is about to be shipped out or the transportation does not need to be corrected. In other words, other business triggered the equipment transportation and a similar correction operation has been implemented. The job is canceled and the status of the task is marked as 404.

[0078] In step 251 , the first correcting tasks for the boxes that do not meet the handling conditions among the plurality of first correcting tasks are canceled, and step 210 is subsequently executed.

[0079] In step 260 , for each material box to be corrected, it is determined whether the material box to be corrected is at the rear depth. If so, step 270 is executed; otherwise, step 280 is executed.

[0080] In step 270, a forward-depth derivative library transfer task is generated.

[0081] In step 280 , a second normalization task is generated.

[0082] In some embodiments, for the material box to be corrected at the rear depth, a derivative transfer task MTask of the front depth is generated, and finally an equipment handling task Task is created for the material box, that is, the second correction task, and the material box status S=50 is modified at the same time, that is, the material box is in transportation.

[0083] In some embodiments, the structure of a Task is shown in Table 4, including the handling task number, the container number, the starting location, the destination location, and the task status. 1 indicates that the task is in progress, and 10 indicates that the task is complete. The starting location and the destination location are consistent, meaning that the device can operate the container pick-up and put-down operations in place to achieve a corrective effect.

[0084] Table 4

[0085] In step 290, the second correction task is sent to the handling equipment.

[0086] In step 2100, the handling device performs a reset task.

[0087] In some embodiments, after receiving the task, the transport device starts to pick up the box without feeding back a signal, and then puts the box down. After the box is put down, the transport device feeds back a signal.

[0088] In step 2110, the corrected container is set to a state of not being moved and not having a correcting task executed, and the last moving time of the corrected container is updated.

[0089] After receiving the feedback signal from the handling equipment, the task status of the second correction task is changed to 10, that is, the execution is completed. At the same time, the material box data is modified L = current time, S = 60 (on the shelf), Do = 0 (not being executed), and the status of the first correction task Job is changed to 10.

[0090] In the above embodiment, supported by the material box data, the method of scheduled tasks + equipment access + system automatic scheduling is adopted, while supporting dynamic cancellation of tasks, supporting multi-depth material boxes, and automatically completing the material box straightening operation. It can minimize the frequency of box collisions when the equipment takes the box, and will not affect the overall operating efficiency, thereby improving the stability of the entire automated warehouse.

[0091] Figure 3 is a structural schematic diagram of some embodiments of the material box correction device disclosed in the present invention. The material box correction device is, for example, a controller, including a material box retrieval module 310, a first task generation module 320, a second task generation module 330 and a correction task sending module 340.

[0092] The container retrieval module 310 is configured to obtain a set of containers to be normalized based on the container data.

[0093] In some embodiments, the container retrieval module 310 obtains a set of containers to be corrected based on the number of days the containers have not been moved, the container status, whether the containers are to be shipped out, and whether a correction task has been performed.

[0094] For example, the material boxes that have not been moved for more than a threshold number of days, are in a state of not being moved, have no outbound tasks, and have not executed correction tasks are regarded as material boxes to be corrected; based on the number of correction tasks executed, a predetermined number of targets to be corrected are selected from multiple material boxes to be corrected to construct a set of material boxes to be corrected.

[0095] The first task generating module 320 is configured to generate a plurality of first normalization tasks based on the set of bins to be normalized.

[0096] In some embodiments, the first task generation module 320 generates a first correction task for a container in the set of to-be-corrected containers that has no outbound task and is not being transported, and sets the container for which the first correction task is generated to a correction execution state.

[0097] For example, after retrieving the material boxes to be corrected, a correction task is generated for each material box. Before generating the correction task, it is verified again whether the material box has no outbound task and is not in transportation. This avoids the material box with the generated correction task being unable to complete the correction task later due to the addition of a new outbound task or being in transportation.

[0098] The second task generating module 330 is configured to generate a second correcting task for the containers that meet the transport conditions in the plurality of first correcting tasks, wherein the containers that meet the transport conditions are containers that are not being transported and have no outbound tasks.

[0099] In some embodiments, the second task generation module 330 generates a second correction task periodically.

[0100] In some embodiments, when the material box that meets the handling conditions is a rear-entry deep material box, the second task generation module 330 generates a second correction task including a forward-entry deep storage task.

[0101] In some embodiments, the starting position and the destination position of the container in the second correction task are the same.

[0102] The correction task sending module 340 is configured to send the second correction task to the handling equipment to complete the correction of the material box.

[0103] In the above embodiment, the material box correction device and the handling equipment cooperate to automatically perform material box correction, which can minimize the frequency of collisions when the equipment takes the box, improve the stability of the automated warehouse, and improve the efficiency of material box correction.

[0104] In other embodiments of the present disclosure, as shown in FIG4 , the container correcting device further includes a correcting task cancellation module 410 configured to cancel a first correcting task of a container that does not meet the handling conditions among the multiple first correcting tasks.

[0105] In this embodiment, the generated correction task can be canceled to avoid the case where the generated correction task cannot be completed later due to the addition of a new outbound task or the case being in transit.

[0106] In other embodiments of the present disclosure, the material bin correction device further includes a correction task trigger module 420 configured to set whether the material bin correction function is enabled and the timing task triggering conditions.

[0107] In some embodiments, task triggers are configured with a time starting point and an on / off switch, a threshold for the number of days a container must remain unmoved, and a maximum number of containers per execution. The correction task trigger module 420 triggers a correction search based on the configured scheduled tasks, and the first task generation module 320 generates multiple first correction tasks.

[0108] FIG5 is a schematic diagram of the structure of other embodiments of the container alignment device disclosed herein. The container alignment device 500 includes a memory 510 and a processor 520. The memory 510 may be a disk, flash memory, or any other non-volatile storage medium. The memory 510 is used to execute instructions in the embodiments corresponding to the above-described embodiments. The processor 520 is coupled to the memory 510 and may be implemented as one or more integrated circuits, such as a microprocessor or microcontroller. The processor 520 is used to execute instructions stored in the memory.

[0109] In some embodiments, the processor 520 is coupled to the memory 510 via a BUS 530. The bin alignment device 500 can also be connected to an external storage device 550 via a storage interface 540 to access external data, and can also be connected to a network or another computer system (not shown) via a network interface 560. A detailed description is omitted here.

[0110] In this embodiment, data instructions are stored in the memory and then processed by the processor, thereby minimizing the frequency of box collisions when the equipment takes boxes without affecting the overall operating efficiency and improving the stability of the entire automated warehouse.

[0111] FIG6 is a schematic structural diagram of some embodiments of the material box correction system disclosed herein, wherein the material box correction system includes a material box correction device 610 and a handling device 620 , wherein the material box correction device 610 has been described in detail in the above embodiments and will not be further elaborated here.

[0112] The handling device 620 is configured to receive a second correction task sent by the material box correction device, perform the material box correction operation according to the second correction task, and send a feedback signal to the material box correction device after performing the material box correction task.

[0113] In some embodiments, after receiving the task, the transport device starts to take the box without feedback signal, and then puts the box. After the box is put, the transport device feeds back signal to the material box correction device.

[0114] In some embodiments of the present disclosure, as shown in FIG. 7 , the container correction system further includes a container data database 710 configured to store container data.

[0115] In some embodiments, the container data is stored in a container database. For example, the container data includes the container number N, the current status S, the last movement time L, whether there is a warehouse reservation P, the location C, the correction task Do in progress, etc.

[0116] In the above embodiment, the material box straightening device and the handling equipment cooperate to automatically complete the material box straightening operation, minimize the frequency of box collision when the equipment takes the box, and will not affect the overall operation efficiency, thereby improving the stability of the entire automated warehouse.

[0117] In other embodiments, a computer-readable storage medium stores computer program instructions thereon, which, when executed by a processor, implement the steps of the method in the above-described embodiment. Those skilled in the art will appreciate that the embodiments of the present disclosure may be provided as methods, devices, or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present disclosure may take the form of a computer program product implemented on one or more computer-usable non-transient storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0118] In some embodiments of the present disclosure, a computer program is further provided, comprising: instructions, which, when executed by a processor, cause the processor to perform the aforementioned material box correction method.

[0119] The present disclosure is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems) and computer program products according to the embodiments of the present disclosure. It should be understood that each process and / or box in the flowchart and / or block diagram and the combination of the processes and / or boxes in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate a device for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0120] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0121] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0122] The present disclosure has been described in detail so far. To avoid obscuring the concept of the present disclosure, some details known in the art have not been described. Based on the above description, those skilled in the art can fully understand how to implement the technical solutions disclosed herein.

[0123] Although some specific embodiments of the present disclosure have been described in detail by way of examples, those skilled in the art will appreciate that the above examples are for illustrative purposes only and are not intended to limit the scope of the present disclosure. Those skilled in the art will appreciate that modifications may be made to the above embodiments without departing from the scope and spirit of the present disclosure. The scope of the present disclosure is defined by the appended claims.

Claims

1. A material box correction method, comprising: According to the bin data, a set of bins to be corrected is obtained; Based on the set of material boxes to be corrected, generating a plurality of first correction tasks; For the material boxes that meet the handling conditions in the plurality of first rectification tasks, a second rectification task is generated, wherein the material boxes that meet the handling conditions are material boxes that are not being handled and have no outbound tasks; as well as The second correction task is sent to the handling equipment to complete the correction of the material box.

2. The material box correction method according to claim 1, wherein: Generating the second normalization task includes: When the material box satisfying the transporting condition is a rear-entry deep material box, a second correction task including a forward-entry deep storage task is generated.

3. The material box correction method according to claim 1 or 2, further comprising: The first return tasks of the material boxes that do not meet the handling conditions among the plurality of first return tasks are canceled.

4. The material box correction method according to any one of claims 1 to 3, wherein: Based on the set of bins to be corrected, generating a plurality of first correcting tasks includes: For the material boxes in the set of material boxes to be corrected that have no outbound tasks and are not being transported, a first correcting task is generated, and the material box for which the first correcting task is generated is set to a correcting execution state.

5. The material box correction method according to any one of claims 1 to 4, wherein: The set of material boxes to be corrected is generated when the material box correction function is turned on and the timing task triggering conditions are met.

6. The material box correction method according to any one of claims 1 to 5, wherein: According to the bin data, the bin set to be corrected includes: The set of material boxes to be corrected is obtained according to the number of days that the material boxes have not been moved, the state of the material boxes, whether the material boxes are to be shipped out of the warehouse, and whether the correction task is to be performed.

7. The material box correction method according to claim 6, wherein: The boxes whose number of days without moving is greater than the threshold, whose status is not being moved, whose outbound tasks are not executed, and whose return tasks have not been executed are regarded as the boxes to be returned; as well as According to the upper limit of the number of correction task executions, a predetermined number of targets to be corrected are selected from the plurality of the boxes to be corrected, and the set of boxes to be corrected is constructed.

8. The material box correction method according to any one of claims 1 to 7, further comprising: Receiving a feedback signal from the handling device after performing a correction task; as well as The corrected material box is set to a state of not being transported and not having a correcting task executed, and the last moving time of the corrected material box is updated.

9. The material box correction method according to any one of claims 1 to 8, wherein: The starting position of the material box in the second correction task is the same as the destination position.

10. The material box correction method according to any one of claims 1 to 9, wherein: The second correction task is generated periodically.

11. A material box correction device, comprising: A bin retrieval module is configured to obtain a set of bins to be corrected according to the bin data; A first task generating module is configured to generate a plurality of first correcting tasks based on the set of material boxes to be corrected; A second task generation module is configured to generate a second correction task for the material boxes that meet the handling conditions in the plurality of first correction tasks, wherein the material boxes that meet the handling conditions are material boxes that are not being handled and have no outbound tasks; as well as The correction task sending module is configured to send the second correction task to the handling equipment to complete the correction of the material box.

12. The material box correcting device according to claim 11, further comprising: The correction task cancellation module is configured to cancel the first correction task of the material box that does not meet the handling conditions among the multiple first correction tasks.

13. The material box correcting device according to claim 11 or 12, further comprising: The correction task trigger module is configured to set whether the material box correction function is turned on and the timing task trigger conditions.

14. A material box correction device, comprising: Memory; as well as A processor coupled to the memory, wherein the processor is configured to execute the container correction method according to any one of claims 1 to 10 based on instructions stored in the memory.

15. A material box correction system, comprising: The material box correcting device according to any one of claims 11 to 14; as well as The handling equipment is configured to receive a second correction task sent by the material box correction device, perform a material box correction operation according to the second correction task, and send a feedback signal to the material box correction device after performing the material box correction task.

16. The container correction system according to claim 15, further comprising: The container data database is configured to store the container data.

17. A computer-readable storage medium having computer program instructions stored thereon, wherein the instructions, when executed by a processor, implement the material box correction method according to any one of claims 1 to 10.

18. A computer program comprising: Instructions, when executed by a processor, cause the processor to perform the box correction method according to any one of claims 1 to 10.

Citation Information

Patent Citations

  • Material box position adjustment method and device, warehousing system, medium and electronic equipment

    CN111056210A

  • Warehouse scheduling method and device and warehouse system

    CN111784220A

  • Warehouse moving method and equipment

    CN113401553A

  • Abnormality processing method and device in warehousing system

    CN113807770A

  • Goods management method and device, goods management system and computer readable storage medium

    CN115744027A