Power grid peak-shaving system and control method therefor

By using a grid and heating network coordinated peak-shaving system, and utilizing the high-pressure/medium-pressure cylinders of steam turbines, combined heat and power generation devices, and electric thermal energy storage devices, full-load peak shaving of coal-fired power units has been achieved, solving the problem of inflexible peak shaving during the heating season and improving energy utilization efficiency and flexibility.

WO2024239751A1PCT designated stage expired Publication Date: 2024-11-28CPI NORTHEAST ENERGY SAVING TECH +1

Patent Information

Application Number
PCT/CN2024/079568
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-25
Filing Date
2024-03-01
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

Existing heat and power decoupling technology is inefficient, has limited applications, high costs, and low energy efficiency. High back pressure coal-fired power units operate in a "heat-driven power generation" mode, which prevents them from generating electricity for peak shaving during the heating season. The heat and power mismatch in coal-fired power units leads to increased coal consumption for power generation.

Method used

A power grid peak-shaving system is proposed, which includes a two-level power grid peak-shaving path and a multi-level heating network peak-shaving path. By combining the high-pressure/medium-pressure cylinder of the steam turbine with a combined power and heat (CHP) device and a CHP energy storage device, the system achieves flexible conversion and storage of electricity and heat. Combined with the cascade utilization of waste steam and steam, it meets the heating load requirements of different heating loads.

Benefits of technology

It has achieved the peak-shaving capacity of coal-fired power units from 0 to 100% full load, broken the "heat-driven power generation" operation mode, improved the comprehensive energy utilization efficiency, reduced coal consumption for power generation, and solved the problem of inflexible peak-shaving during the heating season.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024079568_28112024_PF_FP_ABST
    Figure CN2024079568_28112024_PF_FP_ABST
Patent Text Reader

Abstract

A power grid peak-shaving system and a control method therefor. The system comprises: a unit, which comprises a boiler, a high- / medium-pressure cylinder of a steam turbine, and a generator; and a heater. The power grid peak-shaving system comprises the following two power grid peak-shaving paths, namely, a first power grid peak-shaving path, wherein a third steam branch in communication with the high- / medium-pressure cylinder of the steam turbine is in communication with a power and heat cogeneration device, which is suitable for generating power, a working medium formed by means of steam from the third steam branch doing work at the power and heat cogeneration device to generate power is suitable for performing, in a fourth heater, heat exchange with heat supply circulation return water, and the heat supply circulation return water is suitable for being heated in the fourth heater and then being introduced into a heating network; and a second power grid peak-shaving path, which comprises an electric heating energy storage device, wherein part of power from the generator is suitable for being converted, in the electric heating energy storage device, into heat for storage, the stored heat being suitable for entering the heating network by means of water.
Need to check novelty before this filing date? Find Prior Art

Description

Power grid peak regulation system and control method thereof Technical Field

[0001] The embodiments of the present disclosure relate to the field of power generation and heat supply, and in particular to a power grid peak regulation system and a control method thereof. Background Art

[0002] During the 14th Five-Year Plan period, my country's energy consumption has grown rapidly, ushering in a new stage of energy development. By 2021, my country's installed capacity of renewable energy power generation reached 1.12 billion kilowatts, accounting for 47.10% of the country's total installed power generation capacity. The installed capacity in both operation and under construction already ranked first in the world. While renewable energy sources such as wind power and photovoltaics provide a vast amount of clean electricity, the randomness and instability of their power generation output also pose significant challenges to the safe operation of the power system and the security of power supply. Currently, the risks to the safe operation of the power system have significantly increased, its flexible regulation capacity is insufficient, and the vigorous development of new business models such as energy storage cannot fully meet the requirements of large-scale development and absorption of renewable energy. This has led to serious problems with wind, solar, and hydropower curtailment in some regions.

[0003] The total heated area of ​​urban and rural buildings in northern my country is approximately 20.6 billion square meters, 83% of which is coal-fired, resulting in an annual consumption of approximately 400 million tons of standard coal. As urban areas continue to expand, heating demand is growing. Existing thermoelectric decoupling technology suffers from low efficiency and limited application, even directly using high-quality electricity for feedwater heating. This results in energy efficiency approximately 60% lower than that of conventional hot water boilers.

[0004] Coal-fired power, due to its mature technology and relatively flexible generation capacity, can comprehensively improve the system's peak-shaving and renewable energy absorption capacity, making it an effective and feasible means of promoting renewable energy absorption. The National Development and Reform Commission and the National Energy Administration jointly issued the "Notice on the Nationwide Retrofit and Upgrade of Coal-fired Power Units." The notice proposes that flexibility retrofits for coal-fired power units should be implemented as much as possible during the 14th Five-Year Plan period, aiming to complete 200 million kilowatts of flexibility retrofits and increase system regulation capacity by 30-40 million kilowatts. Heating retrofits should be carried out for coal-fired condensing units that meet heating requirements, with a goal of reaching 50 million kilowatts during the 14th Five-Year Plan period. Based on the national goal of reducing average coal consumption for thermal power generation to below 300 grams of standard coal per kilowatt-hour by 2025, coal-fired power units with a coal consumption above 300 grams should undergo accelerated energy-saving retrofits, with units that cannot be retrofitted being phased out and shut down. The scale of retrofits during the 14th Five-Year Plan period will be no less than 350 million kilowatts.

[0005] Therefore, in order to reduce carbon emissions, it is necessary to further tap the peak-shaving potential of coal-fired units and increase the peak-shaving capacity of the power system.

[0006] There is an urgent need to develop efficient and flexible dual peak-shaving capabilities for electricity and heat from coal-fired power generation units, improve energy utilization efficiency, and effectively utilize renewable energy electricity.

[0007] The existing technology has at least the following problems:

[0008] 1. The current thermoelectric decoupling technology has low efficiency, single application, high cost and low energy efficiency.

[0009] 2. High back-pressure coal-fired power units have an "electricity determined by heat" operating mode, which causes the problem of being unable to generate electricity and regulate peak power during the heating season.

[0010] 3. The heat and power of coal-fired power plants are not matched, which increases the coal consumption for power generation while ensuring heat supply.

[0011] 4. There is an urgent need to break through the flexible, efficient and economical electric and thermal dual peak-shaving technology of coal-fired power units.

[0012] Summary of the Invention

[0013] The present invention is proposed to solve or alleviate at least one aspect of the problems in the prior art.

[0014] An embodiment of the present invention relates to a power grid peak shaving system, comprising:

[0015] Units, including boilers, turbine high-pressure / intermediate-pressure cylinders, and generators;

[0016] heater;

[0017] The power grid peak-shaving system includes the following two-level power grid peak-shaving paths:

[0018] First grid peak-shaving path: A third steam branch connected to the high-pressure / intermediate-pressure cylinders of the steam turbine is connected to a combined heat and power generation device. The combined heat and power generation device is suitable for generating electricity. Steam from the third steam branch performs work in the combined heat and power generation device to generate a working fluid suitable for heat exchange with heat supply cycle return water in a heater. The heat supply cycle return water is suitable for being heated in a fourth heater and then fed into the heat network.

[0019] The second grid peak shaving path includes an electrothermal energy storage device, in which a portion of the electricity from the generator is suitable for being converted into heat storage, and the stored heat is suitable for entering the heating network via water.

[0020] Optionally, the present invention can realize a coordinated peak-shaving system of the power grid and the heat network, that is, in the above-mentioned power grid peak-shaving system, the heater is a fourth heater, the unit also includes a low-pressure cylinder of a steam turbine, and the power grid peak-shaving system includes at least one level of heat network peak-shaving path in the following paths: a first heat network peak-shaving path: the first exhaust steam branch communicated with the low-pressure cylinder is communicated with the first heater, and the heat supply cycle return water is suitable for being heated in the first heater and then returning to the heat network; a second heat network peak-shaving path: the second exhaust steam branch communicated with the low-pressure cylinder is communicated with the steam injection device, and the first steam branch communicated with the high-pressure / medium-pressure cylinder of the steam turbine is communicated with the steam injection device to be suitable for carrying exhaust steam from the second exhaust steam branch into the second heater, and the heat supply cycle return water is suitable for being heated in the second heater and then returning to the heat network; a third heat network peak-shaving path: the second steam branch communicated with the high-pressure / medium-pressure cylinder of the steam turbine is communicated with the third heater, and the heat supply cycle return water is suitable for being heated in the third heater and then returning to the heat network.

[0021] An embodiment of the present invention further relates to a control method for the above-mentioned power grid peak regulation control system, comprising at least one of the following steps:

[0022] Combined heat and power generation step: extracting steam from the high-pressure / intermediate-pressure cylinder of the steam turbine to generate electricity using the combined heat and power generation device, and using the working fluid generated after the steam power generation to heat the heat supply circulating return water, and passing the heated heat supply circulating return water into the heat supply network; and

[0023] Electric thermal energy storage step: convert part of the electricity from the generator into heat storage in the electric thermal energy storage device, and the stored heat is suitable for entering the heating network through water.

[0024] Correspondingly, the present invention also proposes a method for coordinated peak-shaving of the power grid and the heat network. Specifically, the above method also includes at least one of the following steps: utilizing exhaust steam for heating based on the first heat network peak-shaving path; utilizing exhaust steam and steam for heating based on the second heat network peak-shaving path; and utilizing steam for heating based on the third heat network peak-shaving path.

[0025] The present invention also proposes a power grid peak-shaving system for coordinated peak-shaving of the power grid and the heat network, comprising:

[0026] Generator sets, including boilers, steam turbines, and generators;

[0027] A heat network peak shaving path, adapted to provide heat to a fluid to be fed into the heat network based on steam from a steam turbine;

[0028] The grid peak-shaving path is suitable for converting or storing a portion of the electricity from the generator into heat for heating the fluid entering the heat network, and / or is suitable for generating electricity based on steam from the high / medium pressure cylinder of the steam turbine and is suitable for using the working fluid after the steam is used to generate work to provide heat for the fluid to be entered into the heat network. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] FIG1 is a schematic diagram of a power grid and heat network peak regulation system according to an exemplary embodiment of the present invention. DETAILED DESCRIPTION

[0030] The following description of the embodiments of the present invention with reference to the accompanying drawings is intended to explain the overall inventive concept of the present invention and should not be construed as limiting the present invention.

[0031] The embodiment of Figure 1 shows an electric and thermal dual peak-shaving system for a coal-fired power unit, including a coal-fired boiler, a high-pressure / medium-pressure cylinder of a steam turbine, a high-back-pressure low-pressure cylinder of a steam turbine, a low-back-pressure low-pressure cylinder of a steam turbine, cold-end equipment, a composite heater 1, a thermal system, a steam injection upgrading device, a heater 2, and a heater 3; a hot water supply 3, a back-pressure electric and heat cogeneration device, a heater 4, an electric thermal energy storage device, a hot water storage tank, a generator, a power grid, a heat network, and connection components.

[0032] In one embodiment of the present invention, the cold end equipment is an air-cooled island (shown as an air-cooled island in the figure) or a condenser. Optionally, the electric thermal energy storage device is an electromagnetic heating boiler, a semiconductor electric boiler, a resistance heating boiler, an electrode boiler, or a solid thermal storage electric boiler.

[0033] In the embodiment shown in FIG1 , a three-level heat network peak shaving path is shown:

[0034] The first-level heating network peak-shaving path: includes the high back-pressure low-pressure cylinder of the unit, the composite heater 1 (i.e., the first heater), the thermal system, the heating network, and the associated pipelines. In the first-level heating network peak-shaving path, the exhaust steam-heating cycle return water heat exchange and the condensate-heating cycle return water heat exchange are used in the heater 1 to heat the heating cycle return water by recovering the waste heat of the turbine exhaust steam. After the heat exchange, the condensate formed by the exhaust steam drops below 60°C and then enters the thermal system. Specifically, referring to Figure 1, the first exhaust steam branch connected to the high back-pressure low-pressure cylinder is connected to the composite heater 1, and the heating cycle return water is suitable for being heated in the composite heater 1 and then returned to the heating network. After the heating cycle return water is heated by exhaust steam in the composite heater 1 based on the first heating network peak-shaving path, the temperature can be in the range of 50-69°C.

[0035] The secondary heating network peak-shaving path includes the unit's high-pressure / intermediate-pressure cylinders, a steam injection upgrading device (i.e., a steam injection device), heater 2 (i.e., a second heater), a thermal system, a heating network, and associated piping. In this secondary heating network peak-shaving path, exhaust steam from the high-pressure / intermediate-pressure cylinders, such as intermediate-pressure steam, is injected into heater 2 via the steam injection upgrading device to utilize the waste heat of the exhaust and exhaust steam for heat supply. After heat exchange, the working medium (which can be steam or condensate) enters the thermal system. Specifically, referring to Figure 1, the second exhaust steam branch connected to the high-back-pressure low-pressure cylinders is connected to the steam injection upgrading device. The first steam branch connected to the high-pressure / intermediate-pressure cylinders of the steam turbine is connected to the steam injection upgrading device to carry exhaust steam from the second exhaust steam branch into heater 2. The heat supply cycle return water is heated in heater 2 and then returned to the heating network. After being heated in heater 2 using exhaust steam and steam based on the secondary heating network peak-shaving path, the heat supply cycle return water can reach a temperature of 70-85°C.

[0036] The three-stage heat network peak-shaving path includes the unit's high-pressure / medium-pressure cylinder, heater 3 (i.e., the third heater), thermal system, heat network, and associated pipelines. In the three-stage heat network peak-shaving path, the exhaust steam from the unit's high-pressure / medium-pressure cylinder is used to further heat the circulating return water, greatly improving the heating capacity and ensuring heating safety. After heat exchange, the working medium (which can be steam or condensate) enters the thermal system. Specifically, referring to Figure 1, the second steam branch connected to the turbine's high-pressure / medium-pressure cylinder is connected to heater 3 (i.e., the third heater), and the heat circulation return water is suitable for being heated in heater 3 and then returned to the heat network. After the heat circulation return water is heated by steam in heater 3 based on the third heat network peak-shaving path, the temperature can be in the range of 85-95°C.

[0037] Based on the above-mentioned heating network peak-shaving paths, different heating network peak-shaving paths can be selected based on the heating demand (assuming it is measured by temperature). When the required temperature is relatively low, only the first-level heating network peak-shaving path can be used; when the required temperature is higher, the first-level and second-level heating network peak-shaving paths can be used at the same time; when the required temperature is even higher, the first-level, second-level and third-level heating network peak-shaving paths can be used at the same time. As can be understood, only the third-level and second-level heating network peak-shaving paths can be used at the same time, or only the second-level or third-level heating network peak-shaving paths can be used, all of which are within the scope of protection of the present invention.

[0038] As previously described, composite heater 1 utilizes a combination of exhaust steam-heating cycle return water and condensate-heating cycle return water to heat the return water, thereby recovering waste heat from turbine exhaust steam for heating. However, the present invention is not limited to this. Heater 1 need not be a composite heater, as long as it is suitable for exchanging heat from exhaust steam to return water from the heating cycle.

[0039] In addition, the heater 1 can also be in the form of a peak cooler. Coal-fired power air-cooled units generally have high back pressure during the high temperature period in summer, which leads to increased coal consumption for power generation and poor operating economy. Therefore, during the high temperature season in summer, the composite heater 1 can be changed to the operating mode of a peak cooler. By adding a mechanical ventilation cooling device to reduce the operating back pressure of the unit, the power generation efficiency is improved, and the coal consumption for power generation during the peak peak-shaving operation of the unit in summer is reduced. That is, the composite heater 1 is also provided with a cooling air inlet and a cooling air outlet, so that the exhaust steam can be cooled by gas when the return water of the heating cycle is not passed into the composite heater 1. In this way, under non-heating conditions, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is connected to the heater 1. The heater 1 is also provided with a cooling air inlet and a cooling air outlet, so that the exhaust steam can be cooled by gas when the return water of the heating cycle is not passed into the heater 1.

[0040] In the embodiment shown in FIG1 , the back-pressure low-pressure cylinder of the steam turbine includes a high back-pressure low-pressure cylinder and a low back-pressure low-pressure cylinder, but the present invention is not limited thereto. Although not shown, it is also possible to provide only a high back-pressure low-pressure cylinder without providing a low back-pressure low-pressure cylinder. In the case where a high back-pressure low-pressure cylinder is provided, as described above, in the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder, and in the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder. In addition, in the present invention, for exhaust steam to be drawn out from the low-pressure cylinder, it may not be a back-pressure low-pressure cylinder, but other types of steam turbine low-pressure cylinders, which is also within the scope of protection of the present invention.

[0041] As shown in FIG1 , the exhaust steam of the high back-pressure low-pressure cylinder is also suitable for communicating with the air-cooling island 1 (i.e., the first air-cooling island).

[0042] As shown in Figure 1, the exhaust steam from the low-back-pressure, low-pressure cylinder is also suitable for communication with air-cooling island 2 (i.e., the second air-cooling island). Although not shown, the exhaust steam from the low-back-pressure, low-pressure cylinder is also suitable for communication with the condenser. When air-cooling islands 1 and 2 are configured, a balancing device, such as a balancing pump, can be installed between them, as shown in Figure 1, to address the problem of uneven water levels in the cold-end device caused by different operating backpressures in the low-pressure cylinders.

[0043] In the present invention, in the embodiment shown in Figure 1, during the heating season, the low-pressure cylinder of the unit operates in high / low dual back pressure to improve the heating capacity, and the exhaust steam pressure range of the high back pressure low-pressure cylinder is 25~35kPa, and the exhaust steam pressure range of the low back pressure low-pressure cylinder is 13~18kPa; during the non-heating season, the unit switches to air-cooled pure condensing condition low back pressure (13~18kPa) operation, for example, only the low back pressure low-pressure cylinder is operated, the exhaust steam pressure range of the low back pressure low-pressure cylinder is 13~18kPa, and the exhaust steam of the low back pressure low-pressure cylinder is connected to the air-cooled island 2 or another condenser.

[0044] Based on the above, this invention proposes a heat network peak-shaving system that utilizes exhaust steam from a single steam turbine in a cascaded manner, combining steam and exhaust steam to meet heating load requirements under varying cold conditions. Based on primary, secondary, and tertiary heat network peak-shaving paths, this system can achieve cascaded utilization of exhaust steam and steam, flexibly meeting the heating load requirements of coal-fired power units under varying cold conditions.

[0045] In the embodiment shown in FIG1 , a two-stage grid peak-shaving path is also shown.

[0046] The primary power grid peak-shaving path: The path includes the unit's high-pressure / medium-pressure cylinders, a combined heat and electricity generation device, and heater 4 (i.e., the fourth heater). Specifically, the third steam branch connected to the turbine's high-pressure / medium-pressure cylinders is connected to the combined heat and electricity generation device, which is suitable for generating electricity. The steam from the third steam branch performs work in the combined heat and electricity generation device to generate electricity, forming a working fluid suitable for heat exchange with heating cycle return water in heater 4. The heating cycle return water is suitable for being heated in heater 4 and then passed into the heating network. Accordingly, the power grid peak-shaving can include the combined heat and electricity generation step: extracting steam from the turbine's high-pressure / medium-pressure cylinders to generate electricity using the combined heat and electricity generation device, and using the working fluid formed after steam power generation to heat the heating cycle return water, and passing the heated heating cycle return water into the heating network. In the present invention, the exhaust steam from the medium-pressure cylinder of the unit is used to drive the back-pressure cogeneration device, and the generated electricity can be directly incorporated into the plant power system. The exhaust steam from the back-pressure cogeneration device enters the heater 4, and the working medium (which can be steam or condensate) enters the thermal system after heat exchange. The safety and flexibility of the deep peak regulation of the coal-fired power unit are enhanced through the cascade utilization of medium-pressure steam, the plant power consumption rate is reduced, and the energy loss of direct heating is reduced.

[0047] Secondary grid peak-shaving path: The path includes the generator of the unit, the electric thermal energy storage device (in the figure, the electric heating device and the hot water storage tank). Specifically, in the present invention, a portion of the electricity from the generator is suitable for being converted into heat storage in the electric thermal energy storage device, and the stored heat is suitable for entering the heating network via water. Accordingly, the grid peak-shaving may include an electric thermal energy storage step: converting a portion of the electricity from the generator into heat storage in the electric thermal energy storage device, and the stored heat is suitable for entering the heating network via water. In an embodiment of the present invention, the electric thermal energy storage device is designed to consume electricity that is at least the electricity generated by the generator at the minimum load of the boiler in stable operation without combustion support; or the electric thermal energy storage device is designed to consume electricity that is the electricity generated by the generator at at least 20% of the rated load of the boiler. More specifically, during periods of low grid power demand, the present invention converts electricity into heat energy through an electric thermal energy storage device configured at 20% capacity, which is then stored as hot water (75-98°C). This allows the coal-fired power unit to achieve full-load peak-shaving capability of 0-100%, while maintaining stable operation of the coal-fired boiler at 20% of its rated load without combustion support. The heat release process is achieved by adjusting the flow rate of hot water 4 (70-95°C) to meet actual heating demand.

[0048] The present invention also proposes a method for controlling electric and thermal dual peak-shaving: during the heating season, according to the peak-shaving demands of the heating network and the power grid and the optimal comprehensive energy utilization efficiency, a flexible combination of the primary, secondary, and tertiary heating network peak-shaving paths and the primary and secondary power grid peak-shaving paths is selected. For example: when the heating load demand is low, a combination of the primary and secondary heating network peak-shaving paths is adopted; when the heating load demand is large or there is a fault in the other paths, a third-level heating network peak-shaving path is adopted; when the power demand of the power grid does not fluctuate much, a combination of the primary and secondary power grid peak-shaving paths is adopted; when the power demand of the power grid is low, a second-level power grid peak-shaving path is adopted to achieve deep peak-shaving with zero power generation load. When the power grid peak-shaving system is in operation for a long time, the heat network peak-shaving path to be put into operation is determined based on the actual heating load demand.

[0049] In addition, when the unit's low-pressure cylinder is operating with high / low dual back pressure, a balancing device (such as a balancing pump) is used to solve the problem of unbalanced water levels in the cold-end device caused by different back pressures in the low-pressure cylinder.

[0050] Based on the above, the present invention proposes the following innovative solutions:

[0051] 1. A power grid peak-shaving system that is deeply coupled with a heat network peak-shaving system, a heat storage system, and a back-pressure combined heat and power generation device is proposed. This system can achieve a 0-100% full-load peak-shaving capability for coal-fired power units, breaking the "heat-to-electricity" operating mode of high-back-pressure coal-fired power units and solving the problem of inability to flexibly adjust the peak load when the units are supplying heat.

[0052] 2. A cascaded heat network peak-shaving system based on double back-pressure control of exhaust steam and steam from a single steam turbine is proposed to meet the heating load requirements under different cold conditions.

[0053] 3. It has a control method that can simultaneously operate and flexibly switch the peak load of the power grid and the peak load of the heat network, relieve the constraints of the heat load on the electric load, avoid the increase in coal consumption during traditional thermal power decoupling, and improve the comprehensive energy utilization efficiency.

[0054] Based on the technical solution of the present invention, the present invention has at least one of the following technical effects:

[0055] 1. The heat network peak-shaving system with cascaded utilization of exhaust steam and steam can flexibly meet the heating load requirements of coal-fired power units under different cold conditions.

[0056] 2. The deep coupling of the heat network peak-shaving system and the power grid peak-shaving system realizes the 0-100% full-load peak-shaving capability of coal-fired power units, breaks the "heat-to-electricity" operation mode of high back-pressure units, and solves the problem of inability to flexibly adjust the peak when the units are supplying heat.

[0057] 3. Through the electric-thermal dual peak-shaving control method of the power grid peak-shaving system and the heat network peak-shaving system, the constraints of the thermal load on the electric load are removed, the increase in coal consumption during traditional thermal-electric decoupling is avoided, and the comprehensive energy utilization efficiency is improved.

[0058] Based on the above, the present invention proposes the following technical solutions:

[0059] 1. A power grid peak regulation system, comprising:

[0060] Units, including boilers, turbine high-pressure / intermediate-pressure cylinders, and generators;

[0061] heater;

[0062] The power grid peak-shaving system includes the following two-level power grid peak-shaving paths:

[0063] First grid peak-shaving path: A third steam branch connected to the high-pressure / intermediate-pressure cylinders of the steam turbine is connected to a combined heat and power generation device. The combined heat and power generation device is suitable for generating electricity. Steam from the third steam branch performs work in the combined heat and power generation device to generate a working fluid suitable for heat exchange with heat supply cycle return water in a heater. The heat supply cycle return water is suitable for being heated in a fourth heater and then fed into the heat network.

[0064] The second grid peak shaving path includes an electrothermal energy storage device, in which a portion of the electricity from the generator is suitable for being converted into heat storage, and the stored heat is suitable for entering the heating network via water.

[0065] 2. The power grid peak-shaving system according to item 1, wherein:

[0066] A portion of the electricity from the generator is used to heat the heating cycle return water in the electric thermal energy storage device.

[0067] 3. The power grid peak-shaving system according to item 1, wherein:

[0068] The cogeneration device is a back-pressure cogeneration device, and the electricity generated by the back-pressure cogeneration device is suitable for being incorporated into the factory power system.

[0069] 4. The power grid peak-shaving system according to item 1, wherein:

[0070] The electric thermal energy storage device includes an electric heating device and a water storage device. Part of the electricity from the generator is suitable for heating water in the electric heating device, the heated water is suitable for being stored in the water storage device, and the water from the water storage device is suitable for being fed into the heating network.

[0071] 5. The power grid peak-shaving system according to item 1, wherein:

[0072] The electric thermal energy storage device is designed to consume at least as much electricity as the generator would produce when the boiler is operating stably without combustion support at a minimum load; or

[0073] The electric thermal energy storage device is designed to consume electricity generated by the generator when the boiler is at least 20% of the rated load.

[0074] 6. The power grid peak-shaving system according to item 1, wherein:

[0075] The first grid peak shaving path is configured so that the return water of the heating cycle is heated to a temperature in the range of 70-95° C.; and / or

[0076] The second grid peak shaving path is configured so that the temperature of water entering the heating network is in the range of 70-95°C.

[0077] 7. The power grid peak shaving system according to any one of 1 to 6, wherein:

[0078] The heater is a fourth heater;

[0079] The unit also includes a steam turbine low-pressure cylinder; and

[0080] The power grid peak-shaving system includes at least one level of the following heat network peak-shaving path:

[0081] The first heating network peak shaving path: the first exhaust steam branch connected to the low-pressure cylinder is connected to the first heater, and the heating cycle return water is suitable for being heated in the first heater and then returned to the heating network;

[0082] The second heat network peak shaving path: the second exhaust steam branch connected to the low-pressure cylinder is connected to the steam injection device, and the first steam branch connected to the high-pressure / intermediate-pressure cylinder of the steam turbine is connected to the steam injection device to carry the exhaust steam from the second exhaust steam branch into the second heater. The heat supply cycle return water is suitable for being heated in the second heater and then returned to the heat network;

[0083] The third heating network peak-shaving path: the second steam branch connected to the high-pressure / medium-pressure cylinder of the turbine is connected to the third heater, and the heating cycle return water is suitable for being heated in the third heater and then returned to the heating network.

[0084] 8. The power grid peak-shaving system according to item 7, wherein:

[0085] The first heater is a composite heater that utilizes exhaust steam-heating cycle return water heat exchange and condensed water-heating cycle return water heat exchange.

[0086] 9. The power grid peak-shaving system according to 8, wherein:

[0087] The first heater is further provided with a cooling air inlet and a cooling air outlet, so as to utilize gas to cool the exhaust steam when the return water of the heating cycle is not passed into the first heater.

[0088] 10. The power grid peak-shaving system according to item 7, wherein:

[0089] The low-pressure cylinder of the steam turbine includes a high back-pressure low-pressure cylinder;

[0090] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0091] In the second heating network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder.

[0092] 11. The power grid peak regulation system according to 10, wherein:

[0093] The exhaust steam of the high back pressure low pressure cylinder is also suitable for communicating with the first air cooling island or the first condenser.

[0094] 12. The power grid peak-shaving system according to 10, wherein:

[0095] The low-pressure cylinder of the steam turbine also includes a low-back-pressure low-pressure cylinder, and the exhaust steam of the low-back-pressure low-pressure cylinder is suitable for communicating with the second air-cooling island or the second condenser.

[0096] 13. A control method for a power grid peak regulation system according to any one of 1 to 6, comprising at least one of the following steps:

[0097] Combined heat and power generation step: extracting steam from the high-pressure / intermediate-pressure cylinder of the steam turbine to generate electricity using the combined heat and power generation device, and using the working fluid generated after the steam power generation to heat the heat supply circulating return water, and passing the heated heat supply circulating return water into the heat supply network; and

[0098] Electric thermal energy storage step: convert part of the electricity from the generator into heat storage in the electric thermal energy storage device, and the stored heat is suitable for entering the heating network through water.

[0099] 14. The method according to 13, further comprising the steps of:

[0100] The electric power consumed by the electric thermal energy storage device is at least equal to the electric power generated by the generator when the boiler is operating stably without combustion support at the minimum load; or

[0101] The electric power consumed by the electric thermal energy storage device is the electric power generated by the generator when the boiler is at least 20% of the rated load.

[0102] 15. The method according to 13, wherein the power grid peak-shaving system is the power grid peak-shaving system according to any one of 7-12, wherein:

[0103] The method comprises at least one of the following steps: utilizing exhaust steam for heating based on a first heat network peak shaving path; utilizing exhaust steam and steam for heating based on a second heat network peak shaving path; and

[0104] Steam heating is used based on the peak-shaving path of the third heating network.

[0105] 16. The method according to 15, wherein:

[0106] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;

[0107] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0108] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0109] The method comprises the steps of:

[0110] During the heating season, the high back pressure low pressure cylinder and the low back pressure low pressure cylinder operate with dual back pressure. The exhaust pressure range of the high back pressure low pressure cylinder is 25~35kPa, and the exhaust pressure range of the low back pressure low pressure cylinder is 13~18kPa.

[0111] 17. The method according to 16, further comprising the following steps:

[0112] Utilize exhaust steam for heating based on the peak load regulation path of the first heating network;

[0113] Utilize exhaust steam and steam for heating based on the peak-shaving path of the second heating network;

[0114] Steam heating is used based on the peak-shaving path of the third heating network.

[0115] 18. The method according to 15, wherein:

[0116] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;

[0117] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0118] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0119] The method comprises the steps of:

[0120] In non-heating conditions, only the low back pressure low pressure cylinder is in operation, the exhaust steam pressure range of the low back pressure low pressure cylinder is 13 ~ 18kPa, and the exhaust steam of the low back pressure low pressure cylinder is connected to the second air cooling island or the second condenser.

[0121] 19. The method according to item 15, wherein:

[0122] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;

[0123] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0124] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;

[0125] The method comprises the steps of:

[0126] In non-heating conditions, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is connected to the first heater. The first heater is also provided with a cooling air inlet and a cooling air outlet to use gas to cool the exhaust steam when the heating cycle return water does not pass into the first heater.

[0127] 20. The method according to item 15, wherein:

[0128] The return water of the heating cycle is heated by exhaust steam in the first heater based on the peak-shaving path of the first heating network, and the temperature is in the range of 50-69°C;

[0129] The return water of the heating cycle is heated by exhaust steam and steam in the second heater based on the peak regulation path of the second heating network, and the temperature is in the range of 70-85℃;

[0130] The return water of the heating cycle is heated by steam in the third heater based on the peak regulation path of the third heating network, and the temperature is in the range of 85-95°C.

[0131] 21. A power grid peak regulation system, comprising:

[0132] Generator sets, including boilers, steam turbines, and generators;

[0133] A heat network peak shaving path, adapted to provide heat to a fluid to be fed into the heat network based on steam from a steam turbine;

[0134] The grid peak-shaving path is suitable for converting or storing a portion of the electricity from the generator into heat for heating the fluid entering the heat network, and / or is suitable for generating electricity based on steam from the high / medium pressure cylinder of the steam turbine and is suitable for using the working fluid after the steam is used to generate work to provide heat for the fluid to be entered into the heat network.

[0135] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made to the embodiments and combinations of elements may be made without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A power grid peak load regulation system, include: Units, including boilers, turbine high / medium pressure cylinders, and generators; Heater; The power grid peak-shaving system includes the following two-level power grid peak-shaving paths: First grid peak load path: the third steam branch connected to the high-pressure / medium-pressure cylinder of the steam turbine is connected to the combined heat and electricity generation device, the combined heat and electricity generation device is suitable for power generation, the steam from the third steam branch performs work in the combined heat and electricity generation device to form a working fluid suitable for heat exchange with the heat supply cycle return water in the fourth heater, and the heat supply cycle return water is suitable for being heated in the fourth heater and then introduced into the heat network; The second grid peak load path includes an electric thermal energy storage device, in which a portion of the electricity from the generator is suitable for being converted into heat storage, and the stored heat is suitable for entering the heat network via water.

2. The power grid peak load regulation system according to claim 1, in: A portion of the electricity from the generator is used to heat the heating cycle return water in the electric thermal energy storage device.

3. The power grid peak load regulation system according to claim 1, in: The cogeneration device is a back-pressure cogeneration device, and the electricity generated by the back-pressure cogeneration device is suitable for being incorporated into the factory power system.

4. The power grid peak load regulation system according to claim 1, in: The electric thermal energy storage device comprises an electric heating device and a water storage device, a part of the electricity from the generator is suitable for heating water in the electric heating device, the heated water is suitable for being stored in the water storage device, and the water from the water storage device is suitable for being introduced into the heating network.

5. The power grid peak load regulation system according to claim 1, in: The electric thermal energy storage device is designed to consume at least the power generated by the generator under the minimum load of the boiler in stable operation without combustion support; or The electric thermal energy storage device is designed to consume electricity generated by the generator at a boiler load of at least 20%.

6. The power grid peak load regulation system according to claim 1, in: The first power grid peak load path is set so that the return water of the heating cycle is heated to a range of 70-95°C; and / or The second grid peak load path is configured so that the temperature of water entering the heating network is in the range of 70-95°C.

7. The power grid peak load regulation system according to any one of claims 1 to 6, in: The heater is a fourth heater; The unit also includes a steam turbine low-pressure cylinder; and The power grid peak-shaving system includes at least one primary heat network peak-shaving path in the following paths: The first heat network peak load path: the first exhaust steam branch connected to the low-pressure cylinder is connected to the first heater, and the return water of the heating cycle is suitable for returning to the heat network after being heated in the first heater; The second heat network peak load path: the second exhaust steam branch connected to the low pressure cylinder is connected to the steam injection device, the first steam branch connected to the high pressure / medium pressure cylinder of the steam turbine is connected to the steam injection device to carry the exhaust steam from the second exhaust steam branch into the second heater, and the heat supply cycle return water is suitable for being heated in the second heater and then returned to the heat network; The third heating network peak-shaving path: the second steam branch connected to the high-pressure / medium-pressure cylinder of the steam turbine is connected to the third heater, and the heating cycle return water is suitable for being heated in the third heater and then returned to the heating network.

8. The power grid peak load regulation system according to claim 7, in: The first heater is a composite heater that utilizes exhaust steam-heating cycle return water heat exchange and condensed water-heating cycle return water heat exchange.

9. The power grid peak load regulation system according to claim 8, in: The first heater is also provided with a cooling air inlet and a cooling air outlet, so as to utilize gas to cool the exhaust steam when the return water of the heating cycle is not passed into the first heater.

10. The power grid peak load regulation system according to claim 7, in: The steam turbine low-pressure cylinder includes a high back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heating network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder.

11. The power grid peak load regulation system according to claim 10, in: The exhaust steam of the high back pressure low pressure cylinder is also suitable for communicating with the first air cooling island or the first condenser.

12. The power grid peak load regulation system according to claim 10, in: The steam turbine low-pressure cylinder also includes a low back-pressure low-pressure cylinder, and the exhaust steam of the low back-pressure low-pressure cylinder is suitable for communicating with the second air-cooling island or the second condenser.

13. A control method for a power grid peak load regulation system according to any one of claims 1 to 6, comprising at least one of the following steps: Combined heat and power generation step: extracting steam from the high-pressure / medium-pressure cylinder of the steam turbine to generate electricity using the combined heat and power generation device, and using the working fluid generated after the steam is generated to heat the heat supply cycle return water, and passing the heated heat supply cycle return water into the heat network; and Electric thermal energy storage step: convert part of the electricity from the generator into heat storage in the electric thermal energy storage device, and the stored heat is suitable for entering the heating network via water.

14. The method according to claim 13, further comprising the steps of: The electric power consumed by the electric thermal energy storage device is at least equal to the electric power generated by the generator under the minimum load of the boiler in stable operation without combustion support; or The electric power consumed by the electric thermal energy storage device is the electric power generated by the generator when the boiler is at least 20% of the rated load.

15. The method according to claim 13, wherein the power grid peak shaving system is the power grid peak shaving system according to any one of claims 7 to 12, in: The method comprises at least one of the following steps: utilizing exhaust steam for heating based on a first heat network peak shaving path; utilizing exhaust steam and steam for heating based on a second heat network peak shaving path; and utilizing steam for heating based on a third heat network peak shaving path.

16. The method according to claim 15, in: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: During the heating season, the high back pressure low pressure cylinder and the low back pressure low pressure cylinder operate with dual back pressure. The exhaust pressure range of the high back pressure low pressure cylinder is 25-35kPa, and the exhaust pressure range of the low back pressure low pressure cylinder is 13-18kPa.

17. The method according to claim 16, further comprising the steps of: Utilize exhaust steam for heating based on the peak load regulation path of the first heat network; Utilize exhaust steam and steam for heating based on the peak load regulation path of the second heat network; Steam heating is used based on the peak-shaving path of the third heating network.

18. The method according to claim 15, in: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: Under non-heating conditions, only the low back pressure low pressure cylinder is in operation, the exhaust steam pressure range of the low back pressure low pressure cylinder is 13-18 kPa, and the exhaust steam of the low back pressure low pressure cylinder is connected to the second air cooling island or the second condenser.

19. The method according to claim 15, in: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: In non-heating conditions, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is connected to the first heater. The first heater is also provided with a cooling air inlet and a cooling air outlet to utilize gas to cool the exhaust steam when the heating cycle return water does not pass into the first heater.

20. The method according to claim 15, in: The return water of the heating cycle is heated by exhaust steam in the first heater based on the peak load path of the first heating network, and the temperature is in the range of 50-69°C; The return water of the heating cycle is heated by exhaust steam and steam in the second heater based on the peak load path of the second heating network, and the temperature is in the range of 70-85℃; The return water of the heating cycle is heated by steam in the third heater based on the peak-shaving path of the third heating network, and the temperature is in the range of 85-95°C.

21. A power grid peak load regulation system, include: Units, including boilers, turbines, and generators; A heat network peak load regulation path, adapted to provide heat for a fluid to be fed into the heat network based on steam from a steam turbine; A grid peak-shaving path is suitable for converting or storing a portion of the electricity from the generator into heat for heating the fluid entering the thermal network, and / or is suitable for generating electricity based on steam from the high / medium pressure cylinder of the steam turbine and is suitable for using the steam to generate electricity to provide heat for the fluid to be entered into the thermal network.

Citation Information

Patent Citations

  • Thermal power plant thermoelectric decoupling system

    CN108301883A

  • Thermoelectric decoupling system and method combining low back pressure cylinder switching and high back pressure

    CN112228173A

  • Power grid peak regulation system and control method thereof

    CN117404148A

  • System for utilize bypass to realize thermoelectric decoupling zero and fast speed adjusting peak

    CN208073573U

  • Steam turbine power plant and operation method thereof

    US20100326074A1

Cited By

  • Steam sensible heat cascade storage combined heat and power generation peak regulation system and working method

    CN119554106A

  • A steam sensible heat cascade storage combined heat and power peak shaving system and working method

    CN119554106B

  • Deep peak regulation system provided with steam ejector and heat storage device and operation method

    CN119593824A

  • A deep peak shaving system configured with a steam ejector and a heat storage device and an operation method thereof