Robot multi-task operation planning method and system and use thereof

By using task trajectory to simulate the boundaries of the automatic work area in large-scale work areas, the robot deployment process is simplified, the cumbersome and cost problems of the deployment process are solved, and efficient automatic work application is achieved.

WO2024239814A1PCT designated stage expired Publication Date: 2024-11-28HUIZHI ROBOT TECHNOLOGY (SHENZHEN) CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/086802
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-22
Filing Date
2024-04-09
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

In large-scale operation areas, the deployment process of robot automatic operations is cumbersome, which requires a lot of cost and time to build maps and mark obstacles, and has high requirements for operators, which limits the wide range of robot applications.

Method used

By determining the preset robot and work surface, filtering and combining task sets, using the work trajectory to simulate the boundaries of the automatic work area, and performing path planning and automatic work, the complexity of map construction and path setting is reduced.

Benefits of technology

It realizes automatic operation deployment in large-scale operation areas, reduces costs and time expenditures, simplifies operation processes, and gives full play to the advantages of non-automatic operations and automatic operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024086802_28112024_PF_FP_ABST
    Figure CN2024086802_28112024_PF_FP_ABST
Patent Text Reader

Abstract

Provided in the present invention are a robot multi-task operation planning method and system and the use thereof. The method comprises: determining a first robot and a surface to be operated; screening and combining task sets capable of simulating the boundary of an automatic operation region; screening for one or more task sets as preliminary task sets, and configuring a trajectory task for each task; executing corresponding trajectory tasks while executing the preliminary task sets and, on the basis of the collected working trajectories, finally fitting one or more complete and closed boundary lines; and making the robot perform trajectory planning and automatic operation within the boundary line. The solution of the present invention fully leverages the coordination of tasks between working regions, and utilizes the working trajectories of other tasks to create related region information before the robot automatically operates, thereby completing the deployment of the robot without the need for tedious dedicated deployment processes such as mapping, editing, and path setting.
Need to check novelty before this filing date? Find Prior Art

Description

A robot multi-task operation planning method, system and application thereof Technical Field

[0001] The present invention relates to the field of robot multi-task operation planning, and in particular to a robot multi-task operation planning method, system and application thereof. Background Art

[0002] A robot is a machine that performs tasks autonomously, either under human command or following pre-programmed instructions. In modern industry, a robot refers to a man-made machine capable of performing tasks autonomously, replacing or assisting humans. These devices are typically electromechanical, controlled by computer programs or electronic circuits. Robots perform tasks that replace or assist humans, such as in manufacturing and construction, or in hazardous occupations. With the advancement of mobile robot technology, their application is expanding across various industries and scenarios.

[0003] Autonomous robot operations generally require a clear operating area for path planning. Creating and editing maps in advance, and planning the operating area and operating plan are all steps involved in deployment. Deployment is crucial for autonomous robot operations. Without a map as a guide, it's difficult for a robot to complete autonomous operations within a designated area. The deployment process is often cumbersome, requiring tasks like map building and path setting. This is especially true in large areas, such as shopping malls and large farmlands, where the operating area is vast and the terrain is complex. Automatic robot operations (such as automated cleaning and harvesting) require significant costs for map building and obstacle marking, and place high demands on both deployment and operator personnel. Therefore, in large operating areas, the initial preparations for robots are extremely cumbersome, severely limiting their application.

[0004] In existing technology, some solutions utilize a teach-and-play approach to deploy robots. This approach requires the operator to demonstrate a complete path, allowing the robot to learn the operator's path and repeat the same path, thereby simplifying the deployment process. However, in large work areas, requiring the operator to fully demonstrate the entire work path is extremely time-consuming and requires a certain level of operator skill.

[0005] Summary of the Invention

[0006] In view of this, the present invention proposes a robot multi-task operation planning method, system and application thereof, the specific scheme is as follows:

[0007] In the first part, the present invention proposes a robot multi-task operation planning method, which includes:

[0008] Determining a preset first robot and a preset surface to be operated, and defining an area of ​​the surface to be operated where the first robot is required to automatically complete a preset first type of operation as an automatic operation area;

[0009] Screening out tasks that need to be performed on the waiting operation surface and involve the boundary of the automatic operation area, and combining all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when it is executed;

[0010] Based on the execution status and operation types of tasks in each task set and the simulation of the automatic operation area boundary, one or more task sets are selected as the preliminary task set, and a trajectory task is configured for each task in the preliminary task set to collect the work trajectory during the task execution;

[0011] While executing the preliminary task set, the corresponding trajectory task is executed, the collected work trajectory is projected onto the surface to be worked on to obtain a work path, and one or more complete and closed boundary lines are fitted based on the work path. The area enclosed by the boundary lines is the simulated automatic working area;

[0012] The first robot is enabled to perform path planning in the simulated automatic operation area and automatically complete the operation of the first operation type in the automatic operation area.

[0013] In a specific embodiment, a task related to the first job type is defined as a first task;

[0014] Determine whether there is a first task in the previous task set;

[0015] If the first task does not exist, arranging the operation of the first operation type for the area of ​​the surface to be operated except the automatic operation area;

[0016] If there is a first task, a first operation area in which the operation has been completed is constructed based on the work trajectory of the first task, and the operation of the first operation type is arranged for the area of ​​the surface to be operated except the automatic operation area and the first operation area.

[0017] In a specific embodiment, after the automatic operation is completed, the operation effect of the automatic operation area is detected;

[0018] If there is an area where the operation effect is not good, a task of performing the first operation type in this area is constructed.

[0019] In a specific embodiment, if the equipment involved in a task needs to be active on the waiting working surface, then:

[0020] A preset trajectory tracking device is configured on the device to collect the working trajectory, and the trajectory of the device is used as the working trajectory of the task.

[0021] In a specific embodiment, if the equipment involved in a task is not active on the surface to be operated, and the equipment relies on the user to move on the surface to be operated, then:

[0022] A preset trajectory tracking device is configured on the user to collect the work trajectory, and the user's activity trajectory is used as the work trajectory of the task.

[0023] In the second part, the present invention proposes a robot multi-task operation planning system, which includes: a preliminary preparation unit for determining a preset first robot and a preset surface to be operated, and defining an area of ​​the surface to be operated where the first robot is required to automatically complete a preset first operation type as an automatic operation area;

[0024] a task screening unit, configured to screen out tasks that need to be performed on the surface to be operated and involve the boundary of the automatic operation area, and to combine all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when executed;

[0025] The task allocation unit is used to comprehensively consider the execution status and operation types of tasks in each task set and the simulation of the boundary of the automatic operation area, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set to collect the work trajectory when the task is executed;

[0026] a task execution unit, configured to execute corresponding trajectory tasks while executing the previous task set, project the collected work trajectory onto the surface to be worked to obtain a work path, and fit one or more complete and closed boundary lines based on the work path. The area enclosed by the boundary lines is the simulated automatic working area;

[0027] The automatic operation unit is used to enable the first robot to plan a path in a simulated automatic operation area and automatically complete the operation of the first operation type in the automatic operation area.

[0028] In a specific embodiment, it also includes:

[0029] a non-automatic operation unit, configured to define a task involving the first operation type as a first task; determine whether the first task exists in the previous task set; and if the first task does not exist, arrange an operation of the first operation type for an area of ​​the surface to be operated other than the automatic operation area;

[0030] If there is a first task, a first operation area of ​​completed work is constructed based on the work trajectory of the first task, and the first operation type of work is arranged for the area of ​​the surface to be worked on except the automatic operation area and the first operation area. The robot multi-task operation planning system also includes:

[0031] The operation detection unit is used to detect the operation effect of the automatic operation area after completing the automatic operation; if there is an area with poor operation effect, a task of performing the first operation type in this area is constructed.

[0032] In the third part, the present invention proposes a cleaning method, which adopts the robot multi-task operation planning method described in any one of the first parts, and the cleaning method includes:

[0033] Determining a preset cleaning robot and a preset surface to be cleaned, and defining an area of ​​the surface to be cleaned where the cleaning robot is required to automatically complete a preset first cleaning type as an automatic cleaning area;

[0034] Screening out tasks that need to be performed on the surface to be cleaned and involve the boundary of the automatic cleaning area, and combining all task sets that can simulate the boundary of the automatic cleaning area according to the activity range of each task when it is performed;

[0035] Based on the execution status and job types of tasks in each task set and the simulation of the boundary of the automatic cleaning area, one or more task sets are selected as the preliminary task set, and a trajectory task is configured for each task in the preliminary task set to collect the work trajectory during the task execution;

[0036] While executing the preliminary task set, the corresponding trajectory task is executed, the collected working trajectory is projected onto the surface to be cleaned to obtain a working path, and one or more complete and closed boundary lines are fitted based on the working path. The area enclosed by the boundary lines is the simulated automatic cleaning area;

[0037] The cleaning robot is enabled to perform path planning in the simulated automatic cleaning area and automatically complete the first cleaning type of operation in the automatic cleaning area.

[0038] In a specific embodiment, the cleaning equipment involved in the task includes a floor scrubber and / or a floor sweeper.

[0039] In the fourth part, the present invention proposes an aerial work method, which adopts the robot multi-task work planning method described in any one of the first parts, and the aerial work method includes:

[0040] Determining a preset flying robot and a preset surface to be operated, and defining an area of ​​the surface to be operated where the flying robot is required to automatically complete a preset first type of operation as an automatic flight zone;

[0041] Screening out tasks that need to be performed on the waiting operation surface and involve the boundary of the automatic flight zone, and combining all task sets that can simulate the boundary of the automatic flight zone according to the activity range of each task when executed;

[0042] Comprehensively considering the execution status and operation types of tasks in each task set and the simulation of the automatic flight zone boundary, one or more task sets are selected as the preliminary task set, and a trajectory task is configured for each task in the preliminary task set to collect the flight trajectory during the execution of the task;

[0043] While executing the preliminary task set, the corresponding trajectory task is executed, the collected flight trajectory is projected onto the surface to be operated to obtain a flight path, and one or more complete and closed boundary lines are fitted based on the flight path. The area enclosed by the boundary lines is the simulated automatic flight area;

[0044] The flying robot is enabled to perform path planning in the simulated automatic flight area and automatically complete the operation of the first operation type in the automatic flight area.

[0045] Beneficial Effects: This invention provides a method, system, and application for planning multi-task robotic operations. By leveraging the coordinated relationships between tasks within a work area, the system utilizes the work trajectories of other tasks to create relevant regional information before the robot begins autonomous operation, thereby completing the robot's deployment process. Compared to existing technologies, this method eliminates the need for specialized and tedious deployment processes such as map creation, editing, and path setting, nor does it require complex operations such as selecting tasks, confirming locations, and initiating tasks. It fully leverages the advantages of both non-automatic and automated operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] FIG1 is a flow chart of a robot multi-task operation planning method according to an embodiment of the present invention;

[0047] FIG2 is a schematic diagram of the boundary of the automatic operation area according to an embodiment of the present invention;

[0048] 3 is a schematic diagram of a robot multi-task operation planning system module according to an embodiment of the present invention;

[0049] FIG4 is a flow chart of a cleaning method according to an embodiment of the present invention;

[0050] FIG5 is a flow chart of an aerial operation method according to an embodiment of the present invention.

[0051] Figure numerals: 1-preliminary preparation unit; 2-task screening unit; 3-task allocation unit; 4-task execution unit; 5-automatic operation unit. DETAILED DESCRIPTION

[0052] Hereinafter, various embodiments of the present disclosure will be described more fully. The present disclosure may have various embodiments, and modifications and variations may be made therein. However, it should be understood that there is no intention to limit the various embodiments of the present disclosure to the specific embodiments disclosed herein, but rather that the present disclosure should be construed to encompass all modifications, equivalents, and / or alternatives falling within the spirit and scope of the various embodiments of the present disclosure.

[0053] Example 1

[0054] Embodiment 1 of the present invention discloses a method for planning multi-task operations for robots. This method leverages the coordination relationships between tasks within a work area and uses the work trajectories of other tasks to create area information before the robot automatically performs its work. This method leverages the advantages of both manual and automated operations. The specific process is shown in Figure 1 of the specification. The specific solution is as follows:

[0055] A robot multi-task operation planning method, the planning method comprising:

[0056] 101. Determine a preset first robot and a preset surface to be operated, and define an area of ​​the surface to be operated where the first robot is required to automatically complete a preset first operation type as an automatic operation area;

[0057] 102. Filter out tasks that need to be performed on the surface to be operated and involve the boundary of the automatic operation area, and combine all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when it is executed;

[0058] 103. Comprehensively considering the execution status and operation types of tasks in each task set and the simulation status of the automatic operation area boundary, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set to collect the work trajectory during the task execution;

[0059] 104. While executing the previous task set, execute the corresponding trajectory task, project the collected work trajectory onto the work surface to obtain the work path, and fit one or more complete and closed boundary lines based on the work path. The area enclosed by the boundary lines is the simulated automatic operation area;

[0060] 105. Enable the first robot to perform path planning in the simulated automatic operation area, and automatically complete the operation of the first operation type in the automatic operation area;

[0061] 106. After the automatic operation is completed, the operation effect of the automatic operation area is detected; if there is an area with poor operation effect, a task of performing the first operation type is constructed in this area.

[0062] The robot multi-task operation planning method of this embodiment, multi-task can refer to a single manual and automatic combination, as well as multiple manual and automatic combinations. It is suitable for scenarios where the work area is large and it is inconvenient to build a map. In these work areas, there are often various tasks, and the robot's automatic operation is just one of them. For example, in a large shopping mall, the robot multi-task operation planning method of this embodiment can be applied to cleaning work. The robot performs floor cleaning work. Before the automatic operation, the trajectory of work such as wiping walls and escalators is recorded to set the area to be cleaned.

[0063] 101. Determine a preset first robot and a preset surface to be operated. Define the area within the surface to be operated where the first robot is required to automatically complete a preset first operation type as an automatic operation zone. The automatic operation zone is the area to be solved. Once the boundaries of the automatic operation zone are determined, the robot can automatically perform path planning. The surface to be operated is large, making it difficult to create a map, and has different operational requirements. The first robot is responsible for performing the automatic operation tasks. The first operation type is the operation performed by the first robot. For example, if the first robot is a sweeping robot, the first operation type is sweeping. The surface to be operated and the first robot can be set according to the specific application scenario. For example, the surface to be operated is an entire field to be harvested, the first robot is an automatic harvester, and the first operation type is harvesting a specific crop without manual operation. Using the robot multi-task operation planning method of this embodiment, weeding the edge of the field can be performed before automatic harvesting to establish the boundaries for automatic harvesting.

[0064] 102. Filter out tasks that need to be performed on the surface to be operated and involve the boundaries of the automatic operation area, and combine all task sets that can simulate the boundaries of the automatic operation area based on the range of activity when each task is executed. There are multiple tasks involved in the surface to be operated, and these tasks are necessary to be performed. There are not many requirements for the execution order of the tasks, so multiple task sets can be flexibly set. The solution of this embodiment requires recording the relevant work trajectories while performing certain tasks, and then deducing the boundaries of the automatic operation area of ​​the first robot. For example, when wiping the floor of a shopping mall, the tasks include wiping the walls, cleaning the trash cans, and repairing equipment.

[0065] The diversity of tasks means that a variety of task sets can be combined. A task set can be understood as a plan for achieving a specific effect. Each task set represents a plan, and the results and execution of each plan vary. In this embodiment, each task set can simulate the boundaries of the automated operation zone. However, there will be discrepancies between the simulation and the execution of the task, necessitating the selection of the optimal plan for execution.

[0066] Among the numerous tasks, select those that are executed on the work surface and involve the boundaries of the automated operation zone. The solution of this embodiment requires sorting out the boundaries of the automated operation zone from the work trajectories involved in these tasks, so it is necessary to select tasks that involve the boundaries of the automated operation zone. The screening rules can be pre-set. The boundaries of the automated operation zone often have a general area. Tasks can be selected manually, or the scope of an area can be set in advance to include tasks involving that area. First, the robot requires a precise boundary. Previous boundary ranges were fuzzy, and only simulated boundaries are precise boundaries. It should be noted that the boundary of the automated operation zone is not limited to a single closed curve at the outer edge; the boundary can be multiple closed curves. As shown in the scenario in Figure 2, the automated operation zone has three closed boundary lines, including two boundary lines at the inner edge and one boundary line at the outer edge. In actual applications, there are often areas within the work area where automated operations are not required, such as areas for storing equipment. Therefore, the automated operation zone not only has boundary lines at the outer edge, but also boundary lines at the inner edge.

[0067] Furthermore, tasks involving the first operation type are defined as first tasks. Some tasks may have multiple task types. For example, cleaning the floor may involve sweeping, mopping, disinfecting, and other types. The solution of this embodiment needs to filter out the parts involving the first operation type, and perform trajectory monitoring on the content of the first task involving the first operation type to avoid duplication of work and reduce work efficiency. Therefore, it is necessary to determine whether the first task exists in the previous task set; if the first task does not exist, then arrange the first operation type of operation for the area of ​​the surface to be operated except the automatic operation area; if the first task exists, then construct the first operation area that has completed the operation based on the work trajectory of the first task, and arrange the first operation type of operation for the area of ​​the surface to be operated except the automatic operation area and the first operation area. In addition to the automatic operation area, there are other areas on the surface to be operated, and the first robot needs to set a certain safety distance when working automatically. Therefore, it is necessary to set tasks for the areas outside the automatic operation area to fully complete the work on the surface to be operated.

[0068] 103. Based on the execution status and operation type of tasks in each task set and the simulation of the boundary of the automatic operation area, one or more task sets are selected as the preliminary task set, and a trajectory task is configured for each task in the preliminary task set regarding the work trajectory when the task is executed.

[0069] The preliminary task set is a screened set of tasks and can be composed of one or more task sets. Each task set simulates the boundaries of the automated operation zone. The preliminary task set is equivalent to an optimal solution or a combination of optimal solutions. The preliminary task set is not limited to a single task set; its purpose is to deduce the boundaries of the automated operation zone as completely and accurately as possible. Each task set derives the boundaries corresponding to that solution. Multiple task sets can significantly enrich and verify the accuracy of the boundaries. The preliminary task set can be screened based on the execution status of each task, the type of operation, and the simulation of the boundaries. The execution status primarily refers to relevant matters during task execution, such as whether the task was executed, the execution time, and execution precautions. The type of operation primarily refers to the types of tasks that need to be executed. The simulation of the boundaries can be understood as the effectiveness of the solution; a good simulation indicates a good solution.

[0070] After setting up the initial task set, you need to create corresponding trajectory tasks for each task. The purpose of a trajectory task is to record the work trajectory during task execution. Trajectory task parameters can be pre-stored in a database or configured by the operator based on the specific scenario. Trajectory task parameters specifically address where to record the trajectory, when to start recording, and when to end recording, and can be configured based on the task attributes.

[0071] In one specific embodiment, if a task involves equipment moving across a work surface, a preset trajectory tracking device is configured on the equipment to collect its work trajectory, and this trajectory is used as the task's work trajectory. For example, if a cleaner is using a handheld floor scrubber to clean a shopping mall floor, the trajectory task involves integrating a trajectory tracking device into the scrubber to record its movement trajectory.

[0072] In one specific embodiment, if the equipment involved in a task isn't physically located on the work surface, but relies on a user to physically move around the work surface, a pre-set tracking device is installed on the user to collect their work trajectory, and the user's movement trajectory serves as the task's work trajectory. For example, if a cleaner is tasked with wiping the walls of a shopping mall, the task involves integrating a tracking device on the cleaner to record their movement trajectory.

[0073] 104. While executing the previous task set, execute the corresponding trajectory task, project the collected work trajectory onto the surface to be operated to obtain the work path, and fit one or more complete and closed boundary lines based on the work path. The area surrounded by the boundary lines is the simulated automatic operation area. The work trajectory may not be on the surface to be operated, so it needs to be projected to convert it to the surface to be operated. The execution of step 104 requires the integration of various work trajectories and the processing of the work trajectory. The obtained work path is first uniformly input into the computing terminal, and the boundary line is fitted according to the area. The fitting rules can be set in advance or according to the specific application scenario.

[0074] 105. The first robot is instructed to perform path planning within the simulated automated operation area and automatically complete the first type of operation within the automated operation area. The first robot can automatically perform path planning. Since the scope of the automated operation area is already defined, it is equivalent to constructing a map. Automatically planning the path and completing the operation according to the plan completes the deployment phase. After completing the automated operation, new tasks can be formulated for other areas not covered to complete the operation of the entire surface to be operated.

[0075] This embodiment proposes a multi-task robot operation planning method that leverages the coordination between tasks in the work area. Before the robot begins autonomous operation, it uses the work trajectories of other tasks to create relevant area information, thereby completing the robot's deployment process. Compared to existing technologies, this method eliminates the need for specialized and tedious deployment processes such as map creation, editing, and path setting, nor does it require complex operations such as task selection, location confirmation, and task initiation. It fully leverages the advantages of both non-automated and automated operations.

[0076] Example 2

[0077] Embodiment 2 of the present invention discloses a robot multi-task operation planning system, which systematizes the robot multi-task operation planning method of embodiment 1 to make it more practical. The overall structure of the robot multi-task operation planning system is shown in Figure 3 of the specification. The specific scheme is as follows:

[0078] A robot multi-task operation planning system is suitable for scenarios where the work area is large and map creation is inconvenient. The robot multi-task operation planning system includes:

[0079] The preliminary preparation unit 1 is used to determine a preset first robot and a preset surface to be operated, and define an area of ​​the surface to be operated where the first robot is required to automatically complete a preset first operation type as an automatic operation area;

[0080] Task screening unit 2 is used to screen out tasks that need to be performed on the work surface and involve the boundary of the automatic operation area, and combine all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when it is executed;

[0081] The task allocation unit 3 is used to comprehensively consider the execution status and operation types of tasks in each task set and the simulation status of the automatic operation area boundary, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set to collect the work trajectory during the task execution;

[0082] The task execution unit 4 is used to execute the corresponding trajectory task while executing the previous task set, projecting the collected work trajectory onto the work surface to obtain a work path, and fitting one or more complete and closed boundary lines based on the work path. The area enclosed by the boundary lines is the simulated automatic operation area;

[0083] The automatic operation unit 5 is used to enable the first robot to plan a path in the simulated automatic operation area and automatically complete the operation of the first operation type in the automatic operation area.

[0084] In a specific embodiment, it also includes:

[0085] The non-automatic operation unit is used to define a task involving a first operation type as a first task; determine whether the first task exists in the previous task set; if the first task does not exist, arrange operations of the first operation type for areas other than the automatic operation area in the surface to be operated; if the first task exists, construct a first operation area that has completed the operation based on the work trajectory of the first task, and arrange operations of the first operation type for areas other than the automatic operation area and the first operation area in the surface to be operated.

[0086] In a specific embodiment, it also includes:

[0087] The operation detection unit is used to detect the operation effect of the automatic operation area after completing the automatic operation; if there is an area with poor operation effect, a task of performing the first operation type is constructed in this area.

[0088] This embodiment proposes a robot multi-task operation planning system, which systematizes the robot multi-task operation planning method of Example 1 to make it more practical.

[0089] Example 3

[0090] This embodiment discloses a cleaning method, which applies the robot multi-task operation planning method of embodiment 1 to the cleaning field. The flowchart of the cleaning method is shown in Figure 4, and the specific scheme is as follows:

[0091] A cleaning method, using the robot multi-task operation planning method of embodiment 1, comprising:

[0092] 201. Determine a preset cleaning robot and a preset surface to be cleaned, and define an area of ​​the surface to be cleaned where the cleaning robot needs to automatically complete a preset first cleaning type as an automatic cleaning area;

[0093] 202. Filter out tasks that need to be executed on the surface to be cleaned and involve the boundary of the automatic cleaning area, and combine all task sets that can simulate the boundary of the automatic cleaning area according to the activity range of each task when executed;

[0094] 203. Comprehensively considering the execution status and job types of tasks in each task set and the simulation status of the boundary of the automatic cleaning area, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set to collect the work trajectory during the task execution;

[0095] 204. While executing the previous task set, execute the corresponding trajectory task, project the collected work trajectory onto the surface to be cleaned to obtain a work path, and fit one or more complete and closed boundary lines based on the work path. The area enclosed by the boundary lines is the automatic cleaning area;

[0096] 205. The cleaning robot performs path planning in the simulated automatic cleaning area, and automatically completes a first cleaning type of operation in the automatic cleaning area;

[0097] 206. After the automatic operation is completed, the operation effect of the automatic cleaning area is detected; if there is an area with poor cleaning effect, a first cleaning type task is performed in this area.

[0098] The cleaning equipment involved in the task includes floor scrubbers and / or sweepers. Exemplary cleaning equipment includes household handheld floor scrubbers, commercial handheld floor scrubbers (water tank on the handle), commercial handheld floor scrubbers (water tank on the chassis), single-plug machines, commercial push-type sweepers, commercial push-type floor scrubbers, commercial ride-on floor scrubbers, commercial stand-on floor scrubbers, commercial ride-on combined washer and sweeper machines, and commercial ride-on sweepers.

[0099] The cleaning method is not limited to ground cleaning, but can also be used for water surface cleaning or even space cleaning. For example, the cleaning robot can be a garbage cleaning boat, and the surface to be cleaned is a certain area of ​​water where garbage is present.

[0100] In a specific embodiment, the task involving the first cleaning type is defined as the first task; it is determined whether the first task exists in the previous task set; if the first task does not exist, the first cleaning type of operation is arranged for the area of ​​the surface to be cleaned except the automatic cleaning area; if the first task exists, a first working area that has completed the operation is constructed based on the work trajectory of the first task, and the first cleaning type of operation is arranged for the area of ​​the surface to be cleaned except the automatic cleaning area and the first working area.

[0101] Example 4

[0102] This embodiment discloses an aerial work method, which applies the robot multi-task work planning method of embodiment 1 to the field of aerial work. The flowchart of the aerial work method is shown in Figure 4, and the specific scheme is as follows:

[0103] 301. Determine a preset flying robot and a preset operation surface, and define an area of ​​the operation surface where the flying robot needs to automatically complete a preset first operation type as an automatic flight area;

[0104] 302. Filter out tasks that need to be executed on the waiting operation surface and involve the boundary of the automatic flight zone, and combine all task sets that can simulate the boundary of the automatic flight zone according to the activity range of each task when executed;

[0105] 303. Comprehensively considering the execution status and operation types of tasks in each task set and the simulation status of the automatic flight zone boundary, select one or more task sets as preliminary task sets, and configure a trajectory task for each task in the preliminary task set to collect the flight trajectory during the execution of the task;

[0106] 304. While executing the previous task set, execute the corresponding trajectory task. Project the collected flight trajectory onto the work surface to obtain a flight path. Fit one or more complete and closed boundary lines based on the flight path. The area enclosed by the boundary lines is the simulated automatic flight area.

[0107] 305. Enable the flying robot to perform path planning in the simulated automatic flight area, and automatically complete an operation of the first operation type in the automatic flight area.

[0108] 306. After completing the automatic operation, detect the operation effect of the automatic flight area; if there is an area with poor operation effect, construct a task to perform the first operation type in this area.

[0109] For example, the flying robot may be a drone, and the first operation type may be pesticide spraying. Within the automated flight zone, the drone can autonomously spray the pesticide. Before the automated flight zone is established, the user can manually control the drone to spray a portion of the area, thereby establishing a safety boundary for the drone.

[0110] This invention provides a method, system, and application for planning multi-task robotic operations. Leveraging the coordinated relationships between tasks within a work area, this system utilizes the work trajectories of other tasks to create relevant regional information before the robot begins autonomous operation, thereby completing the robot's deployment. Compared to existing technologies, this method eliminates the need for specialized and tedious deployment processes such as map creation, editing, and path setting, nor does it require complex tasks such as selecting tasks, confirming locations, and initiating tasks. It leverages the advantages of both non-automated and automated operations.

[0111] Those skilled in the art will appreciate that the accompanying drawings are merely schematic diagrams of a preferred implementation scenario, and that the modules or processes depicted in the drawings are not necessarily required to implement the present invention. Those skilled in the art will appreciate that the modules within the devices within the implementation scenarios may be distributed throughout the devices within the implementation scenarios as described in the implementation scenarios, or may be modified accordingly and located within one or more devices different from the implementation scenarios.

Claims

1. A robot multi-task operation planning method, It is characterized in that Planning methods include: Determine a preset first robot and a preset surface to be operated, and define an area of ​​the surface to be operated where the first robot needs to automatically complete a preset first operation type as an automatic operation area; Screening out tasks that need to be performed on the waiting operation surface and involve the boundary of the automatic operation area, and combining all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when it is executed; Comprehensively considering the execution status and operation type of tasks in each task set and the simulation status of the boundary of the automatic operation area, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set about the work trajectory when the task is executed; While executing the preliminary task set, the corresponding trajectory task is executed, the collected work trajectory is projected onto the work surface to obtain a work path, and one or more complete and closed boundary lines are fitted based on the work path, and the area surrounded by the boundary lines is the simulated automatic operation area; The first robot is enabled to perform path planning in the simulated automatic operation area, and automatically complete the operation of the first operation type in the automatic operation area.

2. The robot multi-task operation planning method according to claim 1, It is characterized in that defining a task involving the first job type as a first task; Determine whether there is a first task in the previous task set; If the first task does not exist, arranging the operation of the first operation type for the area of ​​the surface to be operated except the automatic operation area; If there is a first task, then the completed job is constructed based on the work track of the first task The first operation area is used to arrange the operation of the first operation type for the area of ​​the surface to be operated except the automatic operation area and the first operation area.

3. The robot multi-task operation planning method according to claim 1, It is characterized in that After completing the automatic operation, check the operation effect of the automatic operation area; If there is an area where the operation effect is not good, a task of performing the first operation type in the area is constructed.

4. The robot multi-task operation planning method according to claim 1, It is characterized in that If the equipment involved in a task needs to be active on the work surface, then: A preset trajectory tracking device is configured on the device to collect the working trajectory, and the trajectory of the device is used as the working trajectory of the task.

5. The robot multi-task operation planning method according to claim 1, It is characterized in that If the equipment involved in a task is not active on the surface to be operated, and the equipment relies on the user to move on the surface to be operated, then: A preset trajectory tracking device is configured on the user to collect the work trajectory, and the activity trajectory of the user is used as the work trajectory of the task.

6. A robot multi-task operation planning system, It is characterized in that The system includes: An early preparation unit is used to determine a preset first robot and a preset surface to be operated, and define an area of ​​the surface to be operated where the first robot needs to automatically complete a preset first operation type as an automatic operation area; A task screening unit, used to screen out tasks that need to be performed on the waiting operation surface and involve the boundary of the automatic operation area, and combine all task sets that can simulate the boundary of the automatic operation area according to the activity range of each task when it is executed; The task allocation unit is used to comprehensively consider the execution status and operation type of tasks in each task set and the simulation status of the boundary of the automatic operation area, select one or more task sets as the preliminary task set, and configure a trajectory task for each task in the preliminary task set about the work trajectory when the collection task is executed; A task execution unit is used to execute the corresponding trajectory task while executing the previous task set, project the collected work trajectory onto the surface to be operated to obtain a work path, and fit one or more complete and closed boundary lines based on the work path. The area surrounded by the boundary lines is the simulated automatic operation area; The automatic operation unit is used to enable the first robot to perform path planning in a simulated automatic operation area and automatically complete the operation of the first operation type in the automatic operation area.

7. The robot multi-task operation planning system according to claim 6, It is characterized in that Also includes: A non-automatic operation unit is used to define a task related to the first operation type as a first task; and determine whether the first task exists in the previous task set; If the first task does not exist, arranging the operation of the first operation type for the area of ​​the surface to be operated except the automatic operation area; If there is a first task, a first operation area where the operation has been completed is constructed based on the work trajectory of the first task, and operations of the first operation type are arranged for the area of ​​the surface to be operated except the automatic operation area and the first operation area.

8. The robot multi-task operation planning system according to claim 7, It is characterized in that Also includes: An operation detection unit is used to detect the operation effect of the automatic operation area after the automatic operation is completed; If there is an area where the operation effect is not good, a task of performing the first operation type in the area is constructed.

9. A cleaning method, It is characterized in that Using the robot multi-task operation planning method according to any one of claims 1 to 5, the cleaning method comprises: Determine a preset cleaning robot and a preset surface to be cleaned, and define an area of ​​the surface to be cleaned where the cleaning robot needs to automatically complete a preset first cleaning type as an automatic cleaning area; Screening out tasks that need to be performed on the surface to be cleaned and involve the boundary of the automatic cleaning area, and combining all task sets that can simulate the boundary of the automatic cleaning area according to the activity range of each task when it is performed; Comprehensively considering the execution status and operation types of tasks in each task set and the simulation status of the boundary of the automatic cleaning area, one or more task sets are selected as the preliminary task set, and a trajectory task about the work trajectory of the collection task when it is executed is configured for each task in the preliminary task set; While executing the preliminary task set, the corresponding trajectory task is executed, the collected working trajectory is projected onto the surface to be cleaned to obtain a working path, and one or more complete and closed boundary lines are fitted based on the working path, and the area surrounded by the boundary lines is the simulated automatic cleaning area; The cleaning robot is enabled to perform path planning in the simulated automatic cleaning area, and automatically complete the first cleaning type of operation in the automatic cleaning area.

10. A method of aerial work, It is characterized in that The robot multi-task operation planning method according to any one of claims 1 to 5 is adopted, and the aerial operation method comprises: Determine a preset flying robot and a preset operation surface, and define an area of ​​the operation surface where the flying robot needs to automatically complete a preset first operation type as an automatic flight area; Screening out tasks that need to be performed on the waiting operation surface and involve the boundary of the automatic flight zone, and combining all task sets that can simulate the boundary of the automatic flight zone according to the activity range when each task is performed; Comprehensively considering the execution status and operation types of tasks in each task set and the simulation status of the boundary of the automatic flight zone, one or more task sets are selected as the preliminary task set, and a trajectory task about the flight trajectory when the collection task is executed is configured for each task in the preliminary task set; While executing the preliminary task set, the corresponding trajectory task is executed, the collected flight trajectory is projected onto the surface to be operated to obtain a flight path, and one or more complete and closed boundary lines are fitted based on the flight path, and the area surrounded by the boundary lines is the simulated automatic flight area; The flying robot is enabled to perform path planning in the simulated automatic flight area, and automatically complete the operation of the first operation type in the automatic flight area.

Citation Information

Patent Citations

  • Work platform with automatic mapping and path planning function, and control method thereof

    CN110320915A

  • Self-walking equipment operation boundary acquisition method and self-walking equipment

    CN112486173A

  • Position information acquisition method, position acquisition device and mower

    CN112612278A

  • Robot multi-task operation planning method and system and application of robot multi-task operation planning method and system

    CN116300976A

  • Unmanned vehicle searches

    US20150066248A1