Pressure water storage tank having air storage tank

By designing a pressure water storage bucket with an air storage tank, using a variable volume water purification chamber, air cavity structure and elastic capsule bag, the air cavity explosion problem in the prior art caused by excessive water pressure is solved, and the product is improved Safety and service life, and easy installation.

WO2024239946A1PCT designated stage expired Publication Date: 2024-11-28ZHU XINNI
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/091119
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-23
Filing Date
2024-05-06
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

During the pumping process of existing water purifiers, the water pressure in the water chamber is too high due to delay sensors and pumps, and the air pressure in the air chamber increases, which may cause the water storage bucket to explode, affecting consumer safety and product life.

Method used

设计了一种带有储气罐的压力储水桶,其净水腔和气腔是相互隔离且容积可变的,通过管路将气腔内的气体与储气罐内的气体连通,净水腔 When the volume is maximum, the volume of the air cavity is zero to avoid explosion of the air cavity, and the structure of the elastic capsule bag and inner liner ensures sealing and volume changes.

Benefits of technology

It effectively avoids the risk of air cavity explosion caused by excessive water pressure in the water cavity, reduces the explosion destructive power of the water storage bucket, improves the safety and service life of the product, and reduces the width of the water purifier for easy installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024091119_28112024_PF_FP_ABST
    Figure CN2024091119_28112024_PF_FP_ABST
Patent Text Reader

Abstract

The present utility model relates to the field of water purification devices, and discloses a pressure water storage tank having an air storage tank. For the pressure water storage tank having the air storage tank, a volume-variable water purification cavity and a volume-variable air cavity are formed in the pressure water storage tank. The water purification cavity and the air cavity are isolated from each other. The volume changes of the water purification cavity and the air cavity are in inverse proportion. The water purification cavity is used for receiving and storing water purified by a water purifier. The air storage tank is arranged on the outer side of the pressure water storage tank. The interior of the air storage tank is a closed cavity. The pressure water storage tank and the air storage tank are arranged in a split mode. A pipeline is connected between the pressure water storage tank and the air storage tank to enable air in the air cavity and air in the air storage tank to be communicated. According to the pressure water storage tank, the objective of effectively avoiding the problem of air cavity burst caused by excessive water pressure in the water cavity can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

A pressure water storage barrel with a gas storage tank Technical Field

[0001] The utility model belongs to the field of water purification equipment, and more specifically, relates to a pressure water storage barrel with a gas storage tank. Background Art

[0002] Water purifiers are generally equipped with a water storage tank to hold filtered clean water and discharge a set amount of clean water when needed.

[0003] Existing water storage barrels have a double-layer structure, namely, an inner barrel and an outer barrel; the barrel wall of the inner barrel is made of at least elastic material, the inner side of the inner barrel is a water cavity, and the water cavity is used to hold clean water; the outer barrel is located outside the inner barrel, and there is an air cavity between the outer barrel and the inner barrel, which is used to hold gas. The air cavity is a closed chamber, and under normal conditions, the amount of gas in the air cavity is fixed.

[0004] When clean water flows into the water storage barrel, the inner barrel wall stretches due to the water pressure, and the volume of the water cavity increases, but the air cavity is affected by the stretching of the inner barrel wall, and the container becomes smaller instead; since the amount of gas in the air cavity is constant, when clean water continues to flow into the water cavity, the air pressure in the air cavity will continue to increase, thereby hindering the expansion of the water cavity.

[0005] However, when the existing water purifier pumps water into the water storage tank, due to the inevitable delay in the operation of components such as sensors and pumps, it will be impossible to stop pumping water into the water storage tank at the specified time, so that the actual water volume in the water cavity is inevitably higher than the set water volume, and the actual air pressure in the air cavity is inevitably higher than the set air pressure.

[0006] When the actual air pressure in the air cavity is higher than the rated air pressure, the barrel wall of the water storage barrel will burst due to the internal high pressure. Under high air pressure, the water cavity in the water storage barrel will also burst due to the influence of air pressure, resulting in the cumulative increase of the degree of explosion, affecting the personal safety and property safety of consumers, and the service life of the product is also very short.

[0007] Utility Model Content

[0008] The technical problem to be solved by the utility model is to provide a pressure water storage barrel with an air storage tank, which can effectively avoid the problem of air cavity bursting due to excessive water pressure in the water cavity.

[0009] The utility model discloses a pressure water storage barrel with an air storage tank, wherein the pressure water storage barrel is provided with a water purification chamber and an air chamber with variable volumes; the water purification chamber and the air chamber are isolated and independent from each other; the volume changes of the water purification chamber and the air chamber are inversely proportional; the water purification chamber is used to receive and store purified water produced by a water purifier;

[0010] An air storage tank is arranged outside the pressure water storage barrel; the interior of the air storage tank is a closed chamber; the pressure water storage barrel and the air storage tank are arranged separately; a pipeline is connected between the pressure water storage barrel and the air storage tank to connect the gas in the air cavity with the gas in the air storage tank.

[0011] As a further improvement to the present invention, when the water purification chamber volume is at its maximum, the air chamber volume is zero, thus sealing off the pipeline connection. This arrangement effectively prevents water leaking from the pressure water storage tank from entering the air storage tank through the connecting hole. Furthermore, when the water pressure in the water purification chamber continues to increase in this state, the air pressure in the air chamber will not increase further, reducing the risk of the air chamber bursting.

[0012] As a further improvement of the present invention, the gas storage tank and the pressure water storage barrel are stacked horizontally. Compared with a conventional water purifier equipped with a pressure water storage barrel of the same water storage capacity, this arrangement can reduce the width of the water purifier, thereby facilitating installation of the water purifier in a limited space.

[0013] As a further improvement to the present invention, the pressure water storage barrel includes a barrel body and an elastic bladder located within the barrel body. The elastic bladder separates the two sides of the barrel body into a separate water purification chamber and an air chamber. The elastic bladder is at least partially made of elastic material to have the ability to expand and contract to change the volume of the water purification chamber and the air chamber. This arrangement effectively ensures that when the water purification chamber is filled with water, the volume of the air chamber and the water purification chamber will also change simultaneously.

[0014] As a further improvement to the present invention, an inner liner is fixedly embedded and fitted onto the inner wall of one side of the barrel; the inner liner is open at one end; an elastic bladder is located inside the inner liner, and the opening of the elastic bladder is directly or indirectly sealed to the end of the inner liner, so that the elastic bladder and the inner liner enclose a water purification chamber; and the gap between the elastic bladder and the inner wall of the other side of the barrel forms an air cavity. This arrangement effectively ensures the sealing of the water purification chamber.

[0015] As a further improvement to the present invention, a mounting opening is provided at the top of the barrel, and a water spout is integrally mounted on the top of the inner liner, extending through the mounting opening and out of the barrel. The spout seals with the mounting opening and is secured to the barrel via a nut. This arrangement further enhances the sealing and firmness of the water purification chamber.

[0016] As a further improvement of the present invention, the port of the inner bladder is provided with a structure formed by a depression of the outer wall toward the inner wall, which is manifested as a first annular groove on the outer wall and a first annular protrusion on the inner wall; a second annular protrusion is provided on the inner wall of the barrel body at a position corresponding to the first annular groove of the inner bladder, which cooperates with it; a hard collar is provided on the inner side of the opening of the elastic bladder; the hard collar and the elastic bladder are sealed and connected as a whole; the outer ring of the hard collar is provided with a second annular groove that cooperates with the first annular protrusion; the opening of the elastic bladder is compressed and positioned between the first annular protrusion and the second annular groove to achieve a sealed connection. This arrangement effectively improves the connection strength and sealing performance between the inner bladder and the elastic bladder.

[0017] As a further improvement to the present invention, a third annular protrusion is provided on the inner ring of the elastic bladder opening, and the second annular groove matches the third annular protrusion. During installation, the third annular protrusion is embedded in the second annular groove to achieve a snap-fit ​​connection. This arrangement further improves the connection strength and sealing performance between the inner liner and the elastic bladder.

[0018] As a further improvement to the present invention, the bottom wall of the barrel, where the air chamber is located, is provided with a connecting hole for connecting to the pipeline; the bottom wall of the elastic bladder is provided with a protruding sealing member; when the water purification chamber is filled with water, the sealing member presses against the bottom wall of the barrel where the connecting hole is located, disconnecting the pipeline port. This arrangement effectively ensures the airtightness of the pipeline when the water purification chamber is expanded to its maximum state, effectively preventing water leaking from the pressure water storage tank from entering the air storage tank through the connecting hole. At the same time, if the water pressure in the water purification chamber continues to increase in this state, the air pressure in the air chamber will not increase further, reducing the risk of the air chamber bursting.

[0019] As a further improvement of the present invention, the sealing member is an annular sealing rib; when the water purification chamber is filled with water, the sealing rib presses against the outer periphery of the communicating hole.

[0020] As a further improvement of the present invention, a valve core is provided on the surface of the gas storage tank, which can effectively replenish the gas volume in the gas storage tank and ensure the supporting strength of the water purification chamber.

[0021] As a further improvement of the present invention, a sealing ring is pressed between the end face of the nut and the outer surface of the barrel body to achieve sealing.

[0022] As a further improvement of the present invention, a quick-connect connector is provided in the faucet.

[0023] Compared with the prior art, the beneficial effects of the present invention are:

[0024] The present application connects the air cavity of the pressure water storage barrel with the gas storage tank, which actually expands the total volume of the air cavity. Since the water purification chamber needs to expand, the gas in the air cavity will inevitably be compressed. Under the premise that the expansion amount of the water purification chamber is constant, the expansion of the total volume of the air cavity will reduce the increase in the air pressure in the air cavity, slowing down the pressure on the gas storage tank body and the pressure water storage barrel body, and effectively avoiding the pressure water storage barrel from bursting due to excessive increase in air pressure. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] FIG1 is a schematic diagram of the connection structure of a pressure water storage barrel and a gas storage tank in Example 1 of the present utility model;

[0026] FIG2 is a schematic cross-sectional view of the pressure water storage barrel of Example 1 of the present invention (when not filled with water);

[0027] FIG3 is an enlarged view of the structure of each layer of the pressure water storage barrel of Example 1 of the present invention (when not processed and close-fitting);

[0028] FIG4 is an enlarged view of the structure of the water inlet of the pressure water storage barrel of Example 1 of the present invention;

[0029] FIG5 is a schematic diagram of the three-dimensional structure of the outer shell of the first embodiment of the present invention

[0030] FIG6 is a schematic diagram of the three-dimensional structure of the installation port of the second embodiment of the present invention;

[0031] FIG7 is a cross-sectional view of the pressure water storage barrel and the gas storage tank of the second embodiment of the present invention when not filled with water;

[0032] FIG8 is an exploded view of the second embodiment of the present invention;

[0033] FIG9 is a schematic cross-sectional view of the pressure water storage barrel when it is full of water according to the second embodiment of the present invention;

[0034] FIG10 is an exploded view of the pressure water storage tank of the second embodiment of the present invention.

[0035] Description of the numbers in the figure:

[0036] 100. Outer shell; 200. Pressure water storage barrel; 210. Barrel body; 211. Second annular protrusion; 212. Connecting hole; 213. Mounting port; 220. Inner liner; 221. First annular groove; 222. First annular protrusion; 223. Water nozzle; 230. Elastic bladder; 231. Sealing rib; 240. Hard clamping ring; 241. Second annular groove; 250. Nut; 260. Sealing ring; 270. Quick connector; 300. Air tank; 310. Valve core; H. Clean water chamber; G. Air chamber. DETAILED DESCRIPTION

[0037] Specific embodiment 1: Please refer to Figures 1-5 for a pressure water storage barrel with an air storage tank.

[0038] An air tank 300 is installed outside the pressure water tank 200; the interior of the air tank 300 is a closed chamber; the pressure water tank 200 and the air tank 300 are separate components. In this case, the separate components refer to the pressure water tank 200 and the air tank 300 not being nested together, but rather occupying corresponding physical spaces, with their outer surfaces spaced apart. A valve core 310 is provided on the surface of the air tank 300 for replenishing gas within the air tank 300. In this embodiment, the body of the air tank 300 is formed by rolling a metal plate and then straight-seam welding it, which facilitates the manufacture of the air tank 300 and reduces costs.

[0039] The gas storage tank 300 and the pressure water storage barrel 200 are stacked horizontally. In this way, when the pressure water storage barrel has the same water storage capacity as the traditional water purifier, this arrangement can reduce the width of the water purifier, thereby facilitating the installation of the water purifier in a limited space.

[0040] The pressure water storage barrel 200 includes a barrel body 210 and an elastic bag 230 located inside the barrel body 210 .

[0041] The elastic bladder 230 separates the chamber within the barrel 210 into two independent chambers: a clean water chamber H and an air chamber G. Made of an elastic material (such as butyl rubber), the elastic bladder 230 is capable of expansion and contraction, changing the volumes of the clean water chamber H and the air chamber G. A pipeline is connected between the pressure water storage barrel 200 and the air storage tank 300 to connect the gas in the air chamber G with the gas in the air storage tank 300. In this embodiment, the pipeline is welded to the surfaces of the pressure water storage barrel 200 and the air storage tank 300, achieving a sealed and fixed connection.

[0042] The barrel body 210 includes a barrel body and a barrel cover; the barrel body is formed by rolling a metal plate and then welding it through a straight seam; the barrel cover is sealed and fixedly connected to the head and tail ends of the barrel body to form an internal chamber of the barrel body 210.

[0043] An inner liner 220 is fixedly embedded and fitted onto the right inner wall of the barrel body 210. The inner liner 220 is open at one end and is made of plastic. An elastic bladder 230 is located inside the inner liner 220. The opening of the elastic bladder 230 is directly or indirectly sealed to the end of the inner liner 220, so that the elastic bladder 230 and the inner liner 220 enclose a water purification chamber H. The gap between the elastic bladder 230 and the left inner wall of the barrel body 210 forms an air chamber G. The water purification chamber H and the air chamber G are separated by the elastic bladder 230. The sum of the volumes of the water purification chamber H and the air chamber G constitutes the total volume of the pressure water storage barrel 200. Since the elastic bag 230 is elastic, the volumes of the water purification chamber H and the air cavity G are both variable; the volume changes of the water purification chamber H and the air cavity G are inversely proportional; when water is filled into the water purification chamber H, the water purification chamber H becomes larger and the air cavity G becomes smaller; when water is discharged to the outside, the water purification chamber H becomes smaller and the air cavity G becomes larger.

[0044] The water purification chamber H is used to receive and store purified water produced by the water purifier; the air in the air cavity G is used to provide air pressure to support the water purification chamber H. The bottom wall of the barrel body 210 where the air cavity G is located is provided with a connecting hole 212 for connecting to the pipeline.

[0045] The maximum limit volume of the elastic bladder 230 is greater than or equal to the volume of the barrel body 210. Therefore, the elastic bladder band 230 can be filled with water and expand until it fills the entire internal cavity of the barrel body 210. At this time, the outer wall of the elastic bladder band 230 blocks the connecting hole 212, the volume of the air cavity G is zero, and the connection of the pipeline is closed. In this embodiment, a protruding sealing plug is integrally formed on the bottom wall of the elastic bladder band 230. When the clean water chamber H is full of water, the sealing plug presses against the connecting hole 212 to disconnect the pipeline port, effectively preventing water leaking from the pressure water storage barrel 200 from entering the air storage tank 300 through the connecting hole 212. At the same time, in this state, if the water pressure in the clean water chamber H continues to increase, the air pressure in the air cavity G will not increase further, reducing the risk of the air cavity G bursting.

[0046] In this embodiment, the elastic bladder 230 and the inner liner 220 are connected as follows: a structure formed by a depression from the outer wall to the inner wall is provided at the port of the inner liner 220, which is manifested as a first annular groove 221 on the outer wall and a first annular protrusion 222 on the inner wall; a second annular protrusion 211 is provided on the inner wall of the barrel body 210, corresponding to the first annular groove 221 of the inner liner 220. A hard collar 240 is provided on the inner side of the bag opening of the elastic bladder 230. The hard collar 240 is made of metal material; the outer ring of the hard collar 240 is provided with a second annular groove 241; and a third annular protrusion is integrally formed on the inner ring of the bag opening of the elastic bladder 230; the second annular groove 241 matches the third annular protrusion, and the second annular groove 241 also matches the first annular protrusion 222. During installation, the second annular protrusion 211 is embedded in the first annular groove 221, the first annular protrusion 222 is embedded in the second annular groove 241, and the third annular protrusion is embedded in the second annular groove 241. The opening of the elastic bag 230 is pressed between the first annular protrusion 222 and the second annular groove 241. Preferably, the second annular protrusion 211 is located in the middle of the barrel body 210, and the inner liner 220 and the elastic bag 230 are each half of the barrel body 210.

[0047] Figure 3 shows the structure of the inner liner 220 and the barrel body 210 that have not been extruded by a machine; to achieve the final matching connection form, it is necessary to extrude the corresponding parts of the inner liner 220 and the barrel body 210 by machine on the basis of the structure shown in Figure 3, so that they are compressed and deformed inward, and form a first annular groove 221, a first annular protrusion 222, a second annular protrusion 211 and other structures, and make the second annular protrusion 211 of the barrel body 210 and the first annular groove 221 of the inner liner 220 match and fit together, and the first annular protrusion 222 of the inner liner 220 and the third annular groove of the hard clamp 240 match and fit together, and at the same time, the bag opening of the elastic bag 230 is pressed between the inner liner 220 and the hard clamp 240 to achieve sealing.

[0048] When there is no water in the pressure water storage barrel 200, the elastic bag 230 shrinks in the inner liner 220 under the action of air pressure; when the water storage barrel is full of water, the elastic bag 230 moves toward the air cavity G side under the action of water pressure and fully opens.

[0049] In addition, the top of the barrel body 210 is provided with an installation opening 213, and the top of the inner liner 220 is integrally provided with a water spout 223 that extends through the installation opening 213 to the outside of the barrel body 210. The water spout 223 is sealed with the installation opening 213 and is fixedly connected to the barrel body 210 by a nut 250. Specifically, in this embodiment, a sealing ring 260 is pressed between the end surface of the nut 250 and the outer surface of the barrel body 210 to achieve a seal. Preferably, a quick-connect connector 270 is provided inside the water spout 223 to facilitate quick connection with various pipes and connectors.

[0050] In this way, when water is injected into the clean water chamber H through the water pump, the clean water chamber H can pressurize all the gas in the air chamber G into the gas storage tank 300, so that the clean water chamber H can basically completely fill the inner cavity of the pressure water storage barrel 200, so that the volume of the clean water chamber H is basically equivalent to the volume of the pressure water storage chamber, effectively increasing the space utilization rate of the pressure water storage barrel 200 and effectively increasing the water storage capacity; at the same time, after the clean water chamber H is filled with water, continuous water injection causes an explosion, and the air pressure in the pressure water storage device remains basically unchanged, thereby greatly reducing the destructive force of the explosion; furthermore, the speed at which the air pressure in the pressure water storage device decreases can be slowed down, thereby slowing down the attenuation of the water discharge rate of the device.

[0051] Specific embodiment 2: Based on the specific embodiment 1, please refer to Figures 6-10, the gas storage tank 300 and the pressure water storage barrel 200 are both arranged in the outer shell 100. The gas storage tank 300 and the pressure water storage barrel 200 are arranged horizontally in the outer shell 100.

[0052] Preferably, an annular sealing rib 231 is provided on the bottom wall of the elastic bag 230; when the clean water chamber H is full of water, the sealing rib 231 presses against the outer periphery of the connecting hole 212 to disconnect the pipeline port, effectively preventing water leaking from the pressure water storage barrel 200 from entering the gas storage tank 300 through the connecting hole 212. At the same time, in this state, when the water pressure in the clean water chamber H continues to increase, the air pressure in the air chamber G will no longer increase, and the risk of the air chamber G bursting is reduced.

Claims

1. A pressure water storage barrel with a gas storage tank, Features: A water purification chamber (H) and an air chamber (G) with variable volumes are provided in the pressure water storage barrel (200); the water purification chamber (H) and the air chamber (G) are isolated and independent from each other; the volume changes of the water purification chamber (H) and the air chamber (G) are inversely proportional; the water purification chamber (H) is used to receive and store purified water produced by the water purification machine; An air storage tank (300) is arranged outside the pressure water storage barrel (200); the interior of the air storage tank (300) is a closed chamber; the pressure water storage barrel (200) and the air storage tank (300) are arranged separately; and a pipeline is arranged between the pressure water storage barrel (200) and the air storage tank (300) to connect the gas in the air cavity (G) with the gas in the air storage tank (300).

2. A pressure water storage barrel with a gas storage tank according to claim 1, Features: When the volume of the clean water chamber (H) is at its maximum, the volume of the air chamber (G) is zero, thereby closing the connection of the pipeline.

3. A pressure water storage barrel with a gas storage tank according to claim 1, Features: The pressure water storage barrel (200) comprises a barrel body (210) and an elastic bag (230) located inside the barrel body (210); the elastic bag (230) separates two sides of a chamber inside the barrel body (210) into a water purification chamber (H) and an air chamber (G) that are independent of each other; the elastic bag (230) is at least partially made of elastic material to have the ability to expand and contract to change the volumes of the water purification chamber (H) and the air chamber (G).

4. A pressure water storage barrel with a gas storage tank according to claim 3, Features: An inner liner (220) is fixedly embedded and fitted on the inner wall of one side of the barrel body (210); the inner liner (220) is open at one end; an elastic bag (230) is located inside the inner liner (220); the bag opening of the elastic bag (230) and the end of the inner liner (220) are directly or indirectly sealed and connected, so that the elastic bag (230) and the inner liner (220) are surrounded to form a water purification cavity (H); and the gap between the elastic bag (230) and the inner wall of the other side of the barrel body (210) forms an air cavity (G).

5. A pressure water storage barrel with a gas storage tank according to claim 4, Features: The top of the barrel body (210) is provided with a mounting opening (213), and the top of the inner liner (220) is integrally provided with a water spout (223) that passes through the mounting opening (213) and extends to the outside of the barrel body (210); the water spout (223) is sealedly matched with the mounting opening (213) and is positionally connected to the barrel body (210) through a nut (250).

6. A pressure water storage barrel with a gas storage tank according to claim 4, Features: A structure formed by the outer wall being recessed toward the inner wall is provided at the port of the inner liner (220), which is represented by a first annular groove (221) on the outer wall and a first annular protrusion (222) on the inner wall; a second annular protrusion (211) matching the first annular groove (221) of the inner liner (220) is provided on the inner wall of the barrel body (210); a hard clamping ring (240) is provided on the inner side of the bag opening of the elastic bag (230); the hard clamping ring (240) and the elastic bag (230) are sealed and connected as a whole; the outer ring of the hard clamping ring (240) is provided with a second annular groove (241) matching the first annular protrusion (222); the bag opening of the elastic bag (230) is compressed and located between the first annular protrusion (222) and the second annular groove (241) to be sealed and connected.

7. A pressure water storage barrel with a gas storage tank according to claim 6, Features: A third annular protrusion is provided on the inner circle of the bag opening of the elastic bag (230), and the second annular groove (241) matches the third annular protrusion; during installation, the third annular protrusion is embedded in the second annular groove (241) to achieve snap connection.

8. A pressure water storage barrel with a gas storage tank according to claim 3, Features: A communication hole (212) for communicating with a pipeline is provided on the bottom wall of the barrel body (210) where the air cavity (G) is located; a protruding sealing member is provided on the bottom wall of the elastic bag (230); when the water purification chamber (H) is filled with water, the sealing member presses against the bottom wall of the barrel body (210) where the communication hole (212) is located to disconnect the pipeline port.

9. A pressure water storage barrel with a gas storage tank according to claim 8, Features: The sealing member is an annular sealing convex rib (231); when the water purification chamber (H) is filled with water, the sealing convex rib (231) presses against the outer periphery of the communication hole (212).

10. A pressure water storage barrel with a gas storage tank according to claim 5, Features: A sealing ring (260) is pressed between the end surface of the nut (250) and the outer surface of the barrel body (210) to achieve sealing.

11. A pressure water storage barrel with a gas storage tank according to claim 5, Features: A quick-connect connector (270) is provided inside the water nozzle (223).

Citation Information

Patent Citations

  • Pressure water storage barrel with good pressure bearing capacity

    CN104405866A

  • Pressure water storage device for RO (reverse osmosis) water purifier

    CN117003335A

  • Improvement of pressure accumulation type liquid storing barrel

    CN201042387Y

  • Pressure water storage barrel with good pressure resistance

    CN204083206U

  • Pressure storage water barrel

    CN2289764Y