Communication control device and communication control method for railway communication system

The communication control device dynamically manages and prioritizes communication paths in railway systems, ensuring reliability and reducing processing loads by selectively using available paths, addressing the challenges of shared equipment and public network usage in railway communication systems.

WO2024247531A1PCT designated stage expired Publication Date: 2024-12-05HITACHI LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/015372
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-30
Filing Date
2024-04-18
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Railway communication systems face challenges in ensuring communication reliability and reducing processing load when using shared, multipurpose communication equipment and public network lines, as the increased number of redundant communication paths can lead to higher processing loads and costs.

Method used

A communication control device that monitors and manages multiple communication paths, allowing for dynamic path switching and prioritization, distributing only used paths for data transmission to improve reliability and reduce processing load, while maintaining communication quality.

Benefits of technology

This approach enhances communication reliability and reduces processing loads by selectively using available communication paths, optimizing data transmission and minimizing costs associated with public network usage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024015372_05122024_PF_FP_ABST
    Figure JP2024015372_05122024_PF_FP_ABST
Patent Text Reader

Abstract

To provide communication control that ensures communication reliability by making redundant communication routes and that determines an optimal communication route and decides an optimal number of routes in a railway communication system, the present invention provides a communication control device for the railway communication system that performs data transfer between a plurality of devices through a plurality of communication routes, among which at least one route includes a wireless communication route. The communication control device comprises: a communication route monitoring unit that monitors the availability of each of the plurality of communication routes; a communication route determination unit that decides a communication route to be used for data transfer from the plurality of communication routes; and a route management unit that manages whether the plurality of communication routes are communication routes in a use state, communication routes in a standby state, or communication routes in an unavailable state. The communication route determination unit decides, from the monitoring result from the communication route monitoring unit, a communication route to be used for data transfer, sorts each of the plurality of communication routes into one of the use state, the standby state, and the unavailable state, and registers the communication routes in the route management unit.
Need to check novelty before this filing date? Find Prior Art

Description

Communication control device and communication control method for railway communication system

[0001] The present invention relates to a communication control device and a communication control method for a railway communication system that controls communication paths in a railway.

[0002] In railway communication systems, train control is performed by exchanging control data and the like through communication between devices such as between trains and ground control devices, and between ground central control devices and ground field devices.

[0003] For example, in a CBTC (Communication Based Train Control) system that uses wireless communication to control trains, train control is achieved by exchanging information necessary for train control between trains and ground control devices. Furthermore, data or signal information is exchanged between the ground central control device and ground field devices (e.g., signals and points) mainly via dedicated wired communication lines.

[0004] Traditionally, efforts have been made to ensure communication quality for systems related to railway operation control by using privately operated wireless systems or wired communications via dedicated lines dedicated to the communication system. However, in order to reduce communication infrastructure and facility operating costs, there is a demand for the use of general-purpose, multi-purpose shared communication facilities or public network lines that can be shared by multiple communication facilities, rather than providing dedicated communication facilities for each facility. Typical public networks include public wired communication networks such as the Internet and cellular public wireless communication networks.

[0005] While using shared communication facilities and public network lines is expected to reduce the costs of installing and operating the facilities, the reliability of communications may be lower than when communication facilities are built using privately operated facilities.

[0006] In order to ensure the reliability of communications while utilizing public network lines, one possible method is to use multiple communication routes simultaneously to create redundancy for the communication routes.A wide variety of combinations of communication route redundancy methods are conceivable, such as using multiple public network lines in parallel, or effectively mixing locations where private communication facilities are installed with locations where communications are only via public network lines.

[0007] As background technology relating to communication path redundancy in the field of railway communications, for example, Patent Document 1 discloses a technology for achieving redundancy by providing multiple communication paths when control information is exchanged between an on-board control device mounted on a train and a ground control device via wireless communication.

[0008] JP 2009-067357 A

[0009] The technology disclosed in the above-mentioned Patent Document 1 uses multiple communication paths simultaneously, but does not perform priority control or switching control of the communication paths, and instead applies all redundant paths to communication. Therefore, the more redundant communication paths there are, the greater the processing load in communication processing and the greater the communication volume is expected to be.

[0010] Therefore, in this invention, by switching the communication path used for sending and receiving control data while achieving redundancy of the communication path, it is possible to ensure both communication performance and communication processing load, and to reduce the amount of communication data. Here, the present invention can be applied to any form of communication path redundancy, such as redundancy between a private communication network and a public network, or redundancy between wired communication and wireless communication.

[0011] In order to solve the above problems, one representative communication control device of the present invention is a communication control device for a railway communication system that transmits data between multiple devices via multiple communication paths, at least one of which is a wireless communication path, and is equipped with a communication path monitoring unit that monitors the availability of each of the multiple communication paths, a communication path determination unit that determines which of the multiple communication paths to use for data transmission, and a path management unit that manages the multiple communication paths as being in use, in standby, or in an unavailable state, and the communication path determination unit determines the communication path to use for data transmission based on the monitoring results of the communication path monitoring unit, and classifies each of the multiple communication paths into either a used state, a standby state, or an unavailable state and registers it in the path management unit.

[0012] According to the present invention, by allocating only the communication paths to be used for communication among the redundant communication paths to a usage path pool, it is possible to eliminate the need to use all redundant communication paths for communication (i.e., it is possible to eliminate the need to perform communication processing on all redundant communication paths simultaneously), thereby reducing the processing load related to data transmission processing and improving communication reliability. Problems, configurations, and effects other than those described above will be made clear in the description of the following embodiments.

[0013] Fig. 3 is a diagram showing an example of a communication configuration to which the railway communication system according to the present invention is applied. Fig. 4 is a diagram showing an example of the configuration of a ground radio control unit and an on-board radio control unit in the railway communication system according to Example 1 of the present invention. Fig. 5 is a diagram showing an example of the configuration of a ground radio control unit and an on-board radio control unit in the railway communication system according to Example 2 of the present invention. Fig. 6 is a diagram showing an example of an operation mode when determination control of a communication path is performed using the configuration shown in Fig. 3.

[0014] Hereinafter, as modes for carrying out the present invention, Examples 1 and 2 will be described with reference to the drawings. Note that the present invention is not limited to these Examples. In addition, in the description of the drawings, the same parts are designated by the same reference numerals.

[0015] Fig. 1 is a diagram showing an example of a communication configuration to which the railway communication system according to the present invention is applied. Here, the railway communication system performs communication between devices that transmit and receive control information, and while Fig. 1 focuses on communication between a device installed on the ground and a device installed on a train, the same applies to communication between devices that are both installed on the ground or both installed on a train, and the form is not limited thereto.

[0016] Control information is communicated between the train 101 and the wayside equipment 108, and the control information is, for example, communication of data for a plurality of applications represented by a train control application 104 and a voice communication application 105.

[0017] Application data of the wayside equipment 108 is outputted to a communication network such as a public wireless network 110 or a privately operated wireless network 111 via a wayside wireless control unit 109. Similarly, application data of the on-board equipment 103 mounted on the train 101 is outputted to a communication network such as a public wireless network 110 or a privately operated wireless network 111 via an on-board wireless control unit 102.

[0018] When communication is performed between devices both installed on the ground, both wireless and wired connections are possible, but wireless communication is generally used for communication between the ground and on-board devices shown in Figure 1. Therefore, a wireless device 112 is provided to output data output by the on-board wireless control unit 102 to the communication network.

[0019] 2 is a diagram showing an example of the configuration of a ground radio control unit and an on-board radio control unit in the railway communication system according to the first embodiment of the present invention. Here, the ground radio control unit and the on-board radio control unit both have the same configuration and operation mode as communication control devices.

[0020] The ground wireless control unit or on-board wireless control unit 214 performs transmission output control to output data received from the railway applications (104 to 107) 215 to the wired / wireless communication network 201. As the wired / wireless communication network 201, for example, any number of communication paths, such as the wired communication network 202 and wireless communication networks 1 to 4 (203 to 206), are prepared in advance.

[0021] In this way, the purpose of preparing multiple communication paths is to provide redundancy for the communication paths and improve communication quality. In particular, when using a public wireless communication network for wireless communication, it is difficult for the entity operating the applicable railway communication system (e.g., railway operator) to control the communication quality of the communication path. Therefore, it is expected that the communication quality will be lower than when a privately operated communication network is installed, or that the quality will not be constant but will fluctuate depending on the situation. In order to reduce this impact, it is useful to prepare multiple communication paths in advance.

[0022] The ground radio control unit or on-board radio control unit 214 is made up of a communication path monitoring unit 207, a communication path determination unit 213, a path management pool 209, and a packet transmission control unit 208. Furthermore, the path management pool 209 functions as a path management unit and is made up of a used path pool 210 that manages paths to be used for communication of control data within the defined wired / wireless communication network 201, a standby path pool 211 that manages paths that are not currently used for communication of control data but can be used as communication paths, and a broken path pool 212 that manages paths that cannot currently be used for communication of control data.

[0023] The communication path monitoring unit 207 monitors all defined communication paths and checks whether the path is usable for communication. Possible communication path monitoring methods include monitoring the communication carrier level for each communication path, sending a communication path monitoring test packet (e.g., ping data) to check the communication path's availability (communication availability) and response time including delay time, monitoring the communication quality (e.g., communication error rate) of the communication path over a certain period of time, or monitoring the communication throughput of each path. The communication path monitoring unit 207 performs monitoring using at least one of these methods and notifies the communication path determination unit 213 of the monitoring results for each path.

[0024] The communication path determination unit 213 allocates and registers each communication path to one of the path management pools 209 based on the monitoring results of the communication path monitoring unit 207. The communication path determination unit 213 may use a method of determining which path to allocate the communication path to by setting a determination threshold for the monitoring results of the communication path monitoring unit 207, or a method of determining the path based on the transition of the monitoring results over a certain period of time in the past.

[0025] As a result of the determination by the communication path determination unit 213, a path determined to be communication-unavailable is allocated to the broken path pool 212, and a path determined to be communication-enabled is allocated to either the used path pool 210 or the standby path pool 211. At this time, a allocation rule for allocating to either the used path pool 210 or the standby path pool 211 is defined in advance in the communication path determination unit 213. For example, if it is defined in advance that all communication-enabled paths are allocated and registered in the used path pool 210, no paths will be allocated to the standby path pool 211.

[0026] The packet transmission control unit 208 controls the transmission of data of the railway application (104 to 107) 215 to the communication routes allocated and registered in the usage route pool 210. Therefore, when there are many communication routes available, all of them are allocated and registered in the usage route pool 210, and the data of the railway application (104 to 107) 215 is transmitted to all of the communication routes. Here, when the packet transmission control unit 208 transmits the data of the railway application (104 to 107) 215 to each communication route, it transmits a copy of the same data content to all of the communication routes.

[0027] According to the definition rules for the used route pool 210 described above, the more available routes there are, the more routes are used for transmission control, resulting in an increased processing load for transmission control. Furthermore, even in a situation where many communication routes are available and communication quality can be ensured, all available communication routes will be used, which increases communication costs if the communication routes used are public communication networks with a pay-as-you-go system. Therefore, even if a route is available for communication, if other available routes exist, some of the communication routes can be allocated and registered in the standby route pool 211 so that they are not used for control data communication for the railway application (104-107) 215.

[0028] For example, when the communication path determination unit 213 determines that multiple communication paths are available for communication, the paths to be preferentially registered in the usage path pool and the priority of registration in the usage path pool are defined in advance. Furthermore, if the maximum number of communication paths through which the packet transmission control unit 208 transmits data is set to N paths (N: any number equal to or greater than 1), when the total number of paths determined by the communication path determination unit 213 as available for communication is N paths or less, the available paths are registered in the usage path pool. On the other hand, when the total number of paths is greater than N paths, the N communication paths are registered in the usage path pool 210 according to the predefined priority, and the remaining available paths are registered in the standby path pool 211. This allows the packet transmission control unit 208 to simultaneously select up to N paths as transmission paths and perform transmission processing, preventing transmission processing (load) beyond this limit.

[0029] The routes allocated and registered in the standby route pool 211 are not used for data transmission by the railway application 215, but their status can be recorded as routes that can be used for communication. In addition, a control method can be adopted in which, when any of the routes allocated and registered in the used route pool 210 becomes unavailable for communication, the next communication route to be used is preferentially the one that was registered in the standby route pool 211 immediately before that.

[0030] Although there are no set rules for the communication path monitoring period by the communication path monitoring unit 207 and the communication path determination period by the communication path determination unit 213, the shorter the period, the more likely it is that the most suitable path available for communication at that time will be allocated and registered as needed in the used path pool 210. The packet transmission control unit 208 can transmit data using an available path the moment it is registered.

[0031] 2 illustrates an example in which, when wireless communication network 2 (204) and wireless communication network 3 (205) are registered for allocation as the use route pool 210, the packet transmission control unit 208 transmits data of the railway application 215 to these two routes. Also, FIG. 2 illustrates packet transmission, but does not illustrate reception. Packets can also be received via a route different from the route via which the packet is being transmitted. Furthermore, route selection based on the use route pool 210 relates to transmission routes, and does not restrict reception routes.

[0032] 3 is a diagram showing an example of the configuration of a ground radio control unit and an on-board radio control unit in a railway communication system according to a second embodiment of the present invention. This configuration is obtained by adding a route selection unit 216 to the configuration according to the first embodiment shown in FIG.

[0033] The communication path determination unit 213 takes into account not only the path monitoring results of the communication path monitoring unit 207 but also information from the path selection unit 216, and allocates and registers each communication path to one of the pools (210 to 212) in the path management pool 209.

[0034] For example, if information from the communication path monitoring unit 207 indicates that there are multiple communication paths available for communication, the information from the path selection unit 216 can be used to determine which path to preferentially register in the usage path pool 210.

[0035] In addition, when an instruction to always select a specific route is given by the route selection unit 216, the communication route determination unit 213 can preferentially allocate and register the specific route in the usage route pool 210 regardless of the monitoring result of the communication route monitoring unit 207. For example, a method in which a commander or a driver at a control center performs fixed setting of a communication route by operation and notifies the route selection unit 216 of the setting information, thereby selecting the fixedly set communication route, is included.

[0036] Conversely, it is also possible to keep a specific route unused at all times based on information from the route selection unit 216, and to allocate and register the route to the route disconnection pool 212 even if communication is possible.

[0037] In addition, if the communication route determination unit 213 defines rules that trigger the train's presence or passing through a specific geographical location and assigns and registers a specific communication route to one of the three route pools, it will be possible to assign routes according to location information.

[0038] In this case, the train position information is acquired as externally set information from the route selection unit 216. Methods for acquiring the train position information include a method using GPS position information and a method using position information obtained from a transponder ground coil.

[0039] Furthermore, by comparing both the location information and the monitoring results of the communication path, the communication path determining unit 213 can define how to sort and decide on registration.

[0040] Fig. 4 is a diagram showing an example of an operational mode when communication path determination control is performed using the configuration shown in Fig. 3. In Fig. 4, the communication paths that provide communication services between point 1 (408) and point 8 (415) include satellite communication 406, public communication network carrier A (405), and public communication network carrier B (404). In addition, there are public communication network carrier C (403) that provides communication services between point 1 (408) and point 5 (412) and partway between point 5 (412) and point 6 (413), public communication network carrier D (402) that provides communication services between point 4 (411) and point 8 (415), and private communication network 401 that defines the area between point 6 (413) and point 7 (414) as a communication area.

[0041] The upper diagram in Figure 4 shows the route for the communication service provided in the section from point 1 (408) to point 8 (415), and the lower diagram in Figure 4 shows the registration status in each pool within the route management pool 209 in the section from point 1 (408) to point 8 (415).

[0042] The following describes the cases where the train 101 is located in sections (1) to (7) when traveling from point 1 (408) to point 8 (415). In this example, the maximum number of routes that can be allocated and registered in the usage route pool 310 is predefined as three.

[0043] (1) Point 1 (408) to Point 2 (409) Based on the information from the monitoring results of the communication path monitoring unit 207, the communication path determination unit 213 determines that four paths, namely, public communication network carrier A (405), public communication network carrier B (404), public communication network carrier C (403), and satellite communication (406), are possible for communication.

[0044] Since the maximum number of routes that can be allocated and registered in the usage route pool 210 is three, the communication route determination unit 213 selects the route to be allocated and registered in the usage route pool 210 based on the route priority selection information and driving position information obtained from the route selection unit 216.

[0045] In this example, public communication network carrier A (405), public communication network carrier B (404), and public communication network carrier C (403) are allocated and registered in the used route pool 210 and used for controlling the transmission of application data. The remaining satellite communication (406) is allocated and registered in the standby route pool 211. The private communication network 401 is determined to be unable to communicate as a result of communication route monitoring, and is allocated and registered in the route disconnection route pool 212.

[0046] (2) Point 2 (409) to Point 3 (410) This section is assumed to be a section (communication failure section) where communication congestion or the like has occurred in public communication network carrier C (403), causing communication failure. The communication path monitoring unit 207 monitors the communication path and outputs a monitoring result indicating that communication congestion has occurred in public communication network carrier C (403), causing communication failure. Based on the information from this monitoring result, the communication path determination unit 213 determines that communication is not possible with public communication network carrier C (403) and assigns and registers it in the route failure path pool 212. Instead, the satellite communication 406, which was previously registered in the standby path pool 211, is assigned and registered in the used path pool 210. That is, in this section, communication is performed over a total of three paths, including satellite communication 406 (public communication network carrier A (405), public communication network carrier B (404), and satellite communication 406).

[0047] (3) Point 3 (410) to Point 4 (411) In this section, no communication congestion occurs in the public communication network carrier C (403), and the communication path determination unit 213 determines that the public communication network carrier C (403) is a possible communication path based on information from the monitoring results of the communication path monitoring unit 207. As a result, the satellite communication 406 is allocated and registered in the standby path pool 211 by path priority selection, just as in the case where a line is present in the above-mentioned section (1) (point 1 (408) to point 2 (409)).

[0048] (4) Point 4 (411) to Point 5 (412) Based on the information from the monitoring results of the communication path monitoring unit 207, the communication path determination unit 213 determines that in addition to public communication network carrier A (405), public communication network carrier B (404), and public communication network carrier C (403), public communication network carrier D (402) is now a possible communication path.

[0049] However, until passing through point 5 (412), the selection priority of public communication network carrier D (402) is defined in advance as lower than that of public communication network carrier C (403). Therefore, based on the location information from the route selection unit 216, the communication route determination unit 213 prioritizes public communication network carrier C (403) and allocates and registers it in the use route pool.

[0050] Here, public communication network carrier D (402) that has been determined to be newly available for communication is allocated and registered in the standby route pool 211. By keeping the carrier in hot standby after determining that communication is available in this way, the route to be used can be switched smoothly after passing through point 5 (412).

[0051] In this example, since it is defined that public communication network carrier D (402) is selected with higher priority than public communication network carrier C (403) after passing point 5 (412), the route used is switched to public communication network carrier D (402) with higher priority after passing point 5 (412). Here, if the system is in a hot standby state, it is possible to switch from public communication network carrier C (403) to public communication network carrier D (402) after determining whether communication can be maintained reliably.

[0052] (5) Point 5 (412) to Point 6 (413) As described above, the communication route determination unit 213 allocates and registers the public communication network carrier D (402) in the usage route pool 210. Because the service area of ​​the public communication network carrier C (403) extends to the middle of the section from Point 5 (412) to Point 6 (413), the communication route determination unit 213 determines whether to allocate and register the public communication network carrier D (402) in the usage route pool 210 based on the location information acquired from the route selection unit 216 before exiting the service section.

[0053] (6) Point 6 (413) to Point 7 (414) In this section, in addition to the public communication networks (402 to 405), a private communication network 401 is installed. Since the private communication network 401 is expected to have more stable communication quality and communication level than the public communication networks (402 to 405), the private communication network 401 is registered in advance in the communication route determination unit 213 so that it is preferentially allocated and registered in the usage route pool 210, or a command is set in the route selection unit 216 to forcibly select the private communication network 401.

[0054] The communication route determination unit 213 allocates and registers the private communication network 401 in the used route pool 210 based on the definition information and the command information or location information from the route selection unit 216. Instead, the public communication network carrier B (404) is allocated and registered in the standby route pool 211 based on the route priority selection definition.

[0055] (7) Point 7 (414) to Point 8 (415) As in the case of the section (1) above (point 1 (408) to point 2 (409)), the communication path determination unit 213 allocates and registers the satellite communication 406 in the standby path pool 211.

[0056] As described above, the communication route determination unit 213 determines the communication routes to be allocated and registered in the usage route pool 210 based on external conditions such as location and definition information, making it possible to always select the optimal communication route from among the maximum number of simultaneous communication routes, which is three.

[0057] Although Examples 1 and 2 have been described above as embodiments of the present invention, the present invention is not limited to the above-described Examples 1 and 2, and various modifications are possible within the scope of the present invention.

[0058] Furthermore, the above-described configurations, functions, and processing units may be partially or entirely implemented in hardware, for example, by designing them as integrated circuits. Furthermore, the above-described configurations and functions may be implemented in software by a processor interpreting and executing a program that implements each function. In this case, information about the program that implements each function may be stored in a storage device such as a memory or a hard disk, or in a storage medium such as an IC card, an SD card, or a DVD.

[0059] 101 Train, 102 On-board radio control unit, 103 On-board equipment, 104 Train control application, 105 Voice call application, 106 Information content distribution application, 107 Video transmission application, 108 Ground equipment, 109 Ground radio control unit, 110 Wireless network (public), 111 Wireless network (private), 112 Radio, 201 Wired / wireless communication network, 202 Wired communication network, 203 Wireless communication network 1, 204 Wireless communication network 2, 205 Wireless communication network 3, 206 Wireless communication network 4, 207 Communication path monitoring unit, 208 Packet transmission control unit, 209 Route management pool, 210 Used route pool, 211 Standby route pool, 212 Route disconnection route pool, 213 Communication path determination unit, 214 Ground radio control unit or on-board radio control unit, 215 Railway application, 216 Route selection unit, 401 Private communication network, 402 Public communication network carrier D, 403 Public communication network carrier C, 404 Public communication network carrier B, 405 Public communication network carrier A, 406 Satellite communication, 408 Point 1, 409 Point 2, 410 Point 3, 411 Point 4, 412 Point 5, 413 Point 6, 414 Point 7, 415 Point 8

Claims

1. A communication control device for a railway communication system which transmits data between multiple devices via multiple communication paths, at least one of which is a wireless communication path, comprising: a communication path monitoring unit which monitors whether each of the multiple communication paths is available for use; a communication path determination unit which determines which of the multiple communication paths is to be used for the data transmission; and a path management unit which manages the multiple communication paths as being in use, in standby, or in an unavailable state, wherein the communication path determination unit determines the communication path to be used for the data transmission based on the monitoring results of the communication path monitoring unit, and classifies each of the multiple communication paths as being in use, in standby, or in unavailable state, and registers them in the path management unit.

2. A communication control device for a railway communication system as described in claim 1, characterized in that the route management unit is composed of a used route pool that manages communication routes that are in use, a standby route pool that manages communication routes that are in standby, and a disconnected route pool that manages communication routes that are unavailable.

3. A communication control device for a railway communication system as described in claim 1 or 2, characterized in that the communication path monitoring unit monitors the availability of each of the multiple communication paths based on at least one of the following: communication availability, response time including delay time, communication carrier level, communication quality, and communication throughput.

4. A communication control device for a railway communication system as described in any one of claims 1 to 3, characterized in that the communication path determination unit determines the communication path to be used for the data transmission based on at least one of the position information of trains using the railway communication system and the priority of each of the multiple communication paths in addition to the monitoring results.

5. A communication control device for a railway communication system as described in any one of claims 1 to 4, further comprising a route selection unit that controls the allocation of each of the plurality of communication routes to the route management unit by the communication route determination unit based on predetermined setting information including settings from outside.

6. A communication control method for a railway communication system in which data is transmitted between multiple devices via multiple communication paths, at least one of which is a wireless communication path, comprising the steps of: monitoring the availability of each of the multiple communication paths; determining the communication path to be used for the data transmission based on the monitoring results; and managing each of the multiple communication paths by classifying them into an available state, a standby state, or an unavailable state.

7. A communication control method for a railway communication system as described in claim 6, characterized in that the availability of each of the plurality of communication paths is monitored based on at least one of the following: communication availability, response time including delay time, communication carrier level, communication quality, and communication throughput.

8. A communication control method for a railway communication system as claimed in claim 6 or 7, characterized in that the communication route to be used for the data transmission is determined based on at least one of position information of trains using the railway communication system and a priority for each of the plurality of communication routes in addition to the monitoring results.

9. A communication control method for a railway communication system according to any one of claims 6 to 8, characterized in that each of said plurality of communication paths is assigned to be in use, in standby or in unavailable state based on predetermined setting information including external settings.

Citation Information

Patent Citations

  • Train control system

    JP2009067357A

  • Communication system, and communication control method

    JP2012209787A

  • Railroad facility monitoring system and data communication device

    JP2015166217A

  • Train control system

    JP2019107915A

  • Radio communication system and radio communication method

    WO2022157843A1