Information processing device, program, and information processing method
The information processing device manages heat exchange between the latent heat storage material and the heat source based on battery charging state and processing capacity to maintain CPU/GPU speed, addressing heat-related issues in mobile devices during high-processing tasks.
Patent Information
- Application Number
- PCT/JP2024/018559
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-30
- Filing Date
- 2024-05-20
- Publication Date
- 2024-12-05
AI Technical Summary
Mobile devices such as smartphones and tablets experience significant heat generation during high-processing tasks like video shooting, gaming, and charging, leading to reduced CPU/GPU processing speed and potential processing failures, which impair user experience and pose risks of overheating.
An information processing device equipped with a secondary battery and a cold storage device that dynamically controls heat exchange between the latent heat storage material and the heat source based on the battery's charging state and processing capacity, prioritizing cooling when necessary to maintain processing speed.
This approach effectively maintains CPU/GPU processing speed by managing heat generation, reducing the likelihood of processing failures and user experience degradation while minimizing the risk of overheating.
Smart Images

Figure JP2024018559_05122024_PF_FP_ABST
Abstract
Description
Information processing device, program, and information processing method
[0001] The present disclosure relates to an information processing device, a program, and an information processing method.
[0002] In mobile terminals such as smartphones and tablet PCs (Personal Computers), and information processing devices such as digital cameras, significant heat generation can occur when the central processing unit (CPU) or graphic processing unit (GPU) is under high processing load. In particular, when high-load processing such as video recording, streaming, or game operation is performed simultaneously with charging, the internal temperature of the information processing device rises significantly.
[0003] For this reason, some information processing devices are equipped with a function to suppress the rise in internal temperature by, for example, reducing the processing speed of the CPU or GPU when the internal temperature approaches a dangerous temperature that could cause low-temperature burns to the user or deterioration of the information processing device.
[0004] International Publication No. 2021 / 095140
[0005] However, a decrease in CPU / GPU processing speed can cause processing to stop or slow down, resulting in so-called slowdowns. This slowdown is especially likely to occur during high-load processing, such as video recording, streaming, and gameplay. Slowdowns during such high-load processing can be a major factor in impairing a user's comfortable experience, and are undesirable for users.
[0006] Therefore, it is desirable to minimize the decrease in the processing power of information processing devices during high-load processing, but for example, heat dissipation design to deal with internal temperature increases assumed during high-load processing is a barrier to miniaturization of information processing devices. Also, it is not easy to install a cold storage device in an information processing device that operates on a secondary battery in terms of the power required to cool the latent heat storage material of the cold storage device and the heat generated when the cooling function is operated.
[0007] Therefore, the present disclosure proposes an information processing device, a program, and an information processing method that can maintain a state in which a decrease in CPU / GPU processing speed due to heat generation is unlikely to occur for as long as possible.
[0008] According to the present disclosure, there is provided an information processing device that includes a secondary battery and a cold storage device, and that determines whether the processing capacity of the information processing device is limited by heat generation, determines whether to cool the latent heat storage material of the cold storage device based on the charging state of the secondary battery, and, if it is determined that the processing capacity is limited by heat generation, that includes a control unit that executes a process to exchange heat between the latent heat storage material and a heat source.
[0009] In addition, according to the present disclosure, a program is provided for an information processing device equipped with a secondary battery and a cold storage device, which determines whether the processing capacity of the information processing device is limited by heat generation, determines whether to cool the latent heat storage material of the cold storage device based on the charging state of the secondary battery, and if it is determined that the processing capacity is limited by heat generation, executes a process to exchange heat between the latent heat storage material and a heat source.
[0010] Furthermore, according to the present disclosure, an information processing method is provided in which an information processing device equipped with a secondary battery and a cold storage device determines whether the processing capacity of the information processing device is limited by heat generation, determines whether to cool the latent heat storage material of the cold storage device based on the charge state of the secondary battery, and if it is determined that the processing capacity is limited by heat generation, executes a process to exchange heat between the latent heat storage material and a heat source.
[0011] 1 is a diagram illustrating an example of an information processing device 10 according to the present embodiment; FIG. 2 is a diagram illustrating another example of the information processing device 10 according to the present embodiment; FIG. 3 is a block diagram illustrating an example of a functional configuration of the information processing device 10 according to the present embodiment; FIG. 4 is a diagram illustrating an example of a configuration of a cold storage device 310 according to the present embodiment; FIG. 5 is a diagram illustrating a control method (1) of the cold storage device 310 and the secondary battery 500 according to the present embodiment; FIG. 6 is a diagram illustrating a control method (2) of the cold storage device 310 and the secondary battery 500 according to the present embodiment; FIG. 7 is a diagram illustrating a control method (3) of the cold storage device 310 and the secondary battery 500 according to the present embodiment; FIG. 8 is a diagram illustrating a heat exchange method (1) between the cold storage device 310 and the heat source 410 according to the present embodiment; FIG. 9 is a diagram illustrating a heat exchange method (2) between the cold storage device 310 and the heat source 410 according to the present embodiment; FIG. 10 is a diagram illustrating a heat exchange method (3) between the cold storage device 310 and the heat source 410 according to the present embodiment; FIG. 11 is a diagram illustrating switching of a charge control mode according to the present embodiment; FIG. 12 is a diagram illustrating switching of a charge control mode according to the present embodiment; FIG. 13 is a flowchart illustrating a flow of a charge control process according to the present embodiment. 1 is a flowchart illustrating a flow of a heat exchange control process according to the present embodiment. FIG. 2 is a block diagram illustrating an example of a hardware configuration of an information processing apparatus 10 according to the present embodiment. FIG.
[0012] The present embodiment will be described in detail below with reference to the drawings. In this specification and the drawings, substantially the same components are designated by the same reference numerals, and redundant description will be omitted.
[0013] The description will be given in the following order: 1. Embodiment 1.1. Example of functional configuration 1.2. Details of functions 1.3. Flow of functions 2. Example of hardware configuration 3. Summary
[0014] 1. Embodiment First, an information processing device 10 according to this embodiment will be described. The information processing device 10 may be, for example, a mobile terminal such as a smartphone or tablet PC capable of executing various applications, or may be a stationary terminal installed in a user's home or office. The information processing device 10 includes, for example, a secondary battery (also referred to as a rechargeable battery, storage battery, battery, or rechargeable battery). Furthermore, by charging the secondary battery, the information processing device 10 can operate for a certain period of time using power supplied from the secondary battery without power supply from an external power source (such as an AC adapter or mobile battery).
[0015] FIG. 1 is a diagram illustrating an example of an information processing device 10 according to this embodiment. In the example of FIG. 1, a game application is displayed on a display unit 110, which is a display of the information processing device 10, indicating that the game application is in the foreground state. The information processing device 10 is also connected to an external power source 90 via a cable 50. Note that if the external power source 90 is directly connected to the information processing device 10, the cable 50 is not necessary. For example, if the state illustrated in FIG. 1 were realized in a conventional information processing device, high-load processing by the game application and charging would be performed simultaneously, which could result in a significant increase in the internal temperature of the information processing device and a decrease in the processing speed of the CPU.
[0016] 2 is a diagram showing another example of the information processing device 10 according to the present embodiment. In the example of FIG. 2, nothing is displayed on the display unit 110 of the information processing device 10, indicating that no user operations are being performed. The information processing device 10 is also connected to an external power source 90 via a cable 50. For example, if the state shown in FIG. 2 is realized in a conventional information processing device, the information processing device is in a low-load processing state, and the internal temperature of the information processing device does not rise significantly, with heat generated by charging being the main heat source.
[0017] <<1.1. Functional Configuration Example>> Next, the functional configuration of the information processing device 10 according to this embodiment will be described. FIG. 3 is a block diagram showing an example of the functional configuration of the information processing device 10 according to this embodiment. As shown in FIG. 3, the information processing device 10 according to this embodiment includes, for example, a display unit 110, an operation unit 120, a memory unit 130, a camera unit 140, a detection unit 150, a measurement unit 160, a determination unit 170, a charge control unit 180, a control unit 200, a cold storage unit 300, a heat exchange control unit 350, a heat generation unit 400, a heat path 450, and a secondary battery 500. The determination unit 170 includes, for example, a determination unit A171, a determination unit B172, a determination unit C173, and a determination unit D174. Although not shown, the information processing device 10 may also include a communication unit that is connected wirelessly or wired to various communication networks such as the Internet and transmits and receives information to and from other information processing devices on the network.
[0018] (Display Unit 110) The display unit 110 according to the present embodiment displays various types of visual information, for example, under the control of the control unit 200. For example, the display unit 110 may display images, text, and the like related to an application. To this end, the display unit 110 includes various display devices, such as a liquid crystal display (LCD) device or an organic light emitting diode (OLED) display device. Furthermore, the display unit 110 can also superimpose and display the user interface (UI) of an operating system or another application on a layer above or below the screen of the application being displayed.
[0019] (Operation Unit 120) The operation unit 120 according to this embodiment detects various operations by the user, such as device operations for applications, and inputs information related to the detected user operations to the control unit 200. The device operations include, for example, touch operations. The touch operations refer to contact operations such as tapping, double tapping, swiping, and pinching on the display unit 110, but may also include non-contact operations in which an object such as a finger is brought close to the display unit 110. The operation unit 120 also includes, for example, a touch panel, buttons, a keyboard, a mouse, and a proximity sensor.
[0020] (Storage Unit 130) The storage unit 130 according to this embodiment is, for example, a storage area for temporarily or permanently storing various programs and data. For example, the storage unit 130 may store programs and data for the information processing device 10 to execute various functions. As a specific example, the storage unit may store programs for executing various applications, management data for managing various settings, and the like. Note that these programs and data are merely examples, and the types of data stored in the storage unit are not particularly limited.
[0021] (Camera Unit 140) The camera unit 140 according to this embodiment is, for example, a camera device, and captures an image of a subject and acquires various types of visual information under the control of the control unit 200. For example, the camera unit 140 may acquire information such as an image of the subject, distance, size, etc.
[0022] (Detection Unit 150) The detection unit 150 according to this embodiment monitors and detects various changes that trigger execution of, for example, the secondary battery charging control process or the heat exchange control process. For example, the detection unit 150 detects whether the temperature of the cold storage device 310, which is an example of the cold storage unit 300, is equal to or greater than a predetermined threshold value or less than a predetermined threshold value. The detection unit 150 monitors the temperature of the cold storage device 310 and detects whether a condition is satisfied with respect to a preset threshold value. For example, the detection unit 150 can also detect whether the temperature is equal to or less than a threshold value or whether the temperature is greater than or equal to a threshold value. In other words, whether the condition includes a threshold value (e.g., equal to or greater than, or less than, etc.) or does not include a threshold value (e.g., less than, above, or below, etc.) is entirely within the scope of a design change.
[0023] The detection unit 150 also detects, for example, when a specific application enters the foreground state, the sleep state, and when it has terminated. Note that the sleep state does not mean that the application is completely stopped, but rather background processing may be performed, so the detection unit 150 can also detect when the application enters the background state. That is, for example, in the case of a specific application whose background processing may be a high-load process, the detection unit 150 can detect when the application enters the background state and execute a heat exchange control process as if it were in the foreground state. The specific application may be, for example, a pre-designated application that may be a high-load process. Alternatively, for a specific application, the performance and resource status of the information processing device 10 may be measured by the measurement unit 160 (described later) or the like, and the application that is actually performing a high-load process may be identified.
[0024] Furthermore, the detection unit 150 detects, for example, whether the remaining charge of the secondary battery 500 is equal to or greater than a predetermined threshold or whether it is less than a predetermined threshold. Note that the detection unit 150 only needs to monitor the remaining charge of the secondary battery 500 and detect whether a condition for a preset threshold is satisfied, and the threshold determination condition can be changed within the scope of design changes, similar to the threshold condition for detecting the temperature of the cool storage device 310 described above.
[0025] Furthermore, the detection unit 150 detects, for example, that an external power supply 90 has been connected to the information processing device 10. Note that detecting that the external power supply 90 has been connected includes, for example, detecting that a cable 50 connected to the external power supply 90 has been connected to the information processing device 10, as shown in FIG.
[0026] (Measurement Unit 160) The measurement unit 160 according to this embodiment measures various values within the information processing device 10, for example, under the control of the control unit 200. For example, the measurement unit 160 measures the temperature within the information processing device 10. The temperature within the information processing device 10 may include the temperatures of the heat generating unit 400 (such as the CPU or GPU), which is a heat source, the secondary battery 500 (including the charging circuit), and the cool storage device 310, as well as the temperature of the rear surface of the housing of the information processing device 10. The measurement unit 160 also measures, for example, the remaining charge of the secondary battery 500. The measurement unit 160 also measures operation information from the operation unit 120 (for example, whether or not there is a change in the capacitance value of the touch panel or whether or not there is a change in the acceleration sensor) to determine the user's usage status, such as whether or not the user is holding the information processing device 10 in their hand.
[0027] (Determination Unit 170) The determination unit 170 according to the present embodiment determines various conditions, for example, based on control by the control unit 200. For example, as shown in FIG. 3 , the determination unit 170 includes a determination unit A171 that determines whether the processing capacity of the information processing device 10 is limited due to heat generation, a determination unit B172 that determines whether to cool the cool storage device 310 based on the charge state of the secondary battery 500, a determination unit C173 that determines whether to cool the heat source based on the running state of a predetermined application and the heat generation conditions of the heat source, and a determination unit D174 that determines the user's usage state and determines the cooling capacity of the cool storage device 310 based on the temperature inside the information processing device 10 and the user's usage state. The cooling of the cool storage device 310 may be, for example, cooling of the latent heat storage material 311 of the cool storage device 310, as described below. The heat generation conditions of the heat source may be, for example, the type and amount of heat generation of the heat source, the thermal resistance or thermal conductivity of the heat source, etc. The temperature inside the information processing device 10 may be, for example, the temperature of the heat source, the secondary battery 500, the charging circuit of the secondary battery 500, the cool storage device 310, the rear surface of the housing of the information processing device 10, and the like.
[0028] Furthermore, the determination unit 170 determines, for example, whether the remaining charge of the secondary battery 500 is equal to or greater than a predetermined threshold, or determines the running state of a predetermined application, such as whether the predetermined application is in the foreground state. Furthermore, for example, the determination of whether to cool the cold storage device 310 based on the charge state of the secondary battery 500, which is executed by the determination unit 170, may include determining whether to prioritize cooling the cold storage device 310 over charging the secondary battery 500, based on the remaining charge of the secondary battery 500 or the temperature of the cold storage device 310.
[0029] Note that some of the determinations made by the determination unit 170 are similar to the detections made by the detection unit 150 described above, such as the temperature of the cool storage device 310 reaching a predetermined threshold or higher, the remaining charge of the secondary battery 500 reaching a predetermined threshold or higher, or a predetermined application entering the foreground state. However, at the timing of the determination made by the determination unit 170, it is possible that each of the phenomena that should be detected by the detection unit 150 has already occurred, and in this case the detection unit 150 is unable to detect the phenomena, and therefore the determination is made by the determination unit 170 without omission.
[0030] (Charging control unit 180) The charging control unit 180 according to the present embodiment controls, for example, the cooling of the cold storage device 310 and the charging of the secondary battery 500 based on the control by the control unit 200. Furthermore, the charging control unit 180 controls the cooling of the cold storage device 310 from the external power supply 90 and the charging of the secondary battery 500 based on, for example, the contents of detection by the detection unit 150 and the determination result by the determination unit 170.
[0031] (Control Unit 200) The control unit 200 according to this embodiment is, for example, a processing unit that controls the entire information processing device 10, and controls each component included in the information processing device 10.
[0032] (Cold storage unit 300) The cold storage unit 300 according to this embodiment is a cold storage device 310 that combines a cold storage device such as a latent heat storage material 311 that is cooled based on the control of the charge control unit 180, and a device such as a Peltier element or a heat pump for performing cooling.
[0033] FIG. 4 is a diagram illustrating an example configuration of a cold storage device 310 according to this embodiment. As illustrated in FIG. 4 , the cold storage device 310, which is an example of the cold storage unit 300, includes a latent heat storage material 311, such as a phase change material (PCM), a thermally conductive paste 312, a cooling element 313, such as a Peltier element, and a heat dissipation structure 314, such as a heat sink. The heat dissipation structure 314 can dissipate heat generated when the cooling element 313 is operated to cool the latent heat storage material 311. The heat dissipation structure 314 may also be used to dissipate heat from the heat generating unit 400 according to this embodiment. The thermally conductive paste 312 (or a thermally conductive sheet) is used to increase thermal conductivity, for example, and is commonly used in locations where heat exchange occurs and where contact thermal resistance is high. FIG. 4 illustrates this example. The configuration of the cold storage device 310 illustrated in FIG. 4 is merely an example, and some of the components may be omitted, or components other than those illustrated in FIG. 4 may be included.
[0034] (Heat exchange control unit 350) The heat exchange control unit 350 according to this embodiment, for example, based on the control by the control unit 200, thermally connects the latent heat storage material 311 of the cold storage unit 300 and the heat generation unit 400 via a highly thermally conductive material, which is a thermal path 450, and controls the heat exchange between the latent heat storage material 311 and the heat generation unit 400. Regarding the heat transfer path of the heat exchange, for example, since the latent heat storage material 311 of the cold storage device 310 is the part to be cooled as the cold storage part, the latent heat storage material 311 and the heat generation unit 400 are connected via the highly thermally conductive material, which is the thermal path 450, and the heat exchange control unit 350, and heat exchange is performed.
[0035] Furthermore, the heat exchange control unit 350 not only controls based on the control by the control unit 200, but can also thermally connect the latent heat storage material 311 and the heat generation unit 400 by utilizing the temperature difference between the latent heat storage material 311 of the cold storage unit 300 and the heat generation unit 400, for example, using a shape memory alloy. The heat exchange control unit 350 can also control whether or not to bring a thermal switch, a shape memory alloy, or a material with high thermal conductivity into physical contact with the latent heat storage material 311 using an external force. In the case of a thermal switch, for example, if the switching temperature of the thermal switch can be freely controlled, the heat exchange control unit 350 can change the thermal conductivity based on the difference between the temperature of the cold storage device 310 and the temperature of the heat generation unit 400, which may eliminate the need for control from the control unit 200.
[0036] (Heat generating unit 400) The heat generating unit 400 according to this embodiment indicates, for example, a heat source that generates heat and inhibits the processing capability of the information processing device 10. Note that while the heat generating unit 400 is shown in Fig. 3, it may be in various locations, such as the device itself that is responsible for the processing capability of the CPU or GPU, a power supply integrated circuit (IC), a signal processing unit, or the camera unit 140. Furthermore, the heat generating unit is not limited to one location, and may be in multiple locations.
[0037] An example of the functional configuration of the information processing device 10 according to this embodiment has been described above. Note that the functional configuration described above using FIG. 3 is merely an example, and the functional configuration of the information processing device 10 according to this embodiment is not limited to this example. For example, the information processing device 10 does not necessarily have to include all of the components shown in FIG. 3. Furthermore, the functional configuration of the information processing device 10 according to this embodiment can be flexibly modified depending on the specifications and operation.
[0038] In addition, a computing device such as a CPU (Central Processing Unit) may read and execute an information processing program that describes the processing procedures for realizing the functions of each component from a storage medium such as a ROM (Read Only Memory) or a RAM (Random Access Memory). Therefore, the configuration used can be changed as appropriate depending on the technical level at the time of implementing this embodiment. An example of the hardware configuration of the information processing device 10 will be described later.
[0039] <<1.2. Detailed Functions>> Next, the functions of the information processing device 10 according to this embodiment will be described in detail. For example, when the external power supply 90 is connected, the control unit 200 of the information processing device 10 according to this embodiment controls the components shown in FIG. 3 and receives, as input from each component, the detection details of the detection unit 150 and the determination results of the determination unit 170. One of the features of this embodiment is that the control unit 200 controls charging of the secondary battery 500 from the external power supply 90 and cooling of the cold storage device 310 via the charge control unit 180, for example, in accordance with the received detection details and determination results. A control method for the cold storage device 310 and the secondary battery 500 will be described in more detail using FIGS. 5 to 8 .
[0040] 5 is a diagram for explaining a control method (1) of the cold storage device 310 and the secondary battery 500 according to this embodiment. Fig. 5 is a diagram illustrating a "normal charging mode," which is one of the control modes according to this embodiment. As shown in Fig. 5 , in the normal charging mode, for example, the CPU / GPU 210, which is the control unit 200 of the information processing device 10, the secondary battery 500, and the cold storage device 310 are all controlled to receive power supply from the external power supply 90.
[0041] Such control of the normal charging mode is a common control method when, for example, the external power supply 90 is connected to the information processing device 10 equipped with the secondary battery 500. The secondary battery 500 is charged while the latent heat storage material 311 of the cooling storage device 310 is simultaneously cooled. Therefore, if a high-load process, such as a game operation, is performed while the normal charging mode is maintained, the temperature inside the information processing device rises significantly due to the combination of heat generated by the high-load process, heat generated by charging, and heat generated by cooling the latent heat storage material 311 of the cooling storage device 310. As a result, the increase in internal temperature leads to a decrease in the processing speed of the CPU and GPU, making the device prone to processing sluggishness. Therefore, in this embodiment, the control mode is switched based on the charging state of the secondary battery 500 and the cooling state of the latent heat storage material 311 of the cooling storage device 310, etc., to maintain a state in which a decrease in the CPU / GPU processing speed is unlikely to occur for as long as possible.
[0042] FIG. 6 is a diagram illustrating a control method (2) for the cold storage device 310 and the secondary battery 500 according to this embodiment. FIG. 6 is a diagram illustrating a "charge priority mode," which is one of the control modes according to this embodiment. As shown in FIG. 6 , in the charge priority mode, for example, the CPU / GPU 210 and the secondary battery 500 of the information processing device 10 are controlled to receive power from the external power supply 90, while the cold storage device 310 is controlled not to receive power. In other words, since the cold storage device 310 does not receive power, the latent heat storage material 311 of the cold storage device 310 is not cooled. Therefore, in the charge priority mode, unlike the normal charging mode, heat is not generated due to cold storage.
[0043] FIG. 7 is a diagram illustrating a control method (3) for the cold storage device 310 and the secondary battery 500 according to the present embodiment. FIG. 7 illustrates a "cold storage priority mode," which is one of the control modes according to the present embodiment. As shown in FIG. 7 , in the cold storage priority mode, for example, the secondary battery 500 is controlled so as not to receive power supply from the external power source 90. In this case, the information processing device 10 can use the power supplied from the external power source 90 to cool the latent heat storage material 311 of the cold storage device 310, for example. This suppresses heat generation due to charging of the secondary battery 500 and allows the latent heat storage material 301 of the cold storage device 310 to cool more quickly. Furthermore, in the cold storage priority mode, for example, if the determination unit D174, which determines the user's usage state, determines that the user is not directly holding the information processing device 10, the risk of low-temperature burns on the user is reduced. Therefore, the information processing device 10 can be controlled to increase the cooling capacity of the cold storage device 310 for the latent heat storage material 311.
[0044] As described above, the information processing device 10 switches between the normal charging mode, charging priority mode, and cold storage priority mode so as to maintain for as long as possible a state in which a decrease in CPU / GPU processing speed due to heat generation is unlikely to occur, and controls charging of the secondary battery 500 and cooling of the cold storage device 310.
[0045] More specifically, for example, when the remaining charge of the secondary battery 500 is equal to or greater than a predetermined threshold (e.g., 80%) and a predetermined application is not in the foreground, the charging control unit 180 switches to the cold storage priority mode, stops charging the secondary battery 500 from the external power supply 90, and prioritizes cooling the latent heat storage material 311 of the cold storage device 310. This suppresses an increase in internal temperature due to charging, allowing the latent heat storage material 311 of the cold storage device 310 to store cold more quickly. Note that the threshold for the remaining charge of the secondary battery 500 can also be set so as to prioritize cooling the latent heat storage material 311 of the cold storage device 310 over charging the secondary battery 500 if a situation in which a high CPU / GPU processing speed is required can be foreseen in advance.
[0046] Furthermore, in response to detecting that the cold storage temperature of the latent heat storage material 311 of the cold storage device 310 has fallen below a predetermined threshold (e.g., −5° C.), the charge control unit 180 switches from the cold storage priority mode to the normal charging mode and starts charging the secondary battery 500 from the external power supply 90. Furthermore, the normal charging mode can be a mode in which, when the user switches the information processing device 10 from an unused state (e.g., while the user is sleeping) to a used state (e.g., when the user wakes up), power is supplied to both the cold storage device 310 and the secondary battery 500 in order to maintain an optimal balance between the increase in the cold storage temperature of the latent heat storage material 311 of the cold storage device 310 after cooling is stopped and the decrease in the remaining battery power of the secondary battery 500 after charging is stopped.
[0047] Furthermore, for example, in response to detecting that a predetermined application has entered a sleep state or been terminated, the charge control unit 180 can control the secondary battery 500 to be used to cool the latent heat storage material 311 of the cold storage device 310 if the remaining battery charge of the secondary battery 500 is sufficient (e.g., 50% or more). In this case, the charge control mode can be, for example, a "cold storage priority mode." FIG. 8 is a diagram for explaining a control method (4) for the cold storage device 310 and the secondary battery 500 according to this embodiment. FIG. 8 is a diagram illustrating such a "cold storage priority mode" in which the secondary battery 500 is controlled to be used to cool the latent heat storage material 311 of the cold storage device 310. As shown in FIG. 8, in such cold storage priority mode, for example, the latent heat storage material 311 of the cold storage device 310 is controlled to be cooled by power supplied from the secondary battery 500.
[0048] The charge control modes include, for example, a general normal charge mode in which the secondary battery 500 is charged, as well as a rapid charge mode that reduces the time required for charging compared to normal charge. The rapid charge mode generates more heat per unit time due to charging than the normal charge mode. For example, when the internal temperature of the information processing device 10 measured by the measurement unit 160 is within a predetermined temperature range, the charge control unit 180 can control the charging of the secondary battery 500 from the external power supply 90 to be rapid charge.
[0049] Furthermore, for example, if heat generated by charging the secondary battery 500 affects the processing capacity of the CPU / GPU, the charging control unit 180 may perform control to stop charging the secondary battery 500 from the external power supply 90 .
[0050] The control to stop charging the secondary battery 500 from the external power supply 90 may be, for example, control to stop charging the secondary battery from the external power supply 90 when the remaining charge of the secondary battery 500 is equal to or greater than a first threshold and a predetermined application is in the foreground state. Note that the first threshold is, for example, a boundary below which a decrease in the processing speed of the CPU / GPU due to a decrease in the remaining charge of the secondary battery 500 may occur if the remaining charge of the secondary battery 500 falls below the first threshold.
[0051] Furthermore, the control to stop charging of the secondary battery 500 from the external power supply 90 may be, for example, control to stop charging of the secondary battery 500 from the external power supply 90 and stop the power supply from the external power supply 90 when the remaining charge of the secondary battery 500 is equal to or greater than a second threshold. Note that the second threshold is, for example, a boundary at which deterioration of the secondary battery 500 may occur due to overcharging or the like if the remaining charge of the secondary battery 500 continues to exceed the second threshold.
[0052] Next, a heat exchange method between the cold storage device 310 and the heat source 410 will be described in more detail with reference to Figures 9 to 11. Figure 9 is a diagram for explaining a heat exchange method (1) between the cold storage device 310 and the heat source 410 according to this embodiment. Figure 9 is a diagram showing the heat source 410, which is the heat generating unit 400, and the latent heat storage material 311 of the cold storage device 310, which are connected via a heat exchange control unit 350 and a highly thermally conductive material, which is a heat path 450.
[0053] Note that the heat source 410 may be in one location or in two or more locations depending on the configuration of the information processing device 10, for example, so the example in Figure 9 shows two locations: heat source A 410-1 and heat source B 410-2. Also, if there are multiple heat sources 410, there is a heat exchange control unit 350 for each heat source 410, so the example in Figure 9 shows heat exchange control units A 350-1 and B 350-2 for heat source A 410-1 and heat source B 410-2, respectively. Note that, for example, the CPU / GPU that controls the processing capacity of the information processing device 10 is a large heat source for the heat source 410, but other large heat sources such as the camera unit 140 can also be large heat sources.
[0054] Furthermore, for example, when cooling of the heat source 410 is required, the heat exchange control unit 350 performs control to increase the thermal conductivity or decrease the thermal resistance of the heat source 410 in accordance with instructions from the control unit 200. In the example of FIG. 9, the heat exchange control unit A350-1 and the heat exchange control unit B350-2 perform control to increase the thermal conductivity or decrease the thermal resistance of the latent heat storage material 311 of the cold storage device 310 and the heat source A410-1 and the heat source B410-2, respectively. The example of FIG. 9 shows a case where heat exchange is required for both the heat source A410-1 and the heat source B410-2. This is the case, for example, when the camera unit 140 inputs video to the control unit 200. In this case, the heat source 410 is located in two places: the CPU / GPU 210 and the camera unit 140, so that the CPU / GPU 210 processes the signal from the camera unit 140.
[0055] 10 is a diagram illustrating a heat exchange method (2) between the cold storage device 310 and the heat source 410 according to the present embodiment. The example in FIG. 10 shows a case where heat exchange is not required for the heat source B410-2. This is the case, for example, when an application that does not use the camera unit 140 is being used. In this case, there is only one heat source 410, and heat exchange is not required for the heat source B410-2. Therefore, the heat exchange control unit B350-2 controls the heat exchange control unit B350-2 to increase the thermal resistance of the heat source B410-2 so that the heat exchange is not performed.
[0056] FIG. 11 is a diagram illustrating a heat exchange method (3) between the cold storage device 310 and the heat source 410 according to this embodiment. The example in FIG. 11 illustrates a case where heat exchange is not required for both the heat source A 410-1 and the heat source B 410-2. This is the case, for example, when the heat generation amount of the heat source 410 in the information processing device 10 is low and within a range where heat exchange with the cold storage device 310 is not required. In this case, the heat exchange control unit 350 controls the heat source 410 to maintain a high thermal resistance, thereby maintaining the temperature of the cold storage device 310 at a low level. For example, in an application using the camera unit 140 with low resolution and low heat generation, where heat exchange with the cold heat of the latent heat storage material 311 of the cold storage device 310 is not required, control is performed to prevent heat exchange from occurring for both the heat source A 410-1 and the heat source B 410-2, and the cold heat of the latent heat storage material 311 of the cold storage device 310 can be preserved for use during maximum load.
[0057] Next, switching of the charge control mode will be described in more detail using Figures 12 and 13. Figure 12 is a diagram for explaining switching of the charge control mode (1) according to this embodiment. Figure 12 is a diagram showing, for example, how the charge control mode is switched depending on the state of a specific application performing high-load processing or the remaining charge of the secondary battery 500, and how the heat exchange control unit operates depending on the temperature of the latent heat storage material 311 of the cold storage device 310. The vertical axis on the left side of the graph in Figure 12 represents the remaining charge of the secondary battery 500, the vertical axis on the right side represents the temperature of the latent heat storage material 311 of the cold storage device 310, and the horizontal axis represents time.
[0058] 12 shows that the initial state (time 0) shows that the specific application is in the foreground state and the external power supply 90 is not yet connected. In this state, since the external power supply 90 is not connected, the remaining charge of the secondary battery 500 continues to decrease, as shown in FIG. 12. Furthermore, since the secondary battery 500 is not being charged, the charge control mode is not active. Furthermore, the operation of the specific application increases the amount of heat generated by the heat source 410, and a heat exchange state is active to cool the heat source 410. Here, the heat exchange state refers to, for example, a state in which heat exchange between the cool storage device 310 and the heat source 410 is being performed by the heat exchange control unit 350.
[0059] 12, when the external power supply 90 is connected to the information processing device 10 at time a, the charge control mode is controlled to switch to the charge priority mode. In this state, charging of the secondary battery 500 begins, and the remaining charge of the secondary battery 500 continues to increase. In addition, the heat generation state of the specific application being operated is compared with the temperature state of the cold storage device 310, and if the temperature of the latent heat storage material 311 of the cold storage device 310 is still low enough to perform cooling, the heat exchange control unit 350 continues to operate while maintaining the heat exchange state.
[0060] 12 , at time b, the specific application goes into a sleep state or is terminated, so that the amount of heat generated by the heat source 410 decreases, and the heat exchange control unit 350 switches to a no-heat-exchange state. Here, the no-heat-exchange state refers to, for example, a state in which the heat exchange control unit 350 is not performing heat exchange between the cold storage device 310 and the heat source 410.
[0061] Next, as shown in FIG. 12 , at time c, when the secondary battery 500 is charged to a predetermined threshold (e.g., 80%) or more, the charge control mode is controlled to switch from the charge priority mode to the cold storage priority mode, and the power supplied from the external power supply 90 is controlled to be used to cool the latent heat storage material 311 of the cold storage device 310. In this state, the temperature of the latent heat storage material 311 of the cold storage device 310 continues to decrease. Furthermore, since the secondary battery 500 is not being charged, the remaining charge of the secondary battery 500 does not increase. However, since power is supplied to the CPU / GPU 210 from the external power supply 90, the remaining charge of the secondary battery 500 does not decrease. In this case, the remaining charge of the secondary battery 500 remains stable. Furthermore, since there is no heat generation due to charging of the secondary battery 500, the cooling efficiency of the cold storage device 310 also increases.
[0062] Next, as shown in Figure 12, at time d, when the temperature of the cold storage device 310 is cooled below a predetermined threshold (e.g., -5 degrees), the charge control mode is controlled to switch from the cold storage priority mode to the normal charge mode, and charging of the secondary battery 500 and cooling of the cold storage device 310 are controlled to be performed up to the maximum allowable value. Regarding the charging up to the maximum allowable value, for example, depending on the type of secondary battery 500, charging is controlled to be performed slowly as the secondary battery approaches 100% full charge, which is an example of the maximum allowable value, to minimize overcharging. Furthermore, for example, cooling of the cold storage device 310 is affected by heat generated by charging the secondary battery 500, and the cooling rate is controlled to be slowed down to minimize the temperature caused by the heat generation reaching the maximum allowable value.
[0063] 12 , at time e, the specific application enters the foreground state again, and the amount of heat generated by heat source 410 increases with the operation of the specific application, so that control is performed to switch to a state with heat exchange in order to cool heat source 410. In this case, control is performed to switch the charge control mode to a charge priority mode in order to stop cooling of cold storage device 310. Note that, for example, if the heat generated by cooling cold storage device 310 does not contribute to a temperature increase in other heat sources 410, cooling of latent heat storage material 311 of cold storage device 310 may continue as is; however, this is currently impractical and difficult for a small information processing device 10 such as a smartphone.
[0064] 13 is a diagram illustrating switching of the charge control mode (2) according to the present embodiment. In FIG. 13, in the initial state (time 0), the specific application is in a sleep state or is not running, so the heat source 410 of the information processing device 10 generates little heat, and the cold energy of the latent heat storage material 311 of the cold storage device 310 does not need to be used to cool the heat source 410, so the heat exchange control unit 350 operates in a state without heat exchange.
[0065] 13, at time a, the specific application enters the foreground state and operates, increasing the amount of heat generated by the heat source 410. The heat generation status of the operating specific application is then compared with the temperature status of the latent heat storage material 311 of the cold storage device 310, and if the temperature is low enough for the latent heat storage material 311 of the cold storage device 310 to perform cooling, the heat exchange control unit 350 switches to a state with heat exchange.
[0066] 13 , at time b, the specific application goes into a sleep state or is terminated, so the amount of heat generated by the heat source 410 decreases, and the heat exchange control unit 350 switches to a state without heat exchange. Also, if the remaining charge of the secondary battery 500 is equal to or greater than a predetermined threshold (e.g., 50%) and the temperature of the information processing device 10 is acceptable for cooling the cold storage device 310, the charge control mode is controlled to switch from the charge priority mode to the cold storage priority mode, and the power of the secondary battery 500 is controlled to be used to cool the latent heat storage material 311 of the cold storage device 310.
[0067] Next, as shown in Figure 13, at time c, when the remaining charge of the secondary battery 500 is less than a predetermined threshold (e.g., 50%) or the temperature of the latent heat storage material 311 of the cold storage device 310 is cooled to less than a predetermined threshold (e.g., 10 degrees), the charging control mode is controlled to switch to a non-existent state.
[0068] Next, as shown in Fig. 13 , when the external power supply 90 is connected at time d, the charge control mode is controlled to be switched between the charge priority mode and the rapid charge mode depending on the remaining charge of the secondary battery 500. Fig. 13 shows an example in which the charge control mode is switched to the rapid charge mode. Furthermore, in the rapid charge mode, the amount of heat generated from the charging circuit is large and it is necessary to suppress the charging capacity. Therefore, the heat exchange control unit 350 switches to a state with heat exchange in order to utilize the cold energy of the latent heat storage material 311 of the cold storage device 310.
[0069] Next, as shown in FIG. 13, at time e, the specific application enters the foreground state again, and as the specific application operates, the amount of heat generated by the heat source 410 increases, causing the temperature of the latent heat storage material 311 in the cooling storage device 310 to rise.
[0070] 13 , at time f, if the rapid charge mode continues while a specific application, which is a high-load process, remains in the foreground, the internal temperature of the information processing device 10 may rise significantly. Therefore, the rapid charge mode is stopped (the charge control mode is switched to the charge priority mode). In this state, the heat exchange control unit 350 continues to operate while maintaining the heat exchange state. This is because, for example, even if the temperature of the latent heat storage material 311 of the cold storage device 310 rises, in a situation where the temperature does not rise higher than that of the heat source 410, maintaining a low thermal resistance between the heat source 410 and the cold storage device 310 allows for better dissipation of heat within the information processing device 10.
[0071] In this way, the charging control unit 180 and the heat exchange control unit 350 control the timing of charging the secondary battery 500 and cooling the cold storage device 310 so that a state in which specific applications performing high-load processing are not restricted by heat generation, i.e., a state in which a decrease in CPU / GPU processing speed due to heat generation is unlikely to occur, can be maintained for as long as possible.
[0072] <<1.3. Functional Flow>> Next, the procedure of the charge control process according to this embodiment will be described with reference to Fig. 14. Fig. 14 is a flowchart showing the flow of the charge control process according to this embodiment. The charge control process switches the charge control mode based on the connection state of the external power supply 90, the remaining charge of the secondary battery 500, and the temperature of the latent heat storage material 311 of the cold storage device 310, and controls the charging of the secondary battery 500 and the cooling of the cold storage device 310.
[0073] First, as shown in FIG. 14, the information processing device 10 determines whether or not the external power supply 90 is connected to the information processing device 10 (step S101).
[0074] If it is determined that the external power supply 90 is connected to the information processing device 10 (step S101: Yes), the information processing device 10 then determines, for example, whether the remaining charge of the secondary battery 500 is 80% or more (step S102).
[0075] If it is determined that the remaining charge of the secondary battery 500 is 80% or more (step S102: Yes), the information processing device 10 then determines whether the temperature of the cool storage device 310 is, for example, −5 degrees or more (step S103).
[0076] If it is determined that the temperature of the cold storage device 310 is −5 degrees or higher (step S103: Yes), the information processing device 10 then switches the charge control mode to, for example, a cold storage priority mode and cools the latent heat storage material 311 of the cold storage device 310 (step S104). After step S104 is executed, the charge control process shown in Fig. 14 ends, but strictly speaking, the charge control process shown in Fig. 14 is repeated as needed, and the charge control mode is switched and control is performed in each charge control mode based on the connection state of the external power supply 90, the remaining charge of the secondary battery 500, and the temperature of the latent heat storage material 311 of the cold storage device 310.
[0077] On the other hand, if it is determined that the temperature of the cold storage device 310 is lower than −5 degrees (step S103: No), then, for example, the information processing device 10 switches the charge control mode to the normal charge mode and controls the CPU / GPU 210, the secondary battery 500, and the cold storage device 310 so that they all receive power supply from the external power supply 90 (step S105). After step S105 is executed, the charge control process shown in FIG. 14 also ends, but the charge control process shown in FIG. 14 is repeated as needed.
[0078] Furthermore, if it is determined in step S102 that the remaining charge of the secondary battery 500 is less than 80% (step S102: No), then the information processing device 10 switches the charge control mode to a charge priority mode, for example, and controls the CPU / GPU 210 and the secondary battery 500 to receive power supply from the external power supply 90, but not the cool storage device 310 (step S106). After step S106 is executed, the charge control process shown in Fig. 14 also ends, but the charge control process shown in Fig. 14 is repeated as needed.
[0079] Also, if it is determined in step S101 that the external power source 90 is not connected to the information processing device 10 (step S101: No), the information processing device 10 then determines, for example, whether the remaining charge of the secondary battery 500 is 50% or more (step S107).
[0080] If it is determined that the remaining charge of the secondary battery 500 is 50% or more (step S107: Yes), the information processing device 10 then determines whether the temperature of the cool storage device 310 is 10 degrees or more (step S108).
[0081] If it is determined that the temperature of the cold storage device 310 is 10 degrees or higher (step S108: Yes), the information processing device 10 then switches the charge control mode to, for example, a cold storage priority mode and cools the latent heat storage material 311 of the cold storage device 310 (step S109). After step S109 is executed, the charge control process shown in Fig. 14 also ends, but the charge control process shown in Fig. 14 is repeated as needed.
[0082] On the other hand, if it is determined that the temperature of the cold storage device 310 is less than 10 degrees (step S108: No), or if it is determined in step S107 that the remaining charge of the secondary battery 500 is less than 50% (step S107: No), then the information processing device 10 switches the charge control mode to the normal charge mode, for example, and controls the CPU / GPU 210, the secondary battery 500, and the cold storage device 310 to receive power supply from the external power supply 90 (step S110). After step S110 is executed, the charge control process shown in FIG. 14 also ends, but the charge control process shown in FIG. 14 is repeated as needed.
[0083] Next, the procedure of the heat exchange control process according to this embodiment will be described with reference to Fig. 15. Fig. 15 is a flowchart showing the flow of the heat exchange control process according to this embodiment. The heat exchange control process is a process for controlling the latent heat storage material 311 of the cold storage device 310 to be thermally connected to the heat source 410 by a highly thermally conductive material or the like, which is a thermal path 450, when it is determined that cooling of the heat source 410 is necessary based on the operating state of a specific application and the charge control mode.
[0084] First, as shown in FIG. 15, the information processing apparatus 10 determines whether the operation state of a specific application is in the foreground state (step S201).
[0085] If it is determined that the operation state of the specific application is the foreground state (step S201: Yes), the information processing apparatus 10 then determines, for example, whether or not cooling of the heat source 410 is necessary (step S202).
[0086] If it is determined that cooling of the heat source 410 is necessary (step S202: Yes), the information processing device 10 then switches to a state with heat exchange, for example, and performs heat exchange between the cold storage device 310 and the heat source 410 (step S203). After execution of step S203, the heat exchange control process shown in Fig. 15 ends. However, strictly speaking, the heat exchange control process shown in Fig. 15 is repeated as needed, and heat exchange between the cold storage device 310 and the heat source 410 is controlled based on the operating state of the specific application and the charge control mode.
[0087] On the other hand, if it is determined that cooling of the heat source 410 is not necessary (step S202: No), the information processing device 10 then switches to a state without heat exchange (step S204), for example. In this case, heat exchange between the cold storage device 310 and the heat source 410 is not performed. After step S204 is executed, the heat exchange control process shown in Fig. 15 also ends, but the heat exchange control process shown in Fig. 15 is repeated as needed.
[0088] Also, if it is determined in step S201 that the operating state of the specific application is not in the foreground state (step S201: No), the information processing device 10 then determines, for example, whether the charging control mode is the cold storage priority mode (step S205).
[0089] If it is determined that the charge control mode is not the cold-storage priority mode (step S205: No), the information processing device 10 then determines, for example, whether or not cooling of the charging circuit of the secondary battery 500 is necessary (step S206).
[0090] If it is determined that cooling of the charging circuit is necessary (step S206: Yes), then, the information processing device 10 switches to a state with heat exchange, for example, and performs heat exchange between the cold storage device 310 and the charging circuit, which is the heat source 410 (step S207). After step S207 is executed, the heat exchange control process shown in Fig. 15 also ends, but the heat exchange control process shown in Fig. 15 is repeated as needed.
[0091] On the other hand, if it is determined that cooling of the charging circuit is not necessary (step S206: No), or if it is determined in step S205 that the charging control mode is the cold-storage priority mode (step S205: Yes), the information processing device 10 then switches to a state without heat exchange (step S208). After step S208 is executed, the heat exchange control process shown in Fig. 15 also ends, but the heat exchange control process shown in Fig. 15 is repeated as needed.
[0092] 2. Hardware Configuration Example Next, a hardware configuration example of the information processing device 10 according to this embodiment will be described. The information processing device 10 according to this embodiment described above is realized by, for example, a computer 1000 having a configuration as shown in Fig. 16. Fig. 16 is a block diagram showing a hardware configuration example of the information processing device 10 according to this embodiment.
[0093] The computer 1000 includes a CPU 1100, a RAM 1200, a ROM 1300, a hard disk drive (HDD) 1400, a communication interface 1500, and an input / output interface 1600. The components of the computer 1000 are connected to each other via a bus 1050.
[0094] The CPU 1100 operates and controls each component based on programs stored in the ROM 1300 or the HDD 1400. For example, the CPU 1100 loads the programs stored in the ROM 1300 or the HDD 1400 into the RAM 1200 and executes processing corresponding to the various programs.
[0095] The ROM 1300 stores boot programs such as a Basic Input Output System (BIOS) that is executed by the CPU 1100 when the computer 1000 is started, and programs that depend on the hardware of the computer 1000 .
[0096] The HDD 1400 is a computer-readable recording medium that non-temporarily records programs executed by the CPU 1100 and data used by such programs. Specifically, the HDD 1400 is a recording medium that records the program according to this embodiment, which is an example of the program data 1450.
[0097] The communication interface 1500 is an interface for connecting the computer 1000 to an external network 1550 (e.g., the Internet). For example, the CPU 1100 receives data from other information processing devices or transmits data generated by the CPU 1100 to other information processing devices or the like via the communication interface 1500.
[0098] The input / output interface 1600 is an interface for connecting the input / output device 1650 and the computer 1000. For example, the CPU 1100 receives data from an input device such as a keyboard or a mouse via the input / output interface 1600. The CPU 1100 also transmits data to an output device such as a display, a speaker, or a printer via the input / output interface 1600. The input / output interface 1600 may also function as a media interface for reading programs recorded on a predetermined recording medium. Here, the predetermined recording medium may be, for example, an optical recording medium such as a DVD (registered trademark) (Digital Versatile Disc) or a PD (Phase Change Rewritable Disk), a magneto-optical recording medium such as an MO (Magneto-Optical disk), a tape medium, a magnetic recording medium, or a semiconductor memory.
[0099] Furthermore, for example, when the computer 1000 operates as the information processing device 10 according to this embodiment, the CPU 1100 of the computer 1000 executes a program loaded onto the RAM 1200, thereby performing the processing of each processing unit, such as the control unit 200 shown in Fig. 3. The HDD 1400 stores the program according to this embodiment and data in the storage unit 130. The CPU 1100 reads and executes program data 1450 from the HDD 1400, but as another example, the CPU 1100 may obtain these programs from another information processing device via an external network 1550.
[0100] <3. Summary> As described above, the information processing device 10 equipped with the secondary battery 500 and the cold storage device 310 determines whether the processing capacity of the information processing device 10 is limited by heat generation, determines whether to cool the latent heat storage material 311 of the cold storage device 310 depending on the charge state of the secondary battery 500, and if it is determined that the processing capacity is limited by heat generation, executes a process of exchanging heat between the latent heat storage material 311 and the heat source 410.
[0101] In this way, the information processing device 10 can maintain a state where a decrease in the processing speed of the CPU / GPU due to heat generation is unlikely to occur for as long as possible by controlling the cooling of the cool storage device 310 and the charging of the secondary battery 500.
[0102] Although the preferred embodiments of the present disclosure have been described in detail above with reference to the accompanying drawings, the technical scope of the present disclosure is not limited to such examples. It is clear that a person skilled in the art of the present disclosure can conceive of various modified or altered examples within the scope of the technical idea described in the claims, and it is understood that these also naturally fall within the technical scope of the present disclosure.
[0103] Furthermore, the effects described herein are merely descriptive or exemplary and are not limiting. In other words, the technology according to the present disclosure may achieve other effects that will be apparent to those skilled in the art from the description of this specification, in addition to or in place of the above-described effects.
[0104] The present technology may also be configured as follows. (1) An information processing device including a secondary battery and a cool storage device, the information processing device including a control unit that executes a process of determining whether a processing capability of the information processing device is limited by heat generation, determining whether to perform cooling on the latent heat storage material of the cool storage device based on a charge state of the secondary battery, and performing heat exchange between the latent heat storage material and a heat source if it is determined that the processing capability is limited by heat generation. (2) The information processing device described in (1), wherein the process of determining whether to perform cooling on the latent heat storage material includes a process of determining whether to prioritize cooling of the latent heat storage material over charging of the secondary battery, based on at least one of a remaining charge of the secondary battery and a temperature of the cool storage device. (3) The information processing device described in (1) or (2), wherein the control unit executes a process of determining whether to perform cooling on the heat source based on at least one of a running state of a predetermined application and a heat generation condition of the heat source, and performing heat exchange between the latent heat storage material and the heat source if it is determined that cooling on the heat source is to be performed. (4) The information processing device according to (3), wherein the heat generation condition is at least one of the type of the heat source, the heat generation amount of the heat source, and the thermal resistance or thermal conductivity to the heat source. (5) The information processing device according to any one of (1) to (4), wherein the control unit executes a process of determining a cooling capacity of the cold storage device for the latent heat storage material based on at least one of a temperature inside the information processing device and a user's usage state of the information processing device. (6) The information processing device according to (5), wherein the temperature is a temperature of at least one of the heat source, the secondary battery, a charging circuit of the secondary battery, the cold storage device, and a rear surface of a housing of the information processing device. (7) A program that causes an information processing device including a secondary battery and a cold storage device to execute a process of determining whether a processing capacity of the information processing device is limited by heat generation, determining whether to cool the latent heat storage material of the cold storage device based on a charging state of the secondary battery, and performing heat exchange between the latent heat storage material and the heat source when it is determined that the processing capacity is limited by heat generation.(8) An information processing method in which an information processing device equipped with a secondary battery and a cold storage device determines whether the processing capacity of the information processing device is limited by heat generation, determines whether to cool the latent heat storage material of the cold storage device based on the charge state of the secondary battery, and performs heat exchange between the latent heat storage material and a heat source if it is determined that the processing capacity is limited by heat generation.
[0105] 10 Information processing device 50 Cable 90 External power supply 110 Display unit 120 Operation unit 130 Memory unit 140 Camera unit 150 Detection unit 160 Measurement unit 170 Determination unit 171 Determination unit A 172 Determination unit B 173 Determination unit C 174 Determination unit D 180 Charging control unit 200 Control unit 210 CPU / GPU 300 Cold storage unit 310 Cold storage device 311 Latent heat storage material 312 Thermally conductive paste 313 Cooling element 314 Heat dissipation structure 350 Heat exchange control unit 400 Heat generating unit 410 Heat source 450 Heat path 500 Secondary battery 1000 Computer 1050 Bus 1100 CPU 1200 RAM 1300 ROM 1400 HDD 1450 Program data 1500 Communication interface 1550 External network 1600 Input / output interface 1650 Input / output device
Claims
1. An information processing device having a secondary battery and a cold storage device, the information processing device comprising: a control unit that executes the following processes: determining whether the processing capacity of the information processing device is limited by heat generation; determining whether to cool the latent heat storage material of the cold storage device based on the charging state of the secondary battery; and, if it is determined that the processing capacity is limited by heat generation, performing heat exchange between the latent heat storage material and a heat source.
2. The information processing device according to claim 1, wherein the process of determining whether or not to cool the latent heat storage material includes a process of determining whether or not to prioritize cooling of the latent heat storage material over charging of the secondary battery based on at least one of the remaining charge of the secondary battery and the temperature of the cold storage device.
3. An information processing device as described in claim 1 or 2, wherein the control unit determines whether or not to cool the heat source based on at least one of the startup state of a predetermined application and the heat generation conditions of the heat source, and if it is determined that cooling should be performed on the heat source, executes a process of performing heat exchange between the latent heat storage material and the heat source.
4. The information processing device according to claim 3, wherein the heat generation condition is at least one of the type of the heat generation source, the amount of heat generated by the heat generation source, and the thermal resistance or thermal conductivity of the heat generation source.
5. An information processing device according to claim 1 or 2, wherein the control unit executes a process of determining the cooling capacity of the cold storage device for the latent heat storage material based on at least one of the temperature inside the information processing device and the user's usage state of the information processing device.
6. The information processing device according to claim 5, wherein the temperature is the temperature of at least one of the heat source, the secondary battery, the charging circuit of the secondary battery, the cold storage device, and the rear surface of the housing of the information processing device.
7. A program for causing an information processing device having a secondary battery and a cold storage device to execute a process of determining whether the processing capacity of the information processing device is limited by heat generation, determining whether or not to cool the latent heat storage material of the cold storage device based on the charging state of the secondary battery, and performing heat exchange between the latent heat storage material and a heat source if it is determined that the processing capacity is limited by heat generation.
8. An information processing method in which an information processing device having a secondary battery and a cold storage device determines whether the processing capacity of the information processing device is limited by heat generation, determines whether to cool the latent heat storage material of the cold storage device based on the charging state of the secondary battery, and executes a process of exchanging heat between the latent heat storage material and a heat source if it is determined that the processing capacity is limited by heat generation.
Citation Information
Patent Citations
Battery pack, electronic apparatus, charger and battery-driven electronic apparatus system
JP2006092894A
Electronic apparatus and control method of electronic apparatus
JP2015029036A
Electronic apparatus, control method, and program
JP2023062592A