Information processing method, information processing device, and control program

The information processing method predicts renewable energy storage in storage batteries, enabling users to select charging stations based on accurate forecasts and optimizing energy usage, thereby reducing CO2 emissions.

WO2024247972A1PCT designated stage expired Publication Date: 2024-12-05PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/019448
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-29
Filing Date
2024-05-27
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing technologies cannot accurately predict the amount of renewable energy stored in storage batteries at charging stations, leading to potential mismatches between user expectations and actual energy availability, which can result in reduced renewable energy usage and increased CO2 emissions.

Method used

An information processing method that acquires the remaining power amount of a storage battery and predicts the required power amount for a specified time, calculating the renewable energy contribution based on actual charging and discharge values, allowing for the output of a renewable energy rate that reflects the proportion of renewable energy stored.

Benefits of technology

Enables users to select charging stations based on predicted renewable energy availability, optimizing energy usage and reducing CO2 emissions by ensuring accurate forecasting of renewable energy storage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024019448_05122024_PF_FP_ABST
    Figure JP2024019448_05122024_PF_FP_ABST
Patent Text Reader

Abstract

This server acquires the remaining power amount of a storage battery possessed by a charging base, a designated time after the present, a first actual value that is the actual value of charging power to the storage battery by a renewable energy, and a second actual value that is the actual value of discharge power from the storage battery, predicts, on the basis of the remaining power amount of the storage battery and the second actual value, a necessary power amount that is the charge amount of the storage battery in a period from the present to the designated time, predicts, on the basis of the first actual value, a renewable energy amount that is a power amount by the renewable energy among the necessary power amount, and outputs the renewable energy rate of the storage battery at the designated time on the basis of the renewable energy amount.
Need to check novelty before this filing date? Find Prior Art

Description

Information processing method, information processing device, and control program

[0001] The present disclosure relates to a technique for managing a storage battery that is charged with electricity generated by renewable energy.

[0002] BACKGROUND ART In recent years, there has been an increase in charging stations that charge storage batteries with power self-generated using renewable energy such as solar power and supply the power stored in the storage batteries to electrically powered mobile objects such as electric vehicles (EVs).

[0003] Accordingly, there has been an increase in services that provide information about charging stations via the Internet. For example, Patent Literature 1 describes a technology that provides an electric vehicle with a renewable energy rate, which is the proportion of renewable energy in the energy stored in a storage battery at a charging station, via a communication line.

[0004] However, the technology described in Patent Document 1 has the problem that while it is possible to determine the amount of renewable energy currently stored in the storage batteries of a charging station, it is not possible to determine how much renewable energy the storage batteries of the charging station will store in the future.

[0005] JP 2017-93289 A

[0006] The present disclosure has been made to solve such problems, and aims to provide technology that makes it possible to determine how much electricity generated by renewable energy will be stored in the storage batteries at charging stations in the future.

[0007] An information processing method in one aspect of the present disclosure is an information processing method in a computer, which acquires the remaining energy amount of a storage battery owned by a charging station and a specified time after the present, acquires a first actual value which is an actual value of charging power to the storage battery from renewable energy and a second actual value which is an actual value of discharging power from the storage battery, predicts a required amount of power which is the amount of charge to the storage battery for a period from the present to the specified time based on the remaining energy amount of the storage battery and the second actual value, predicts a renewable energy amount of power which is the amount of power which comes from the renewable energy out of the required amount of power based on the first actual value, and outputs a renewable energy rate which is the proportion of the amount of power which comes from the renewable energy in the storage battery at the specified time based on the renewable energy amount.

[0008] FIG. 1 is a diagram illustrating an overall configuration of an information processing system according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating an example of a server configuration. FIG. 3 is a flowchart illustrating an example of server processing according to embodiment 1. FIG. 4 is a flowchart illustrating an example of server processing according to embodiment 2. FIG. 5 is a diagram illustrating an example of a screen generated by a calculation unit according to embodiment 3. FIG. 6 is a flowchart illustrating an example of server processing according to embodiment 4. FIG. 7 is a diagram illustrating an example of a screen generated by a calculation unit according to embodiment 4.

[0009] (Findings underlying the present disclosure) In recent years, there has been an increase in charging stations (hereinafter referred to as charging points) that charge storage batteries with electricity generated by renewable energy sources such as solar, geothermal, or wind power, and supply the electricity stored in the storage batteries to electric vehicles. Accordingly, there has also been an increase in services that provide information about charging points via the Internet, such as the location of the charging station, the number of electric vehicles that can use the charging station, and the hours during which the charging station is available. Furthermore, there are also charging points that allow users to select the electricity to be supplied from the storage battery to the electric vehicle.

[0010] For example, Patent Literature 1 describes a technology for providing the renewable energy rate of a battery at a charging station to an electric vehicle via a communication line. However, while the technology described in Patent Literature 1 can determine the amount of renewable energy currently stored in the battery at the charging station, it cannot determine how much renewable energy the battery at the charging station will store in the future. As a result, when a user arrives at a charging station, the amount of renewable energy stored in the battery may be less than the amount the user expected.

[0011] On the other hand, it is assumed that it is possible to know how much power generated by renewable energy will be stored in the storage battery at the charging station in the future. In this case, the user of the electric vehicle can select the charging station to use and decide when to use the charging station, taking into consideration how much power generated by renewable energy will be stored in the storage battery when the user arrives at the charging station. At the charging station, the lifetime CO2 emissions can be calculated. 2 The amount can be controlled and reduced.

[0012] Therefore, the inventors have conducted extensive research into technology that can determine how much electricity generated by renewable energy will be stored in the storage batteries at charging stations in the future, and have come up with the various aspects of the present disclosure described below.

[0013] (1) An information processing method according to one aspect of the present disclosure is an information processing method in a computer, which acquires the remaining energy amount of a storage battery owned by a charging station and a specified time after the present, acquires a first actual value that is an actual value of charging power to the storage battery from renewable energy and a second actual value that is an actual value of discharging power from the storage battery, predicts a required energy amount that is the amount of charge to the storage battery for a period from the present to the specified time based on the remaining energy amount of the storage battery and the second actual value, predicts a renewable energy energy amount that is the amount of power from the renewable energy of the required energy based on the first actual value, and outputs a renewable energy rate that is the proportion of the amount of power from the renewable energy in the storage battery at the specified time based on the renewable energy energy amount.

[0014] In this configuration, the required amount of power, which is the amount of charge of the storage battery during a period from the present to a specified time, is predicted based on the remaining amount of power in the storage battery and a second actual value, which is the actual value of the discharged power from the storage battery. Furthermore, the amount of renewable energy power, which is the amount of power generated from renewable energy within the required amount of power, is predicted based on a first actual value, which is the actual value of the power charged to the storage battery from renewable energy. Therefore, based on the amount of renewable energy power, it is possible to predict the amount of power to be used to charge the storage battery during the future period, separating the amount of power generated from renewable energy from other amounts of power.

[0015] In this configuration, the renewable energy rate of the storage battery at the specified time is output based on the predicted amount of renewable energy power to be used to charge the storage battery during the period. Therefore, with this configuration, it is possible to know how much power generated by renewable energy will be stored in the storage battery at the charging station at a specified time in the future.

[0016] (2) In the information processing method described in (1) above, the renewable energy rate of the remaining power amount of the storage battery may be further acquired, and the renewable energy rate of the storage battery at the specified time may be output based on the renewable energy rate of the storage battery and the amount of renewable energy power.

[0017] According to this configuration, the renewable energy rate of the remaining power amount of the storage battery is obtained, so that an appropriate renewable energy rate of the storage battery at a specified time can be output based not only on the amount of renewable energy power but also on the obtained renewable energy rate of the storage battery.

[0018] (3) In the information processing method described in (1) above, a purchase plan for grid power for the period may be further obtained, and the amount of renewable energy power may be predicted based on the purchase plan and the first actual value.

[0019] According to this configuration, a grid power purchase plan for the period is obtained, so that the amount of renewable energy power can be appropriately predicted based not only on the first actual value but also on the obtained grid power purchase plan.

[0020] (4) In the information processing method described in (3) above, a current number of chargeable vehicles, which is the number of electric vehicles that can be charged simultaneously by discharging from the storage battery, may be further acquired, and in acquiring the second actual value, the second actual value may be acquired when the number of chargeable vehicles matches the current number of chargeable vehicles, and in acquiring the purchase plan for the period, the purchase plan may be acquired when the number of chargeable vehicles for the period matches the current number of chargeable vehicles, and further, if the renewable energy rate of the storage battery at the specified time is less than a predetermined target value, a plan may be developed to reduce the number of chargeable vehicles for the period so that the renewable energy rate of the storage battery at the specified time is equal to or greater than the target value.

[0021] In this configuration, a plan is created to reduce the number of chargeable vehicles during the period so that the renewable energy rate of the storage battery at the specified time is equal to or greater than a predetermined target value. Therefore, according to this configuration, by limiting the number of chargeable vehicles during the period at the charging station in accordance with the created plan, the renewable energy rate of the storage battery at the specified time can be equal to or greater than the target value.

[0022] (5) In the information processing method described in any one of (1) to (4) above, the charging station may include one or more first charging stations, and the charging station may further acquire the user's current location and the positions of the one or more first charging stations. In the output, information showing a screen displaying a first map image displaying the user's current location and the positions of the one or more first charging stations and the renewable energy rate of the storage batteries of each of the one or more first charging stations at the specified time may be output to a terminal device used by the user.

[0023] In this configuration, information indicating a screen displaying a first map image displaying the user's current location and the locations of one or more first charging stations and the renewable energy rates of the storage batteries of each of the one or more first charging stations at the specified time is output to a terminal device used by the user. Therefore, by referring to the screen on the terminal device, the user can easily grasp the location of a charging station whose renewable energy rate of the storage battery at the specified time is closest to the user's desired value.

[0024] (6) In the information processing method described in (5) above, the current remaining energy amount and renewable energy rate of a secondary battery possessed by an electric vehicle used by the user may be further acquired, and a required charge amount, which is the amount of energy required to charge the secondary battery until the remaining energy amount of the secondary battery reaches a predetermined target energy amount, may be calculated for the one or more first charging stations, and the renewable energy rate of the storage battery possessed by each first charging station at the specified time may be calculated for the one or more first charging stations, and the renewable energy rate of the secondary battery immediately after the secondary battery is charged by the required charge amount by discharging from the storage battery possessed by each first charging station may be calculated based on the remaining energy amount and renewable energy rate of the secondary battery, the required charge amount, and the renewable energy rate of the storage battery possessed by each first charging station at the specified time.

[0025] According to this configuration, when the secondary battery of an electric vehicle used by a user at each of one or more first charging stations is charged to the required amount by discharging from the storage battery at each first charging station, it is possible to manage how much electricity generated by renewable energy the secondary battery will hold immediately after charging.

[0026] (7) In the information processing method described in (6) above, one or more second charging stations from among the one or more first charging stations for which a renewable energy rate of the secondary battery has been calculated to be equal to or greater than a predetermined threshold may be identified, and the current location of the user and the positions of the one or more second charging stations may be acquired. In the output, information indicating a screen displaying a second map image displaying the current location of the user and the positions of the one or more second charging stations and the renewable energy rate of the storage battery of each of the one or more second charging stations at the specified time may be output to the terminal device.

[0027] In this configuration, a screen displaying a second map image showing the user's current location and the locations of the one or more second charging stations, and the renewable energy rates of the storage batteries of each of the one or more second charging stations at the specified time, is output to a terminal device used by the user. Therefore, by referring to the screen on the terminal device, the user can easily grasp the locations of the one or more second charging stations that will make the renewable energy rate of the secondary battery equal to or greater than a predetermined threshold if the secondary battery is charged by the required amount at the specified time.

[0028] (8) In the information processing method described in (1) above, the prediction of the amount of renewable energy power may include predicting the amount of self-generated power by the renewable energy during the period and the amount of charging to the storage battery by the renewable energy from the grid power during the period.

[0029] According to this configuration, the amount of renewable energy power, which is the amount of power generated from renewable energy out of the required amount of power, which is the amount of power charged to the storage battery in the future period, can be predicted by dividing it into the amount of self-generated power from renewable energy and the amount of power charged to the storage battery from renewable energy out of the grid power.

[0030] (9) In another aspect of the present disclosure, an information processing device includes: a first acquisition unit that acquires the remaining amount of power in a storage battery owned by a charging station; a second acquisition unit that acquires a specified time after the present; a third acquisition unit that acquires a first actual value that is an actual value of charging power to the storage battery from renewable energy and a second actual value that is an actual value of discharging power from the storage battery; a second prediction unit that predicts a required amount of power that is the amount of charge of the storage battery during a period from the present to the specified time based on the remaining amount of power in the storage battery and the second actual value; a first prediction unit that predicts a renewable energy amount of power that is the amount of power that comes from the renewable energy out of the required amount of power based on the first actual value; and an output unit that outputs a renewable energy rate that is the proportion of the amount of power that comes from the renewable energy in the storage battery at the specified time based on the renewable energy amount of power.

[0031] According to this configuration, the same effects as those of the information processing method described above in (1) can be obtained.

[0032] (10) In yet another aspect of the present disclosure, a control program is a control program that controls a computer of an information processing device, and causes the computer to function as a first acquisition unit that acquires the remaining amount of power in a storage battery owned by a charging station, a second acquisition unit that acquires a specified time after the present, a third acquisition unit that acquires a first actual value that is an actual value of charging power to the storage battery from renewable energy and a second actual value that is an actual value of discharging power from the storage battery, a second prediction unit that predicts a required amount of power that is the amount of charge of the storage battery during a period from the present to the specified time based on the remaining amount of power in the storage battery and the second actual value, a first prediction unit that predicts a renewable energy amount of power that is the amount of power that comes from the renewable energy out of the required amount of power based on the first actual value, and an output unit that outputs a renewable energy rate that is the proportion of the amount of power that comes from the renewable energy in the storage battery at the specified time based on the renewable energy amount of power.

[0033] According to this configuration, the same effects as those of the information processing method described above in (1) can be obtained.

[0034] The present disclosure can also be realized as an information processing system operated by such a control program. Needless to say, such a computer program can be distributed on a non-transitory computer-readable recording medium such as a CD-ROM or via a communication network such as the Internet.

[0035] Note that the embodiments described below each illustrate a specific example of the present disclosure. The numerical values, shapes, components, steps, and step orders shown in the following embodiments are merely examples and are not intended to limit the present disclosure. Furthermore, among the components in the following embodiments, components that are not described in an independent claim that represents a superordinate concept are described as optional components. Furthermore, in all embodiments, the respective contents can be combined.

[0036] 1 is a diagram illustrating an overall configuration of an information processing system 1000 according to an embodiment of the present disclosure. The information processing system 1000 includes a server 2 (information processing device), a mobile object 1 (electric mobile object), a user terminal 6 (terminal device), and a charging station 3.

[0037] The server 2 is communicatively connected to the mobile object 1, the user terminal 6, and the charging / discharging device 30 at the charging station 3 via the network 4. The network 4 is, for example, a wide area communication network including the Internet and a mobile phone communication network. While one mobile object 1, one user terminal 6, and one charging / discharging device 30 are illustrated in FIG. 1 , there may be multiple mobile objects 1, one user terminal 6, and one charging / discharging device 30. The mobile object 1, the user terminal 6, and the charging / discharging device 30 are each uniquely identified by a communication address.

[0038] The mobile object 1 is equipped with a rechargeable secondary battery and runs using the power of the secondary battery as a power source. The mobile object 1 is, for example, an electric car or an electric motorcycle. The secondary battery equipped in the mobile object 1 is, for example, a rechargeable secondary battery such as a lithium-ion battery or a nickel-metal hydride battery. The secondary battery of the mobile object 1 is electrically connected to a charging / discharging device 30 by a charging cable (not shown), and is charged by power discharged from a storage battery 31 (hereinafter, referred to as discharge power) under the control of the charging / discharging device 30.

[0039] The mobile object 1 includes a display that displays various information, a touch panel device that accepts various operations, a communication circuit for communicating with external devices via the network 4, and the like. The mobile object 1 periodically transmits information related to its travel (hereinafter, travel information) to the server 2 using the communication circuit. The travel information includes the current date and time, identification information of the mobile object 1, the current location and travel speed, and the remaining power (SOC) of a secondary battery mounted on the mobile object 1. The mobile object 1 may also include a wireless communication circuit that performs short-range wireless communication with the user terminal 6. In this case, the travel information may be transmitted to the server 2 via the user terminal 6.

[0040] The user terminal 6 is a portable information processing terminal such as a tablet computer or a smartphone, used by a user of the information processing system 1000. The user terminal 6 includes a display that displays various information, a touch panel device that accepts various operations, and a communication circuit for communicating with external devices via the network 4.

[0041] The user terminal 6 uses the communication circuit to communicate various types of information with external devices such as the charging / discharging device 30 and the server 2. The user terminal 6 may also include a short-range wireless communication circuit for performing short-range wireless communication with the mobile object 1. In this case, the user terminal 6 may transmit traveling information acquired through short-range wireless communication with the mobile object 1 to the server 2 using the communication circuit.

[0042] The charging station 3 includes a power generation device 39, a charging / discharging device 30, and a storage battery 31. Although one charging station 3 is illustrated in Fig. 1 , there may be multiple charging stations 3. Furthermore, although one storage battery 31 and one power generation device 39 are illustrated in Fig. 1 at one charging station 3, one charging station 3 may include multiple storage batteries 31 and multiple power generation devices 39.

[0043] The power generation device 39 supplies electric power generated using renewable energy (hereinafter referred to as privately generated electric power) to the charging / discharging device 30. The renewable energy is, for example, solar energy, geothermal energy, wind power, or the like.

[0044] The charging / discharging device 30 charges the storage battery 31 with power purchased from the power grid 9 (hereinafter referred to as grid power) and privately generated power generated by the power generation device 39. The storage battery 31 is, for example, a rechargeable secondary battery such as a lithium ion battery.

[0045] The charging / discharging device 30 includes a measuring instrument that measures the remaining amount of power in the storage battery 31, the power charged to the storage battery 31, and the power discharged from the storage battery 31. The charging / discharging device 30 further includes a display that displays various information, a touch panel device that accepts various operations, and a communication circuit for communicating with an external device via the network 4.

[0046] The charging / discharging device 30 is configured to be able to simultaneously charge a number of mobile objects 1 up to a predetermined upper limit number using discharged power discharged from the storage battery 31. Specifically, one end of a number of charging cables (not shown) equal to the upper limit number is electrically connected to the charging / discharging device 30. When the other end of each charging cable is electrically connected to a secondary battery mounted on the mobile object 1, the charging / discharging device 30 discharges the power held in the storage battery 31 to the secondary battery via each charging cable. As a result, the secondary battery connected to the other end of each charging cable is charged with the discharged power discharged from the storage battery 31.

[0047] The charging / discharging device 30 manages the remaining power amount of the storage battery 31 by dividing it into the remaining power amount from renewable energy and the remaining power amount from grid power. The charging / discharging device 30 manages the renewable energy rate (hereinafter referred to as the renewable energy rate) of the storage battery 31. The renewable energy rate of the storage battery 31 is the rate at which the remaining power amount from renewable energy accounts for the remaining power amount of the storage battery 31.

[0048] Specifically, immediately after the installation of the storage battery 31, the charging / discharging device 30 calculates the integrated value of the amount of power charged into the storage battery 31 by the grid power each time the storage battery 31 is charged by the grid power. Similarly, immediately after the installation of the storage battery 31, the charging / discharging device 30 calculates the integrated value of the amount of power charged into the storage battery 31 by the self-generated power each time the charging of the storage battery 31 by the self-generated power is completed. The charging / discharging device 30 calculates the renewable energy rate of the storage battery 31 by dividing the integrated value of the amount of power charged into the storage battery 31 by the self-generated power by the sum of the integrated value of the amount of power charged into the storage battery 31 by the grid power and the integrated value of the amount of power charged into the storage battery 31 by the self-generated power.

[0049] Meanwhile, each time charging / discharging device 30 discharges power from storage battery 31 to mobile object 1, charging / discharging device 30 subtracts the product of the amount of power discharged to mobile object 1 and the renewable energy rate of storage battery 31 as the amount of self-generated power discharged from storage battery 31 from the integrated value of the amount of power charged to storage battery 31 by the self-generated power. Similarly, each time charging / discharging device 30 discharges power from storage battery 31 to mobile object 1, charging / discharging device 30 calculates the product of the amount of power discharged to mobile object 1 and the result of subtracting the renewable energy rate of storage battery 31 from 1 (1 - renewable energy rate of storage battery 31). Charging / discharging device 30 subtracts this product as the amount of grid power discharged from storage battery 31 from the integrated value of the amount of power charged to storage battery 31 by grid power.

[0050] The charging / discharging device 30 periodically transmits information about the state of the storage battery 31 (hereinafter referred to as storage battery information) to the server 2 using the communication circuit. Specifically, the storage battery information includes the current date and time, identification information of the charging station 3 including the charging / discharging device 30, identification information of the charging / discharging device 30, identification information of the storage battery 31, the remaining energy amount of the storage battery 31, the renewable energy rate of the storage battery 31, and the number of mobile objects 1 that can be simultaneously charged by discharging from the storage battery 31 (hereinafter referred to as the number of chargeable objects).

[0051] The charging / discharging device 30 may acquire information indicating the current weather from a predetermined weather server using a communication circuit at a predetermined timing, such as every hour. Accordingly, the charging / discharging device 30 may include the most recently acquired weather information in the charging information and discharging information.

[0052] Next, a detailed description will be given of the configuration of the server 2. Fig. 2 is a diagram showing an example of the configuration of the server 2. The server 2 includes a communication unit 21, a memory 22, and a processor 20 (computer).

[0053] The communication unit 21 is a communication circuit that connects the server 2 to the network 4. The communication unit 21 receives traveling information from the mobile object 1 or the user terminal 6. The communication unit 21 receives storage battery information from the charging / discharging device 30.

[0054] The memory 22 is configured by, for example, a non-volatile rewritable semiconductor memory such as a flash memory, a hard disk drive (HDD), etc. The memory 22 stores a control program executed by the processor 20. The memory 22 includes a map information storage unit 221, a storage battery information storage unit 222, a model storage unit 223, a driving information storage unit 224, and a plan information storage unit 225.

[0055] The map information storage unit 221 stores information about each point within a predetermined area (hereinafter, referred to as map information). Each point within the area includes facilities such as charging stations 3, parks, and schools that exist within the area, as well as distinctive points on roads, such as intersections and endpoints of roads that exist within the area. The map information includes a map image showing a map of the area and information indicating the position of each point within the area. The information indicating the position of each point includes the latitude and longitude of each point. Note that the information indicating the position of each point may further include the altitude of each point.

[0056] The battery information storage unit 222 stores the battery information transmitted from the charging / discharging device 30 to the server 2 .

[0057] The model storage unit 223 stores trained models used for various processes executed by the processor 20.

[0058] For example, the model storage unit 223 stores a first model that is machine-learned to describe the relationship between the actual value at the time when the storage battery 31 is charged with privately generated power generated by the power generation device 39 and the actual value of the privately generated power used to charge the storage battery 31 at that time. When a time is input, the first model outputs an estimated value of the privately generated power used to charge the storage battery 31 at that time.

[0059] The first model may be a model obtained by machine learning the relationship between the actual value at the time when the storage battery 31 was charged with self-generated power, the actual value of information indicating the weather at that time, and the actual value of the self-generated power used at that time to charge the storage battery 31. In this case, when the time and information indicating the weather at that time are input, the first model outputs an estimated value of the self-generated power used to charge the storage battery 31 at that time.

[0060] The model storage unit 223 stores a second model that is machine-learned to describe the relationship between the actual value at the time when the storage battery 31 discharges power to the mobile object 1 and the actual value of the discharged power discharged from the storage battery 31 at that time. When a time is input, the second model outputs an estimated value of the discharged power discharged from the storage battery 31 at that time.

[0061] The travel information storage unit 224 stores travel information transmitted by the mobile object 1 or the user terminal 6. The travel information storage unit 224 further stores information (hereinafter, user information) that associates identification information of the mobile object 1, identification information of the secondary battery mounted on the mobile object 1, the amount of power held by the secondary battery when it is in a fully charged state (hereinafter, fully charged power amount), identification information of the user of the mobile object 1, and identification information of the user terminal 6 used by the user.

[0062] The plan information storage unit 225 stores information (hereinafter, plan information) indicating a plan (hereinafter, purchase plan) for the charging station 3 to purchase grid power from the power grid 9 ( FIG. 1 ). The purchase plan includes information on the date and time when the charging station 3 will receive supply of grid power from the power grid 9 and the grid power to be purchased from the power grid 9 on that date and time. The information on the grid power includes the power value and purchase price of the grid power, etc.

[0063] The processor 20 is configured by, for example, a central processing unit. The processor 20 executes a control program stored in the memory 22 to function as a first acquisition unit 201, a second acquisition unit 202, a first prediction unit 203 (third acquisition unit, first prediction unit), a second prediction unit 204 (third acquisition unit, second prediction unit), a planning unit 205 (fourth acquisition unit), and a calculation unit 206 (calculation unit, output unit). However, this is just an example, and the first acquisition unit 201, the second acquisition unit 202, the first prediction unit 203, the second prediction unit 204, the planning unit 205, and the calculation unit 206 may be realized by dedicated electrical circuits such as ASICs.

[0064] The first acquisition unit 201 acquires the remaining energy amount and the renewable energy rate of the storage battery 31. Specifically, the first acquisition unit 201 acquires the remaining energy amount and the renewable energy rate of the storage battery 31 from the storage battery information stored in the storage battery information storage unit 222. For example, the first acquisition unit 201 acquires, as the current remaining energy amount and the renewable energy rate of the storage battery 31, the remaining energy amount and the renewable energy rate of the storage battery 31 that are included in the battery information that includes the most recent current date and time and that is stored in the storage battery information storage unit 222.

[0065] The second acquisition unit 202 acquires a specified time after the present. Specifically, when a user performs a predetermined operation on the user terminal 6 to send request information, the user terminal 6 sends the request information to the server 2. The request information is information that requests the server 2 to calculate the renewable energy rate of the storage battery 31 at a specified time after the present. The request information includes the current location of the user terminal 6, identification information of the user terminal 6, identification information of the user who uses the user terminal 6, and the specified time.

[0066] When the communication unit 21 receives request information from the user terminal 6, the second acquisition unit 202 acquires the designated time included in the request information. Note that the method by which the second acquisition unit 202 acquires the designated time is not limited to this. For example, the second acquisition unit 202 may acquire the time when a predetermined time has elapsed from the present as the designated time.

[0067] The first prediction unit 203 acquires an actual value of the self-generated power from renewable energy (hereinafter referred to as the first actual value). The self-generated power from renewable energy is power (charge power) generated by the power generation device 39 and used to charge the storage battery 31. Based on the first actual value, the first prediction unit 203 predicts the amount of self-generated power from renewable energy during the period from the present to the specified time acquired by the second acquisition unit 202 (hereinafter referred to as the first period). Details of the first prediction unit 203 will be described later.

[0068] The second prediction unit 204 acquires an actual value (hereinafter, second actual value) of the discharged power from the storage battery 31. The second prediction unit 204 predicts the charge amount of the storage battery 31 during the first period (hereinafter, required power amount), which is the amount of power required for discharging from the storage battery 31 during the first period, based on the current renewable energy rate of the storage battery 31 acquired by the first acquisition unit 201 and the second actual value.

[0069] Specifically, the second prediction unit 204 predicts the amount of self-generated power required for discharging from the storage battery 31 during the first period out of the required amount of power, and the amount of grid power required for discharging from the storage battery 31 during the first period out of the required amount of power, based on the current renewable energy rate of the storage battery 31 and the second actual value acquired by the first acquisition unit 201. Hereinafter, the amount of self-generated power required for discharging from the storage battery 31 will be referred to as a required self-generated power amount. The amount of grid power required for discharging from the storage battery 31 will be referred to as a required grid power amount. Details of the second prediction unit 204 will be described later.

[0070] The planning unit 205 acquires the planning information stored in the planning information storage unit 225. As described above, the planning information is information indicating a purchase plan for grid power that the charging station 3 purchases from the power grid 9. The purchase plan includes information on the date and time when the charging station 3 will receive supply of grid power from the power grid 9 and information on the grid power to be purchased from the power grid 9 on that date and time. The planning unit 205 calculates the amount of grid power to be purchased in the first period by referring to the purchase plan indicated in the planning information. Hereinafter, the amount of grid power to be purchased in the first period will be referred to as the amount of power purchased in the first period.

[0071] The calculation unit 206 calculates the renewable energy rate of the storage battery 31 at the specified time based on the current remaining power amount and renewable energy rate of the storage battery 31 acquired by the first acquisition unit 201, the amount of private power generation by renewable energy in the first period predicted by the first prediction unit 203, the required amount of private power generation and required amount of grid power in the first period predicted by the second prediction unit 204, and the amount of purchased power in the first period calculated by the planning unit 205. The calculation unit 206 outputs the calculated renewable energy rate of the storage battery 31 at the specified time. Details of the calculation unit 206 will be described later.

[0072] The above is the configuration of the server 2. Next, the processing of the server 2 will be described. In this description, the first prediction unit 203, the second prediction unit 204, and the calculation unit 206 will be described in detail. Fig. 3 is a flowchart showing an example of the processing of the server 2 in the first embodiment. When the communication unit 21 receives request information from the user terminal 6, the processor 20 starts the processing shown in Fig. 3.

[0073] In step S11 , the first acquisition unit 201 acquires the remaining energy and the renewable energy rate of the storage battery 31 of the current charging station 3 .

[0074] In step S12, the second acquisition unit 202 acquires a designated time after the present.

[0075] In step S13, the calculation unit 206 divides the first period from the present to the specified time acquired in step S12 into one or more second periods. Note that the lengths of the second periods may or may not be the same. Furthermore, the calculation unit 206 may treat the first period as one second period.

[0076] In step S14, the calculation unit 206 extracts one second period from among the unprocessed second periods included in the first period in order of earliest start time, and sets the one second period as a target period for processing to predict the renewable energy rate of the storage battery 31. The unprocessed second period is a second period for which the renewable energy rate of the storage battery 31 has not been predicted.

[0077] In step S15, the first prediction unit 203 acquires a first actual value, which is an actual value of the self-generated power from renewable energy, and predicts the amount of self-generated power from renewable energy for the target period based on the first actual value.

[0078] Specifically, in step S15, the first prediction unit 203 acquires, as a first actual value, from the model storage unit 223, a first model that has been machine-learned to describe the relationship between the actual value at the time when the storage battery 31 is charged with self-generated power generated by the power generation device 39 and the actual value of the self-generated power used to charge the storage battery 31 at that time. As described above, when a time is input, the first model outputs an estimated value of the self-generated power used to charge the storage battery 31 at that time. When the start time of the target period is input to the first model, the first prediction unit 203 acquires an estimated value of the self-generated power output by the first model. The first prediction unit 203 calculates the product of the acquired estimated value and the length of the target period as the amount of self-generated power during the target period.

[0079] Next, in step S16, the second prediction unit 204 predicts the required amount of self-generated power (the amount of self-generated power required to discharge from the storage battery 31) and the required amount of grid power (the amount of grid power required to discharge from the storage battery 31) for the target period based on the second actual value, which is the actual value of the discharged power from the storage battery 31.

[0080] Specifically, in step S16, the second prediction unit 204 acquires, as a second actual value, from the model storage unit 223, a second model that has been machine-learned to describe the relationship between the actual value at the time when the storage battery 31 discharges to the mobile object 1 and the actual value of the discharged power discharged from the storage battery 31 at that time. As described above, when a time is input, the second model outputs an estimated value of the discharged power discharged from the storage battery 31 at that time. When the start time of the target period is input to the second model, the second prediction unit 204 acquires the estimated value of the discharged power output by the second model.

[0081] The second prediction unit 204 calculates the required amount of privately-owned power generation for the target period by multiplying the acquired estimated value, the renewable energy rate of the storage battery 31 at the start time of the target period, and the length of the target period. On the other hand, the second prediction unit 204 calculates the required amount of grid power for the target period by multiplying the acquired estimated value, the result of subtracting the renewable energy rate of the storage battery 31 at the start time of the target period from 1 (1 - renewable energy rate), and the length of the target period.

[0082] If the target period is the second period having the earliest start time, the second prediction unit 204 uses the current renewable energy rate of the storage battery 31 acquired in step S11 as the renewable energy rate of the storage battery 31 at the start time of the target period. If the target period is different from the second period having the earliest start time, the second prediction unit 204 uses the renewable energy rate of the storage battery 31 predicted in the most recent step S18 as the renewable energy rate of the storage battery 31 at the start time of the target period.

[0083] In step S17, the planning unit 205 acquires the planning information stored in the planning information storage unit 225, and calculates the amount of grid power to be purchased during the target period (hereinafter referred to as the amount of purchased power during the target period) by referring to the purchase plan indicated by the planning information.

[0084] In step S18, the calculation unit 206 calculates the renewable energy rate of the storage battery 31 at the end time of the target period based on the current remaining energy amount and renewable energy rate of the storage battery 31 acquired in step S11, and the amount of self-generated electricity, purchased electricity, required self-generated electricity, and required grid electricity during the target period predicted and calculated in steps S15 to S17.

[0085] Specifically, in step S18, if the target period is the second period with the earliest start time among one or more second periods, the calculation unit 206 calculates the renewable energy rate of the storage battery 31 at the end time of the target period as follows.

[0086] The calculation unit 206 calculates the product of the current remaining energy amount of the storage battery 31 acquired in step S11 and the current renewable energy rate of the storage battery 31 as the amount of privately generated power charged in the storage battery 31 at the start time of the target period (hereinafter referred to as the start privately generated power amount). The calculation unit 206 also calculates the product of the remaining energy amount of the storage battery 31 acquired in step S11 and the result (1 - renewable energy rate) obtained by subtracting the renewable energy rate of the storage battery 31 from 1 as the amount of grid power charged in the storage battery 31 at the start time of the target period (hereinafter referred to as the start grid power amount).

[0087] The calculation unit 206 calculates the sum (= start amount of private power generation + amount of private power generation in the target period) of the amount of private power generation at the start and the amount of private power generation in the target period predicted in step S15. The calculation unit 206 subtracts the amount of private power generation required in the target period predicted in step S16 from the sum (= start amount of private power generation + amount of private power generation in the target period - amount of private power generation required in the target period), and calculates the result as the amount of privately generated power charged in the storage battery 31 at the end of the target period (hereinafter, end amount of private power generation).

[0088] Meanwhile, the calculation unit 206 calculates the sum (=start grid energy + purchased energy during the target period) of the start grid energy and the amount of purchased energy during the target period calculated in step S17. The calculation unit 206 subtracts the required grid energy during the target period predicted in step S16 from the sum (=start grid energy + purchased energy during the target period - required grid energy during the target period), and calculates the result as the amount of grid energy charged in the storage battery 31 at the end of the target period (hereinafter, end grid energy).

[0089] The calculation unit 206 divides the end-time self-generated power amount by the sum of the end-time self-generated power amount and the end-time grid power amount (= end-time self-generated power amount / (end-time self-generated power amount + end-time grid power amount)) and calculates the result as the renewable energy rate of the storage battery 31 at the end time of the target period.

[0090] In addition, if the target period is not the second period with the earliest start time among one or more second periods, the calculation unit 206 uses the end-time self-generated power amount calculated in the previous step S18 as the start-time self-generated power amount, and uses the end-time system power amount calculated in the previous step S18 as the start-time system power amount, and calculates the renewable energy rate of the storage battery 31 at the end of the target period in the same manner as described above.

[0091] Next, in step S19, the calculation unit 206 determines whether the target period is the second period with the latest start time among one or more second periods (hereinafter, the last second period). If it is determined in step S19 that the target period is not the last second period (NO in step S19), the processing from step S14 onwards is performed again.

[0092] On the other hand, if it is determined in step S19 that the target period is the last second period (YES in step S19), in step S20, the calculation unit 206 outputs the renewable energy rate of the storage battery 31 at the end time of the target period calculated in the most recent step S18 as the renewable energy rate of the storage battery 31 at the specified time.

[0093] For example, in step S20, the calculation unit 206 returns information including the renewable energy rate of the storage battery 31 at the specified time to the user terminal 6 that transmitted the request information. When step S20 ends, the processor 20 ends the processing illustrated in FIG.

[0094] As described above, according to the first embodiment, the amount of privately generated electricity from renewable energy during a first period from the present to a specified time is predicted, and the amount of purchased electricity during the first period, which is the amount of grid power to be purchased during the first period, is calculated. Furthermore, the required privately generated electricity amount, which is the amount of privately generated electricity required for discharging the storage battery 31 during the first period, and the required grid power amount, which is the amount of grid power required for discharging the storage battery 31 during the first period, are predicted. Therefore, according to the first embodiment, the amount of electricity to be used for charging and discharging the storage battery 31 during the first future period can be grasped by separating it into the amount of privately generated electricity from renewable energy and the amount of grid power.

[0095] In this configuration, the renewable energy rate of the storage battery 31 at the specified time is calculated and output based on the current renewable energy rate and remaining power amount of the storage battery 31, the amount of private power generation, the purchase plan, the required private power generation amount, and the required grid power amount for the first period. Therefore, it is possible to know how much power that the storage battery 31 possesses at the charging station 3 will have self-generated using renewable energy at a specified time in the future.

[0096] Step S17 may be omitted. Accordingly, in step S18, the calculation unit 206 may calculate the grid energy at the end, assuming that the amount of purchased energy in the target period is zero.

[0097] In addition, if the renewable energy rate of the storage battery 31 is not included in the storage battery information transmitted by the charging / discharging device 30, the calculation unit 206 may output the renewable energy rate of the storage battery 31 at a specified time as follows.

[0098] Specifically, similar to step S11, the first acquisition unit 201 acquires the remaining amount of power in the storage battery 31 of the current charging station 3. Similar to step S12, the second acquisition unit 202 acquires a specified time after the present. Next, similar to step S15, when the start time of the first period is input to the first model, the first prediction unit 203 calculates the product of the estimated value of self-generated power output by the first model and the length of the first period as the amount of self-generated power in the first period.

[0099] Next, similarly to step S16, the second prediction unit 204 calculates the required amount of energy for the first period as the product of the estimated value of discharge power output by the second model when the start time of the first period is input to the second model and the length of the first period. Then, the calculation unit 206 outputs the renewable energy rate of the required amount of energy for the first period, which is the result of dividing the amount of private power generation for the first period calculated by the first prediction unit 203 by the required amount of energy for the first period calculated by the second prediction unit 204, as the renewable energy rate of the storage battery 31 at the end time of the first period, i.e., the specified time. In this case, the renewable energy rate of the amount of energy to be charged (required amount of energy) can be output as the renewable energy rate of the storage battery 31 at the specified time. Note that the calculation unit 206 may output the renewable energy rate of the required amount of energy for the first period calculated in this manner together with the renewable energy rate of the storage battery 31 at the specified time in step S20 described above.

[0100] (Embodiment 2) In the first embodiment, an example was described in which the renewable energy rate of the storage battery 31 at a specified time is output without considering the number of chargeable units, which is the number of mobile objects 1 that can be simultaneously charged by discharging from the storage battery 31. In the second embodiment, an example will be described in which the renewable energy rate of the storage battery 31 at a specified time is calculated taking into consideration the number of chargeable units, and a plan is made to reduce the number of chargeable units so that the renewable energy rate is equal to or greater than a predetermined target value.

[0101] In the second embodiment, the second model is obtained by machine learning the relationship between the actual value at the time when the storage battery 31 discharges power to the mobile object 1, the actual value of the discharged power discharged from the storage battery 31 at that time, and the actual value of the number of chargeable vehicles at that time. When the time and the number of chargeable vehicles at that time are input, the second model outputs an estimated value of the discharged power discharged from the storage battery 31 at that time.

[0102] In the second embodiment, the plan information includes purchase plans for each number of chargeable vehicles up to the upper limit number. For example, if the upper limit number is two, the plan information includes a purchase plan for when the number of chargeable vehicles is two, a purchase plan for when the number of chargeable vehicles is one, and a purchase plan for when the number of chargeable vehicles is zero.

[0103] The processing of the server 2 in the second embodiment will be described in detail below. In the following description, the same components as those in the first embodiment will be denoted by the same reference numerals and will not be described again. Fig. 4 is a flowchart showing an example of the processing of the server 2 in the second embodiment. In the second embodiment, when the communication unit 21 receives request information from the user terminal 6, the processor 20 starts the processing shown in Fig. 4.

[0104] When the processing shown in Figure 4 is started, in step S11a, the first acquisition unit 201 acquires not only the remaining energy amount and renewable energy rate of the current storage battery 31 owned by the charging station 3, but also the current number of mobile bodies 1 that can be charged simultaneously by discharging from the storage battery 31.

[0105] Specifically, in step S11a, the first acquisition unit 201 acquires the remaining energy amount, renewable energy rate, and number of chargeable units of the storage battery 31 from the storage battery information including the most recent current date and time stored in the storage battery information memory unit 222.

[0106] After step S15, in step S16a, the second prediction unit 204 predicts the required amount of self-generated power and required amount of grid power for the target period based on the actual value of the discharged power from the storage battery 31 when the number of chargeable units matches the current number of chargeable units obtained in step S11a.

[0107] Specifically, in step S16a, the second prediction unit 204 obtains from the model memory unit 223 a second model that has been machine-learned to describe the relationship between the actual value at the time when discharge from the storage battery 31 to the mobile body 1 was performed, the actual value of the discharge power discharged from the storage battery 31 at that time, and the actual value of the number of chargeable vehicles at that time, as the second actual value when the number of chargeable vehicles matches the current number of chargeable vehicles obtained in step S11a.

[0108] As described above, in the second embodiment, when a time and the number of chargeable vehicles at that time are input, the second model outputs an estimated value of the discharge power discharged from the storage battery 31 at that time. When the start time of the target period and the current number of chargeable vehicles acquired in step S11a are input to the second model, the second prediction unit 204 acquires an estimated value of the discharge power output by the second model.

[0109] Thereafter, the second prediction unit 204 calculates the required amount of privately-owned power generation for the target period as the product of the acquired estimated value, the renewable energy rate of the storage battery 31 at the start time of the target period, and the length of the target period, as in Embodiment 1. Meanwhile, the second prediction unit 204 calculates the required amount of grid power for the target period as the product of the acquired estimated value, the result of subtracting the renewable energy rate of the storage battery 31 at the start time of the target period from 1 (1 - renewable energy rate), and the length of the target period.

[0110] After step S16a, in step S17a, the planner 205 acquires a purchase plan for when the number of chargeable vehicles matches the number of chargeable vehicles acquired in step S11a from the plan information stored in the plan information storage unit 225. The planner 205 refers to the purchase plan and calculates the amount of electricity to be purchased during the target period.

[0111] Assume that it is determined in step S19 that the target period is the last second period (YES in step S19). In this case, in step S21, the calculation unit 206 determines whether the renewable energy rate of the storage battery 31 calculated in the most recent step S18 is equal to or greater than a predetermined target value.

[0112] When the calculation unit 206 determines in step S21 that the renewable energy rate of the storage battery 31 is less than the predetermined target value (NO in step S21), the calculation unit 206 reduces the number of chargeable devices by one in step S22.

[0113] If the number of chargeable vehicles after being reduced in step S22 is not 0 (NO in step S23), the processing from step S14 onwards is performed again. In the processing from step S14 onwards that is performed again, the number of chargeable vehicles after being reduced in step S22 is used in steps S16a and S17a instead of the number of chargeable vehicles acquired in step S11a. Note that in the processing from step S14 onwards that is performed again, step S15 is processing that does not depend on the number of chargeable vehicles and may therefore be omitted.

[0114] In step S21, if it is determined that the renewable energy rate of the storage battery 31 is equal to or greater than a predetermined target value (YES in step S21), and if the number of chargeable units after being reduced in step S22 is 0 (YES in step S23), processing from step S24 onwards is performed.

[0115] In step S24, the calculation unit 206 creates a plan to set the chargeable number of storage batteries 31 in the first period from the present to the specified time to the chargeable number used in the most recent steps S16a and S17a.

[0116] Specifically, in step S24, calculation unit 206 uses communication unit 21 to transmit to charging / discharging device 30 an instruction to set the chargeable number of storage battery 31 in the first period to the chargeable number used in the most recent steps S16a and S17a. Upon receiving the instruction, charging / discharging device 30 limits the number of mobile objects 1 that can be simultaneously charged by discharging from storage battery 31 to the instructed chargeable number during the first period in accordance with the instruction.

[0117] After step S24, step S20 is performed.

[0118] In the second embodiment, a plan is created to reduce the number of chargeable vehicles in the first period so that the renewable energy rate of the storage battery 31 at the specified time is equal to or greater than a predetermined target value. Therefore, by limiting the number of chargeable vehicles in the first period at the charging station 3 in accordance with the created plan, the renewable energy rate of the storage battery 31 at the specified time can be equal to or greater than the predetermined target value.

[0119] (Embodiment 3) In embodiment 3, an example will be described in which, as in embodiment 1 or 2, the renewable energy rates of the storage batteries 31 at a specified time are calculated for each of one or more charging stations 3 included in the information processing system 1000, and these are output to a user terminal 6.

[0120] Specifically, in the third embodiment, when the communication unit 21 receives request information from the user terminal 6, the processor 20 acquires the current location of the user terminal 6 included in the request information. The processor 20 refers to the map information stored in the map information storage unit 221, and identifies one or more charging stations 3 (hereinafter, one or more first charging stations) that are located within a predetermined distance from the current location of the user terminal 6.

[0121] The processor 20 performs the process shown in Fig. 3 or 4 for the storage battery 31 of each of the one or more first charging stations. In the third embodiment, in step S20, the calculation unit 206 stores in the memory 22 the renewable energy rate of the storage battery 31 of each first charging station at the end time of the target period, which was calculated in the most recent step S18, as the renewable energy rate of the storage battery 31 of each first charging station at the specified time.

[0122] Furthermore, the calculation unit 206 acquires the current location of the user terminal 6 acquired by the processor 20 as the user's current location. The calculation unit 206 acquires a map image including the user's current location and the locations of one or more first charging stations from the map information storage unit 221. The calculation unit 206 generates a map image (first map image) that displays the user's current location and the locations of the one or more first charging stations on the map image. The calculation unit 206 generates information indicating a screen that displays the map image and the renewable energy rates of the storage batteries 31 in each of the one or more charging stations 3 at the specified time, which are stored in the memory 22. The calculation unit 206 returns the information indicating the screen to the user terminal 6 that sent the request information.

[0123] 5 is a diagram showing an example of a screen 900 generated by the calculation unit 206 in embodiment 3. For example, the calculation unit 206 generates information showing the screen 900 shown in FIG. 5 and returns the information to the user terminal 6 that sent the request information. Upon receiving the information showing the screen 900, the user terminal 6 displays the screen 900 on its own display.

[0124] The screen 900 includes a map image 901 (first map image) and a time selection screen 902. The map image 901 shows an example in which the user's current location 91, a position 92a of a first charging location "charging location A," a position 92b of a first charging location "charging location B," and a position 92c of a first charging location "charging location C" are displayed on a map image including the user's current location and the positions of one or more first charging locations.

[0125] The time selection screen 902 includes a tab area 903 for allowing the user to select the elapsed time from the current time, and a display area 904. The display area 904 displays the renewable energy rate of the storage battery 31 of each first charging station at the specified time, which is the time when the elapsed time selected in the tab area 903 has elapsed from the current time.

[0126] Specifically, when an elapsed time from the current time is selected in the tab area 903, the user terminal 6 sets the time when the selected elapsed time has elapsed from the current time as the designated time and transmits request information including the designated time to the server 2. As a result, the server 2 calculates the renewable energy rate of the storage batteries 31 of each of the one or more first charging stations at the designated time, and displays the calculated renewable energy rate in the display area 904.

[0127] Fig. 5 shows an example in which the elapsed time from the current time "3 hours later" is selected in the tab area 903. Fig. 5 shows an example in which the display area 904 displays the renewable energy rate "RE: 100" of the storage battery 31 owned by the first charging station "charging station A," the renewable energy rate "RE: 30" of the storage battery 31 owned by the first charging station "charging station B," and the renewable energy rate "RE: 50" of the storage battery 31 owned by the first charging station "charging station C" at the same time "3 hours later."

[0128] In the third embodiment, information indicating a screen 900 displaying a map image 901 displaying a user's current location 91 and the positions 92a to 92c of one or more first charging stations, and the renewable energy rate of the storage battery 31 of each of the one or more first charging stations at a specified time, is output to the user terminal 6. Therefore, by referring to the screen 900 on the user terminal 6, the user can easily grasp the location of a charging station 3 whose renewable energy rate of the storage battery 31 at the specified time is close to what the user desires.

[0129] (Fourth Embodiment) In a fourth embodiment, an example will be described in which, when a secondary battery of a mobile object 1 used by a user is charged with discharged power discharged from the storage batteries 31 of one or more first charging stations, the renewable energy rate of the secondary battery at a time immediately after the charging is calculated. Also, an example will be described in which information showing a screen related to one or more second charging stations among the one or more first charging stations for which a renewable energy rate of the secondary battery equal to or greater than a predetermined threshold has been calculated is output to a user terminal 6.

[0130] 6 is a flowchart showing an example of processing by the server 2 in embodiment 4. In embodiment 4, when the communication unit 21 receives request information from the user terminal 6, the processor 20 starts the processing shown in FIG.

[0131] In step S41, the first acquisition unit 201 acquires the remaining power amount and the renewable energy rate of the secondary battery installed in the mobile object 1 used by the user. Hereinafter, the secondary battery installed in the mobile object 1 used by the user will be abbreviated as the secondary battery of the mobile object 1.

[0132] Specifically, in the fourth embodiment, the mobile object 1 is configured to be able to manage the renewable energy rate of the secondary battery of the mobile object 1 at the current time. The traveling information periodically transmitted from the mobile object 1 to the server 2 includes the renewable energy rate of the secondary battery.

[0133] In step S41, the first acquisition unit 201 refers to the user information stored in the travel information storage unit 224 and acquires identification information of the mobile object 1 used by the user of the user terminal 6 that sent the request information. The first acquisition unit 201 acquires travel information including the acquired identification information of the mobile object 1 and the most recent current date and time from the travel information storage unit 224. The first acquisition unit 201 acquires the remaining power amount and renewable energy rate of the secondary battery of the mobile object 1, which are included in the travel information acquired from the travel information storage unit 224.

[0134] In step S42, the calculation unit 206 calculates the amount of power required to charge the secondary battery of the moving object 1 until the remaining amount of power in the secondary battery reaches a predetermined target amount of power (hereinafter referred to as the required charge amount).

[0135] Specifically, the target amount of power is predetermined to, for example, the amount of fully charged power that the secondary battery of the mobile object 1 has when it is in a fully charged state. In this case, in step S42, the calculation unit 206 obtains the amount of fully charged power of the secondary battery of the mobile object 1 from the user information stored in the travel information storage unit 224. The target amount of power is not limited to this, and may be included in the request information transmitted by the user terminal 6. In this case, the calculation unit 206 obtains the target amount of power from the request information.

[0136] The calculation unit 206 subtracts the remaining power amount of the secondary battery acquired in step S41 from the target power amount (=target power amount−remaining power amount of the secondary battery) to calculate the required charge amount.

[0137] Next, in step S12, the second acquisition unit 202 acquires a designated time after the present time, as in the first or second embodiment.

[0138] Next, in step S44, the processor 20 identifies one or more first charging stations that are located within a predetermined distance from the current location of the user terminal 6, as in the third embodiment, and performs the process shown in Fig. 3 or 4 for the storage batteries 31 that each of the one or more first charging stations has. As a result, the renewable energy rate of the storage batteries 31 that each of the one or more first charging stations has at the specified time is calculated.

[0139] Next, in step S45, the calculation unit 206 calculates the renewable energy rate of the secondary battery of the mobile body 1 immediately after charging when the secondary battery is charged to the required charge amount using discharged power from the storage battery 31 possessed by each first charging station for one or more first charging stations.

[0140] Specifically, in step S45, the calculation unit 206 calculates the product of the remaining power amount and the renewable energy rate of the secondary battery of the mobile object 1 acquired in step S41 (= remaining power amount of secondary battery × renewable energy rate of secondary battery). Hereinafter, this product will be referred to as a first product. In this way, the calculation unit 206 calculates the amount of self-generated power currently held in the secondary battery of the mobile object 1.

[0141] Next, the calculation unit 206 calculates the product (= renewable energy rate of the storage battery 31 at each first charging station × required charge amount) of the renewable energy rate of the storage battery 31 at each first charging station acquired in step S11 ( FIG. 3 ) or step S11a ( FIG. 4 ), which is included in the process shown in FIG. 3 or 4 performed in step S44, and the required charge amount calculated in step S42. Hereinafter, this product will be referred to as a second product. As a result, the calculation unit 206 calculates the amount of self-generated power to be discharged from the storage battery 31 at each first charging station to the secondary battery of the mobile object 1 when the secondary battery of the mobile object 1 is charged to the required charge amount.

[0142] The calculation unit 206 divides the sum of the first product and the second product (= remaining energy amount of the secondary battery × renewable energy rate of the secondary battery + renewable energy rate of the storage battery 31 possessed by each first charging station × required charging amount) by the fully charged energy amount of the secondary battery of the mobile body 1.

[0143] The calculation unit 206 calculates the result of the division (= (remaining energy amount of the secondary battery × renewable energy rate of the secondary battery + renewable energy rate of the storage battery 31 possessed by each first charging station × required charge amount) / fully charged energy amount of the secondary battery) as the renewable energy rate of the secondary battery of the mobile body 1 immediately after charging when the secondary battery is charged to the required charge amount using discharged power from the storage battery 31 possessed by each first charging station.

[0144] In step S46, the calculation unit 206 identifies one or more second charging stations from among the one or more first charging stations for which the calculated renewable energy rate of the secondary battery is equal to or greater than a predetermined threshold. As in the third embodiment, the calculation unit 206 outputs information showing a screen related to the one or more second charging stations to the user terminal 6 that transmitted the request information.

[0145] 7 is a diagram showing an example of a screen 900a generated by the calculation unit 206 in embodiment 4. For example, in step S46, the calculation unit 206 generates information indicating the screen 900a shown in FIG. 7 and returns the information to the user terminal 6 that sent the request information. Upon receiving the information indicating the screen 900a, the user terminal 6 displays the screen 900a on its own display.

[0146] The screen 900a includes a map image 901a (second map image) and a time selection screen 902a. The map image 901a shows an example in which the user's current location 91 and the location 92a of the second charging location "charging location A" are displayed on a map image including the user's current location and the locations of one or more second charging locations.

[0147] The time selection screen 902a includes a tab area 903 and a display area 904a similar to those in Fig. 5. In the display area 904a, the time when the elapsed time selected in the tab area 903 has elapsed from the current time is set as the designated time, and the renewable energy rate of the storage battery 31 of each second charging station at the designated time is displayed.

[0148] Specifically, when an elapsed time from the current time is selected in the tab area 903, the user terminal 6 sets the time when the selected elapsed time from the current time as the designated time and transmits request information including the designated time to the server 2. As a result, the server 2 calculates the renewable energy rate of the storage battery 31 of each of the one or more first charging stations at the designated time. Furthermore, for the one or more first charging stations, the server 2 calculates the renewable energy rate of the secondary battery immediately after the charging when the secondary battery of the mobile object 1 is charged to a required charge amount using discharged power from the storage battery 31 of each first charging station. Then, one or more second charging stations from among the one or more first charging stations are identified, and the renewable energy rate of the storage battery 31 of each of the one or more second charging stations is displayed in the display area 904a.

[0149] The tab area 903 in Fig. 7 shows an example in which the elapsed time "3 hours later" from the current time is selected. The display area 904a in Fig. 7 shows an example in which the second charging station "charging station A" that will make the renewable energy rate of the secondary battery of the mobile object 1 equal to or greater than a predetermined threshold immediately after charging the required amount of power is identified from among the three first charging stations "charging station A," "charging station B," and "charging station C" shown in Fig. 5. The display area 904a in Fig. 7 also shows an example in which the renewable energy rate "RE: 100" of the storage battery 31 of the second charging station "charging station A" at the time when the elapsed time "3 hours later" from the current time has elapsed is displayed.

[0150] According to embodiment 4, by referring to the screen 900a on the user terminal 6, the user of the mobile body 1 can easily grasp the location of one or more second charging stations that can make the renewable energy rate of the secondary battery equal to or greater than a predetermined threshold value when the secondary battery of the mobile body 1 is charged to the required amount at a specified time using discharge power from the storage batteries 31 possessed by each second charging station.

[0151] In the first to fourth embodiments, the charging base 3 has been described as a charging station. However, the charging base 3 is not limited to a charging station as long as it has at least a storage battery and is configured to be able to charge the storage battery using renewable energy. The charging base 3 may be, for example, one or more electric vehicles each having a storage battery, a facility such as a factory having a stationary storage battery, or a residence having a stationary storage battery. In these cases, the charging base 3 is also typically configured to be able to supply power stored in the storage battery of the charging base 3 to other storage batteries or electrical devices.

[0152] Furthermore, if the grid power purchased by the charging station 3 includes power generated from renewable energy sources and the renewable energy rate in the grid power is clear, the charging station 3 does not necessarily have to have equipment for private power generation, such as the power generation device 39. In this case, the amount of power generated from renewable energy sources in the grid power calculated based on the renewable energy rate in the grid power corresponds to the amount of private power generation in the first to fourth embodiments.

[0153] Furthermore, grid power may be supplied from multiple power grids 9. For example, power with a renewable energy rate of 100% may be purchased as grid power from one power grid 9, and power with an unknown renewable energy rate may be purchased as grid power from another power grid 9. Even in this case, the amount of renewable energy power calculated based on the amount of grid power purchased from one power grid 9 and the renewable energy rate of that grid power (100% in the above example) corresponds to the amount of self-generated power in the first to fourth embodiments.

[0154] According to the present disclosure, it is possible to grasp the amount of electricity generated using renewable energy that a storage battery at a charging station will have in the future. Therefore, the present disclosure is useful for a user to decide which charging station to use and when, and to estimate the lifetime CO2 emissions at the charging station. 2 It is also useful for controlling the amount.

Claims

1. An information processing method in a computer, comprising: acquiring a remaining amount of power in a storage battery owned by a charging station and a designated time after the present; acquiring a first actual value which is an actual value of charging power to the storage battery from renewable energy and a second actual value which is an actual value of discharging power from the storage battery; predicting a required amount of power, which is the amount of power charged to the storage battery during the period from the present to the designated time, based on the remaining amount of power in the storage battery and the second actual value; predicting a renewable energy amount of power, which is the amount of power from the renewable energy of the required amount, based on the first actual value; and outputting a renewable energy rate, which is the proportion of the amount of power from the renewable energy in the storage battery at the designated time, based on the renewable energy amount.

2. The information processing method according to claim 1, further comprising: acquiring a renewable energy rate in the remaining power amount of the storage battery; and outputting the renewable energy rate of the storage battery at the specified time based on the renewable energy rate of the storage battery and the amount of renewable energy power.

3. The information processing method according to claim 1, further comprising: acquiring a purchase plan for grid power for the period; and predicting the amount of renewable energy power based on the purchase plan and the first actual value in predicting the amount of renewable energy power.

4. The information processing method of claim 3, further comprising: acquiring a number of chargeable vehicles, which is the current number of electric vehicles that can be charged simultaneously by discharging from the storage battery; acquiring the second actual value includes acquiring the second actual value when the number of chargeable vehicles matches the current number of chargeable vehicles; acquiring the purchase plan for the period includes acquiring the purchase plan when the number of chargeable vehicles for the period matches the current number of chargeable vehicles; and, if the renewable energy rate of the storage battery at the specified time is less than a predetermined target value, formulating a plan to reduce the number of chargeable vehicles for the period so that the renewable energy rate of the storage battery at the specified time is equal to or greater than the target value.

5. The information processing method according to any one of claims 1 to 4, wherein the charging stations include one or more first charging stations, and further, the information processing method acquires a current location of the user and positions of the one or more first charging stations, and the information processing method outputs, to a terminal device used by the user, information indicating a screen displaying a first map image displaying the current location of the user and the positions of the one or more first charging stations, and the renewable energy rate of the storage battery of each of the one or more first charging stations at the specified time.

6. The information processing method according to claim 5, further comprising: acquiring a current remaining energy amount and renewable energy rate of a secondary battery possessed by an electric vehicle used by the user; calculating a required charge amount, which is the amount of energy required to charge the secondary battery until the remaining energy amount of the secondary battery reaches a predetermined target energy amount; calculating, for the one or more first charging stations, the renewable energy rate of the storage battery possessed by each of the first charging stations at the specified time; and calculating, for the one or more first charging stations, the renewable energy rate of the secondary battery immediately after the secondary battery is charged by the required charge amount by discharging from the storage battery possessed by each of the first charging stations based on the remaining energy amount and renewable energy rate of the secondary battery, the required charge amount, and the renewable energy rate of the storage battery possessed by each of the first charging stations at the specified time.

7. The information processing method according to claim 6, further comprising: identifying one or more second charging stations among the one or more first charging stations for which a renewable energy rate of the secondary battery has been calculated to be equal to or higher than a predetermined threshold; acquiring a current location of the user and positions of the one or more second charging stations; and outputting, to the terminal device, information showing a screen displaying a second map image displaying the current location of the user and the positions of the one or more second charging stations and the renewable energy rate of the storage battery of each of the one or more second charging stations at the specified time.

8. The information processing method according to claim 1, wherein the prediction of the amount of renewable energy power includes predicting the amount of self-generated power from the renewable energy during the period, and the amount of charging to the storage battery from the renewable energy among the grid power during the period.

9. An information processing device comprising: a first acquisition unit that acquires the remaining amount of energy in a storage battery owned by a charging station; a second acquisition unit that acquires a designated time after the present; a third acquisition unit that acquires a first actual value that is an actual value of charging power to the storage battery from renewable energy and a second actual value that is an actual value of discharging power from the storage battery; a second prediction unit that predicts a required amount of energy, which is the amount of charge of the storage battery during a period from the present to the designated time, based on the remaining amount of energy in the storage battery and the second actual value; a first prediction unit that predicts a renewable energy amount of energy, which is the amount of energy from the renewable energy out of the required amount of energy, based on the first actual value; and an output unit that outputs a renewable energy rate, which is the proportion of the amount of energy from the renewable energy in the storage battery at the designated time, based on the renewable energy amount of energy.

10. A control program for controlling a computer of an information processing device, the control program causing the computer to function as: a first acquisition unit that acquires the remaining amount of energy in a storage battery owned by a charging station; a second acquisition unit that acquires a designated time after the present; a third acquisition unit that acquires a first actual value that is an actual value of charging power to the storage battery from renewable energy and a second actual value that is an actual value of discharging power from the storage battery; a second prediction unit that predicts a required amount of energy, which is the amount of charge of the storage battery during the period from the present to the designated time, based on the remaining amount of energy in the storage battery and the second actual value; a first prediction unit that predicts a renewable energy amount of energy, which is the amount of energy from the renewable energy out of the required amount of energy, based on the first actual value; and an output unit that outputs a renewable energy rate, which is the ratio of the amount of energy from the renewable energy in the storage battery at the designated time, based on the renewable energy amount of energy.

Citation Information

Patent Citations

  • Charging of electrical vehicles

    EP2426804A1

  • Terminal device, method and program

    JP2021176064A

  • System and method for electrical grid management, risk mitigation, and resilience

    US20220261715A1

  • Charging information-providing device

    WO2013024521A1

  • Charging of electric vehicles using renewable energy

    WO2020208655A1