Resource information exchange management system for differentiated coordinated development of county-level economy

By designing a resource information interaction management system for county economy, the problem of difficulty in integrating characteristic industries and leading industries into the division of labor in the industrial chain has been solved, and the construction of characteristic industrial clusters and the improvement of county economic resource interaction has been achieved.

WO2025130335A1PCT designated stage expired Publication Date: 2025-06-26HUNAN WOMENS UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/127282
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-12-18
Filing Date
2024-10-25
Publication Date
2025-06-26

AI Technical Summary

Technical Problem

The existing technology cannot integrate characteristic industries and leading industries into the division of labor of the industrial chain and build characteristic industrial clusters, resulting in strong fragmentation of county economic development and low resource interaction.

Method used

A resource information interaction management system was designed, including industrial management module, cluster analysis module and industrial matching module. By conducting management analysis, cluster management analysis and industrial matching analysis of county economic industries, it integrates characteristic industries and leading industries to build characteristic industrial clusters.

Benefits of technology

It has achieved effective integration of characteristic industries and leading industries, improved the resource interaction degree and integrity of the industrial chain of county economy, and reduced the fragmentation of county economic development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024127282_26062025_PF_FP_ABST
    Figure CN2024127282_26062025_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the field of development of county-level economy, relates to data analysis technology, is used for solving the problem in the prior art that specialty industries and leading industries cannot be integrated into division of labor in industry chains, thereby hindering establishment of a specialty industry cluster, and specifically relates to a resource information exchange management system for differentiated coordinated development of county-level economy, comprising an exchange management platform. An industry management module, a cluster analysis module, an industry matching module, and a storage module are communicationally connected to the exchange management platform. The cluster analysis module is used for: performing cluster-based management analysis on county-level economic industries; and arranging pillar objects according to a descending order of management coefficient GL values to obtain a pillar sequence, and performing interception analysis on the pillar sequence to obtain a plurality of reserved clusters. According to the present invention, management analysis is performed on the county-level economic industries, and the overall development state of the county-level economic industries is fed back on the basis of the management coefficients, thereby providing data support for the cluster-based management analysis process.
Need to check novelty before this filing date? Find Prior Art

Description

Resource information interactive management system for differentiated and coordinated development of county economies Technical Field

[0001] The present invention belongs to the field of county economic development and relates to data analysis technology, specifically a resource information interaction management system for differentiated and coordinated development of county economies. Background Art

[0002] County economy refers to the regional economy within the county-level administrative division, with the county seat as the center, townships as the link, and rural areas as the foundation, and is organically composed of various economic elements. In recent years, my country's county economy has developed rapidly and has become an important force in promoting the country's economic development. Technical issues

[0003] The resource information interaction management system for the differentiated and coordinated development of county economies in existing technologies is unable to manage and analyze the characteristic industries and leading industries in the county economies. Characteristic industries and leading industries are difficult to integrate into the industrial chain division of labor and build characteristic industrial clusters, resulting in highly fragmented county economic development and a low level of resource interaction.

[0004] In response to the above technical problems, this application proposes a solution. Technical Solutions

[0005] The purpose of the present invention is to provide a resource information interaction management system for the differentiated and coordinated development of county economies, which is used to solve the problem that existing technologies cannot integrate characteristic industries and leading industries into the industrial chain division of labor and build characteristic industrial clusters;

[0006] The technical problem to be solved by the present invention is: how to provide a resource information interaction management system that can integrate characteristic industries and leading industries into the industrial chain division of labor and build characteristic industrial clusters for the differentiated and coordinated development of county economies.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] A resource information interactive management system for differentiated and coordinated development of county economies includes an interactive management platform, wherein the interactive management platform is communicatively connected to an industry management module, a cluster analysis module, an industry matching module, and a storage module;

[0009] The industry management module is used to manage and analyze the county's economic industries: marking the county's economic industries as management objects, obtaining the management object's talent data RC, revenue data YS, and land data TD; obtaining the management coefficient GL of the management object by numerically calculating the talent data RC, revenue data YS, and land data TD; marking the management object as a supplementary object or a pillar object based on the management coefficient GL; sending all pillar objects to the interactive management platform, which sends the pillar objects to the cluster analysis module after receiving them;

[0010] The cluster analysis module is used to perform cluster management analysis on the county economy and industry: the pillar objects are arranged in descending order according to the management coefficient GL value to obtain a pillar sequence, the pillar sequence is intercepted and analyzed to obtain a number of retained clusters; all the retained clusters are sent to the interactive management platform, and the interactive management platform sends the retained clusters to the industry matching module after receiving them;

[0011] The industry matching module is used to perform matching analysis on the vacant industries in the county economic industrial cluster and obtain a complete cluster.

[0012] As a preferred embodiment of the present invention, the talent data RC is the number of employees of the management object in the previous year, the revenue data YS is the sum of the profits of all corresponding enterprises of the management object in the previous year, and the land data TD is the sum of the office address area values ​​of all corresponding enterprises of the management object.

[0013] As a preferred embodiment of the present invention, the specific process of marking a management object as a supplementary object or a pillar object includes: obtaining the management threshold GLmin through the storage module, and comparing the management coefficient GL of the management object with the management threshold GLmin: if the management coefficient GL is less than the management threshold GLmin, it is determined that the industrial scale of the management object does not meet the requirements, and the corresponding management object is marked as a supplementary object; if the management coefficient GL is greater than or equal to the management threshold GLmin, it is determined that the industrial scale of the management object meets the requirements, and the corresponding management object is marked as a pillar object.

[0014] As a preferred embodiment of the present invention, the specific process of intercepting and analyzing the pillar sequence includes: intercepting the top L1 pillar objects in the pillar sequence and marking them as intercepted objects, freely combining the intercepted objects to obtain several industrial clusters, marking the ratio of the number of intercepted objects in the industrial cluster to the number of industries in the industrial cluster as the occupancy coefficient of the industrial cluster, and marking the industrial cluster as an invalid cluster or a retained cluster through the occupancy coefficient; when the number of retained clusters is one, the intercepted objects in the retained cluster are removed from the pillar sequence, and then the pillar sequence after the removal is intercepted and analyzed again; when the number of retained clusters is greater than one, the intercepted objects in the retained cluster with the largest occupancy coefficient value are removed from the sequence, and then the pillar sequence after the removal is intercepted and analyzed again; when the number of retained clusters is zero, intercepting the top L1+m pillar objects in the pillar sequence and marking them as intercepted objects, recombining the industrial clusters and calculating the occupancy coefficient; and so on, until the last pillar object in the pillar sequence is marked as an intercepted object and the industrial cluster formation is completed.

[0015] As a preferred embodiment of the present invention, the specific process of marking an industrial cluster as an invalid cluster or a reserved cluster includes: obtaining the occupancy threshold through the storage module, and comparing the occupancy coefficient of the industrial cluster with the occupancy threshold: if the occupancy coefficient is less than the occupancy threshold, it is determined that the pillar occupancy rate of the industrial cluster does not meet the requirements, and the corresponding industrial cluster is marked as an invalid cluster; if the occupancy coefficient is greater than or equal to the occupancy threshold, it is determined that the pillar occupancy rate of the industrial cluster meets the requirements, and the corresponding industrial cluster is marked as a reserved cluster.

[0016] As a preferred embodiment of the present invention, the specific process of the industry matching module matching and analyzing the vacant industries of the county economic industrial cluster includes: arranging the retained clusters in order of occupancy coefficient values ​​from large to small to obtain a retained sequence, arranging the supplementary objects in order of management coefficient GL values ​​from large to small to obtain a supplementary sequence, supplementing and matching the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters, sending the industry information of the complete cluster to the interactive management platform, and the interactive management platform sending the received industry information of the complete cluster to the mobile phone terminal of the manager; the industry information of the complete cluster includes the industry type, the enterprise name corresponding to the intercepted object and the enterprise name corresponding to the supplemented object.

[0017] As a preferred embodiment of the present invention, the working method of the resource information interactive management system for differentiated and coordinated development of county economies includes the following steps:

[0018] Step 1: Conduct management analysis on county-level economic industries: Mark county-level economic industries as management objects, obtain the talent data RC, revenue data YS, and land data TD of the management objects, and perform numerical calculations to obtain the management coefficient GL of the management objects. The management coefficient GL is used to mark the management objects as supplementary objects or pillar objects.

[0019] Step 2: Conduct cluster management analysis of county-level economic industries: Arrange pillar objects in descending order of management coefficient GL values ​​to obtain a pillar sequence, perform interception analysis on the pillar sequence to obtain several retained clusters, and send all retained clusters to the industry matching module through the interactive management platform;

[0020] Step 3: Conduct matching analysis on the vacant industries in the county economic industrial clusters: Arrange the retained clusters in descending order of the occupancy coefficient values ​​to obtain a retained sequence, arrange the supplementary objects in descending order of the management coefficient GL values ​​to obtain a supplementary sequence, and supplement the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters. Beneficial effects

[0021] The present invention has the following beneficial effects:

[0022] 1. The industry management module can be used to manage and analyze county-level economic industries. Comprehensive analysis and calculation of various operating parameters of county-level economic industries can be used to obtain management coefficients. The management coefficients can be used to provide feedback on the overall development status of county-level economic industries. Based on the management coefficients, management objects can be marked for development differentiation, providing data support for the cluster management analysis process.

[0023] 2. The cluster analysis module can be used to conduct cluster management analysis of county-level economic industries, and intercept and analyze the pillar sequence to obtain retained clusters. The pillar objects account for a high proportion of industries in the retained clusters. Therefore, under the current state of county economic development, the formation of retained clusters is easy and has high returns;

[0024] 3. The industrial matching module can be used to conduct matching analysis on the vacant industries in the county economic industrial clusters, sort the matching priorities by the degree of completion of the retained clusters, and then fill the vacant industries in the retained clusters according to the matching priorities to improve the integrity of the characteristic industrial chain. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0026] FIG1 is a system block diagram of a first embodiment of the present invention;

[0027] FIG2 is a flow chart of a method according to a second embodiment of the present invention. Modes for Carrying Out the Invention

[0028] The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the embodiments described are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative efforts shall fall within the scope of protection of the present invention. Example 1

[0029] As shown in FIG1 , the resource information interactive management system for the differentiated and coordinated development of county economies includes an interactive management platform, which is connected to an industry management module, a cluster analysis module, an industry matching module, and a storage module.

[0030] The industrial management module is used to manage and analyze the county's economic industries: mark the county's economic industries as management objects, obtain the management object's talent data RC, revenue data YS, and land data TD, where the talent data RC is the number of employees of the management object in the previous year, the revenue data YS is the sum of the profits of all corresponding enterprises of the management object in the previous year, and the land data TD is the sum of the office address area values ​​of all corresponding enterprises of the management object; the management coefficient GL of the management object is obtained through the formula GL=α1*RC+α2*YS+α3*TD, where α1, α2, and α3 are all proportional coefficients, and α1>α2>α3>1; the management threshold GLmin is obtained through the storage module, and the management coefficient GL of the management object is compared with the management threshold GLmin. Comparison: If the management coefficient GL is less than the management threshold GLmin, it is determined that the industrial scale of the management object does not meet the requirements, and the corresponding management object is marked as a supplementary object; if the management coefficient GL is greater than or equal to the management threshold GLmin, it is determined that the industrial scale of the management object meets the requirements, and the corresponding management object is marked as a pillar object; all pillar objects are sent to the interactive management platform, and after receiving the pillar objects, the interactive management platform sends the pillar objects to the cluster analysis module; management analysis is conducted on the county economic industry, and the various operating parameters of the county economic industry are comprehensively analyzed and calculated to obtain the management coefficient. The overall development status of the county economic industry is fed back through the management coefficient, so that the management objects are marked with development differentiation according to the management coefficient, providing data support for the cluster management analysis process.

[0031] The cluster analysis module is used to conduct cluster management analysis on county economic industries: the pillar objects are arranged in descending order according to the management coefficient GL value to obtain a pillar sequence, and the pillar sequence is intercepted and analyzed: the top L1 pillar objects in the pillar sequence are intercepted and marked as intercepted objects, L1 is a numerical constant, and the specific value of L1 is set by the management personnel; the intercepted objects are freely combined to obtain several industrial clusters, and the ratio of the number of intercepted objects in the industrial cluster to the number of industries in the industrial cluster is marked as the occupation coefficient of the industrial cluster, and the occupation threshold is obtained through the storage module, and the occupation coefficient of the industrial cluster is compared with the occupation threshold: if the occupation coefficient is less than the occupation threshold, it is determined that the pillar occupation rate of the industrial cluster does not meet the requirements, and the corresponding industrial cluster is marked as an invalid cluster; if the occupation coefficient is greater than or equal to the occupation threshold, it is determined that the pillar occupation rate of the industrial cluster meets the requirements, and the corresponding industrial cluster is marked as a reserved cluster; when the number of reserved clusters is one, the intercepted objects in the reserved cluster are removed from the pillars. The pillar sequences are eliminated, and then the pillar sequences after elimination are intercepted and analyzed again; when the number of retained clusters is greater than one, the intercepted objects in the retained cluster with the largest occupancy coefficient value are eliminated from the sequence, and then the pillar sequences after elimination are intercepted and analyzed again; when the number of retained clusters is zero, the top L1+m pillar objects in the pillar sequence are intercepted and marked as intercepted objects, where m is a numerical constant and the value of m is set by the management personnel. The industrial clusters are regrouped and the occupancy coefficient is calculated; this process is repeated until the last pillar object in the pillar sequence is marked as an intercepted object and the industrial cluster formation is completed; all retained clusters are sent to the interactive management platform, which sends the retained clusters to the industry matching module after receiving them; cluster management and analysis of county economic industries are carried out, and retained clusters are obtained by intercepting and analyzing the pillar sequences. The pillar objects account for a high proportion of industries in the retained clusters. Therefore, under the current state of county economic development, the formation of retained clusters is low in difficulty and high in benefits.

[0032] The industrial matching module is used to perform matching analysis on the vacant industries in the county economic industrial clusters: the retained clusters are arranged in descending order according to the values ​​of the occupancy coefficient to obtain a retained sequence, the supplementary objects are arranged in descending order according to the values ​​of the management coefficient GL to obtain a supplementary sequence, and the vacant industries in the retained clusters are supplemented and matched in the order of the supplementary sequence and the retained sequence to obtain several complete clusters, and the industrial information of the complete clusters is sent to the interactive management platform, and the interactive management platform sends the received industrial information of the complete clusters to the mobile phone terminals of the managers; the industrial information of the complete clusters includes the industry type, the enterprise name corresponding to the intercepted object, and the enterprise name corresponding to the supplementary object; the vacant industries in the county economic industrial clusters are matched and analyzed, and the matching priority is sorted according to the degree of completion of the retained clusters, and then the vacant industries in the retained clusters are supplemented according to the matching priority to improve the integrity of the characteristic industrial chain. Example 2

[0033] As shown in FIG2 , a resource information interaction management method for differentiated and coordinated development of county economies includes the following steps:

[0034] Step 1: Conduct management analysis on county-level economic industries: Mark county-level economic industries as management objects, obtain the talent data RC, revenue data YS, and land data TD of the management objects, and perform numerical calculations to obtain the management coefficient GL of the management objects. The management coefficient GL is used to mark the management objects as supplementary objects or pillar objects.

[0035] Step 2: Conduct cluster management analysis of county-level economic industries: Arrange pillar objects in descending order of management coefficient GL values ​​to obtain a pillar sequence, perform interception analysis on the pillar sequence to obtain several retained clusters, and send all retained clusters to the industry matching module through the interactive management platform;

[0036] Step 3: Conduct matching analysis on the vacant industries in the county economic industrial clusters: Arrange the retained clusters in descending order of the occupancy coefficient values ​​to obtain a retained sequence, arrange the supplementary objects in descending order of the management coefficient GL values ​​to obtain a supplementary sequence, and supplement the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters.

[0037] The resource information interactive management system used for the differentiated and coordinated development of county economies, when working, marks the county economic industries as management objects, obtains the talent data RC, revenue data YS and land data TD of the management objects and performs numerical calculations to obtain the management coefficient GL of the management objects, and marks the management objects as supplementary objects or pillar objects through the management coefficient GL; arranges the pillar objects in descending order according to the values ​​of the management coefficient GL to obtain a pillar sequence, intercepts and analyzes the pillar sequence to obtain several retained clusters, and sends all the retained clusters to the industry matching module through the interactive management platform; arranges the retained clusters in descending order according to the values ​​of the occupancy coefficient to obtain a retained sequence, arranges the supplementary objects in descending order according to the values ​​of the management coefficient GL to obtain a supplementary sequence, and supplements and matches the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters.

[0038] The above content is merely an example and explanation of the structure of the present invention. Those skilled in the art may make various modifications or additions to the described specific embodiments or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the scope of protection of the present invention.

[0039] The above formulas are all obtained by collecting a large amount of data and performing software simulation to obtain a formula close to the actual value. The coefficients in the formula are set by those skilled in the art based on actual conditions; for example: formula GL=α1*RC+α2*YS+α3*TD; those skilled in the art collect multiple groups of sample data and set corresponding management coefficients for each group of sample data; the set management coefficients and the collected sample data are substituted into the formula, and any three formulas form a system of three linear equations. The calculated coefficients are screened and averaged, and the values ​​of α1, α2, and α3 are obtained as 4.48, 2.65, and 2.39, respectively;

[0040] The size of the coefficient is to quantify each parameter to obtain a specific numerical value, which is convenient for subsequent comparison. The size of the coefficient depends on the amount of sample data and the initial setting of the corresponding management coefficient for each set of sample data by technical personnel in this field; as long as it does not affect the proportional relationship between the parameter and the quantified value, such as the management coefficient is proportional to the value of the talent data.

[0041] Throughout this specification, references to terms such as "one embodiment," "example," or "specific example" indicate that the specific features, structures, materials, or characteristics described in conjunction with that embodiment or example are included in at least one embodiment or example of the present invention. In this specification, schematic representations of these terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

[0042] The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the present invention to specific embodiments. Obviously, many modifications and variations are possible based on the contents of this specification. These embodiments are selected and described in detail in this specification to better explain the principles and practical applications of the present invention, thereby enabling those skilled in the art to better understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A resource information interactive management system for differentiated and coordinated development of county economies, characterized by: It includes an interactive management platform, which is communicatively connected with an industry management module, a cluster analysis module, an industry matching module and a storage module; The industrial management module is used to manage and analyze the county economic industry: mark the county economic industry as a management object, obtain the talent data RC, revenue data YS and land data TD of the management object; obtain the management coefficient GL of the management object by numerically calculating the talent data RC, revenue data YS and land data TD; mark the management object as a supplementary object or a pillar object through the management coefficient GL; send all pillar objects to the interactive management platform, and the interactive management platform sends the pillar objects to the cluster analysis module after receiving the pillar objects; The cluster analysis module is used to perform cluster management analysis on the county economy industry: the pillar objects are arranged in descending order according to the management coefficient GL values ​​to obtain a pillar sequence, the pillar sequence is intercepted and analyzed to obtain a number of reserved clusters; all the reserved clusters are sent to the interactive management platform, and the interactive management platform sends the reserved clusters to the industry matching module after receiving them; The industry matching module is used to perform matching analysis on the vacant industries in the county economic industrial cluster and obtain a complete cluster.

2. The resource information interactive management system for differentiated and coordinated development of county economies according to claim 1 is characterized in that: The talent data RC is the number of employees of the management object in the previous year, the revenue data YS is the sum of the profits of all corresponding enterprises of the management object in the previous year, and the land data TD is the sum of the office address area values ​​of all corresponding enterprises of the management object.

3. The resource information interactive management system for differentiated and coordinated development of county economies according to claim 2 is characterized in that: The specific process of marking a management object as a supplementary object or a pillar object includes: obtaining the management threshold GLmin through the storage module, and comparing the management coefficient GL of the management object with the management threshold GLmin: if the management coefficient GL is less than the management threshold GLmin, it is determined that the industrial scale of the management object does not meet the requirements, and the corresponding management object is marked as a supplementary object; if the management coefficient GL is greater than or equal to the management threshold GLmin, it is determined that the industrial scale of the management object meets the requirements, and the corresponding management object is marked as a pillar object.

4. The resource information interactive management system for differentiated and coordinated development of county economies according to claim 3 is characterized in that: The specific process of intercepting and analyzing the pillar sequence includes: intercepting the top L1 pillar objects in the pillar sequence and marking them as intercepted objects, freely combining the intercepted objects to obtain several industrial clusters, marking the ratio of the number of intercepted objects in the industrial cluster to the number of industries in the industrial cluster as the occupation coefficient of the industrial cluster, and marking the industrial cluster as an invalid cluster or a reserved cluster through the occupation coefficient; when the number of reserved clusters is one, the intercepted objects in the reserved cluster are removed from the pillar sequence, and then the intercepted pillar sequence after elimination is intercepted and analyzed again; when the number of reserved clusters is greater than one, the intercepted objects in the reserved cluster with the largest occupation coefficient value are removed from the sequence, and then the intercepted pillar sequence after elimination is intercepted and analyzed again; when the number of reserved clusters is zero, intercepting the top L1+m pillar objects in the pillar sequence and marking them as intercepted objects, recombining the industrial clusters and calculating the occupation coefficient; and so on, until the last pillar object in the pillar sequence is marked as an intercepted object and the industrial cluster formation is completed.

5. The resource information interactive management system for differentiated and coordinated development of county economies according to claim 4 is characterized in that: The specific process of marking an industrial cluster as an invalid cluster or a reserved cluster includes: obtaining the occupancy threshold through the storage module, and comparing the occupancy coefficient of the industrial cluster with the occupancy threshold: if the occupancy coefficient is less than the occupancy threshold, it is determined that the pillar occupancy rate of the industrial cluster does not meet the requirements, and the corresponding industrial cluster is marked as an invalid cluster; if the occupancy coefficient is greater than or equal to the occupancy threshold, it is determined that the pillar occupancy rate of the industrial cluster meets the requirements, and the corresponding industrial cluster is marked as a reserved cluster.

6. The resource information interactive management system for differentiated and coordinated development of county economies according to claim 5 is characterized in that: The specific process of the industry matching module matching and analyzing the vacant industries of the county economic industrial clusters includes: arranging the retained clusters in descending order according to the occupancy coefficient values ​​to obtain a retained sequence, arranging the supplementary objects in descending order according to the management coefficient GL values ​​to obtain a supplementary sequence, supplementing and matching the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters, sending the industry information of the complete clusters to the interactive management platform, and the interactive management platform sends the received industry information of the complete clusters to the mobile phone terminals of the managers; the industry information of the complete clusters includes the industry type, the enterprise name corresponding to the intercepted object, and the enterprise name corresponding to the supplemented object.

7. The resource information interactive management system for differentiated and coordinated development of county economies according to any one of claims 1 to 6, characterized in that: The working method of the resource information interactive management system for the differentiated and coordinated development of county economies includes the following steps: Step 1: Conduct management analysis on county economic industries: Mark county economic industries as management objects, obtain the talent data RC, revenue data YS and land data TD of the management objects, and perform numerical calculations to obtain the management coefficient GL of the management objects. The management objects are marked as supplementary objects or pillar objects through the management coefficient GL. Step 2: Conduct cluster management analysis on county economic industries: Arrange pillar objects in descending order of management coefficient GL values ​​to obtain a pillar sequence, perform intercept analysis on the pillar sequence to obtain several reserved clusters, and send all reserved clusters to the industry matching module through the interactive management platform; Step 3: Matching analysis of vacant industries in county economic industrial clusters: Arrange the retained clusters in descending order of the occupancy coefficient values ​​to obtain a retained sequence, arrange the supplementary objects in descending order of the management coefficient GL values ​​to obtain a supplementary sequence, and supplement and match the vacant industries in the retained clusters in the order of the supplementary sequence and the retained sequence to obtain several complete clusters.

Citation Information

Patent Citations

  • Industrial cluster analysis and evaluation system and method based on regional economic development planning

    CN109272211A

  • Industrial relation chain construction method, device and equipment and storage medium

    CN110378569A

  • Enterprise cluster determination method and device applied to urban planning and electronic equipment

    CN116452014A

  • Resource information interaction management system for differentiated coordinated development of county economy

    CN117575367A