A formwork element, kit, assembly and method

Elongate formwork panel connectors with an offset configuration address hinge-type failures, ensuring proper alignment and reducing installation time and labor, thereby enhancing construction quality and efficiency.

WO2026232183A1PCT designated stage Publication Date: 2026-11-12AWADA FOUAD ELABD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/AU2026/050376
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-04
Filing Date
2026-04-20
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing formwork systems are complex, time-consuming, and prone to hinge-type failures, leading to poor construction quality and increased costs due to the need for skilled labor and heavy materials.

Method used

The use of elongate formwork panel connectors with an offset configuration that includes an elongate web and panel edge keepers, allowing formwork panels to be connected in a staggered arrangement that resists hinge-type failures and maintains alignment during concrete pouring and curing.

Benefits of technology

The offset configuration ensures proper alignment and prevents bulging, reducing installation time and labor requirements while improving the quality of concrete structures by maintaining panel spacing and self-aligning during concrete pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure AU2026050376_12112026_PF_FP_ABST
    Figure AU2026050376_12112026_PF_FP_ABST
Patent Text Reader

Abstract

An elongate formwork panel connector comprises an elongate web extending along a longitudinal axis between first and second ends, the elongate web including first and second sides laterally spaced on either side of the longitudinal axis. A first panel edge keeper disposed at the first side of the elongate web extends along the longitudinal axis and is configured to receive an edge portion of a formwork panel. A second panel edge keeper disposed at the second side of the elongate web extends along the longitudinal axis and is configured to receive an edge portion of a formwork panel. The first panel edge keeper is offset a selected distance from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge keepers.
Need to check novelty before this filing date? Find Prior Art

Description

A FORMWORK ELEMENT, KIT, ASSEMBLY AND METHODFIELD OF INVENTION

[0001] The present disclosure relates to formwork for constructing concrete structures, and more particularly to formwork panel connectors, kits, assemblies and methods for connecting spaced apart formwork panels to form concrete walls.BACKGROUND

[0002] Formwork is a structure, usually temporary, which has voids and hollow sections into which ready-mix concrete or cement slurry is poured. The formwork provides support for a concrete structure of a desired shape until the concrete can support itself. The formwork is usually removed after the concrete cures.

[0003] Concrete formwork takes time and skilled labour to set up because useful formwork is strong enough such that it can hold the concrete in a selected shape during concrete curing. Concrete, in the quantities required to make structural walls and floors, is very heavy, so the formwork has to resist a great deal of mass. Some systems use steel framing to support a plywood outer layer.

[0004] There are plastic systems that are known, but they generally require complex and thick one-piece extruded sections to support the load of the concrete within the formwork. Some formwork systems require very thick panellingjoists, whalers, accessories, and therefore involve heavy lifting to operate and install.

[0005] Even when the base edge is constrained, some form work arrangements can develop a hinge-type failure wherein form panels fold along a join line between form panels. This is undesirable in a straight wall, since it bulges and deviates from the intended configuration.

[0006] These systems can become fiddly, time consuming and expensive to set up and install before a concrete pour. Overall construction time can increase as a result, as well as the quality of the resulting structure being poor.

[0007] Known formwork systems use walers to prevent a hinging movement, when formwork panels are aligned and in step with one another. Walers act as strongbacks, installed at calculated intervals to transfer loads vertically while maintaining formwork alignment. They work with accessories like clamps, tie rods, wing nuts, and washers to secure the system. They are difficult to work with and complex to use.

[0008] Therefore, improved formwork systems, elements and methods that address at least one or more of these shortcomings are desired.SUMMARY

[0009] According to an aspect of the present disclosure, an elongate formwork panel connector is provided. The elongate formwork panel connector comprises an elongate web extending along a longitudinal axis between first and second ends. The elongate web includes first and second sides laterally spaced on either side of the longitudinal axis. A first panel edge keeper is disposed at the first side of the elongate web. The first panel edge keeper extends along the longitudinal axis and is configured to receive an edge portion of a formwork panel. A second panel edge keeper is disposed at the second side of the elongate web. The second panel edge keeper extends along the longitudinal axis and is configured to receive an edge portion of a formwork panel. The first panel edge keeper is offset a selected distance from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge keepers.

[0010] According to other aspects of the present disclosure, the elongate formwork panel connector may include one or more of the following features. The elongate web and the first and second panel edge keepers may be integral with one another in a unitary form. Theelongate web and the first and second panel edge keepers may be configured to connect to one another at the first and second sides of the elongate web. The elongate formwork panel connector may further comprise a coupler for connecting the elongate web to the first and second panel edge keepers. The coupler may be a snap connector including a head portion configured to insert into a cooperating head receiver. The elongate web may include two head receivers along the first and second sides, and the head receivers may include a barb receiver configured to receive a barb from the head portion in a sliding manner. At least one of the first and second panel edge keepers may include a curved flange configured to promote release of the formwork panel from a finished concrete structure. At least one of the first and second panel edge keepers may include a channel formed by spaced apart side walls for receiving the edge portion of the formwork panel. The channel may include a first side wall longer than a second side wall to facilitate loading the edge portion of the formwork panel into the channel. The elongate web may include one or more apertures configured to receive concrete slurry therethrough and to receive one or more reinforcing bars. The one or more apertures may include scalloped bottom edges configured to receive a plurality of reinforcing bars. The elongate web may include one or more accessways formed in side edges of the elongate web to allow access to the one or more apertures for insertion of reinforcing bars. The elongate web may comprise a plate or sheet of polymer, plastic, glass reinforced plastic, or carbon fibre. The elongate formwork panel connector may have an I-beam configuration with T-sections at the first and second ends of the elongate web. At least one of the first and second panel edge keepers may include an angled portion configured to provide the offset between the first and second panel edge keepers.

[0011] According to another aspect of the present disclosure, a method of installing formwork is provided. The method comprises installing a plurality of elongate formwork frame elements on or in relation to a structure. Each of the plurality of elongate formwork frame elements includes an elongate web extending along a longitudinal axis and having first and second sides laterally spaced from the longitudinal axis, and first and second panel edge receivers disposed at the first and second sides for receiving an edge of a formwork panel.The first panel edge receiver is offset a selected distance from the second panel edge receiver along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge receivers. The method further comprises mounting edges of a plurality of formwork panels in the first and second panel edge receivers such that edges of formwork panels on one side of the formwork are not disposed directly opposite edges of formwork panels on an opposite side of the formwork.

[0012] According to other aspects of the present disclosure, the method may include one or more of the following features. The method may further comprise installing one or more elongate base frame elements on a floor surface. The one or more elongate base frame elements may include side wall channels configured to receive base edges of the plurality of formwork panels. The one or more elongate base frame elements may include apertures configured to accommodate reinforcing starter bars extending upwardly from the floor surface. Mounting the edges of the plurality of formwork panels may comprise mounting formwork panels of different widths such that when installed, an edge of one formwork panel is not disposed directly opposite a panel edge on an opposite side of a concrete structure to be formed. The method may further comprise pouring concrete into the formwork, wherein the plurality of elongate formwork frame elements maintain spacing between opposing formwork panels during concrete curing and the formwork self-aligns during the pouring of concrete.

[0013] The foregoing general description of the illustrative embodiments and the following detailed description thereof are merely exemplary aspects of the teachings of this disclosure and are not restrictive.BRIEF DESCRIPTION OF FIGURES

[0014] Non-limiting and non-exhaustive examples are described with reference to the following figures.

[0015] FIG. 1 illustrates a plan view of an elongate formwork frame element, according to an embodiment of the present disclosure.

[0016] FIG. 2 illustrates an isometric view of an elongate formwork frame element, according to an embodiment of the present disclosure.

[0017] FIG. 3 depicts a plan view of a formwork assembly, according to an embodiment of the present disclosure.

[0018] FIG. 4 depicts a plan view of a prior art formwork showing a hinge failure problem.

[0019] FIG. 5 illustrates a plan view of a section of formwork, according to an embodiment of the present disclosure.

[0020] FIG. 6 illustrates a side view of an elongate formwork connector with an offset configuration, according to an embodiment of the present disclosure.

[0021] FIG. 7 illustrates an isometric view of a base frame element, according to an embodiment of the present disclosure.

[0022] FIG. 8 illustrates a section view of a panel edge keeper configured to couple with a head receiver, according to an embodiment of the present disclosure.

[0023] FIG. 9 illustrates a perspective view of an elongate web configured for use as a formwork panel connector, according to an embodiment of the present disclosure.

[0024] FIG. 10 shows a plan view of a formwork assembly illustrating a panel edge keeper with a curved flange, according to an embodiment of the present disclosure.

[0025] FIG. 11 illustrates a plan view of a formwork assembly utilizing formwork connector assemblies in an offset configuration, according to an embodiment of the present disclosure.

[0026] FIG. 12 depicts a plan view of a formwork assembly showing an arrangement of panels and connectors, according to an embodiment of the present disclosure.

[0027] FIG. 13 illustrates an isometric view of a formwork assembly installed at a comer junction of a roof structure, according to an embodiment of the present disclosure.

[0028] FIG. 14 illustrates a plan view of a formwork connector assembly having a zero offset angle, according to an embodiment of the present disclosure.

[0029] FIG. 15 is a front view of an elongate web shown first at Fig. 9.

[0030] FIG. 16 is a front view of a panel edge keeper shown at Fig. 8.

[0031] FIG. 17 is a front view of the web and keepers shown in FIGs 15 and 16 in an assembled configuration.

[0032] FIG. 18 is a plan view of a known formwork system with walers which inhibit hinging during a pour.DETAILED DESCRIPTION

[0033] The following description sets forth exemplary aspects of the present disclosure. It should be recognized, however, that such description is not intended as a limitation on the scope of the present disclosure. Rather, the description also encompasses combinations and modifications to those exemplary aspects described herein.

[0034] Referring to FIGS. 1-17, the present disclosure describes formwork panel connectors, kits, assemblies and methods for connecting spaced apart formwork panels to form concrete walls and other concrete structures. The formwork systems described herein may address problems associated with prior art formwork arrangements, including hinge-type failure wherein form panels fold along a join line between form panels.

[0035] As shown in FIGS. 1 and 2, an elongate formwork panel connector 10 may include an elongate web 21 extending along a longitudinal axis 24 between first and second ends. The elongate web 21 may include first and second sides laterally spaced on either side of the longitudinal axis 24. A first panel edge keeper 30a may be disposed at the first side of the elongate web 21, and a second panel edge keeper 30 may be disposed at the second side of the elongate web 21. Each panel edge keeper may extend along the longitudinal axis 24 and may be configured to receive an edge portion of a formwork panel 20.

[0036] With continued reference to FIG. 1, the first panel edge keeper may be offset a selected distance 34 from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web 21 extends laterally at an angle 25 between the first and second panel edge keepers 30. This offset configuration may provide advantages over prior art formwork systems. That is, in operation, when formwork is filled with concrete, static pressure exerts forces on the form work panels to drive opposite panels away from each other. The offset web configuration in operation creates a mechanical arrangement wherein concrete pressure assists in maintaining proper alignment of the formwork panels during concrete pouring and curing operations.

[0037] As further shown in FIG. 5, a formwork assembly includes a plurality of elongate form work frame elements and a plurality of form work panels 3 arranged on either side 29 of a longitudinal axis 24 to create a cavity for receiving concrete 4. The formwork panels 3a on one side are offset relative to the formwork panels 3 on the opposite side, such that edges of panels on one side are not disposed directly opposite the panel edges on the other side of the cavity or concrete structure. This arrangement helps prevent hinge-type failure during concrete pouring operations.

[0038] Referring to FIG. 1, an elongate formwork frame element 10 is configured to connect two spaced apart formwork panels to form a concrete wall 30. The elongate formwork frame element 10 includes an elongate web 21 extending along a longitudinal axis (extending into the page in Figure 1) between first and second ends. The elongate web 21 includes first side 13a and second side 13 laterally spaced on either side of the longitudinal axis.

[0039] A first panel edge keeper 30a is disposed at the first side 13a of the elongate web 21, and a second panel edge keeper 30 is disposed at the second side 13 of the elongate web 21. Each panel edge keeper 30, 30a extends along the longitudinal axis (into the page on Figure 1) and may be configured to receive an edge portion of a formwork panel 20. The first panel edge keeper 30a may be offset a selected distance 34 from the second panel edge keeper along an axis 97 normal to the lateral sides 13a, 13 such that the elongate web 21extends laterally at an angle 25 between the first 30a and second 30 panel edge keepers. This offset configuration may result in the elongate formwork frame element 10 taking the form of an offset I-beam.

[0040] With continued reference to FIG. 1 and 9 and 10, and 15, 16 and 17, each panel edge keeper 30a, 30 may include a channel 32 formed by spaced apart walls for receiving an edge portion of a formwork panel. The channel 32 may be formed from a straight or curved flange 35, 135 on an outer side and an inside wall 36 on an inner side. The straight or curved flange 35, 135 may be taller than the inside wall 36. The arrangement wherein the curved flange 35 is longer than the inside wall 36 may facilitate loading and removal of formwork panels into and from the channel 32. The curved flange 35 may be configured to promote release of the formwork panel from a finished concrete wall 30 after the concrete has cured.

[0041] It can be seen that numerals and names are similar between Figures 1, 9, 10, 15, 6 and 17 at the very least. Similar numerals denote similar features. For example, 35, 135 is the straight / curved flange.

[0042] The channel 32 may include a spacing between the curved flange 35 and the inside wall 36 configured to accommodate a formwork panel 20. In some cases, the spacing may be about 20mm to snugly receive an edge of the plywood panel 20. A flange 31 may extend from the elongate web 21 at the first and second sides 13a, 13, such that the elongate formwork frame element 10 includes T-sections at the first and second sides 13a, 13 of the elongate web 21. The channels 32 may be formed at both ends of the elongate web 21, on both sides 13a, 13 of the elongate web 21, to retain formwork panels extending from both sides 13a, 13 of the elongate web 21 at both sides of the elongate web 21.

[0043] The offset configuration of the elongate formwork frame element 10 may allow formwork panels of different widths to be installed such that the edges of formwork panel 20 on one side of the concrete wall 30 are not disposed directly opposite panel edges on the other side of the concrete wall 30. This arrangement may help prevent hinge-type failure (shown in Figure 4) wherein formwork panels fold along a join line between form panels.

[0044] Referring to FIG. 2, an elongate formwork frame element 10 may include an elongate web 21 extending along a longitudinal axis between first end 15 and second end 17. The elongate web 21 may comprise a plate 22 or a sheet 23 configuration. The elongate web 21 may include first side 13a and second side 13 laterally spaced on either side of the longitudinal axis, with panel edge keepers 30 positioned at the first and second sides 13a, 13. The panel edge keepers 30 on one side may be offset from the panel edge keepers on the opposite side 30a, creating an offset profile 10.

[0045] With continued reference to FIG. 2, the elongate web 21 may include a plurality of apertures 50 formed therein. The apertures 50 may be configured to receive concrete slurry therethrough and to receive one or more reinforcing bars. The apertures 50 may be positioned at regular intervals along the elongate web 21. In some cases, the apertures 50 may include scalloped bottom edges, each one configured to receive one or more reinforcing bars (not shown). Each aperture 50 with scalloped bottom edges may facilitate two reinforcing bars disposed in the wall side by side, and may accommodate up to four reinforcing bars. In some cases, the apertures 50 may be semicircular or hemispherical to receive a single reinforcing bar.

[0046] As further shown in FIG. 2, one or more accessways 99 may be formed in sides 13a, 13 of the elongate web 21 to allow access to the apertures 50 for insertion of reinforcing bars and mesh from the side. The accessways 99 may facilitate the placement of reinforcement within the formwork structure. The accessways 99 may also accommodate bends in wall configurations.

[0047] The elongate web 21 may comprise a plate or sheet of polymer, plastic, glass reinforced plastic (GRP), or carbon fibre. In some cases, the elongate web 21 may be rigid. The elongate formwork frame element 10 may be extruded, moulded, or additively manufactured. The wall thicknesses of each section of the elongate formwork frame element 10 may be about 1mm, 2mm, 3mm, or 5mm.

[0048] Referring to FIG. 3, a form work assembly may include a plurality of formwork panels 20 arranged to define the shape of a concrete wall structure. The formwork panels 20may be positioned along opposing sides of the assembly to create a cavity into which concrete may be poured. A plurality of elongate formwork frame elements 10 as described herein may be positioned along the edges of the formwork panels 20 to connect and retain adjacent formwork panels 20 in position.

[0049] With continued reference to FIG. 1, 2 and 3, the elongate form work frame elements 10 are visible along the edges of the assembly, with a series of connectors 30 spaced to retain the edges of the formwork panels 20. Each elongate formwork frame element 10 may include an elongate web 21 extending along a longitudinal axis between first end 15 and second end 17, with first and second panel edge keepers 30a, 30 disposed at the first and second sides 13a and 13 of the elongate web 21. The panel edge keepers may receive edge portions of the formwork panels 20 to hold the formwork panels 20 in a selected position during concrete pouring operations.

[0050] The formwork assembly shown in FIG. 3 may form L-shaped walls when viewed from above. The formwork panels 20 may create the outer boundaries of the formwork structure into which concrete may be poured. In some cases, a first connector may be positioned at a first end of the assembly, and the first end may be where the formwork is set up to be vertical, plumb, and dimensionally accurate. The remaining portions of the formwork assembly may be constructed with less investment in dimensional accuracy, because the thickness of the wall may be set by the elongate webs of the elongate formwork frame elements. This is similar to that described in International Patent application no PCT / AU2024 / 050886 by the inventor of the present invention.

[0051] As further shown in FIG. 3, the offset configuration of the elongate formwork frame elements may allow formwork panels 20 of different widths to be installed such that panel edges on one side of the concrete wall structure are not disposed directly opposite panel edges on the other side of the concrete wall structure. The elongate formwork frame elements 10 may maintain spacing between opposing formwork panels 20 during concrete curing and may facilitate self-alignment of the formwork during the pouring of concrete. The elongatewebs of the elongate formwork frame elements may create tension that assists in straightening the formwork assembly as concrete flows through the structure.

[0052] Referring to FIG. 4, a prior art formwork arrangement is shown illustrating a hinge failure problem. The prior art formwork arrangement includes two spaced apart formwork panels 20 that define the sides of a concrete wall structure. A connector element 9 extends between the two parallel formwork panels to maintain spacing between the panels during concrete pouring operations.

[0053] In these prior art formwork arrangements where the connector is straight and does not include an offset configuration, the formwork panels may move in a hinge-type movement. In such arrangements, the opposite panels may maintain the same distance from one another while folding along a join line between form panels. When the connector extends directly laterally between the panel edge keepers without an offset, only friction may resist the hinge-type movement, which may provide a small amount of resistance force.

[0054] With continued reference to FIG. 4, the curved or wavy line extending between the two parallel formwork panels illustrates how the formwork may develop a hinge-type failure. The formwork panels may fold along a join line between adjacent form panels, causing the wall to bulge and deviate from the intended straight wall configuration. An arrow indicates the direction of movement or force that may contribute to the hinge failure mode. Even when the base edge of the formwork is constrained, prior art formwork arrangements may develop the hinge-type failure wherein form panels fold along the join line between form panels. The hinge-type failure is undesirable in a straight wall because the resulting concrete structure bulges and deviates from the intended configuration.

[0055] Referring to FIG. 5, a formwork section may extend along a longitudinal axis 24 between a first end 2 and a second end 5, with a distal end 6 positioned at one portion of the assembly. The formwork section may include a plurality of formwork panels 3, 3a arranged on either side 29 of the longitudinal axis 24 to create a cavity for receiving concrete 4. The formwork panels 3, 3a may be held in position by a plurality of elongate formwork frame elements that connect the formwork panels 3, 3a on opposite sides of the assembly.

[0056] With continued reference to FIG. 5, the formwork panels 3a on one side 29 may be offset relative to the formwork panels 3 on the opposite side, such that edges of formwork panels 3a on one side 29 are not disposed directly opposite panel 3 edges on the other side of the concrete structure. The offset configuration of the elongate formwork frame elements may allow formwork panels 3 of different widths to be installed such that when installed, an edge of one form work panel 3 is not disposed directly opposite a panel edge 3 a on the opposite side of the concrete 4 structure to be formed. This arrangement may help prevent hinge-type failure wherein form panels fold along a join line between form panels.

[0057] As further shown in FIG. 5, the concrete 4 may fill the space between the opposing formwork panels 3, with the elongate formwork frame elements maintaining the spacing between the formwork panels 3 during the concrete pour and curing process. The elongate formwork frame elements may extend along the longitudinal axis 24 between the first end 2 and the second end 5, with each elongate formwork frame element including first and second panel edge receivers disposed at first and second sides for receiving edges of the formwork panels 3.

[0058] In some cases, a concreter may carefully set up one end region at the first end 2 of the formwork so that the formwork is vertical, plumb, and dimensionally accurate. The remaining portions of the formwork toward the second end 5 and the distal end 6 may be constructed with less investment in dimensional accuracy, because the thickness of the wall may be set by the elongate webs of the elongate formwork frame elements. Before the concrete 4 is poured, the distal end 6 of the walls may be at a sideways lean.

[0059] Regardless of any lean at the distal end 6, an automatic shaping up may occur during a pour because of the structure of the elongate formwork frame elements. This automatic or self-shaping may occur because of the elongate formwork frame elements, each of which may be configured to retain the ends of formwork panels 3 at each of the sides 29. When the concrete 4 is poured in from the first end 2 or any end or intermediate portion, the rest of the formwork may shape up to vertical and plumb by itself as the concrete 4 pours.The formwork may straighten due to tension on the elongate webs of the elongate formwork frame elements.

[0060] A method of installing formwork may include installing a plurality of elongate formwork frame elements on or in relation to a structure. Each of the plurality of elongate formwork frame elements may include an elongate web extending along a longitudinal axis 24 and having first and second sides laterally spaced from the longitudinal axis 24, and first and second panel edge receivers disposed at the first and second sides for receiving an edge of a formwork panel 3. The first panel edge receiver may be offset a selected distance from the second panel edge receiver along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge receivers.

[0061] The method may further include mounting edges of a plurality of formwork panels 3 in the first and second panel edge receivers such that edges of formwork panels 3 on one side 29 of the formwork are not disposed directly opposite edges of formwork panels 3 on an opposite side 29 of the formwork. In some cases, mounting the edges of the plurality of form work panels 3 may include mounting form work panels 3 of different widths such that when installed, an edge of one formwork panel 3 is not disposed directly opposite a panel edge on an opposite side of the concrete 4 structure to be formed. The method may further include pouring concrete 4 into the formwork, wherein the plurality of elongate formwork frame elements maintain spacing between opposing formwork panels 3 during concrete curing and the form work self-aligns during the pouring of concrete 4.

[0062] Referring to FIG. 6, an elongate formwork connector 10 may be shown in a front view illustrating an offset configuration. The elongate formwork connector 10 may include an elongate web 21 extending along a longitudinal axis between first and second ends, with first and second panel edge keepers disposed at the first and second sides of the elongate web 21 in a similar way to that previously described.

[0063] With continued reference to FIG. 6, the elongate web may include a plurality of apertures 50 distributed along the length of the elongate web. The apertures 50 may be configured to allow the passage of concrete slurry through the formwork wall structure fromone end to the other. The apertures 50 may also be configured to receive one or more reinforcing bars. In some cases, the apertures 50 may be semicircular to receive a single reinforcing bar. In other cases, the apertures 50 may include scalloped bottom edges configured to receive a plurality of reinforcing bars. Each aperture 50 with scalloped bottom edges may facilitate two reinforcing bars disposed in the wall side by side, and may accommodate up to four reinforcing bars. The apertures 50 may be positioned at regular intervals along the elongate web to facilitate concrete flow between adjacent sections of the formwork assembly.

[0064] As further shown in FIG. 6, one or more accessways 99 may be formed in side edges of the elongate web to allow access to the apertures 50 for insertion of reinforcing bars and mesh. The accessways 99 may facilitate the placement of reinforcement within the formwork structure by allowing reinforcing bars to be inserted from the side of the connector. The accessways 99 may also facilitate bends in wall configurations. The side view of FIG. 6 may reveal the vertical arrangement of the formwork panels held within the connector structure, with the formwork panels extending upward from a base element. The offset configuration of the connector may be visible in the side view, showing how the panel edge keepers on opposite sides are displaced from one another along an axis normal to the lateral sides of the elongate web.

[0065] Referring to FIG. 7, a base frame element 310 may be an elongate component configured to be positioned at the base of a formwork assembly. The base frame element 310 may include a bottom edge 321 designed to rest on a floor surface such as a concrete floor. The base frame element 310 may extend along a longitudinal axis between first and second ends.

[0066] With continued reference to FIG. 7, side wall channels 332 may be positioned along side edges of the base frame element 310. The side wall channels 332 may extend upwardly from the base frame element 310 and may be configured to receive and retain base edges of formwork panels. The side wall channels 332 may provide secure engagementbetween the formwork panels and the base frame element 310 during concrete pouring operations.

[0067] As further shown in FIG. 7, the base frame element 310 may include a plurality of apertures 350 formed in a web portion of the base frame element 310. The apertures 350 may be configured to accommodate reinforcing starter bars extending upwardly from the floor surface. In some cases, the floor surface may be a concrete floor with reinforcing starter bars extending upwardly therefrom. The reinforcing starter bars may extend upwardly through the apertures 350 in the base frame element 310 when the base frame element 310 is located on the floor surface. The apertures 350 may also facilitate the flow of concrete slurry through the formwork structure during a pour operation.

[0068] A method of installing formwork may include installing one or more elongate base frame elements 310 on a floor surface. The one or more elongate base frame elements 310 may include side wall channels 332 configured to receive base edges of a plurality of formwork panels. The one or more elongate base frame elements 310 may include apertures 350 configured to accommodate reinforcing starter bars extending upwardly from the floor surface. In some cases, the base frame element 310 may be fixed to the floor surface using fasteners such as dyno bolts.

[0069] With continued reference to FIG. 7, a base edge of a formwork panel may be located in the side wall channels 332 of the base frame element 310. The side wall channels 332 may retain the base edges of the formwork panels in position during concrete pouring and curing operations. The base frame element 310 may cooperate with a plurality of elongate formwork frame elements to form a complete formwork assembly for constructing concrete walls.

[0070] Referring to FIG. 8 and 9, a panel edge keeper 130 is shown that indicates a side part of a three-part formwork connector 10. The multi-part connector 10 has this keeper 130 which may be configured to couple with a cooperating head receiver 137 on an elongate web 121, shown in Figure 9. The panel edge keeper 130 may include a curved flange 135 at one end and a head portion 138 at an opposite end. The curved flange 135 may be configured topromote release of a formwork panel from a finished concrete structure after the concrete has cured.

[0071] With continued reference to FIG. 8 and 9, the head portion 138 may include a barb 134 configured to insert into a cooperating head receiver 137 in a sliding manner. A coupler 139 may facilitate the connection between the panel edge keeper 130 and the elongate web 121. In some cases, the coupler 139 may be a snap connector. The head portion 138 may be configured to slide into the cooperating head receiver 137 (shown in Figure 9) to secure the panel edge keeper 130 to the elongate web 121.

[0072] Referring to FIG. 9, the elongate web 121 may include head receivers 137 positioned along first and second sides 29 of the elongate web 121. Each head receiver 137 may include a barb receiver 136 configured to receive the barb 134 from the head portion 138 in a sliding manner. The head receivers 137 may be bulbous in shape to accommodate the cooperating head portion 138 from the panel edge keeper 130.

[0073] With continued reference to FIGS. 8 and 9, the elongate web 121 and the first and second panel edge keepers 130 may be configured to connect to one another at the first and second sides 29 of the elongate web 121. This arrangement may provide an assembly form configuration wherein the elongate formwork panel connector includes separate web and keeper components that connect together. In some cases, the head portion 138 may be a barb 134, but the head portion 138 may alternatively include a bulb shape, an arrowhead shape, or another barb-like configuration.

[0074] As further shown in FIG. 8, the panel edge keeper 130 may include an angled portion 132 just at the same angle which was indicated in Figure 1 at 26 configured to provide the offset between the first and second panel edge keepers 130 when assembled with the elongate web 121. In some cases, the elongate web 121 may include an angled portion 132 adjacent the head receiver 137 to provide the offset configuration. The assembly form configuration may allow the elongate formwork panel connector 110 to be assembled from separate components at a worksite or may allow for replacement of individual components as needed.

[0075] Referring to FIG. 9, an elongate web 121 may be configured for use as a formwork panel connector. The elongate web 121 may extend between first and second ends along a longitudinal axis, with first and second sides 29 laterally spaced on either side of the longitudinal axis. The elongate web 121 may include head receivers 137 positioned along the first and second sides 29 for connecting with panel edge keepers 130.

[0076] With continued reference to FIG. 9, each head receiver 137 may include a barb receiver 136 configured to receive a barb 134 from a panel edge keeper 130 in a sliding manner. The head receivers 137 may be bulbous in shape to accommodate a cooperating head portion 138 from the panel edge keeper 130. The barb receiver 136 may be shaped to securely retain the barb 134 once the barb 134 is slid into position within the head receiver 137.

[0077] As further shown in FIG. 9, the arrangement of the head receivers 137 and barb receivers 136 on the sides 29 of the elongate web 121 may enable the assembly of the formwork connector by connecting separate web and keeper components. The elongate web 121 and the first and second panel edge keepers 130 may be configured to connect to one another at the first and second sides 29 of the elongate web 121. This arrangement may provide an assembly form configuration wherein the elongate formwork panel connector includes separate web and keeper components that connect together. In some cases, the head portion 138 may be a barb 134, but the head portion 138 may alternatively include a bulb shape, an arrowhead shape, or another barb-like configuration. The assembly form configuration may allow the elongate formwork panel connector to be assembled from separate components at a worksite or may allow for replacement of individual components as needed.

[0078] Referring to FIG. 10, the form work assembly may include a panel edge keeper 30 with a curved flange 35 positioned in relation to a concrete wall 4. The curved flange 35 may be disposed at an edge of a formwork panel 20 and may be designed with a curved profile. The curved profile of the curved flange 35 may promote release of the formwork panel from the finished concrete wall 4 after the concrete has cured.

[0079] With continued reference to FIG. 10, the concrete wall 30 may be formed within the formwork structure, with the curved flange 35 positioned at the interface between the formwork panel and the concrete wall 30. The curved configuration of the curved flange 35 may facilitate easier removal of the formwork panels from the completed concrete structure. In some cases, the curved profile may reduce the effort required during a stripping process when the formwork panels are removed from the cured concrete wall 30.

[0080] As further shown in FIG. 10, the curved flange 35 may help preserve surface quality of the finished concrete wall 30 during the removal of the formwork panels. The curved flange 35 may be positioned on an outer side of a channel formed by spaced apart walls for receiving an edge portion of the formwork panel 20. In some cases, the curved flange 35 may be taller than an inside wall on an opposite side of the channel to facilitate loading and removal of formwork panels 20 into and from the channel 32.

[0081] Referring to FIG. 11, a formwork assembly may include a plurality of formwork panels 20 arranged to form opposing sides of a wall structure. The formwork panels 20 may be connected and held in position by a plurality of elongate webs 121 that span between the opposing formwork panels 20. Each elongate web 121 may extend along a longitudinal axis between first and second ends, with first and second sides laterally spaced on either side of the longitudinal axis.

[0082] With continued reference to FIG. 11, the elongate webs 121 may extend laterally at an angle between panel edge keepers on each side of the elongate webs 121. The panel edge keepers on one side of each elongate web 121 may be offset from the panel edge keepers on the opposite side, creating the offset configuration characteristic of the formwork assembly. The offset configuration may result in each elongate web 121 extending at an angle rather than directly laterally between the panel edge keepers.

[0083] As further shown in FIG. 11, the offset arrangement may ensure that edges of formwork panels 20 on one side of the wall structure are not disposed directly opposite panel edges on the other side of the concrete structure. The formwork panels 20 on one side may be positioned such that panel edges are staggered relative to the panel edges on the oppositeside. In some cases, formwork panels 20 of different widths may be installed to facilitate the staggered arrangement of panel edges.

[0084] The offset configuration of the elongate webs 121 may help prevent hinge-type failure wherein form panels fold along a join line between form panels. In arrangements where a connector extends directly laterally between panel edge keepers without an offset, the form work panels may move in a hinge-type movement where opposite panels maintain the same distance from one another while folding along a join line. In such arrangements, only friction may resist the hinge-type movement. The offset configuration of the elongate webs 121 may provide increased resistance to hinge-type movement by creating a mechanical arrangement wherein the angled elongate webs 121 resist lateral displacement of the form work panels 20.

[0085] With continued reference to FIG. 11, the elongate webs 121 may be positioned at intervals along the length of the wall structure to provide consistent spacing between the opposing formwork panels 20. The spacing between the opposing formwork panels 20 may define the thickness of the resulting concrete wall. The elongate webs 121 may maintain the spacing between the opposing formwork panels 20 during concrete pouring and curing operations.

[0086] Referring to FIG. 12, a form work assembly may include a plurality of form work panels and elongate formwork frame elements arranged to create formwork for a wall structure. The formwork assembly may include corner panels positioned at a corner region of the wall structure. A first corner panel and a second corner panel may be positioned at a left corner region of the formwork assembly, with the comer panels configured to form a comer junction between two wall sections.

[0087] With continued reference to FIG. 12, formwork panels may extend from the corner panels along a first wall section. A first panel and a second panel may be positioned adjacent to the corner panels and may extend along the first wall section. The formwork panels may be arranged on opposite sides of a wall cavity defined by the elongate formwork frame elements. The elongate formwork frame elements may connect adjacent formworkpanels and may maintain spacing between opposing formwork panels on either side of the wall cavity.

[0088] As further shown in FIG. 12, a perpendicular wall section may extend from the first wall section. The perpendicular wall section may include starter panels positioned at a junction between the first wall section and the perpendicular wall section. A first starter panel and a second starter panel may be positioned vertically at the junction, with additional formwork panels extending from the starter panels along the perpendicular wall section.

[0089] The elongate formwork frame elements positioned between adjacent formwork panels may include an offset configuration. Each elongate formwork frame element may include an elongate web extending along a longitudinal axis between first and second ends, with first and second panel edge keepers disposed at first and second sides of the elongate web. The first panel edge keeper may be offset a selected distance from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge keepers.

[0090] With continued reference to FIG. 12, the offset configuration of the elongate formwork frame elements may create an angled connection between panel edges on opposite sides of the wall cavity. The offset connectors may result in the elongate web extending at an angle rather than directly laterally between the panel edge keepers. The offset arrangement may ensure that edges of formwork panels on one side of the wall structure are not disposed directly opposite panel edges on the other side of the wall cavity.

[0091] The formwork assembly may include formwork panels of different widths to facilitate the staggered arrangement of panel edges. The deployment of the elongate formwork frame elements in an offset shape may facilitate the use of different size formwork panels when the form work panels are disposed opposite one another. In some cases, each formwork panel may be of a different width, which may assist with shaping up and keeping the wall vertical during concrete pouring operations.

[0092] As further shown in FIG. 12, the offset configuration of the elongate formwork frame elements may help prevent hinge-type failure wherein form panels fold along a join line between form panels. In arrangements where a connector extends directly laterally between panel edge keepers without an offset, the formwork panels may move in a hingetype movement where opposite panels maintain the same distance from one another while folding along a join line. The offset configuration may provide increased resistance to hingetype movement by creating a mechanical arrangement wherein the angled elongate webs resist lateral displacement of the formwork panels.

[0093] Referring to FIG. 13, a formwork assembly may be installed at a corner junction of a structure 103. The formwork assembly may include a plurality of elongate formwork frame elements 10 and a plurality of formwork panels 20 arranged to form a comer configuration where two wall sections meet at an angle. The elongate formwork frame elements 10 may be positioned vertically and may extend along edges of the structure 103.

[0094] With continued reference to FIG. 13, the elongate formwork frame elements 10 may connect adjacent formwork panels 20 at the corner junction. Each elongate formwork frame element 10 may include an elongate web extending along a longitudinal axis between first and second ends, with first and second panel edge keepers disposed at first and second sides of the elongate web. The panel edge keepers may receive edge portions of the formwork panels 20 to hold the formwork panels 20 in a selected position during concrete pouring operations.

[0095] As further shown in FIG. 13, the formwork panels 20 may be arranged in a grid pattern on both sides of the corner junction. The elongate formwork frame elements 10 may serve as connectors between adjacent formwork panels 20, maintaining spacing between opposing formwork panels 20 to define a wall thickness. The vertical orientation of the elongate formwork frame elements 10 and the arrangement of the formwork panels 20 may create a structured framework suitable for receiving poured concrete to form a corner wall section of the structure 103.

[0096] In some cases, the flanges or channel walls of the elongate formwork frame elements 10 may extend at an angle to the elongate web to form a comer formwork element or an end formwork element. In such configurations, the formwork panels 20 assembled in the angled channels may meet to form a mitre joint at the corner junction. The angled configuration of the flanges or channel walls may accommodate corner configurations where two wall sections meet at an angle other than ninety degrees.

[0097] A kit may include formwork elements of different lengths to make a contoured wall. The elongate form work frame elements 10 of different lengths may be selected and positioned to accommodate the geometry of the comer junction and the sloped surfaces of the structure 103. The offset configuration of the elongate formwork frame elements 10 may allow formwork panels 20 of different widths to be installed such that panel edges on one side of the concrete structure are not disposed directly opposite panel edges on the other side of the concrete structure.

[0098] Referring to FIG. 14, a formwork connector assembly 110 may have a zero offset angle. The formwork connector assembly shown (in three parts 130 and 121 and 130) may include an elongate web 21 extending horizontally between first and second ends along a longitudinal axis. A first panel edge keeper 130 may be disposed at a first side of the elongate web 21, and a second panel edge keeper 130 may be disposed at a second side of the elongate web 21. In the zero offset configuration, the first panel edge keeper 130 and the second panel edge keeper 130 may be aligned without any offset between the first and second panel edge keepers 130, such that the elongate web 21 extends directly laterally between the first and second panel edge keepers 130. In some embodiments, the offset may be zero.

[0099] With continued reference to FIG. 14, the zero offset configuration may contrast with offset embodiments wherein the first panel edge keeper is offset a selected distance from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge keepers. In offset embodiments, the angled configuration of the elongate web may provide resistance to hingetype failure during concrete pouring operations. In the zero offset configuration shown inFIG. 14, the elongate web 21 may extend perpendicular to the panel edge keepers 130 rather than at an angle.

[0100] The elongate formwork panel connector may be provided in a unitary form wherein the elongate web and the first and second panel edge keepers are integral with one another. In the unitary form configuration, the elongate web and the first and second panel edge keepers may be formed as a single component. The unitary form configuration may be extruded, moulded, or additively manufactured as a single piece.

[0101] As further shown in FIG. 14, the elongate formwork panel connector may have an I-beam configuration with T-sections at the first and second sides of the web 21. Channels may be formed, on both sides of the elongate web 21, to retain formwork panels.

[0102] In some cases, at least one of the first and second panel edge keepers 130 may include an angled portion configured to provide the offset between the first and second panel edge keepers 130. In other cases, the elongate web may include an angled portion adjacent a head receiver to provide the offset configuration. The angled portion may be positioned at the junction between the elongate web and the panel edge keeper to create the offset arrangement. In the zero offset configuration shown in FIG. 14, the panel edge keepers 130 may not include an angled portion, such that the elongate web 21 extends directly laterally between the panel edge keepers 130.

[0103] The elongate formwork panel connector and associated formwork elements may be configured with various dimensional parameters and material options to accommodate different construction requirements.

[0104] Referring to FIG. 1, the offset 34 between the first panel edge keeper and the second panel edge keeper may be about 10mm, 15mm, 20mm, 25mm, 30mm, 35mm, 40mm, 45mm, 50mm, 55mm, 60mm, 65mm, 70mm, 75mm, 80mm, 85mm, 90mm, or 100mm. The selected offset distance may be chosen based on the desired resistance to hinge-type movement and the widths of formwork panels to be used in the formwork assembly. The different offsets clearly change the angle 26.

[0105] With continued reference to FIG. 1, the elongate web 21 may have a width of about 100mm, 150mm, 200mm, 250mm, or 300mm. The width of the elongate web 21 may correspond to the desired wall thickness, such that formwork panels on opposite sides of the elongate web 21 are spaced apart across a wall width to make a concrete wall 30 of the corresponding width. In some cases, an elongate web 21 with a width of about 100mm may include a hemisphere-shaped aperture 50 configured to receive a single reinforcing bar. In some cases, elongate webs 21 with wider widths may include apertures 50 with scalloped bottom edges configured to receive a plurality of reinforcing bars.

[0106] As further shown in FIG. 2, the elongate web 21 may have a thickness of about 1mm, 2mm, or 3mm. The channel walls forming the panel edge keepers may have a thickness of about 1mm, 2mm, or 3mm. The wall thicknesses of each section of the elongate formwork frame element 10 may be about 1mm, 2mm, 3mm, or 5mm.

[0107] Referring to FIG. 1, the channel 32 may include a spacing between the curved flange 35 and the inside wall 36 of about 10mm, 15mm, 20mm, 25mm, 30mm, 35mm, 40mm, or 50mm to accommodate formwork panels of corresponding thickness. In some cases, the spacing may be about 20mm to snugly receive an edge of a plywood panel. The curved flange 35 may be about 40mm long to provide secure fitment of the formwork panel within the channel 32.

[0108] With continued reference to FIG. 5, formwork panels 3 may have a thickness of about 18mm, 19mm, 20mm, 21mm, 22mm, 23mm, 24mm, or 25mm. The formwork panels 3 may have a width of about 100mm, 150mm, 200mm, 250mm, 300mm, 350mm, 400mm, 450mm, 600mm, or 750mm. The formwork panels 3 may have a height of about 2400mm, 2700mm, 3000mm, 3300mm, 3600mm, or 3900mm.

[0109] As further shown in FIG. 5, the elongate formwork frame elements may be spaced along a wall about 300mm, 450mm, 600mm, 750mm, 875mm, or 1000mm apart. The spacing between adjacent elongate formwork frame elements along the wall may correspond to the width of the formwork panels 3 positioned between the elongate formwork frame elements.

[0110] Referring to FIG. 2, a kit may include elongate formwork frame elements 10 with elongate webs 21 of various lengths. The elongate web 21 may have a length of about 50mm, 60mm, 70mm, 80mm, 90mm, 100mm, 110mm, 120mm, 125mm, 130mm, 140mm, 150mm, 160mm, 170mm, 180mm, 190mm, 200mm, 210mm, 220mm, 230mm, 240mm, 250mm, or other suitable length. A kit may include formwork elements of different lengths to make a contoured wall.[OHl] With continued reference to FIG. 2, the elongate web 21 may comprise a plate 22 or a sheet 23 of polymer, plastic, glass reinforced plastic (GRP), or carbon fibre. In some cases, the elongate web 21 may be flexible, such as a Kevlar sheet or similar flexible material. In some cases, the elongate web 21 may be rigid. The elongate web 21 may be a plate of plastic, steel, metal, or some other rigid body. In some cases, the elongate web 21 may be an elongate web in the form of a line, a cord, a string, or a finger extending between the panel edge keepers. The elongate formwork frame element 10 may be extruded, moulded, or additively manufactured.

[0112] Referring to FIG. 8, the panel edge keeper 130 may include an angled bight. The angled bight may include an angled wall that is offset from the elongate web 121 to extend directly laterally across the longitudinal axis. The arrangement may be such that the angled lateral wall abuts a side of the formwork panel when the formwork panel is mounted in the bight. As further shown in FIG. 8, the angled bight may be formed by a side T-flange extending across the lateral wall on both sides to provide an acute bight and an obtuse bight. The T-flange configuration may accommodate formwork panels positioned at different angles relative to the elongate web 121.

[0113] Referring to FIGS. 1 and 8, the panel edge keepers may include various receiver configurations and retention features for receiving and retaining edge portions of formwork panels. The receiver configurations may be adapted to securely hold formwork panels in position during concrete pouring and curing operations while facilitating loading and removal of the formwork panels.

[0114] With continued reference to FIG. 1, a panel edge keeper may include a receiver in the form of a recess for receiving an end of a plywood sheet or other form work panel. The receiver recess may include a bight to receive an end of the formwork panel. In some cases, the receiver recess may include a recess disposed between two flanges. The receiver may be a channel 32 disposed between two side walls extending from the elongate web 21.

[0115] As further shown in FIG. 1, the receiver may include a first flange disposed at one end region of the elongate web 21 and a second flange spaced from the first flange along the elongate web 21, with the first and second flanges extending transversely from the elongate web 21. The first and second flanges may be disposed about 20mm apart along the elongate web 21 to snugly receive an edge of a plywood sheet. In some cases, the first flange may be longer than the second flange to facilitate loading and removal of the formwork panel and to balance the formwork panel securely within the channel 32.

[0116] Referring to FIG. 8, the panel edge keeper 130 may include gripping elements or barbs 134 in the flanges to facilitate retention of formwork panel ends. The gripping elements or barbs 134 may engage with the surface of the formwork panel to resist withdrawal of the formwork panel from the channel during concrete pouring operations. The barbs 134 may be positioned along the inner surfaces of the flanges to contact the formwork panel when the form work panel is inserted into the channel.

[0117] With continued reference to FIG. 8, the receiver may include alternative retention features. The receiver may include a clip configured to grip an edge portion of the formwork panel. In some cases, the receiver may include a clamp for securing the formwork panel within the channel. The receiver may include teeth positioned along the inner surfaces of the flanges to engage with the formwork panel surface.

[0118] As further shown in FIGS. 8 and 9, the receiver may include locks configured to secure the formwork panel in position within the channel. In some cases, the receiver may include a thicker or larger end configured to retain the formwork panel. The receiver may include a ball or a boss positioned to engage with the formwork panel. The receiver mayinclude any protrusion behind which a formwork panel may sit when installed in the formwork assembly.

[0119] Referring to FIG. 9, the elongate web 121 may include head receivers 137 positioned along the first and second sides 29 of the elongate web 121 for connecting with panel edge keepers 130. Each head receiver 137 may include a barb receiver 136 configured to receive a barb 134 from a head portion 138 of the panel edge keeper 130 in a sliding manner. The head receivers 137 may be bulbous in shape to accommodate the cooperating head portion 138 from the panel edge keeper 130.

[0120] With continued reference to FIGS. 8 and 9, the head portion 138 may be a barb 134, but the head portion 138 may alternatively include a bulb shape, an arrowhead shape, or another barb-like configuration. The barb receiver 136 may be shaped to securely retain the barb 134 once the barb 134 is slid into position within the head receiver 137. The sliding engagement between the barb 134 and the barb receiver 136 may allow the panel edge keeper 130 to be connected to the elongate web 121 during assembly of the formwork connector.

[0121] As further shown in FIG. 1, the curved flange 35 may be configured to promote release of the formwork panel from a finished concrete wall 30 after the concrete has cured. The curved profile of the curved flange 35 may reduce adhesion between the formwork panel and the cured concrete, facilitating easier removal of the formwork panels during a stripping process. The curved flange 35 may be taller than the inside wall 36 to facilitate loading and removal of formwork panels into and from the channel 32 while providing secure retention during concrete pouring operations.

[0122] Referring to FIGS. 3, 5, and 7, a method of installing formwork may include a series of steps for constructing a formwork assembly. A base frame element 310 may be fixed down in a selected position on a floor surface using fasteners such as dyno bolts. The base frame element 310 may include a bottom edge 321 configured to rest on the floor surface and side wall channels 332 configured to receive base edges of formwork panels 3.

[0123] With continued reference to FIG. 7, all openings may be marked on an edge of the base frame element 310 prior to installation of the formwork panels 3. The markings may indicate locations for apertures 350, reinforcing starter bars, or other features of the formwork assembly. The base frame element 310 may include apertures 350 configured to accommodate reinforcing starter bars extending upwardly from the floor surface.

[0124] As further shown in FIGS. 3 and 5, tension straps may be added at comers to provide bottom bracing. The lip of all base frame elements 310 may be made continuous by adding tension straps at corners and other locations along the base of the formwork assembly. The tension straps may provide bottom bracing to maintain alignment of the base frame elements 310 during concrete pouring operations.

[0125] Referring to FIG. 5, a first comer board may be braced vertically with cross bracing so that all following formwork panels 3 are kept vertical in line along the wall from a first end 2 to a second end 5. The cross bracing may maintain the vertical orientation of the formwork panels 3 during assembly and concrete pouring operations. A first side of the formwork may be completed by using precut formwork panels 3.

[0126] With continued reference to FIGS. 3 and 5, timber shutters may be fixed to the formwork panels 3 by nailing the timber shutters to the formwork panels 3. External comers and end walls may be braced with tension strap ties. After bracing, all comers may be standing vertically and braced against wind load with cross bracing. The formwork assembly may then be ready for a concrete pour.

[0127] Screws may be used for fixing braces at a back surface of the formwork panels 3. In some cases, the screws used for fixing braces may be about 15mm long so that the screws do not penetrate a face of the plywood and keep one face of the plywood free from imperfections. The 15mm screw length may preserve the surface quality of the formwork panels 3 for producing a smooth concrete surface.

[0128] Referring to FIG. 5, concrete 4 may be poured into the formwork, wherein the plurality of elongate formwork frame elements maintain spacing between opposing formworkpanels 3 during concrete curing. The formwork may self-align during the pouring of concrete 4. The self-aligning operation may occur because of the structure of the elongate formwork frame elements, each of which may be configured to retain edges of formwork panels 3 at each of the sides 29.

[0129] With continued reference to FIG. 5, before the concrete 4 is poured, a distal end 6 of the walls may be at a sideways lean. Regardless of any lean at the distal end 6, an automatic shaping up may occur during a pour because of the structure of the elongate formwork frame elements. When the concrete 4 is poured in from the first end 2 or any end or intermediate portion, the rest of the formwork may shape up to vertical and plumb by itself as the concrete 4 pours. The formwork may straighten due to tension on the elongate webs of the elongate formwork frame elements.

[0130] As further shown in FIG. 5, during and after the pour, an operator may shake the wall and the shaking may assist with shaping the wall up. The shaking action may facilitate the flow of concrete 4 through the formwork structure and may assist the self-aligning operation of the formwork assembly. The concrete pressure inside the formwork may help the formwork system shape up during the pour.

[0131] Referring to FIG. 3, when the formwork is filled with concrete, static pressure may exert forces on the form work panels 3 to keep opposite panels away from each other. The offset configuration of the elongate formwork frame elements may create a mechanical arrangement wherein concrete pressure assists in maintaining proper alignment of the formwork panels 3. The concrete pressure may tend to help the formwork move back into alignment, resulting in a self-aligning formwork system.

[0132] A formwork kit may be brought to a worksite for installation. The formwork kit may include a plurality of elongate formwork frame elements 10, each including an elongate web 21 with first and second ends and panel edge keepers at the first and second ends of the elongate web 21. The panel edge keepers may be configured to retain a portion of a form work panel 20.

[0133] The formwork kit may include packaging for holding the formwork elements together for transportation to a worksite. In some cases, the packaging may include a bag for holding the formwork elements together. In some cases, the packaging may include a strap for securing the formwork elements during transportation. In some cases, the packaging may include a container for holding the formwork elements. In some cases, the packaging may include a tie for bundling the formwork elements together. The packaging may facilitate transportation of the formwork kit to a construction site and may protect the formwork elements during transit.

[0134] A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure. Accordingly, other implementations are within the scope of the following claims.

Claims

CLAIMS1. An elongate formwork panel connector, comprising:an elongate web extending along a longitudinal axis between first and second ends, the elongate web including first and second sides laterally spaced on either side of the longitudinal axis;a first panel edge keeper disposed at the first side of the elongate web, the first panel edge keeper extending along the longitudinal axis and configured to receive an edge portion of a form work panel; anda second panel edge keeper disposed at the second side of the elongate web, the second panel edge keeper extending along the longitudinal axis and configured to receive an edge portion of a formwork panel,wherein the first panel edge keeper is offset a selected distance from the second panel edge keeper along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge keepers.

2. The elongate formwork panel connector of claim 1, wherein the elongate web and the first and second panel edge keepers are integral with one another in a unitary form.

3. The elongate formwork panel connector of claim 1, wherein the elongate web and the first and second panel edge keepers are separable and configured to connect to one another at the first and second sides of the elongate web.

4. The elongate formwork panel connector of claim 3, further comprising a coupler for connecting the elongate web to the first and second panel edge keepers.

5. The elongate formwork panel connector of claim 4, wherein the coupler is a snap connector including a head portion configured to insert into a cooperating head receiver.

6. The elongate formwork panel connector of claim 5, wherein the elongate web includes two head receivers along the first and second sides, and wherein the head receiversinclude a barb receiver configured to receive a barb from the head portion in a sliding manner.

7. The elongate formwork panel connector of any one of claims 1 to 6, wherein at least one of the first and second panel edge keepers includes a curved flange configured to promote release of the formwork panel from a finished concrete structure.

8. The elongate formwork panel connector of any one of claims 1 to 7, wherein at least one of the first and second panel edge keepers includes a channel formed by spaced apart side walls for receiving the edge portion of the formwork panel.

9. The elongate formwork panel connector of claim 8, wherein the channel includes a first side wall longer than a second side wall to facilitate loading the edge portion of the form work panel into the channel.

10. The elongate formwork panel connector of any one of claims 1 to 9, wherein the elongate web includes one or more apertures configured to receive concrete slurry therethrough and to receive one or more reinforcing bars.

11. The elongate formwork panel connector of claim 10, wherein the one or more apertures include scalloped bottom edges configured to receive a plurality of reinforcing bars.

12. The elongate formwork panel connector of claim 10, wherein the elongate web includes one or more accessways formed in side edges of the elongate web to allow access to the one or more apertures for insertion of reinforcing bars.

13. The elongate formwork panel connector of any one of claims 1 to 12, wherein the elongate web comprises a plate or sheet of polymer, plastic, glass reinforced plastic, or carbon fibre.

14. The elongate formwork panel connector of any one of claims 1 to 13, wherein the elongate formwork panel connector has an I-beam configuration with T-sections at the first and second ends of the elongate web.

15. The elongate formwork panel connector of any one of claims 1 to 14, wherein at least one of the first and second panel edge keepers includes an angled portion configured to provide the offset between the first and second panel edge keepers.

16. A method of installing formwork, the method comprising:installing a plurality of elongate formwork frame elements on or in relation to a structure, each of the plurality of elongate formwork frame elements including an elongate web extending along a longitudinal axis and having first and second sides laterally spaced from the longitudinal axis, and first and second panel edge receivers disposed at the first and second sides for receiving an edge of a formwork panel, wherein the first panel edge receiver is offset a selected distance from the second panel edge receiver along an axis normal to the lateral sides such that the elongate web extends laterally at an angle between the first and second panel edge receivers; andmounting edges of a plurality of form work panels in the first and second panel edge receivers such that edges of formwork panels on one side of the formwork are not disposed directly opposite edges of formwork panels on an opposite side of the formwork.

17. The method of claim 16, further comprising installing one or more elongate base frame elements on a floor surface, the one or more elongate base frame elements including side wall channels configured to receive base edges of the plurality of formwork panels.

18. The method of claim 17, wherein the one or more elongate base frame elements include apertures configured to accommodate reinforcing starter bars extending upwardly from the floor surface.

19. The method of claim 16, wherein mounting the edges of the plurality of formwork panels comprises mounting formwork panels of different widths such that when installed, an edge of one formwork panel is not disposed directly opposite a panel edge on an opposite side of a concrete structure to be formed.

20. The method of claim 16, further comprising pouring concrete into the formwork, wherein the plurality of elongate formwork frame elements maintain spacing between opposing formwork panels during concrete curing and the formwork self-aligns during the pouring of concrete.