Controllable temporary-plugging bridge plug and controllable temporary-plugging packer

By using a pre-installed expansion unit for the controlled temporary plugging bridge plug and packer, along with a fracture disc or controlled dissolution design, and combined with an electronic control system, the problem of existing plugging tools being unable to provide long-term temporary plugging is solved. This achieves automatic unplugging, reduces operating costs and reservoir damage, and is suitable for various well types.

WO2026232826A1PCT designated stage Publication Date: 2026-11-12CHINA NAT PETROLEUM CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2025/144564
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-08
Filing Date
2025-12-23
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing plugging tools cannot meet the needs of long-term temporary plugging in oil and gas operations. Furthermore, existing soluble bridge plugs have short plugging time and inaccurate unplugging control. Conventional bridge plug unplugging requires external force, resulting in cumbersome and costly operations.

Method used

The system employs controllable temporary plugging bridge plugs and packers, and achieves controllable unblocking of the bridge plugs or packers through pre-installed expansion units to break up the rupture disc or through controllable dissolution. Combined with the electronic control system, it achieves automatic unblocking and avoids secondary operations.

Benefits of technology

It achieves the requirement of long-term temporary plugging, reduces the cost of single-well operation, avoids reservoir damage, and enables direct and continuous production. It is suitable for vertical wells, directional wells, and horizontal wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2025144564_12112026_PF_FP_ABST
    Figure CN2025144564_12112026_PF_FP_ABST
Patent Text Reader

Abstract

A controllable temporary-plugging bridge plug and a controllable temporary-plugging packer. The controllable temporary-plugging bridge plug comprises a central tube (50) and a temporary plugging device (52); a central flow channel (51) is provided in the central tube (50), and the temporary plugging device (52) is connected to an upper portion or a lower portion of the central tube (50) or is built in the central flow channel (51); the temporary plugging device (52) comprises a cylindrical body (10), a plugging mechanism, and an unplugging mechanism; a channel (13) is provided in the cylindrical body (10), and the cylindrical body (10) is fixedly connected to the central tube (50); the plugging mechanism is installed in the cylindrical body (10) to plug the channel (13), so that the temporary plugging device (52) is in a plugging state; and the unplugging mechanism is installed in the cylindrical body (10), and the unplugging mechanism is used for controlling the plugging mechanism to operate so as to switch the temporary plugging device (52) from the plugging state to an unplugging state. The solution achieves controllable unplugging of the bridge plug or the packer by pre-installing an expansion unit (30) to rupture a rupture disk or by controllable dissolution, thereby satisfying both the requirements for long-term temporary plugging and the requirements for short-term temporary plugging, and solving the problem that existing plugging tools cannot satisfy usage requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Controllable temporary plug bridge plug and controllable temporary plug packer

[0001] Related applications

[0002] This application claims priority to Chinese patent applications Nos. 202510591856.9 and 202510591976.9, filed on May 8, 2025, and incorporates the entire contents of the disclosures of the aforementioned patent applications as part of this application. Technical Field

[0003] This application relates to the field of temporary plugging technology, and in particular to a controllable temporary plugging bridge plug and a controllable temporary plugging packer. Background Technology

[0004] During the exploration and development of oil and gas fields, it is necessary to temporarily plug the reservoir in layers within the wellbore to meet the field requirements such as layered fracturing, layered oil and gas production, layered plugging, layered reinjection, and layered gas injection. Therefore, during the process of sealing and producing oil and gas, it is necessary to temporarily plug the inside of the packer's central tube for a long time to achieve the sealing and production of oil and gas.

[0005] In oil and gas well layer inspection and perforation measures, long-term temporary plugging of the lower reservoir is required to avoid inter-layer interference and enable the development of the upper new layer. Currently, for gas exploration wells, layered fracturing tests require long-term plugging (20-40 days), generally using retrieval or drillable bridge plugs. During production, well killing and retrieval or drilling are required, which is a complicated procedure. Moreover, well killing operations have the problems of secondary operation damage such as loss of old layers, reservoir damage, and difficulty in fluid drainage. The cost of retrieval and drilling of bridge plugs in gas exploration wells is over one million yuan per well, and the risk of failure is high, which greatly increases the cost per well. While existing soluble bridge plugs can avoid well killing, fishing, and drilling, their effective plugging time is short (generally 2-3 days). The plugging mechanism and the unplugging mechanism are the same, making it difficult to control the time, effect, and reliability of plugging and unplugging. They cannot meet the time requirements for long-term temporary plugging. For example, Chinese invention patent application CN107013181A, "Dissolvable Bridge Plug and Bridge Plug Fracturing System", and Chinese invention patent application CN116856881A, "An Embedded Plug Structure Bridge Plug and Its Bridge Plug Setting Method". Other types of temporary plugging bridge plugs require external force (such as pressure to break the blockage) to unblock them, and cannot unblock on their own. Examples include: Chinese invention patent application CN116892377A, "A bridge plug with self-sealing capability and its application and usage method", Chinese invention patent application CN108104764A, "Temporary plugging bridge plug", and Chinese utility model patent CN217106941U, "A multifunctional soluble bridge plug".

[0006] Among them, the Chinese utility model patent with announcement number CN217106941U discloses a multifunctional soluble bridge plug. Although it is designed to temporarily block, its method of pressure knocking or drilling requires subsequent well control operations, which has a long construction cycle, high operating costs, and great damage to the reservoir. For example, the method of fixing the temporary plug with a fastening pin requires a secondary tubing string to be run into the bridge plug's central tube for pressure to remove the temporary plug, which is cumbersome. Moreover, the secondary tubing string may not be able to be successfully reinserted into the bridge plug's central tube because there will definitely be fracturing sand, fracturing fluid, and produced material blocking the bridge plug. Furthermore, directly pressurizing the central tube at the wellhead is not feasible because it is easy to damage the reservoir above the already fractured bridge plug, since the pressure will inevitably be higher than the previous fracturing pressure. Otherwise, the temporary plug of the bridge plug would fall off during fracturing. During the operation, either the pressure cannot be reached, or multiple fracturing trucks must be organized to carry out secondary fracturing. In addition, the obstruction above the bridge plug will hinder the removal of the temporary plug, so this method is not advisable. In addition, its soluble design cannot meet the needs of long-term temporary plugging.

[0007] In conclusion, existing plugging tools cannot meet the needs for long-term temporary plugging during oil and gas operations. Summary of the Invention

[0008] The purpose of this application is to provide a controllable temporary plugging bridge plug and a controllable temporary plugging packer, which achieves controllable unblocking of the bridge plug or packer by means of pre-installed expansion unit to break up the rupture disc or controllable dissolution. This can meet both long-term and short-term temporary plugging requirements, and solve the problem that existing plugging tools cannot meet the usage needs.

[0009] An embodiment of the first aspect of this application provides a controllable temporary plugging bridge plug, comprising:

[0010] A central tube, wherein the central tube has a central flow channel;

[0011] A temporary plugging device, which is connected to the upper or lower part of the central tube or built into the central flow channel;

[0012] The temporary blocking device includes:

[0013] The main body cylinder has a channel that connects the upper and lower parts, and the main body cylinder is fixedly connected to the central tube;

[0014] A blocking mechanism is installed inside the main body cylinder to block the channel, so that the temporary blocking device is in a blocked state;

[0015] An unblocking mechanism is installed inside the main body cylinder. The unblocking mechanism is used to control the action of the blocking mechanism so that the temporary blocking device changes from the blocking state to the unblocking state.

[0016] In an optional embodiment of this application, the controllable temporary plug further includes:

[0017] A rubber sleeve, fitted onto the central tube, is used to radially position the controllable temporary plugging bridge plug under compression.

[0018] A cone-shaped assembly is fitted onto the central tube and located on both sides of the rubber cylinder. The cone-shaped assembly is used to apply relative compressive force to the rubber cylinder along the axial direction of the central tube.

[0019] The slip assembly is fitted onto the central tube and located on both sides of the cone assembly opposite to the rubber cylinder. The slip assembly is used to axially position the bridge plug and to drive the cone assembly to move toward the rubber cylinder.

[0020] The push ring assembly is fitted onto the central tube and located on both sides of the slip assembly opposite to the vertebral body assembly. The push ring assembly is used to drive the slip assembly toward the vertebral body assembly after receiving the sealing force.

[0021] In one optional embodiment of this application, the sealing mechanism is a rupture disc, and the unblocking mechanism is a pre-set expansion unit that can break the rupture disc; the rupture disc is fixed inside the main body cylinder by a fixing cylinder, and the pre-set expansion unit is a compression spring storage structure, an electrically controlled thermal expansion structure, a chemical reaction expansion structure, or an electrically controlled cold expansion structure.

[0022] In one optional embodiment of this application, the number of rupture discs is at least two, and the plurality of rupture discs are arranged in the channel to form a sealing chamber, and the pre-installed expansion unit is disposed in the sealing chamber.

[0023] In an optional embodiment of this application, the rupture disc includes a first rupture disc and a second rupture disc arranged opposite each other. The upper and lower ends of the channel are respectively provided with positioning steps, and the upper and lower ends of the main body cylinder are respectively provided with a first fixing cylinder and a second fixing cylinder, so as to abut and fix the first rupture disc and the second rupture disc on the positioning steps respectively.

[0024] In an optional embodiment of this application, the sealing chamber is provided with at least one partition, which divides the sealing chamber into at least two sealing sub-cavities. The two sealing sub-cavities correspond to the two rupture discs respectively, and each sealing sub-cavity is provided with the pre-installed expansion unit.

[0025] In an optional embodiment of this application, the partition includes a first partition and a second partition disposed opposite to each other, and a power supply chamber for storing power is formed between the first partition and the second partition.

[0026] In an optional embodiment of this application, the compression spring storage structure includes:

[0027] Two sets of springs are arranged opposite each other, and the springs abut against the limiting step on the side wall of the sealing chamber;

[0028] Two impact pins are arranged opposite each other, and the two impact pins are respectively inserted into the two sets of springs. The impact pins are provided with limiting discs that abut against the springs. The head ends of the two impact pins are respectively facing the two breaking discs.

[0029] A heat-fusion connecting sleeve is provided, in which the two firing pins compress the two sets of springs respectively through the limiting plate, so that the tail ends of the two firing pins are connected through the heat-fusion connecting sleeve.

[0030] A heating coil for heating the thermofusion sleeve is disposed on the side wall of the sealing chamber and located on the outer periphery of the thermofusion sleeve.

[0031] In one optional embodiment of this application, the sealing mechanism is a metal dissolving disc, and the unblocking mechanism is a temporary blocking control unit capable of controlling the dissolution of the metal dissolving disc.

[0032] In an optional embodiment of this application, the temporary blocking control unit includes:

[0033] A cathode protection sleeve is provided on the inner wall of the main body cylinder;

[0034] A power supply is located inside the main body cylinder, and the power supply is electrically connected to the metal melting plate and the cathode protection sleeve respectively.

[0035] In the blocked state, the negative terminal of the power supply is electrically connected to the metal dissolution disk, and the positive terminal of the power supply is electrically connected to the cathode protection sleeve.

[0036] In the unblocked state, the positive terminal of the power supply is electrically connected to the metal dissolution disk, and the negative terminal of the power supply is electrically connected to the cathode protection sleeve.

[0037] In an optional embodiment of this application, positioning steps are provided at the upper and lower ends of the channel, and a first fixing cylinder and a second fixing cylinder are provided at the upper and lower ends of the main body cylinder, respectively, so as to abut and fix the metal melting plate and the cathode protection sleeve on the positioning steps.

[0038] In an optional embodiment of this application, the temporary blocking control unit is a soluble metal block, and the metal dissolving plate and the soluble metal block are arranged adjacent to each other. The metal activity of the soluble metal block is higher than that of the metal dissolving plate, and the dissolution rate of the soluble metal block is greater than that of the metal dissolving plate.

[0039] In one optional embodiment of this application, a first fixing cylinder and a second fixing cylinder are respectively provided at the upper and lower ends of the main body cylinder to abut and fix the metal melting plate and the soluble metal block.

[0040] An embodiment of the second aspect of this application also provides a controllable temporary plugging packer, comprising:

[0041] Packer center tube, wherein the packer center tube has a central flow channel;

[0042] A rubber sleeve sealing assembly is fitted onto the outer periphery of the packer's central tube;

[0043] A temporary plugging device, which is connected to the upper or lower part of the packer's central tube or is built into the central flow channel;

[0044] The temporary blocking device includes:

[0045] The main body cylinder has a channel that connects the upper and lower parts, and the main body cylinder is fixedly connected to the central tube of the packer;

[0046] A blocking mechanism is installed inside the main body cylinder to block the channel, thereby putting the temporary blocking device in a blocked state.

[0047] In an optional embodiment of this application, the temporary blocking device further includes:

[0048] An unblocking mechanism is installed inside the main body cylinder. The unblocking mechanism is used to control the action of the blocking mechanism so that the temporary blocking device changes from the blocking state to the unblocking state.

[0049] In one optional embodiment of this application, the sealing mechanism is a rupture disc, and the unblocking mechanism is a pre-set expansion unit that can break the rupture disc; the rupture disc is fixed inside the main body cylinder by a fixing cylinder, and the pre-set expansion unit is a compression spring storage structure, an electrically controlled thermal expansion structure, a chemical reaction expansion structure, or an electrically controlled cold expansion structure.

[0050] In one optional embodiment of this application, the number of rupture discs is at least two, and the plurality of rupture discs are arranged in the channel to form a sealing chamber, and the pre-installed expansion unit is disposed in the sealing chamber.

[0051] In an optional embodiment of this application, the rupture disc includes a first rupture disc and a second rupture disc arranged opposite each other. The upper and lower ends of the channel are respectively provided with positioning steps, and the upper and lower ends of the main body cylinder are respectively provided with a first fixing cylinder and a second fixing cylinder, so as to abut and fix the first rupture disc and the second rupture disc on the positioning steps respectively.

[0052] In an optional embodiment of this application, the sealing chamber is provided with at least one partition, which divides the sealing chamber into at least two sealing sub-cavities. The two sealing sub-cavities correspond to the two rupture discs respectively, and each sealing sub-cavity is provided with the pre-installed expansion unit.

[0053] In an optional embodiment of this application, the partition includes a first partition and a second partition disposed opposite to each other, and a power supply chamber for storing power is formed between the first partition and the second partition.

[0054] In an optional embodiment of this application, the compression spring storage structure includes:

[0055] Two sets of springs are arranged opposite each other, and the springs abut against the limiting step on the side wall of the sealing chamber;

[0056] Two impact pins are arranged opposite each other, and the two impact pins are respectively inserted into the two sets of springs. The impact pins are provided with limiting discs that abut against the springs. The head ends of the two impact pins are respectively facing the two breaking discs.

[0057] A heat-fusion connecting sleeve is provided, in which the two firing pins compress the two sets of springs respectively through the limiting plate, so that the tail ends of the two firing pins are connected through the heat-fusion connecting sleeve.

[0058] A heating coil for heating the thermofusion sleeve is disposed on the side wall of the sealing chamber and located on the outer periphery of the thermofusion sleeve.

[0059] In one optional embodiment of this application, the sealing mechanism is a metal dissolving disc, and the unblocking mechanism is a temporary blocking control unit capable of controlling the dissolution of the metal dissolving disc.

[0060] In an optional embodiment of this application, the temporary blocking control unit includes:

[0061] A cathode protection sleeve is provided on the inner wall of the main body cylinder;

[0062] A power supply is located inside the main body cylinder, and the power supply is electrically connected to the metal melting plate and the cathode protection sleeve respectively.

[0063] In the blocked state, the negative terminal of the power supply is electrically connected to the metal dissolution disk, and the positive terminal of the power supply is electrically connected to the cathode protection sleeve.

[0064] In the unblocked state, the positive terminal of the power supply is electrically connected to the metal dissolution disk, and the negative terminal of the power supply is electrically connected to the cathode protection sleeve.

[0065] In an optional embodiment of this application, positioning steps are provided at the upper and lower ends of the channel, and a first fixing cylinder and a second fixing cylinder are provided at the upper and lower ends of the main body cylinder, respectively, so as to abut and fix the metal melting plate and the cathode protection sleeve on the positioning steps.

[0066] In an optional embodiment of this application, the temporary blocking control unit is a soluble metal block, and the metal dissolving plate and the soluble metal block are arranged adjacent to each other. The metal activity of the soluble metal block is higher than that of the metal dissolving plate, and the dissolution rate of the soluble metal block is greater than that of the metal dissolving plate.

[0067] In one optional embodiment of this application, a first fixing cylinder and a second fixing cylinder are respectively provided at the upper and lower ends of the main body cylinder to abut and fix the metal melting plate and the soluble metal block.

[0068] An embodiment of the third aspect of this application also provides a controllable temporary plugging bridge plug, comprising a central tube and a temporary plugging device. The temporary plugging device includes a body cylinder, a plugging mechanism, and a de-plugging mechanism. The central tube has a central flow channel, and the temporary plugging device is connected to the upper or lower part of the central tube, or is built into the central flow channel. The body cylinder has a vertically connected channel, and the body cylinder is fixedly connected to the central tube. The plugging mechanism is installed inside the body cylinder and includes two rupture discs spaced apart in the axial direction of the central tube to plug the channel. The de-plugging mechanism is installed inside the body cylinder and located between the two rupture discs. The de-plugging mechanism includes two impact pins arranged along the axial direction, a thermoplastic connecting sleeve, a spring, two limiting discs, and a heating coil for heating the thermoplastic connecting sleeve. The two impact pins face the two rupture discs respectively, are connected by the thermoplastic connecting sleeve, and the spring is sleeved outside the two impact pins. Two limiting discs are located on opposite sides of the spring in the axial direction and are respectively connected to the two striking pins for compressing the spring. A heating coil is arranged around the thermofused connecting sleeve and installed on the inner wall of the main body cylinder. The heating coil heats the thermofused connecting sleeve to disconnect the two striking pins, thereby releasing the two striking pins. Under the pushing force of the spring, the two striking pins strike the two rupture discs, causing them to break and thus releasing the blockage of the channel.

[0069] Compared with the prior art, the technical solution described in this application has the following features and advantages:

[0070] This application adopts a controllable temporary plugging design, which achieves controllable unblocking of bridge plugs and packers by pre-installed expansion units to break up the fractured plate or by controllable dissolution. It can meet both long-term and short-term temporary plugging requirements, and can achieve unblocking without additional operations, connecting the layers and realizing joint production. It avoids reservoir damage caused by secondary operations, reduces single-well operation costs, enables direct and continuous production, and achieves quick results, helping oil and gas wells to efficiently tap their potential. It is applicable to vertical wells, directional wells, and horizontal wells.

[0071] Furthermore, the controllable temporary plugging packer of this application differs from conventional packers. Conventional packers are used to seal the annulus, while the temporary plugging packer of this application can seal the annulus and also temporarily plug the packer's central tube. This allows for both temporary sealing of the sealing layer and stratified oil and gas production, as well as stratified reinjection of gas and water, demonstrating significant advantages. Attached Figure Description

[0072] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. The drawings described herein are for illustrative purposes only and are not intended to limit the scope of this application in any way. In addition, the shapes and scales of the components in the drawings are only schematic and used to help understand this application, and are not intended to specifically limit the shapes and scales of the components in this application. Those skilled in the art, under the teachings of this application, can select various possible shapes and scales to implement this application according to specific circumstances. In the drawings:

[0073] Figure 1 is a schematic diagram of the controllable temporary plug bridge plug described in this application;

[0074] Figure 2 is a structural schematic diagram of the first embodiment of the temporary blocking device described in this application;

[0075] Figure 3 is a structural schematic diagram of the second embodiment of the temporary blocking device described in this application;

[0076] Figure 4 is a structural schematic diagram of the third embodiment of the temporary blocking device described in this application;

[0077] Figure 5 is a structural schematic diagram of the fourth embodiment of the temporary blocking device described in this application;

[0078] Figure 6 is a structural schematic diagram of the fifth embodiment of the temporary blocking device described in this application;

[0079] Figure 7 is a structural schematic diagram of the sixth embodiment of the temporary blocking device described in this application;

[0080] Figure 8 is a structural schematic diagram of the seventh embodiment of the temporary blocking device described in this application;

[0081] Figure 9 is a structural schematic diagram of the eighth embodiment of the temporary blocking device described in this application;

[0082] Figure 10 is a structural schematic diagram of the controllable temporary plugging packer described in this application.

[0083] Explanation of reference numerals in the attached drawings: 10. Main body cylinder; 11. Upper cylinder; 12. Lower cylinder; 13. Channel; 14. Power supply; 15. First sealing ring; 16. Second sealing ring; 17. Third sealing ring; 18. Fourth sealing ring; 20. First rupture disc; 21. Second rupture disc; 22. First fixed cylinder; 23. Second fixed cylinder; 24. Sealing chamber; 241. Sealing sub-chamber; 25. Partition plate; 26. First partition plate; 27. Second partition plate; 28. Power supply chamber; 30. Pre-set expansion unit; 31. Spring; 32. Impact pin; 33. Limiting disc; 34. Hot melt connecting sleeve; 35. Heating coil; 40. Metal dissolving disc; 41. Cathode protection sleeve; 42. Soluble metal block; 43. Fifth sealing ring; 44. Sixth sealing ring; 50. Central tube; 51. Central flow channel; 52. Temporary plugging device; 60. Glue tube; 61. Upper cone body; 62. Lower cone body; 63. Upper slip; 64. Lower slip; 65. Upper push ring; 66. Lower connecting sleeve; 67. Release shear nail; 68. Shear nail; 69. Guide shoe; 70. Packer center tube; 71. Glue tube sealing assembly. Detailed Implementation

[0084] To enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this application.

[0085] It should be noted that when an element is referred to as being "set on" another element, it can be directly on the other element or there may be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or there may be an intervening element. The terms "vertical," "horizontal," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only embodiments.

[0086] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the application. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.

[0087] Implementation Method 1:

[0088] As shown in Figures 1 to 9, this application provides a controllable temporary plugging bridge plug, which includes a central tube 50 and a temporary plugging device 52. The central tube 50 has a central flow channel 51, and the temporary plugging device 52 is connected to the upper or lower part of the central tube 50, or is built into the central flow channel 51. The temporary plugging device 52 includes a body cylinder 10, a sealing mechanism, and a deblocking mechanism. The body cylinder 10 has a vertically connected channel 13, and the body cylinder 10 is fixedly connected to the central tube 50. The sealing mechanism is installed in the body cylinder 10 to seal the channel 13, so that the temporary plugging device 52 is in a sealed state. The deblocking mechanism has a different structure from the sealing mechanism. The deblocking mechanism is installed in the body cylinder 10 and is used to control the action of the sealing mechanism to change the temporary plugging device 52 from a sealed state to a deblocked state.

[0089] Furthermore, as shown in Figure 1, the controllable temporary plugging bridge plug also includes a rubber sleeve 60, a cone assembly, a slip assembly, and a push ring assembly. The rubber sleeve 60 is fitted onto the central tube 50 and, under compression, is used for radial positioning of the controllable temporary plugging bridge plug. The cone assembly is fitted onto the central tube 50 and located on both sides of the rubber sleeve 60, and is used to apply relative compression force to the rubber sleeve 60 along the axial direction of the central tube 50. The slip assembly is fitted onto the central tube 50 and located on both sides of the cone assembly opposite to the rubber sleeve 60, and is used for axial positioning of the bridge plug and for driving the cone assembly to move towards the rubber sleeve 60. The push ring assembly is fitted onto the central tube 50 and located on both sides of the slip assembly opposite to the cone assembly, and is used to drive the slip assembly to move towards the cone assembly after receiving the setting force.

[0090] Specifically, as shown in Figure 1, the upper part of the central tube 50 is provided with a release scissor 67 for connecting with the sealing tool. The outer periphery of the central tube 50 is provided with, from top to bottom, an upper push ring 65, an upper slip 63, an upper cone 61, a rubber sleeve 60, a lower cone 62, a lower slip 64, and a lower connecting sleeve 66. The upper push ring 65 is fixed to the outer periphery of the central tube 50 by a shear pin 68. The lower part of the upper push ring 65 is in direct contact with the upper end face of the upper slip 63. The inner inclined surface of the upper slip 63 is in contact with the outer inclined surface of the upper cone 61. The lower end face of the upper cone 61 is in contact with the rubber sleeve 60. The lower end face of the rubber sleeve 60 is in contact with the upper end face of the lower cone 62. The lower cone 62 is fixed to the outer periphery of the central tube 50 by a shear pin 68. The outer inclined surface of the lower cone 62 is in contact with the inner inclined surface of the lower slip 64. The lower end face of the lower slip 64 is in contact with the upper end face of the lower connecting sleeve 66. The lower connecting sleeve 66 is connected to the aforementioned temporary blocking device 52. The lower part of the temporary blocking device 52 is connected to the guide shoe 69.

[0091] As shown in Figure 1, the body cylinder 10 of the temporary plugging device 52 can be an integral structure with the central tube 50, meaning the central tube 50 and the body cylinder 10 can be manufactured as a single piece; alternatively, the body cylinder 10 and the central tube 50 can be separate structures, meaning the body cylinder 10 is installed and fixed on the central tube 50. The body cylinder 10 can be located at the upper or lower end of the central tube 50, or it can be located on the central flow channel 51 inside the central tube 50. The central tube 50 and the body cylinder 10 are coaxially arranged, and the central flow channel 51 inside the central tube 50 is axially connected to or overlaps with the channel 13 inside the body cylinder 10. The plugging mechanism inside the temporary plugging device 52 can plug the central flow channel 51 inside the central tube 50, thereby achieving temporary plugging of the controllable temporary plugging bridge plug; the unplugging mechanism inside the temporary plugging device 52 can drive the plugging mechanism to change the temporary plugging device 52 from a plugging state to an unplugging state, thereby achieving unplugging of the controllable temporary plugging bridge plug.

[0092] In some embodiments, the unblocking mechanism further includes an electronic control system configured to control the unblocking mechanism to automatically drive the sealing mechanism from the sealing state to the unblocking state, thereby achieving automatic unblocking and eliminating the need for subsequent operations such as pressure testing required for traditional unblocking.

[0093] Furthermore, the unblocking mechanism is completely set in the inner cavity formed by the sealing mechanism and the main body cylinder 10, so that the sealing mechanism can automatically release its sealing state by controlling its own energy release through the electronic control system.

[0094] The specific structure of the temporary plugging device 52 in the controllable temporary plugging bridge plug described in this application will be described below. The controllable temporary plugging of the temporary plugging device 52 can be achieved by using the pre-set expansion unit 30 to break up the rupture disc or by controllable dissolution.

[0095] As shown in Figures 2 to 7, in this embodiment, the sealing mechanism within the temporary plugging device 52 is a fractured disc, and the unblocking mechanism within the temporary plugging device 52 is a pre-installed expansion unit 30 that can break the fractured disc. The controllable temporary plugging bridge plug described in this application adopts a controllable temporary plugging design. By breaking the fractured disc through the pre-installed expansion unit 30, the bridge plug can be unblocked in a controllable manner. This meets both the requirements for long-term and short-term temporary plugging, and unblocking can be achieved without additional subsequent operations, connecting various layers and enabling combined production. This avoids reservoir damage caused by secondary operations, reduces single-well operation costs, enables direct and continuous production, and yields quick results, helping to efficiently tap the potential of oil and gas wells. It is applicable to vertical wells, directional wells, and horizontal wells.

[0096] As shown in Figure 2, in this embodiment, the main body cylinder 10 is a section of circular tube with a central through hole inside. The central through hole forms a channel 13 that connects the upper and lower parts inside the main body cylinder 10. A positioning step is provided on the inner side wall of the channel 13. The positioning step is used to install the rupture disc. The rupture disc is sealed and fixed in the channel 13 inside the main body cylinder 10 by a fixing cylinder and a sealing ring to block the channel 13. The central axis of the rupture disc coincides with the central axis of the main body cylinder 10.

[0097] Specifically, a positioning step is provided on the inner wall of channel 13. The outer diameter of the rupture disc is larger than the inner diameter of the positioning step but smaller than the outer diameter of the positioning step. The first rupture disc 20 is fixedly mounted on the upper surface of the positioning step by the first fixing cylinder 22, and the first sealing ring 15 is disposed between the first fixing cylinder 22 and the first rupture disc 20. The second rupture disc 21 is fixedly mounted on the lower surface of the positioning step by the second fixing cylinder 23, and the second sealing ring 16 is disposed between the second fixing cylinder 23 and the second rupture disc 21. Both the first fixing cylinder 22 and the second fixing cylinder 23 are circular tube structures with a central through hole. Both the first fixing cylinder 22 and the second fixing cylinder 23 are fixed together by external threads connected to the internal threads on the main body cylinder 10.

[0098] Furthermore, the first rupture disc 20, the second rupture disc 21, and the main body cylinder 10 surround and form a sealing chamber 24. The sealing chamber 24 is equipped with a pre-expansion unit 30, and a control system is installed inside the pre-expansion unit 30. The control system can automatically control or time the expansion to break the two rupture discs, thereby unblocking the channel 13 inside the main body cylinder 10.

[0099] Among them, the rupture disc is a spherical disc, with the concave surface of the first rupture disc 20 facing down and the convex surface of the first rupture disc 20 facing up, the concave surface of the second rupture disc 21 facing up and the convex surface of the second rupture disc 21 facing down; and the rupture disc is made of glass or ceramic.

[0100] The pre-installed expansion unit 30 can be a compression spring storage structure, an electrically controlled heated expansion structure, a chemical reaction expansion structure, or an electrically controlled cold expansion structure. The compression spring storage structure releases the spring force of the compression spring 31 through electrical control or other delay mechanisms, and the released driving pin 32 breaks the rupture disc. The electrically controlled heated expansion structure expands solids, liquids, or gases through electrical control, and the high pressure generated by the expansion ruptures the rupture disc, such as by electrically heating (electric heating devices such as electric heaters, induction cookers, etc.) within a confined space. The chemical reaction expansion structure (such as detonators or bombs) releases heat through a chemical reaction through electrical control or other delay mechanisms, and the heated expansion forms a high-pressure explosion that ruptures the rupture disc. The electrically controlled cold expansion structure (such as a refrigerator) cools the liquid through electrical control, causing the liquid volume to expand, and the high pressure generated by the expansion ruptures the rupture disc, which can then be melted by geothermal heat; the liquid can be water.

[0101] As shown in Figure 3, in this embodiment, the fracturing disc is a flat disc (circular disc), and a third sealing ring 17 is provided between the periphery of the fracturing disc and the inner wall of the main body cylinder 10. The other structures in this embodiment are the same as those in the embodiment shown in Figure 2, and will not be described again. The planar design of the fracturing disc results in smaller fragments after fracturing, which can prevent fragments from clogging the downhole passage.

[0102] As shown in Figure 4, in this embodiment, a partition 25 is provided inside the sealing chamber 24, dividing the sealing chamber 24 into two sealing sub-cavities 241. The two sealing sub-cavities 241 correspond to two rupture discs, and each sealing sub-cavity 241 is provided with a pre-set expansion unit 30. The other structures of this embodiment are the same as those of the embodiment shown in Figure 2, and will not be described again. The partition 25 allows the first rupture disc 20 and the second rupture disc 21 to undergo rupture and unblocking operations through a pre-set expansion unit 30, avoiding the problem of one rupture disc being unblocked while the other rupture disc remains unblocked.

[0103] The baffle 25 is made of a soluble material, which can be a soluble metal such as aluminum, magnesium, zinc, indium, aluminum-magnesium alloy, magnesium alloy, zinc alloy, or indium alloy, or a soluble non-metal such as polyurethane. After the ruptured disc is broken and unblocked, the baffle 25 dissolves in the downhole fluid through a chemical reaction, thereby preventing the baffle 25 from affecting the conductivity of the downhole channel.

[0104] As shown in Figure 5, in this embodiment, a partition 25 is provided inside the sealing chamber 24, dividing the sealing chamber 24 into at least two sealing sub-cavities 241. The two sealing sub-cavities 241 correspond to two rupture discs, and each sealing sub-cavity 241 is provided with a pre-installed expansion unit 30. Other structural features of this embodiment are the same as those shown in Figure 3, and will not be described again. The partition 25 ensures that the first rupture disc 20 and the second rupture disc 21 are each ruptured and unblocked through a pre-installed expansion unit 30, avoiding the problem of one rupture disc being unblocked while the other remains unblocked.

[0105] As shown in Figure 6, in this embodiment, the sealing chamber 24 is provided with a first partition 26 and a second partition 27 that are arranged vertically opposite each other. The first partition 26 abuts against the upper surface of the positioning step, and the first rupture disc 20 is located above the first partition 26. A sealing sub-cavity 241 is formed between the first rupture disc 20 and the first partition 26, and a pre-installed expansion unit 30 is provided within the sealing sub-cavity 241. The second partition 27 abuts against the lower surface of the positioning step, and the second rupture disc 21 is located below the second partition 27. A sealing sub-cavity 241 is formed between the second rupture disc 21 and the second partition 27, and a pre-installed expansion unit 30 is also provided within the sealing sub-cavity 241. A power supply chamber 28 is formed between the first rupture disc 20 and the second rupture disc 21. The side wall of the power supply chamber 28 is provided with a long annular groove, and a power supply 14 (usually a sufficient battery) is provided within the long annular groove to supply power to the pre-installed expansion unit 30 for a long period of time, achieving the purpose of long-term control of temporary blockage, such as when temporary blockage control is required for 2-5 years. The other structures in this embodiment are the same as those in the embodiment shown in Figure 2, and will not be described again.

[0106] As shown in Figure 7, in this embodiment, the main body cylinder 10 includes an upper cylinder 11 and a lower cylinder 12 that are threadedly connected. A fourth sealing ring 18 is provided at the mating surface of the upper cylinder 11 and the lower cylinder 12 to improve the sealing effect between the upper cylinder 11 and the lower cylinder 12. A sandwich chamber is formed between the upper cylinder 11 and the lower cylinder 12, and a power supply 14 is provided in the sandwich chamber to supply power to the pre-installed expansion unit 30. The other structures of this embodiment are the same as those of the embodiment described in Figure 2, and will not be described again.

[0107] Furthermore, as shown in Figure 7, the pre-expansion unit 30 in this embodiment is a compression spring storage structure, which includes a spring 31, a striking pin 32, a thermoplastic connecting sleeve 34, and a heating coil 35. Specifically, two sets of springs 31 arranged vertically opposite each other abut against the limiting steps on the side wall of the sealing chamber 24; two striking pins 32 arranged vertically opposite each other pass through the two sets of springs 31, and each striking pin 32 is provided with a limiting plate 33 that abuts against the spring 31. The head ends of the two striking pins 32 face the two rupture plates respectively; the two striking pins 32 compress the two sets of springs 31 respectively through the limiting plate 33, so that the tail ends of the two striking pins 32 are connected through the thermoplastic connecting sleeve 34; the heating coil 35 is provided on the side wall of the sealing chamber 24, and the heating coil 35 is located on the outer periphery of the thermoplastic connecting sleeve 34. The heating coil 35 is used to heat the thermoplastic connecting sleeve 34 to melt it, and the power supply 14 is electrically connected to the heating coil 35 to supply power to the heating coil 35. When unblocking is required, the heating coil 35 heats the thermomelting connecting sleeve 34 to melt it, releasing the two striking pins 32. Under the action of the two sets of springs 31, the two striking pins 32 break the two rupture discs upward and downward respectively, thereby achieving unblocking.

[0108] Optionally, the impact pin 32 is made of a soluble material, such as aluminum, magnesium, zinc, indium, aluminum-magnesium alloy, magnesium alloy, zinc alloy, or indium alloy, or a soluble non-metal such as polyurethane.

[0109] In this embodiment, the unblocking mechanism includes an electrical control system, which is electrically connected to the heating coil 35 and configured to control the heating coil 35 to periodically heat the hot-melt connecting sleeve 34 to periodically release the two sets of springs 31. As shown in Figures 8 and 9, in this embodiment, the sealing mechanism is a metal dissolution disk 40, and the unblocking mechanism is a temporary plugging control unit that can control the dissolution of the metal dissolution disk 40. The temporary plugging control unit has an electrochemical protection structure. The controllable temporary plugging bridge plug described in this application adopts a controllable temporary plugging design. By controlling the dissolution of the metal dissolution disk 40 through metal electrochemical protection, the bridge plug can be unblocked in a controllable manner. It can meet both long-term and short-term temporary plugging requirements, and can achieve unblocking without additional subsequent operations, connecting all layers and achieving joint production. It avoids reservoir damage caused by secondary operations, reduces single-well operation costs, enables direct continuous production, and is quick to take effect, helping oil and gas wells to efficiently tap their potential. It is suitable for vertical wells, directional wells, and horizontal wells.

[0110] As shown in Figure 8, in this embodiment, the temporary plugging control unit includes a cathode protection sleeve 41 and a power supply 14. The metal dissolution disk 40 is a metal disc structure that can block the channel 13 of the main body cylinder 10, and the metal dissolution disk 40 can chemically react with the downhole fluid to dissolve. The cathode protection sleeve 41 is located on the inner wall of the lower end of the main body cylinder 10, and is a section of metal circular tube with a central through hole. The power supply 14 is located inside the main body cylinder 10 and is electrically connected to both the metal dissolution disk 40 and the cathode protection sleeve 41. In the plugging state, the negative terminal of the power supply 14 is electrically connected to the metal dissolution disk 40, and the positive terminal of the power supply 14 is electrically connected to the cathode protection sleeve 41. In the unplugging state, the positive terminal of the power supply 14 is electrically connected to the metal dissolution disk 40, and the negative terminal of the power supply 14 is electrically connected to the cathode protection sleeve 41. When it is necessary to protect the metal dissolution disk 40, the cathode protection sleeve 41, as the anode, is the one that provides electrons to prevent the metal dissolution disk 40 from losing electrons and being corroded. When it is necessary to unblock the metal dissolution disk 40, the positive and negative terminals of the power supply 14 of the cathode protection sleeve 41 and the metal dissolution disk 40 are reversed to make the metal dissolution disk 40 lose electrons and accelerate the chemical dissolution of the metal dissolution disk 40.

[0111] The upper and lower ends of the channel 13 of the main body cylinder 10 are respectively provided with positioning steps. The upper and lower ends of the main body cylinder 10 are respectively provided with a first fixing cylinder 22 and a second fixing cylinder 23. The first fixing cylinder 22 abuts and fixes the metal dissolution disk 40 to the upper positioning step, and the second fixing cylinder 23 abuts and fixes the cathode protection sleeve 41 to the lower positioning step. A fifth sealing ring 43 is provided between the outer periphery of the metal dissolution disk 40 and the inner wall of the main body cylinder 10, and a sixth sealing ring 44 is provided between the first fixing cylinder 22 and the metal dissolution disk 40. Both the first fixing cylinder 22 and the second fixing cylinder 23 are circular tube structures with a central through hole. Both the first fixing cylinder 22 and the second fixing cylinder 23 are fixed together by external threads connected to the internal threads of the main body cylinder 10.

[0112] Furthermore, as shown in Figure 8, the main body cylinder 10 includes an upper cylinder 11 and a lower cylinder 12 that are threadedly connected, with a sandwich chamber formed between the upper cylinder 11 and the lower cylinder 12, and the power supply 14 is located in the sandwich chamber. A fourth sealing ring 18 is provided at the mating surface of the upper cylinder 11 and the lower cylinder 12 to improve the sealing effect between the upper cylinder 11 and the lower cylinder 12.

[0113] The metal melting plate 40 is made of one or more of aluminum, magnesium, zinc, indium, aluminum-magnesium alloy, magnesium alloy, zinc alloy or indium alloy; the cathode protection sleeve 41 is made of high silicon cast iron.

[0114] In this embodiment, the unblocking mechanism includes an electronic control system, which is configured to control the power supply 14 to switch between the positive and negative terminals connected to the metal dissolution plate 40 and the cathode protection sleeve 41 by switching the positive and reverse current applied to the power supply 14.

[0115] As shown in Figure 8, the process of using the controllable temporary plug bridge plug in this embodiment is as follows:

[0116] The metal dissolution plate 40 within the temporary plugging device 52 of the controllable temporary plugging bridge plug is made of soluble metal, and the cathodic protection sleeve 41 is made of high-silicon cast iron. A power supply 14 is electrically connected to both the metal dissolution plate 40 and the cathodic protection sleeve 41. The temporary plugging duration is pre-set at the wellhead or triggered by parameters such as pressure, flow rate, fluid density, or temperature. The controllable temporary plugging bridge plug is then lowered into the well and anchored. When plugging is required (the metal dissolution plate 40 does not dissolve), the positive terminal of the power supply 14 is electrically connected to the cathodic protection sleeve 41, and the negative terminal is electrically connected to the metal dissolution plate 40, providing cathodic protection for the metal dissolution plate 40. When unplugging is required (the metal dissolution plate 40 dissolves), the positive terminal of the power supply 14 is electrically connected to the metal dissolution plate 40, and the negative terminal is electrically connected to the cathodic protection sleeve 41, accelerating the electrochemical dissolution of the metal dissolution plate 40 and achieving unplugging. The above control method involves forcibly applying positive and negative currents to achieve cathodic protection or accelerate dissolution, thereby achieving long-term temporary plugging control. For example, when a forward current is applied, the positive terminal of power supply 14 is electrically connected to the cathode protection sleeve 41, and the negative terminal of power supply 14 is electrically connected to the metal dissolution disk 40; when a reverse current is applied, the positive terminal of power supply 14 is electrically connected to the metal dissolution disk 40, and the negative terminal of power supply 14 is electrically connected to the cathode protection sleeve 41. The electrical control system can automatically switch the forward current to the reverse current through a timing method.

[0117] As shown in Figure 9, in this embodiment, the temporary blocking control unit is a soluble metal block 42. The metal dissolving plate 40 and the soluble metal block 42 are arranged adjacent to each other. The metal activity of the soluble metal block 42 is higher than that of the metal dissolving plate 40, and the dissolution rate of the soluble metal block 42 is greater than that of the metal dissolving plate 40. The soluble metal block 42 dissolves preferentially to protect the metal dissolving plate 40. The duration of temporary blocking can be controlled by increasing or decreasing the number of soluble metal blocks 42. For example, the metal dissolving plate 40 can be made of zinc alloy, and the soluble metal block 42 can be made of aluminum-magnesium alloy.

[0118] The upper and lower ends of the main body cylinder 10 are respectively provided with a first fixing cylinder 22 and a second fixing cylinder 23 to abut and fix the metal melting disk 40 and the soluble metal block 42. The first fixing cylinder 22 abuts against the upper end face of the metal melting disk 40, and the second fixing cylinder 23 abuts against the lower end face of the soluble metal block 42. A fifth sealing ring 43 is provided between the outer periphery of the metal melting disk 40 and the inner side wall of the main body cylinder 10, and a sixth sealing ring 44 is provided between the first fixing cylinder 22 and the metal melting disk 40. Both the first fixing cylinder 22 and the second fixing cylinder 23 are circular tube structures with a central through hole, and both the first fixing cylinder 22 and the second fixing cylinder 23 are fixed together by external threads connected to the internal threads of the main body cylinder 10.

[0119] The metal dissolving disk 40 and the soluble metal block 42 are made of aluminum, magnesium, zinc, indium, aluminum-magnesium alloy, magnesium alloy, zinc alloy or indium alloy, and the metal activity of the soluble metal block 42 is higher than that of the metal dissolving disk 40. The soluble metal block 42 preferentially undergoes electrochemical corrosion dissolution downhole.

[0120] As shown in Figure 9, the process of using the controllable temporary plug bridge plug in this embodiment is as follows:

[0121] The metal dissolution plate 40 and soluble metal block 42 within the temporary plugging device 52 of the controllable temporary plugging bridge plug are both made of soluble metal. The soluble metal block 42 preferentially undergoes electrochemical corrosion dissolution downhole to protect the metal dissolution plate 40. The mass of the soluble metal block 42 is pre-set at the wellhead according to the plugging duration. Then, the controllable temporary plugging bridge plug is lowered into the well and anchored. Once the soluble metal block 42 is completely dissolved, the metal dissolution plate 40 begins to dissolve. By adjusting and optimizing the mass and shape of the soluble metal block 42, the metal dissolution plate 40 can be protected from dissolution for a predetermined time, achieving long-term control. This control method is a sacrificial anode protection method, ultimately achieving complete dissolution and unblocking.

[0122] Implementation Method Two:

[0123] This application also provides a controllable temporary plugging packer, as shown in Figure 10, which includes a packer central tube 70, a rubber sleeve sealing assembly 71, and a temporary plugging device 52. The packer central tube 70 has a central flow channel; the rubber sleeve sealing assembly 71 is fitted around the outer periphery of the packer central tube 70; the temporary plugging device 52 is connected to the upper or lower part of the packer central tube 70, or is built into the central flow channel. The temporary plugging device 52 includes a body cylinder 10 and a plugging mechanism; the body cylinder 10 has a vertically connected channel 13, and the body cylinder 10 is fixedly connected to the packer central tube 70; the plugging mechanism is installed in the body cylinder 10 to plug the channel 13, so that the temporary plugging device 52 is in a plugged state. The plugging mechanism can be activated under the action of external force (high pressure fluid, etc.) to change the temporary plugging device 52 from a plugged state to an unplugged state.

[0124] Its advantage lies in that, especially for differential pressure expansion packers, there is no need to connect a small-diameter throttling nozzle to the lower end of the packer string. The pressure can be directly controlled to not exceed the unblocking pressure of the temporary plugging device 52, so that the rubber sleeve can expand and seal the packer. When unblocking is required, the pressure is controlled to exceed the unblocking pressure of the temporary plugging device 52, so that it changes from the sealing state to the unblocking state. This can facilitate both sealing and unblocking.

[0125] Furthermore, the temporary blocking device 52 also includes a deblocking mechanism with a structure different from the blocking mechanism. The deblocking mechanism is installed inside the main body cylinder 10 and is used to control the action of the blocking mechanism so that the temporary blocking device 52 changes from the blocking state to the deblocking state.

[0126] The body cylinder 10 of the temporary plugging device 52 can be an integral structure with the packer central tube 70, meaning the packer central tube 70 and the body cylinder 10 can be manufactured as a single piece; alternatively, the body cylinder 10 and the packer central tube 70 can be separate structures, meaning the body cylinder 10 is installed and fixed on the packer central tube 70. The body cylinder 10 can be located at the upper or lower end of the packer central tube 70, or it can be located on the central flow channel inside the packer central tube 70. The packer central tube 70 and the body cylinder 10 are coaxially arranged, and the central flow channel inside the packer central tube 70 is axially connected to or coincides with the channel 13 inside the body cylinder 10. The blocking mechanism inside the temporary blocking device 52 can block the central flow channel inside the packer central tube 70, thereby achieving temporary blocking of the controllable temporary blocking packer; the unblocking mechanism inside the temporary blocking device 52 can drive the blocking mechanism to change the temporary blocking device 52 from the blocking state to the unblocking state, thereby achieving unblocking of the controllable temporary blocking packer.

[0127] As shown in Figures 2 to 9, the controllable temporary plugging of the temporary plugging device 52 can be achieved by using the pre-installed expansion unit 30 to break up the rupture disc or by controllable dissolution. In other words, the structure of the temporary plugging device 52 installed in the controllable temporary plugging packer is the same as the structure of the temporary plugging device 52 installed in the controllable temporary plugging bridge plug in Embodiment 1; the specific structure and technical effects will not be described in detail here.

[0128] The controllable temporary plugging packer described in this application differs from conventional packers. Conventional packers are used to seal the annulus, while the temporary plugging packer of this application can seal the annulus and also temporarily plug the packer's central tube. This allows for both temporary sealing of the layer and stratified oil and gas production, as well as stratified reinjection of gas and water, demonstrating significant advantages.

[0129] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of this application. It should be understood that the above descriptions are merely specific embodiments of this application and are not intended to limit the scope of protection of this application. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of protection of this application.

Claims

1. A controllable temporary plugging bridge plug, wherein, include: A central tube (50) having a central flow channel (51) inside; Temporary plugging device (52), which is connected to the upper or lower part of the central tube (50) or built into the central flow channel (51); The temporary blocking device (52) includes: The main body cylinder (10) has a channel (13) that connects the upper and lower parts, and the main body cylinder (10) is fixedly connected to the central tube (50); A blocking mechanism is installed inside the main body cylinder (10) to block the channel (13), so that the temporary blocking device (52) is in a blocked state; The unblocking mechanism is installed inside the main body cylinder (10). The unblocking mechanism is used to control the action of the blocking mechanism so that the temporary blocking device (52) changes from the blocking state to the unblocking state.

2. The controllable temporary plug bridge plug according to claim 1, wherein, The unblocking mechanism also includes an electronic control system configured to control the unblocking mechanism to automatically drive the blocking mechanism to change from the blocking state to the unblocking state.

3. The controllable temporary plugging bridge plug according to claim 1 or 2, wherein, The unblocking mechanism is completely set in the inner cavity formed by the sealing mechanism and the main body cylinder (10), so that the sealing mechanism can automatically release its sealing state by controlling its own energy release through the electronic control system.

4. The controllable temporary plugging bridge plug according to any one of claims 1 to 3, wherein, The controllable temporary plugging bridge plug also includes: A rubber sleeve (60) is fitted onto the central tube (50) and is used to radially position the controllable temporary plug bridge plug under compression. A cone-shaped assembly is fitted onto the central tube (50) and located on both sides of the rubber cylinder (60). The cone-shaped assembly is used to apply relative compressive force to the rubber cylinder (60) along the axial direction of the central tube (50). The slip assembly is fitted onto the central tube (50) and located on both sides of the vertebral assembly opposite to the rubber cylinder (60). The slip assembly is used to axially position the bridge plug and to drive the vertebral assembly to move toward the rubber cylinder (60). A push ring assembly, fitted onto the central tube (50) and located on the side of the slip assembly opposite to the vertebral body assembly, is used to drive the slip assembly toward the vertebral body assembly after receiving a sealing force.

5. The controllable temporary plugging bridge plug according to any one of claims 1 to 4, wherein, The sealing mechanism is a rupture disc, and the unblocking mechanism is a pre-set expansion unit (30) that can break the rupture disc; the rupture disc is fixed inside the main body cylinder (10) by a fixing cylinder, and the pre-set expansion unit (30) is a compression spring storage structure, an electrically controlled heated expansion structure, a chemical reaction expansion structure, or an electrically controlled cold expansion structure.

6. The controllable temporary plugging bridge plug according to claim 5, wherein, The number of rupture discs is at least two, and the plurality of rupture discs are arranged in the channel (13) to form a sealing chamber (24), and the pre-installed expansion unit (30) is disposed in the sealing chamber (24).

7. The controllable temporary plugging bridge plug according to claim 6, wherein, The rupture disc includes a first rupture disc (20) and a second rupture disc (21) arranged opposite each other. The upper and lower ends of the channel (13) are respectively provided with positioning steps. The upper and lower ends of the body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the first rupture disc (20) and the second rupture disc (21) on the positioning steps.

8. The controllable temporary plugging bridge plug according to claim 6, wherein, The sealing chamber (24) is provided with at least one partition (25), which divides the sealing chamber (24) into at least two sealing sub-chambers (241). The two sealing sub-chambers (241) correspond to the two rupture discs respectively, and each sealing sub-chamber (241) is provided with the pre-installed expansion unit (30).

9. The controllable temporary plugging bridge plug according to claim 8, wherein, The partition (25) includes a first partition (26) and a second partition (27) arranged opposite to each other, and a power supply chamber (28) for storing power (14) is formed between the first partition (26) and the second partition (27).

10. The controllable temporary plugging bridge plug according to claim 6, wherein, The compression spring energy storage structure includes: Two sets of springs (31) are arranged opposite each other, and the springs (31) abut against the limiting step on the side wall of the sealing chamber (24); Two impact pins (32) are arranged opposite each other, and the two impact pins (32) are respectively inserted into the two sets of springs (31). The impact pins (32) are provided with limiting discs (33) that abut against the springs (31). The head ends of the two impact pins (32) are respectively facing the two breaking discs. The two impact pins (32) are connected by the heat-melt connecting sleeve (34) through the limiting plate (33) to compress the two sets of springs (31) respectively. A heating coil (35) for heating the heat-fusion connecting sleeve (34) is provided on the side wall of the sealing chamber (24) and located on the outer periphery of the heat-fusion connecting sleeve (34); Preferably, the unblocking mechanism includes an electronic control system that is electrically connected to the heating coil (35) and configured to control the heating coil (35) to periodically heat the thermoplastic connecting sleeve (34) to periodically release the two sets of springs (31).

11. The controllable temporary plugging bridge plug according to any one of claims 1 to 4, wherein, The sealing mechanism is a metal dissolution disk (40), and the unblocking mechanism is a temporary blocking control unit that can control the dissolution of the metal dissolution disk (40).

12. The controllable temporary plugging bridge plug according to claim 11, wherein, The temporary blocking control unit includes: A cathode protection sleeve (41) is provided on the inner wall of the main body cylinder (10); A power supply (14) is located inside the main body cylinder (10), and the power supply (14) is electrically connected to the metal melting plate (40) and the cathode protection sleeve (41) respectively; In the blocked state, the negative terminal of the power supply (14) is electrically connected to the metal dissolution disk (40), and the positive terminal of the power supply (14) is electrically connected to the cathode protection sleeve (41). In the unblocked state, the positive terminal of the power supply (14) is electrically connected to the metal dissolution disk (40), and the negative terminal of the power supply (14) is electrically connected to the cathode protection sleeve (41). Preferably, the unblocking mechanism includes an electronic control system configured to control the power supply (14) to switch between the positive and negative terminals connected to the metal dissolution plate (40) and the cathode protection sleeve (41) by switching the positive and reverse current applied to the power supply (14).

13. The controllable temporary plugging bridge plug according to claim 12, wherein, The upper and lower ends of the channel (13) are respectively provided with positioning steps, and the upper and lower ends of the main body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the metal melting plate (40) and the cathode protection sleeve (41) on the positioning steps respectively.

14. The controllable temporary plugging bridge plug according to claim 11, wherein, The temporary blocking control unit is a soluble metal block (42). The metal dissolving plate (40) and the soluble metal block (42) are arranged adjacent to each other. The metal activity of the soluble metal block (42) is higher than that of the metal dissolving plate (40). The dissolution rate of the soluble metal block (42) is greater than that of the metal dissolving plate (40).

15. The controllable temporary plug bridge plug according to claim 14, wherein, The upper and lower ends of the main body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the metal melting plate (40) and the soluble metal block (42) together.

16. A controllable temporary plugging packer, wherein, include: Packer center tube (70), wherein the packer center tube (70) has a central flow channel; A rubber sleeve sealing assembly (71) is fitted around the outer periphery of the packer center tube (70); Temporary plugging device (52), the temporary plugging device (52) is connected to the upper or lower part of the packer central tube (70) or built into the central flow channel; The temporary blocking device (52) includes: The main body tube (10) has a channel (13) that connects the upper and lower parts inside the main body tube (10), and the main body tube (10) is fixedly connected to the central tube (70) of the packer; A blocking mechanism is installed inside the main body cylinder (10) to block the channel (13), so that the temporary blocking device (52) is in a blocked state; The unblocking mechanism is installed inside the main body cylinder (10). The unblocking mechanism is used to control the action of the blocking mechanism so that the temporary blocking device (52) changes from the blocking state to the unblocking state.

17. The controllable temporary plugging packer according to claim 16, wherein, The unblocking mechanism also includes an electronic control system configured to control the unblocking mechanism to automatically drive the blocking mechanism to change from the blocking state to the unblocking state.

18. The controllable temporary plugging packer according to claim 16 or 17, wherein, The unblocking mechanism is completely set in the inner cavity formed by the sealing mechanism and the main body cylinder (10), so that the sealing mechanism can automatically release its sealing state by controlling its own energy release through the electronic control system.

19. The controllable temporary plugging packer according to any one of claims 16 to 18, wherein, The sealing mechanism is a rupture disc, and the unblocking mechanism is a pre-set expansion unit (30) that can break the rupture disc; the rupture disc is fixed inside the main body cylinder (10) by a fixing cylinder, and the pre-set expansion unit (30) is a compression spring (31) power storage structure, an electrically controlled heated expansion structure, a chemical reaction expansion structure, or an electrically controlled cold expansion structure.

20. The controllable temporary plugging packer according to claim 19, wherein, The number of rupture discs is at least two, and the plurality of rupture discs are arranged in the channel (13) to form a sealing chamber (24), and the pre-installed expansion unit (30) is disposed in the sealing chamber (24).

21. The controllable temporary plugging packer according to claim 20, wherein, The rupture disc includes a first rupture disc (20) and a second rupture disc (21) arranged opposite each other. The upper and lower ends of the channel (13) are respectively provided with positioning steps. The upper and lower ends of the body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the first rupture disc (20) and the second rupture disc (21) on the positioning steps.

22. The controllable temporary plugging packer according to claim 20, wherein, The sealing chamber (24) is provided with at least one partition (25), which divides the sealing chamber (24) into at least two sealing sub-chambers (241). The two sealing sub-chambers (241) correspond to the two rupture discs respectively, and each sealing sub-chamber (241) is provided with the pre-installed expansion unit (30).

23. The controllable temporary plugging packer according to claim 22, wherein, The partition (25) includes a first partition (26) and a second partition (27) arranged opposite to each other, and a power supply chamber (28) for storing power (14) is formed between the first partition (26) and the second partition (27).

24. The controllable temporary plugging packer according to claim 20, wherein, The compression spring energy storage structure includes: Two sets of springs (31) are arranged opposite each other, and the springs (31) abut against the limiting step on the side wall of the sealing chamber (24); Two impact pins (32) are arranged opposite each other, and the two impact pins (32) are respectively inserted into the two sets of springs (31). The impact pins (32) are provided with limiting discs (33) that abut against the springs (31). The head ends of the two impact pins (32) are respectively facing the two breaking discs. The two impact pins (32) are connected by the heat-melt connecting sleeve (34) through the limiting plate (33) to compress the two sets of springs (31) respectively. A heating coil (35) for heating the heat-fusion connecting sleeve (34) is provided on the side wall of the sealing chamber (24) and located on the outer periphery of the heat-fusion connecting sleeve (34); Preferably, the unblocking mechanism includes an electronic control system that is electrically connected to the heating coil (35) and configured to control the heating coil (35) to periodically heat the thermoplastic connecting sleeve (34) to periodically release the two sets of springs (31).

25. The controllable temporary plugging packer according to any one of claims 16 to 18, wherein, The sealing mechanism is a metal dissolution disk (40), and the unblocking mechanism is a temporary blocking control unit that can control the dissolution of the metal dissolution disk (40).

26. The controllable temporary plugging packer according to claim 25, wherein, The temporary blocking control unit includes: A cathode protection sleeve (41) is provided on the inner wall of the main body cylinder (10); A power supply (14) is located inside the main body cylinder (10), and the power supply (14) is electrically connected to the metal melting plate (40) and the cathode protection sleeve (41) respectively; In the blocked state, the negative terminal of the power supply (14) is electrically connected to the metal dissolution disk (40), and the positive terminal of the power supply (14) is electrically connected to the cathode protection sleeve (41). In the unblocked state, the positive terminal of the power supply (14) is electrically connected to the metal dissolution disk (40), and the negative terminal of the power supply (14) is electrically connected to the cathode protection sleeve (41). Preferably, the unblocking mechanism includes an electronic control system configured to control the power supply (14) to switch between the positive and negative terminals connected to the metal dissolution plate (40) and the cathode protection sleeve (41) by applying a positive or reverse current to the power supply (14).

27. The controllable temporary plugging packer according to claim 26, wherein, The upper and lower ends of the channel (13) are respectively provided with positioning steps, and the upper and lower ends of the main body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the metal melting plate (40) and the cathode protection sleeve (41) on the positioning steps respectively.

28. The controllable temporary plugging packer according to claim 25, wherein, The temporary blocking control unit is a soluble metal block (42). The metal dissolving plate (40) and the soluble metal block (42) are arranged adjacent to each other. The metal activity of the soluble metal block (42) is higher than that of the metal dissolving plate (40). The dissolution rate of the soluble metal block (42) is greater than that of the metal dissolving plate (40).

29. The controllable temporary plugging packer according to claim 28, wherein, The upper and lower ends of the main body cylinder (10) are respectively provided with a first fixing cylinder (22) and a second fixing cylinder (23) to abut and fix the metal melting plate (40) and the soluble metal block (42) together.