Mechanism for updating transmission scheduling
By enabling user devices to proactively request updated transmission scheduling through layer 1 or layer 2 signaling, the mechanism addresses the challenges of dynamic XR traffic, reducing overhead and latency, and enhancing user experience.
Patent Information
- Application Number
- PCT/EP2026/063082
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2026-05-06
- Publication Date
- 2026-11-12
AI Technical Summary
Current communication standards face challenges in managing dynamic aspects of XR traffic, such as variable video resolutions and frame rates, leading to increased signaling overhead and latency when reconfiguring transmission schedules, which disrupts the user experience.
Implementing a mechanism where the user device proactively determines and requests updated transmission scheduling configurations using layer 1 or layer 2 signaling, reducing the need for RRC reconfiguration and enabling faster adjustments based on prior knowledge of traffic characteristics.
This approach reduces signaling overhead and latency, enhances flexibility in transmission scheduling, and improves user experience by allowing quicker adaptations to changing network conditions.
Smart Images

Figure EP2026063082_12112026_PF_FP_ABST
Abstract
Description
[0001] MECHANISM FOR UPDATING TRANSMISSION SCHEDULING
[0002] DESCRIPTION BACKGROUND
[0003] Examples of embodiments described herein relate to apparatuses, methods, systems, computer programs, computer program products and (non-transitory) computer-readable media usable for controlling an update of transmission scheduling between a communication element representing a user device and a communication network. Specifically, examples of embodiments described herein relate to apparatuses, methods, systems, computer programs, computer program products and (non-transitory) computer-readable media usable for controlling an update of a configuration of a scheduling of uplink or downlink transmissions.
[0004] The following description of background may include insights, discoveries, understandings or disclosures, or associations, together with disclosures that are not already known, but rather provided herein by the disclosure as one or more examples of embodiments. Some of examples of embodiments may be specifically pointed out below, whereas other of such contributions will be apparent from the related context.
[0005] SUMMARY
[0006] According to some aspects, there is provided the subject matter of the independent claims. Some further aspects are defined in the dependent claims.
[0007] BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Some examples of disclosure related to embodiments are described below, byway of example only, with reference to the accompanying drawings, in which:
[0009] Fig. 1 shows a diagram illustrating a communication network part where an update control processing as an example of embodiments is implementable;
[0010] Fig. 2 shows a signaling diagram illustrating an example of a processing according to an example of embodiments;
[0011] Fig. 3 shows a signaling diagram illustrating another example of a processing according to an example of embodiments;
[0012] Fig. 4 shows a diagram illustrating an example for different settings for a parent configuration and a child configuration usable in examples of embodiments;Fig. 5 shows a diagram illustrating an example for different settings for a parent configuration and a child configuration usable in examples of embodiments;
[0013] Fig. 6 shows a diagram illustrating an example for different settings for a parent configuration and a child configuration usable in examples of embodiments;
[0014] Fig. 7 shows a diagram illustrating an example for a content of an update request usable in examples of embodiments;
[0015] Fig. 8 shows a diagram illustrating an example for a content of an update request usable in examples of embodiments;
[0016] Fig. 9 shows a flow chart of a processing conducted in a communication element like a user device conducting a processing according to some examples of embodiments;
[0017] Fig. 10 shows a flow chart of a processing conducted in a communication network control element or communication network control function conducting a processing according to some examples of embodiments;
[0018] Fig. 11 shows a flow chart of a processing conducted in a communication element like a user device conducting a processing according to some examples of embodiments;
[0019] Fig. 12 shows a flow chart of a processing conducted in a communication network control element or communication network control function conducting a processing according to some examples of embodiments;
[0020] Fig. 13 shows a diagram of a user device according to some examples of embodiments; and Fig. 14 shows a diagram of a communication network control element according to some examples of embodiments
[0021] DETAILED DESCRIPTION
[0022] Current and new communication standards, such as 3GPP (3rdGeneration Partnership Project) based 5G (5thgeneration) and 6G (6thgeneration) based communication networks, provide improved techniques allowing, for example, high bit rates and low latency, combined with high reliability.
[0023] The combination of high bit rates and low latency required by enhances services, such as loT (Internet of Things) or extended Reality (XR) services, poses new challenges to wireless access.
[0024] XR refers to all real-and-virtual combined environments and human-machine interactions generated by computer technology and wearables. XR is an umbrella term for different types of realities: Virtual reality (VR), which aims at giving the user the feeling of being physically and spatially there, Augmented Reality (AR), which provides a user with additional content overlaid upon their environment, and Mixed Reality (MR), which is an advanced form of AR where some virtual elementsare inserted and can be interacted with. In all cases, XR content is generated by XR engines, which typically include a rendering engine for graphics, an audio engine for sound, and a physics engine for emulating the laws of physics.
[0025] Using XR as an example for explaining requirements for enhanced services, it is a common understanding thatXR traffic can be with many dynamic aspects. Dynamic aspects in XR traffic can refer to the variability in system performance and user experience, particularly in how XR applications adapt to changing network conditions and user interactions. This includes the ability to handle for example multiple video resolutions and frame rates based on real-time requirements and user preferences. In addition, XR services support a range of video resolutions, from lower resolutions (e.g., 240p) to high-definition formats (e.g., 1080p). The ability to dynamically adjust video resolution is crucial for maintaining quality while optimizing bandwidth usage. Another critical parameter is the frame rate (typically ranging from 15 to 120 frames per second) which can influence the smoothness and responsiveness of the experience. The ability to modify the frame rate in real-time is essential for ensuring a seamless user experience, especially in interactive XR environments. In short, XR traffic characteristics are heavily influenced by dynamic aspects such as video resolution and frame rate, which must be managed effectively to ensure a high-quality user experience.
[0026] Scheduling of data transmissions is an important part of mobile networks, with the performance of a network’s data throughput depending on corresponding scheduling algorithms. For example, in 3GPP based networks, a data scheduler exists in base stations (such as gNB), at the MAC (Medium Access Control) layer. It coordinates the data transmissions on both UL (uplink) and DL (downlink) legs for all UEs (user equipments) within its cell range. The scheduler allocates physical layer resources separately for the downlink and for the uplink.
[0027] Configured Scheduling is a mechanism in which gNB can schedule PDSCH (Physical Downlink Shared Channel) or PUSCH (Physical Uplink Shared Channel) without using DCI (Downlink control information) for every transmission. For UL, CG (configured grant) is used, while for DL, SPS (semi persistent scheduling) is used.
[0028] Configured scheduling, such as CG, has been specified since the very first release of 5G NR (New Radio). For CG based scheduling, the UL resource is configured in a periodic manner and the relevant parameters are configured via RRC (Radio Resource Control) message. The actual uplink grant may become activated either via RRC message (for typel ) or via the PDCCH (Physical Downlink Control Channel), addressed to CS-RNTI (configured scheduling radio network temporary identifier) (type2).
[0029] Some of the main characteristics of NR UL CG are:- UL radio resources for sending one transport block with a regular time-periodicity is configured for a UE;
[0030] - The periodicities are: 2, 7, n*14 symbols, where the range for n depends on configured SCS (subcarrier spacing);
[0031] - Up to 12 configured grant configurations per BWP (bandwidth part) (configured through RRC signaling);
[0032] - One or multiple CG PUSCH transmission occasions can be configured in a CG period; - UTO-UCI (Unused Transmission Occasion-Uplink Control Information) is specified to enable UE to report unused UL CG PUSCH occasions.
[0033] The basic CG features has been specified in the first release of 5G NR. Further enhancements were introduced in Rel-16, for example, multiple CG configurations per UE in order to support different services or applications with different QoS requirements. Enhanced configured grant has been specified in Rel-18 to efficiently support XR traffic. Here, two key features were specified, i.e. that multiple CG PUSCH transmission occasions are provided within one CG period, i.e. single CG configuration with multiple PUSCH occasions per CG period was agreed, and that a dynamic indication of unused transmission occasions (UTO) via UTO-UCI is possible, which refers to the UCI that provides information about unused CG PUSCH transmission occasions.
[0034] As discussed above, communication traffic for services as indicated above, such as XR traffic, which is most likely periodic traffic, can be scheduled with UL CG or DL SPS, as already specified in 3GPP. However, as indicated, due the dynamic nature of the XR traffic or other applications with similar properties, with the current specification, one UE may have to be configured with multiple CG configurations and each individual CG configuration corresponds to one type of traffic characteristics. Whenever there is a change with the traffic due to different reasons, following the current procedure, the network has to reconfigure the CG resources or switch among different CG configurations according to the updated application characteristics / parameters. Following current specification, such switching will include the steps of RRC reconfiguration (for Type 1 CG) or DCI signaling (one for release the activated CG configuration and the other one for activating the new CG configuration for Type 2 CG) which results in increased signaling overhead. As a consequence, latency is also expected before activating the new CG configuration which could lead to disruption of the ongoing XR traffic Another aspect which is not considered in the current NR is prior knowledge of the traffic at UE side, especially the dynamic aspects. For example, once the traffic characteristics changed, it is not possible for the UE to initiate CG configuration updates / switching.
[0035] In order to deal with the above described issues, instead of defining, for example, multiple configurations and then using RRC or DCI to activate one of them, an initial configuration, also referredto as parent configuration, for transmission scheduling is defined, wherein in addition rules are specified on how to derive another configuration for transmission scheduling, also referred to as child configuration, from the parent configuration. For signaling corresponding messages and / or parameters, layer 1 or layer 2 signaling, such as MAC CE (MAC control element), is usable, by means of which required parameters for generating and implementing a new configuration on both the network side and the UE side can be transmitted.
[0036] Due to this, it is possible to reduce signaling overhead, such as to reduce RRC message size. Moreover, flexibility in transmission scheduling settings can be achieved, which increases reliability, compared to, for example, DCI based solutions. In addition, a faster response time regarding changed conditions is achievable, by a faster change of transmission scheduling configurations, such as CG configuration.
[0037] Moreover, it is possible that the UE, based on its prior knowledge of the traffic to be scheduled, such as UL traffic, can proactively initiate a request to update the CG configuration to a new child configuration, which is not possible with current standards. Similarly, for DL traffic using SPS, the UE can request at the network, i.e. the gNB, to change the SPS configuration, for example when due to some internal trigger such as overheating a processing capability is temporarily reduced. That is, the UE is triggered to transmit a request for a transmission scheduling (e.g. CG) configuration update (together with determined parameter(s) for the transmission scheduling) based on configured conditions / rules. Hence, as a result, an improved user experience can be achieved since the UE is able to initiate a transmission scheduling configuration update based on changes at UE side (such traffic characteristics). Moreover, the possibility to use layer 1 or layer 2 signaling (e.g. MAC CE) for the update process leads to reduced signaling overhead
[0038] It is to be noted that in the following, as an example for a transmission scheduling scenario, CG is considered. However, the principles described below are applicable to other transmission scheduling scenarios, such as SPS.
[0039] In the following, different examples of embodiments will be described for illustrating several examples for processing applicable in the above indicated situations. It is to be noted that the following examples and embodiments are to be understood only as illustrative examples. Although the text herein may refer to “an”, “one”, or “some” example(s) or embodiment(s) in several locations, this does not necessarily mean that each such reference is related to the same example(s) or embodiment(s), or that the feature only applies to a single example or embodiment. Single features of different embodiments may also be combined to provide other embodiments. Furthermore, terms like “comprising” and “including” should be understood as not limiting the described embodiments toconsist of only those features that have been mentioned; such examples and embodiments may also comprise features, structures, units, modules etc., that have not been specifically mentioned.
[0040] The general functions and interconnections of described elements and functions, which also depend on the system type, are understood by those skilled in the art and described in corresponding specifications so that a detailed description thereof may be omitted herein. However, it is to be noted that several additional elements and / or signaling links may be employed for a data exchange between involved elements, functions or applications, like a communication device or user device, also referred to as an UE, a communication network control element or communication network control function, such as a base station or gNB, and other elements besides those described in detail herein below.
[0041] A system architecture as being considered in examples of embodiments may also be able to support the usage of cloud services for virtual network elements or functions thereof, wherein it is to be noted that the virtual system part can also be provided by non-cloud resources, e.g. an internal network or the like. Generally, a system element, or node, can be implemented either as a network element on a dedicated hardware, as a software instance running on a dedicated hardware, or as a virtualized function instantiated on an appropriate platform, e.g., a cloud infrastructure.
[0042] Furthermore, a network element or network function, such as network node acting as a communication network control element or communication network control function, like a gNB, or a user equipment (UE), as described herein, may be implemented by software, e.g. by a computer program product for a computer, and / or by hardware. For executing their respective processing, correspondingly used devices, nodes, functions or system elements may include several means, modules, units, components, etc. (not shown) which are utilized for control of processing and / or signaling functionality. Such means, modules, units and components may include, for example, one or more processors or processor units including one or more processing portions for executing instructions and / or programs and / or for processing data, storage or memory units or means for storing instructions, programs and / or data, for serving as a work area of the processor or processing portion and the like (e.g. read only memory (ROM), random access memory (RAM), electrically erasable programmable read only memory (EEPROM), and the like), input or interface means for inputting data and instructions by software (e.g. floppy disc, compact disc ROM (CD-ROM), EEPROM, and the like), a user interface for providing monitor and manipulation possibilities to a user (e.g. a screen, a keyboard and the like), other interface or means for establishing links and / or connections under the control of the processor unit or portion (e.g. wired and wireless interface means, radio interface means including e.g. an antenna unit or the like, means for forming a radio communication part etc.) and the like, wherein respective means forming an interface, such as a radio communication part, can be also located on a remote site (e.g. a radio head or a radio station etc.). It is to be noted herein thatprocessing portions should not be only considered to represent physical portions of one or more processors, but may also be considered as a logical division of the referred processing tasks performed by one or more processors.
[0043] As used in this application, the term “circuitry” may refer to one or more or all of the following:
[0044] (a) hardware-only circuit implementations (such as implementations in only analog and / or digital circuitry) and
[0045] (b) combinations of hardware circuits and software, such as (as applicable):
[0046] (i) a combination of analog and / or digital hardware circuit(s) with software / firmware and
[0047] (ii) any portions of hardware processor(s) with software (including digital signal processor(s)), software, and memory(ies) that work together to cause an apparatus, such as a device acting as a node, to perform various functions) and hardware circuit(s) and or processor(s), such as a microprocessor(s) or a portion of a microprocessor(s), that requires software (e.g., firmware) for operation, but the software may not be present when it is not needed for operation. This definition of circuitry applies to all uses of this term in this application, including in any claims. As a further example, as used herein, the term circuitry also covers an implementation of merely a hardware circuit or processor (or multiple processors) or portion of a hardware circuit or processor and its (or their) accompanying software and / or firmware. The term circuitry also covers, for example and if applicable to the particular claim element, a baseband integrated circuit or processor integrated circuit for a system element or node or a similar integrated circuit in server, a communication network device, or other computing or network device.
[0048] Furthermore, as used herein, “at least one of the following:” and “at least one of ” and similar wording, where the list of two or more elements are joined by “and” or “or”, mean at least any one of the elements, or at least any two or more of the elements, or at least all the elements.
[0049] Fig. 1 shows a diagram illustrating an example of a (simplified) system architecture of a communication network based on 3GPP in which examples of the disclosure are implementable. It is to be noted that the example architecture in Fig. 1 shows those parts of a complete network architecture which are useful for understanding principles of embodiments of the disclosure, while other elements and interfaces are omitted in the illustration. Specifically, Fig. 1 shows a 3GPP 5G or 6G based network in which a UE can conduct a communication with one or more communication network control elements or functions, such as a gNB.
[0050] As shown in Fig. 1, the 5G network comprises, amongst others, the following elements or functions. A communication element or communication function, such as a UE 10, is connected to aRAN (Radio Access Network) or access network represented by a gNB 20. The UE 10 may, for example, be implemented by any device or function used directly by an end-user to communicate, such as a handheld phone, laptop, and so forth.
[0051] The gNB 20 provides a radio technology that allows access to the core network (CN) 30, and represents a base station using a NR radio access technology and / or an evolved LTE base station, or a general base station including e.g. non-3GPP access, e.g., Wi-Fi or an access network termination. The CN 30 comprises, for example, various network functions, which are omitted here for the sake of simplicity.
[0052] According to a first aspect, there is provided the subject matter of: determining, at the UE side, based on a trigger event, that a request for an updated configuration of a scheduling of transmissions between the user device and a communication network is triggered, determining, on the UE side, a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling, and transmitting, on the UE side, to the communication network (e.g. the gNB or another suitable element or application in the communication network), the request for the updated configuration including an indication of the plurality of parameter sets. The first aspect may be implemented in algorithm(s), encoded in a distribution medium or computer program product(s), and as method(s) performed by apparatus(es). An apparatus may comprise means for causing the apparatus at least to perform the method(s). The means may comprise at least one processor; and at least one memory storing algorithm as instructions that, when executed by the at least one processor, cause the apparatus at least to perform the method (s).
[0053] The first aspect may include any single feature or any combination of features from:
[0054] - receiving, from the communication network (e.g. the gNB or another suitable element or application in the communication network), a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted (or, optionally, not accepted), and an indication of a selected parameter set of the plurality of parameter sets, and update of the configuration of the scheduling using the at least one parameter or a selected value of the value range for at least one parameter included in the selected parameter set based on the request for the updated configuration being accepted;
[0055] - the scheduling of transmissions between the user device and the communication network may be related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication;
[0056] - at least one of the request for the updated configuration and a response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling (e.g. a MAC CE);- including, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update;
[0057] - the trigger event may be related to at least one of a communication condition or a status condition of the apparatus;
[0058] - the trigger event may be based on at least one of:
[0059] a determination that a communication condition or the status condition of the apparatus is in accordance with a condition indicated in configuration data being set in the apparatus and providing trigger options, wherein the configuration data comprising at least one of data being preset in the apparatus or data being obtained from the control element or control function of the communication network,
[0060] a determination considering assistance information related to a communication condition or a status condition of the apparatus, wherein information elements and ranges of values for each information element to be used for the determination of the trigger event are preset or obtained from the control element or control function of the communication network, or
[0061] a determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the apparatus;
[0062] - the communication condition may include at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements, and the status condition of the apparatus includes at least one of a battery usage amount, a heating condition, an available processing power;
[0063] - the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling may be related to at least one of the number of transmission occasions over a shared channel in a scheduling period, or a periodicity of transmissions;
[0064] - determining the at least one parameter or the value range for at least one parameter for the update of the configuration of the scheduling on the basis of at least one of traffic characteristics or a change of traffic characteristics of the transmission, apparatus characteristics or a change of apparatus characteristics, and assistance information;
[0065] - there may be, configured by the communication network, an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update, wherein in case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration;- the request for the updated configuration including an indication of the at least one determined parameter may be transmitted to a control element or control function of the communication network, a response to the request may be received from the control element or control function of the communication network, and the initially valid configuration of the scheduling of transmissions may be configured, by the control element or control function of the communication network.
[0066] According to a second aspect, there is provided the subject matter of: receiving, in a communication network, from a user device, a request for an updated configuration including an indication of a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the user device and the communication network, processing, in the communication network, the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter, and sending, from the communication network to the user device, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted or not accepted, and an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set. The second aspect may be implemented in algorithm(s), encoded in a distribution medium or computer program product(s), and as method(s) performed by apparatus(es). An apparatus may comprise means for causing the apparatus at least to perform the method(s). The means may comprise at least one processor; and at least one memory storing algorithm as instructions that, when executed by the at least one processor, cause the apparatus at least to perform the method(s).
[0067] The second aspect may include any single feature or any combination of features from: - updating, in case the request for the updated configuration is accepted, the configuration of the scheduling using the selected parameter set or the selected value of the value range for the at least one parameter based on the request for the updated configuration being accepted;
[0068] - the scheduling of transmissions between the user device and the communication network may be related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication;
[0069] - at least one of the request for the updated configuration and the response to the request for the updated configuration may be transmitted by using a layer 1 or layer 2 signaling;- determining, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update, and using the identifier in the processing of the request for the updated configuration;
[0070] - configuring the user device with configuration data related to at least one of a communication condition or a status condition of the user device and indicating a trigger event for triggering the request for the updated configuration;
[0071] - the trigger event may be based on at least one of
[0072] a determination that a communication condition or a status condition of the user device is in accordance with a condition indicated in the configuration data being set in the apparatus and providing trigger options, or
[0073] assistance information related to a communication condition or a status condition of the user device for a trigger event, wherein information elements and ranges of values for each information element to be used for the determination of the trigger event are indicated, or
[0074] a confidence value to be used for a trigger event based on a prediction model predicting at least one of a communication condition or a status condition of the user device; - the communication condition may include at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements, and the status condition of the user device includes at least one of a battery usage amount, a heating condition, an available processing power;
[0075] - the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling may be related to at least one of the number of transmission occasions over a shared channel in a scheduling period, or a periodicity of transmissions;
[0076] - configuring the user device with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update, wherein in case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration;
[0077] - obtaining, from a core network element or core network function of the communication network, information related to traffic characteristics of the communication of the user device, and using the obtained information for defining settings for the parent configuration and the child configuration;
[0078] - the above processing may be conducted by a control element or control function of the communication network.In the following, with reference to Fig. 2, which shows a signaling diagram illustrating an example of a processing according to an example of embodiments, an example of a first embodiment is described. In this example, the transmission scheduling is represented by CG. In the present embodiment, an indication or pointer to a specified child CG configuration (i.e. to determine and request a specific child configuration) is communicated via a CG configuration update request to the network. In S200, a configuration processing of the UE with at least one initial (parent) CG configuration setting is conducted. In this connection, according to examples of embodiments, the UE is also configured with triggers (conditions) and relevant parameters for sending a CG configuration update request to the network when a corresponding trigger event is determined or detected.
[0079] According to some examples, the data (i.e. parameters of the initial CG setting, trigger information or condition values, parameters for sending the update request) are preset information available at the UE. According to further examples, at least a part of the data (or the complete set of data) is provided by the network, e.g. the gNB, as configuration data for the UE. In this case, according to further examples, the gNB fetches information regarding traffic characteristics from the core network or relevant user application function entities to better define the initial configuration. For example, the gNB can receive traffic characteristics from CN (e.g. AF (application function) or SMF (session management function)), which information allows the gNB to configure parent configuration and also child configurations, i.e. the gNB can determine which settings for child configurations are suitable, and provide corresponding information to the UE allowing the UE to determine which change of the CG configuration is to be used for the update request. For example, in case the supported video traffic resolutions are: 4K, 2K, 1080, 720, 480, with the assumption that the periodicity is the same, then the parent configuration can be configured to support 4K video, while four child configurations are conceivable for 2K, 1080, 720, 480.
[0080] In S210, the UE transmits traffic data in UL based on the current CG configuration setting. It is to be noted that depending on the type of the CG, an activation DCI may be necessary to be sent via the NW prior to S210.
[0081] Furthermore, it is to be noted that according to examples of embodiments, the current CG configuration is the initial (parent) CG configuration or another configuration. For the latter, it is a possible that the gNB activates another CG configuration different to the initial CG configuration on its own. That is, the gNB may indicate to the UE to change the CG configuration from the initial CG configuration to another CG configuration, which may also match to one of the child configurations. This change in the configuration can be initiated by the gNB e.g. by means of legacy methods or in other ways (as described below).In S220, the UE determines, based on the conditions indicated to be configured in S200, a trigger event for the request for an updated CG configuration. That is, UE MAC triggers sending a CG configuration update request to the network.
[0082] In this connection, in S230, the UE determines at least one parameter for the updated configuration. That is, the UE calculates a desired or recommended CG configuration it would like to have based on changed conditions causing the trigger event, such as a change in the traffic behavior, RF channel conditions, etc. For example, in case a remote peer is not compatible with the current setting (frame rate, resolution or the like), or a change of available resources is detected, a corresponding new CG configuration is determined.
[0083] In S240, the UE transmits, caused by the trigger event, the CG configuration update request to the gNB. With the CG configuration update request, an indication is transmitted in order to recommend the desired (determined) new CG configuration. That is, the at least one parameter which is determined to be changed in the CG configuration is indicated.
[0084] In S250, the network (i.e. the gNB MAC) receives and processes the UE’s request. As a result of the processing, the gNB decides whether it accepts or declines the update request. For example, based on the indication of the parameter included in the request message, it is determined whether a resulting new CG configuration is acceptable or not (e.g. whether a newly requested frame rate is acceptable or not).
[0085] In S260, the gNB’s decision regarding the UE’s request is sent back to the UE. According to the present example of embodiments, the decision is either an ACK message in case it is decided by the gNB that the update request is acceptable, or a NACK message in case it is decided to decline the request.
[0086] In case the decision of the gNB is a NACK, then the UE continues with the current CG configuration, and neither on the network side nor on the UE side any reconfiguration process is executed.
[0087] On the other hand, in case of ACK, the UE switches to the configuration it recommended in S240, i.e. a reconfiguration to the new CG configuration is initiated.
[0088] In the latter case (i.e. ACK), the gNB updates in S270 its local parameters regarding the change in the CG configuration. Similarly, in S280, the UE updates its local parameters regarding the change in the CG configuration.
[0089] Then, in S290, the UE uses the new CG configuration (in case of an ACK from the gNB, otherwise the former CG configuration is still valid) for the upcoming UL transmissions for the specified logical channels (LCHs).Next, with reference to Fig. 3, which shows a signaling diagram illustrating an example of a processing according to an example of embodiments, an example of a second embodiment is described. In this example, again, the transmission scheduling is represented by CG.
[0090] In the present embodiment, instead of a single pointer to a child CG configuration (i.e. to determine and request a specific child configuration), a plurality of parameter sets indicating a list of candidate child configurations, or a range of values for one or more parameters of a transmission scheduling (i.e. CG in the present example) configuration (i.e. a range ofvalues for various parameters the UE would like to have for a child CG configuration) is communicated via the CG configuration update request to the network. On the network side, the gNB can select amongst the present list of CG configurations or the range of values for deciding about the final child CG configuration.
[0091] In S300, a configuration processing of the UE with at least one initial (parent) CG configuration setting is conducted. In this connection, according to examples of embodiments, the UE is also configured with triggers (conditions) and relevant parameters for sending a CG configuration update request to the network when a corresponding trigger event is determined or detected.
[0092] According to some examples, the data (i.e. parameters of the initial CG setting, trigger information or condition values, parameters for sending the update request) are preset information available at the UE. According to further examples, at least a part of the data (or the complete set of data) is provided by the network, e.g. the gNB, as configuration data for the UE. In this case, according to further examples, the gNB fetches information regarding traffic characteristics from the core network or relevant user application function entities to better define the initial configuration. For example, the gNB can receive traffic characteristics from CN (e.g. AF (application function) or SMF (session management function)), which information allows the gNB to configure parent configuration and also child configurations, i.e. the gNB can determine which settings for child configurations are suitable, and provide corresponding information to the UE allowing the UE to determine which change of the CG configuration is to be used for the update request. For example, in case the supported video traffic resolutions are: 4K, 2K, 1080, 720, 480, with the assumption that the periodicity is the same, then the parent configuration can be configured to support 4K video, while four child configurations are conceivable for 2K, 1080, 720, 480.
[0093] In S310, the UE transmits traffic data in UL based on the current CG configuration setting. It is to be noted that depending on the type of the CG, an activation DCI may be necessary to be sent via the NW prior to S310.
[0094] Furthermore, it is to be noted that according to examples of embodiments, the current CG configuration is the initial (parent) CG configuration or another configuration. For the latter, it is a possible that the gNB activates another CG configuration different to the initial CG configuration on itsown. That is, the gNB may indicate to the UE to change the CG configuration from the initial CG configuration to another CG configuration, which may also match to one of the child configurations. This change in the configuration can be initiated by the gNB e.g. by means of legacy methods or in other ways (as described below).
[0095] In S320, the UE determines, based on the conditions indicated to be configured in S300, a trigger event for the request for an updated CG configuration. That is, UE MAC triggers sending a CG configuration update request to the network.
[0096] In this connection, in S330, the UE determines a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for the updated configuration. That is, the UE calculates a desired or recommended CG configuration it would like to have based on changed conditions causing the trigger event, such as a change in the traffic behavior, RF channel conditions, etc. For example, in case a remote peer is not compatible with the current setting (frame rate, resolution or the like), or a change of available resources is detected, a corresponding new CG configuration is determined.
[0097] In S340, the UE transmits, caused by the trigger event, the CG configuration update request to the gNB. With the CG configuration update request, an indication is transmitted in order to recommend the desired (determined) new CG configuration. That is, the plurality of parameter sets, each of which including at least one parameter or a value range for at least one parameter which are determined to be changed in the CG configuration is indicated.
[0098] In S350, the network (i.e. the gNB MAC) receives and processes the UE’s request. In this connection, the gNB uses the plurality of parameter sets for deciding whether it accepts or declines the update request.. When it is determined that one of the plurality of parameter sets (i.e. the parameters indicated in one of the sets or a value included in the value range for the at least one parameter) is acceptable (e.g. when one of several proposed / requested frame rates is acceptable), it is determined that a resulting new CG configuration is acceptable. Otherwise, it is determined that the update request is not acceptable.
[0099] In S360, the gNB’s decision regarding the UE’s request is sent back to the UE. According to the present example of embodiments, the decision is either an ACK message including an indication of a selected one of the plurality of parameter sets included in the request message (e.g. the selected parameter(s) indicated in one of the parameter sets or a selected value included in the value range for the at least one parameter) in case it is decided by the gNB that the update request is acceptable, or a NACK message in case it is decided to decline the request.In case the decision of the gNB is a NACK, then the UE continues with the current CG configuration, and neither on the network side nor on the UE side any reconfiguration process is executed.
[0100] On the other hand, in case of ACK, the UE switches to the configuration according to the indicated parameter set being selected by the gNB which is received in S360), i.e. a reconfiguration to the new CG configuration is initiated.
[0101] In the latter case (i.e. ACK), the gNB updates in S370 its local parameters regarding the change in the CG configuration. Similarly, in S380, the UE updates its local parameters regarding the change in the CG configuration.
[0102] Then, in S390, the UE uses the new CG configuration (in case of an ACK from the gNB, otherwise the former CG configuration is still valid) for the upcoming UL transmissions for the specified LCHs.
[0103] It is to be noted that according to examples of embodiments, in the case that there are multiple active / configured CGs, a corresponding identification (ID) associated with the target CG configuration is to be included in UE's request in S240 or S340, wherein the network (gNB) conducts the processing for deciding of accepting or declining the request under consideration of the identified CG configuration.
[0104] As indicated above, the above example of embodiments discussed in connection with Fig. 2 or Fig. 3 is related to a CG case. However, a similar processing is also conceivable for DL SPS case. In this case, the UE is configured, as trigger for requesting an updated SPS configuration, with UE’s internal conditions such as battery usage, heating, processing power limitation, and the like. These UE’s internal conditions can limit the UE’S ability to process DL data. In case a corresponding trigger event is determined, the UE transmits a request to the gNB to change (e.g. downgrade) the DL resource allocation. Thus, like in the CG case described above, the UE is configured with an initial (parent) SPS configuration (e.g. by presetting and / or by the gNB), and the UE can then determine which child configuration is desired (requested), based on a set of rules provided at the UE.
[0105] In the following, different examples of parent / child configurations are explained. In the examples described below, a CG configuration is used for explaining settings of the respective parent / child configuration, but the principles described below are also applicable for SPS configuration settings. Furthermore, while in the explained examples a downgrading of resources from a parent configuration to a child configuration is assumed, it is also possible that an upgrading of resources from the parent configuration to the child configuration is possible. Moreover, while in the explained examples only one child configuration is described, it is evident that further child configurations arepossible, which represent further changes (downgrading / upgrading) from the (described) first child configuration described below.
[0106] Furthermore, it is to be noted that according to examples of embodiments, the above mentioned indication (or pointer) included in the request for an updated configuration is an information element that is used to indicate, to the receiver, to determine suitable transmission scheduling (e.g. a CG) configurations to be used for updating. As one example, assuming 4 different periodicities (10 ms, 20 ms, 40ms, 80 ms) are supported by an application of a service (e.g. one of the above indicated enhanced services) for which the transmission scheduling (e.g. CG) configuration is used. Then, the indication or pointer can be captured, for example, via 2 bits and the 2-bit indication can point to one specific value of periodicity ( for example: 00: 10 ms, 01 : 20ms, 10: 40 ms; 11 : 80ms). On the basis of the received indication in the MAC CE, the receiver will know which configuration (here e.g. a CG configuration) should become activated. Another example for a corresponding indication can be e.g. a relation of bit values to different video resolutions, and the like.
[0107] Fig. 4 shows a diagram illustrating an example for different settings for a parent configuration and a child configuration usable in examples of embodiments. In the example of Fig. 4, which illustrates resources in a time (x axis) - frequency (y axis) domain, the respective parent / child CG configuration is based on the number of PUSCH occasions (illustrated by boxes) in a CG period corresponding to different resolutions of a video frame. As shown in Fig. 4, a parent CG configuration includes 4 PUSCH occasions, which is used to support high resolution video, while the child CG configuration includes only 2 PUSCH occasions, which is used for low resolution video frame.
[0108] Fig. 5 shows a diagram illustrating another example for different settings for a parent configuration and a child configuration usable in examples of embodiments. In the example of Fig. 5, which also illustrates resources in a time (x axis) - frequency (y axis) domain, the respective parent / child CG configurations are different in the number of PUSCH resources corresponding to different video frame rates (fps). In the example of Fig. 5, the parent CG configuration (the complete box) is used to support a high frame rate of a video, while the child CG configuration (the black part of the box) is used for low frame rate.
[0109] Fig. 6 shows a diagram illustrating another example for different settings for a parent configuration and a child configuration usable in examples of embodiments. In the example of Fig. 6, which also illustrates resources in a time (x axis) - frequency (y axis) domain, the respective parent / child CG configurations are different in the periodicity of the traffic.. In the example of Fig. 6, the parent CG configuration (the solid line boxes) is used to support a high periodicity, while the child CG configuration (the dotted line box) is used for low periodicity.In the examples described above, a trigger event, which is based on traffic characteristics or device conditions, cause the change of CG configuration. In case of using a traffic characteristic as a trigger, for example, a change in resolution, periodicity (fps) or any other traffic characteristic which affects the amount of physical resources can be considered. Any change in these traffic attributes requires the UE to determine or calculate, based on pre-configured rules (configured e.g. in S200 or S300), a new child CG configuration, and to send a request to the gNB to approve this change.
[0110] In the following, examples are described how the changes of attributes are communicated to the gNB. According to examples of embodiments, a layer 1 or layer 2 signaling is used for communicating the request (and also parameters for the change of the transmission scheduling configuration) between the UE and the gNB. For example, the UE can send a MAC CE with new values of the attributes to the gNB.
[0111] Figs. 7 and 8 show diagrams illustrating a respective example for a content of an update request usable in examples of embodiments, which is related to above mentioned indication (or pointer) included in the request for an updated configuration. Specifically, Figs. 7 and 8 show possible formats / structures along with contents of the MAC CE for a transmission scheduling (e.g. CG) configuration update request.
[0112] As mentioned above, whenever a trigger event is detected by the UE, such as a change of UL traffic characteristics, the UE sends a request, e.g. in the form of a MAC CE along with a parameter or a set of parameters (i.e. new values of attributes for the CG configuration) to the gNB. The UE and the gNB can determine a new CG configuration based on the new values of the attributes and preconfigured rules, which are known on both sides, i.e. the UE and the gNB. The gNB, at its end, can also use the new attributes and the same pre-configured rules to determine whether the new (child) CG configuration (i.e. the update request) is acceptable or not, based on the available resources and other considerations from the network point of view. In the example of Fig. 7 of such a MAC CE, considering there are 3 attributes as the triggers for CG configuration update (identified by logical channel ID (LCID) and with 4 bits field for each attribute, there can be up to 16 values of each attribute for which the CG configuration update request can be sent. It is to be noted that these numbers are merely examples, and there can be any number of attributes with any number of bits for each field. Fig. 8 shows another example of a format for a MAC CE, where in one octet the attribute and then a corresponding value for the attribute are indicated.
[0113] It is to be noted that the format for the request indicated in Fig. 7 or Fig. 8 can be also used by the gNB to indicate to the UE that a transmission scheduling configuration is to be changed, and in which way the change is to be made. The UE, like the gNB, can determine the new CG configurationbased on the new values of the attributes and pre-configured rules. It is thus possible that the gNB use the same MAC CE, even without a UE request, to update the CG configuration, for the UE.
[0114] Furthermore, as indicated above, there are pre-configured rules at the UE and the gNB for determining a new (child) transmission scheduling (e.g. CG) configuration. As an example of embodiments, such rules are related to how the UE determines the updated / new child CG configuration from the current / ongoing CG configuration. As an example, an case is considered in which in the parent CG configuration there are MoCG PUSCH occasion for a maximum resolution Ro. Then, for a lower resolution Rltthe required number of PUSCH occasions, Mltcan be determined as follows:
[0115] Ri
[0116]
[0117] In this example, the value of R1 may be used as the attribute in the request to the gNB.
[0118] A similar logic can be applied for other parameters, such as a number of physical resource blocks (PRBs) in case of a single CG PUSCH occasion and for other traffic attributes e.g., periodicity.
[0119] In the following, triggers and conditions which are configured at the UE (e.g. in S200 and S300) are described.
[0120] According to an example of embodiments, the triggers configured at the UE comprises one or more (e.g. a list of) trigger options. As indicated above, the corresponding data can be configured by the network in the RRC, or preset / specified in the standards. The trigger options are to be checked before UE creates the CG configuration update request. Taking XR traffic as example, especially video traffic, trigger options to be considered refer to changes to the video frame periodicity, video frame resolution, packet loss requirements etc. Other trigger options are related, for example, to conditions of the device (e.g. the UE), such as a battery usage level, heating, processing power limitation etc, which cause the UE to downgrade a video quality.
[0121] Alternatively or additionally, according to examples of embodiments, trigger options are based on a decision from a prediction model which can trigger the request. A corresponding prediction model may predict one or more the traffic characteristics or UE’s device status (e.g. overheating, battery life etc.). According to examples of embodiments, a corresponding prediction model may use AIML (Artificial Intelligence / Machine Learning) based algorithms, or it may be based on extrapolation of historic data in the past. According to some examples of embodiments, the network (e.g. the gNB) is aware of the existence of such an AIML model. In this case, the network is able to configure a confidence threshold (e.g. X%, ) which represents a setting for a threshold for the confidence on theoutput of the model. The UE is then allowed to trigger the CG configuration update request in case the confidence level is above the configured threshold.
[0122] Alternatively or additionally, according to examples of embodiments, trigger options are based on UE assistance information (UAI) which are used by the UE for triggering. For example, the UE us configured by the network or by preset information on which information elements are to be used for the trigger. Also ranges of values for each information element that should trigger the request are defined. For example, information elements regarding a change in a jitter range, a change in the periodicity etc. are usable in this regard.
[0123] Fig. 9 shows a flow chart of a processing for controlling an update processing of transmission scheduling between a network and a UE in a communication network as shown in Fig. 1. Specifically, the flow chart shown in Fig. 9 illustrates a processing related to a control process for a transmission scheduling configuration which is conducted on the UE side, which corresponds to the signaling diagram as shown in Fig. 2.
[0124] In S910, the UE determines, based on a trigger event, that a request for an updated configuration of a scheduling of transmissions between the user device and a communication network is triggered.
[0125] According to some examples of embodiments, the scheduling of transmissions between the user device and the communication network is related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication.
[0126] Furthermore, according to examples of embodiments, the trigger event is related to at least one of a communication condition (e.g. traffic condition) or a status condition of the UE. For example, the trigger event is based on a determination that a communication condition or a status condition of the UE is in accordance with a condition indicated in configuration data being set in the UE and providing trigger options (e.g. a list of trigger options). The configuration data can be data being preset in the UE and / or data being obtained, in configuration data, from the network, e.g. the gNB. As an additional or alternative example, the trigger event is based on a determination considering assistance information (UAI) related to a communication condition or a status condition of the UE. In this case, information elements and ranges of values for each information element to be used for the determination of the trigger event are preset or obtained from the network (e.g. the gNB) in configuration data. As another additional or alternative example, the trigger event is based a determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the UE.
[0127] Moreover, the communication condition includes at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packetloss requirements. On the other hand, the status condition of the UE includes at least one of a battery usage amount, a heating condition, an available processing power.
[0128] In S920, the UE determines at least one parameter for an update of the configuration of the scheduling.
[0129] According to examples of embodiments, the determination of the at least one parameter for the update of the configuration of the scheduling is made by the UE on the basis of traffic characteristics and / or a change of traffic characteristics of the transmission. Alternatively or additionally, the determination of the at least one parameter for the update of the configuration of the scheduling is made by the UE on the basis of UE characteristics or a change of UE characteristics. In addition, the determination of the at least one parameter for the update of the configuration of the scheduling is made by the UE on the basis of assistance information (e.g. UAI).
[0130] According to further examples of embodiments, the at least one parameter for an update of the configuration of the scheduling is related to at least one of the number of transmission occasions over a shared channel (PUSCH, PDSCH) in a scheduling period, or a periodicity of transmissions.
[0131] In S930, the UE transmits, to the communication network (e.g. to the gNB or another suitable element or application in the communication network), the request for the updated configuration including an indication of the at least one determined parameter.
[0132] According to examples of embodiments, the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0133] According to examples of embodiments, in case there exists more than one transmission scheduling configuration, the request for the updated configuration includes an identifier associated with the configuration of the scheduling of transmissions targeted for the update.
[0134] In S940, the UE receives, from the communication network (e.g. the gNB or another suitable element or application in the communication network), a response to the request for the updated configuration. The response indicates whether the request for the updated configuration is accepted (or, optionally, not accepted). In case the request for the updated configuration is accepted, the configuration of the scheduling is updated by using the at least one determined parameter, based on the request for the updated configuration being accepted. Otherwise, in case the update request is not accepted, the former configuration is maintained.
[0135] According to examples of embodiments, the response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0136] Moreover, according to examples of embodiments, the UE is configured, by the network (e.g. the gNB) with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update. In case the request for the updatedconfiguration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
[0137] Fig. 10 shows a flow chart of a processing for controlling an update processing of transmission scheduling between a network and a UE in a communication network as shown in Fig. 1. Specifically, the flow chart shown in Fig. 10 illustrates a processing related to a control process for a transmission scheduling configuration which is conducted on the communication network side (e.g. in a control element or control function like the gNB or another suitable element or application in the communication network), which corresponds to the signaling diagram as shown in Fig. 2.
[0138] In S1010, the communication network (e.g. the gNB) receives, from a UE, a request for an updated configuration including an indication of at least one parameter for an update of a configuration of a scheduling of transmissions between the UE and the communication network (e.g. the gNB).
[0139] According to some examples of embodiments, the scheduling of transmissions between the UE and the communication network is related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication.
[0140] Furthermore, according to examples of embodiments, the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0141] Moreover, according to examples of embodiments, the at least one parameter for an update of the configuration of the scheduling is related to at least one of the number of transmission occasions over a shared channel (PUSCH, PDSCH) in a scheduling period, or a periodicity of transmissions.
[0142] In S1020, the communication network (e.g. the gNB) processes the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted.
[0143] According to some examples of embodiments, the communication network (e.g. the gNB) determines, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update (in case there exists more than one transmission scheduling configuration). In this case, the identifier is used in the processing of the request for the updated configuration (for identifying the correct configuration setting).
[0144] In S1030, the communication network (e.g. the gNB) sends, to the UE, a response to the request for the updated configuration. The response indicates whether the request for the updated configuration is accepted (ACK) or not accepted (NACK).
[0145] According to examples of embodiments, the response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.Moreover, in case the request for the updated configuration is accepted, the update of the configuration of the scheduling is implemented by using the at least one determined parameter, based on the request for the updated configuration being accepted .
[0146] In addition, according to examples of embodiments, the communication network (e.g. the gNB) configures the UE with configuration data related to at least one of a communication condition or a status condition of the user device and indicating a trigger event for triggering the request for the updated configuration. For example, the trigger event is based on a determination that a communication condition or a status condition of the UE is in accordance with a condition indicated in configuration data being set in the UE and providing trigger options (e.g. a list of trigger options). As an additional or alternative example, the trigger event is based on a determination considering assistance information (UAI) related to a communication condition or a status condition of the UE. In this case, information elements and ranges of values for each information element to be used for the determination of the trigger event are indicated in configuration data. As another additional or alternative example, in case the trigger event is based a determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the UE, a confidence value to be used for this trigger event is provided.
[0147] According to examples of embodiments, the communication condition includes at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements. On the other hand, the status condition of the UE includes at least one of a battery usage amount, a heating condition, an available processing power.
[0148] Moreover, according to examples of embodiments, the communication network (e.g. the gNB) configures the UE with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update. In case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
[0149] In this connection, according to examples of embodiments, the communication network (e.g. the gNB) obtains, from a core network element or core network function of the communication network, information related to traffic characteristics of the communication of the UE. The obtained information is then used by the communication network (e.g. the gNB) for defining settings for the parent configuration and the child configuration.
[0150] Fig. 11 shows a flow chart of a processing for controlling an update processing of transmission scheduling between a network and a UE in a communication network as shown in Fig. 1. Specifically, the flow chart shown in Fig. 11 illustrates a processing related to a control process for a transmissionscheduling configuration which is conducted on the UE side, which corresponds to the signaling diagram as shown in Fig. 3.
[0151] In S1110, the UE determines, based on a trigger event, that a request for an updated configuration of a scheduling of transmissions between the user device and a communication network is triggered.
[0152] According to some examples of embodiments, the scheduling of transmissions between the user device and the communication network is related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication.
[0153] Furthermore, according to examples of embodiments, the trigger event is related to at least one of a communication condition (e.g. traffic condition) or a status condition of the UE. For example, the trigger event is based on a determination that a communication condition or a status condition of the UE is in accordance with a condition indicated in configuration data being set in the UE and providing trigger options (e.g. a list of trigger options). The configuration data can be data being preset in the UE and / or data being obtained, in configuration data, from the network, e.g. the gNB. As an additional or alternative example, the trigger event is based on a determination considering assistance information (UAI) related to a communication condition or a status condition of the UE. In this case, information elements and ranges of values for each information element to be used for the determination of the trigger event are preset or obtained from the network (e.g. the gNB) in configuration data. As another additional or alternative example, the trigger event is based a determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the UE.
[0154] Moreover, the communication condition includes at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements. On the other hand, the status condition of the UE includes at least one of a battery usage amount, a heating condition, an available processing power.
[0155] In S1120, the UE determines a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling.
[0156] According to examples of embodiments, the determination of the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for the update of the configuration of the scheduling is made by the UE on the basis of traffic characteristics and / or a change of traffic characteristics of the transmission. Alternatively or additionally, the determination of the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for the update of the configuration of the scheduling is made bythe UE on the basis of UE characteristics or a change of UE characteristics. In addition, the determination of the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for the update of the configuration of the scheduling is made by the UE on the basis of assistance information (e.g. UAI).
[0157] According to further examples of embodiments, the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling is related to at least one of the number of transmission occasions over a shared channel (PUSCH, PDSCH) in a scheduling period, or a periodicity of transmissions.
[0158] In S1130, the UE transmits, to the communication network (e.g. to the gNB or another suitable element or application in the communication network), the request for the updated configuration including an indication of the plurality of parameter sets.
[0159] According to examples of embodiments, the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0160] According to examples of embodiments, in case there exists more than one transmission scheduling configuration, the request for the updated configuration includes an identifier associated with the configuration of the scheduling of transmissions targeted for the update.
[0161] In S1140, the UE receives, from the communication network (e.g. the gNB or another suitable element or application in the communication network), a response to the request for the updated configuration. The response indicates whether the request for the updated configuration is accepted (or, optionally, not accepted) and an indication of a selected parameter set of the plurality of parameter sets. In case the request for the updated configuration is accepted, the configuration of the scheduling is updated by using the at least one parameter or a selected value of the value range for at least one parameter included in the selected parameter set, based on the request for the updated configuration being accepted. Otherwise, in case the update request is not accepted, the former configuration is maintained.
[0162] According to examples of embodiments, the response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0163] Moreover, according to examples of embodiments, the UE is configured, by the network (e.g. the gNB) with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update. In case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
[0164] Fig. 12 shows a flow chart of a processing for controlling an update processing of transmission scheduling between a network and a UE in a communication network as shown in Fig. 1. Specifically,the flow chart shown in Fig. 12 illustrates a processing related to a control process for a transmission scheduling configuration which is conducted on the communication network side (e.g. in a control element or control function like the gNB or another suitable element or application in the communication network), which corresponds to the signaling diagram as shown in Fig. 3.
[0165] In 1210, the communication network (e.g. the gNB) receives, from a UE, a request for an updated configuration including an indication of a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the UE and the communication network (e.g. the gNB).
[0166] According to some examples of embodiments, the scheduling of transmissions between the UE and the communication network (e.g. the gNB) is related to at least one of a configured grant, CG, for uplink communication, or a semi persistent scheduling, SPS, for downlink communication.
[0167] Furthermore, according to examples of embodiments, the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.
[0168] Moreover, according to examples of embodiments, the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling is related to at least one of the number of transmission occasions over a shared channel (PUSCH, PDSCH) in a scheduling period, or a periodicity of transmissions.
[0169] In S1220, the communication network (e.g. the gNB) processes the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter.
[0170] According to some examples of embodiments, the communication network (e.g. the gNB) determines, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update (in case there exists more than one transmission scheduling configuration). In this case, the identifier is used in the processing of the request for the updated configuration (for identifying the correct configuration setting).
[0171] In S1230, the communication network (e.g. the gNB) sends, to the UE, a response to the request for the updated configuration. The response indicates whether the request for the updated configuration is accepted (ACK) or not accepted (NACK). Furthermore, the response includes an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set.
[0172] According to examples of embodiments, the response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling, e.g. a MAC CE.Moreover, in case the request for the updated configuration is accepted, the update of the configuration of the scheduling is implemented by using the selected parameter set or the selected value of the value range for the at least one parameter, based on the request for the updated configuration being accepted.
[0173] In addition, according to examples of embodiments, the communication network (e.g. the gNB) configures the UE with configuration data related to at least one of a communication condition or a status condition of the user device and indicating a trigger event for triggering the request for the updated configuration. For example, the trigger event is based on a determination that a communication condition or a status condition of the UE is in accordance with a condition indicated in configuration data being set in the UE and providing trigger options (e.g. a list of trigger options). As an additional or alternative example, the trigger event is based on a determination considering assistance information (UAI) related to a communication condition or a status condition of the UE. In this case, information elements and ranges of values for each information element to be used for the determination of the trigger event are indicated in configuration data. As another additional or alternative example, in case the trigger event is based a determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the UE, a confidence value to be used for this trigger event is provided.
[0174] According to examples of embodiments, the communication condition includes at least one of the changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements. On the other hand, the status condition of the UE includes at least one of a battery usage amount, a heating condition, an available processing power.
[0175] Moreover, according to examples of embodiments, the communication network (e.g. the gNB) configures the UE with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update. In case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
[0176] In this connection, according to examples of embodiments, the communication network (e.g. the gNB) obtains, from a core network element or core network function of the communication network, information related to traffic characteristics of the communication of the UE. The obtained information is then used by the communication network (e.g. the gNB) for defining settings for the parent configuration and the child configuration.
[0177] Fig. 13 shows a diagram of a communication element 10, such as a UE, which conducts a processing related to control an update of transmission scheduling between the communication element and a communication network, according to some examples of the embodiments, asdescribed in connection with Figs. 2 and 3. It is to be noted that the communication element 10, which is configured to be a UE, may include further elements or functions besides those described herein below. Furthermore, even though reference is made to network element or function, the element or function may be also another device or function having a similar task, such as a chipset, a chip, a module, an application etc., which can also be part of another element or attached as a separate element to another element, or the like. It should be understood that each block and any combination thereof may be implemented by various means or their combinations, such as hardware, software, firmware, one or more processors and / or circuitry.
[0178] The communication element 10 shown in Fig. 13 may include a processing circuitry, a processing function, a control unit or a processor 101 , such as a CPU or the like, which is suitable for executing instructions given by programs or the like related to the control procedure. The processor 101 may include one or more processing portions or functions dedicated to specific processing as described below, or the processing may be run in a single processor or processing function. Portions for executing such specific processing may be also provided as discrete elements or within one or more further processors, processing functions or processing portions, such as in one physical processor like a CPU, for example. Reference sign 102 denote input / output (I / O) units or functions (interfaces) connected to the processor or processing function 101. The I / O unit 102 may be used for communicating with a network, such as a gNB. The I / O units 102 may be combined units including communication equipment towards several entities, or may include a distributed structure with a plurality of different interfaces for different entities. Reference sign 104 denotes a memory usable, for example, for storing data and programs to be executed by the processor or processing function 101 and / or as a working storage of the processor or processing function 101. It is to be noted that the memory 104 may be implemented by using one or more memory portions of the same or different type of memory.
[0179] The processor or processing function 101 is configured to execute processing related to the above described control procedure. In particular, the processor or processing circuitry or function 101 includes one or more of the following sub-portions. Sub-portion 1011 is a processing portion which is usable as a portion for determining a trigger for requesting an update of a transmission scheduling configuration. The portion 1011 may be configured to perform processing according to S910 of Fig. 9 or S1110 of Fig. 11. Furthermore, the processor or processing circuitry or function 101 may include a sub-portion 1012 usable as a portion for determining a parameter or a sets of parameters. The portion 1012 may be configured to perform a processing according to S920 of Fig. 9 or S1120 of Fig. 11. In addition, the processor or processing circuitry or function 101 may include a sub-portion 1013 usable as a portion for transmitting a request for an update. The portion 1013 may be configured to performa processing according to S930 of Fig. 9 or S1130 of Fig. 11. Furthermore, the processor or processing circuitry or function 101 may include a sub-portion 1014 usable as a portion for receiving a response to the request. The portion 1013 may be configured to perform a processing according to S940 of Fig.
[0180] 9 or S1140 of Fig. 11.
[0181] Fig. 14 shows a diagram of a communication network control element 20, such as a gNB, which conducts a processing related to control an update of transmission scheduling between the communication element and a communication network, according to some examples of the embodiments, as described in connection with Figs. 2 and 3. It is to be noted that the communication network control element 20, which is configured to be a gNB, may include further elements or functions besides those described herein below. Furthermore, even though reference is made to communication network control element or function, the element or function may be also another device or function having a similar task, such as a chipset, a chip, a module, an application etc., which can also be part of another element or attached as a separate element to another element, or the like. It should be understood that each block and any combination thereof may be implemented by various means or their combinations, such as hardware, software, firmware, one or more processors and / or circuitry.
[0182] The communication network control element 20 shown in Fig. 14 may include a processing circuitry, a processing function, a control unit or a processor 201 , such as a CPU or the like, which is suitable for executing instructions given by programs or the like related to the control procedure. The processor 201 may include one or more processing portions or functions dedicated to specific processing as described below, or the processing may be run in a single processor or processing function. Portions for executing such specific processing may be also provided as discrete elements or within one or more further processors, processing functions or processing portions, such as in one physical processor like a CPU, for example. Reference signs 202 and 203 denote input / output (I / O) units or functions (interfaces) connected to the processor or processing function 201. The I / O units 202 may be used for communicating with a user equipment. The I / O units 203 may be used for communicating with other network elements, such as a core network element or function of a communication network. The I / O units 202 and 203 may be combined units including communication equipment towards several entities, or may include a distributed structure with a plurality of different interfaces for different entities. Reference sign 204 denotes a memory usable, for example, for storing data and programs to be executed by the processor or processing function 201 and / or as a working storage of the processor or processing function 201. It is to be noted that the memory 204 may be implemented by using one or more memory portions of the same or different type of memory.
[0183] The processor or processing function 201 is configured to execute processing related to the above described control procedure. In particular, the processor or processing circuitry or function 201includes one or more of the following sub-portions. Sub-portion 2011 is a processing portion which is usable as a portion for receiving a request for an update of a transmission scheduling configuration. The portion 2011 may be configured to perform processing according to S1010 of Fig. 10 or S1210 of Fig. 12. Furthermore, the processor or processing circuitry or function 201 may include a sub-portion 2012 usable as a portion for processing the request. The portion 2012 may be configured to perform a processing according to S1020 of Fig. 10 or S1220 of Fig. 12. In addition, the processor or processing circuitry or function 201 may include a sub-portion 2013 usable as a portion for transmitting a response to the request. The portion 2013 may be configured to perform a processing according to S1030 of Fig. 20 or S1230 of Fig. 12.
[0184] According to a further example of embodiments, in an aspect 1 , there is provided, for example, an apparatus comprising means for determining, on the basis of a trigger event triggering a request for an updated configuration of a scheduling of transmissions between the user device and a communication network, that the request for the updated configuration is triggered, means for determining a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling, and means for transmitting, to a control element or control function of the communication network, the request for the updated configuration including an indication of the plurality of parameter sets.
[0185] Furthermore, according to some other examples of embodiments, the above defined apparatus according to aspect 1 may further comprise means for conducting at least one of the processing defined in the above described methods, for example a method according to that described in connection with Fig. 11.
[0186] According to a further example of embodiments, in an aspect 2, there is provided, for example, an apparatus comprising means for receiving, from a user device, a request for an updated configuration including an indication of a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the user device and the communication network, means for processing the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter, and means for sending, to the user device, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted or not accepted, and an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set.Furthermore, according to some other examples of embodiments, the above defined apparatus according to aspect 2 may further comprise means for conducting at least one of the processing defined in the above described methods, for example a method according to that described in connection with Fig. 12.
[0187] According to a further example of embodiments, in an aspects, there is provided, for example, a computer program product for a computer, including software code portions for performing, when said product is run on the computer steps for determining, on the basis of a trigger event triggering a request for an updated configuration of a scheduling of transmissions between the user device and a communication network, that the request for the updated configuration is triggered, determining a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling, and transmitting, to a control element or control function of the communication network, the request for the updated configuration including an indication of the plurality of parameter sets. The computer program product may include a computer-readable medium on which said software code portions are stored. Furthermore, the computer program product may be directly loadable into the internal memory of the computer and / or transmittable via a network by means of: upload; download; and / or push procedures.
[0188] Furthermore, according to some other examples of embodiments, the above defined computer program product according to aspect 3 may further comprise software code portions for performing, when said product is run on the computer steps for the processing defined in the above described methods, for example a method according to that described in connection with Fig. 11.
[0189] According to a further example of embodiments, in an aspects there is provided, for example, a computer program product for a computer, including software code portions for performing, when said product is run on the computer steps for receiving, from a user device, a request for an updated configuration including an indication of a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the user device and the communication network, means for processing the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter and means for sending, to the user device, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted or not accepted, and an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set. The computer program product may include a computer-readable medium on which said software code portions are stored. Furthermore, the computerprogram product may be directly loadable into the internal memory of the computer and / or transmittable via a network by means of: upload; download; and / or push procedures.
[0190] Furthermore, according to some other examples of embodiments, the above defined computer program product according to aspect 4 may further comprise software code portions for performing, when said product is run on the computer steps for the processing defined in the above described methods, for example a method according to that described in connection with Fig. 12.
[0191] It should be appreciated that
[0192] - an communication technology via which data is transferred to and from an entity in the system may be any suitable present or future technology, such as WLAN (Wireless Local Access Network), WiMAX (Worldwide Interoperability for Microwave Access), LTE, LTE-A, 5G, Bluetooth, Infrared, and the like may be used; additionally, embodiments may also apply wired technologies, e.g. IP based access technologies like cable networks or fixed lines;
[0193] - embodiments suitable to be implemented as software code or portions of it and being run using a processor or processing function are software code independent and can be specified using any known or future developed programming language, such as a high-level programming language, such as objective-C, C, C++, C#, Java, Python, Javascript, other scripting languages etc., or a low-level programming language, such as a machine language, or an assembler;
[0194] - implementation of embodiments is hardware independent and may be implemented using any known or future developed hardware technology or any hybrids of these, such as a microprocessor or CPU (Central Processing Unit), MOS (Metal Oxide Semiconductor), CMOS (Complementary MOS), BiMOS (Bipolar MOS), BiCMOS (Bipolar CMOS), ECL (Emitter Coupled Logic), and / or TTL (Transistor-Transistor Logic);
[0195] - embodiments may be implemented as individual devices, apparatuses, units, means or functions, or in a distributed fashion, for example, one or more processors or processing functions may be used or shared in the processing, or one or more processing sections or processing portions may be used and shared in the processing, wherein one physical processor or more than one physical processor may be used for implementing one or more processing portions dedicated to specific processing as described;
[0196] - an apparatus may be implemented by a semiconductor chip, a chipset, or a (hardware) module including such chip or chipset;
[0197] - embodiments may also be implemented as any combination of hardware and software, such as ASIC (Application Specific IC (Integrated Circuit)) components, FPGA (Field-programmable Gate Arrays) or CPLD (Complex Programmable Logic Device) components or DSP (Digital Signal Processor) components;- embodiments may also be implemented as computer program products, including a computer usable medium having a computer readable program code embodied therein, the computer readable program code adapted to execute a process as described in embodiments, wherein the computer usable medium may be a non-transitory medium.
[0198] Although the present disclosure has been described herein before with reference to particular embodiments thereof, the present disclosure is not limited thereto and various modifications can be made thereto.
Claims
34CLAIMS1. An apparatus, in a user device, comprisingat least one processor, andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least todetermine, based on a trigger event, that a request for an updated configuration of a scheduling of transmissions between the user device and a communication network is triggered, determine a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling, and transmit, to the communication network, the request for the updated configuration including an indication of the plurality of parameter sets.
2. The apparatus according to claim 1, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:receive, from the communication network, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted and an indication of a selected parameter set of the plurality of parameter sets, andupdate the configuration of the scheduling using the at least one parameter or a selected value of the value range for at least one parameter included in the selected parameter set based on the request for the updated configuration being accepted.
3. The apparatus according to any of claims 1 and 2, wherein the scheduling of transmissions between the user device and the communication network is related to at least one ofa configured grant, CG, for uplink communication, ora semi persistent scheduling, SPS, for downlink communication.
4. The apparatus according to any of claims 1 to 3, wherein at least one of the request for the updated configuration and a response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling.
355. The apparatus according to any of claims 1 to 4, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:include, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update.
6. The apparatus according to any of claims 1 to 5, wherein the trigger event is related to at least one of a communication condition or a status condition of the apparatus.
7. The apparatus according to claim 6, wherein the trigger event is based on at least one of a determination that a communication condition or a status condition of the apparatus is in accordance with a condition indicated in configuration data being set in the apparatus and providing trigger options, wherein the configuration data comprising at least one of data being preset in the apparatus or data being obtained from the control element or control function of the communication network,a determination considering assistance information related to a communication condition or a status condition of the apparatus, wherein information elements and ranges of values for each information element to be used for the determination of the trigger event are preset or obtained from the control element or control function of the communication network, ora determination based on a prediction model, wherein the prediction model predicts at least one of a communication condition or a status condition of the apparatus.
8. The apparatus according to claim 6 or 7, wherein the communication condition includes at least one ofthe changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements, andthe status condition of the apparatus includes at least one of a battery usage amount, a heating condition, an available processing power.
9. The apparatus according to any of claims 1 to 8, wherein the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling is related to at least one ofthe number of transmission occasions over a shared channel in a scheduling period, or a periodicity of transmissions.
10. The apparatus according to any of claims 1 to 9, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:determine the at least one parameter or the value range for at least one parameter for the update of the configuration of the scheduling on the basis of at least one oftraffic characteristics or a change of traffic characteristics of the transmission, apparatus characteristics or a change of apparatus characteristics, and assistance information.
11. The apparatus according to any of claims 1 to 10, wherein the apparatus is configured, by the communication network, with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update, wherein in case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
12. The apparatus according to any of claims 1 to 11 , whereinthe request for the updated configuration including an indication of the at least one determined parameter to a control element or control function of the communication network,a response to the request is received from the control element or control function of the communication network, andthe apparatus is configured, by the control element or control function of the communication network, with an initially valid configuration of the scheduling of transmissions.
13. An apparatus, in a communication network, comprisingat least one processor, andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least toreceive, from a user device, a request for an updated configuration including a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the user device and the communication network,process the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter, andsend, to the user device, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted or not accepted, and an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set.
14. The apparatus according to claim 13, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to: update, in case the request for the updated configuration is accepted, the configuration of the scheduling using the selected parameter set or the selected value of the value range for the at least one parameter based on the request for the updated configuration being accepted.
15. The apparatus according to any of claims 13 and 14, wherein the scheduling of transmissions between the user device and the communication network is related to at least one of a configured grant, CG, for uplink communication, ora semi persistent scheduling, SPS, for downlink communication.
16. The apparatus according to any of claims 13 to 15, wherein at least one of the request for the updated configuration and the response to the request for the updated configuration is transmitted by using a layer 1 or layer 2 signaling.
17. The apparatus according to any of claims 13 to 16, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:determine, in the request for the updated configuration, an identifier associated with the configuration of the scheduling of transmissions targeted for the update, anduse the identifier in the processing of the request for the updated configuration.
18. The apparatus according to any of claims 13 to 17, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:configure the user device with configuration data related to at least one ofa communication condition or a status condition of the user device and indicating a trigger event for triggering the request for the updated configuration.3819. The apparatus according to claim 18, wherein the trigger event is based on at least one of a determination that a communication condition or a status condition of the user device is in accordance with a condition indicated in the configuration data being set in the apparatus and providing trigger options, orassistance information related to a communication condition or a status condition of the user device for a trigger event, wherein information elements and ranges of values for each information element to be used for the determination of the trigger event are indicated, ora confidence value to be used for a trigger event based on a prediction model predicting at least one of a communication condition or a status condition of the user device.
20. The apparatus according to claim 18 or 19, wherein the communication condition includes at least one ofthe changes of traffic characteristics, including at least one of a video frame periodicity, a video frame resolution, or packet loss requirements, andthe status condition of the apparatus includes at least one of a battery usage amount, a heating condition, an available processing power.
21. The apparatus according to any of claims 13 to 20, wherein the at least one parameter or the value range for at least one parameter included in each of the plurality of parameter sets for an update of the configuration of the scheduling is related to at least one ofthe number of transmission occasions over a shared channel in a scheduling period, or a periodicity of transmissions.
22. The apparatus according to any of claims 13 to 21 , wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:configure the user device with an initially valid configuration of the scheduling of transmissions which represents a parent configuration and is used as a starting point for an update, wherein in case the request for the updated configuration is accepted, an updated configuration of the scheduling of transmissions represents a child configuration of the parent configuration.
23. The apparatus according to claim 22, wherein the instructions stored by the at least one memory further cause the apparatus, when executed by the at least one processor, at least to:39obtain, from a core network element or core network function of the communication network, information related to traffic characteristics of the communication of the user device, anduse the obtained information for defining settings for the parent configuration and the child configuration.
24. The apparatus according to any of claims 13 to 23, wherein the apparatus is included in a control element or control function of the communication network.
25. A method comprisingdetermining, based on a trigger event, that a request for an updated configuration of a scheduling of transmissions between the user device and a communication network is triggered, determining a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of the configuration of the scheduling, and transmitting, to the communication network, the request for the updated configuration including an indication of the plurality of parameter sets.
26. A method comprisingreceiving, from a user device, a request for an updated configuration including a plurality of parameter sets, each set including at least one parameter or a value range for at least one parameter for an update of a configuration of a scheduling of transmissions between the user device and the communication network,processing the request for the updated configuration for determining whether the request for the updated configuration is accepted or not accepted, and for selecting one of the plurality of parameter sets or a value included in the value range for the at least one parameter, and sending, to the user device, a response to the request for the updated configuration, the response indicating whether the request for the updated configuration is accepted or not accepted, and an indication of the selected parameter set of the plurality of parameter sets or a selected value of the value range for the at least one parameter included in the selected parameter set.