Concentric modular smart infrastructure pole system integrating renewable energy generation, energy storage, electric vehicle fast charging, telecommunications microcells, satellite backhaul redistribution, and ai-based edge processing
A unified modular infrastructure system integrating renewable energy, energy storage, EV charging, and telecommunications through a concentric generator around a lamppost shaft addresses structural inefficiencies and grid instability, enabling simultaneous high-current EV charging and rural broadband connectivity with local Al processing.
Patent Information
- Application Number
- PCT/IN2026/050799
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-08
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-12
AI Technical Summary
Existing infrastructure systems for street lighting, renewable energy generation, electric vehicle charging, telecommunications, satellite terminals, and smart city analytics are deployed as separate installations, leading to high installation costs, structural inefficiencies, and grid instability, particularly in rural areas where infrastructure duplication is economically unsustainable.
A unified modular infrastructure system integrating renewable energy generation, energy storage, electric vehicle charging, telecommunications, and artificial intelligence processing through a concentric hollow-core annular generator mounted around a lamppost shaft, with a dual-module battery architecture and hybrid energy routing.
This integration eliminates the need for separate structural supports, enables simultaneous high-current EV charging and uninterrupted telecommunications, provides rural broadband connectivity, and reduces upstream bandwidth requirements through local Al processing, enhancing scalability and operational efficiency.
Smart Images

Figure IN2026050799_12112026_PF_FP_ABST
Abstract
Description
CONCENTRIC MODULAR SMART INFRASTRUCTURE POLE SYSTEM INTEGRATING RENEWABLE ENERGY GENERATION, ENERGY STORAGE, ELECTRIC VEHICLE FAST CHARGING, TELECOMMUNICATIONS MICROCELLS, SATELLITE BACKHAUL REDISTRIBUTION, AND AI-BASED EDGE PROCESSINGSection I — EARLIEST PRIORITY DATE:This Application claims priority from a Provisional patent application filed in India having Patent Application No. 202541034096, filed on May 08, 2025, and titled “VERTICAL AXIS WIND TURBINE INTEGRATED WITH SOLAR CELLS FOR INSTALLATION ON LAMPPOST FOR POWER GENERATION AND AN OPTIONAL CARBON CAPTURE SYSTEM FOR AIR PURIFICATION”.Section II — FIELD OF THE INVENTIONThe present invention relates to smart city infrastructure systems and distributed infrastructure systems and, more particularly, to a multi -function modular lamppost-based infrastructure platform capable of integrating energy generation, telecommunications, sensing systems, energy storage, and environmental processing technologies within a single structural unit. The invention more specifically relates to a modular platform integrating renewable energy generation, electrical energy storage, electric vehicle fast charging, telecommunications microcell hosting, satellite backhaul redistribution, and artificial intelligence-enabled edge processing within a unified concentric structural architecture.The invention addresses the intersection of distributed renewable energy systems, electric vehicle charging infrastructure, telecommunications microcell support structures, Low Earth Orbit (LEO) satellite communication redistribution systems, and artificial intelligence-enabled smart city platforms.For classification purposes, the invention pertains to International Patent Classification codes including F03D 3 / 00 (vertical axis wind motors), H02J 7 / 00 (battery charging circuit arrangements), H02J 3 / 38 (arrangements for parallel operation of generators), H04W 88 / 08 (multi-mode telecommunications terminals), B60L 53 / 30 (electric vehicle charging), and G06N 20 / 00 (machine learning).Section III — BACKGROUND OF THE INVENTIONExisting infrastructure deployments treat street lighting, renewable generation, EV charging, telecommunications systems, satellite terminals, traffic cameras, environmental monitoring systems, smart city analytics and pedestrian security as separate installations requiring independent support structures, power supplies, and grid interconnections. This fragmented approach results in high installation costs, infrastructure clutter, inefficient land use, and high maintenance requirements.Wind turbines require dedicated towers engineered for aerodynamic loads. EV charging systems require high-capacity grid reinforcement. Fifth generation (5G) microcells rely on pole mounting but require external battery systems. Satellite terminals require separate energy provisioning. Smart traffic systems rely on independent power and data routing.This fragmentation increases capital expenditure, regulatory complexity, structural redundancy, and grid-edge instability, particularly in rural and emerging markets where infrastructure duplication is economically unsustainable.In rural and remote areas where cellular coverage is absent, Low Earth Orbit (LEO) satellite networks provide high-speed, low-latency internet connectivity. Networks such as Starlink (SpaceX) and Project Kuiper (Amazon) are designed to deliver broadband to communities beyond the reach of existing terrestrial networks. A multi-purpose pole-mounted infrastructure node that can harness renewable energy and simultaneously support both cellular and satellite communications directly addresses these diverse and growing connectivity needs without requiring separate power or structural installations.Prior art wind turbines mounted to poles typically utilise offset generators creating bending stress and structural inefficiency. Small cells mounted to light poles rely entirely on grid power, providing no resilience during outages. EV chargers require high-capacity grid reinforcement that may not be available in rural contexts.Urban and rural infrastructure systems are traditionally deployed in isolated functional silos. Wind turbines require separate structural towers. Electric vehicle fast charging requires high-capacitygrid reinforcement. 5G and 6G small cells require powered mounting structures. Satellite terminals require independent energy and structural support. Traffic surveillance and security systems require dedicated installation and maintenance infrastructure.This separation results in capital inefficiencies, grid constraints, duplication of structural systems, and limited scalability in rural environments. There is therefore a need for a unified modular infrastructure solution capable of combining these systems into a single distributed node deployed using existing lamppost infrastructure.Representative prior art illustrating the fragmented state of the field includes: US 8,358,029 B2 (Costin et al.), which discloses a vertical axis wind turbine mounted offset to a support pole using a side bracket, resulting in the bending moment and torsional inefficiencies described above; US 9,611,837 B2 (Allaei), which discloses a shrouded wind turbine for urban deployment but does not achieve coaxial through-bore mounting around an existing pole structure; US 10,882,415 B2 (Yeh et al.), which discloses a combined EV charging and photovoltaic pole but relies entirely on grid connection without integrated wind generation or telecommunications support; and EP 3 312 432 Al (Philips Lighting), which discloses a smart city pole with sensor and communications integration but provides no renewable energy generation or EV charging capability. None of the foregoing prior art discloses or suggests the coaxial hollow-bore annular generator configuration of the present invention, nor the dual-module battery architecture enabling simultaneous high-current EV charging and uninterrupted telecommunications operation within a single retrofittable node.There is therefore a need for a unified modular infrastructure solution capable of combining these systems into a single distributed node deployed using existing lamppost infrastructure, and which achieves the structural and operational integration not taught or suggested by the prior art identified above.To the best of the inventor's knowledge, no prior art system achieves coaxial mounting of a hollowbore annular generator around an existing lamppost shaft in combination with an integrated dualmodule battery architecture supporting simultaneous electric vehicle fast charging and uninterrupted telecommunications operation, further combined with renewable-powered Low Earth Orbit satellite redistribution and Al-based edge analytics, in a single retrofittable infrastructure node.Section IV — SUMMARY OF THE INVENTIONThe inventive concept resides in the structural and electrical unification of multiple infrastructure systems through a concentric hollow-core annular generator having a central through-bore mounted circumferentially around a lamppost shaft.Unlike prior art systems that merely co-locate devices on poles, the present invention structurally integrates renewable energy generation, energy storage, electric vehicle charging, telecommunications support, satellite redistribution, and artificial intelligence processing through a concentric mechanical configuration centred on a hollow-core annular generator having a central through-bore mounted around the pole shaft.The structural, electrical, and operational integration of the claimed system produces synergistic advantages not achievable by mere co-location of individually known components: (i) the coaxial hollow-bore mounting of the annular generator around the lamppost shaft eliminates the need for a separate generator tower; (ii) the dual-module battery architecture enables simultaneous high-current vehicle charging and uninterrupted telecommunications operation from a single node without mutual interference; (iii) the renewable-powered satellite redistribution configuration enables provision of broadband connectivity in off-grid rural locations without grid reinforcement; and (iv) Al edge processing within the node reduces upstream backhaul bandwidth requirements by performing traffic analytics locally prior to cloud transmission.The system includes a hybrid energy routing algorithm coordinating renewable inputs, storage outputs, telecom loads, EV charging demand, and grid export or import.Section V — STATEMENT OF INVENTIVE CONCEPT AND NOVELTYThe present invention is directed to a unified concentric infrastructure architecture in which multiple traditionally independent infrastructure systems are structurally and electrically integrated into a single lamppost-based node.Unlike prior art systems that merely co-locate devices on poles, the present invention structurally integrates renewable energy generation, energy storage, electric vehicle (EV) charging, telecommunications support, satellite redistribution, and artificial intelligence (Al) processing through a concentric mechanical configuration centred on a hollow-core annular generator having a central through-bore mounted around the pole shaft.The concentric generator architecture distributes mass symmetrically around the vertical axis of the pole, reducing bending moments and torsional stress. This structural integration allows scalable multifunctional deployment not achievable by simple aggregation of known components.The inventive step resides in:(a) The concentric hollow-core annular generator having a central through-bore mounted around a lamppost shaft, with generator blades incorporating thin-film photovoltaic solar layers;(b) The modular mechanical-electrical interface standardisation allowing independent subsystem deployment;(c) The hybrid energy routing system enabling simultaneous EV charging and telecom power stability;(d) The renewable-powered satellite redistribution configuration enabling rural broadband delivery; and(e) The distributed Al-enabled infrastructure node architecture for real-time traffic analytics and edge computing.The invention therefore provides more than a predictable combination of known systems, and instead establishes a new structural class of multifunctional infrastructure nodes suitable for urban and rural deployment. The structural, electrical, and operational integration of the claimed system produces synergistic advantages not achievable by mere co-location of individually known components: (i) the coaxial hollow-bore mounting of the annular generator around the lamppost shaft eliminates the need for a separate generator tower and reduces planning and permitting requirements compared to standalone wind installations; (ii) the dualmodule battery architecture, with the primary module at the base serving EV fast charging and the secondary module in the upper housing serving telecommunications and Al loads, enables simultaneous high-current vehicle charging and uninterrupted telecommunications operation from a single node without mutual interference; (iii) the renewable-powered satellite redistribution configuration enables provision of broadband connectivity in off-grid rurallocations without the grid reinforcement that would be required for a grid-powered equivalent; and (iv) Al edge processing within the node reduces upstream backhaul bandwidth requirements by performing traffic analytics, automatic number plate recognition, and pedestrian security monitoring locally prior to cloud transmission. No prior art combination of separately installed components achieves these interdependent operational advantages.DETAILED DESCRIPTION OF THE INVENTION6.1 Structural Configuration and MountingThe lamppost serves as the central structural spine and internal conduit for power and data routing. A pair of clamping plates secure the hollow axle of the unit to the lamppost. A bearing supports a vertical rotor shaft that rotates concentrically around and upon the pole. The rotor shaft is hollow to allow the pole to pass through and to provide a conduit for cables.The generator includes a central aperture ranging from approximately 120 mm to 400 mm to permit coaxial mounting around the lamppost shaft. The generator outer diameter ranges from 300 mm to 1,200 mm depending on rated power output and installation context. This concentric mass distribution minimises bending moments and torsional stress compared to offset generator designs. Preferred lamppost height ranges between 6 and 16 metres, with variable outer diameters and wall thickness depending on installation demands. The lamppost may be retrofitted to existing structures or purpose-built. The direct-drive configuration eliminates gearbox requirements and reduces vibration, mechanical complexity, and maintenance requirements. Reinforced lamppost variants constructed with greater wall thickness or higher-grade structural steel may support larger turbine capacities, additional telecommunications equipment, and greater combined loads, and are expressly contemplated within the scope of the present invention.6.2 Renewable Energy ModuleThe vertical axis wind turbine (VAWT) comprises between two and nine blades, preferably three. The turbine blade assembly surrounds the vertical support structure, with blades distributed circumferentially around and enclosing the pole shaft. Blades are manufactured from HDPE or LLDPE or Polymer composite material with a polyethylene foam core having density between 10 and 120 kg / m3. Blade length ranges between approximately 1.2 metres and 3.5 metres. Blade chordwidth ranges between 250 mm and 450 mm. The blades may be helical, straight-vertical, or arranged in a multi-blade cylindrical configuration, all of which configurations are encompassed by the present invention. The circumferential arrangement of blades surrounding the pole provides structural symmetry, minimises unbalanced aerodynamic forces, and is an integral feature of the coaxial concentric architecture.Photovoltaic modules may be disposed on the wind turbine blades, on the vertical support structure, or on other surfaces of the system, using UV-resistant weather-proof lamination or other suitable attachment means. Each photovoltaic element provides between 50 W and 120 W, or up to 200 W depending on surface area, of photovoltaic capacity. Maximum power point tracking (MPPT) is integrated within the DC bus management system. In alternative embodiments, rigid photovoltaic panels or flexible thin-film PV may additionally be mounted on top of the unit housing or between blade arms, providing supplementary solar generation capacity and improving energy yield in high-irradiance, low-wind environments. The combination of blade-integrated and housing-mounted photovoltaic surfaces provides more consistent hybrid generation across variable meteorological conditions.The generator includes permanent magnet arrays, optimised stator winding patterns, and high-efficiency output conversion electronics. Output voltage after rectification ranges between 12 V DC and 800 V DC. Efficiency is preferably equal to or greater than 92 percent.6.3 Dual-Module Energy Storage and ManagementIn a preferred embodiment, the energy storage system comprises two discrete battery modules. A primary high-capacity battery module, located at the base of the vertical support structure, is configured primarily for electric vehicle fast charging, with storage capacity ranging between 60 kWh and 350 kWh or greater. A secondary battery module, integrated within the upper unit housing, is configured to independently supply power to the telecommunications interface, satellite terminal, hybrid routing controller, and Al edge computing module.Preferred chemistry is lithium iron phosphate (LFP), though alternative lithium-ion or future solid-state chemistries may be employed. Nominal DC bus voltage may range between 600 V and 1,000 V. A Battery Management System (BMS) monitors individual cell voltage, temperature, and current. The system supports island-mode operation during grid outage.A hybrid energy routing algorithm dynamically allocates energy between renewable input, battery storage, EV charging demand, telecommunications baseline load, grid export, and grid import. The routing controller operates according to a defined priority hierarchy and set of switching conditions as follows. In a first priority tier, the telecommunications interface, satellite terminal, and Al edge computing module are supplied with continuous power at all times from the secondary battery module, irrespective of other load conditions; this baseline load, typically between 2 kW and 6 kW, is never interrupted by EV charging demand or grid events. In a second priority tier, renewable generation output from wind and solar sources is directed first to replenish the secondary battery module to a minimum state of charge threshold, preferably more than 40 percent of capacity, before surplus energy is directed to the primary EV battery module or exported to the grid. In a third priority tier, EV fast charging is allocated power from the primary battery module and any surplus renewable generation, subject to the constraint that the secondary battery module state of charge remains above the minimum threshold defined in the second priority tier. In a fourth priority tier, surplus energy beyond all local load requirements is exported to the grid via the bidirectional inverter. In the event of grid outage, the algorithm transitions automatically to island-mode operation: renewable generation and battery storage supply all local loads according to the priority hierarchy above, grid export and import functions are suspended, and anti -islanding protection is activated. The algorithm monitors renewable generation output, state of charge of both battery modules, current load on each subsystem, and grid availability on a continuous basis, with a control loop cycle time not exceeding 100 milliseconds, enabling dynamic reallocation in response to changing load and generation conditions. In a multi-node cluster deployment, the routing algorithm at each contributing node is further configured to maximise grid export during periods of surplus renewable generation, such that the aggregate exported energy from the cluster is available for import at a designated primary charging node via the shared local distribution grid, as further described in Section 6.12.6.4 Electric Vehicle Fast ChargingThe charging system supports DC fast charging capacities between 50 kW and 350 kW. Connector standards include CCS, NACS, or regionally compliant equivalents. Charging sessions of approximately 5 to 30 minutes for 40 kWh energy transfer are contemplated, depending on vehicle battery type and state of charge. The EV charging port is disposed near the base of the pole. In alternative embodiments, a Level 2 AC charging port delivering between 7 kW and 22 kW maybe provided in place of or in addition to the DC fast charging module, accommodating deployment contexts where lower charging power is sufficient or where DC fast charging infrastructure is not yet required.Dynamic load balancing prioritises telecommunications baseline loads before allocating power to EV charging. Al optimisation determines energy sourcing between wind generation, solar generation, battery storage, and grid supply. Charging status may be integrated with remote applications and third-party fleet management platforms. A user interface and remote reservation system are supported. [0023A] In densely developed urban areas where no dedicated parking spaces for electric vehicle charging are available, or where spatial constraints make a full-sized primary battery module impractical, the primary battery module may be deployed at a reduced capacity sized only to supply telecommunications, satellite, Al, and lighting loads. In such configurations the EV fast charging capability may be omitted or deferred, and the node operates as a renewable energy and communications node without an active EV charging function. The modular architecture of the system expressly accommodates this reduced configuration..6.5 Telecommunications IntegrationStandardised mounting interfaces support 5G and 6G small cell equipment including mmWave arrays, Wi-Fi transmitters, and loT gateway modules. Reserved power allocation between 1 kW and 5 kW ensures telecom continuity. Battery backup supports at least four hours of autonomous telecom operation during grid outage in addition to energy generated by wind and solar at that period. The microcell covers up to approximately two kilometres and serves up to 200 or more simultaneous users, dependent on the generation of telecommunications equipment deployed. The loT gateway capability enables the node to serve as a data aggregation point for connected urban sensors including traffic, environmental, and weather monitoring equipment. Fibre or microwave backhaul connectivity may be utilised where available, with the pole conduit serving as a cable routing path for fibre connections; Low Earth Orbit satellite backhaul serves as an alternative or backup communication path where terrestrial networks, fibre or microwave infrastructure is insufficient or absent.The microcell draws power from the integrated battery and may use the pole conduit as a backhaul routing path.6.6 Satellite Backhaul RedistributionThe system includes a stabilised mounting interface for Low Earth Orbit (LEO) satellite terminals positioned at the top of the structure or the top of the pole. Power allocation between 1 kW and 2 kW, extendable to 5 kW depending on terminal type, is reserved for satellite equipment. Satellite bandwidth may be redistributed locally via 5G or 6G microcell or via WiFi 6 or WiFi 7 systems to surrounding users, improving coverage in urban areas where conventional macrocells experience capacity and line-of-sight limitations. This configuration enables renewable-powered rural broadband deployment where terrestrial mobile networks are unavailable.6.7 Al Edge ProcessingHigh-resolution camera modules are mounted near the microcell base station. Industrial Al processors perform traffic density analysis, crash detection, road hazard identification, automatic number plate recognition, hazard light option and pedestrian security monitoring prior to cloud transmission. Local edge processing reduces cloud bandwidth demand and latency. The surveillance camera monitors traffic flow, detects speed violations and other infractions, performs automatic number plate recognition, and supports pedestrian security and safety analytics. Video and data are transmitted through the microcell base station. Real-time surveillance improves road safety and supports urban management operations with optional hazard lights to signal road danger ahead to drivers. Data may be transmitted via telecom or satellite channels. The edge computing module is powered by integrated renewable energy and battery storage, eliminating dependency on external power for Al operations.The Al edge computing module further supports intelligent street lighting control, enabling adaptive dimming, motion-activated illumination, and remote management of the pole’s lighting function in accordance with smart city management platforms and applicable municipal standards. This capability allows the infrastructure node to replace or supplement conventional street lighting controllers, reducing energy consumption and enabling centralised urban lighting management.6.8 Optional Carbon Capture Module and optional lightingAn optional direct air carbon capture module may be incorporated at or near the base of the lamppost unit. The module contains a sorbent material configured to remove carbon dioxide from ambient air and is powered by renewable energy and the integrated battery energy storage system.An optional supplementary lighting module may additionally be incorporated at the base of the unit or along the shaft of the unit, providing configurable ambient, decorative, or functional lighting as required by municipalities or smart city deployments. This lighting module is powered by the integrated battery energy storage system and may be managed by the Al edge computing module as part of the adaptive street lighting control function described in Section 6.7. Further these light can be deployed as hazard warning to drivers.6.9 Modular Architecture and LicensingAll modules are connected via standardised mechanical and electrical interfaces allowing regional licensing and modular deployment. The standardised mechanical interface comprises a bolt-circle mounting pattern compatible with at least one of IEC, ANSI, or EN mounting standards. The standardised electrical interface comprises a multi-pin connector body providing DC power, AC power, a data bus, and ground connections in a single connector assembly. Subsystems may be deployed independently or in combination depending on regional requirements.6.10 Power Conditioning and Grid InterfaceMaximum power point tracking (MPPT) controllers manage renewable inputs from both wind and solar sources. A DC bus management unit routes energy between all subsystems. A bidirectional inverter enables both grid export and grid import operations. Island-mode operation is supported for off-grid deployment.Overvoltage, overload, and anti-islanding protection are included in compliance with applicable grid codes. Automatic turbine braking may be engaged under high wind conditions. Overcurrent and overvoltage protection prevent equipment damage. Redundant telecom power paths ensure continuous communications during grid events.6.11 Alternative EmbodimentsAlternative embodiments contemplated by the present invention include:(a) A renewable energy and telecom node embodiment with satellite unit optional;(b) A renewable EV charging-only embodiment without telecommunications;(c) A renewable telecom-only smart pole embodiment;(d) An underground battery vault configuration for larger energy storage;(e) A floating marine platform embodiment for offshore or waterway deployment; capable of charging electric boats and(f) A hybrid configuration incorporating additional environmental sensors including air quality monitoring, heat sensors, and cool cities spray systems; and(g) A smart city sensing node embodiment integrating weather monitoring equipment, security surveillance cameras, pedestrian counting sensors, and noise monitoring equipment, enabling the infrastructure node to serve as a comprehensive urban data collection and loT gateway platform.6.12 Inter-Pole Energy Sharing via Grid Wheeling and Cluster Charging ArchitectureIn a preferred embodiment for deployment in locations where the electricity grid is weak, intermittent, or absent, a plurality of infrastructure nodes according to the present invention may be operated as a coordinated cluster in which surplus renewable energy generated by contributing nodes is made available to a designated primary node for electric vehicle fast charging. This cluster architecture enables commercially useful EV charging power levels to be achieved collectively by a group of nodes, each of which individually generates modest renewable energy insufficient for standalone fast charging or too long charging of the primary battery unit.The energy sharing mechanism operates on the principle of grid wheeling. Each contributing node in the cluster exports its surplus renewable energy to the local electricity distribution network via its bidirectional inverter and existing underground lamppost supply cabling, consistent with conventional lamppost electrical installation practice. No additional inter-pole wiring is required. The underground wiring infrastructure of the lamppost network, which is already present as part of a standard street lighting installation, serves as the physical medium through which wheeled energy flows between nodes. The designated primary charging node draws the aggregated exported energy back from the local distribution network as grid import, replenishing its primary high-capacity battery module and making that energy available for electric vehicle DC fast charging at the base of the primary pole.From the perspective of the primary charging node, the wheeled energy arrives as electricity from the grid and is managed by the hybrid energy routing algorithm in the same manner as any other grid import. No modification to the charging node’s hardware or control architecture is required to receive wheeled energy from contributing nodes. The bidirectional inverter and grid interfaceof each contributing node, already described in Section 6.10, provide all the functionality necessary for grid export within the wheeling arrangement.The wheeling arrangement between nodes and the local distribution system operator or utility may be formalised through a virtual net metering or energy wheeling agreement, under which the aggregate export of the contributing nodes is offset against the import of the primary charging node within a defined settlement period. This arrangement is consistent with wheeling frameworks already established in electricity markets for the transfer of renewable energy between producers and consumers connected to the same distribution network.The number of contributing nodes in a cluster is not limited. In a preferred embodiment, between two and twenty contributing nodes supply a single primary charging node, though larger clusters are contemplated. Each contributing node continues to serve its own telecommunications, satellite, Al, and lighting loads independently and does not sacrifice service continuity by participating in the cluster wheeling arrangement. The remote monitoring and management platform described in Claim 10 may be configured to coordinate cluster-level energy scheduling, optimising the timing of grid exports from contributing nodes to align with anticipated EV charging demand at the primary node.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of the utility unit mounted on a light pole, showing the vertical -axis wind turbine, photovoltaic modules on blade surfaces, microcell base station, surveillance cameras, and satellite receiver at the top of the structure.FIG. l
[0033] is a cross-sectional elevation view of the apparatus illustrating the mounting structure, the concentric hollow-core annular generator having a central through-bore, blade and generator cover, battery enclosure at the base, and positions of the microcell and surveillance camera, showing labelled components: (1) Satellite Receiver, (2) Street Light, (3) Al Controller, (4) 5G / 6G Microcell, (5) Surveillance Cameras, (6) Blades with flexible thin PV film, (7) Slip Ring, (8) Hollow axle generator, (9) Controller / Inverter, (10) Secondary Battery Unit, (11) Primary Battery Unit at the base.FIG. 3 is a perspective schematic view of the complete utility unitEnablement and Technical ParametersThe following technical parameters are disclosed to enable a person skilled in the art to reproduce the invention without undue experimentation:Concentric Annular Generator:Central aperture: 120 mm to 400 mm. Generator outer diameter: 400 mm to 1,200 mm. Output voltage (DC after rectification): 12 V to 800 V DC. Efficiency target: equal to or greater than 92 percent. Direct-drive, gearbox-free configuration.Blade Construction:Material: HDPE or LLDPE or Polymer composite outer shell with polyethylene foam core, density 10 to 120 kg / m3. Thin-film photovoltaic layers: 50 W to 120 W per blade, bonded using UV-resistant lamination. Blade length: 1.2 m to 3.5 m. Blade chord: 250 mm to 450 mm. Number of blades: two to nine, preferably three. Fully recyclable at end-of-life. Battery Storage:Primary module capacity: 60 kWh to 350 kWh or greater (EV charging DC to DC). Secondary module: sized for telecommunications, satellite, Al loads. Alternative chemistries: lithium-ion variants: Lithium Iron Phosphate (LFP). Nominal DC bus voltage: 600 V to 1,000 V. Battery Management System with thermal management and fire suppression interfaces.EV Charging:DC charging capacity: 60 kW to 350 kW. Connector standards: CCS, NACS, or regionally compliant equivalents. Estimated session time: 5 to 30 minutes for 40 kWh transfer depending on vehicle battery type and state of chargeT elecommunications :Standards: 5G and 6G small cells including mmWave arrays. Reserved power: 1 kW to 5 kW. Battery backup: minimum 4 hours autonomous operation. Present coverage: up to approximately 2 km radius, up to 200 simultaneous users.Satellite Redistribution:Terminal type: LEO satellite (phased-array or dish). Power allocation: 1 kW to 2 kW, extendable to 5 kW. Redistribution via: 5G microcell or WiFi 6 / 7. Compatible networks include Starlink (SpaceX), Project Kuiper (Amazon), and equivalent LEO constellations.Al Edge Processing:High-resolution cameras with industrial Al processors. Functions: traffic density analysis, crash detection, road hazard identification, automatic number plate recognition, pedestrian security monitoring, hazard light option and event analytics. Local processing prior to cloud transmission.Lamppost Dimensions:Height: 6 m to 16 m. May be retrofitted to existing lamppost infrastructure without removal of the existing pole.[EN-SYN] A person skilled in the art of power electronics, mechanical engineering, and telecommunications will understand from the foregoing that the disclosed system enables a node capable of simultaneously generating renewable electricity, storing energy in a dual-module battery system, delivering EV fast charging at commercial rates, hosting 5G / 6G small cell equipment with uninterrupted power, redistributing LEO satellite broadband, and performing local Al-based traffic analytics — all within a single retrofittable lamppost-mounted structure. The combination of these functions within a single concentric node is enabled by the structural arrangement described herein and does not require undue experimentation by a skilled person.
Claims
WE CLAIM:
1. A modular smart multifunctional infrastructure pole system comprising: a vertical support structure; a hollow-core annular generator having a central through-bore, mounted concentrically around the vertical support structure; a vertical axis wind turbine coupled to the generator, the turbine comprising a blade assembly arranged circumferentially around and surrounding the vertical support structure; at least one photovoltaic module disposed on the wind turbine blades or on the vertical support structure or on other surfaces of the systemA modular smart multifunctional infrastructure pole system comprising: a vertical support structure; a hollow-core annular generator having a central through-bore, mounted concentrically around the vertical support structure; a vertical axis wind turbine coupled to the generator, the turbine comprising a blade assembly arranged circumferentially around and surrounding the vertical support structure; ; a battery energy storage system electrically connected to the generator and the photovoltaic module; an electric vehicle DC fast charging module electrically connected to the battery energy storage system; a telecommunications mounting and power interface configured to host fifth generation (5G) or sixth generation (6G) small cell equipment; a satellite communication terminal mounting interface comprising a stabilised bracket and a dedicated power conditioning circuit configured to supply between 1 kW and 3 kW to a Low Earth Orbit satellite terminal mounted thereon; an artificial intelligence edge computing module; and a hybrid energy routing controller electrically interconnected with each of the renewable generation, battery storage, electric vehicle charging, telecommunications, and satellite subsystems and configured to dynamically allocate energy among said subsystems to coordinate simultaneous multi-load operation; wherein the central through-bore of the annular generator is dimensioned to receive the vertical support structure coaxially therethrough, such that the generator is supported by and rotates concentrically around the vertical support structure without requiring a separate generator tower or offset mounting bracket; and wherein the blade assembly surrounds the vertical support structure such that the pole passes through the centre of the turbine assembly.
2. A modular smart infrastructure pole system comprising: a vertical support structure; a hollow-core annular generator having a central through-bore, mounted concentrically around the vertical support structure; a vertical axis wind turbine coupled to the generator; a primary battery module located at or near the base of the vertical support structure and configured tosupply power primarily to an electric vehicle DC fast charging module electrically connected thereto; and a secondary battery module disposed in an upper housing of the system, electrically isolated from the primary battery module, and configured to supply power independently to a telecommunications small cell interface, a satellite terminal interface, a hybrid energy routing controller, and an artificial intelligence edge computing module; wherein the primary and secondary battery modules are each managed by a dedicated battery management system and wherein the hybrid energy routing controller coordinates energy allocation between the primary and secondary modules to prevent contention between electric vehicle charging demand and telecommunications baseline load.
3. The system of claim 1, wherein the hollow-core annular generator includes a central aperture ranging from 120 mm to 400 mm to permit coaxial mounting around the vertical support structure, the generator being direct-drive and gearbox-free with an efficiency of not less than 92 percent; and wherein the vertical axis wind turbine comprises between two and nine blades, each blade being formed from a composite outer shell of high-density polyethylene (HDPE) or linear low-density polyethylene (LLDPE) or other Polymer with a polyethylene foam core having density between 20 and 90 kg / m3, the blades being helical, straight-vertical, or arranged in a multi-blade cylindrical configuration, spaced evenly around the hollow shaft, and fully recyclable at end-of-life.
4. The system of claim 1, wherein at least one photovoltaic module is disposed on the wind turbine blades, on the vertical support structure, or on other surfaces of the system, each photovoltaic element providing between 50 W and 120 W, or up to 200 W depending on surface area, of photovoltaic output capacity, the photovoltaic output being managed by a maximum power point tracking (MPPT) controller integrated within the DC bus management system and operable simultaneously with wind energy generation to provide hybrid renewable generation under variable meteorological conditions; and wherein, in alternative or supplementary embodiments, rigid photovoltaic panels or additional flexible thin-film photovoltaic modules are mounted on top of the unit housing or between blade arms to provide additional solar generation capacity.
5. The system of claim 1 , wherein the hybrid energy routing controller includes a bidirectional inverter enabling both grid export and grid import, maximum power point tracking controllers for renewable inputs, overvoltage protection, overload protection, and anti-islanding protection compliant with applicable grid codes; wherein automatic turbine braking is engaged under high wind conditions and redundant telecom power paths ensure continuous telecommunications operation during grid events; and wherein the system supports island-mode operation maintaining telecommunications, satellite, and Al loads independently of the grid during outage conditions.
6. The system of claim 1, wherein the telecommunications mounting and power interface includes standardised mechanical mounting brackets or as an integrated part of the infrastructure unit placed above the wind turbine unit and electrical interfaces for 5G and 6G small cell equipment including mmWave arrays, Wi-Fi access point equipment, and loT gateway modules, reserves between 1 kW and 5 kW of dedicated power allocation for telecommunications equipment, and provides battery backup supporting at least four hours of autonomous telecommunications operation during grid interruption with extended periods utilising electricity generation by solar and wind unit.
7. The system of claim 6, wherein the telecommunications small cell interface provides a microcell coverage radius of up to approximately two kilometres and is configured to support two hundred or more simultaneous users, dependent on the generation of telecommunications equipment deployed.
8. The system of claim 1 , wherein the artificial intelligence edge computing module includes high-resolution camera modules and industrial Al processors configured to perform, locally prior to cloud transmission, traffic density analysis, crash detection, road hazard identification, automatic number plate recognition, and pedestrian security monitoring; The system of claim 1, wherein the artificial intelligence edge computing module includes high-resolution camera modules and industrial Al processors configured to perform, locally prior to cloud transmission, traffic density analysis, crash detection, road hazard identification, automatic number plate recognition, and pedestrian security monitoring and wherein the artificial intelligence edge computing module is further configured to perform adaptive street lighting control, including motion-activated illumination adjustment, scheduled dimming, and remotemanagement of lighting outputs, road hazard light flashing, all in accordance with smart city management protocols and applicable municipal standards; and wherein the loT gateway module is configured to aggregate data from connected urban sensors including traffic, environmental, and weather monitoring equipment.
9. The system of claim 1, wherein the vertical support structure is a lamppost having a height between 6 m and 16 m; wherein the system is configured for retrofitting to existing lamppost infrastructure without removal of the existing pole; and wherein all subsystem modules are interconnected via standardised mechanical and electrical interfaces comprising a bolt-circle mounting pattern compatible with at least one of IEC, ANSI, or EN mounting standards and a multi-pin connector body providing DC power, AC power, a data bus, and ground connections in a single connector assembly, enabling independent subsystem deployment, regional licensing, and modular expansion; and wherein the hollow conduit of the vertical support structure is configured to serve as a cable routing path for fibre optic or coaxial backhaul connections, the conduit thereby providing a protected internal route for telecommunications backhaul cabling between ground-level termination points and upper-mounted telecommunications equipment.
10. A method of operating a modular multifunctional infrastructure pole system, the method comprising: generating electrical energy from wind using a vertical axis wind turbine having a hollow-core annular generator having a central through-bore, mounted concentrically around a vertical support structure; generating electrical energy from solar irradiance using thin-film photovoltaic modules integrated on the turbine blades; storing the generated electrical energy in an integrated battery energy storage system; dynamically allocating stored energy among electric vehicle DC fast charging, telecommunications small cell power supply, satellite terminal power supply, and grid export using a hybrid energy routing algorithm; prioritising telecommunications baseline load during peak demand conditions; distributing satellite broadband connectivity to local users by receiving satellite signals via a Low Earth Orbit satellite terminal mounted on the vertical support structure and redistributing bandwidth via 5G microcell or WiFi networks; performing Al-based traffic analytics locally at the infrastructure node, the analytics comprising at least one of traffic density analysis, crash detection, road hazard identification, and automatic number plate recognition, prior totransmission of data to a remote cloud platform; and performing Al-assisted electric vehicle charging prioritisation by monitoring real-time energy generation, battery state of charge, and current loads, generating a predicted EV charging demand forecast based on historical usage patterns, time-of-day data, or remote reservation inputs, and adjusting energy allocation in advance of predicted peak demand to maximise primary battery state of charge prior to an anticipated charging session.
11. A distributed multifunctional infrastructure network comprising: a plurality of infrastructure nodes, each node being a system according to claim 1, deployed across a geographic region; standardised mechanical and electrical interfaces enabling independent subsystem configuration per deployment location; and a remote monitoring and management platform communicatively coupled to each node and configured to receive real-time telemetry data therefrom, the telemetry data comprising energy generation output, battery state of charge, electric vehicle charging session data, telecommunications load metrics, and Al analytics outputs, and to transmit remote control commands to individual nodes to dynamically adjust energy routing priorities across the network in response to said telemetry data.
12. The system of claim 1, wherein the energy storage system comprises two discrete battery modules: a primary high-capacity battery module located at the base of the vertical support structure, configured primarily for electric vehicle fast charging, with storage capacity between 60 kWh and 350 kWh, employing lithium iron phosphate (LFP), ), though alternative lithium-ion or equivalent / future solid-state chemistries may be employed, operating at a nominal DC bus voltage between 600 V and 1,000 V, and including a battery management system configured to monitor cell voltage, temperature, and current, the system further supporting island-mode operation during grid outage; and a secondary battery module integrated within the upper unit housing, configured to independently supply power to the telecommunications interface, satellite terminal, hybrid routing controller, and Al edge computing module; and wherein the electric vehicle DC fast charging module supports power delivery between 50 kW and 350 kW and is compatible with CCS, NACS, or regionally compliant connector standards, and wherein the hybrid energy routing controller prioritises telecommunications baseline load before allocating power to vehicle charging.
13. The system of claim 1, wherein the satellite communication terminal mounting interface includes a stabilised bracket positioned on the vertical support structure, reserves between 1 kW and 3 kW, extendable to 5 kW depending on satellite terminal type and constellation, for satellite terminal operation, and is configured to redistribute satellite bandwidth locally via 5G microcell or WiFi 6 / 7 networks; and wherein the satellite communication terminal is configured to connect to Low Earth Orbit (LEO) satellite networks, including Starlink (SpaceX), Project Kuiper (Amazon), and equivalent LEO constellations, to provide broadband internet connectivity as an alternative or backup communication path where terrestrial networks, fibre, or microwave backhaul infrastructure is unavailable, insufficient, or absent, the satellite terminal thereby operating as the primary backhaul where no terrestrial option exists and as a redundant failover path where terrestrial connectivity is degraded or intermittent.
14. A cluster energy sharing system for electric vehicle charging in weak-grid or off-grid locations, comprising: a plurality of infrastructure nodes each being a system according to claim 1, deployed along a shared lamppost installation and electrically interconnected via the existing underground lamppost supply cabling of said installation; wherein each contributing node in the cluster is configured to export surplus renewable energy to the local electricity distribution network via its bidirectional inverter when local battery storage exceeds a defined state-of-charge threshold; wherein a designated primary node in the cluster is configured to import said exported energy from the local electricity distribution network and store it in the primary battery module of said primary node; and wherein the electric vehicle DC fast charging module of the primary node is thereby supplied with aggregated renewable energy from the plurality of contributing nodes, enabling commercially useful DC fast charging power levels to be achieved collectively in locations where the grid supply is insufficient or absent for individual node charging; wherein no additional interpole wiring is required beyond the existing underground lamppost supply cabling already present in a standard street lighting installation; and wherein the energy transfer between contributing nodes and the primary node is effected by grid wheeling through the local distribution network, such that the primary node receives the aggregated energy as a grid import indistinguishable in operation from conventional grid supply; and wherein the plurality of contributing nodes simultaneously charge the primary battery module of the primary node.