The invention belongs to the technical field of
tunnel construction, and particularly relates to a settlement slowing structure for a soft soil foundation shield tunnel. The settlement slowing structure comprises a
mortar spraying mechanism, a shield tunnel segment, a grouting connecting part, a grouting
pipe, grouting equipment and a
power unit. The front part of the
mortar spraying mechanism penetrates into the shield tunnel segment and extends into soft soil. The
tail part of the
mortar spraying mechanism is rotatably connected with the
power unit, the grouting connecting part is arranged on the outer side of the
power unit, the grouting connecting part communicates with the mortar spraying mechanism, and the grouting connecting part is connected with grouting equipment through the grouting
pipe. The problems that the segment leaks water and continuous settlement exists after construction due to the fact that in an existing tunnel anti-settlement structure construction, under the action of grouting, excessive
pore water pressure can be generated in a stratum due to uneven mortar spraying, settlement can be generated in the stratum along with dissipation of the excess pore waterpressure, and grouting is insufficient are solved.