Combined leveling device
By designing a combined leveling device, using the sliding connection and traction device between the floating body and the hull, the existing stone-throwing leveling ship has solved the complex structure and high cost of use, and achieved efficient and convenient backfill and leveling of submarine stones. .
Patent Information
- Application Number
- CN202011355560.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-27
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2040-11-27
AI Technical Summary
The existing rock-dumping leveling ship has a complex structure, high cost of use, inconvenient movement and low working efficiency.
A combined leveling device is designed, including a support device, a first truss assembly, a second truss assembly, a traction device and a leveling assembly. The device uses the sliding connection between the floating body and the hull, and uses the traction device and truss assembly to realize the left and right movement and distance adjustment of the floating body and the hull, and combines the driving crane and the discharge pipe to complete the backfilling and leveling of the stone.
The device is simple in structure, easy to maintain, convenient to move, high working efficiency, reduced cost of use, has scalability and high typhoon prevention capabilities, and is suitable for undersea tunnel construction and other scenarios.
Smart Images

Figure CN112431206B_ABST
Abstract
Description
Technical Field
[0001] The invention is used in the technical field of offshore leveling machines, and in particular relates to a combined leveling device. Background Art
[0002] The construction of long-distance cross-sea channels generally adopts a combination of bridges and tunnels, while the method of building submarine tunnels (i.e. immersed tube tunnels) generally adopts the immersed tube method, that is, laying multiple immersed tubes on the seabed, and then connecting multiple immersed tubes to form a submarine channel. The construction steps of immersed tube tunnels include foundation trench excavation, foundation construction and immersed tube installation. Among them, the foundation trench excavation is to use dredgers, lifting equipment with claw buckets, etc. to open up the foundation trench; the foundation construction is to lay coarse stones first and then fine stones; the immersed tube installation includes hoisting the immersed tube and backfilling gravel on both sides of the immersed tube. Among them, the work of backfilling gravel is completed by a stone-throwing and leveling ship.
[0003] The riprap leveling boat in the prior art is formed with a moon pool of fixed size, and moves back and forth in the area defined by the moon pool through a feeding pipe to backfill gravel to the seabed. When the gravel in the defined area of the moon pool is backfilled, the riprap boat needs to be moved to the next working area by a barge or the like. The disadvantages thereof are: the overall structure of the riprap leveling boat is complex, the use cost is high, and it is inconvenient to move and the working efficiency is low. Summary of the invention
[0004] The purpose of the present invention is to solve at least one of the technical problems existing in the prior art and to provide a combined leveling device which has a simple structure, is easy to move, is easy to maintain, has high working efficiency and reduces the cost of use.
[0005] The technical solution adopted by the present invention to solve its technical problem is:
[0006] A combined leveling device, comprising
[0007] The supporting device comprises a floating body and a hull arranged side by side in the left-right direction;
[0008] A first truss assembly includes a first transverse truss and a second transverse truss arranged side by side in a front-to-rear direction, one end of each of the first transverse truss and the second transverse truss is fixed to the floating body, and the other ends of the first transverse truss and the second transverse truss are slidably mounted on the hull in a left-right direction;
[0009] The second truss assembly comprises a first longitudinal truss and a second longitudinal truss arranged side by side in the left-right direction, wherein the first longitudinal truss and the second longitudinal truss are both slidably mounted on the first transverse truss and the second transverse truss in the left-right direction;
[0010] a traction device installed on the hull, the traction device comprising a first traction device and a second traction device, the first traction device being used to pull or release the first transverse truss, and the second traction device being used to pull or release the second transverse truss, so that the floating body approaches or moves away from the hull in a left-right direction;
[0011] The leveling assembly includes a feed pipe and a traveling crane. The traveling crane is movably mounted on the first longitudinal truss and the second longitudinal truss. The traveling crane is used to lift and lower the feed pipe. The feed pipe is used to receive stones and then discharge the stones downwards.
[0012] In combination with the above-mentioned implementations, in certain implementations of the present invention, the first traction device includes a first winch and a second winch, the first winch is located on the left side of the hull and is connected to the right end of the first transverse truss through a first connecting rope, the second winch is located on the right side of the hull and is connected to the left end of the first transverse truss through a second connecting rope, the second traction device includes a third winch and a fourth winch, the third winch is located on the left side of the hull and is connected to the right end of the second transverse truss through a third connecting rope, the fourth winch is located on the right side of the hull and is connected to the left end of the second transverse truss through a fourth connecting rope.
[0013] In combination with the above-mentioned implementation manner, in certain implementation manners of the present invention, the floating body is provided with a first leg and a second leg, the hull is provided with a plurality of third legs spaced apart along the left-right direction and a plurality of fourth legs spaced apart along the left-right direction, one end of the first transverse truss is connected to the floating body through the first leg, the other end of the first transverse truss is slidably mounted on the third leg, one end of the second transverse truss is connected to the floating body through the second leg, and the other end of the second transverse truss is slidably mounted on the fourth leg.
[0014] In combination with the above-mentioned implementation manner, in certain implementation manners of the present invention, a storage bin is provided on the hull, the storage bin is provided with a discharge port, a first stone conveying device is provided between the buoy and the hull, the first stone conveying device is located below the discharge port, a first material distributor is provided on the first stone conveying device, a second stone conveying device is provided on the second longitudinal truss, a second material distributor is provided on the second stone conveying device, the first material distributor is used to transfer the stone on the first stone conveying device to the second stone conveying device, and the second material distributor is used to drop the stone on the second stone conveying device into the discharge pipe.
[0015] In combination with the above implementations, in certain implementations of the present invention, both the first stone conveying device and the second stone conveying device include belt conveying devices.
[0016] In combination with the above-mentioned implementation methods, in certain implementation methods of the present invention, a fifth leg is provided on the floating body, a plurality of sixth legs are provided on the hull and are spaced apart along the left and right directions, one end of the first stone conveying device is fixedly connected to the fifth leg, and the other end of the first stone conveying device can be slidably installed on the sixth leg.
[0017] In combination with the above implementations, in certain implementations of the present invention, the feed pipe includes a plurality of feed pipe segments, and two adjacent feed pipe segments are detachably connected.
[0018] In combination with the above implementations, in certain implementations of the present invention, a stone leveling machine is provided at the bottom of the feed pipe, the feed pipe is connected to the overhead crane via the stone leveling machine, and the stone leveling machine is used to level the stones.
[0019] In combination with the above implementations, in certain implementations of the present invention, the floating body is provided with a plurality of ballast water tanks along the length direction, the hull is provided with a ballast water tank, and the first transverse truss and the second transverse truss are both provided with a water level gauge.
[0020] In combination with the above implementations, in certain implementations of the present invention, a grille channel is provided on the first transverse truss and / or the second transverse truss.
[0021] One of the above technical solutions has at least one of the following advantages or beneficial effects: when working, the combined leveling device is moved to the working area, and the first truss assembly is pulled and released by the traction device, so that the first truss assembly and the floating body move left and right and away from the hull, and then the feeding pipe is lowered to the bottom of the water by the crane, and the stone can be received through the feeding pipe and discharged to the seabed. After the feeding pipe is driven by the crane to complete the leveling operation of a ridge in the front and rear direction, the crane lifts the feeding pipe, and then drives the feeding pipe to move to the next ridge leveling operation area by moving the second truss assembly, and the work is cyclical. The combined leveling device of this technical solution adopts the first truss assembly to slide the floating body and the hull, expands the distance between the floating body and the hull when working, and can be brought closer to the floating body and the hull when not working. It has scalability, improves typhoon prevention capability, facilitates towing and dock mooring, is easy to move, has high working efficiency, and has a simple structure, is easy to maintain, and has low use cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention will be further described below in conjunction with the accompanying drawings:
[0023] Figure 1 This is a schematic diagram of the structure of a floating body when it is close to a hull according to an embodiment of the present invention;
[0024] Figure 2 yes Figure 1 A schematic side view of one embodiment shown;
[0025] Figure 3 It is a schematic structural diagram of an embodiment of the present invention when the floating body is away from the hull;
[0026] Figure 4 yes Figure 3 A schematic side view of one embodiment is shown;
[0027] Figure 5 It is a schematic diagram of the use of an embodiment of the present invention. DETAILED DESCRIPTION
[0028] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.
[0029] In the present invention, if directions (up, down, left, right, front and back) are described, it is only for the convenience of describing the technical solution of the present invention, and does not indicate or imply that the technical features referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention.
[0030] In the present invention, "several" means one or more, "multiple" means more than two, "greater than", "less than", "exceed" and the like are understood to exclude the number itself; "above", "below", "within" and the like are understood to include the number itself. In the description of the present invention, if there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0031] In the present invention, unless otherwise clearly defined, the words "set", "install", "connect" and the like should be understood in a broad sense, for example, they can be directly connected or indirectly connected through an intermediate medium; they can be fixedly connected or detachably connected or integrally formed; they can be mechanically connected or electrically connected or able to communicate with each other; they can be the internal connection of two elements or the interaction relationship between two elements. Those skilled in the art can reasonably determine the specific meanings of the above words in the present invention in combination with the specific content of the technical solution.
[0032] See also Figures 1 to 4An embodiment of the present invention provides a combined leveling device, including a supporting device, a first truss assembly, a second truss assembly, a traction device and a leveling assembly. The supporting device includes a floating body 1 and a hull 2 arranged side by side in the left-right direction, that is, the floating body 1 is located on the side of the hull 2. The first truss assembly includes a first transverse truss 31 and a second transverse truss 32 arranged side by side in the front-back direction, one end of the first transverse truss 31 and the second transverse truss 32 are both fixed to the floating body 1, and the other ends of the first transverse truss 31 and the second transverse truss 32 are slidably installed on the hull 2 in the left-right direction. When the first transverse truss 31 and the second transverse truss 32 are pushed to move in the left-right direction, the first transverse truss 31 and the second transverse truss 32 can drive the floating body 1 to move in the left-right direction. The second truss assembly includes a first longitudinal truss 41 and a second longitudinal truss 42 arranged side by side in the left-right direction. The first longitudinal truss 41 and the second longitudinal truss 42 are both slidably installed on the first transverse truss 31 and the second transverse truss 32 in the left-right direction.
[0033] The traction device is installed on the hull 2, and the traction device includes a first traction device and a second traction device. The first traction device is used to pull or pull the first transverse truss 31, and the second traction device is used to pull or pull the second transverse truss 32, so that the floating body 1 is close to or away from the hull 2 in the left and right direction. The leveling assembly includes a feed pipe 51 and a crane 52. The crane 52 is movably installed on the first longitudinal truss 41 and the second longitudinal truss 42. The crane 52 is used to lift and lower the feed pipe 51. The feed pipe 51 is used to receive the stone 6 and then discharge the stone 6 downward.
[0034] See also Figure 5 When working, move the combined leveling device to the working area and anchor the hull 2. Figure 1 and Figure 3 The first truss assembly is pulled and released by the traction device, so that the first truss assembly and the floating body 1 move left and right and away from the hull 2. Figure 2 and Figure 4 , and then the feeding pipe 51 is lowered to the bottom of the water by the crane 52, so that the stone 6 can be received by the feeding pipe 51 and discharged to the seabed. After the feeding pipe 51 is driven by the crane 52 to complete the leveling operation of one ridge in the front and rear directions, see Figure 2 , the crane 52 lifts the feeding pipe 51, and then drives the feeding pipe 51 to move to the next ridge leveling operation area by moving the second truss assembly, and the operation is repeated in this way. The combined leveling device of this technical solution uses the first truss assembly to slide the floating body 1 and the hull 2. Figure 3 , the distance between the deployed float 1 and the hull 2 during operation; see Figure 1When not in operation, the floating body 1 and the hull 2 are pulled closer, which is scalable, improves the typhoon prevention capability, facilitates towing and dock mooring, is easy to move, has high working efficiency, and has a simple structure, is easy to maintain, and reduces the cost of use.
[0035] The traction device can be a winch, electric hoist, etc. Figure 2 In some embodiments, the first traction device includes a first winch 71 and a second winch 72. The first winch 71 is located on the left side of the hull 2 and is connected to the right end of the first transverse truss 31 through a first connecting rope; the second winch 72 is located on the right side of the hull 2 and is connected to the left end of the first transverse truss 31 through a second connecting rope. The second traction device includes a third winch 73 and a fourth winch 74. The third winch 73 is located on the left side of the hull 2 and is connected to the right end of the second transverse truss 32 through a third connecting rope. The fourth winch 74 is located on the right side of the hull 2 and is connected to the left end of the second transverse truss 32 through a fourth connecting rope. When the first connecting rope is pulled by the first winch 71 and the second connecting rope is pulled by the second winch 72, the first transverse truss 31 moves in the left-right direction away from the hull 2 under the joint action of the first connecting rope and the second connecting rope; at the same time, the third connecting rope is pulled by the third winch 73 and the fourth connecting rope is pulled by the fourth winch 74, so that the second transverse truss 32 moves in the left-right direction away from the hull 2 under the joint action of the third connecting rope and the fourth connecting rope, see Figure 4 When the floating body 1 needs to be retracted to make it close to the hull 2, the first winch 71 pulls the first connecting rope, the second winch 72 pulls the second connecting rope, the third winch 73 pulls the third connecting rope, and the fourth winch 74 pulls the fourth connecting rope, see Figure 2 The first traction device and the second traction device arranged in this manner can improve the balance when the floating body 1 is retracted and deployed, and improve the stability and safety of the overall equipment.
[0036] See also Figure 2 and Figure 4 In some embodiments, the floating body 1 is provided with a first leg 75 and a second leg, and the hull 2 is provided with a plurality of third legs 76 and a plurality of fourth legs spaced apart in the left-right direction. One end of the first transverse truss 31 is connected to the floating body 1 through the first leg 75, and the other end of the first transverse truss 31 is slidably mounted on the third leg 76; one end of the second transverse truss 32 is connected to the floating body 1 through the second leg, and the other end of the second transverse truss 32 is slidably mounted on the fourth leg. By providing the first leg 75 and the third leg 76, it is convenient to install the first transverse truss 31 on the floating body 1 and the hull 2, and by providing the second leg and the fourth leg, it is convenient to install the second transverse truss 32 on the floating body 1 and the hull 2. It can be understood that the first leg 75 and the second leg can both adopt a truss structure, which can reduce the mass of the floating body 1 and the hull 2 and facilitate movement.
[0037] See also Figures 1 to 4 In some embodiments, a storage bin 21 is provided on the hull 2, and the storage bin 21 is used to store stones 6. The storage bin 21 is provided with a discharge port 211. A first stone conveying device 81 is provided between the floating body 1 and the hull 2, and the first stone conveying device 81 is located below the discharge port 211 to receive the stones 6 sent out from the discharge port 211. A first material distributor 83 is provided on the first stone conveying device 81. A second stone conveying device 82 is provided on the second longitudinal truss 42, that is, the second longitudinal truss 42 is provided with a second stone conveying device 82 along the length direction. A second material distributor 84 is provided on the second stone conveying device 82, and the first material distributor 83 is used to transfer the stones 6 on the first stone conveying device 81 to the second stone conveying device 82, and the second material distributor 84 is used to put the stones 6 on the second stone conveying device 82 into the discharge pipe 51. Through the coordinated operation of the first stone conveying device 81, the first material distributor 83, the second stone conveying device 82 and the second material distributor 84, the stone 6 in the storage bin 21 can be quickly transported to the discharge pipe 51 to complete the work of laying the stone 6, with high work continuity and improved work efficiency. Among them, the first material distributor 83 can be movably arranged on the first stone conveying device 81, and the second material distributor 84 can be movably arranged on the second stone conveying device 82 to adapt to the change of the discharge position of the discharge pipe 51. For example, the first material distributor 83 and the second material distributor 84 can be matched with the mounting frames on both sides of the first stone conveying device 81 and the second stone conveying device 82 by means of matching with guide rail sliders, or can be installed on the first stone conveying device 81 or the second stone conveying device 82 by means of moving with walking wheels.
[0038] See also Figure 2 and Figure 4 In some embodiments, the floating body 1 is provided with a fifth leg 77, and the hull 2 is provided with a plurality of sixth legs 78 spaced apart in the left-right direction. One end of the first stone conveying device 81 is fixedly connected to the fifth leg 77, and the other end of the first stone conveying device 81 can be slidably mounted on the sixth leg 78. By providing the fifth leg 77 and the sixth leg 78, it is convenient to install the first stone conveying device 81 on the floating body 1 and the hull 2, and the height difference between the first stone conveying device 81 and the second stone conveying device 82 can be adjusted by coordinating with the height of the first leg 75, the second leg, the third leg 76 and the fourth leg to meet the operation requirements. It can be understood that the fifth leg 77 and the sixth leg 78 can both adopt a truss structure, which can reduce the mass of the floating body 1 and the hull 2 and facilitate movement.
[0039] It is understandable that the conveying device may be a belt conveyor, a chain conveyor or a plate chain conveyor, etc. In some embodiments, the first stone conveying device 81 and the second stone conveying device 82 both include a belt conveyor.
[0040] See also Figure 1 and Figure 3 In some embodiments, the floating body 1 is provided with a plurality of ballast water tanks 11 along the length direction, which can be used to adjust the draft of the floating body 1. The hull 2 is provided with a ballast water tank, which can be used to adjust the draft of the hull 2. The first transverse truss 31 and the second transverse truss 32 are both provided with a water level gauge 12, which is convenient for adjusting the water volume of the ballast water tank 11 and the ballast water tank according to the reading of the water level gauge 12, and then adjusting the draft of the floating body 1 and the hull 2, ensuring that the drafts of the water level gauges 12 on the first transverse truss 31 and the second transverse truss 32 are the same, so as to improve the balance of the combined leveling device during the leveling operation.
[0041] See also Figure 4 In some embodiments, the feed pipe 51 includes multiple feed pipe segments 511, and two adjacent feed pipe segments 511 can be detachably connected. Before the leveling operation, a corresponding number of feed pipe segments 511 can be spliced according to the water depth to ensure that the feed pipe 51 can deliver the stone 6 to the seabed smoothly and accurately, thereby improving the leveling accuracy and efficiency.
[0042] See also Figure 4 In some embodiments, a stone leveler 53 is provided at the bottom of the feed pipe 51, and the feed pipe 51 is connected to the crane 52 through the stone leveler 53. The stone leveler 53 is used to level the stone 6, and can flatten the gravel backfilled to the seabed to meet the work requirements.
[0043] See also Figure 1 , Figure 3 and Figure 5 In some embodiments, a grille channel 33 is provided on the first transverse truss 31 and / or the second transverse truss 32 to facilitate the movement of workers between the floating body 1 and the hull 2 and to facilitate work.
[0044] In the description of this specification, the description with reference to the terms "example", "embodiment" or "some embodiments" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0045] Of course, the invention is not limited to the above-mentioned embodiments, and those skilled in the art may make equivalent modifications or substitutions without violating the spirit of the invention, and these equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A combined leveling device, characterized in that: include: A supporting device, comprising a floating body and a hull arranged side by side in a left-right direction; A first truss assembly includes a first transverse truss and a second transverse truss arranged side by side in a front-to-rear direction, one end of each of the first transverse truss and the second transverse truss is fixed to the floating body, and the other ends of the first transverse truss and the second transverse truss are slidably mounted on the hull in a left-right direction; The second truss assembly comprises a first longitudinal truss and a second longitudinal truss arranged side by side in the left-right direction, wherein the first longitudinal truss and the second longitudinal truss are both slidably mounted on the first transverse truss and the second transverse truss in the left-right direction; a traction device installed on the hull, the traction device comprising a first traction device and a second traction device, the first traction device being used to pull or release the first transverse truss, and the second traction device being used to pull or release the second transverse truss, so that the floating body approaches or moves away from the hull in a left-right direction; The leveling assembly includes a feed pipe and a traveling crane. The traveling crane is movably mounted on the first longitudinal truss and the second longitudinal truss. The traveling crane is used to lift and lower the feed pipe. The feed pipe is used to receive stones and then discharge the stones downwards.
2. The combined leveling device according to claim 1, characterized in that: The first traction device includes a first winch and a second winch. The first winch is located on the left side of the hull and is connected to the right end of the first transverse truss through a first connecting rope. The second winch is located on the right side of the hull and is connected to the left end of the first transverse truss through a second connecting rope. The second traction device includes a third winch and a fourth winch. The third winch is located on the left side of the hull and is connected to the right end of the second transverse truss through a third connecting rope. The fourth winch is located on the right side of the hull and is connected to the left end of the second transverse truss through a fourth connecting rope.
3. The combined leveling device according to claim 1, characterized in that: The floating body is provided with a first leg and a second leg, the hull is provided with a plurality of third legs spaced apart along the left-right direction and a plurality of fourth legs spaced apart along the left-right direction, one end of the first transverse truss is connected to the floating body via the first leg, the other end of the first transverse truss is slidably mounted on the third leg, one end of the second transverse truss is connected to the floating body via the second leg, and the other end of the second transverse truss is slidably mounted on the fourth leg.
4. The combined leveling device according to claim 1, characterized in that: A storage bin is provided on the hull, and a discharge port is provided in the storage bin. A first stone conveying device is provided between the buoy and the hull, and the first stone conveying device is located below the discharge port. A first material distributor is provided on the first stone conveying device, and a second stone conveying device is provided on the second longitudinal truss, and a second material distributor is provided on the second stone conveying device. The first material distributor is used to transfer the stone on the first stone conveying device to the second stone conveying device, and the second material distributor is used to drop the stone on the second stone conveying device into the discharge pipe.
5. The combined leveling device according to claim 4, characterized in that: The first stone conveying device and the second stone conveying device both include belt conveying devices.
6. The combined leveling device according to claim 4, characterized in that: The floating body is provided with a fifth leg, the hull is provided with a plurality of sixth legs spaced apart in the left-right direction, one end of the first stone conveying device is fixedly connected to the fifth leg, and the other end of the first stone conveying device can be slidably mounted on the sixth leg.
7. The combined leveling device according to claim 1, characterized in that: The feed pipe comprises a plurality of feed pipe segments, and two adjacent feed pipe segments are detachably connected.
8. The combined leveling device according to claim 1, characterized in that: A stone leveler is provided at the bottom of the feed pipe, and the feed pipe is connected to the overhead crane via the stone leveler, and the stone leveler is used for leveling stones.
9. The combined leveling device according to claim 1, characterized in that: The floating body is provided with a plurality of ballast water tanks along the length direction, the hull is provided with a ballast water tank, and the first transverse truss and the second transverse truss are both provided with a water level gauge.
10. The combined leveling device according to claim 1, characterized in that: The first transverse truss and / or the second transverse truss is provided with a grid channel.
Citation Information
Patent Citations
Combined leveling device
CN214143720U