A method, system, device and medium for building curtain wall simulation design based on BIM
By obtaining and optimizing the initial design and construction plan of building curtain walls in the BIM curtain wall design system, and performing collision detection and simulation design, the problem of low design efficiency of existing systems is solved, and more efficient construction quality and safety is achieved.
Patent Information
- Application Number
- CN202410739428.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2044-06-07
AI Technical Summary
The existing BIM curtain wall design system lacks intelligent parameterized design capabilities and integration of simulation and preview functions, resulting in low efficiency in architectural curtain wall design.
By obtaining the initial design and construction plan of the building curtain wall, extracting the curtain wall component information and construction location node information, performing collision detection and optimization, building simulation design models, conducting construction simulation and visual display, using the collaborative design platform to update the design plan, improve design efficiency and Construction quality.
It improves the design efficiency and construction quality of architectural curtain wall design, enhances the understanding and planning capabilities of designers and construction parties, and ensures the safety and accuracy of the construction process.
Smart Images

Figure HDA0004882739020000011 
Figure HDA0004882739020000021 
Figure HDA0004882739020000031
Abstract
Description
Technical Field
[0001] The present application relates to the field of curtain wall design technology, and in particular to a BIM-based building curtain wall simulation design method, system, equipment and medium. Background Art
[0002] During the design process of building curtain walls, designers need to complete the design work efficiently and accurately, and consider the impact of various environmental factors on the performance of the curtain wall. The field of building curtain wall design is undergoing profound technological changes, such as the introduction of BIM technology. BIM technology realizes the information management of the entire life cycle of the building through digital means, so as to improve the collaborative efficiency of each link of design, construction and operation.
[0003] At present, although the BIM curtain wall design systems on the market can assist designers in completing basic curtain wall design work, they usually lack the ability of intelligent parametric design and have obvious deficiencies in the functional integration of simulation, preview and collaborative design. As a result, there is a defect of low design efficiency in building curtain wall design, which urgently needs to be improved. Summary of the Invention
[0004] In order to improve the design efficiency of building curtain wall design, the present application provides a building curtain wall simulation design method, system, equipment and medium based on BIM.
[0005] In the first aspect, the invention objectives of this application are achieved by adopting the following technical solutions:
[0006] A BIM-based building curtain wall simulation design method, comprising:
[0007] Obtaining an initial design and construction plan for the building curtain wall, and obtaining corresponding curtain wall component information and construction location node information based on the initial design and construction plan;
[0008] In the pre-built main building BIM model, collision detection is performed based on the curtain wall component information and construction location node information to obtain a collision detection result;
[0009] Optimizing the initial design and construction plan of the building curtain wall based on the collision detection result to obtain a curtain wall simulation design plan, and performing a construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result;
[0010] Obtaining scheme revision parameters of a preset collaborative design platform based on the construction simulation results, and updating the curtain wall simulation design scheme based on the scheme revision parameters;
[0011] A curtain wall simulation design model is constructed based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0012] By adopting the above technical solution, during the designer's design process, the initial design and construction plan of the building curtain wall is first obtained, and the corresponding curtain wall component information and construction location node information are extracted, wherein the curtain wall component information includes the size, shape, and material property information of multiple types of curtain wall components, and the construction location node information is the construction layout position, construction construction node information, etc. of each curtain wall component. The main building BIM model is a main building model constructed using BIM technology to simulate the actual installation environment of the building curtain wall. Collision detection is performed through the curtain wall component information and construction location node information, and the rationality and accuracy of the initial design and construction plan are verified in an intelligent verification manner. The detection efficiency is high, and collision checks can be performed on design results of different disciplines, so that the optimized curtain wall simulation design plan is more in line with actual construction requirements. The curtain wall simulation design plan is constructed in an intelligent auxiliary design manner to present the construction design results in a more intuitive way, helping designers Designers and contractors can better understand and plan the construction process of building curtain walls, which is conducive to improving construction quality and safety. Designers can also input scheme correction parameters through the collaborative design platform based on real-time feedback of construction simulation results to update the curtain wall simulation design scheme, so as to control the construction quality. Then, a curtain wall simulation design model is constructed based on the construction links, work content and corresponding work processes of the updated building curtain wall simulation design scheme. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, so as to simulate the design results and construction process of the building curtain wall simulation design scheme. By previewing the design results in advance, designers can instantly view the design effect of the building curtain wall. The collaborative design platform is also in line with the actual design process, where there are multiple designers collaborating on the design. This application is conducive to improving the design efficiency of building curtain wall design through real-time preview and simulation, and the design operation is more convenient.
[0013] In a preferred embodiment of the present application, the collaborative design platform includes a BIM database of curtain wall component information and construction technical specification information; obtaining an initial design and construction plan for the building curtain wall, and obtaining corresponding curtain wall component information and construction location node information based on the initial design and construction plan, includes:
[0014] Obtaining an initial design and construction plan for a building curtain wall, extracting a number of construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; correlating corresponding curtain wall components and component identifiers based on the number of construction processes and corresponding construction contents, and obtaining corresponding curtain wall component information;
[0015] According to several of the construction processes, corresponding construction contents and curtain wall component information, all construction processes are associated with the construction technical specification information, and the construction position layout information and construction nodes of each component of the curtain wall component information are obtained based on the construction technical specification information; and the construction position node information is obtained based on the construction position layout information and construction nodes of each component.
[0016] By adopting the above technical solution, all construction processes of the entire building curtain wall during the construction process and the construction content corresponding to each construction process are obtained based on the initial design and construction plan. Based on the curtain wall components required for all construction processes and corresponding construction contents, the corresponding component identifications are associated one by one. The component identification is unique curtain wall component identification information. All curtain wall components designed during the construction process of the building curtain wall are associated with the corresponding component identifications to obtain curtain wall construction information; further, in order to verify the standardization and rationality of each construction process, this application obtains the construction position layout information of each component and the construction node of the curtain wall component based on the construction technical specification information, associates the construction position layout information of each curtain wall component with the corresponding component node, and maps it to the corresponding main building BIM model to obtain construction position node information. The construction position node information includes the installation coordinate information of each component in the main building BIM model, thereby facilitating the mold test of the curtain wall component and the main building BIM model, which is beneficial to improving the authenticity and restoration of the building curtain wall simulation design.
[0017] In a preferred example of the present application, in the pre-built main building BIM model, collision detection is performed based on the curtain wall component information and construction location node information to obtain collision detection results, including:
[0018] In the pre-built main building BIM model, the collision detection range and collision location information are obtained based on the construction location layout information of each component;
[0019] Based on the curtain wall component information, obtaining the contour line parameters and size parameters of each corresponding component;
[0020] The collision detection range, collision position information, component outline parameters and size parameters are associated based on the component node, and collision detection is performed to obtain a collision detection result.
[0021] By adopting the above technical solution, in the BIM model of the main building, construction collision detection is carried out based on the initial construction design plan of the building curtain wall, and the overall collision detection range and collision position information of each component are obtained. By displaying the collision association of the detailed contour parameters and size parameters of the components, it is beneficial to improve the accuracy of collision detection. The collision detection results can be used to know the components with collision relationships and their locations, so as to provide more intuitive data support for the designer's design optimization.
[0022] In a preferred example of the present application, the collision detection range, collision position information, component outline parameters, and size parameters are associated with the component node, and collision detection is performed. After obtaining the collision detection result, the method includes:
[0023] Based on the collision position and the curtain wall components involved in the collision in the collision detection result, collision type information of each curtain wall component in a collision relationship is obtained; the collision type information includes hard collision, soft collision and gap collision; the curtain wall component is associated with a component identifier; and the collision type information is associated with a collision identifier;
[0024] According to the different collision marks and curtain wall components, corresponding collision component models are obtained and displayed separately;
[0025] In the pre-built main building BIM model, corresponding collision position information is displayed according to the collision position.
[0026] By adopting the above technical solution, different collision detection results are differentiated and associated and displayed. Since different types of collisions may occur during the actual construction of building curtain walls, such as hard collisions, soft collisions and gap collisions, in order to provide designers with more intuitive, clearly positioned and accurate collision detection results, the collision component model and collision position information are differentiated and displayed, so as to further improve the intelligence and automation of the building curtain wall simulation design system.
[0027] In a preferred embodiment of the present application, the method further includes:
[0028] In the curtain wall simulation design model, wind field load simulations of different scenarios are performed based on the acquired wind field load simulation data, and wind pressure intensity feedback diagrams of the different scenarios are generated accordingly. The wind pressure intensity feedback diagrams are obtained based on the wind pressure response data acquired when performing the wind field load simulation for each curtain wall component of the curtain wall component information;
[0029] In the curtain wall simulation design model, temperature excitation simulation is performed based on the acquired temperature and heat load simulation data, and corresponding heat load deformation evolution diagrams are produced for different time periods. The heat load evolution diagrams are obtained by fitting the component deformation trajectory data acquired when performing the temperature and heat load simulation data for each curtain wall component based on the curtain wall component information. The heat load deformation evolution diagrams dynamically render the component deformation trajectory data of each curtain wall component.
[0030] By adopting the above-mentioned technical solution, this application also provides multi-scenario wind field load simulation and time-series-based temperature excitation simulation functions to evaluate the performance of building curtain walls under different wind field conditions, providing a reference for designers to optimize the design of building curtain walls. It can also evaluate the changes of curtain wall components under different temperature conditions to analyze the damage to the components caused by thermal expansion and contraction of the curtain wall materials. The wind pressure intensity feedback diagram and the thermal load deformation evolution diagram can intuitively display the component characteristics and usage response of the building curtain wall under different working conditions in the actual installation environment.
[0031] In a preferred embodiment of the present application, the method further includes:
[0032] Associating the wind pressure response data of each curtain wall component of the curtain wall component information with the construction location node information to obtain component wind pressure intensity data and wind pressure intensity distribution position; associating different component wind pressure intensity data with corresponding component identifications;
[0033] Sending wind pressure strength data of different components to a preset judgment model to identify and obtain a threshold interval corresponding to the wind pressure strength data of the component; and judging whether the wind pressure strength data of the component is within the corresponding threshold interval;
[0034] When the wind pressure intensity data of a component is not within the corresponding threshold range, a wind pressure abnormality mark point is generated based on the component identifier and wind pressure intensity distribution position corresponding to the wind pressure intensity data of the component;
[0035] The wind pressure anomaly mark point is displayed in association with the wind pressure intensity feedback diagram.
[0036] By adopting the above technical solution, the wind pressure intensity data of different components are compared with the range of the corresponding threshold interval to determine whether the wind pressure intensity data of the components are stable. When the wind pressure intensity data of a component is not within the corresponding threshold interval, it indicates that the structural reliability and stability of the component in the current simulation design are insufficient, and optimization and design changes are required. At this time, the wind pressure abnormality mark points are displayed in association in the wind pressure intensity feedback diagram, so that designers can understand the structural response of curtain wall components under wind loads in different scenarios, and help designers evaluate the performance of building curtain walls.
[0037] In the second aspect, the invention objective of this application is achieved by adopting the following technical solutions:
[0038] A BIM-based building curtain wall simulation design system, the system includes:
[0039] A curtain wall component information and location node information acquisition module is used to obtain an initial design and construction plan of the building curtain wall, and obtain corresponding curtain wall component information and construction location node information based on the initial design and construction plan;
[0040] A collision detection module is used to perform collision detection based on the curtain wall component information and construction location node information in a pre-built main building BIM model to obtain a collision detection result;
[0041] A construction simulation module is used to optimize the initial design and construction plan of the building curtain wall based on the collision detection result to obtain a curtain wall simulation design plan, and perform construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result;
[0042] A simulation design scheme updating module is used to obtain scheme correction parameters of a preset collaborative design platform based on the construction simulation results, and to update the curtain wall simulation design scheme based on the scheme correction parameters;
[0043] The visual construction scenario simulation module is used to construct a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0044] By adopting the above technical solution, all construction processes of the entire building curtain wall during the construction process and the construction content corresponding to each construction process are obtained based on the initial design and construction plan. Based on the curtain wall components required for all construction processes and corresponding construction contents, the corresponding component identifications are associated one by one. The component identification is unique curtain wall component identification information. All curtain wall components designed during the construction process of the building curtain wall are associated with the corresponding component identifications to obtain curtain wall construction information; further, in order to verify the standardization and rationality of each construction process, this application obtains the construction position layout information of each component and the construction node of the curtain wall component based on the construction technical specification information, associates the construction position layout information of each curtain wall component with the corresponding component node, and maps it to the corresponding main building BIM model to obtain construction position node information. The construction position node information includes the installation coordinate information of each component in the main building BIM model, thereby facilitating the mold test of the curtain wall component and the main building BIM model, which is beneficial to improving the authenticity and restoration of the building curtain wall simulation design.
[0045] In a preferred example of the present application, the module for acquiring curtain wall component information and location node information includes:
[0046] The curtain wall component information acquisition submodule is used to obtain an initial design and construction plan of the building curtain wall, extract a number of construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; associate the corresponding curtain wall components and component identifiers based on the several construction processes and corresponding construction contents, and obtain the corresponding curtain wall component information;
[0047] The position node information acquisition submodule is used to associate all construction processes with the construction technical specification information based on several of the construction processes, corresponding construction contents and curtain wall component information, and obtain the construction position layout information and construction nodes of each component of the curtain wall component information based on the construction technical specification information; and obtain the construction position node information based on the construction position layout information and construction nodes of each component.
[0048] By adopting the above technical solution, during the designer's design process, the initial design and construction plan of the building curtain wall is first obtained, and the corresponding curtain wall component information and construction location node information are extracted, wherein the curtain wall component information includes the size, shape, and material property information of multiple types of curtain wall components, and the construction location node information is the construction layout position, construction construction node information, etc. of each curtain wall component. The main building BIM model is a main building model constructed using BIM technology to simulate the actual installation environment of the building curtain wall. Collision detection is performed through the curtain wall component information and construction location node information, and the rationality and accuracy of the initial design and construction plan are verified in an intelligent verification manner. The detection efficiency is high, and collision checks can be performed on design results of different disciplines, so that the optimized curtain wall simulation design plan is more in line with actual construction requirements. The curtain wall simulation design plan is constructed in an intelligent auxiliary design manner to present the construction design results in a more intuitive way, helping designers Designers and contractors can better understand and plan the construction process of building curtain walls, which is conducive to improving construction quality and safety. Designers can also input scheme correction parameters through the collaborative design platform based on real-time feedback of construction simulation results to update the curtain wall simulation design scheme, so as to control the construction quality. Then, a curtain wall simulation design model is constructed based on the construction links, work content and corresponding work processes of the updated building curtain wall simulation design scheme. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, so as to simulate the design results and construction process of the building curtain wall simulation design scheme. By previewing the design results in advance, designers can instantly view the design effect of the building curtain wall. The collaborative design platform is also in line with the actual design process, where there are multiple designers collaborating on the design. This application is conducive to improving the design efficiency of building curtain wall design through real-time preview and simulation, and the design operation is more convenient.
[0049] In a third aspect, the invention objective of this application is achieved by adopting the following technical solutions:
[0050] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned BIM-based building curtain wall simulation design method are implemented.
[0051] Fourthly, the invention objectives of this application are achieved by adopting the following technical solutions:
[0052] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned BIM-based building curtain wall simulation design method.
[0053] In summary, this application includes at least one of the following beneficial technical effects:
[0054] 1. During the design process, the designer first obtains the initial design and construction plan of the building curtain wall, and extracts the corresponding curtain wall component information and construction location node information. The curtain wall component information includes the size, shape, and material property information of multiple types of curtain wall components. The construction location node information is the construction layout position, construction construction node information, etc. of each curtain wall component. The main building BIM model is a main building model constructed using BIM technology to simulate the actual installation environment of the building curtain wall. Collision detection is performed through the curtain wall component information and construction location node information. The rationality and accuracy of the initial design and construction plan are verified in an intelligent verification manner. The detection efficiency is high, and collision checks can be performed on design results of different disciplines, so that the optimized curtain wall simulation design plan is more in line with actual construction requirements. The curtain wall simulation design plan is constructed in an intelligent auxiliary design manner to present the construction design results in a more intuitive way, helping designers and construction parties to Better understanding and planning of the building curtain wall construction process is conducive to improving construction quality and safety. Designers can also input scheme correction parameters through the collaborative design platform based on the real-time feedback of the construction simulation results to update the curtain wall simulation design scheme, so as to control the construction quality. Then, a curtain wall simulation design model is constructed based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design scheme. The curtain wall simulation design model performs a visual construction scenario simulation of the design and construction process of the building curtain wall to simulate the design results and construction process of the building curtain wall simulation design scheme. By previewing the design results in advance, designers can immediately view the design effect of the building curtain wall. The collaborative design platform also conforms to the actual design process, in which multiple designers collaborate on the design. This application is conducive to improving the design efficiency of the building curtain wall design through real-time preview and simulation, and the design operation is more convenient.
[0055] 2. Based on the initial design and construction plan, all construction processes of the entire building curtain wall during the construction process and the construction content corresponding to each construction process are obtained. Based on all the construction processes and the curtain wall components required for the corresponding construction content, the corresponding component identifiers are associated one by one. The component identifier is the unique curtain wall component identification information. All the curtain wall components designed during the construction process of the building curtain wall are associated with the corresponding component identifiers to obtain curtain wall construction information. Furthermore, in order to verify the standardization and rationality of each construction process, this application obtains the construction location layout information of each component and the construction node of the curtain wall component based on the construction technical specification information, associates the construction location layout information of each curtain wall component with the corresponding component node, and maps it to the corresponding main building BIM model to obtain construction location node information. The construction location node information includes the installation coordinate information of each component in the main building BIM model, thereby facilitating the matching test of the curtain wall components with the main building BIM model, which is conducive to improving the authenticity and restoration of the building curtain wall simulation design.
[0056] 3. In the BIM model of the main building, construction collision detection is performed based on the initial construction design plan of the building curtain wall, and the overall collision detection range and collision location information of each component are obtained. By displaying the detailed contour parameters and size parameters of the components for collision association, the accuracy of collision detection is improved. The collision detection results can be used to determine the components with collision relationships and their locations, providing more intuitive data support for designers to optimize their design plans. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 This is a flow chart of a BIM-based building curtain wall simulation design method in one embodiment of the present application;
[0058] Figure 2 This is a flowchart of step S2 in a BIM-based building curtain wall simulation design method in one embodiment of the present application;
[0059] Figure 3 This is a flowchart after step S23 in a BIM-based building curtain wall simulation design method in one embodiment of the present application;
[0060] Figure 4 This is another flow chart of a BIM-based building curtain wall simulation design method in one embodiment of the present application;
[0061] Figure 5 This is another flow chart of a BIM-based building curtain wall simulation design method in one embodiment of the present application;
[0062] Figure 6 It is a schematic diagram of a device in one embodiment of the present application. DETAILED DESCRIPTION
[0063] The present application is further described in detail below with reference to the accompanying drawings.
[0064] In one embodiment, if Figure 1 As shown, the present application discloses a BIM-based building curtain wall simulation design method, which specifically includes the following steps:
[0065] S1: Obtain an initial design and construction plan for the building curtain wall, and obtain corresponding curtain wall component information and construction location node information based on the initial design and construction plan.
[0066] In this embodiment, the initial design and construction plan is a combination of design and construction plans of various different professions based on the building curtain wall; the curtain wall component information includes the size, shape, and material property information of multiple types of curtain wall components; the construction location node information is the construction layout position, construction construction node information, etc. of each curtain wall component.
[0067] S2: In the pre-built BIM model of the main building, collision detection is performed based on the curtain wall component information and construction location node information to obtain the collision detection results.
[0068] In this embodiment, the main building BIM model is a main building model constructed using BIM technology to simulate the actual installation environment of the building curtain wall; the collision detection results include hard collision, soft collision and gap collision.
[0069] Specifically, collision detection is performed through curtain wall component information and construction location node information, and the rationality and accuracy of the initial design and construction plan are verified in an intelligent manner. The detection efficiency is high, and collision checks can be performed on design results of different disciplines, making the optimized curtain wall simulation design plan more in line with actual construction requirements.
[0070] S3: Based on the collision detection results, the initial design and construction plan of the building curtain wall is optimized to obtain a curtain wall simulation design plan. Construction simulation is performed based on the curtain wall simulation design plan to obtain a construction simulation result.
[0071] In this embodiment, optimization suggestion parameters are automatically obtained based on the collision detection results and output on the collaborative design platform. The designer inputs the optimization parameters of the initial design and construction plan based on his or her own professional experience or the optimization suggestion parameters to optimize the initial design and construction plan of the building curtain wall and obtain an optimized curtain wall simulation design plan. Then, through intelligent auxiliary design, the curtain wall simulation design plan is subjected to construction simulation to present the construction design results in a more intuitive way, helping designers and construction parties to better understand and plan the building curtain wall construction process, which is conducive to improving construction quality and safety.
[0072] S4: Based on the construction simulation results, the scheme revision parameters of the preset collaborative design platform are obtained, and the curtain wall simulation design scheme is updated based on the scheme revision parameters.
[0073] In this embodiment, the collaborative design platform includes a BIM database of curtain wall component information and construction technical specification information; the collaborative design platform is a collaborative work platform that links the design user terminals of multiple designers. It supports multiple designers to perform curtain wall design work online at the same time, and displays the scheme correction parameters of each designer in real time to support multiple designers to edit, discuss and modify the curtain wall design online.
[0074] Specifically, the scheme correction parameters are the correction data input by the designer through the text box of the collaborative design platform for receiving scheme correction parameters. After the designer enters the correction data through the text box of the collaborative design platform, the scheme correction instructions are output to update and correct the curtain wall simulation design file, which is conducive to improving the design quality of the building curtain wall.
[0075] S5: Construct a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation of the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0076] Specifically, a curtain wall simulation design model is constructed based on the construction links, work content and corresponding work processes of the updated building curtain wall simulation design scheme. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, so as to simulate the design results and construction process of the building curtain wall simulation design scheme. By previewing the design results in advance, designers can instantly view the design effects of the building curtain wall. Through the collaborative design platform, it is also in line with the actual design process, in which multiple designers collaborate on the design. This application is conducive to improving the design efficiency of building curtain wall design through real-time preview and simulation, and the design operation is more convenient.
[0077] In one embodiment, the collaborative design platform includes a BIM database of curtain wall component information and construction technical specification information. In step S1, an initial design and construction plan for the building curtain wall is obtained, and corresponding curtain wall component information and construction location node information are obtained based on the initial design and construction plan, including:
[0078] S11: Obtain an initial design and construction plan of the building curtain wall, extract several construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; associate corresponding curtain wall components and component identifiers based on the several construction processes and corresponding construction contents, and obtain corresponding curtain wall component information.
[0079] In this embodiment, the component identifier is unique curtain wall component identification information.
[0080] Specifically, based on the initial design and construction plan, all construction processes of the entire building curtain wall during the construction process and the construction content corresponding to each construction process are obtained. Based on the curtain wall components required for all construction processes and corresponding construction contents, the corresponding component identifications are associated one by one, and all curtain wall components designed during the construction process of the building curtain wall are associated with the corresponding component identifications to obtain the curtain wall construction information.
[0081] S12: Based on a number of construction processes, corresponding construction contents and curtain wall component information, all construction processes are associated with construction technical specification information, and the construction position layout information and construction nodes of each component of the curtain wall component information are obtained based on the construction technical specification information; construction position node information is obtained based on the construction position layout information and construction nodes of each component.
[0082] In this embodiment, the construction technical specification information includes the quality inspection and evaluation standards, construction technical specifications and directive documents corresponding to the building curtain wall; the construction node is the connection node of the curtain wall component, and the construction location node information includes the component node installation coordinate information of each curtain wall component.
[0083] Specifically, in order to verify the standardization and rationality of each construction process, this application obtains the construction location layout information of each component and the construction nodes of the curtain wall components based on the construction technical specification information, associates the construction location layout information of each curtain wall component with the corresponding component node, and maps it to the corresponding main building BIM model to obtain the construction location node information. The construction location node information includes the installation coordinate information of each component in the main building BIM model, which facilitates the mold test of the curtain wall components and the main building BIM model, which is conducive to improving the authenticity and restoration of the building curtain wall simulation design.
[0084] In one embodiment, if Figure 2 As shown, in step S2, in the pre-built main building BIM model, collision detection is performed based on curtain wall component information and construction location node information to obtain collision detection results, which specifically include:
[0085] S21: In the pre-constructed main building BIM model, collision detection range and collision position information are obtained based on the construction position layout information of each component.
[0086] Specifically, the collision detection range and collision location information are displayed in the main building BIM model.
[0087] S22: Based on the curtain wall component information, obtain the contour parameters and size parameters of each corresponding component.
[0088] Specifically, the component outline parameters are the outlines of the length, width, height, etc. of the component.
[0089] S23: Associating the collision detection range, collision position information, component outline parameters, and size parameters based on the component node, performing collision detection, and obtaining a collision detection result.
[0090] In this embodiment, in the BIM model of the main building, construction collision detection is performed based on the initial construction design plan of the building curtain wall, and the overall collision detection range and collision position information of each component are obtained. By displaying the collision association of the detailed contour line parameters and size parameters of the components, it is beneficial to improve the accuracy of collision detection. The collision detection results can be used to know the components with collision relationships and their locations, so as to provide more intuitive data support for the designer's design optimization.
[0091] In one embodiment, if Figure 3 As shown, after step S23, the BIM-based building curtain wall simulation design method includes:
[0092] S231: Based on the collision position and the curtain wall components involved in the collision in the collision detection results, the collision type information of each curtain wall component with a collision relationship is obtained; the collision type information includes hard collision, soft collision and gap collision; the curtain wall component is associated with the component identifier; the collision type information is associated with the collision identifier.
[0093] S232: According to different collision identifiers and curtain wall components, corresponding collision component models are obtained and displayed separately.
[0094] S233: In the pre-built main building BIM model, corresponding collision position information is displayed according to the collision position.
[0095] In this embodiment, different collision detection results are differentiated and associated displayed. Since different types of collisions may occur during the actual construction of building curtain walls, such as hard collisions, soft collisions and gap collisions, in order to provide designers with more intuitive, clearly positioned and accurate collision detection results, the collision component model and collision position information are differentiated and displayed to further improve the intelligence and automation of the building curtain wall simulation design system.
[0096] In one embodiment, if Figure 4 As shown in the figure, the BIM-based building curtain wall simulation design method includes:
[0097] S10: In the curtain wall simulation design model, wind field load simulations of different scenarios are performed based on the acquired wind field load simulation data, and wind pressure intensity feedback diagrams of different scenarios are generated accordingly. The wind pressure intensity feedback diagrams are obtained based on the wind pressure response data acquired when the wind field load simulation is performed for each curtain wall component based on the curtain wall component information.
[0098] In this embodiment, when performing wind field load simulation, a time series analysis is performed based on the wind pressure response data to obtain the wind pressure changes of the curtain wall components in different time periods. The wind pressure response data is dynamic response data. The structural stress and strain analysis of the curtain wall structure of the building curtain wall is performed under different application scenarios through the dynamic wind pressure response data to analyze the deformation of the curtain wall components at different times, thereby understanding the vibration, deformation and stability performance of the curtain wall components under wind load.
[0099] S20: In the curtain wall simulation design model, a temperature excitation simulation is performed based on the acquired temperature and heat load simulation data, and corresponding heat load deformation evolution diagrams are produced for different time periods. The heat load evolution diagrams are obtained by fitting the component deformation trajectory data acquired when performing the temperature and heat load simulation data for each curtain wall component based on the curtain wall component information. The heat load deformation evolution diagrams dynamically render the component deformation trajectory data of each curtain wall component.
[0100] Specifically, thermal load analysis is performed using temperature heat load simulation data to determine the thermal load of curtain wall components. Thermal load includes the transfer and absorption of heat. The thermal attenuation and energy loss of curtain wall components during the heat transfer process are analyzed through thermal load analysis, and the thermal attenuation data of curtain wall components are predicted. Then, the thermal expansion and deformation evolution analysis of the component unit thermal load data is performed using the thermal attenuation data of the components to determine the dimensional change and shape deformation of the curtain wall components under temperature changes, so as to obtain the component deformation trajectory data. The component deformation trajectory data of each curtain wall component is dynamically rendered based on the thermal load deformation evolution diagram to intuitively display the component characteristics and usage response of the building curtain wall under different working conditions in the actual installation environment.
[0101] In one embodiment, if Figure 5 As shown in the figure, the BIM-based building curtain wall simulation design method also includes:
[0102] S101: Associating the wind pressure response data of each curtain wall component with the construction location node information of the curtain wall component information to obtain the component wind pressure intensity data and wind pressure intensity distribution position; and associating different component wind pressure intensity data with corresponding component identifiers.
[0103] In this embodiment, the wind pressure response data is associated with the construction location node information to facilitate subsequent analysis of the location of abnormal wind pressure response data.
[0104] S102: Sending different component wind pressure strength data to a preset judgment model, identifying and obtaining a threshold range corresponding to the component wind pressure strength data; and judging whether the component wind pressure strength data is within the corresponding threshold range.
[0105] Specifically, by comparing the wind pressure intensity data of different components with the range of the corresponding threshold interval, it is determined whether the wind pressure intensity data of the component is within the normal wind pressure response range.
[0106] S103: When the wind pressure intensity data of a certain component is not within the corresponding threshold range, a wind pressure anomaly mark point is generated based on the component identifier and wind pressure intensity distribution position corresponding to the component wind pressure intensity data.
[0107] S104: Displaying the wind pressure anomaly mark point in association with the wind pressure intensity feedback diagram.
[0108] Specifically, when the wind pressure intensity data of a component is not within the corresponding threshold range, it indicates that the structural reliability and stability of the component in the current simulated design are insufficient and optimization and design changes are required. At this time, the wind pressure abnormality mark points are displayed in the wind pressure intensity feedback diagram to help designers understand the structural response of curtain wall components under wind loads in different scenarios, thereby helping designers evaluate the performance of building curtain walls.
[0109] It should be understood that the serial numbers of the steps in the above embodiments do not imply the order of execution. The order of execution of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0110] In one embodiment, a BIM-based building curtain wall simulation design system is provided. The BIM-based building curtain wall simulation design system corresponds to the BIM-based building curtain wall simulation design method in the above embodiment.
[0111] A BIM-based building curtain wall simulation design system includes a curtain wall component information and location node information acquisition module, a collision detection module, a construction simulation module, a simulation design scheme update module, and a visual construction scenario simulation module. A detailed description of each functional module is as follows:
[0112] The module for acquiring curtain wall component information and location node information is used to acquire the initial design and construction plan of the building curtain wall, and acquire the corresponding curtain wall component information and construction location node information based on the initial design and construction plan;
[0113] The collision detection module is used to perform collision detection based on curtain wall component information and construction location node information in the pre-built main building BIM model to obtain collision detection results;
[0114] The construction simulation module is used to optimize the initial design and construction plan of the building curtain wall based on the collision detection results, obtain a curtain wall simulation design plan, and perform construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result;
[0115] The simulation design scheme update module is used to obtain the scheme correction parameters of the preset collaborative design platform based on the construction simulation results, and update the curtain wall simulation design scheme based on the scheme correction parameters;
[0116] The visual construction scenario simulation module is used to build a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation of the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0117] Optionally, the module for obtaining curtain wall component information and location node information includes:
[0118] The curtain wall component information acquisition submodule is used to obtain the initial design and construction plan of the building curtain wall, extract several construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; associate the corresponding curtain wall components and component identifiers based on the several construction processes and corresponding construction contents, and obtain the corresponding curtain wall component information;
[0119] The position node information acquisition submodule is used to associate all construction processes with construction technical specification information based on several construction processes, corresponding construction contents and curtain wall component information, and obtain the construction position layout information and construction nodes of each component of the curtain wall component information based on the construction technical specification information; and obtain the construction position node information based on the construction position layout information and construction nodes of each component.
[0120] For the specific limitations of the BIM-based building curtain wall simulation design system, please refer to the limitations of the BIM-based building curtain wall simulation design method above, which will not be repeated here; the various modules in the above-mentioned BIM-based building curtain wall simulation design system can be implemented in whole or in part through software, hardware and their combination; the above-mentioned modules can be embedded in or independent of the processor in the computer device in hardware form, or can be stored in the memory of the computer device in software form, so that the processor can call and execute the corresponding operations of the above-mentioned modules.
[0121] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 6As shown. The computer device includes a processor, a memory, a network interface and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store curtain wall component information, construction location node information and curtain wall simulation design schemes, etc. The network interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a building curtain wall simulation design method based on BIM is implemented.
[0122] In one embodiment, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the following steps are performed:
[0123] S1: Obtain the initial design and construction plan of the building curtain wall, and obtain the corresponding curtain wall component information and construction location node information based on the initial design and construction plan;
[0124] S2: In the pre-built main building BIM model, collision detection is performed based on curtain wall component information and construction location node information to obtain collision detection results;
[0125] S3: Optimize the initial design and construction plan of the building curtain wall based on the collision detection results to obtain a curtain wall simulation design plan. Perform construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result.
[0126] S4: Based on the construction simulation results, the scheme revision parameters of the preset collaborative design platform are obtained, and the curtain wall simulation design scheme is updated based on the scheme revision parameters;
[0127] S5: Construct a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation of the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0128] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the following steps are implemented:
[0129] S1: Obtain the initial design and construction plan of the building curtain wall, and obtain the corresponding curtain wall component information and construction location node information based on the initial design and construction plan;
[0130] S2: In the pre-built main building BIM model, collision detection is performed based on curtain wall component information and construction location node information to obtain collision detection results;
[0131] S3: Optimize the initial design and construction plan of the building curtain wall based on the collision detection results to obtain a curtain wall simulation design plan. Perform construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result.
[0132] S4: Based on the construction simulation results, the scheme revision parameters of the preset collaborative design platform are obtained, and the curtain wall simulation design scheme is updated based on the scheme revision parameters;
[0133] S5: Construct a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design plan. The curtain wall simulation design model performs a visual construction scenario simulation of the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform.
[0134] Those skilled in the art will understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program. The computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0135] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0136] The above-described embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present application, and should all be included in the scope of protection of the present application.
Claims
1. A BIM-based building curtain wall simulation design method, It is characterized in that include: Obtaining an initial design and construction plan of a building curtain wall, and obtaining corresponding curtain wall component information and construction location node information based on the initial design and construction plan; In the pre-constructed BIM model of the main building, collision detection is performed based on the curtain wall component information and the construction location node information to obtain a collision detection result; Based on the collision detection result, the initial design and construction plan of the building curtain wall is optimized to obtain a curtain wall simulation design plan, and a construction simulation is performed based on the curtain wall simulation design plan to obtain a construction simulation result; Acquire a preset scheme correction parameter of the collaborative design platform based on the construction simulation result, and update the curtain wall simulation design scheme based on the scheme correction parameter; The collaborative design platform is a collaborative operation platform that links design user terminals of multiple designers, and the scheme revision parameters are revision data input through the collaborative design platform; Building a curtain wall simulation design model based on the construction links, work contents and corresponding workflows of the updated building curtain wall simulation design scheme, wherein the curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform; The collaborative design platform includes a BIM database of curtain wall component information and construction technical specification information; the initial design and construction plan of the building curtain wall is obtained, and the corresponding curtain wall component information and construction location node information are obtained based on the initial design and construction plan, including: Acquire an initial design and construction plan of a building curtain wall, extract a number of construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; associate corresponding curtain wall components and component identifiers based on the construction processes and corresponding construction contents, and obtain corresponding curtain wall component information; According to the plurality of construction processes, corresponding construction contents and curtain wall component information, all construction processes are associated with the construction technical specification information, and the construction position layout information and component nodes of each component of the curtain wall component information are obtained based on the construction technical specification information; and the construction position node information is obtained based on the construction position layout information and component nodes of each component.
2. According to the BIM-based building curtain wall simulation design method of claim 1, It is characterized in that In the pre-constructed main building BIM model, collision detection is performed based on the curtain wall component information and the construction location node information to obtain the collision detection result, including: In the pre-built main building BIM model, the collision detection range and collision position information are obtained based on the construction location layout information of each component; Based on the curtain wall component information, obtaining contour line parameters and size parameters of each corresponding component; The collision detection range, collision position information, component contour parameters and size parameters are associated based on the component node, and collision detection is performed to obtain a collision detection result.
3. According to the BIM-based building curtain wall simulation design method of claim 2, It is characterized in that The method of associating the collision detection range, collision position information, component contour parameters and size parameters based on the component node and performing collision detection to obtain the collision detection result includes: Based on the collision position and the curtain wall components involved in the collision in the collision detection result, the collision type information of each curtain wall component having a collision relationship is obtained; the collision type information includes hard collision, soft collision and gap collision; the curtain wall component is associated with a component identifier; the collision type information is associated with a collision identifier; According to the different collision marks and curtain wall components, corresponding collision component models are obtained and displayed separately; In the pre-constructed BIM model of the main building, corresponding collision position information is displayed according to the collision position.
4. According to the BIM-based building curtain wall simulation design method of claim 1, It is characterized in that The method also includes: In the curtain wall simulation design model, wind field load simulations of different scenarios are performed based on the acquired wind field load simulation data, and wind pressure intensity feedback diagrams of different scenarios are generated accordingly. The wind pressure intensity feedback diagrams are obtained based on the wind pressure response data acquired when the wind field load simulation is performed for each curtain wall component of the curtain wall component information; In the curtain wall simulation design model, temperature excitation simulation is performed based on the acquired temperature heat load simulation data, and a heat load deformation evolution diagram is produced corresponding to different time periods. The heat load evolution diagram is obtained by fitting the component deformation trajectory data acquired when performing the temperature heat load simulation data for each curtain wall component based on the curtain wall component information. The heat load deformation evolution diagram dynamically renders the component deformation trajectory data of each curtain wall component.
5. According to the BIM-based building curtain wall simulation design method of claim 4, It is characterized in that The method also includes: Associating the wind pressure response data of each curtain wall component of the curtain wall component information with the construction location node information to obtain component wind pressure strength data and wind pressure strength distribution position; associating different component wind pressure strength data with corresponding component identifications; Sending different component wind pressure strength data to a preset judgment model, identifying and obtaining a threshold interval corresponding to the component wind pressure strength data; judging whether the component wind pressure strength data is within the corresponding threshold interval; When the wind pressure intensity data of a certain component is not within the corresponding threshold interval, a wind pressure abnormality mark point is generated based on the component identification and wind pressure intensity distribution position corresponding to the wind pressure intensity data of the component; The wind pressure anomaly mark point is displayed in association with the wind pressure intensity feedback diagram.
6. A BIM-based building curtain wall simulation design system, It is characterized in that The system includes: A curtain wall component information and location node information acquisition module is used to acquire an initial design and construction plan of a building curtain wall, and acquire corresponding curtain wall component information and construction location node information based on the initial design and construction plan; A collision detection module is used to perform collision detection based on the curtain wall component information and the construction location node information in the pre-built main building BIM model to obtain a collision detection result; A construction simulation module, used to optimize the initial design and construction plan of the building curtain wall based on the collision detection result to obtain a curtain wall simulation design plan, and perform construction simulation based on the curtain wall simulation design plan to obtain a construction simulation result; A simulation design scheme updating module is used to obtain a scheme correction parameter of a preset collaborative design platform based on the construction simulation result, and to update the curtain wall simulation design scheme based on the scheme correction parameter; the collaborative design platform is a collaborative operation platform linking design user terminals of multiple designers, and the scheme correction parameter is correction data input through the collaborative design platform; A visual construction scenario simulation module is used to construct a curtain wall simulation design model based on the construction links, work content and corresponding workflow of the updated building curtain wall simulation design scheme. The curtain wall simulation design model performs a visual construction scenario simulation on the design and construction process of the building curtain wall, obtains the simulation results and displays them on the preset collaborative design platform; The curtain wall component information and location node information acquisition module includes: The curtain wall component information acquisition submodule is used to obtain the initial design and construction plan of the building curtain wall, extract several construction processes and corresponding construction contents of the building curtain wall based on the initial design and construction plan; associate the corresponding curtain wall components and component identifiers based on several of the construction processes and corresponding construction contents, and obtain the curtain wall component information accordingly; The location node information acquisition submodule is used to associate all the construction processes with the construction technical specification information according to the plurality of the construction processes, the corresponding construction contents and the curtain wall component information, and to obtain the construction location layout information and component nodes of each component of the curtain wall component information based on the construction technical specification information; and to obtain the construction location node information based on the construction location layout information and component nodes of each component; The collaborative design platform includes a BIM database of curtain wall component information and construction technical specification information.
7. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the BIM-based building curtain wall simulation design method as described in any one of claims 1 to 5 are implemented.
8. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of a BIM-based building curtain wall simulation design method are implemented as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Collision detection method based on BIM technology
CN107330139A
BIM-based curtain wall engineering refined construction method and system, terminal and medium
CN113656879A