Use method of geomembrane in reservoir bottom seepage prevention and whole reservoir basin membrane seepage prevention system
By laying HDPE and TPO geomembranes in different areas at the bottom of the reservoir and using transition membrane welding connections, the 'clog effect' problem between HDPE geomembranes and rigid structure anchoring parts is solved, and the reservoir anti-seepage effect is improved and the system durability is achieved. Sexual and economical.
Patent Information
- Application Number
- CN202411185526.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
HDPE geomembrane and rigid structure anchoring areas are prone to "clog effect", resulting in concentrated leakage in the reservoir.
HDPE and TPO geomembranes are laid in different areas, and connected through transition film welding. The welding properties and elastic material characteristics of the new geomembranes are used to ensure the mechanical properties and anti-seepage effect of the welding site.
It effectively avoids concentrated leakage of the anti-seepage structure of the base membrane of the reservoir, improves the adaptability and durability of the anti-seepage system, reduces costs, and improves overall benefits.
Smart Images

Figure CN118880942A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a method for using a geomembrane in reservoir bottom anti-seepage and a whole reservoir basin membrane anti-seepage system, belonging to the technical field of geomembranes. Background Art
[0002] The geomembrane laying method is a support method for geomembrane construction. When laying the geomembrane, it is first planned according to the actual terrain size of the reservoir bottom, and the membrane is cut according to the actual planned size and transported to the corresponding position of the construction site.
[0003] At present, HDPE geomembrane and TPO geomembrane are usually anchored on the top of reinforced concrete drainage corridors, and the two different types of geomembranes are connected by reinforced concrete drainage corridors. According to the existing anti-seepage structure engineering of the upper reservoir of pumped storage power stations, the hardness of HDPE geomembrane is relatively large and its ability to adapt to foundation deformation is poor. It is easy to produce a "clamp effect" at the anchoring part of the relatively rigid structure, resulting in tensile damage of the geomembrane, which in turn leads to concentrated leakage of the reservoir. Summary of the invention
[0004] In order to solve the above problems, a method for using geomembrane in reservoir bottom waterproofing and a whole reservoir basin membrane waterproofing system are provided, which realizes the effective connection between two different types of geomembranes, HDPE and TPO, and avoids concentrated leakage of the reservoir bottom membrane waterproofing structure due to the "clamp effect".
[0005] The present invention adopts the following technical solutions:
[0006] According to one aspect of the present application, a method for using a geomembrane in reservoir bottom anti-seepage is provided, comprising the following steps:
[0007] (1) Clean the bottom of the reservoir to make its surface dry and flat, and there should be no debris within a vertical depth of 25 mm;
[0008] (2) Measure the dimensions of each area of the reservoir bottom and cut the corresponding geomembrane according to the dimensions;
[0009] (3) Lay 1#TPO geomembrane in the filling area at the bottom of the reservoir, lay HDPE geomembrane in the excavation area, lay transition membrane in the drainage corridor, and then use sandbags to press the geomembranes laid in each area firmly;
[0010] (4) Weld the transition membrane to the 1#TPO geomembrane and HDPE geomembrane respectively, then remove the sandbags and cover the geomembrane in each area with concrete or compacted clay;
[0011] The transition membrane is welded by 2#TPO geomembrane and new geomembrane, one end of 2#TPO geomembrane away from new geomembrane is connected to 1#TPO geomembrane, and one end of new geomembrane away from 2#TPO geomembrane is connected to HDPE geomembrane.
[0012] Optionally, the thickness of the 1#TPO geomembrane is 1-2 mm;
[0013] The thickness of the 2#TPO geomembrane is 1.5-2.5 mm;
[0014] The thickness of the novel geomembrane is 1-2 mm;
[0015] The thickness of the HDPE geomembrane is 1-2 mm.
[0016] Optionally, the overlap width of the seams between adjacent geomembranes is 100-120 mm.
[0017] Optionally, the welding temperature is 380-500° C., and the welding speed is 2.0-2.5 m / min.
[0018] Optionally, the novel geomembrane comprises the following raw materials in parts by weight: 25-40 parts of modified high-density polyethylene, 20-30 parts of low-density polyethylene, 17-25 parts of linear low-density polyethylene, 12-20 parts of polyethylene, 10-15 parts of ethylene-octene copolymer, 3-8 parts of anti-ultraviolet aging agent, 13-18 parts of maleic anhydride grafted ethylene propylene rubber, 5-10 parts of polybutylene terephthalate, 2-5 parts of pine fiber, 2-5 parts of polyacrylonitrile fiber, 1-3 parts of silane coupling agent, and 0.5-2 parts of antioxidant.
[0019] Optionally, the method for preparing the modified high-density polyethylene comprises the following steps:
[0020] S1. Mix 0.5-1wt% titanate and isopropanol evenly to obtain a diluted solution, then dry the composite powder at 90-110°C, add the dried composite powder into a high-speed mixer, heat it to 70-90°C, add the diluted solution into the high-speed mixer at a rate of 1-3 drops / second, stir evenly, and activate the composite powder at 70-90°C for 1-3h to obtain a pretreated composite powder;
[0021] S2. Add the pretreated composite powder and high-density polyethylene in a weight ratio of (0.4-0.6):1 into a high-speed mixer, stir and mix at room temperature for 5-10 minutes, and then extrude the mixture into granules through a twin-screw extruder at an extrusion temperature of 190-220° C. to obtain modified high-density polyethylene.
[0022] Optionally, the composite powder is aluminum nitride, calcite and silicon carbide in a weight ratio of (2-5):(1-3):(0.5-2).
[0023] Optionally, the anti-ultraviolet aging agent is polybenzimidazole and modified carbon black in a weight ratio of 1:(1-3).
[0024] Optionally, the silane coupling agent is selected from at least one of KH550, KH560, and KH570;
[0025] The antioxidant is selected from at least one of tert-butyl-4-hydroxyanisole, 3,4,5-trihydroxybenzoic acid propyl ester and tert-butyl hydroquinone.
[0026] According to another aspect of the present application, a whole reservoir basin membrane anti-seepage system is provided, comprising a 1#TPO geomembrane covering the reservoir bottom fill area, a HDPE geomembrane covering the reservoir bottom excavation area, and a transition membrane covering the reservoir bottom drainage gallery, wherein the transition membrane is connected between the 1#TPO geomembrane and the HDPE geomembrane;
[0027] The transition membrane is welded by 2#TPO geomembrane and the new geomembrane. The end of the 2#TPO geomembrane away from the new geomembrane is connected to the 1#TPO geomembrane, and the end of the new geomembrane away from the 2#TPO geomembrane is connected to the HDPE geomembrane.
[0028] In this application, "TPO" refers to 2,4,6-trimethylbenzoyl-diphenylphosphine oxide;
[0029] "HDPE" refers to high-density polyethylene.
[0030] The beneficial effects of this application include but are not limited to:
[0031] 1. The method for using the geomembrane in the reservoir bottom anti-seepage of the present application can provide the best anti-seepage effect for the reservoir bottom by laying different types of geomembranes in different areas; by setting a transition membrane, the welding construction can be made more convenient, and at the same time, the mechanical properties of the welding parts between adjacent geomembranes can meet the design requirements, avoiding leakage and damage at the connection parts of the reservoir bottom corridor; by cleaning the reservoir bottom, the basic quality of the geomembrane laying is ensured; by accurately cutting the geomembrane and using sandbags to press it firmly, the problems of wrinkles and damage in the laying process of the geomembrane can be effectively avoided, thereby improving the construction quality and efficiency; covering the geomembrane with concrete or compacting clay not only protects the geomembrane, but also facilitates the subsequent inspection and maintenance work.
[0032] 2. The method of using the geomembrane of the present application in reservoir bottom waterproofing, the transition membrane is 2#TPO geomembrane and a new type of geomembrane, which has both the excellent deformation adaptability of elastic materials and the weldability of plastic materials. The strength of the weld is greater than the strength of the membrane body, thereby improving the adaptability and durability of the entire waterproofing system; TPO geomembranes of different thicknesses are set in different areas, which can not only meet the waterproofing needs and ensure the safety and stability of the engineering structure, but also reduce costs and improve overall benefits; under appropriate welding temperature and speed, the geomembrane can be fully melted and a good fusion layer can be formed to ensure welding quality; welds with appropriate overlap widths can reduce damage or failure of the geomembrane due to stress concentration, and significantly reduce the risk of water or liquid penetration through the joints, thereby meeting the engineering waterproofing requirements.
[0033] 3. The new geomembrane of the present application has good anti-seepage performance, mechanical strength and weldability; among them, the addition of modified high-density polyethylene, low-density polyethylene and linear low-density polyethylene not only ensures that the geomembrane has excellent anti-seepage performance, but also enhances its flexibility, which is conducive to maintaining a stable anti-seepage effect in different terrains; in the anti-ultraviolet aging agent, polybenzimidazole and modified carbon black work synergistically to play a UV shielding effect, converting the absorbed light energy into heat energy, thereby inhibiting the photo-oxidation aging degradation of the geomembrane and effectively increasing its service life; this is because polybenzimidazole can inhibit the migration of modified carbon black in the geomembrane, avoiding the agglomeration of modified carbon black particles during use, thereby effectively resisting UV aging; the addition of antioxidants can prevent the geomembrane from being degraded due to oxidation during processing and use, ensuring the stability of its physical and chemical properties.
[0034] 4. In the novel geomembrane of the present application, by adding polyethylene, ethylene-octene copolymer, maleic anhydride grafted ethylene propylene rubber and polybutylene terephthalate, good mechanical strength is provided, and the compatibility between the components is enhanced, thereby improving the tensile and tear resistance of the geomembrane; by adding loose fiber and polyacrylonitrile fiber, it not only helps to improve the mechanical properties of the geomembrane, but also improves its biodegradability and reduces the potential impact on the environment; the addition of silane coupling agent further enhances the compatibility and bonding force between the components, thereby helping to improve the overall performance of the geomembrane. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0036] Figure 1 This is a schematic diagram of the structure of the whole reservoir basin membrane anti-seepage system involved in the embodiment of the present application.
[0037] List of parts and reference numerals:
[0038] 1. 1#TPO geomembrane, 2. HDPE geomembrane, 3. Drainage gallery, 4. 2#TPO geomembrane, 5. New geomembrane. DETAILED DESCRIPTION
[0039] The endpoints and any values of the ranges disclosed in this article are not limited to the precise ranges or values, and these ranges or values should be understood to include values close to these ranges or values. For numerical ranges, the endpoint values of each range, the endpoint values of each range and the individual point values, and the individual point values can be combined with each other to obtain one or more new numerical ranges, which should be considered as specifically disclosed in this article.
[0040] If no specific conditions are specified in the examples, the experiments were carried out under conventional conditions or conditions recommended by the manufacturer. The raw materials or instruments used, if no manufacturer is specified, are all conventional products that can be purchased commercially.
[0041] Reference Figure 1 , introduce the whole reservoir basin membrane anti-seepage system according to this application.
[0042] The whole reservoir basin membrane anti-seepage system according to this embodiment includes a 1#TPO geomembrane covering the fill area at the bottom of the reservoir, a HDPE geomembrane covering the excavation area at the bottom of the reservoir, and a transition membrane covering the drainage corridor at the bottom of the reservoir, and the transition membrane is connected between the 1#TPO geomembrane and the HDPE geomembrane; wherein, by laying different types of geomembranes in different areas, the best anti-seepage effect can be provided for the bottom of the reservoir; by setting the transition membrane, the welding construction can be made more convenient, and at the same time, the mechanical properties of the welding parts between adjacent geomembranes can meet the design requirements, thereby avoiding leakage and damage at the connection parts of the corridor at the bottom of the reservoir.
[0043] The transition membrane is welded by 2#TPO geomembrane and the new geomembrane. The end of 2#TPO geomembrane away from the new geomembrane is connected to 1#TPO geomembrane, and the end of the new geomembrane away from 2#TPO geomembrane is connected to HDPE geomembrane, forming a complete anti-seepage system that can effectively prevent the penetration of water or other liquids.
[0044] As an embodiment, the thickness of 1#TPO geomembrane is 1-2 mm, preferably 1.5 mm;
[0045] The thickness of 2#TPO geomembrane is 1.5-2.5mm, preferably 2mm;
[0046] The thickness of the new geomembrane is 1-2 mm, preferably 1.5 mm;
[0047] The thickness of HDPE geomembrane is 1-2mm, preferably 1.5mm;
[0048] Installing geomembranes of different types and thicknesses in different areas can not only meet the anti-seepage needs and ensure the safety and stability of the engineering structure, but also reduce costs and improve overall benefits.
[0049] As an implementation method, the overlap width of the joints between adjacent geomembranes is 100-120 mm, preferably 110 mm; welds with appropriate overlap width can reduce damage or failure of the geomembrane due to stress concentration, and significantly reduce the risk of water or liquid penetration through the joints, thereby meeting the engineering anti-seepage requirements.
[0050] The present invention is further described below through examples and comparative examples, and the use method of the geomembrane of the present invention in reservoir bottom waterproofing is described in detail. Unless otherwise specified, the thickness of the geomembrane and the overlap width of the joints between adjacent geomembranes involved below are all the above-mentioned preferred values.
[0051] Example 1
[0052] A method for using a geomembrane in reservoir bottom anti-seepage, comprising the following steps:
[0053] (1) Clean the bottom of the reservoir to make it dry and flat, and free of debris to a vertical depth of 25 mm;
[0054] (2) Measure the dimensions of each area of the reservoir bottom and cut the corresponding geomembrane according to the dimensions;
[0055] (3) Lay 1#TPO geomembrane in the filling area at the bottom of the reservoir, lay HDPE geomembrane in the excavation area, lay 2#TPO geomembrane and new geomembrane in the drainage corridor, and then use sandbags to press the geomembranes laid in each area firmly;
[0056] (4) Weld the 2#TPO geomembrane and the new geomembrane, weld the end of the 2#TPO geomembrane away from the new geomembrane to the 1#TPO geomembrane, and weld the end of the new geomembrane away from the 2#TPO geomembrane to the HDPE geomembrane. The welding temperature is 380°C and the welding speed is 2.0 m / min. Then remove the sandbags and cover the geomembranes in each area with concrete or compacted clay.
[0057] The preparation method of the novel geomembrane comprises the following steps:
[0058] a. By weight, 3 parts of anti-ultraviolet aging agent (polybenzimidazole and modified carbon black in a weight ratio of 1:1), 13 parts of maleic anhydride grafted EPDM rubber, 5 parts of polybutylene terephthalate, 2 parts of pine fiber, 2 parts of polyacrylonitrile fiber, 1 part of silane coupling agent KH550, and 0.5 parts of tert-butyl-4-hydroxyanisole were placed in an internal mixer, blended and internally kneaded at 80°C for 30 minutes, and extruded to obtain premixed particles;
[0059] b. Place 25 parts of modified high-density polyethylene, 20 parts of low-density polyethylene, 17 parts of linear low-density polyethylene, 12 parts of polyethylene, 10 parts of ethylene-octene copolymer and the premixed particles in step a into a twin-screw extruder, calender and form after extrusion through a die at 170° C. to obtain a novel geomembrane;
[0060] The preparation method of modified high-density polyethylene comprises the following steps:
[0061] S1. Mix 0.5wt% titanate and isopropanol evenly to obtain a diluted solution, then dry aluminum nitride, calcium silicate, and silicon carbide at a weight ratio of 2:1:0.5 at 90°C, then add the dried composite powder into a high-speed mixer, heat it to 70°C, add the diluted solution into the high-speed mixer at a rate of 1 drop / second, stir evenly, and activate the composite powder at 70°C for 3 hours to obtain a pretreated composite powder;
[0062] S2. Add the pretreated composite powder and high-density polyethylene in a weight ratio of 0.4:1 into a high-speed mixer, stir and mix at room temperature for 5 minutes, and then extrude the mixture into granules through a twin-screw extruder at an extrusion temperature of 190° C. to obtain modified high-density polyethylene.
[0063] Example 2
[0064] A method for using a geomembrane in reservoir bottom anti-seepage, comprising the following steps:
[0065] (1) Clean the bottom of the reservoir to make it dry and flat, and free of debris to a vertical depth of 20 mm;
[0066] (2) Measure the dimensions of each area of the reservoir bottom and cut the corresponding geomembrane according to the dimensions;
[0067] (3) Lay 1#TPO geomembrane in the filling area at the bottom of the reservoir, lay HDPE geomembrane in the excavation area, lay 2#TPO geomembrane and new geomembrane in the drainage corridor, and then use sandbags to press the geomembranes laid in each area firmly;
[0068] (4) Weld the 2#TPO geomembrane and the new geomembrane, weld the end of the 2#TPO geomembrane away from the new geomembrane to the 1#TPO geomembrane, and weld the end of the new geomembrane away from the 2#TPO geomembrane to the HDPE geomembrane. The welding temperature is 420°C and the welding speed is 2.2 m / min. Then remove the sandbags and cover the geomembranes in each area with concrete or compacted clay.
[0069] The preparation method of the novel geomembrane comprises the following steps:
[0070] a. By weight, 6 parts of anti-ultraviolet aging agent (polybenzimidazole and modified carbon black in a weight ratio of 1:2), 15 parts of maleic anhydride grafted EPDM rubber, 8 parts of polybutylene terephthalate, 4 parts of pine fiber, 3 parts of polyacrylonitrile fiber, 2 parts of silane coupling agent KH560, and 1 part of 3,4,5-trihydroxybenzoic acid propyl ester were placed in an internal mixer, blended and internally kneaded at 90°C for 20 minutes, and premixed particles were obtained after extrusion;
[0071] b. Place 33 parts of modified high-density polyethylene, 25 parts of low-density polyethylene, 20 parts of linear low-density polyethylene, 16 parts of polyethylene, 13 parts of ethylene-octene copolymer and the premixed particles in step a into a twin-screw extruder, calender and form after extrusion through a die at 175° C. to obtain a novel geomembrane;
[0072] The preparation method of modified high-density polyethylene comprises the following steps:
[0073] S1. Mix 0.8wt% titanate and isopropanol evenly to obtain a diluted solution, then dry aluminum nitride, calcium silicate, and silicon carbide at a weight ratio of 4:2:1 at 100°C, then add the dried composite powder into a high-speed mixer, heat it to 80°C, add the diluted solution into the high-speed mixer at a rate of 2 drops / second, stir evenly, and activate the composite powder at 80°C for 2h to obtain a pretreated composite powder;
[0074] S2. Add the pretreated composite powder and high-density polyethylene in a weight ratio of 0.5:1 into a high-speed mixer, stir and mix at room temperature for 8 minutes, and then extrude the mixture into granules through a twin-screw extruder at an extrusion temperature of 200° C. to obtain modified high-density polyethylene.
[0075] Example 3
[0076] A method for using a geomembrane in reservoir bottom anti-seepage, comprising the following steps:
[0077] (1) Clean the bottom of the reservoir to make it dry and flat, and free of debris to a vertical depth of 25 mm;
[0078] (2) Measure the dimensions of each area of the reservoir bottom and cut the corresponding geomembrane according to the dimensions;
[0079] (3) Lay 1#TPO geomembrane in the filling area at the bottom of the reservoir, lay HDPE geomembrane in the excavation area, lay 2#TPO geomembrane and new geomembrane in the drainage corridor, and then use sandbags to press the geomembranes laid in each area firmly;
[0080] (4) Weld the 2#TPO geomembrane and the new geomembrane, weld the end of the 2#TPO geomembrane away from the new geomembrane to the 1#TPO geomembrane, and weld the end of the new geomembrane away from the 2#TPO geomembrane to the HDPE geomembrane. The welding temperature is 500°C and the welding speed is 2.5m / min. Then remove the sandbags and cover the geomembranes in each area with concrete or compacted clay.
[0081] The preparation method of the novel geomembrane comprises the following steps:
[0082] a. By weight, 8 parts of anti-ultraviolet aging agent (polybenzimidazole and modified carbon black in a weight ratio of 1:3), 18 parts of maleic anhydride grafted EPDM rubber, 10 parts of polybutylene terephthalate, 5 parts of pine fiber, 5 parts of polyacrylonitrile fiber, 3 parts of silane coupling agent KH570, and 2 parts of tert-butyl hydroquinone were placed in an internal mixer, blended and internally kneaded at 100°C for 15 minutes, and extruded to obtain premixed particles;
[0083] b. Place 40 parts of modified high-density polyethylene, 30 parts of low-density polyethylene, 25 parts of linear low-density polyethylene, 20 parts of polyethylene, 15 parts of ethylene-octene copolymer and the premixed particles in step a into a twin-screw extruder, calender and form after extrusion through a die at 180° C. to obtain a novel geomembrane;
[0084] The preparation method of modified high-density polyethylene comprises the following steps:
[0085] S1. Evenly mix 1wt% of silane coupling agent KH570 and isopropanol to obtain a diluted solution, then dry aluminum nitride, calcium silicate, and silicon carbide at a weight ratio of 5:3:2 at 110°C, then add the dried composite powder into a high-speed mixer, heat it to 90°C, add the diluted solution into the high-speed mixer at a rate of 3 drops / second, stir evenly, and activate the composite powder at 90°C for 1h to obtain a pretreated composite powder;
[0086] S2. Add the pretreated composite powder and high-density polyethylene in a weight ratio of 0.6:1 into a high-speed mixer, stir and mix at room temperature for 10 minutes, and then extrude the mixture into granules through a twin-screw extruder at an extrusion temperature of 220° C. to obtain modified high-density polyethylene.
[0087] Example 4
[0088] The difference from Example 2 is that:
[0089] The thickness of 1#TPO geomembrane is 2mm;
[0090] The thickness of 2#TPO geomembrane is 1mm;
[0091] The thickness of the new geomembrane is 1mm;
[0092] The thickness of HDPE geomembrane is 2mm.
[0093] Example 5
[0094] The difference from Example 2 is that:
[0095] The overlap width of the seams between adjacent geomembranes is 80 mm.
[0096] Example 6
[0097] The difference from Example 2 is that:
[0098] In step (4), the welding temperature is 550° C. and the welding speed is 3 m / min.
[0099] Comparative Example 1
[0100] The difference from Example 2 is that:
[0101] Step (3) is: laying 1#TPO geomembrane in the filling area of the reservoir bottom, laying HDPE geomembrane in the excavation area, and then firmly pressing the geomembranes laid in each area with sandbags;
[0102] Step (4) is: welding 1#TPO geomembrane and HDPE geomembrane at the drainage gallery, the welding temperature is 420°C, the welding speed is 2.2 m / min, then removing the sandbags, and covering the geomembrane in each area with concrete or compacted clay;
[0103] Meanwhile, the preparation method of the novel geomembrane is not disclosed.
[0104] Comparative Example 2
[0105] The difference from Example 2 is that:
[0106] Step (3) is: laying 1#TPO geomembrane in the filling area of the reservoir bottom, laying HDPE geomembrane in the excavation area, laying 2#TPO geomembrane in the drainage gallery, and then firmly pressing the geomembranes laid in each area with sandbags;
[0107] Step (4) is: welding one end of the 2#TPO geomembrane to the 1#TPO geomembrane, and the other end to the HDPE geomembrane, the welding temperature is 420°C, the welding speed is 2.2 m / min, then removing the sandbags, and covering the geomembrane in each area with concrete or compacted clay;
[0108] Meanwhile, the preparation method of the novel geomembrane is not disclosed.
[0109] Comparative Example 3
[0110] The difference from Example 2 is that:
[0111] Step (3) is: laying 1#TPO geomembrane in the filling area at the bottom of the reservoir, laying HDPE geomembrane in the excavation area, laying a new geomembrane in the drainage gallery, and then firmly pressing the geomembranes laid in each area with sandbags;
[0112] Step (4) is: welding one end of the new geomembrane to 1#TPO geomembrane and the other end to HDPE geomembrane, the welding temperature is 420°C, the welding speed is 2.2m / min, then the sandbags are removed, and the geomembrane in each area is covered with concrete or compacted clay.
[0113] Comparative Example 4
[0114] The difference from Example 2 is that:
[0115] The method for preparing the modified high-density polyethylene is not disclosed, and the modified high-density polyethylene is replaced by high-density polyethylene.
[0116] Comparative Example 5
[0117] The difference from Example 2 is that:
[0118] The polybenzimidazole and modified carbon black in a weight ratio of 1:2 were replaced by modified carbon black.
[0119] The new geomembranes prepared in Examples 1-6 and Comparative Examples 1-5 were subjected to performance tests. The tensile breaking strength and tensile breaking elongation of different samples were tested according to CJ / T234-2006 6.6, the tear strength of different samples was tested according to CJ / T234-2006 6.7, the puncture strength of different samples was tested according to CJ / T 234-2006 6.8, the UV resistance of different samples was tested according to CJ / T 234-2006 6.14, the retention of normal pressure OIT after 1600h of ultraviolet irradiation, and the anti-seepage performance of different samples was tested according to CJ / T 234-2006 6.16. The results are shown in Table 1.
[0120] The performance of the new geomembrane was tested according to GB / T 17643-2011. Welded specimens with a size of 25 mm × 150 mm were cut and the welded parts were subjected to tearing and shearing tests using an Examo 300F tensile testing machine. The peel strength and shear strength were both taken as the average values of three seams. The results are shown in Table 1.
[0121] Table 1
[0122]
[0123] It can be seen from the results in Table 1 that the new geomembrane in this application still has excellent mechanical strength after ultraviolet irradiation, and is therefore suitable for long-term use; the 1#TPO geomembrane and the HDPE geomembrane are connected by a transition membrane as a medium, and in the peeling and shearing tests, the welding strength requirements are met, effectively avoiding the problem of peeling and substandard shear strength after direct hot melting of HDPE and TPO, thereby ensuring the effective implementation of the reservoir bottom anti-seepage project.
[0124] The above is only the embodiment of the present application, and the protection scope of the present application is not limited by these specific embodiments, but is determined by the claims of the present application. For those skilled in the art, the present application can have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the technical ideas and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for using a geomembrane in reservoir bottom anti-seepage, characterized in that: The following steps are involved: (1) Clean the bottom of the reservoir to make its surface dry and flat, and there should be no debris within a vertical depth of 25 mm; (2) Measure the dimensions of each area of the reservoir bottom and cut the corresponding geomembrane according to the dimensions; (3) Lay 1#TPO geomembrane in the filling area at the bottom of the reservoir, lay HDPE geomembrane in the excavation area, lay transition membrane in the drainage corridor, and then use sandbags to press the geomembranes laid in each area firmly; (4) Weld the transition membrane to the 1#TPO geomembrane and HDPE geomembrane respectively, then remove the sandbags and cover the geomembrane in each area with concrete or compacted clay; The transition membrane is welded by 2#TPO geomembrane and new geomembrane, one end of 2#TPO geomembrane away from new geomembrane is connected to 1#TPO geomembrane, and one end of new geomembrane away from 2#TPO geomembrane is connected to HDPE geomembrane.
2. The method for using the geomembrane in reservoir bottom anti-seepage according to claim 1, characterized in that: The thickness of the 1#TPO geomembrane is 1-2 mm; The thickness of the 2#TPO geomembrane is 1.5-2.5 mm; The thickness of the novel geomembrane is 1-2 mm; The thickness of the HDPE geomembrane is 1-2 mm.
3. The method for using the geomembrane in reservoir bottom anti-seepage according to claim 1, characterized in that: The overlap width of the joints between adjacent geomembranes is 100-120mm.
4. The method for using a geomembrane in reservoir bottom anti-seepage according to claim 1, characterized in that: The welding temperature is 380-500°C and the welding speed is 2.0-2.5m / min.
5. The method for using a geomembrane in reservoir bottom anti-seepage according to claim 1, characterized in that: The novel geomembrane comprises the following raw materials in parts by weight: 25-40 parts of modified high-density polyethylene, 20-30 parts of low-density polyethylene, 17-25 parts of linear low-density polyethylene, 12-20 parts of polyethylene, 10-15 parts of ethylene-octene copolymer, 3-8 parts of anti-ultraviolet aging agent, 13-18 parts of maleic anhydride grafted ethylene propylene rubber, 5-10 parts of polybutylene terephthalate, 2-5 parts of pine fiber, 2-5 parts of polyacrylonitrile fiber, 1-3 parts of silane coupling agent, and 0.5-2 parts of antioxidant.
6. The method for using the geomembrane in reservoir bottom anti-seepage according to claim 5, characterized in that: The preparation method of the modified high-density polyethylene comprises the following steps: S1. Mix 0.5-1wt% titanate and isopropanol evenly to obtain a diluted solution, then dry the composite powder at 90-110°C, add the dried composite powder into a high-speed mixer, heat it to 70-90°C, add the diluted solution into the high-speed mixer at a rate of 1-3 drops / second, stir evenly, and activate the composite powder at 70-90°C for 1-3h to obtain a pretreated composite powder; S2. Add the pretreated composite powder and high-density polyethylene in a weight ratio of (0.4-0.6):1 into a high-speed mixer, stir and mix at room temperature for 5-10 minutes, and then extrude the mixture into granules through a twin-screw extruder at an extrusion temperature of 190-220° C. to obtain modified high-density polyethylene.
7. The method for using a geomembrane in reservoir bottom anti-seepage according to claim 6, characterized in that: The composite powder is aluminum nitride, wollastonite and silicon carbide in a weight ratio of (2-5):(1-3):(0.5-2).
8. The method for using a geomembrane in reservoir bottom anti-seepage according to claim 5, characterized in that: The anti-ultraviolet aging agent is polybenzimidazole and modified carbon black in a weight ratio of 1:(1-3).
9. The method for using a geomembrane in reservoir bottom anti-seepage according to claim 5, characterized in that: The silane coupling agent is selected from at least one of KH550, KH560 and KH570; The antioxidant is selected from at least one of tert-butyl-4-hydroxyanisole, 3,4,5-trihydroxybenzoic acid propyl ester and tert-butyl hydroquinone.
10. A whole reservoir basin membrane anti-seepage system, characterized in that: It includes a 1#TPO geomembrane covering the filling area at the bottom of the reservoir, a HDPE geomembrane covering the excavation area at the bottom of the reservoir, and a transition membrane covering the drainage gallery at the bottom of the reservoir, wherein the transition membrane is connected between the 1#TPO geomembrane and the HDPE geomembrane; The transition membrane is welded by 2#TPO geomembrane and the new geomembrane. The end of the 2#TPO geomembrane away from the new geomembrane is connected to the 1#TPO geomembrane, and the end of the new geomembrane away from the 2#TPO geomembrane is connected to the HDPE geomembrane.
Citation Information
Patent Citations
Polyacrylonitrile fiber / high-density polyethylene composite material and preparation method thereof
CN104194123A
Reservoir basement membrane with both plastic deformation and strength performance and preparation process of reservoir basement membrane
CN118496543A
Geomembrane produced from mixtures of high-density polyethylene, low density linear polyethylene and low density polyethylene
WO2013016786A1
Cited By
Sand bag and method for pressing geomembrane with sand bag
CN119706063A
Transition zone impermeable material as well as preparation method and application thereof