Molten steel temperature adjusting and dust removing device of argon blowing station and operation method
By designing a steel temperature regulation and dust removal device for the argon blowing station, the problem of flue gas and dust pollution during the argon blowing process of molten steel was solved, and the synchronous regulation and precise control of the temperature and composition of molten steel were achieved, thus improving the working environment.
Patent Information
- Application Number
- CN202411076628.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-19
AI Technical Summary
The process of adding scrap steel to molten steel during argon blowing generates a large amount of flue gas and dust, leading to environmental pollution.
Design a steel temperature regulation and dust removal device for argon blowing station, including a dust removal hood, a weighing magnetic chuck and a rotating horizontal arm. Combined with the converter secondary dust removal system, it can realize the synchronous regulation of steel temperature and composition, and accurately control the amount of scrap steel added through the weighing magnetic chuck.
This technology enables the simultaneous implementation of argon blowing, temperature adjustment, and composition adjustment in molten steel, improving operational accuracy and environmental protection while reducing flue gas and dust pollution.
Smart Images

Figure CN118979132A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steelmaking, in particular to a molten steel temperature regulating and dust removing device and an operating method for an argon blowing station. Background Art
[0002] In the process of molten steel smelting, the problem of large temperature deviation of molten steel affecting the normal continuous casting production and the quality of steel billets often occurs. In order to solve the above problems, it is often necessary to add temperature-regulating scrap steel into the ladle to adjust the temperature of the molten steel to meet the production needs of the continuous casting machine and ensure the quality of the steel billets.
[0003] In actual operation, when argon is blown into molten steel and scrap steel is added to adjust the temperature, a large amount of smoke and dust is often generated, causing great pollution to the environment. Summary of the invention
[0004] The purpose of the present invention is to provide a molten steel temperature control and dust removal device and operation method for an argon blowing station, which is used to solve the problem that a large amount of smoke and dust are often generated during the existing process of molten steel temperature control by blowing argon and adding scrap steel, causing great pollution to the environment. To achieve the above-mentioned purpose, the present invention provides a molten steel temperature control and dust removal device in an argon blowing station, comprising an argon blowing platform, a ladle for smelting molten steel is installed at the bottom of the smelting platform, a dust removal cover is fixedly installed on the argon blowing platform along the vertical upward direction of the ladle, an exhaust duct at the upper end of the dust removal cover is connected to the secondary dust removal system of the converter, an operation port and a wire feeding conduit are arranged on one side of the dust removal cover, an operation window is installed at the operation port, the wire feeding conduit is used for feeding wires into molten steel, a chute for temperature control scrap steel is installed in the dust removal cover, an outlet at the lower end of the chute is directly opposite to the center position of the ladle mouth, an upper end of the chute is connected to a receiving trough for external temperature control scrap steel, the receiving trough and the chute transport the temperature control scrap steel and the additional alloy into the ladle, wherein the temperature control scrap steel is adsorbed and transported by a weighing magnetic suction cup, the weighing magnetic suction cup is transported by a rotating cross arm, and the rotating cross arm is installed on a column support on the argon blowing platform.
[0005] As a further solution of the present invention, the horizontal angle of the chute is not less than 60°.
[0006] As a further solution of the present invention, the weighing magnetic chuck is of electronic specifications, and performs weight detection while adsorbing the temperature-regulated scrap steel.
[0007] As a further solution of the present invention, a temperature-adjustable scrap steel bucket is provided on the argon blowing platform.
[0008] At the same time, the present invention also provides a method for using the device, which is applied to the above-mentioned molten steel temperature adjustment and dust removal device of the argon blowing station, comprising the following steps: Connect the argon blowing temperature control dust removal hood of molten steel to the secondary dust removal system of the converter and start them synchronously; When the converter is finished tapping, and the ladle filled with molten steel reaches the argon blowing and temperature adjustment position, the operator measures the temperature of the molten steel and takes samples through the operation port to confirm the temperature of the molten steel. When the temperature of the molten steel is greater than the upper limit of the target temperature, the amount of scrap steel added for temperature adjustment is calculated according to the middle limit of the target temperature. When additional alloy is needed to fine-tune the composition of molten steel, the additional alloy is added to the ladle through the temperature-adjusting scrap steel chute; The temperature-controlled scrap steel and the additional alloy are adsorbed by the weighing magnetic chuck and rotated with the rotating cross arm to be transported to the top of the receiving trough for unloading, and then added into the ladle through the chute; The steel types that need to be fed are fed synchronously through the wire feeding duct, and the temperature-adjusted scrap steel is added within 4 minutes. After the scrap steel is added, the argon is blown for 2 minutes and the molten steel temperature is measured again; Measure the molten steel temperature again and if it is within the target range, no more scrap steel will be added to adjust the temperature. When the molten steel temperature is still higher than the target temperature upper limit, appropriately extend the argon blowing time to ensure that all the scrap steel is melted and the molten steel temperature is uniform.
[0009] Compared with the prior art, the present invention realizes the simultaneous implementation of argon blowing, temperature adjustment and composition adjustment of molten steel to achieve better refining effect, and the use of a weighing magnetic chuck can accurately control the amount of scrap steel added, thereby improving the accuracy of the temperature adjustment operation. The dust hood is connected to the secondary dust removal system of the converter, which fully utilizes the original dust removal resources. At the same time, the dust hood blocks the high-temperature radiation of the molten steel in the ladle, thereby improving the working environment of the operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 The figure is a schematic diagram of the structure of a molten steel temperature control and dust removal device in an argon blowing station of the present invention.
[0011] In the attached figure: 1. argon blowing platform; 2. dust removal hood; 3. wire feeding duct; 4. operation port; 5. chute; 6. receiving trough; 7. weighing magnetic suction cup; 8. rotating cross arm; 9. column; 10. temperature-adjusting scrap steel bucket; 11. ladle. DETAILED DESCRIPTION
[0012] The technical solution of the present invention is further described in detail below in conjunction with specific implementation methods.
[0013] like Figure 1As shown, in an embodiment of the present invention, a molten steel temperature control and dust removal device of an argon blowing station comprises an argon blowing platform 1, a ladle 11 for smelting molten steel is installed at the bottom of the smelting platform, a dust removal cover 2 is fixedly installed vertically upward along the ladle 11 on the argon blowing platform 1, an exhaust pipe at the upper end of the dust removal cover 2 is connected to the secondary dust removal system of the converter, an operation port 4 and a wire feeding conduit 3 are provided on one side of the dust removal cover 2, an operation window is installed at the operation port 4, and the wire feeding conduit 3 is used for molten steel Feeding line, a chute 5 for temperature-controlled scrap steel is installed in the dust removal cover 2, the lower end outlet of the chute 5 is directly opposite to the center of the ladle 11, the upper end of the chute 5 is connected to the receiving trough 6 of the external temperature-controlled scrap steel, and the temperature-controlled scrap steel is transported to the ladle 11 by the receiving trough 6 and the chute 5, wherein the temperature-controlled scrap steel and the additional alloy are adsorbed and transported by the weighing magnetic suction cup 7, and the weighing magnetic suction cup 7 is transported by the rotating cross arm 8, and the rotating cross arm 8 is installed on the support of the column 9 on the argon blowing platform 1.
[0014] like Figure 1 As shown, in the embodiment of the present invention, the horizontal angle of the chute 5 is not less than 60°, so as to ensure that the temperature-controlled scrap steel slides down automatically. Of course, the actual horizontal angle of the chute 5 can be adjusted according to the actual situation while meeting the requirements of the temperature-controlled scrap steel.
[0015] like Figure 1 As shown, in the embodiment of the present invention, the weighing magnetic chuck 7 is of electronic specifications, which performs weight detection while adsorbing the temperature-regulated scrap steel and adding alloy. The rotation of the weighing magnetic chuck 7 and the rotating cross arm 8 are both operated by an operator remotely by a remote control.
[0016] like Figure 1 As shown, in the embodiment of the present invention, a temperature-controlled scrap steel bucket 10 is provided on the argon blowing platform 1 to facilitate timely replenishment of the temperature-controlled scrap steel.
[0017] At the same time, the present invention also provides a method for using the device, which is applied to any of the above-mentioned argon blowing station molten steel temperature adjustment and dust removal devices, comprising the following steps: Connect the molten steel argon blowing temperature control dust removal hood 2 with the converter secondary dust removal system and start them synchronously; When the steel tapping of the converter is completed and the ladle 11 filled with molten steel reaches the argon blowing and temperature adjustment position of the molten steel, the operator measures the temperature of the molten steel and takes samples through the operation port 4 to confirm the temperature of the molten steel. When the temperature of the molten steel is greater than the upper limit of the target temperature, the amount of scrap steel added for temperature adjustment is calculated according to the middle limit of the target temperature; When additional alloy is needed to fine-tune the composition of molten steel, the additional alloy is added to the ladle through the temperature-adjusting scrap steel chute; The temperature-controlled scrap steel and the additional alloy are adsorbed by the weighing magnetic chuck 7, and rotated with the rotating cross arm 8, and transported to the top of the receiving trough 6 for unloading, and are guided by the chute 5 into the ladle 11; The steel type that needs to be fed is fed synchronously through the wire feeding conduit 3, and the temperature-adjusted scrap steel is added within 4 minutes. After the scrap steel is added, the argon is blown for 2 minutes and the temperature of the molten steel is measured again; Measure the molten steel temperature again and if it is within the target range, no more scrap steel will be added to adjust the temperature. When the molten steel temperature is still higher than the target temperature upper limit, appropriately extend the argon blowing time to ensure that all the scrap steel is melted and the molten steel temperature is uniform.
[0018] The present invention realizes the simultaneous implementation of argon blowing, temperature adjustment and composition adjustment of molten steel, thereby achieving better refining effect. The weight-measuring magnetic chuck 7 can accurately control the amount of scrap steel added, thereby improving the accuracy of the temperature adjustment operation. The dust hood 2 is connected to the secondary dust removal system of the converter, which fully utilizes the original dust removal resources. At the same time, the dust hood 2 blocks the high-temperature radiation of the molten steel in the ladle 11, thereby improving the working environment of the operators.
[0019] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.
Claims
1. A molten steel temperature control and dust removal device for an argon blowing station, characterized in that: It comprises an argon blowing platform, a ladle for smelting molten steel is installed at the bottom of the smelting platform, a dust hood is fixedly installed along the vertical upward direction of the ladle on the argon blowing platform, an exhaust duct at the upper end of the dust hood is connected to the secondary dust removal system of the converter, an operation port and a wire feeding duct are arranged on one side of the dust hood, an operation window is installed at the operation port, the wire feeding duct is used for feeding wire into molten steel, a chute for temperature-adjusting scrap steel is installed in the dust hood, an outlet at the lower end of the chute is directly opposite to the center of the ladle mouth, the upper end of the chute is connected to a receiving trough for external temperature-adjusting scrap steel, the receiving trough and the chute transport the temperature-adjusting scrap steel and the supplementary alloy into the ladle, wherein the temperature-adjusting scrap steel is adsorbed and transported by a weighing magnetic suction cup, and the weighing magnetic suction cup is transported by a rotating cross arm, and the rotating cross arm is installed on the column support on the argon blowing platform.
2. The molten steel temperature control and dust removal device of the argon blowing station according to claim 1 is characterized in that: The horizontal angle of the chute is not less than 60°.
3. The molten steel temperature control and dust removal device of the argon blowing station according to claim 1, characterized in that: The weighing magnetic chuck is of electronic specifications, and performs weight detection while absorbing the temperature-controlled scrap steel.
4. The molten steel temperature control and dust removal device of the argon blowing station according to claim 1, characterized in that: A temperature-adjusting scrap steel bucket is arranged on the argon blowing platform.
5. A method for using the device, characterized in that: A molten steel temperature control and dust removal device for an argon blowing station as claimed in any one of claims 1 to 4 comprises the following steps: Connect the argon blowing temperature control dust removal hood of molten steel to the secondary dust removal system of the converter and start them synchronously; When the converter is finished tapping, and the ladle filled with molten steel reaches the argon blowing and temperature adjustment position, the operator measures the temperature of the molten steel and takes samples through the operation port to confirm the temperature of the molten steel. When the temperature of the molten steel is greater than the upper limit of the target temperature, the amount of scrap steel added for temperature adjustment is calculated according to the middle limit of the target temperature. The temperature-controlled scrap steel is adsorbed by the weighing magnetic chuck and rotated with the rotating cross arm to be transported to the top of the receiving trough for unloading, and then added into the ladle through the chute; When additional alloy is needed to fine-tune the composition of molten steel, the additional alloy is added to the ladle through the temperature-adjusting scrap steel chute; The steel types that need to be fed are fed synchronously through the wire feeding duct, and the temperature-adjusted scrap steel is added within 4 minutes. After the scrap steel is added, the argon is blown for 2 minutes and the molten steel temperature is measured again; Measure the molten steel temperature again and if it is within the target range, no more scrap steel will be added to adjust the temperature. When the molten steel temperature is still higher than the target temperature upper limit, appropriately extend the argon blowing time to ensure that all the scrap steel is melted and the molten steel temperature is uniform.
