Engine turbine rotor taper hole connection combination machining method
Through the use of special tooling and tools, the accuracy and consistency of the processing of the cone hole of the turbine rotor is ensured, which solves the problem of high accuracy requirements but poor consistency in traditional methods, and achieves efficient combined assembly and cost reduction.
Patent Information
- Application Number
- CN202411487942.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional turbine rotor cone hole processing method has problems such as high accuracy requirements but poor consistency, interference assembly affects assembly difficulty and high cost.
Use special tooling for clamping and positioning and special tool processing. Through step-by-step processes, ensure that the coaxiality, parallelism and jumping of the cone hole meet the requirements. Use an integrated inspection tool for inspection to avoid error accumulation and ensure that the high-pressure turbine disc and air conduction are carried out. The exact combination of flow disks.
The accuracy and consistency of the combined processing of the cone hole of the turbine rotor is improved, eliminating interference and reducing assembly difficulty and cost.
Smart Images

Figure CN118989884A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of turbine rotor processing, in particular to a combined processing method for connecting tapered holes of engine turbine rotors. Background Art
[0002] The traditional processing method uses a single part to process the tapered hole, and then the high-pressure turbine disc, air guide disc, and rear journal are assembled. The components are connected by tapered holes, and the air guide disc and the high-pressure turbine disc have an axial interference of 0.05-0.20mm, and the bolts are interference-fitted. If there is a slight deviation, the assembly requirements cannot be met. The processing accuracy of the parts is extremely high and difficult to guarantee.
[0003] The current processing method is to perform tapered hole processing on a single part, which requires high processing accuracy and poor processing consistency. After processing, it is affected by interference fit and is difficult to assemble. When processing a single product, three specifications of special measuring tools need to be designed, which is costly. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a combined processing method for connecting tapered holes of engine turbine rotors, which solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a combined processing method for connecting a tapered hole of an engine turbine rotor, comprising the following specific steps: Step 1: Prepare matching materials, assemble the guide plate, high-pressure turbine plate and high-pressure turbine rotor rear journal according to the matching table, and fill in the matching form in sequence; Step 2: Assembly and inspection; Step 3: Ream the conical hole. The specific steps are as follows: (1) Process the eight holes in the worm gear rotor that are not equipped with process bolts in sequence according to the process drawings; (2) After processing the eight tapered holes above, use eight process tapered bolts to tighten them symmetrically in sequence, with a tightening torque of 22N·m to 27N·m. During the tightening process, the inner hole table of the parts needs to be inspected; after tightening, check the coaxiality, parallelism and runout of each part in sequence according to the process requirements of step 2; (3) Remove the six process bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the six tapered holes; (4) Remove the two process pin bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the last two tapered holes; (5) After the tapered hole is processed, it shall be inspected according to the requirements in step 2, and the inspection shall be confirmed and recorded; (6) The parts are hoisted together with the fixture to the three-coordinate inspection. The inspection requirements of some components in the final inspection process allow the inspection results of this process to be copied; (7) Disassembly of parts; Step 4: Electrolytic marking: Electrolytically mark the "0" position hole of the part according to the process drawing requirements; Step 5: Chamfer the orifice, chamfer the orifice of each part in turn according to the process drawing; Step 6: Final inspection: Carry out final inspection on each part according to the process drawings. The inspection of some components requires the use of the process inspection results of step 3.
[0006] Optionally, the assembly and inspection in step 2 are specifically as follows: (1) Install the fixture on the machine tool turntable and measure the flatness of the fixture to see if it meets the requirements of the drawing; (2) Assemble the parts on the fixture in sequence according to the design drawings. During assembly, it is necessary to confirm whether the parts are aligned and in the same position, and check the runout of each part as required by the design drawings; (3) Assemble the process pin bolts on the two symmetrical process positioning holes and tighten them manually; (4) Assemble six process bolts on the other six holes evenly distributed at eight locations that already contain two pin bolts and tighten them manually; (5) Align and inspect the coaxiality, parallelism and runout of parts according to the design drawings until the requirements are met; (6) Use a torque wrench to tighten the locking bolts symmetrically in sequence. The tightening torque is 35N·m~40N·m. During the tightening process, the inner hole surface of the parts needs to be inspected; (7) Inspect and confirm that the parts meet the requirements of the design drawings after assembly, and record the actual values of the inspection data.
[0007] Optionally, each tapered hole processed in step three must be inspected and confirmed to be qualified before subsequent processing.
[0008] The present invention provides a combined processing method for connecting a tapered hole of an engine turbine rotor, which has the following beneficial effects: The combined processing method for the tapered hole connection of the engine turbine rotor adopts special tooling for clamping and positioning, so that the state of the three products after clamping is consistent with the use state, eliminating the interference between the high-pressure turbine disk and the air guide disk; design a special tool for combined processing, the tool is an integral tool, to ensure that the holes of the three products are on the same generatrix, and use a special inspection fixture for inspection, the inspection fixture is integrated, which can avoid the error accumulation caused by the inspection of single parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is an installation diagram showing the invention during processing; Figure 2This is a partial enlarged display of the guide disc, the high-pressure turbine disc and the high-pressure turbine rotor rear journal connection during the processing of the invention; Figure 3 This is a diagram of the bolt hole arrangement during the processing of the invention.
[0010] In the figure: 1. guide plate; 2. high-pressure turbine plate; 3. rear journal of high-pressure turbine rotor; 4. fixture. DETAILED DESCRIPTION
[0011] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0012] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0013] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0014] The present invention provides a technical solution: a combined processing method for connecting a tapered hole of an engine turbine rotor, comprising the following specific steps: Step 1: Prepare the matching materials, assemble the required parts according to the matching table, and fill in the matching form in sequence; Step 2: Assembly and inspection. The assembly and inspection are as follows: (1) Install the fixture 4 on the machine tool turntable and measure the flatness of the fixture to see if it meets the requirements of the drawing; (2) According to the design drawings, the guide plate 1, the high-pressure turbine plate 2 and the high-pressure turbine rotor rear journal 3 are coaxially assembled on the fixture 4 in sequence. The fixture 4 and the high-pressure turbine rotor rear journal 3 must be kept coaxial. During assembly, it is necessary to confirm whether the parts are aligned and in the same position, and check the runout of each part as shown in the design drawings. Figure 1 As shown; (3) Assemble the process pin bolts on the two symmetrical process positioning holes and tighten them manually, such as Figure 2 As shown; (4) Assemble six process bolts on the other six holes evenly distributed at eight locations that already contain two pin bolts and tighten them manually; (5) Align and inspect the coaxiality, parallelism and runout of parts according to the design drawings until the requirements are met; (6) Use a torque wrench to tighten the locking bolts symmetrically in sequence. The tightening torque is 35N·m~40N·m. During the tightening process, the inner hole surface of the parts needs to be inspected; (7) Inspect and confirm that the parts meet the requirements of the design drawings after assembly, and record the actual values of the inspection data; Step 3: Ream the conical hole. The specific steps are as follows: (1) Process the eight holes in the worm gear rotor that are not equipped with process bolts in sequence according to the process drawings. Each tapered hole must be inspected and confirmed to be qualified before subsequent processing, such as Figure 3 As shown; (2) After processing the eight tapered holes above, use eight process tapered bolts to tighten them symmetrically in sequence, with a tightening torque of 22N·m to 27N·m. During the tightening process, the inner hole table of the parts needs to be inspected; after tightening, check the coaxiality, parallelism and runout of each part in sequence according to the process requirements of step 2; (3) Remove the six process bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the six tapered holes, such as Figure 3 As shown; (4) Remove the two process pin bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the last two tapered holes. Figure 3 As shown; (5) After the tapered hole is processed, it shall be inspected according to the requirements in step 2, and the inspection shall be confirmed and recorded; (6) The parts are hoisted together with the fixture 4 to the three-coordinate inspection. The inspection requirements of some components in the final inspection process allow the inspection results of this process to be copied; (7) Disassembly of parts; Step 4: Electrolytic marking: Electrolytically mark the "0" position hole of the part according to the process drawing requirements; Step 5: Chamfer the orifice, chamfer the orifice of each part in turn according to the process drawing; Step 6: Final inspection: Carry out final inspection on each part according to the process drawings. The inspection of some components requires the use of the process inspection results of step 3.
[0015] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A combined processing method for connecting a tapered hole of an engine turbine rotor, characterized in that: The specific steps include: Step 1: Prepare matching materials, assemble the guide disc (1), the high-pressure turbine disc (2) and the high-pressure turbine rotor rear journal (3) according to the matching table, and fill in the matching form in sequence; Step 2: Assembly and inspection; Step 3: Ream the conical hole. The specific steps are as follows: (1) Process the eight holes in the worm gear rotor that are not equipped with process bolts in sequence according to the process drawings; (2) After processing the eight tapered holes above, use eight process tapered bolts to tighten them symmetrically in sequence, with a tightening torque of 22N·m to 27N·m. During the tightening process, the inner hole table of the parts needs to be inspected; after tightening, check the coaxiality, parallelism and runout of each part in sequence according to the process requirements of step 2; (3) Remove the six process bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the six tapered holes; (4) Remove the two process pin bolts and check the coaxiality, parallelism and runout of each part again. After passing the inspection, process the last two tapered holes; (5) After the tapered hole is processed, it shall be inspected according to the requirements in step 2, and the inspection shall be confirmed and recorded; (6) The parts are hoisted together with the fixture (4) to the three-coordinate inspection. The inspection requirements of some components in the final inspection process allow the inspection results of this process to be copied; (7) Disassembly of parts; Step 4: Electrolytic marking: Electrolytically mark the "0" position hole of the part according to the process drawing requirements; Step 5: Chamfer the orifice, chamfer the orifice of each part in turn according to the process drawing; Step 6: Final inspection: Carry out final inspection on each part according to the process drawings. The inspection of some components requires the use of the process inspection results of step 3.
2. The engine turbine rotor tapered hole connection combined processing method according to claim 1, characterized in that: The assembly and inspection in step 2 are as follows: (1) Install the fixture (4) on the machine tool turntable and measure the flatness of the fixture to see if it meets the requirements of the drawing; (2) Assemble the parts on the fixture (4) in sequence according to the design drawings. During assembly, confirm whether the parts are aligned and in the same position, and check the runout of each part according to the requirements of the design drawings; (3) Assemble the process pin bolts on the two symmetrical process positioning holes and tighten them manually; (4) Assemble six process bolts on the other six holes evenly distributed at eight locations that already contain two pin bolts and tighten them manually; (5) Align and inspect the coaxiality, parallelism and runout of parts according to the design drawings until the requirements are met; (6) Use a torque wrench to tighten the locking bolts symmetrically in sequence. The tightening torque is 35N·m~40N·m. During the tightening process, the inner hole surface of the parts needs to be inspected; (7) Inspect and confirm that the parts meet the requirements of the design drawings after assembly, and record the actual values of the inspection data.
3. The engine turbine rotor tapered hole connection combined processing method according to claim 1, characterized in that: Each tapered hole processed in step three must be inspected and confirmed to be qualified before subsequent processing.
Citation Information
Patent Citations
Method and device for simultaneous drilling and reaming processing of crankshaft and flywheel of marine low-speed diesel engine
CN103551855A
Numerical control machining method for combined matched drilling of taper holes of high-pressure turbine rotor
CN106736332A
Finish machining method for CPP variable-pitch propeller hub assembly
CN115401406A
Bolt connection structure and method for turbine rotor connection
CN117027957A
Precise forming method for axial taper hole of high-pressure turbine rotor of aero-engine
CN118003044A
Cited By
Large-size mortise machining method for super-thick large-specification wheel disc
CN119347341A
Engine turbine rotor machining method and system based on data processing
CN120259951A
Engine turbine rotor machining method and system based on data processing
CN120259951B
Machining method of thin-wall ring part with eccentric structure
CN120839431A