Cross-water suspension tunnel

By adopting a floating structure in an underwater suspended tunnel combined with anchoring and pier column design, and using combined technologies such as anchor wall foundation, connecting cables and vertical pier columns, the problems of high construction difficulty and uneven stress are solved, and the strong Binding and high flexural modulus meet the needs of underwater traffic safety and reduce costs.

CN119041484APending Publication Date: 2024-11-29刘传明
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411492150.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing underwater suspended tunnels are difficult to construct and expensive, and the stress is uneven, making it difficult to meet the needs of safe traffic.

Method used

The floating-tube tunnel structure is combined with anchoring and partial pier column structure, and the combination design is provided by the anchor cable wall base, connecting cable, elastic mounting rod, vertical pier column and cable-stayed cable, providing strong binding force and resistance in horizontal and vertical directions. Flexibility modulus improves the multi-directional pulling force and stability of the tunnel.

Benefits of technology

It effectively ensures strong binding force in the horizontal and vertical directions of the tunnel, improves the bending modulus, meets the needs of safe underwater traffic, and reduces the engineering cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041484A_ABST
    Figure CN119041484A_ABST
Patent Text Reader

Abstract

The invention relates to the field of equipment related to underwater tunnels, and provides a water-crossing suspension tunnel which comprises anchor cable wall foundations arranged on coast on the two sides of a water area respectively, and a plurality of tunnel bodies are arranged between the two anchor cable wall foundations. A tunnel entrance and exit is formed in the middle of the anchor cable wall foundation, a plurality of connecting cables are evenly arranged on the peripheral side wall of the tunnel entrance and exit, a plurality of sets of through cable penetrating holes are formed in the side wall of any set of tunnel body, and positioning connecting holes are formed between every two adjacent sets of cable penetrating holes. One end of each connecting cable is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on one side, and the other end of each connecting cable sequentially penetrates through the cable penetrating holes of the multiple tunnel bodies and then is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on the other side; elastic mounting rods are arranged in the positioning connecting holes between every two adjacent groups of tunnel bodies, and elastic mounting rods are also arranged at the connecting ends of the tunnel bodies and the tunnel entrance and exit and the connecting ends of the channel isolation walls in every two adjacent groups of tunnel bodies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of underwater tunnel-related equipment, and in particular to a cross-water suspended tunnel. Background Art

[0002] An underwater suspended tunnel is generally composed of a tubular structure floating at a certain depth in the water, a support system and structures on both sides. The support system includes anchor cables, piers or pontoons anchored on the seabed foundation. The tubular structure has a large space, which is sufficient to meet the requirements of road and rail transportation. It is a new type of structure for transportation vehicles to cross the two banks separated by deep water. It is suitable for all transportation vehicles that need to travel in the water. It can pass trains, cars, small motor vehicles and pedestrians. It can also be made into a service channel for laying various pipelines and cables.

[0003] In the study of suspended tunnels, according to the relationship between the suspended tunnel's own gravity and the buoyancy it receives, the proposed structural types can be roughly divided into three categories: buoy type, anchor type, and pier type. The buoy type suspended tunnel is a tunnel suspended on a buoy on the water surface by anchor cables or anchor chains. The tunnel's gravity is greater than its buoyancy, and the vertical direction is greatly affected by the fluctuation of tides; the anchor type suspended tunnel is a tunnel anchored to the anchor foundation below the seabed by tension legs or anchor cables. The tunnel's gravity is less than its buoyancy, and the tunnel will shift or shake under the action of hydrodynamics; the pier type is actually a tunnel bridge supported on underwater piers, which is difficult to construct and expensive.

[0004] In order to make the force on the suspended tunnel more reasonable, for example, the pontoon type, vertical tension and inclined tension provide a lower constraint force in the horizontal direction of the tunnel. At the same time, the bending modulus in the horizontal and vertical directions are limited. It is necessary to build a tunnel that can ensure that the horizontal and vertical constraints of the tunnel are strong and have a larger bending modulus to better meet the needs of safe traffic. The present invention provides a pontoon type tunnel structure as a basis, combined with a structure of anchoring and setting some piers to overcome the above-mentioned problems of difficult construction, high cost and uneven force. Summary of the invention

[0005] The present invention proposes a new water-spanning suspended tunnel to solve one of the above-mentioned technical problems.

[0006] In view of this, the present invention proposes a new cross-water suspended tunnel, comprising anchor cable wall foundations respectively arranged on the coasts on both sides of the water area, and multiple groups of tunnel bodies interconnected with each other are arranged between two groups of the anchor cable wall foundations; a tunnel entrance and exit are arranged in the middle of the anchor cable wall foundation, and multiple connecting cables are evenly arranged on the outer peripheral side walls of the tunnel entrance and exit, and an elastic mounting rod is arranged between two adjacent connecting cables; multiple groups of through cable holes are evenly arranged on the side walls of any group of the tunnel bodies, and a positioning connecting hole is arranged between two adjacent groups of the cable holes; one end of each of the connecting cables is arranged on the outer peripheral side wall of the tunnel entrance and exit on one coast, and the other end of each of the connecting cables is arranged on the outer peripheral side wall of the tunnel entrance and exit on one coast, and the other end of each of the connecting cables is arranged on the outer peripheral side wall of the tunnel entrance and exit on one coast. After sequentially passing through the cable holes of multiple tunnel bodies, it is arranged on the outer peripheral side wall of the tunnel entrance and exit on the coast on the other side; the elastic mounting rod is also arranged in the positioning connection hole between the two adjacent groups of tunnel bodies, and the connecting end of the tunnel body and the tunnel entrance and exit is also arranged with the elastic mounting rod, each group of tunnel bodies is symmetrically provided with vertical piers on both sides, the bottom of each group of vertical piers is inserted on the seabed, the outer sides of the two groups of vertical piers are provided with a grounded No. 1 inclined cable, a No. 1 transverse cable is arranged between the tops of the two groups of vertical piers, and two groups of No. 2 inclined cables and two groups of No. 2 transverse cables are symmetrically arranged on the outer side walls on both sides of the tunnel body.

[0007] In the above technical scheme, anchor cable wall foundations for anchoring high-strength connecting cables that penetrate the side walls of the tunnel body are respectively constructed on the banks on both sides, and the anchor cable wall foundations on both sides serve as the entrance and exit of the entire tunnel; moreover, the entire tunnel is assembled by multiple groups of tunnel bodies, and two adjacent groups of tunnel bodies are assembled by connecting cables and connected by elastic mounting rods, which can elastically provide axial pulling force for the tunnel body. In addition, vertical piers with multi-angle pulling are respectively arranged on both sides of each group of tunnel bodies, which can effectively provide effective vertical, oblique and lateral pulling for the tunnel body, thereby improving the multi-directional elastic restraint force of the tunnel body to further meet the needs of safe traffic.

[0008] Preferably, the outer side walls of the two groups of vertical piers are provided with a No. 1 pulley block and a No. 2 pulley block at the same height, the middle part of the No. 2 transverse cable is arranged on the No. 1 pulley block, the end of the No. 2 transverse cable is arranged on the outer side wall of the tunnel body, the end of the No. 2 oblique cable is arranged on the outer side wall of the tunnel body, and the middle part of the No. 2 oblique cable is arranged on the No. 2 pulley block.

[0009] In the above technical scheme, the No. 2 transverse cable is mounted on the No. 1 pulley block. Specifically, a No. 1 pulley block includes a No. 1 fixed pulley and two No. 1 guide wheels. The middle part of each group of No. 2 transverse cables is mounted on the No. 1 fixed pulley, and the two ends of each group of No. 2 transverse cables are respectively arranged on the side walls of the tunnel body along the two No. 1 guide wheels; a No. 2 pulley block includes a No. 2 fixed pulley arranged outside the No. 1 fixed pulley, and two No. 2 guide wheels vertically arranged on the vertical piers. The middle part of each group of No. 2 oblique cables is mounted on the No. 2 fixed pulley, and the two ends of each group of No. 2 oblique cables are respectively arranged on the side walls of the tunnel body along the two No. 2 guide wheels. While providing pulling force, it provides movable space, which can effectively reduce the impact of wave fluctuations on the tunnel body.

[0010] Preferably, an underwater connecting beam is arranged downward on the outer side wall of the bottom of the tunnel body, one end of a No. 3 transverse cable is arranged on both sides of the underwater connecting beam, the other end of the No. 3 transverse cable is arranged on the vertical pier, or the other end of the No. 3 transverse cable is arranged on a cable passing through the vertical pier; an underwater buffer balancing device is arranged at the bottom of the underwater connecting beam.

[0011] In the above technical solution, one or more groups of underwater connecting beams are arranged at the bottom of the tunnel body for connecting the underwater buffer balancing device.

[0012] Preferably, the underwater buffer balancing device includes at least one group of cross-shaped mounting beams, each group of the mounting beams is provided with axles inclined at multiple angles, the middle part of each group of axles is fixed on the mounting beams, and impellers are symmetrically arranged at both ends of each group of axles.

[0013] In the above technical solution, the impellers on the underwater buffer balancing device are symmetrically arranged, which can effectively reduce the impact of waves and load changes on the tunnel.

[0014] Preferably, the tunnel entrance and exit and the inner bottom of the tunnel body are both provided with a roadbed, two groups of channel partition walls are provided from the roadbed upward to the top of the tunnel body, a railway channel is provided between the two groups of channel partition walls, and a highway channel is provided on the outer sides of the two groups of channel partition walls.

[0015] Preferably, a special-shaped railway track is provided at the bottom of the railway passage.

[0016] In the above technical solution, there are road passages on both sides of the tunnel body, which can accommodate small vehicles. Emergency lanes can also be set up outside the road passages, and rail-mounted mechanical arms, lifting, rescue, and transfer flatbed trucks can be set up in the emergency lanes.

[0017] Preferably, the cross-water floating tunnel also includes multiple groups of cross-shore cables, one end of each group of cross-shore cables is arranged on the anchor cable wall foundation on one side of the coast, and the other end of each group of cross-shore cables passes through each group of vertical piers in sequence and is arranged on the anchor cable wall foundation on the other side of the coast.

[0018] In the above technical scheme, the tunnel body is fixed at a place where there are vertical piers. At a position where no vertical piers are set, the tunnel body is fixed on a plurality of cross-shore cables passed through the vertical piers on both sides. This can make full use of the strong stabilizing effect of the vertical piers on the suspended tunnel, so that this strong stabilizing effect can be fully exerted and radiated to other vacant sections without the support of vertical piers. The suspended tunnel is fixed on the plurality of cross-shore cables passed through the vertical piers, thereby reducing the number of vertical piers to be built and reducing the project cost.

[0019] Preferably, the cross-water floating tunnel further comprises a rescue platform and a ventilation shaft, and the rescue platform is connected to the tunnel body through the ventilation shaft.

[0020] In the above technical solution, the ventilation shaft is connected to the air on the water surface through the rescue platform, which is convenient for providing oxygen and air circulation on the one hand, and also convenient for the outside world to carry out real-time rescue operations inside the tunnel on the other hand.

[0021] Preferably, an upper ball head is provided at the top of the ventilation shaft, and a lower ball head is provided at the bottom of the ventilation shaft. The ventilation shaft comprises an upper cylinder assembly and a lower cylinder assembly, and the upper cylinder assembly is movably inserted into the inner side of the top of the lower cylinder assembly for sleeve connection.

[0022] Preferably, the upper cylinder assembly includes an upper inner cylinder, an upper middle cylinder and an upper outer cylinder, and the lower cylinder assembly includes a lower inner cylinder, a lower middle cylinder and a lower outer cylinder, and the contact surfaces of the upper inner cylinder and the lower inner cylinder, the contact surfaces of the upper middle cylinder and the lower middle cylinder, and the contact surfaces of the upper outer cylinder and the lower outer cylinder are all provided with wear-resistant elastic rings; ventilation holes and lubricating oil injection holes are provided between adjacent wear-resistant elastic rings of the above-mentioned each cylinder wall to effectively prevent the wear-resistant elastic ring from being pushed out of the ring groove by the enclosed gas, and ball head slot bases are provided on the rescue platform and the tunnel body, the upper ball head at the top of the ventilation shaft is inserted into the ball head slot base connected to the bottom of the rescue platform, and the lower ball head of the ventilation shaft is inserted into the ball head slot base provided on the tunnel body.

[0023] In the above technical solution, the upper ball head and the lower ball head are both connected to the ball head slot base, and the diameter of the ball head slot base is larger than the diameter of the upper ball head and the lower ball head, so that the end connection of the ventilation shaft can be softly connected to avoid the problem of being too rigid and easy to break.

[0024] Preferably, in order to prevent tunnel collapse-type water seepage and to maximize the safety of people and vehicles in tunnels without water inflow, hidden emergency isolation doors are set on the road surface in the highway tunnels on both sides. The emergency isolation door is similar to the cross-sectional shape of the tunnel and is usually used as a road surface. In the event of a collapse-type water seepage accident, the hidden isolation door quickly pops up, fits and closes the tunnel, and connects with the locking mechanism at the upper part of the tunnel to form a separation wall to prevent water seepage from affecting other things. The isolation door is made of steel plate, and the bottom edge of the steel plate is a door hinge-type rotating shaft, which is fixed to the tunnel body and firmly connected. The back of the door is a hydraulic top connecting rod, which is driven by a servo motor, and the servo motor is composed of an automatic sensing and analysis module. Note that the top of the tunnel where the hidden isolation door is installed, the space inside the insulation steel plate, and the sewer space at the bottom of the road surface are separated by vertical partitions to prevent water flow from intercommunication.

[0025] Preferably, the outer peripheral surface of the cross-shore cable and the tunnel body is sprayed with Teflon coating.

[0026] Compared with the prior art, the advantage of the present invention is that by setting up multiple groups of elastically connected tunnel bodies and vertical piers on both sides of the tunnel body, with the help of anchor wall foundations, connecting cables and cross-shore cables, the strong restraint force in the horizontal and vertical directions of the tunnel is effectively ensured, while also ensuring a large bending modulus, effectively meeting the needs of safe underwater transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of a top view of a water-spanning suspended tunnel according to an embodiment of the present invention is shown; Figure 2 It is shown that according to the present invention Figure 1 Structural schematic diagram of anchor cable wall foundation; Figure 3 It is shown that according to the present invention Figure 1 A set of schematic side structural diagrams of a tunnel body; Figure 4 It is shown that according to the present invention Figure 3 A schematic diagram of the structure of an underwater buffer balance device; Figure 5 A schematic diagram of a cross-sectional connection structure of a rescue platform and a ventilation shaft according to an embodiment of the present invention is shown; Figure 6 A schematic diagram of the side structure of a special-shaped railway track according to an embodiment of the present invention is shown; Figure 7 It is shown that according to the present invention Figure 3 Schematic diagram of the assembly structure of the tunnel body, ventilation shaft and rescue platform; Figure 8 It is shown that according to the present invention Figure 7 Another structural schematic diagram of the ventilation shaft; Fig. 9 A schematic diagram of the structure of the emergency isolation door in use according to an embodiment of the present invention is shown.

[0028] Among them, the names corresponding to the reference numerals in the accompanying drawings are: 101. Anchor cable foundation; 102. Tunnel body; 103. Connecting cable; 104. Elastic mounting rod; 105. Roadbed; 106. Channel partition wall; 107. Railway channel; 108. Highway channel; 109. Special-shaped railway track; 110. Cable hole; 111. Positioning connection hole; 112. Vertical pier; 113. No. 1 inclined cable; 114. No. 1 transverse cable; 115. No. 2 inclined cable; 116. No. 2 transverse cable; 117. No. 1 pulley block; 118. No. 2 pulley block; 119. Water Lower connecting beam; 120, No. 3 horizontal cable; 121, underwater buffer balance device; 122, mounting beam; 123, wheel axle; 124, impeller; 125, cross-shore cable; 126, rescue platform; 127, ventilation shaft; 128, upper ball head; 129, lower ball head; 130, upper cylinder assembly; 131, lower cylinder assembly; 132, ball head slot base; 133, shock-absorbing sealing rubber sleeve; 134, scissor frame; 135, lighthouse; 136, emergency isolation door; 137, rotating shaft; 138, hydraulic top connecting rod. DETAILED DESCRIPTION

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be briefly introduced below in combination with the drawings and the description of the embodiments or the prior art. Obviously, the following description of the structure of the drawings is only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.

[0030] The following combination Figures 1 to 9 The invention is further described.

[0031] Embodiment 1: Reference Figures 1 to 3 As shown, this embodiment provides a cross-water floating tunnel, including anchor cable wall foundations 101 respectively arranged on the coasts on both sides of the water area, and multiple groups of tunnel bodies 102 connected to each other are arranged between two groups of anchor cable wall foundations 101; like Figure 2As shown, a tunnel entrance is arranged in the middle of the anchor cable wall foundation 101, and a plurality of connecting cables 103 are evenly arranged on the outer peripheral side wall of the tunnel entrance, and an elastic mounting rod 104 is arranged between two adjacent connecting cables 103; The tunnel entrance and exit and the inner bottom of the tunnel body 102 of the above embodiment are both provided with a roadbed 105. Figure 2 As shown, two groups of channel partition walls 106 are arranged from the road surface of the roadbed 105 to the top of the tunnel, a railway channel 107 is arranged between the two groups of channel partition walls 106, and highway channels 108 are arranged on the outsides of the two groups of channel partition walls 106. A special-shaped railway track 109 is arranged at the bottom of the railway channel 107.

[0032] In the above embodiment, the pipe column side wall of the tunnel body 102 is divided into five layers from the outside to the inside. The outermost layer is a Teflon coating, which can improve the corrosion resistance of the pipeline to seawater and reduce the resistance of waves and ocean current shock waves. The second layer is an anti-collision and explosion-proof steel plate layer. The third layer is an elastic cement buffer layer. The fourth layer is a concrete layer of a reinforced concrete structure. The fifth layer is a shock wave absorbing steel plate layer (not shown in the figure) supported by multi-point springs and bolts to prevent internal explosions. Among them, a high-power spring support frame with uniform point distribution is arranged between the inner steel plate layer and the concrete layer to provide a buffer space. The spring buffer space here can also effectively improve the heat insulation effect. At the same time, an automatic sprinkler fire extinguishing system is arranged in the isolation layer where the spring support frame is arranged, and the sprinkler port is directed to the inside of the tunnel body 102 through the reserved holes on the steel plate to effectively extinguish the fire.

[0033] During the manufacturing process of the above-mentioned tunnel body 102, in order to ensure good sealing of the tunnel body 102, a single set of tunnel components, anchor wall foundation 101, rescue platform 126 and ventilation shaft 127 and other structures are built on the shore, all of which are integrally formed to ensure sealing. The outer wall of the tunnel body 102 is provided with hanging ears, which are also integrally formed to facilitate hanging of ropes.

[0034] A plurality of through-going cable holes 110 are evenly arranged on the side wall of any group of the tunnel bodies 102, and a positioning connection hole 111 is arranged between two adjacent groups of the cable holes 110; One end of each of the connecting cables 103 is arranged on the outer peripheral side wall of the anchor cable wall of the tunnel entrance on one coast, and the other end of each of the connecting cables 103 passes through the cable holes 110 of the tunnel bodies 102 in sequence and is arranged on the outer peripheral side wall of the anchor cable wall of the tunnel entrance on the other coast; In the above embodiment, a plurality of cable holes 110 and positioning connection holes 111 are prefabricated in the concrete layer of the side wall of the tunnel body 102, wherein the cable hole 110 is used to pass the connecting cable 103, wherein when the cable hole 110 is reserved, the hole openings at both ends of the cable hole 110 are trumpet-shaped (not shown in the figure), and the edges of the trumpet-shaped are chamfered, and a high-strength self-lubricating plastic tube is passed through the cable hole 110 to isolate the connecting cable 103 from the inner wall of the cable hole 110, prevent the connecting cable 103 from directly contacting the concrete of the inner wall of the cable hole 110, and effectively protect the wear resistance of the connecting cable 103.

[0035] The purpose of adopting a trumpet shape and chamfering the edges, as well as adding a hole wall formed by a high-strength self-lubricating plastic tube is: first, to facilitate the insertion of the joint through which the connecting cable 103 passes; second, to leave sufficient space for movement when adjacent tunnel sections are misaligned to prevent the edge of the cable hole 110 from shearing the connecting cable 103; and third, to protect the connecting cable 103 from wear, thereby increasing the service life of the connecting cable 103.

[0036] The elastic mounting rod 104 is also disposed in the positioning connection holes 111 between two adjacent groups of the tunnel bodies 102, and the connection end between the tunnel body 102 and the tunnel entrance is also disposed with the elastic mounting rod 104; In the above embodiment, the positioning connection hole 111 serves as a movement space for inserting the screw and tightening the nut. When assembling the tunnel body 102, the positioning bolt gasket and the buffer spring are inserted into the positioning connection hole 111 between two adjacent groups of tunnel bodies 102, and then the nut is tightened. The screw, tightening nut, positioning bolt gasket and buffer spring constitute the elastic mounting rod 104.

[0037] Each group of the tunnel bodies 102 are symmetrically provided with vertical piers 112 on both sides, the bottom of each group of the vertical piers 112 is inserted into the seabed, the outer sides of the two groups of the vertical piers 112 are provided with grounded No. 1 inclined cables 113, a No. 1 transverse cable 114 is provided between the tops of the two groups of the vertical piers 112, and two groups of No. 2 inclined cables 115 and two groups of No. 2 transverse cables 116 are symmetrically provided on the outer side walls on both sides of the tunnel body 102.

[0038] In the above embodiment, the water-spanning suspended tunnel is composed of an anchor cable wall foundation 101, a plurality of high-strength connecting cables 103, a plurality of tunnel bodies 102, vertical piers 112 arranged on both sides of the tunnel body 102, and underground No. 1 inclined cables 113 and No. 2 inclined cables 115 and No. 2 transverse cables 116 for increasing the stability of the vertical piers 112. During actual operation, the tunnel body 102 is also connected with a permeable emergency drainage system, an emergency rescue system, a security system for preventing train derailment, and a long-distance ventilation system.

[0039] The permeable emergency drainage system is composed of a pump, a permeable intelligent sensing component, and an analysis automatic control module (not shown in the figure). When the water level sensor on the inner wall of the tunnel body 102 detects that the water level in the tunnel body 102 is abnormal, it can automatically trigger the pump to start and pump out the accumulated water in the tunnel body 102; the emergency rescue system includes a fire extinguisher, an emergency oxygen supply box and a rescue platform 126 connected to the outside world arranged inside the tunnel body 102; the security system for preventing train derailment is to provide a semi-T-shaped special-shaped track, such as Figure 6 As shown; the long-distance ventilation system includes a ventilation shaft 127 and multiple ventilation channels.

[0040] In addition, the above-mentioned single group of tunnel bodies 102 are all rigid structural members, which are in the shape of a flat hollow elliptical cylinder with an elliptical cross-section. The entire tunnel is composed of several tunnel bodies 102 connected in series. The interior of a single group of tunnel bodies 102 is provided with an up road, a down road and a train track. The lower part of the tunnel of the tunnel body 102 is a roadbed 105 made of a diaphragm. The bottom of the diaphragm roadbed 105 is prefabricated and connected to the bottom of the inner wall of the tunnel body 102 by multiple vertical walls. The lower hollow part in the tunnel is a water storage chamber, and a water level sensor is provided in the water storage chamber, which is connected to a permeable emergency drainage system.

[0041] After the assembly of multiple sets of tunnel bodies is completed, each tunnel is filled with seawater. In order to drain the water in each tunnel, it is necessary to make a piston and a mechanical walking power device with the same shape as each tunnel, push the piston along the tunnel, and push out the water in the tunnel section by section.

[0042] Specifically, pistons with the same shape as the tunnels are implanted in the tunnels on both sides of the first tunnel body 102 on the shore, and rubber rings are embedded in the edges of the pistons to ensure that the pistons are sealed with the tunnel wall. The pistons are pushed along the tunnel wall to drain the water in the tunnel. As the pistons move forward, the water in the tunnel bodies 102 can be drained after each tunnel body 102 is passed. When the joints of two adjacent tunnel sections are exposed, the pistons are continued to be pushed forward to reinforce the adjacent tunnel sections, and the remaining water is discharged through the drainage system at the bottom of the tunnel until it reaches the other side.

[0043] First, the roads on both sides are paved and road facilities are added. When the weight ratio of the added facilities is appropriate, the railway tunnel is opened, the weight is withdrawn, the positioning bolts are tightened, the auxiliary facilities are assembled, and the special-shaped railway track 109 is paved.

[0044] Among them, the sealing between adjacent tunnel bodies 102 is the lifeline of the safe operation of the suspended tunnel. In order to ensure the water tightness of the tunnel body 102, both ends of each tunnel body 102 adopt elliptical steel joints, one end is a tapered tenon, and the other end is a mortise with a reverse taper. The mortise and tenon structure is provided with a sealing rubber pad (not shown in the figure) made by mixing and integrating rubber, perfluoroether and elastic steel corrugated spring leaves. The spring leaf is provided with multiple strip holes and multiple wave peaks, which can effectively integrate with the rubber pad, increase elasticity, and reduce the influence of fatigue on the sealing effect; the sealing rubber pad is integrally formed with the tunnel body 102, and a positioning connection hole 111 and a cable hole 110 are reserved. The adjacent tunnel bodies 102 are plug-in fit through mortise and tenon.

[0045] Embodiment 2: In combination with the above embodiments, Figure 3 As shown, the outer walls of the two groups of vertical piers 112 are provided with a first pulley block 117 and a second pulley block 118 at the same height, the middle part of the second transverse cable 116 is arranged on the first pulley block 117, and the end of the second transverse cable 116 is arranged on the outer wall of the tunnel body 102, the end of the second inclined cable 115 is arranged on the outer wall of the tunnel body 102, and the middle part of the second inclined cable 115 is arranged on the second pulley block 118.

[0046] During the actual use of this cross-water floating tunnel, when the surface water body close to the water surface is hit by a typhoon, huge waves will be set off. When a part of the water body is thrown up, the potential energy of this part of the water body increases. At the same time, the kinetic energy and potential energy of the thrown water body itself are increasing, and the flow rate gradually increases. Since water is a fluid, the water that is not thrown up must fill the groove formed by the thrown water body, causing the water to flow. Although it loses some potential energy, it increases its own kinetic energy, and the cycle repeats. The floating tunnel in the water body is also affected and goes with the flow.

[0047] In order to prevent the suspended tunnel from swaying laterally in the water, the tunnel body 102 must be fixed to the vertical piers 112 on both sides in the horizontal direction through two groups of cables, one group is the No. 2 horizontal cables 116 on both sides, and the other group is the No. 2 inclined cables 115 on both sides. The connection between the underwater buffer balance device 121 connected to the lower part of each tunnel body 102 and the vertical piers 112 on both sides also provides a certain horizontal stiffness control for the tunnel. In order to increase the tension of the cable, a pulley block can be used for tensioning. According to the formula of the movable pulley block F=G / n, F is the tension of the free end of the cable, n is the number of cable segments wound on all movable pulleys, and G is the tension on the tunnel section body, which is the cable passing through the movable pulley block and the fixed pulley, with a smaller traction force in exchange for a larger fixing force.

[0048] The upper end of each vertical pier 112 on one side of the tunnel body 102 and the upper end of the vertical pier 112 on the other side symmetrical thereto are pulled straight with a high-strength No. 1 transverse cable 114. For the vertical piers 112 that are higher in deep water areas, it is also necessary to add a No. 1 inclined cable 113 on the outer side of the upper end of the vertical pier 112 and fix it with underground anchor cables to increase the stability of the vertical piers 112 on both sides.

[0049] On each vertical pier 112, a plurality of embedded fixed pulleys are arranged at a certain distance from top to bottom, and a pulley block (not shown in the figure) is arranged on the outer side of the vertical pier 112 for horizontal and oblique pulling of the No. 2 transverse cable 116 and the No. 2 oblique cable 115. The pulley block is arranged on the vertical pier 112 through a hydraulic support arm, so that the multiple pulley blocks have a hydraulic shock absorbing function, thereby improving the lateral fixing stiffness of the tunnel body 102, and can reduce the load of the hydraulic support arm and the shock absorbing spring while tightening it through the pulley block.

[0050] Embodiment 3: In combination with the above embodiments, Figure 3 and 4 As shown, an underwater connecting beam 119 is downwardly arranged on the outer side wall of the bottom of the tunnel body 102, and a No. 3 transverse cable 120 is arranged on both sides of the underwater connecting beam 119, wherein one end of the No. 3 transverse cable 120 is arranged at the lowest end of the underwater connecting beam 119, and the other end of the No. 3 transverse cable 120 is arranged on the vertical pier 112 or in a place where no vertical pier is arranged, and the other end of the No. 3 transverse cable 120 is arranged on a cross-shore cable passing through the lowest section of the vertical pier; an underwater buffer balancing device 121 is arranged at the bottom of the underwater connecting beam 119; Specifically, the underwater buffer balancing device 121 includes at least one group of cross-shaped mounting beams 122, each group of the mounting beams 122 is provided with axles 123 inclined at multiple angles, the middle part of each group of axles 123 is fixed on the mounting beams 122, and both ends of each group of axles 123 are symmetrically provided with impellers 124.

[0051] The shape of the vertical pier 112 is similar to the shape of the bridge pier of the high-speed railway track, specifically, an elliptical solid pier or a rectangular pier with pointed ends. The standing direction of the elliptical cylinder is the direction in which the elliptical major axis of the vertical pier 112 is perpendicular to the major axis of the suspended tunnel.

[0052] On the left and right sides at a set distance from the floating tunnel, a row of vertical piers 112 are planted deep into the bedrock of the seabed strata, and the adjacent vertical piers 112 arranged in front and behind are spaced at a set distance, separated by the tunnel as a symmetry axis, and the two rows of vertical piers 112 are symmetrical to each other; the top of the vertical piers 112 is higher than the top of the floating tunnel.

[0053] Embodiment 4: In combination with the above embodiments, Figure 1 and Figure 3 As shown, the cross-water floating tunnel also includes a plurality of groups of cross-shore cables 125, one end of each group of the cross-shore cables 125 is arranged on the anchor cable wall foundation 101 on one side of the coast, and the other end of each group of the cross-shore cables 125 passes through each group of the vertical piers 112 in sequence and is arranged on the anchor cable wall foundation 101 on the other side of the coast.

[0054] Among them, for the fixation of the tunnel body 102, although multiple bundles of high-strength connecting cables 103 of multiple groups of tunnel bodies 102 that run through the entire suspended tunnel are adopted, and the vertical piers 112 on both sides and multiple cross-shore cables 125 on the vertical piers 112 are used to pull the entire tunnel horizontally, obliquely, and vertically to achieve connection and fixation, since the vertical force on the entire tunnel is large and the vertical force is extremely complex, the above measures alone are still weak in controlling the vertical stiffness of the tunnel. It is necessary to rigidly connect the underwater buffer balance device 121 deep into the lower water area at the bottom of the tunnel body 102 for restraint, which can not only provide horizontal stiffness for the suspended tunnel, but also provide vertical stiffness control for the suspended tunnel. The above methods of fixing the tunnel body 102, plus the buoyancy, gravity and bearing force generated by the tunnel body 102 itself, comprehensively balance the magnitude of each force, and can meet the vertical stiffness requirements and safe operation requirements of the tunnel body 102.

[0055] In the above embodiment, the underwater buffer balance device 121 is manufactured based on the principle of floating on water, the principle of leverage and the principle of a big tree taking root in the earth to resist wind. According to the above principles, the tunnel body 102 should be integrated with the upper and lower water bodies and take root in the relatively stable lower water body to achieve the purpose of resisting water flow stirring.

[0056] When a typhoon hits the water surface, the water in the deep water layer is relatively stable compared to the water in the surface water layer. Based on this relative stability, a device can be manufactured to allow the lower water body in a relatively stable state to restrain the floating tunnel in the upper water layer, so as to prevent the floating tunnel in the upper layer from drifting with the current.

[0057] Therefore, according to the force transmission principle and lever principle in mechanical mechanics, an underwater connecting beam 119 extending into the deep water area is installed at the bottom of the tunnel to connect the underwater buffer balance device 121 in the deep water body, so as to make full use of the drag effect of the lower water body to generate a quantitative drag force, which is transmitted upward through the lever arm connection to the tunnel body 102 for drag, so that it becomes stable along with the stability of the lower water body.

[0058] Specifically, the underwater buffer balance device 121 is extended to the deep waters by the underwater connecting beam 119 at the bottom of the tunnel body 102, and the horizontal beams and the horizontal longitudinal beams are rigidly connected at the lower ends of the multiple underwater connecting beams 119. The horizontal beams and the horizontal longitudinal beams are cross-intersected, and the vertical shafts and the horizontal longitudinal beams are respectively installed on the horizontal beams and the horizontal longitudinal beams, that is, multiple groups of multi-angle inclined axles 123 are arranged on the installation beam 122, and impellers 124 are arranged at both ends of the vertical shaft and the horizontal shaft, that is, impellers 124 are arranged at both ends of the axle 123, and the diameter of the impeller 124 and the size of the cutting angle of the blades with the water body are determined by the following formulas: The size, the number of installation layers and groups of impellers 124, and the length of the mounting beam 122 affect the balance, and can be changed according to actual needs. Multiple layers of impellers 124 can also be installed on the same impeller 124 shaft 123, and two adjacent impellers 124 can choose to rotate in opposite directions to stir the water flow. For example, when both are pressing down, the upper blades rotate clockwise and the lower blades rotate counterclockwise, which fully destroys the dispersion effect of the overall force of the surrounding water body on the underwater buffer balance device 121. The rotation of the above impellers can also be used as a hydroelectric power generation device to supply power to the outside.

[0059] First, calculate the net horizontal force of the upper water disturbance on the tunnel body 102 when the unit length of the tunnel body 102 is hit by the strongest typhoon, and the net force does not include the impact of the ocean current; then calculate the vertical net force on the tunnel body 102 caused by the rolling disturbance of the upper water body affected by the typhoon, and calculate the required length of the balance lever arm that penetrates into the lower water area, wherein the calculation is specifically based on the principle of lever mechanics: F1*L1=F2*L2, that is, the principle of power*power arm=resistance*resistance arm. When calculating, the relationship between the vibration wavelength of the tunnel body 102 and the size of the lower buffer balance device must be fully considered to avoid the resonance phenomenon caused by the tunnel body 102 and the movement of the water body; when the vertical moment is constant, the diameter of the impeller 124 that needs to be installed, the number of impeller 124 groups, the blade's cutting angle to the water body, and the moment length that the lower cross arm needs to provide are calculated. When the arm depth is limited, the vertical moment limitation can be compensated by increasing the impeller 124 diameter, increasing the number of impeller 124 groups, reducing the blade cutting angle, or increasing the moment length of the lower cross arm to enhance the effect of stabilizing the suspended tunnel. When the underwater buffer balance device 121 is installed at the bottom of the tunnel body 102, the effect is that when the suspended tunnel in the upper water area is affected by the lateral force, the tunnel body 102 will definitely swing laterally. The swing of the tunnel body 102 is transmitted to the upper lateral force through the underwater connecting beam 119 through the lever arm extending downward from the underwater buffer balance device 121. The lateral force of the upper part is transmitted to the lower lateral lever arm through the underwater connecting beam 119. The lateral lever arm is then transmitted to the impeller 124 and the blades, so that the laterally installed impeller 124 and the blades float up and down, or rotate, and stir, scoop up or press down the water around the blades. The upper and lower water bodies around the blades generate a reaction force on the blade impeller 124, and this reaction force is transmitted to the underwater connecting beam 119. The force arm of the beam 119 is transmitted back to the tunnel body 102, thereby achieving the purpose of stabilizing the tunnel body 102. On the other hand, the vertically installed impeller 124 and blades will affect the displacement of the water on the left and right sides of this place. The displacement of the water here will react on the blades and impeller 124. The force of the impeller 124 and the blades is transmitted to the impeller 124 shaft 123, and the impeller 124 shaft 123 is transmitted to the tunnel through the force arm composed of the underwater connecting beam 119, thereby dissipating the force of the upper tunnel body 102. It can be said that any force on the tunnel body 102 can be borne by the water around the position of the underwater buffer balance device 121 at the bottom of the tunnel body 102.

[0060] Embodiment 5: In combination with the above embodiments, Figure 5 and Figure 7As shown, the cross-water floating tunnel also includes a rescue platform 126 and a ventilation shaft 127, and the rescue platform 126 is connected to the tunnel body 102 through the ventilation shaft 127; wherein the top of the ventilation shaft 127 is provided with an upper ball head 128, and the bottom of the ventilation shaft 127 is provided with a lower ball head 129, and the ventilation shaft 127 includes an upper cylinder assembly 130 and a lower cylinder assembly 131, and the upper cylinder assembly 130 is movably inserted on the top of the lower cylinder assembly 131; in addition, a guardrail and a lighthouse are also provided on the top of the rescue platform 126 to alert passing ships.

[0061] In the actual structure, the upper cylinder assembly 130 includes an upper insert inner cylinder, an upper insert middle cylinder and an upper insert outer cylinder, and the lower cylinder assembly 131 includes a lower insert inner cylinder, a lower insert middle cylinder and a lower insert outer cylinder (not shown in the figure), and the contact surfaces of the upper insert inner cylinder and the lower insert inner cylinder, the contact surfaces of the upper insert middle cylinder and the lower insert middle cylinder, and the contact surfaces of the upper insert outer cylinder and the lower insert outer cylinder are all provided with wear-resistant elastic rings; wherein the outer walls of the upper insert outer, middle and inner cylinders are all provided with multiple grooves for installing elastic rings; The rescue platform 126 and the tunnel body 102 are both provided with a ball head socket base 132 , and the upper ball head 128 and the lower ball head 129 are both inserted on the top of the ball head socket base 132 , that is, inserted into the inside thereof.

[0062] In the above-mentioned embodiment, the suspended tunnel type of transportation is adopted, and the ventilation problem in the tunnel must be solved. Specifically, a shaft type ventilation method is adopted in the suspended tunnel in water.

[0063] The shaft-type ventilation method is specifically implemented by a ventilation shaft 127, which includes an upper cylinder assembly 130 and a lower cylinder assembly 131, specifically two groups of cylinders with different diameters are sheathed together, and the cylinder with a smaller diameter is sheathed into the cylinder with a larger diameter to form a piston-type cylinder. On the outer side of the circumference of the cylinder wall with a smaller diameter, a plurality of grooves for installing wear-resistant elastic rings are provided. When the two cylinders are sheathed, a plurality of wear-resistant elastic rings made of large perfluoroether rubber rings are embedded in each groove to achieve sealing after the two cylinders are sheathed. In this way, the vertical force of the shaft and the rescue platform 126 connected to the shaft is no longer transmitted to the suspended tunnel, and the force of the tunnel is no longer transmitted to the ventilation shaft.

[0064] However, it is also necessary to solve the problem that the horizontal force between the shaft and the tunnel body 102, and between the shaft and the rescue platform 126 is no longer transmitted to the tunnel. This requires that in addition to fixing the rescue platform 126 on the water surface, the ventilation shaft 127 and the vertical pier 112, it is also necessary to make ball-head connections between the ventilation shaft 127 and the rescue platform 126, and between the ventilation shaft 127 and the tunnel body 102. The purpose of setting the ball-head connection is to break the force direction so that the forces are no longer transmitted to each other. The rescue platform 126 floats up and down, and the sleeve piston slides up and down to provide a buffer space. If the rescue platform 126 swings back and forth, left and right, it is released by twisting the two ball-head connections at the upper and lower ends of the ventilation shaft 127. Control the torsion angle that the two ball-head connections can provide, and ensure the activity margin, so that it can move within a limited range.

[0065] In order to increase the water sealing effect, a three-layer sleeve structure can also be used, with multiple outer, middle and inner sealing rings configured, and multi-layer sleeves connected. Air holes must be reserved in the interlayer to ensure that the piston does not hold air during movement and the sealing ring is not pushed out of the groove and misplaced.

[0066] Since the ventilation shaft 127 adopts slot-type docking, multiple sealing rings and multi-layer sleeves are mutually inserted and piston-type sleeved, multiple grooves for installing wear-resistant elastic rings are set on the plug-type sleeve composed of three layers of cylinder walls, the outer wall of the outer cylinder, the outer wall of the middle layer, and the outer wall of the inner layer, and the three-layer sleeve is inserted into the gap of the four-layer sleeve, so that the water seal can achieve multi-layer protection, ensuring that the ventilation shaft 127 has a long service life. This involves the issue of how to place the rubber ring. First, the four-layer sleeve is welded to the hollow disc-type ball head base; one end of the three-layer sleeve located in the middle layer is welded to the other ball head base, and the inner and outer sleeves are both fastened and pressed with the ball head base using movable bolts, the outer ring is pressed with the outer circumference of the bolt, and the inner ring is also pressed with the inner circumference of the bolt. Before crimping with circumferential bolts, each wear-resistant elastic ring should be installed in each reserved sealing ring groove, and lubricating oil should be added. Small air holes and lubricating oil filling holes should be reserved on the wall of the socket sleeve to prevent air suffocation during insertion and the sealing ring will not be pushed out of the sealing ring groove by gas. After insertion, a multi-layer shock-absorbing sealing rubber sleeve 133 is installed on the outer wall of the ventilation shaft 127. The two ends of the sealing rubber sleeve are sealed with clamps or sealants to isolate the piston from water in the movable stroke and protect the piston stroke section. Limiting, connecting ropes and shock-absorbing hydraulic limiting devices are installed on the outer walls of the upper and lower sleeves. A sliding groove stroke limiting device can also be installed. Shock-absorbing springs are placed in the upper and lower sleeves to prevent the two sleeves from colliding and damaging each other during transportation, installation, and mutual insertion.

[0067] When assembling with the tunnel, the ventilation opening of the tunnel is first sealed with a partition, and after the ventilation shaft 127 and the tunnel are completely assembled, the partition is removed.

[0068] At the same vertical position on the outer wall of the upper cylinder assembly 130 and the lower cylinder assembly 131 of the ventilation shaft 127, a shock-absorbing hydraulic base is installed. Figure 5 As shown, the shock-absorbing hydraulic base is provided with an adjusting pulley, and the cable is placed on the adjusting pulley to adjust the cable length and the telescopic distance of the shock-absorbing hydraulic base, and then lock it; in addition, a compression spring is also provided at the bottom of the interlayer groove in the gap between the upper cylinder assembly 130 and the lower cylinder assembly 131, which is used to provide elastic support to achieve a shock-absorbing support effect.

[0069] In the piston travel section of the shaft, a shock-absorbing, dust-proof and waterproof sealing rubber sleeve is installed on the outer wall of the shaft, and the two ends of the sealing rubber sleeve are firmly connected with locking hoops. Lubricating grease can be injected into the rubber sleeve, which is not only waterproof and anti-mud and sand, but also provides lubrication for the piston.

[0070] like Figure 7 As shown, the water surface emergency rescue platform 126 is a cubic closed pontoon that floats on the water surface and is hollow inside. Connecting ears are set at the upper and lower four corners of the pontoon, which are connected and fixed to the vertical piers 112 on both sides of the tunnel through cables. If conditions permit, four piers above the water surface can be built separately for it to fix the rescue platform floating on the water surface and the vertical shaft on the rescue platform. The bottom of the pontoon is connected to the underwater buffer balance device 121 for control. A channel with the same diameter as the ventilation shaft 127 is hollowed out in the middle of the cubic rescue platform 126. The channel is connected to the hollow ball-head base at the bottom of the platform, and then connected to the vertical shaft, serving as a channel for ventilation of the tunnel or transferring items from the tunnel. The channel is sealed and connected to the pontoon cavity of the rescue platform 126.

[0071] In order to ensure that the surface emergency rescue platform 126 is not disconnected from the tunnel body 102, a certain distance must be maintained at the bottom of the rescue platform 126 and the outside of the shaft. Therefore, scissor racks 134 are installed around the four sides to connect with the tunnel, and the travel of the scissor racks 134 is limited to ensure reliable connection between the shaft and the tunnel.

[0072] A transfer passage is built in the ventilation shaft 127 between the emergency rescue platform 126 and the tunnel, and adopts a rail-type automated and intelligent freight elevator for transfer. It can be constructed with reference to the vertical and horizontal elevator modes. The transferred personnel and items are picked up by surface vessels.

[0073] In the actual manufacturing process, the suspended position of the suspended tunnel near the shore first meets the navigation of surface ships and does not affect the passage of submarines underwater. If the depth of the water area permits, the suspended tunnel is suspended below 30 meters above the water surface, which can effectively avoid the impact of the bottom of the ship on the waterway on the tunnel body 102; if the suspended tunnel is suspended within 30 meters below the water surface, it is necessary to consider setting up a suspended weir-type isolation zone on the water surface on both sides of the suspended tunnel to indicate that passing ships are not allowed to approach, and install early warning radars, expulsion water guns, early warning lighthouses, automatic water gun expulsion components and laser irradiation components on the isolation zone for safety protection. The radar, lighthouse and cofferdam are fixed by chains connected to the vertical pier 112, and an underwater buffer balance device 121 can also be set at the bottom of the above-mentioned radar, lighthouse and cofferdam to maintain balance.

[0074] In addition, after a single set of tunnel bodies 102 enters the water, the vertical piers 112 are fully utilized for support, and cross-shore cables 125 are arranged at the upper, middle and lower positions of the vertical piers 112. Two cross-shore cables 125 are arranged above the tunnel body 102. In the position where there are vertical piers 112, the tunnel body 102 is fixed on the vertical piers 112. In the position where there are no vertical piers 112, the tunnel body 102 is hung on the cross-shore cables 125 and locked and fixed.

[0075] The connection between the vertical pier 112 and the tunnel body 102 is achieved by various high-strength cables. From the cross-section of the tunnel body 102, Figure 3 As shown, the tunnel body 102 is fixed in a cross-shaped manner. Specifically, the tunnel body 102 is first fixed to the piers on both sides by horizontal straight pulling of cables. Then, the upper and lower corners of the tunnel body 102 on both sides are connected to the piers by upward hanging and downward oblique pulling of cables in places where there are vertical piers 112. The places without vertical piers 112 are connected to the cross-shore cables 125 passing through the vertical piers 112. The cables between the upper part of the short axis of the tunnel body 102 and the two vertical piers 112 and the nodes of the cross-shore cables 125 are vertically pulled. Two cross-shore cables 125 are installed above the two short axis positions of the tunnel. Then, the underwater buffer balance device 121 in the deep water area is connected to the vertical piers 112 or the cross-shore cables 125 on both sides by horizontal straight pulling of cables. All cables connected to the tunnel body 102 have corresponding hanging ears evenly arranged on the outer wall of the tunnel. All cables connected to the vertical piers 112 have pulley blocks. The cables are passed through the pulleys embedded in the piers, and then passed around the pulley blocks with hydraulic support arms on the outside of the piers. Then, the cables are passed around the pulley blocks embedded in the middle of the piers, and finally connected to the hanging ears at the lower part of the same side of the tunnel body 102. Adjust the length of the cable and lock it, adjust the length of the hydraulic support arm, tighten and lock it, and use the same method to fix the connection between the other side of the tunnel body 102 and the piers; specifically, if Figure 2As shown, there are 10 cross-shore cables, of which 8 cables pass through the piers on both sides, 4 on each side, and 2 above the tunnel. The lowest cable on both sides is used to fix the underwater buffer balance device.

[0076] The connection method of the upper suspension cable and the lower inclined cable on the side of the tunnel body 102 is similar to the connection method of the transverse straight cable.

[0077] Each group of tunnel bodies 102 is connected according to the above method, so that the suspended tunnel is firmly fixed on the two rows of vertical piers 112 on both sides of the tunnel body 102 through the connection of cables, so as to ensure that the suspended tunnel has a certain rigidity in both horizontal and vertical directions.

[0078] The suspended tunnel appears to have a certain rigidity locally, but has a certain flexibility as a whole, because each group of tunnel bodies 102 has a buffer spring at the connection part, and the lateral force is supported by a shock absorbing system consisting of a pulley block and a hydraulic support arm. Therefore, the flexibility of the tunnel body 102 reserves a buffer space to resist a large-force impact. During construction, a sufficient lateral distance is reserved between the tunnel body 102 and the vertical pier 112 to ensure the swing amplitude of the tunnel body 102. If the tunnel body 102 and the vertical pier 112 are too close and there is not enough swing space, the suspended tunnel will collide with the pier, which is not conducive to the safety of the tunnel body 102.

[0079] During the construction process, the cross-shore cable 125 on the suspended tunnel needs to be traction-installed by setting up guide cables. The guide cables are divided into two levels. One is to facilitate construction and improve work efficiency, and the other is to maximize the protection of high-strength cables to avoid being pulled when the high-strength cables are inserted.

[0080] After the tunnel body 102 enters the water, it is much easier to pass the cross-shore cable 125 through the cable hole 110 of the tunnel body 102 on land than to pass the cross-shore cable 125 in water. In order to improve the cable passing efficiency, a small section of guide cable is passed through the cable hole 110 on the shore in advance. This is a primary guide cable, which is divided into an A end and a B end. Its length is longer than a single set of tunnel bodies 102. After passing through the tunnel body 102, the cable noses are exposed respectively. The cable holes 110 of all tunnel bodies 102 are passed through the primary guide cable on the shore, and the cable noses are exposed (not shown in the figure).

[0081] The length of the secondary guide cable is consistent with that of the entire tunnel. First, the A end of the secondary guide cable is fixed on the anchor cable wall on the bank. Starting from the first tunnel section on the bank, the B end of the secondary guide cable is connected to the A end of the primary guide cable that has been penetrated into the tunnel wall. The primary guide cable is pulled out from the other end of the tunnel section, and the secondary guide cable is led out. The secondary guide cable is inserted into the opposite bank section by section in turn and anchored on the anchor wall on the opposite bank, providing a gathering and straightening effect on the tunnel body 102, providing prerequisites for positioning the tunnel body 102 and pre-tensioning it. Positioning spring bolts are installed on adjacent tunnel bodies 102, and they are pre-tightened section by section. The position of each tunnel body 102 is adjusted, and the secondary guide cables are replaced with high-strength cross-shore cables 125 for fastening and anchoring. The sealing bolts are further adjusted to meet the standard (not shown in the figure).

[0082] In addition, during the operation of trains inside the suspended tunnel, although the suspended tunnel has taken a variety of stabilization measures, due to the interference of various factors, the suspended tunnel will drift with the flow, and the trains running in the tunnel will also be at risk of derailment. In addition to reducing the speed of the train, the track needs to be modified, such as Figure 6 As shown, an inwardly inclined slope is arranged on the track in the tunnel so that the train wheels always run along the ruts to prevent the train from going off the track, derailing or overturning.

[0083] Oil filling holes and vent holes (not shown) are provided between adjacent elastic rings on the cylinder wall. Shock-absorbing buffer springs are set in the slots. To increase the connection between adjacent tunnel sections, elastic rods are added at the joints of the vertical partition walls of the two tunnel sections to strengthen the connection. Waterway entrances are reserved on both sides of the road and railway pavement to collect liquid leaking from the storage tank during the transportation of fluids.

[0084] On the other hand, the ventilation shaft can be connected in series with multiple ball-head connections to provide sufficient movable buffer space between the shaft and the tunnel body.

[0085] In order to improve the efficiency of emergency rescue and minimize the occupation of tunnel space, tracks for multifunctional intelligent robots to patrol back and forth are laid on the edges of the road surface on both sides of the highway channel 108 in the tunnel, and tracks are installed on the side walls of the tunnel for the intelligent robots to patrol, detect, automatically warn and notify, fire rescue, and first aid along the track. Track flatbed transportation, robotic arm hoisting, patrol monitoring and recording, public security prevention, air quality, traffic flow monitoring and analysis, control, disease detection, perception and warning can also be automatically climbed and transported along the shaft channel in the ventilation shaft 127. They can be stacked at ordinary times and unfolded when something happens. Multi-axis universal demolition equipment, robotic arms, etc. can arrive within three minutes of an incident. They can also be set up with the shaft as the center and run in opposite directions at both ends (not shown in the figure).

[0086] In order to prevent tunnel collapse and water seepage, and to protect the safety of people and vehicles in the tunnel without water ingress to the greatest extent, hidden emergency isolation doors 136 are set on the road surface in the tunnel on both sides of the highway, such as Fig. 9 As shown, the emergency isolation door 136 is similar to the cross-sectional shape of the tunnel. It is usually used as a road surface. When a collapse-type water seepage accident occurs, the hidden emergency isolation door 136 pops up quickly, fits and closes the tunnel, and connects with the locking mechanism at the upper part of the tunnel to form a separation wall to prevent water seepage from affecting other things. The isolation door is made of steel plate, and the bottom edge of the steel plate is a door hinge-type rotating shaft 137, which is fixed to the tunnel body and firmly connected. The back of the door is a hydraulic top connecting rod 138, which is driven by a servo motor. The servo motor is composed of an automatic sensing and analysis module. Note that the top of the tunnel where the hidden isolation door is installed, the space inside the insulation steel plate, and the sewer space under the road surface are separated by vertical partitions to prevent water flow from intermingling.

[0087] Various detectors and sensors are installed at locations that affect the safe operation of the tunnel, such as hydraulic support pressure sensors, cable tension sensors, tunnel section displacement sensors, water seal sensors, impact sensors, tunnel bottom water permeability sensors, water level sensors, and water flow velocity detection instruments outside the tunnel. An intelligent monitoring and management system (not shown in the figure), an automated drainage system, and an automated fire-fighting system are established to ensure the safe and stable operation of the suspended tunnel.

[0088] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A water-spanning suspended tunnel, characterized in that: It comprises anchor cable wall foundations (101) respectively arranged on the coasts on both sides of the water area, and a plurality of mutually connected tunnel bodies (102) are arranged between two groups of anchor cable wall foundations (101); A tunnel entrance and exit is arranged in the middle of the anchor cable wall foundation (101), a plurality of connecting cables (103) are evenly arranged on the outer peripheral side wall of the tunnel entrance and exit, and an elastic mounting rod (104) is arranged between two adjacent connecting cables (103); A plurality of groups of through-going cable holes (110) are evenly arranged on the side walls of any group of the tunnel bodies (102), and a positioning connection hole (111) is arranged between two adjacent groups of the cable holes (110); One end of each of the connecting cables (103) is arranged on the side wall of the peripheral anchor cable wall of the tunnel entrance on one coast, and the other end of each of the connecting cables (103) is arranged on the side wall of the peripheral anchor cable wall of the tunnel entrance on the other coast after sequentially passing through the cable holes (110) of the plurality of tunnel bodies (102); The elastic mounting rod (104) is also arranged in the positioning connection hole (111) between two adjacent groups of the tunnel bodies (102), and the connection end between the tunnel body (102) and the tunnel entrance and exit is also arranged with the elastic mounting rod (104); Each group of the tunnel bodies (102) is symmetrically provided with vertical piers (112) on both sides, the bottom of each group of the vertical piers (112) is inserted into the seabed, the outer sides of the two groups of the vertical piers (112) are provided with grounded No. 1 inclined cables (113), a No. 1 transverse cable (114) is provided between the tops of the two groups of the vertical piers (112), and two groups of No. 2 inclined cables (115) and two groups of No. 2 transverse cables (116) are symmetrically provided on the outer side walls on both sides of the tunnel body (102).

2. The cross-water floating tunnel according to claim 1, characterized in that: The outer side walls of the two groups of vertical piers (112) are both provided with a first pulley block (117) and a second pulley block (118) at the same height, the middle part of the second transverse cable (116) is arranged on the first pulley block (117), the end of the second transverse cable (116) is arranged on the outer side wall of the tunnel body (102), the end of the second inclined cable (115) is arranged on the outer side wall of the tunnel body (102), and the middle part of the second inclined cable (115) is arranged on the second pulley block (118).

3. The cross-water floating tunnel according to claim 1, characterized in that: An underwater connecting beam (119) is arranged downward on the outer side wall of the bottom of the tunnel body (102); one end of a No. 3 transverse cable (120) is arranged on both sides of the underwater connecting beam (119); the other end of the No. 3 transverse cable (120) is arranged on the vertical pier (112); an underwater buffer balancing device (121) is arranged at the bottom of the underwater connecting beam (119).

4. The cross-water floating tunnel according to claim 3, characterized in that: The underwater buffer balancing device (121) comprises at least one group of cross-shaped mounting beams (122), each group of the mounting beams (122) is provided with axles (123) inclined at multiple angles, the middle of each group of axles (123) is fixed on the mounting beams (122), and impellers (124) are symmetrically arranged at both ends of each group of axles (123).

5. The cross-water floating tunnel according to claim 1, characterized in that: A roadbed (105) is provided at the inner bottom of the tunnel entrance and the tunnel body (102); two groups of channel partition walls (106) are provided on the top of the roadbed (105); a railway channel (107) is provided between the two groups of channel partition walls (106); a highway channel (108) is provided outside the two groups of channel partition walls (106); and elastic mounting rods (104) are also provided at the connecting ends of the channel partition walls (106) inside two adjacent groups of tunnel bodies (102).

6. The cross-water floating tunnel according to claim 5, characterized in that: A specially made special-shaped railway track (109) is arranged at the bottom of the railway passage (107).

7. The cross-water floating tunnel according to claim 2, characterized in that: It also includes a plurality of groups of cross-shore cables (125), one end of each group of the cross-shore cables (125) is arranged on the anchor cable wall foundation (101) on one side of the coast, and the other end of each group of the cross-shore cables (125) passes through each group of the vertical piers (112) in sequence and is then arranged on the anchor cable wall foundation (101) on the other side of the coast.

8. The cross-water floating tunnel according to claim 1, characterized in that: It also includes a rescue platform (126) and a ventilation shaft (127), wherein the rescue platform (126) is connected to the tunnel body (102) through the ventilation shaft (127).

9. The cross-water floating tunnel according to claim 8, characterized in that: An upper ball head (128) is arranged at the top of the ventilation shaft (127), and a lower ball head (129) is arranged at the bottom of the ventilation shaft (127). The ventilation shaft (127) comprises an upper cylinder assembly (130) and a lower cylinder assembly (131), and the upper cylinder assembly (130) is movably inserted at the top of the lower cylinder assembly (131).

10. The cross-water floating tunnel according to claim 9, characterized in that: The upper cylinder assembly (130) comprises an upper insert inner cylinder, an upper insert middle cylinder and an upper insert outer cylinder, and the lower cylinder assembly (131) comprises a lower insert inner cylinder, a lower insert middle cylinder and a lower insert outer cylinder, and the contact surfaces of the upper insert inner cylinder and the lower insert inner cylinder, the contact surfaces of the upper insert middle cylinder and the lower insert middle cylinder, and the contact surfaces of the upper insert outer cylinder and the lower insert outer cylinder are all provided with wear-resistant elastic rings; The rescue platform (126) and the tunnel body (102) are both provided with a ball head slot base (132), and the upper ball head (128) and the lower ball head (129) are both inserted into the ball head slot base (132).

11. The cross-water floating tunnel according to claim 1, characterized in that: A plurality of hidden emergency isolation doors are arranged on the road surface of the highway passage (108) inside each group of the tunnel bodies (102); the emergency isolation doors are laid flat in installation grooves on the road surface of the highway passage (108); and the bottom edges of the isolation doors are hingedly fixed to the hinge shafts of the tunnel bodies.